gate valve - installation, operation & mantainance manual

11
PREPAR FORMAT 1.0 GE It i re ma Ca DE a) b) 1.1 RE 2.0 HE 2.1 W a.) b.) c.) ins d.) e.) cir wi f.) ha g.) pa h.) or fitt ED BY : D.K T NO :0401 ENERAL is recommen pair. Only co aximum life. amtech shall ESIGN COND Valves are force in ex Earthquak Valve are presents p ESPONSIBILIT Due to the to ensure product fo of the pre process is specific ef service life Wa property d EALTH AND S When installin ) Conduct a r ) Work in acc ) Observe all structions on ) Valve shall ) Certain pro rcumstances th that med When opera ands/skin due ) When oper arts. ) If the proce low) that m ted. INST M 1F12 REV. nded that thi orrect installa not accept a DITION designed an xcess of gravi e. intended for please get the TY FOR VALV e variety of d the compati or each speci ssure contai solely the re ffects that th e and ensure arning: The u damage. SAFETY ng and main risk assessme cordance wit site health a n occupation only be oper ocesses utilize to ensure th ia. ating manua e to high tem rating any va ess or enviro ay cause inju TALLATIO MAINTEN GA CHECK NO: 00 DA is entire doc ation, mainte any liability if nd manufact ity is applied r clean fluid e recommen VE SELECTIO duties on wh ibility of the ific applicatio ning parts. C esponsibility he process m e that the sel user is advise taining valve ent and elim th safe syste and safety ru nal health an rated by per e flammable hat the opera l valves, glov mperature/ l alve stand cle onments that ury to person ON, OPER NANCE M ATE VALV KED BY : KMP ATE:0102ument shall enance and f the instruct ured to be in d in any direc without any ndation for s ON AND APPL ich the prod media with t on (i.e. corro Camtech ma of plant des edia will hav lected mater ed that misap es minate or red ms of work. ules, and in c d safety and sonnel quali e, Caustic or ator is aware ves should b ow tempera ear of any m t the produc nnel if touch RATION A MANUAL VE P 2012 be read prio operation w tions set fort nstalled in ap ction. This 1g specific corr uch applicat LICATION duct can be e the valve rat osion, erosio ay offer sugge signers. Plan ve on the val rial is corresp pplication of uce hazards. conformity w prevention fied by train unstable me e of the spec e worn to m ture valve bo moving parts s cts are used i ed, then ade AND DOC REV DAT PAG APP or to proceed ill ensure sm th in this ma pplications w g force can b rosive, chem ion if abrasio employed, it ting and mat n and wear w estions in th nt designers s ve wall thick ponding with f the product . with the legal of accidents ing/experien edia. Care sho cific health a inimize the r ody. such as the s in are likely t equate insula C NO CAM V. NO 00 TE 150 GE NO 1 O ROVED BY : G ding with the mooth valve o nual are not where no mo be an effect o mical attack o on presents. is the end us terials of con which may a e selection b should take kness and co h the proces t may result l local compa s nce. ould be take nd safety ris risk of injury stem and/ or to cause tem ation/protec MTS0030 022012 OF 11 GMR e installation operation an t complied w ore than 1g o of traffic, win or abrasion sers respons nstruction of affect the int but the selec into account orresponding s media. in injuries or any specific en in these ks associated to the r operator m mperatures (h ction must be n or nd with. of nd or sibility the egrity ction t the g r d moving high e

Upload: n-p-srinivasarao

Post on 07-Nov-2015

11 views

Category:

Documents


8 download

DESCRIPTION

Installation & Operation manual for Valves

TRANSCRIPT

  • PREPAR

    FORMAT

    1.0 GEItirema

    CaDEa)

    b)

    1.1 RE

    2.0 HE2.1 W

    a.)b.)c.)insd.)e.)cirwif.)hag.)pah.)orfitt

    EDBY:D.KTNO:0401

    ENERALisrecommenpair.Onlycoaximumlife.

    amtechshallESIGNCONDValvesareforceinexEarthquakValvearepresentsp

    ESPONSIBILITDuetothetoensureproductfoofthepreprocessisspecificefservicelife

    Wapropertyd

    EALTHANDSWheninstallin)Conductar)Workinacc)Observeallstructionson)Valveshall)CertainprorcumstancesththatmedWhenopera

    ands/skindue)Whenoperarts.)Iftheprocelow)thatmted.

    INSTM

    1F12REV.

    ndedthatthiorrectinstalla

    notaccepta

    DITIONdesignedanxcessofgravie.intendedforpleasegettheTYFORVALVevarietyofdthecompatioreachspecissurecontaisolelythereffectsthattheandensurearning:Theudamage.SAFETYngandmainriskassessmecordancewitsitehealthanoccupationonlybeoper

    ocessesutilizetoensurethia.atingmanuaetohightemratinganyvaessorenviroaycauseinju

    TALLATIOMAINTEN

    GA

    CHECK

    NO:00DA

    isentiredocation,mainte

    anyliabilityif

    ndmanufactityisappliedrcleanfluiderecommenVESELECTIOdutiesonwhibilityoftheificapplicationingparts.Cesponsibilityheprocessmethattheseluserisadvise

    tainingvalveentandelimthsafesysteandsafetyrunalhealthanratedbypereflammablehattheoperalvalves,glovmperature/lalvestandcleonmentsthaturytoperson

    ON,OPERNANCEMATEVALV

    KEDBY:KMPATE:0102

    umentshallenanceand

    ftheinstruct

    uredtobeindinanydirecwithoutanyndationforsONANDAPPLichtheprodmediawithton(i.e.corroCamtechmaofplantdesediawillhavlectedmateredthatmisap

    esminateorredmsofwork.ules,andincdsafetyandsonnelqualie,Causticoratorisawarevesshouldbowtemperaearofanymttheproducnneliftouch

    RATIONAMANUALVE

    P2012

    bereadpriooperationw

    tionssetfort

    nstalledinapction.This1gspecificcorruchapplicatLICATIONductcanbeethevalveratosion,erosioayoffersuggesigners.Planveonthevalrialiscorresppplicationof

    ucehazards.conformitywpreventionfiedbytrainunstablemeeofthespeceworntomturevalvebo

    movingpartssctsareusedied,thenade

    AND DOCREV

    DAT

    PAG

    APP

    ortoproceedillensuresm

    thinthisma

    pplicationswgforcecanbrosive,chemionifabrasio

    employed,ittingandmatnandwearwestionsinthntdesignerssvewallthickpondingwithftheproduct

    .withthelegalofaccidentsing/experienedia.Careshocifichealthainimizetherody.suchasthesinarelikelytequateinsula

    CNO CAMV.NO 00TE 150GENO 1O

    ROVEDBY:G

    dingwiththemoothvalveo

    nualarenot

    wherenomobeaneffectomicalattackoonpresents.

    istheendusterialsofconwhichmayaeselectionbshouldtakeknessandcohtheprocestmayresult

    llocalcompasnce.ouldbetakendsafetyrisriskofinjurystemand/ortocausetemation/protec

    MTS0030

    022012OF11

    GMR

    einstallationoperationan

    tcompliedw

    orethan1gooftraffic,winorabrasion

    sersresponsnstructionofaffecttheintbuttheselecintoaccountorrespondingsmedia.ininjuriesor

    anyspecific

    enintheseksassociatedtotheroperatormmperatures(hctionmustbe

    nornd

    with.

    ofndor

    sibilitytheegrityctionttheg

    r

    d

    movinghighe

  • PREPAR

    FORMAT

    injen

    obfro

    3.0 PR3.1 Al

    traenarimre

    1. 2.

    4.0 STa.)

    b.)c.)

    EDBY:D.KTNO:0401

    Warninjuryanddamnvironment

    WarningbservanceofomfluidleakRESERVATIOlvalvesarepansportationndsbothflanreappropriatmpacts,andvespectingthe

    DonotliftCautionmoveranyoregulation

    TORAGE) Storethevremainint

    ) Donotpla) Donotexp

    INSTM

    1F12REV.

    ng:Nonobsemagetothev

    g:Donotexcthiswarningkage(cold,hN,SHIPMENproperlypacnandstoragengedandbuttetoensurevibration.Dueloadcapaci

    thevalvethustbetakenothersplacewsmustbefo

    valveinclosetheiroriginacetheconsiposeconsign

    TALLATIOMAINTEN

    GA

    CHECK

    NO:00DA

    rvanceofsavalvesordam

    ceedthemagmaycausehottoxic,undNTANDHANckedinordereonsite.Thttweldendssafetranspouringhandlintyasapprop

    roughhandnduringthehwhereaposollowed.

    eddryroomslprotectivegnmentpacknmentpackag

    ON,OPERNANCEMATEVALV

    KEDBY:KMPATE:0102

    fetyinstructmagetothe

    aximumoperpersonneliderpressureDLINGrtoprotectthevalvesaresareprotecteortation,pronguseappropriate.

    wheel,eyebhandlingtoasiblefallcou

    sonsolidgropackings.kagesdirectlgestothew

    RATIONAMANUALVE

    P2012

    tionsandwaequipmenta

    ratingconditnjuryandda)andimpair

    thepartsthaepackedwithedwithsuitaotectthevalvopriatetools

    bolt,gearboavoidthatthuldcausedam

    oundinadirlyonthegro

    weatherordi

    AND DOCREV

    DAT

    PAG

    APP

    rningmaypandpollution

    tionsspecifieamagetoprormentofvalv

    ataresubjecththewedgeableplasticovesagainstelikebracket

    oxoractuatohisequipmenmage.Inany

    rtfreeatmosound.rectlytothe

    CNO CAMV.NO 00TE 150GENO 2O

    ROVEDBY:G

    rovokerisksnordamage

    edinthenamopertylikeinvefunction.

    ttodeteriorintheclosedorwoodencaxternalforces,hook,fast

    r.ntpassesoveycase,thelo

    sphere.Allo

    sun.

    MTS0030

    022012OF11

    GMR

    ofpersonnetothe

    meplate.Nonjuriesresult

    rationduringdposition.Vaps.Thepacessuchasener,ropes,

    ertheworkeocalsafety

    owthevalves

    el

    oning

    gValveckingetc.

    ersor

    sto

  • PREPAR

    FORMAT

    d.)e.)f.)

    5.0 MAVa

    6.0 IN

    EDBY:D.KTNO:0401

    ) Checkthe) ChecktheRepairthe

    ARKINGalvesarepro

    STALLATION

    INSTM

    1F12REV.

    WRONG IN

    paintcoatinpackagingevprotectivec

    videdwith1

    N

    TALLATIOMAINTEN

    GA

    CHECK

    NO:00DA

    NSTALLATION

    gfordamagverytwomocoatingifnec

    1nameplate

    ON,OPERNANCEMATEVALV

    KEDBY:KMPATE:0102

    eandcorrosonths.cessary.

    RATIONAMANUALVE

    P2012

    CORR

    sionatregula

    AND DOCREV

    DAT

    PAG

    APP

    RECT INSTALL

    arintervals.

    CNO CAMV.NO 00TE 150GENO 3O

    ROVEDBY:G

    LATION

    MTS0030

    022012OF11

    GMR

  • INSTALLATION,OPERATIONANDMAINTENANCEMANUAL

    GATEVALVE

    DOCNO CAMTS0030REV.NO 00DATE 15022012PAGENO 4OF11

    PREPAREDBY:D.K CHECKEDBY:KMP APPROVEDBY:GMRFORMATNO:0401F12REV.NO:00DATE:01022012

    6.1 PREPARATIONBEFOREINSTALLATION1. Asarule,theengineeringcontractor,ConstructionCompanyoroperator/userisresponsibleforthe

    positioningandinstallationofthevalves.Planningandinstallationerrorsmayimpairthereliablefunctionofthevalvesandposeasubstantialsafetyhazard.

    2. Confirmthatthematerialsofconstructionofthevalve,andthemaximumpressure/temperaturespecifiedinthenameplatesareappropriatefortheserviceintendedandareasspecified.

    3. Thoroughlycleanadjacentpipingsystemtoremoveanyforeignmaterial,weld,piecesofwood/plastic.

    4. Verifythatthespaceavailableforinstallationisadequatetoallowthevalvetobeinstalledandtobeoperated.

    5. Cleanthoroughlytheaccessibleinteriorspacesofbodyends,surfacesandfunctionalpartsandmountingparts(stem,flangeforactuator,mountingetc.)

    6. Gatevalvescanbeinstallednormallyinhorizontalpipelineswithverticalstemandwithflowfromeitherdirection.Valvescanalsobeinstalledinverticalpipeline.

    7. Valveshallnotbeusedattheendofthepipeline.

    THEFOLLOWINGPROVISIONSSHALLBEMADEINTHEPIPELINEa) Drainingandventing.Valvesareprovidedwithbossesfordrainingandventing.Drilled,tappedand

    pluggedconnectionsfordrainingandventingareprovidedwhenrequestedbythecustomer.b) Dangerousdischargeofpressurereliefblowoff.c) Appropriatemeasureinthepipelineduetodecompositionofunstablefluidswhereexist.Operator

    shallhavethoroughknowledgeofsuchfluidsandoperatethevalveasperestablisheddocumentedinstructions.

    d) Pressurereliefvalve,whereunexpectedincreaseinpressure,waterhammerisanticipatedandallowablepressurelimitcanbeexceeded.

    e) Valvesarenotprovidedwithfillingordischarge.Suchprovisionswhererequired,shallbeprovidedinthepipeline.

    6.2 VALVEINSTALLATION1. Installthevalvewithwedgeintheclosedposition.2. Supportthevalveandadjacentpipelines,suchthatpipelinethrustandtorsionalforcesarenot

    transmittedtothevalve.

    A. FLANGEDVALVES1. Cleantheflangefacestoensurethatitisfreefromdamage.2. Thegasketsonthematingflangesareproperlycentered.Onlyfastenersandgasketsofapproved

    materialsshallbeused.Placethevalvebetweenthetwoflangesofthepipeandputthegasketbetweenthevalveflangesandthepipeflange.Makesurethatitiscorrectlypositioned.Tightentheflangeboltsprogressivelyandcrosswise.Usetorquewrenchtotightentotherequestedtorquespecifiedbythespecification.Ensurethattheflangesarestraightandalignedtothepipe.

  • PREPAR

    FORMAT

    B. BU

    Poapwcatosta

    C. VA1. 2.

    7.0 OP1. 2. 3. 4. 5.

    7.1 USGabe

    EDBY:D.KTNO:0401

    UTTWELDVositionthevappliedtotheithapprovedarbonsteelsopromotesloandards.ALVEVERIFIC

    TightenthandincreaCheckthe

    PERATIONValvesareclockwiseDonotuseposition.SubjecttheRetightenEnsuretha

    SEOFGATEVatevalvesareopened/clo

    INSTM

    1F12REV.

    VALVESalveandaligweldends.dweldingprohouldbealloowcoolinga

    CATIONBEFhepackingjuaseoperatingoperationo

    closedbytudirection.egatevalvesevalvetothallbolts/nutatthereisnoVALVESreusedforoosedslowlya

    TALLATIOMAINTEN

    GA

    CHECK

    NO:00DA

    Bo

    gnwiththepUsethesmaocedures.Thowedtocoondlimitthe

    ORESTARTstenoughtogtorque.ofthevalveb

    urningthehasforthrottlinerequiredptsincludingtoleakfromt

    noffserviceandgradually

    ON,OPERNANCEMATEVALV

    KEDBY:KMPATE:0102

    oltTightenin

    ipe.Removeallestelectrohiswillhelplslowly.Theheataffecte

    UPopreventstebystrokingit

    andwheelinngoperationpressureandthestuffingbhevalveand

    e.Gatevalveytotheposi

    RATIONAMANUALVE

    P2012

    ngSequence

    eanygreaseodesandthetominimizeevalvemayedzone.Foll

    emleakage.tofullopen

    nclockwised.Valvesshatemperaturboxgland.Cdtheoperati

    shallnotbeition.

    AND DOCREV

    DAT

    PAG

    APP

    eorprotectiveminimumawarpageinbecoveredwowASMEst

    Overtightenandfullclos

    irectionandllbeeitheriregraduallyaleananddegonissmooth

    eusedforthr

    CNO CAMV.NO 00TE 150GENO 5O

    ROVEDBY:G

    vepaintthatmperagepotheseatareawithaheatiandardsand

    ningwilldecse.

    openedbytnfullopenoandslowly.greasethesth.

    rottlingoper

    MTS0030

    022012OF11

    GMR

    tmayhavebssibleconsisas.Valvesonsulatingbladindustry

    creasepackin

    turningincoorfullclose

    tem.

    ration.Valve

    beenstentfanket

    nglife

    ounter

    shall

  • PREPAR

    FORMAT

    7.2 SHClele

    7.3 EXPeex

    8.0 MAa. PA

    Ifsto

    DothPA

    BevaFa1.2.3.4.bo5.6.7.8.9.

    b. BO

    WBevape

    EDBY:D.KTNO:0401

    HUTDOWNosethevalveectricconneXAMINATIONeriodicallyexxaminationo

    AINTENANCACKINGMAIleakageisobops.Useha

    onotovertighevalveandACKINGREPL

    WARNIeforestartingalvesarenotailuretodosOpencompRemovetheLifttheglanRemovetheore.RepackthePlacetheglTightenlighCyclethevaIftheleakag

    ODYBONNWARNING:eforestartingalvesarenotersonalinjury

    INSTM

    1F12REV.

    e.DepressuctorbeforeNOFVALVESxaminethevofshellthickn

    CEINTENANCEbservedthrolfturnincrem

    ghtenpackinreducepackLACEMENTING:ganymainteintemperatsomaycauseletelythevaenuts(19)ofndflange(12ewornoutppackingringand(11),glatlytheglandalve.Pressurgeoccurs,tig

    NETFLANGE

    ganymainteintemperatyandor/equ

    TALLATIOMAINTEN

    GA

    CHECK

    NO:00DA

    ureanddrainmaintenance

    Svalvedependnessandvalv

    oughthepacmentfortigh

    ngglandnutskinglife.

    enance,deprture.Disconneseriousperalveuptotheftheglandb)andgland(packingusinggsatatimeaandflange(1dnutizethelineghtenthegla

    GASKETMA

    enance,deprture:Disconuipmentdam

    ON,OPERNANCEMATEVALV

    KEDBY:KMPATE:0102

    n/ventallflue.Followthe

    dingontheflvecondition

    king,tightenhtening.

    s.Overtight

    ressurize,dranectanyelecrsonnelinjuryebackseatpbolt.(11)gahockingwandensureth2)intheirorandnutsslow

    AINTENANCE

    ressurize,dranectanyelemage.

    RATIONAMANUALVE

    P2012

    ids.Allowtheprocessgui

    luidconditioshallbema

    ntheglandn

    teningwillin

    ain,ventandctricalpoweryand/orequosition

    wire/otherdehattheyareriginalpositiwlyandeven

    E

    ain,ventandectricalPowe

    AND DOCREV

    DAT

    PAG

    APP

    evalvetocoidelines.

    onandcriticadedependin

    nutsslowlya

    ncreasethet

    dflushthelirsupply.uipmentdam

    evice.Cleanfittedcorreconnlyuntilthe

    dflushtheliersupply.Fa

    CNO CAMV.NO 00TE 150GENO 6O

    ROVEDBY:G

    ooldown.Re

    ality.Asaminguponthef

    ndevenlyun

    torquerequi

    newithair.Cmage.

    thestemanctlyandagai

    eleakagesto

    newithair.ailuretodos

    MTS0030

    022012OF11

    GMR

    emoveany

    nimumannufluid.

    ntiltheleaka

    redtoopera

    Checkthatth

    ndstuffingbonstthebotto

    ops.

    Checkthattsomaycause

    ual

    age

    ate

    he

    oxom.

    thee

  • PREPAR

    FORMAT

    1.2.3.4.5.6.1.

    EDBY:D.KTNO:0401

    CleantheflaPlacethegaposition.PositionallTightentheFollowthebAfterequipm

    Bolttighte

    INSTM

    1F12REV.

    angesurfaceasketinitspothestuds/nustud/nutunbolttighteninmentisinsta

    eningTorque

    TALLATIOMAINTEN

    GA

    CHECK

    NO:00DA

    eositiononthutsniformly,gradngsequencealledandpre

    e

    ON,OPERNANCEMATEVALV

    KEDBY:KMPATE:0102

    hebody.Ens

    duallyandcre.Followtheessuredtight

    RATIONAMANUALVE

    P2012

    surethatgas

    rosswire.tighteningttenonceaga

    AND DOCREV

    DAT

    PAG

    APP

    sketisnotsh

    torquegiveninallthebo

    CNO CAMV.NO 00TE 150GENO 7O

    ROVEDBY:G

    hiftedfromth

    .lts.

    MTS0030

    022012OF11

    GMR

    hecorrect

  • INSTALLATION,OPERATIONANDMAINTENANCEMANUAL

    GATEVALVE

    DOCNO CAMTS0030REV.NO 00DATE 15022012PAGENO 8OF11

    PREPAREDBY:D.K CHECKEDBY:KMP APPROVEDBY:GMRFORMATNO:0401F12REV.NO:00DATE:01022012

    Nominalboltsize(inch)

    Torque(Nm)

    Nominalboltsize(inch) Torque(Nm)

    1/2" 80 13/8" 17805/8" 160 11/2" 23003/4" 275 15/8" 30007/8" 440 13/4" 37001" 650 17/8" 4700

    11/8" 950 2" 570011/4" 1300

    2. ValveTorqueandMountingofactuator

    Thevalvetorquedependsuponmanyparameterslikesize,class,maximumoperatingpressure,frequencyofoperation,fluiddetails,viscosityandflowvelocity.Pleasecontactcamtech,whoselectstheoptimumsizeofactuatorandsupplyofmountingplatesforfieldconversion.

    8.1 PREVENTIVEMAINTENANCEAllvalvecomponentshavebeendesignedtobelargelymaintenancefree.Thematerialofthemovingpartshasbeenselectedforminimumwear.Howevermalfunctioncausedbywrongoperation,lackofmaintenanceorimproperusereducesvalvelife.Allrepairandmaintenanceworkshallbeperformedbyqualifiedpersonnelfollowingallsafetyinstructions.Maintenanceintervalsshouldbeselectedbythevalveuserincompliancewiththeapplicationcondition.

    9.0 TROUBLESHOOTINGTROUBLE POSSIBLECAUSE HOWTOELIMINATE

    Nofluidflow

    Endflangecoversnotremoved.

    Valveinclosedposition.Pipelineupstreamof

    valveisblocked.

    Openthevalve.Cleanthevalve.

    Cleanorreplacestrainer/otherblockingequipment.

    Inspectthepipeline

    FlowRatenotsufficientValveisnotfullopen.Sedimentsinsidethe

    valve.Dirtystrainer.

    Openthevalve.Cleanthevalve.

    Cleanorreplacestrainer/otherblockingequipment.

    Inspectthepipeline.

  • INSTALLATION,OPERATIONANDMAINTENANCEMANUAL

    GATEVALVE

    DOCNO CAMTS0030REV.NO 00DATE 15022012PAGENO 9OF11

    PREPAREDBY:D.K CHECKEDBY:KMP APPROVEDBY:GMRFORMATNO:0401F12REV.NO:00DATE:01022012

    Valveisleaking

    Valveisnotfirmlyclosed.Excessivedifferential

    pressure.Seatandwedgeseatfaces

    damages.Excessiveloadfromthe

    pipeline.

    Closethevalve.Checkthesystem.

    Remachine/lapseatfaces.

    Valvecannotbeoperatedoritisdifficulttoopen/close

    Operatingconditionmightbeoutsidethespecification.

    Bentshaftorthreadsdamaged

    Valvecavityclogged.

    Checktheline/Valve.

    Checkandreplaceworn/bentparts.

    10.0 VALVEDISASSEMBLYANDASSEMBLY

    VALVEDISASSEMBLYFollowthefollowingstepstodisassemblethevalve.A. BONNETASSEMBLY

    1.Loosenandremovestud(16,17)2.Liftthebonnetassembly(02)fromthebody3.Removethebonnetgasket(15)

    B.WEDGE(03)1.Removethewedgefromthestem(06)

    C.STEM1.Removethehandwheelnut(09)bylooseninginanticlockwisedirections2.Removethehandwheel(10)fromthestemnut(07)3.Removethestemnutretainernut(08)fromthebonnet4.Removethestemnutfromstembyturningclockwisedirection5.Loosentheglandnut(19)andpullthestemfromdownsideandremoveit.

    VALVEASSEMBLYFollowreversesequenceofdisassemblyandassemblethevalve

    11.0 GREASESANDSPECIALTOOLSThefollowinggreasesorequivalentothermakecanbeusedforbearing/stem/nut/gearboxes/stemBEACON2ESSO,MOBILELUXEP2MOBL,ALVANIAR2SUPERGREASESHELL,MULTIFAKEP2GREASE,TEXACOSPECIALTOOLNoSpecialtoolisrequiredforthemaintenance.

    12. RECOMMENDEDSPARES

  • PREPAR

    FORMAT

    EDBY:D.KTNO:0401

    GlandpacBonnetgaNote:Onl

    ForExplos1.0 Max

    Valvdonfluid

    INSTM

    1F12REV.

    king(14)asket(15)lyCamtechs

    siveatmosphximumSurfaesdonotgenotdependsdtemperatur

    TALLATIOMAINTEN

    GA

    CHECK

    NO:00DA

    suppliedspar

    here,followceTemperaenerateeneruponthevareislimiteda

    ON,OPERNANCEMATEVALV

    KEDBY:KMPATE:0102

    resshallbeu

    wingprecautituregy/temperalve,butontasperASME

    RATIONAMANUALVE

    P2012

    used

    ions/measur

    atureonitsoheoperatingEB16.34.Ho

    AND DOCREV

    DAT

    PAG

    APP

    resshallbet

    own.Themagfluidconditoweverforex

    CNO CAMV.NO 00TE 150GENO 10

    ROVEDBY:G

    taken.

    aximumsurfation.Themaxplosiveatm

    MTS0030

    022012OF11

    GMR

    acetemperaaximumopermosphere,wh

    atureratinghere

  • INSTALLATION,OPERATIONANDMAINTENANCEMANUAL

    GATEVALVE

    DOCNO CAMTS0030REV.NO 00DATE 15022012PAGENO 11OF11

    PREPAREDBY:D.K CHECKEDBY:KMP APPROVEDBY:GMRFORMATNO:0401F12REV.NO:00DATE:01022012

    thesurfacetemperatureduetooperatingfluidispotentialsourceofexplosion,provideinsulation/otherappropriatemeasures.

    2.0 ProjectedstemEnsurethattheprojectedstemdonottouchanypipingorotherpartthatcancreatespark.

    3.0 BearinglubricationBearingsareslowmovingpartsanddonotrequirelubrication.Howeverlubricationisprovidedforsmoothoperation.

    4.0 DustdepositRemovedustatregularintervalsforexplosiveatmosphere.Ensurethatdustisnotpresentinthegapsandoutsidesurfacestoexcludethepossibilityofexplosion.Ensurethatthesurroundingsarecleanandnoexternalpartfallonthesurface.

    5.0Valvesarenotprovidedwithanyopeningorenclosureforexplosionprevention.