gas regional initiative north-west transmission transparency second mini transparency workshop...

14
Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘ Group Transparency Workstream London, 10 July 2008 Contact: Oliver Altenhoff E.ON Gastransport AG & Co. KG Kallenbergstr. 5 45141 Essen GERMANY Oliver.altenhoff@eon- gastransport.com

Upload: jean-simpson

Post on 18-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘

Gas Regional Initiative North-WestTransmission Transparency

Second Mini Transparency Workshop

Transmission Transparency Project

GRI North-West Operators‘ Group

Transparency Workstream

London, 10 July 2008

Contact:Oliver AltenhoffE.ON Gastransport AG & Co. KGKallenbergstr. 545141 [email protected]

Page 2: Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘

Page 2

Mini Transparency Workshop; London, 10 July 2008

Gas Regional Initiative North-WestTransmission Transparency

Agenda:

Intro-duction

Project

Where do we stand

Next steps

Outlook

Agenda

Introduction

Transmission transparency project

Where do we stand

Next steps in the project

Transparency workstream outlook

Page 3: Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘

Page 3

Mini Transparency Workshop; London, 10 July 2008

Gas Regional Initiative North-WestTransmission Transparency

Agenda:

Intro-duction

Project

Where do we stand

Next steps

Outlook

Introduction

SG meeting in Dublin, TSOs announced the development of a project based on requests of market participants

EFET wish list established (beyond current legislative requirements)

Transparency questionnaire responses and

First Ofgem-Workshop Transparency

Project plan presents TSO commitment

First development report shows progress

Page 4: Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘

Page 4

Mini Transparency Workshop; London, 10 July 2008

Gas Regional Initiative North-WestTransmission Transparency

Agenda:

Intro-duction

Project

Where do we stand

Next steps

Outlook

Participating TSO

Page 5: Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘

Page 5

Mini Transparency Workshop; London, 10 July 2008

Gas Regional Initiative North-WestTransmission Transparency

Agenda:

Intro-duction

Project

Where do we stand

Next steps

Outlook

Project Overview

Objective of the transmission transparency project:

Improve the publication of capacity and flow data

Provide clarity over published data

Demonstrate commitment to market reqirements

Steps:

Enlist participating operators

Develop anticipated time schedule

Establish individual TSO implementation plans

Monitor improvements

Page 6: Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘

Page 6

Mini Transparency Workshop; London, 10 July 2008

Gas Regional Initiative North-WestTransmission Transparency

Agenda:

Intro-duction

Project

Where do we stand

Next steps

Outlook

Information to be published

Capacity Information(C1) Max technical capacity of the transmission system

(C2) Level of interruption probability

(C3) Daily commercial firm and interruptible capacity

Flow Information(F1) Daily flow and interruptions

(F2) Daily prompt allocation information to each shipper

(F3) Daily aggregate day-ahead nominations

(F4) Historic gas flow information database

Page 7: Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘

Gas Regional Initiative North-WestTransmission Transparency

Examples of the project

Page 8: Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘

Page 8

Mini Transparency Workshop; London, 10 July 2008

Gas Regional Initiative North-WestTransmission Transparency

Agenda:

Intro-duction

Project

Where do we stand

Next steps

Outlook

Daily allocations

Page 9: Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘

Page 9

Mini Transparency Workshop; London, 10 July 2008

Gas Regional Initiative North-WestTransmission Transparency

Agenda:

Intro-duction

Project

Where do we stand

Next steps

Outlook

Nominations, allocations, interruptions

Page 10: Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘

Page 10

Mini Transparency Workshop; London, 10 July 2008

Gas Regional Initiative North-WestTransmission Transparency

Agenda:

Intro-duction

Project

Where do we stand

Next steps

Outlook

Max technical capacity

Page 11: Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘

Page 11

Mini Transparency Workshop; London, 10 July 2008

Gas Regional Initiative North-WestTransmission Transparency

Agenda:

Intro-duction

Project

Where do we stand

Next steps

Outlook

Daily technical and available capacity

Page 12: Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘

Page 12

Mini Transparency Workshop; London, 10 July 2008

Gas Regional Initiative North-WestTransmission Transparency

Agenda:

Intro-duction

Project

Where do we stand

Next steps

Outlook

Progress: January to October 2008

11

5

9

4

13

2

7

14

6

13

9

14

3

11

15

12

15

13

14

8

15

0

2

4

6

8

10

12

14

16

Max technicalcapacity

Interruption Dailycommercial firmand interruptible

capacity

Daily flow /aggregatedallocation

Daily promptallocation

information

Daily aggregateday-ahead

nominations

Historic gas flowinformationdatabase

Jan 2008

Apr 2008

Okt. 2008 (expected)

Page 13: Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘

Page 13

Mini Transparency Workshop; London, 10 July 2008

Gas Regional Initiative North-WestTransmission Transparency

Agenda:

Intro-duction

Project

Where do we stand

Next steps

Outlook

Next Steps

Project:

Sept./Oct.: implementation monitoring

Nov: report progress SG-Meeting

Dec./Jan.: implementation monitoring

2009: review the results of the project

2009: lessons learned

2009: Any improvements left?

Page 14: Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘

Page 14

Mini Transparency Workshop; London, 10 July 2008

Gas Regional Initiative North-WestTransmission Transparency

Agenda:

Intro-duction

Project

Where do we stand

Next steps

Outlook

Outlook

Road map - work plan 2009:

Discussion to define further requirements, if any

Where is less than 3 rule applicable?

Should the publication on the TSOs‘ websites be harmonized?

Do TSOs need to publish further information?

A lot of progress has been made

and

there is still room for success!