gate valve - installation, operation & mantainance manual
DESCRIPTION
Installation & Operation manual for ValvesTRANSCRIPT
-
PREPAR
FORMAT
1.0 GEItirema
CaDEa)
b)
1.1 RE
2.0 HE2.1 W
a.)b.)c.)insd.)e.)cirwif.)hag.)pah.)orfitt
EDBY:D.KTNO:0401
ENERALisrecommenpair.Onlycoaximumlife.
amtechshallESIGNCONDValvesareforceinexEarthquakValvearepresentsp
ESPONSIBILITDuetothetoensureproductfoofthepreprocessisspecificefservicelife
Wapropertyd
EALTHANDSWheninstallin)Conductar)Workinacc)Observeallstructionson)Valveshall)CertainprorcumstancesththatmedWhenopera
ands/skindue)Whenoperarts.)Iftheprocelow)thatmted.
INSTM
1F12REV.
ndedthatthiorrectinstalla
notaccepta
DITIONdesignedanxcessofgravie.intendedforpleasegettheTYFORVALVevarietyofdthecompatioreachspecissurecontaisolelythereffectsthattheandensurearning:Theudamage.SAFETYngandmainriskassessmecordancewitsitehealthanoccupationonlybeoper
ocessesutilizetoensurethia.atingmanuaetohightemratinganyvaessorenviroaycauseinju
TALLATIOMAINTEN
GA
CHECK
NO:00DA
isentiredocation,mainte
anyliabilityif
ndmanufactityisappliedrcleanfluiderecommenVESELECTIOdutiesonwhibilityoftheificapplicationingparts.Cesponsibilityheprocessmethattheseluserisadvise
tainingvalveentandelimthsafesysteandsafetyrunalhealthanratedbypereflammablehattheoperalvalves,glovmperature/lalvestandcleonmentsthaturytoperson
ON,OPERNANCEMATEVALV
KEDBY:KMPATE:0102
umentshallenanceand
ftheinstruct
uredtobeindinanydirecwithoutanyndationforsONANDAPPLichtheprodmediawithton(i.e.corroCamtechmaofplantdesediawillhavlectedmateredthatmisap
esminateorredmsofwork.ules,andincdsafetyandsonnelqualie,Causticoratorisawarevesshouldbowtemperaearofanymttheproducnneliftouch
RATIONAMANUALVE
P2012
bereadpriooperationw
tionssetfort
nstalledinapction.This1gspecificcorruchapplicatLICATIONductcanbeethevalveratosion,erosioayoffersuggesigners.Planveonthevalrialiscorresppplicationof
ucehazards.conformitywpreventionfiedbytrainunstablemeeofthespeceworntomturevalvebo
movingpartssctsareusedied,thenade
AND DOCREV
DAT
PAG
APP
ortoproceedillensuresm
thinthisma
pplicationswgforcecanbrosive,chemionifabrasio
employed,ittingandmatnandwearwestionsinthntdesignerssvewallthickpondingwithftheproduct
.withthelegalofaccidentsing/experienedia.Careshocifichealthainimizetherody.suchasthesinarelikelytequateinsula
CNO CAMV.NO 00TE 150GENO 1O
ROVEDBY:G
dingwiththemoothvalveo
nualarenot
wherenomobeaneffectomicalattackoonpresents.
istheendusterialsofconwhichmayaeselectionbshouldtakeknessandcohtheprocestmayresult
llocalcompasnce.ouldbetakendsafetyrisriskofinjurystemand/ortocausetemation/protec
MTS0030
022012OF11
GMR
einstallationoperationan
tcompliedw
orethan1gooftraffic,winorabrasion
sersresponsnstructionofaffecttheintbuttheselecintoaccountorrespondingsmedia.ininjuriesor
anyspecific
enintheseksassociatedtotheroperatormmperatures(hctionmustbe
nornd
with.
ofndor
sibilitytheegrityctionttheg
r
d
movinghighe
-
PREPAR
FORMAT
injen
obfro
3.0 PR3.1 Al
traenarimre
1. 2.
4.0 STa.)
b.)c.)
EDBY:D.KTNO:0401
Warninjuryanddamnvironment
WarningbservanceofomfluidleakRESERVATIOlvalvesarepansportationndsbothflanreappropriatmpacts,andvespectingthe
DonotliftCautionmoveranyoregulation
TORAGE) Storethevremainint
) Donotpla) Donotexp
INSTM
1F12REV.
ng:Nonobsemagetothev
g:Donotexcthiswarningkage(cold,hN,SHIPMENproperlypacnandstoragengedandbuttetoensurevibration.Dueloadcapaci
thevalvethustbetakenothersplacewsmustbefo
valveinclosetheiroriginacetheconsiposeconsign
TALLATIOMAINTEN
GA
CHECK
NO:00DA
rvanceofsavalvesordam
ceedthemagmaycausehottoxic,undNTANDHANckedinordereonsite.Thttweldendssafetranspouringhandlintyasapprop
roughhandnduringthehwhereaposollowed.
eddryroomslprotectivegnmentpacknmentpackag
ON,OPERNANCEMATEVALV
KEDBY:KMPATE:0102
fetyinstructmagetothe
aximumoperpersonneliderpressureDLINGrtoprotectthevalvesaresareprotecteortation,pronguseappropriate.
wheel,eyebhandlingtoasiblefallcou
sonsolidgropackings.kagesdirectlgestothew
RATIONAMANUALVE
P2012
tionsandwaequipmenta
ratingconditnjuryandda)andimpair
thepartsthaepackedwithedwithsuitaotectthevalvopriatetools
bolt,gearboavoidthatthuldcausedam
oundinadirlyonthegro
weatherordi
AND DOCREV
DAT
PAG
APP
rningmaypandpollution
tionsspecifieamagetoprormentofvalv
ataresubjecththewedgeableplasticovesagainstelikebracket
oxoractuatohisequipmenmage.Inany
rtfreeatmosound.rectlytothe
CNO CAMV.NO 00TE 150GENO 2O
ROVEDBY:G
rovokerisksnordamage
edinthenamopertylikeinvefunction.
ttodeteriorintheclosedorwoodencaxternalforces,hook,fast
r.ntpassesoveycase,thelo
sphere.Allo
sun.
MTS0030
022012OF11
GMR
ofpersonnetothe
meplate.Nonjuriesresult
rationduringdposition.Vaps.Thepacessuchasener,ropes,
ertheworkeocalsafety
owthevalves
el
oning
gValveckingetc.
ersor
sto
-
PREPAR
FORMAT
d.)e.)f.)
5.0 MAVa
6.0 IN
EDBY:D.KTNO:0401
) Checkthe) ChecktheRepairthe
ARKINGalvesarepro
STALLATION
INSTM
1F12REV.
WRONG IN
paintcoatinpackagingevprotectivec
videdwith1
N
TALLATIOMAINTEN
GA
CHECK
NO:00DA
NSTALLATION
gfordamagverytwomocoatingifnec
1nameplate
ON,OPERNANCEMATEVALV
KEDBY:KMPATE:0102
eandcorrosonths.cessary.
RATIONAMANUALVE
P2012
CORR
sionatregula
AND DOCREV
DAT
PAG
APP
RECT INSTALL
arintervals.
CNO CAMV.NO 00TE 150GENO 3O
ROVEDBY:G
LATION
MTS0030
022012OF11
GMR
-
INSTALLATION,OPERATIONANDMAINTENANCEMANUAL
GATEVALVE
DOCNO CAMTS0030REV.NO 00DATE 15022012PAGENO 4OF11
PREPAREDBY:D.K CHECKEDBY:KMP APPROVEDBY:GMRFORMATNO:0401F12REV.NO:00DATE:01022012
6.1 PREPARATIONBEFOREINSTALLATION1. Asarule,theengineeringcontractor,ConstructionCompanyoroperator/userisresponsibleforthe
positioningandinstallationofthevalves.Planningandinstallationerrorsmayimpairthereliablefunctionofthevalvesandposeasubstantialsafetyhazard.
2. Confirmthatthematerialsofconstructionofthevalve,andthemaximumpressure/temperaturespecifiedinthenameplatesareappropriatefortheserviceintendedandareasspecified.
3. Thoroughlycleanadjacentpipingsystemtoremoveanyforeignmaterial,weld,piecesofwood/plastic.
4. Verifythatthespaceavailableforinstallationisadequatetoallowthevalvetobeinstalledandtobeoperated.
5. Cleanthoroughlytheaccessibleinteriorspacesofbodyends,surfacesandfunctionalpartsandmountingparts(stem,flangeforactuator,mountingetc.)
6. Gatevalvescanbeinstallednormallyinhorizontalpipelineswithverticalstemandwithflowfromeitherdirection.Valvescanalsobeinstalledinverticalpipeline.
7. Valveshallnotbeusedattheendofthepipeline.
THEFOLLOWINGPROVISIONSSHALLBEMADEINTHEPIPELINEa) Drainingandventing.Valvesareprovidedwithbossesfordrainingandventing.Drilled,tappedand
pluggedconnectionsfordrainingandventingareprovidedwhenrequestedbythecustomer.b) Dangerousdischargeofpressurereliefblowoff.c) Appropriatemeasureinthepipelineduetodecompositionofunstablefluidswhereexist.Operator
shallhavethoroughknowledgeofsuchfluidsandoperatethevalveasperestablisheddocumentedinstructions.
d) Pressurereliefvalve,whereunexpectedincreaseinpressure,waterhammerisanticipatedandallowablepressurelimitcanbeexceeded.
e) Valvesarenotprovidedwithfillingordischarge.Suchprovisionswhererequired,shallbeprovidedinthepipeline.
6.2 VALVEINSTALLATION1. Installthevalvewithwedgeintheclosedposition.2. Supportthevalveandadjacentpipelines,suchthatpipelinethrustandtorsionalforcesarenot
transmittedtothevalve.
A. FLANGEDVALVES1. Cleantheflangefacestoensurethatitisfreefromdamage.2. Thegasketsonthematingflangesareproperlycentered.Onlyfastenersandgasketsofapproved
materialsshallbeused.Placethevalvebetweenthetwoflangesofthepipeandputthegasketbetweenthevalveflangesandthepipeflange.Makesurethatitiscorrectlypositioned.Tightentheflangeboltsprogressivelyandcrosswise.Usetorquewrenchtotightentotherequestedtorquespecifiedbythespecification.Ensurethattheflangesarestraightandalignedtothepipe.
-
PREPAR
FORMAT
B. BU
Poapwcatosta
C. VA1. 2.
7.0 OP1. 2. 3. 4. 5.
7.1 USGabe
EDBY:D.KTNO:0401
UTTWELDVositionthevappliedtotheithapprovedarbonsteelsopromotesloandards.ALVEVERIFIC
TightenthandincreaCheckthe
PERATIONValvesareclockwiseDonotuseposition.SubjecttheRetightenEnsuretha
SEOFGATEVatevalvesareopened/clo
INSTM
1F12REV.
VALVESalveandaligweldends.dweldingprohouldbealloowcoolinga
CATIONBEFhepackingjuaseoperatingoperationo
closedbytudirection.egatevalvesevalvetothallbolts/nutatthereisnoVALVESreusedforoosedslowlya
TALLATIOMAINTEN
GA
CHECK
NO:00DA
Bo
gnwiththepUsethesmaocedures.Thowedtocoondlimitthe
ORESTARTstenoughtogtorque.ofthevalveb
urningthehasforthrottlinerequiredptsincludingtoleakfromt
noffserviceandgradually
ON,OPERNANCEMATEVALV
KEDBY:KMPATE:0102
oltTightenin
ipe.Removeallestelectrohiswillhelplslowly.Theheataffecte
UPopreventstebystrokingit
andwheelinngoperationpressureandthestuffingbhevalveand
e.Gatevalveytotheposi
RATIONAMANUALVE
P2012
ngSequence
eanygreaseodesandthetominimizeevalvemayedzone.Foll
emleakage.tofullopen
nclockwised.Valvesshatemperaturboxgland.Cdtheoperati
shallnotbeition.
AND DOCREV
DAT
PAG
APP
eorprotectiveminimumawarpageinbecoveredwowASMEst
Overtightenandfullclos
irectionandllbeeitheriregraduallyaleananddegonissmooth
eusedforthr
CNO CAMV.NO 00TE 150GENO 5O
ROVEDBY:G
vepaintthatmperagepotheseatareawithaheatiandardsand
ningwilldecse.
openedbytnfullopenoandslowly.greasethesth.
rottlingoper
MTS0030
022012OF11
GMR
tmayhavebssibleconsisas.Valvesonsulatingbladindustry
creasepackin
turningincoorfullclose
tem.
ration.Valve
beenstentfanket
nglife
ounter
shall
-
PREPAR
FORMAT
7.2 SHClele
7.3 EXPeex
8.0 MAa. PA
Ifsto
DothPA
BevaFa1.2.3.4.bo5.6.7.8.9.
b. BO
WBevape
EDBY:D.KTNO:0401
HUTDOWNosethevalveectricconneXAMINATIONeriodicallyexxaminationo
AINTENANCACKINGMAIleakageisobops.Useha
onotovertighevalveandACKINGREPL
WARNIeforestartingalvesarenotailuretodosOpencompRemovetheLifttheglanRemovetheore.RepackthePlacetheglTightenlighCyclethevaIftheleakag
ODYBONNWARNING:eforestartingalvesarenotersonalinjury
INSTM
1F12REV.
e.DepressuctorbeforeNOFVALVESxaminethevofshellthickn
CEINTENANCEbservedthrolfturnincrem
ghtenpackinreducepackLACEMENTING:ganymainteintemperatsomaycauseletelythevaenuts(19)ofndflange(12ewornoutppackingringand(11),glatlytheglandalve.Pressurgeoccurs,tig
NETFLANGE
ganymainteintemperatyandor/equ
TALLATIOMAINTEN
GA
CHECK
NO:00DA
ureanddrainmaintenance
Svalvedependnessandvalv
oughthepacmentfortigh
ngglandnutskinglife.
enance,deprture.Disconneseriousperalveuptotheftheglandb)andgland(packingusinggsatatimeaandflange(1dnutizethelineghtenthegla
GASKETMA
enance,deprture:Disconuipmentdam
ON,OPERNANCEMATEVALV
KEDBY:KMPATE:0102
n/ventallflue.Followthe
dingontheflvecondition
king,tightenhtening.
s.Overtight
ressurize,dranectanyelecrsonnelinjuryebackseatpbolt.(11)gahockingwandensureth2)intheirorandnutsslow
AINTENANCE
ressurize,dranectanyelemage.
RATIONAMANUALVE
P2012
ids.Allowtheprocessgui
luidconditioshallbema
ntheglandn
teningwillin
ain,ventandctricalpoweryand/orequosition
wire/otherdehattheyareriginalpositiwlyandeven
E
ain,ventandectricalPowe
AND DOCREV
DAT
PAG
APP
evalvetocoidelines.
onandcriticadedependin
nutsslowlya
ncreasethet
dflushthelirsupply.uipmentdam
evice.Cleanfittedcorreconnlyuntilthe
dflushtheliersupply.Fa
CNO CAMV.NO 00TE 150GENO 6O
ROVEDBY:G
ooldown.Re
ality.Asaminguponthef
ndevenlyun
torquerequi
newithair.Cmage.
thestemanctlyandagai
eleakagesto
newithair.ailuretodos
MTS0030
022012OF11
GMR
emoveany
nimumannufluid.
ntiltheleaka
redtoopera
Checkthatth
ndstuffingbonstthebotto
ops.
Checkthattsomaycause
ual
age
ate
he
oxom.
thee
-
PREPAR
FORMAT
1.2.3.4.5.6.1.
EDBY:D.KTNO:0401
CleantheflaPlacethegaposition.PositionallTightentheFollowthebAfterequipm
Bolttighte
INSTM
1F12REV.
angesurfaceasketinitspothestuds/nustud/nutunbolttighteninmentisinsta
eningTorque
TALLATIOMAINTEN
GA
CHECK
NO:00DA
eositiononthutsniformly,gradngsequencealledandpre
e
ON,OPERNANCEMATEVALV
KEDBY:KMPATE:0102
hebody.Ens
duallyandcre.Followtheessuredtight
RATIONAMANUALVE
P2012
surethatgas
rosswire.tighteningttenonceaga
AND DOCREV
DAT
PAG
APP
sketisnotsh
torquegiveninallthebo
CNO CAMV.NO 00TE 150GENO 7O
ROVEDBY:G
hiftedfromth
.lts.
MTS0030
022012OF11
GMR
hecorrect
-
INSTALLATION,OPERATIONANDMAINTENANCEMANUAL
GATEVALVE
DOCNO CAMTS0030REV.NO 00DATE 15022012PAGENO 8OF11
PREPAREDBY:D.K CHECKEDBY:KMP APPROVEDBY:GMRFORMATNO:0401F12REV.NO:00DATE:01022012
Nominalboltsize(inch)
Torque(Nm)
Nominalboltsize(inch) Torque(Nm)
1/2" 80 13/8" 17805/8" 160 11/2" 23003/4" 275 15/8" 30007/8" 440 13/4" 37001" 650 17/8" 4700
11/8" 950 2" 570011/4" 1300
2. ValveTorqueandMountingofactuator
Thevalvetorquedependsuponmanyparameterslikesize,class,maximumoperatingpressure,frequencyofoperation,fluiddetails,viscosityandflowvelocity.Pleasecontactcamtech,whoselectstheoptimumsizeofactuatorandsupplyofmountingplatesforfieldconversion.
8.1 PREVENTIVEMAINTENANCEAllvalvecomponentshavebeendesignedtobelargelymaintenancefree.Thematerialofthemovingpartshasbeenselectedforminimumwear.Howevermalfunctioncausedbywrongoperation,lackofmaintenanceorimproperusereducesvalvelife.Allrepairandmaintenanceworkshallbeperformedbyqualifiedpersonnelfollowingallsafetyinstructions.Maintenanceintervalsshouldbeselectedbythevalveuserincompliancewiththeapplicationcondition.
9.0 TROUBLESHOOTINGTROUBLE POSSIBLECAUSE HOWTOELIMINATE
Nofluidflow
Endflangecoversnotremoved.
Valveinclosedposition.Pipelineupstreamof
valveisblocked.
Openthevalve.Cleanthevalve.
Cleanorreplacestrainer/otherblockingequipment.
Inspectthepipeline
FlowRatenotsufficientValveisnotfullopen.Sedimentsinsidethe
valve.Dirtystrainer.
Openthevalve.Cleanthevalve.
Cleanorreplacestrainer/otherblockingequipment.
Inspectthepipeline.
-
INSTALLATION,OPERATIONANDMAINTENANCEMANUAL
GATEVALVE
DOCNO CAMTS0030REV.NO 00DATE 15022012PAGENO 9OF11
PREPAREDBY:D.K CHECKEDBY:KMP APPROVEDBY:GMRFORMATNO:0401F12REV.NO:00DATE:01022012
Valveisleaking
Valveisnotfirmlyclosed.Excessivedifferential
pressure.Seatandwedgeseatfaces
damages.Excessiveloadfromthe
pipeline.
Closethevalve.Checkthesystem.
Remachine/lapseatfaces.
Valvecannotbeoperatedoritisdifficulttoopen/close
Operatingconditionmightbeoutsidethespecification.
Bentshaftorthreadsdamaged
Valvecavityclogged.
Checktheline/Valve.
Checkandreplaceworn/bentparts.
10.0 VALVEDISASSEMBLYANDASSEMBLY
VALVEDISASSEMBLYFollowthefollowingstepstodisassemblethevalve.A. BONNETASSEMBLY
1.Loosenandremovestud(16,17)2.Liftthebonnetassembly(02)fromthebody3.Removethebonnetgasket(15)
B.WEDGE(03)1.Removethewedgefromthestem(06)
C.STEM1.Removethehandwheelnut(09)bylooseninginanticlockwisedirections2.Removethehandwheel(10)fromthestemnut(07)3.Removethestemnutretainernut(08)fromthebonnet4.Removethestemnutfromstembyturningclockwisedirection5.Loosentheglandnut(19)andpullthestemfromdownsideandremoveit.
VALVEASSEMBLYFollowreversesequenceofdisassemblyandassemblethevalve
11.0 GREASESANDSPECIALTOOLSThefollowinggreasesorequivalentothermakecanbeusedforbearing/stem/nut/gearboxes/stemBEACON2ESSO,MOBILELUXEP2MOBL,ALVANIAR2SUPERGREASESHELL,MULTIFAKEP2GREASE,TEXACOSPECIALTOOLNoSpecialtoolisrequiredforthemaintenance.
12. RECOMMENDEDSPARES
-
PREPAR
FORMAT
EDBY:D.KTNO:0401
GlandpacBonnetgaNote:Onl
ForExplos1.0 Max
Valvdonfluid
INSTM
1F12REV.
king(14)asket(15)lyCamtechs
siveatmosphximumSurfaesdonotgenotdependsdtemperatur
TALLATIOMAINTEN
GA
CHECK
NO:00DA
suppliedspar
here,followceTemperaenerateeneruponthevareislimiteda
ON,OPERNANCEMATEVALV
KEDBY:KMPATE:0102
resshallbeu
wingprecautituregy/temperalve,butontasperASME
RATIONAMANUALVE
P2012
used
ions/measur
atureonitsoheoperatingEB16.34.Ho
AND DOCREV
DAT
PAG
APP
resshallbet
own.Themagfluidconditoweverforex
CNO CAMV.NO 00TE 150GENO 10
ROVEDBY:G
taken.
aximumsurfation.Themaxplosiveatm
MTS0030
022012OF11
GMR
acetemperaaximumopermosphere,wh
atureratinghere
-
INSTALLATION,OPERATIONANDMAINTENANCEMANUAL
GATEVALVE
DOCNO CAMTS0030REV.NO 00DATE 15022012PAGENO 11OF11
PREPAREDBY:D.K CHECKEDBY:KMP APPROVEDBY:GMRFORMATNO:0401F12REV.NO:00DATE:01022012
thesurfacetemperatureduetooperatingfluidispotentialsourceofexplosion,provideinsulation/otherappropriatemeasures.
2.0 ProjectedstemEnsurethattheprojectedstemdonottouchanypipingorotherpartthatcancreatespark.
3.0 BearinglubricationBearingsareslowmovingpartsanddonotrequirelubrication.Howeverlubricationisprovidedforsmoothoperation.
4.0 DustdepositRemovedustatregularintervalsforexplosiveatmosphere.Ensurethatdustisnotpresentinthegapsandoutsidesurfacestoexcludethepossibilityofexplosion.Ensurethatthesurroundingsarecleanandnoexternalpartfallonthesurface.
5.0Valvesarenotprovidedwithanyopeningorenclosureforexplosionprevention.