( Slide #: 1 ) Komex International Ltd. Environmental and Engineering Consultants K I I n n - - s s i i t t u u C C o o n n t t a a i i n n m m e e n n t t a a n n d d T T r r e e a a t t m m e e n n t t o o f f a a F F r r e e e e P P h h a a s s e e H H y y d d r r o o c c a a r r b b o o n n P P l l u u m m e e B B e e n n e e a a t t h h P P l l a a n n t t I I n n f f r r a a s s t t r r u u c c t t u u r r e e I I n n - - s s i i t t u u C C o o n n t t a a i i n n m m e e n n t t a a n n d d T T r r e e a a t t m m e e n n t t I I n n - - s s i i t t u u C C o o n n t t a a i i n n m m e e n n t t a a n n d d T T r r e e a a t t m m e e n n t t o o f f a a F F r r e e e e P P h h a a s s e e H H y y d d r r o o c c a a r r b b o o n n P P l l u u m m e e o o f f a a F F r r e e e e P P h h a a s s e e H H y y d d r r o o c c a a r r b b o o n n P P l l u u m m e e B B e e n n e e a a t t h h P P l l a a n n t t I I n n f f r r a a s s t t r r u u c c t t u u r r e e B B e e n n e e a a t t h h P P l l a a n n t t I I n n f f r r a a s s t t r r u u c c t t u u r r e e M. Brewster 1 , S.Penny 1 , B.Odell 1 , and T. Jorgensen-Nelson 2 1 Komex International Ltd. 2 Confidential Employer M. Brewster M. Brewster 1 1 , S.Penny , S.Penny 1 1 , B.Odell , B.Odell 1 1 , and , and T. Jorgensen-Nelson T. Jorgensen-Nelson 2 2 1 1 Komex International Ltd. Komex International Ltd. 2 2 Confidential Employer Confidential Employer

Upload: buitram

Post on 20-Mar-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 1 )

Komex International Ltd.Environmental and Engineering Consultants

K

IIIInnnn----ssssiiiittttuuuu CCCCoooonnnnttttaaaaiiiinnnnmmmmeeeennnntttt aaaannnndddd TTTTrrrreeeeaaaattttmmmmeeeennnntttt

ooooffff aaaa FFFFrrrreeeeeeee PPPPhhhhaaaasssseeee HHHHyyyyddddrrrrooooccccaaaarrrrbbbboooonnnn PPPPlllluuuummmmeeee

BBBBeeeennnneeeeaaaatttthhhh PPPPllllaaaannnntttt IIIInnnnffffrrrraaaassssttttrrrruuuuccccttttuuuurrrreeee

IIIInnnn----ssssiiiittttuuuu CCCCoooonnnnttttaaaaiiiinnnnmmmmeeeennnntttt aaaannnndddd TTTTrrrreeeeaaaattttmmmmeeeennnnttttIIIInnnn----ssssiiiittttuuuu CCCCoooonnnnttttaaaaiiiinnnnmmmmeeeennnntttt aaaannnndddd TTTTrrrreeeeaaaattttmmmmeeeennnntttt

ooooffff aaaa FFFFrrrreeeeeeee PPPPhhhhaaaasssseeee HHHHyyyyddddrrrrooooccccaaaarrrrbbbboooonnnn PPPPlllluuuummmmeeeeooooffff aaaa FFFFrrrreeeeeeee PPPPhhhhaaaasssseeee HHHHyyyyddddrrrrooooccccaaaarrrrbbbboooonnnn PPPPlllluuuummmmeeee

BBBBeeeennnneeeeaaaatttthhhh PPPPllllaaaannnntttt IIIInnnnffffrrrraaaassssttttrrrruuuuccccttttuuuurrrreeeeBBBBeeeennnneeeeaaaatttthhhh PPPPllllaaaannnntttt IIIInnnnffffrrrraaaassssttttrrrruuuuccccttttuuuurrrreeee

M. Brewster1, S.Penny1, B.Odell1, andT. Jorgensen-Nelson2

1 Komex International Ltd.

2 Confidential Employer

M. BrewsterM. Brewster11, S.Penny, S.Penny11, B.Odell, B.Odell11, and, andT. Jorgensen-NelsonT. Jorgensen-Nelson22

11 Komex International Ltd. Komex International Ltd.

22 Confidential Employer Confidential Employer

Page 2: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 2 )

Komex International Ltd.Environmental and Engineering Consultants

K

EEEEnnnnvvvviiiirrrroooonnnnmmmmeeeennnnttttaaaallll PPPPrrrroooobbbblllleeeemmmmEEEEnnnnvvvviiiirrrroooonnnnmmmmeeeennnnttttaaaallll PPPPrrrroooobbbblllleeeemmmmEEEEnnnnvvvviiiirrrroooonnnnmmmmeeeennnnttttaaaallll PPPPrrrroooobbbblllleeeemmmm

➾ Hydrocarbon free product was detected in LiquefiedPetroleum Gases (LPG) Recovery Area at an Albertagas plant.

➾ Approximate area of 3,100 m2 with hydrocarbon freeproduct on water table.

➾➾ Hydrocarbon free product was detected in LiquefiedHydrocarbon free product was detected in LiquefiedPetroleum Gases (LPG) Recovery Area at an AlbertaPetroleum Gases (LPG) Recovery Area at an Albertagas plant.gas plant.

➾➾ Approximate area of 3,100 mApproximate area of 3,100 m22 with hydrocarbon free with hydrocarbon freeproduct on water table.product on water table.

Page 3: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 3 )

Komex International Ltd.Environmental and Engineering Consultants

K

PPPPllllaaaannnn VVVViiiieeeewwww ooooffff SSSSiiiitttteeeePPPPllllaaaannnn VVVViiiieeeewwww ooooffff SSSSiiiitttteeeePPPPllllaaaannnn VVVViiiieeeewwww ooooffff SSSSiiiitttteeee

LEGEND:

98-2

4C

98-2

4B

98-2

4A

LPG STORAGE TANKS(87,000 GAL. EACH) 0 10 20m

Page 4: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 4 )

Komex International Ltd.Environmental and Engineering Consultants

K

SSSSiiiitttteeee DDDDeeeessssccccrrrriiiippppttttiiiioooonnnnSSSSiiiitttteeee DDDDeeeessssccccrrrriiiippppttttiiiioooonnnnSSSSiiiitttteeee DDDDeeeessssccccrrrriiiippppttttiiiioooonnnn

➾ Plume located within the process area and straddlestwo hydrogeological units.

➾➾ Plume located within the process area and straddlesPlume located within the process area and straddlestwo hydrogeological units.two hydrogeological units.

TILL K< 1x10 m/s

GRAVEL FILL K~ 1x10 m/s

BEDROCK (SILTSTONE)

?-7

?

C

WATER TABLE

LEAN OILFREE PRODUCT PLUME

DISSOLVED PHASE GROUNDWATER CONTAMINANT PLUME

TILLK< 1x10 m/s-7

0 10 20m

Page 5: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 5 )

Komex International Ltd.Environmental and Engineering Consultants

K

SSSSiiiitttteeee DDDDeeeessssccccrrrriiiippppttttiiiioooonnnn CCCCoooonnnnttttiiiinnnnuuuueeeeddddSSSSiiiitttteeee DDDDeeeessssccccrrrriiiippppttttiiiioooonnnn CCCCoooonnnnttttiiiinnnnuuuueeeeddddSSSSiiiitttteeee DDDDeeeessssccccrrrriiiippppttttiiiioooonnnn CCCCoooonnnnttttiiiinnnnuuuueeeedddd

➾ Source area beneath the process facilities consists ofgranular fill. (K = 10-5 m/s)

➾ Approximately 10 m downgradient gravel thins out tonative till. (K = 10-8 m/s)

➾ Groundwater surface located approximately 1.5 mbgsin the fill and 0.5 mbgs in the till.

➾➾ Source area beneath the process facilities consists ofSource area beneath the process facilities consists ofgranular fill. (K = 10granular fill. (K = 10-5-5 m/s) m/s)

➾➾ Approximately 10 m downgradient gravel thins out toApproximately 10 m downgradient gravel thins out tonative till. (K = 10native till. (K = 10-8-8 m/s) m/s)

➾➾ Groundwater surface located approximately 1.5 mbgsGroundwater surface located approximately 1.5 mbgsin the fill and 0.5 mbgs in the till.in the fill and 0.5 mbgs in the till.

Page 6: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 6 )

Komex International Ltd.Environmental and Engineering Consultants

K

RRRReeeemmmmeeeeddddiiiiaaaattttiiiioooonnnn GGGGooooaaaallllssssRRRReeeemmmmeeeeddddiiiiaaaattttiiiioooonnnn GGGGooooaaaallllssssRRRReeeemmmmeeeeddddiiiiaaaattttiiiioooonnnn GGGGooooaaaallllssss

➾ No disturbance toinfrastructure/operations

➾ Containment of free product and dissolvedphase plumes

➾ Recovery of free product (reduce seepage)

➾➾ No disturbance toNo disturbance toinfrastructure/operationsinfrastructure/operations

➾➾ Containment of free product and dissolvedContainment of free product and dissolvedphase plumesphase plumes

➾➾ Recovery of free product (reduce seepage)Recovery of free product (reduce seepage)

Page 7: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 7 )

Komex International Ltd.Environmental and Engineering Consultants

K

RRRReeeemmmmeeeeddddiiiiaaaattttiiiioooonnnn OOOOppppttttiiiioooonnnnssssRRRReeeemmmmeeeeddddiiiiaaaattttiiiioooonnnn OOOOppppttttiiiioooonnnnssssRRRReeeemmmmeeeeddddiiiiaaaattttiiiioooonnnn OOOOppppttttiiiioooonnnnssss

➾ Excavation and ex-situ treatment

➾ Soil vapour extraction

➾ Multi-phase extraction

➾ Product skimming

➾ Dual phase pumping

➾ Trench and gate cutoff system

➾➾ Excavation and ex-situ treatmentExcavation and ex-situ treatment

➾➾ Soil vapour extractionSoil vapour extraction

➾➾ Multi-phase extractionMulti-phase extraction

➾➾ Product skimmingProduct skimming

➾➾ Dual phase pumpingDual phase pumping

➾➾ Trench and gate cutoff systemTrench and gate cutoff system

Page 8: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 8 )

Komex International Ltd.Environmental and Engineering Consultants

K

RRRReeeemmmmeeeeddddiiiiaaaattttiiiioooonnnn AAAApppppppprrrrooooaaaacccchhhhRRRReeeemmmmeeeeddddiiiiaaaattttiiiioooonnnn AAAApppppppprrrrooooaaaacccchhhhRRRReeeemmmmeeeeddddiiiiaaaattttiiiioooonnnn AAAApppppppprrrrooooaaaacccchhhh

Phased in-situ approach selected:

Phase I: installation of a hydrocarbon recovery trench withinthe core of the plume (Installed in 1999)

Phase II: Installation of Trench and Gate System atthe downgradient edge of the plume (Installed in2000)

Phase III: Installation of additional recovery wells in gravel fillsection (in progress)

Phased in-situ approach selected:Phased in-situ approach selected:

Phase I: installation of a hydrocarbon recovery trench withinPhase I: installation of a hydrocarbon recovery trench withinthe core of the plume (Installed in 1999)the core of the plume (Installed in 1999)

Phase II: Installation of Trench and Gate System atPhase II: Installation of Trench and Gate System atthe downgradient edge of the plume (Installed inthe downgradient edge of the plume (Installed in2000)2000)

Phase III: Installation of additional recovery wells in gravel fillPhase III: Installation of additional recovery wells in gravel fillsection (in progress)section (in progress)

Page 9: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 9 )

Komex International Ltd.Environmental and Engineering Consultants

K

TTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeee CCCCoooommmmppppoooonnnneeeennnnttttssssTTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeee CCCCoooommmmppppoooonnnneeeennnnttttssssTTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeee CCCCoooommmmppppoooonnnneeeennnnttttssss

➾ A permeable �V� shaped trench directinggroundwater flow to the �gate�

➾ A free product separation gate

➾ A dissolved phase treatment gate

➾ A post-treatment re-infiltration gallery

➾➾ A permeable �V� shaped trench directingA permeable �V� shaped trench directinggroundwater flow to the �gate�groundwater flow to the �gate�

➾➾ A free product separation gateA free product separation gate

➾➾ A dissolved phase treatment gateA dissolved phase treatment gate

➾➾ A post-treatment re-infiltration galleryA post-treatment re-infiltration gallery

Page 10: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 10 )

Komex International Ltd.Environmental and Engineering Consultants

K

TTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeee SSSSyyyysssstttteeeemmmm ---- SSSScccchhhheeeemmmmaaaattttiiiiccccTTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeee SSSSyyyysssstttteeeemmmm ---- SSSScccchhhheeeemmmmaaaattttiiiiccccTTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeee SSSSyyyysssstttteeeemmmm ---- SSSScccchhhheeeemmmmaaaattttiiiicccc

Weeping Tile

Water Table

CROSS-SECTION

Collection Trench

PLAN VIEW

Treatment Gate

Gravel Backfill

Backfill/Bentonite

ContaminantPlume

Gravel BackfillSeparation Gate

Reinfiltration Gallery

Cross- Section

Impermeable Trench Wall

Flow Direction

Contaminant Plume

Ground Surface

Impermeable Liner (Trench Wall)

Flow Direction

Page 11: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 11 )

Komex International Ltd.Environmental and Engineering Consultants

K

CCCCoooolllllllleeeeccccttttiiiioooonnnn aaaannnndddd TTTTrrrreeeeaaaattttmmmmeeeennnntttt GGGGaaaatttteeeessssCCCCoooolllllllleeeeccccttttiiiioooonnnn aaaannnndddd TTTTrrrreeeeaaaattttmmmmeeeennnntttt GGGGaaaatttteeeessssCCCCoooolllllllleeeeccccttttiiiioooonnnn aaaannnndddd TTTTrrrreeeeaaaattttmmmmeeeennnntttt GGGGaaaatttteeeessss

PERFORATED/SCREENED INTERVAL

FREE PRODUCT LAYER

FREE PRODUCT REMOVAL

GROUND LEVEL

WATER TABLE

TO RE-INFILTRATION GALLERY

FREE PRODUCTSEPARATOR

AERATIONTANK

Page 12: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 12 )

Komex International Ltd.Environmental and Engineering Consultants

K

PPPPllllaaaannnn VVVViiiieeeewwww ooooffff TTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeeePPPPllllaaaannnn VVVViiiieeeewwww ooooffff TTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeeePPPPllllaaaannnn VVVViiiieeeewwww ooooffff TTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeee98

-24C

98-2

4B

98-2

4A

LEGEND:

LPG STORAGE TANKS(87,000 GAL. EACH)

TRENCH AND GATE SYSTEMPRODUCT SEPARATION GATE

TREATMENT GATERE-INFILTRATION GALLERY

0 10 20m

Page 13: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 13 )

Komex International Ltd.Environmental and Engineering Consultants

K

TTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeee CCCCoooonnnnssssttttrrrruuuuccccttttiiiioooonnnnTTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeee CCCCoooonnnnssssttttrrrruuuuccccttttiiiioooonnnnTTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeee CCCCoooonnnnssssttttrrrruuuuccccttttiiiioooonnnn

Excavation of Collection Trench Installation of Separation Gate

Page 14: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 14 )

Komex International Ltd.Environmental and Engineering Consultants

K

PPPPrrrroooodddduuuucccctttt SSSSeeeeppppaaaarrrraaaattttiiiioooonnnn GGGGaaaatttteeeePPPPrrrroooodddduuuucccctttt SSSSeeeeppppaaaarrrraaaattttiiiioooonnnn GGGGaaaatttteeeePPPPrrrroooodddduuuucccctttt SSSSeeeeppppaaaarrrraaaattttiiiioooonnnn GGGGaaaatttteeee

Page 15: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 15 )

Komex International Ltd.Environmental and Engineering Consultants

K

BBBBaaaacccckkkkffffiiiilllllllliiiinnnngggg GGGGrrrraaaavvvveeeellll iiiinnnnttttoooo RRRReeee----iiiinnnnffffiiiillllttttrrrraaaattttiiiioooonnnn

GGGGaaaalllllllleeeerrrryyyy

BBBBaaaacccckkkkffffiiiilllllllliiiinnnngggg GGGGrrrraaaavvvveeeellll iiiinnnnttttoooo RRRReeee----iiiinnnnffffiiiillllttttrrrraaaattttiiiioooonnnnBBBBaaaacccckkkkffffiiiilllllllliiiinnnngggg GGGGrrrraaaavvvveeeellll iiiinnnnttttoooo RRRReeee----iiiinnnnffffiiiillllttttrrrraaaattttiiiioooonnnn

GGGGaaaalllllllleeeerrrryyyyGGGGaaaalllllllleeeerrrryyyy

Page 16: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 16 )

Komex International Ltd.Environmental and Engineering Consultants

K

CCCCoooommmmppppaaaaccccttttiiiinnnngggg SSSSooooiiiillllssss aaaarrrroooouuuunnnndddd TTTTrrrreeeeaaaattttmmmmeeeennnntttt

GGGGaaaatttteeee

CCCCoooommmmppppaaaaccccttttiiiinnnngggg SSSSooooiiiillllssss aaaarrrroooouuuunnnndddd TTTTrrrreeeeaaaattttmmmmeeeennnnttttCCCCoooommmmppppaaaaccccttttiiiinnnngggg SSSSooooiiiillllssss aaaarrrroooouuuunnnndddd TTTTrrrreeeeaaaattttmmmmeeeennnntttt

GGGGaaaatttteeeeGGGGaaaatttteeee

Page 17: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 17 )

Komex International Ltd.Environmental and Engineering Consultants

K

DDDDiiiissssssssoooollllvvvveeeedddd PPPPhhhhaaaasssseeee TTTTrrrreeeeaaaattttmmmmeeeennnntttt GGGGaaaatttteeeeDDDDiiiissssssssoooollllvvvveeeedddd PPPPhhhhaaaasssseeee TTTTrrrreeeeaaaattttmmmmeeeennnntttt GGGGaaaatttteeeeDDDDiiiissssssssoooollllvvvveeeedddd PPPPhhhhaaaasssseeee TTTTrrrreeeeaaaattttmmmmeeeennnntttt GGGGaaaatttteeee

Page 18: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 18 )

Komex International Ltd.Environmental and Engineering Consultants

K

SSSSeeeeppppaaaarrrraaaattttiiiioooonnnn aaaannnndddd TTTTrrrreeeeaaaattttmmmmeeeennnntttt GGGGaaaatttteeeessssSSSSeeeeppppaaaarrrraaaattttiiiioooonnnn aaaannnndddd TTTTrrrreeeeaaaattttmmmmeeeennnntttt GGGGaaaatttteeeessssSSSSeeeeppppaaaarrrraaaattttiiiioooonnnn aaaannnndddd TTTTrrrreeeeaaaattttmmmmeeeennnntttt GGGGaaaatttteeeessss

Page 19: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 19 )

Komex International Ltd.Environmental and Engineering Consultants

K

IIIInnnnssssttttaaaalllllllliiiinnnngggg CCCCoooonnnnnnnneeeeccccttttoooorrrr PPPPiiiippppeeeeIIIInnnnssssttttaaaalllllllliiiinnnngggg CCCCoooonnnnnnnneeeeccccttttoooorrrr PPPPiiiippppeeeeIIIInnnnssssttttaaaalllllllliiiinnnngggg CCCCoooonnnnnnnneeeeccccttttoooorrrr PPPPiiiippppeeee

Page 20: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 20 )

Komex International Ltd.Environmental and Engineering Consultants

K

CCCCoooolllllllleeeeccccttttiiiioooonnnn TTTTrrrreeeennnncccchhhhCCCCoooolllllllleeeeccccttttiiiioooonnnn TTTTrrrreeeennnncccchhhhCCCCoooolllllllleeeeccccttttiiiioooonnnn TTTTrrrreeeennnncccchhhh

Page 21: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 21 )

Komex International Ltd.Environmental and Engineering Consultants

K

SSSSyyyysssstttteeeemmmm OOOOppppeeeerrrraaaattttiiiioooonnnnSSSSyyyysssstttteeeemmmm OOOOppppeeeerrrraaaattttiiiioooonnnnSSSSyyyysssstttteeeemmmm OOOOppppeeeerrrraaaattttiiiioooonnnn

➾ System was constructed in Fall 2000.

➾ Has been operating since Spring 2001.

➾ System was designed to operate continuously for 12months per year.

➾➾ System was constructed in Fall 2000.System was constructed in Fall 2000.

➾➾ Has been operating since Spring 2001.Has been operating since Spring 2001.

➾➾ System was designed to operate continuously for 12System was designed to operate continuously for 12months per year.months per year.

Page 22: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 22 )

Komex International Ltd.Environmental and Engineering Consultants

K

PPPPeeeerrrrffffoooorrrrmmmmaaaannnncccceeee RRRReeeevvvviiiieeeewwwwPPPPeeeerrrrffffoooorrrrmmmmaaaannnncccceeee RRRReeeevvvviiiieeeewwwwPPPPeeeerrrrffffoooorrrrmmmmaaaannnncccceeee RRRReeeevvvviiiieeeewwww

Evaluated via the following metrics:

➾ product recovery volumes in the product separationgate; and.

➾ groundwater quality before and after treatment in thedissolved phase treatment gate.

Evaluated via the following metrics:Evaluated via the following metrics:

➾➾ product recovery volumes in the product separationproduct recovery volumes in the product separationgate; and.gate; and.

➾➾ groundwater quality before and after treatment in thegroundwater quality before and after treatment in thedissolved phase treatment gate.dissolved phase treatment gate.

Page 23: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 23 )

Komex International Ltd.Environmental and Engineering Consultants

K

FFFFrrrreeeeeeee PPPPrrrroooodddduuuucccctttt RRRReeeeccccoooovvvveeeerrrryyyyFFFFrrrreeeeeeee PPPPrrrroooodddduuuucccctttt RRRReeeeccccoooovvvveeeerrrryyyyFFFFrrrreeeeeeee PPPPrrrroooodddduuuucccctttt RRRReeeeccccoooovvvveeeerrrryyyy

➾ To date, there has been no significant entry of freeproduct in the Separation Gate.

➾ A fairly continuous hydrocarbon sheen is observed inthe gate.

➾➾ To date, there has been no significant entry of freeTo date, there has been no significant entry of freeproduct in the Separation Gate.product in the Separation Gate.

➾➾ A fairly continuous hydrocarbon sheen is observed inA fairly continuous hydrocarbon sheen is observed inthe gate.the gate.

Page 24: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 24 )

Komex International Ltd.Environmental and Engineering Consultants

K

PPPPllllaaaannnn VVVViiiieeeewwww ooooffff TTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeeePPPPllllaaaannnn VVVViiiieeeewwww ooooffff TTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeeePPPPllllaaaannnn VVVViiiieeeewwww ooooffff TTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeee98

-24C

98-2

4B

98-2

4A

LEGEND:

LPG STORAGE TANKS(87,000 GAL. EACH)

TRENCH AND GATE SYSTEMPRODUCT SEPARATION GATE

TREATMENT GATERE-INFILTRATION GALLERY

0 10 20m

Page 25: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 25 )

Komex International Ltd.Environmental and Engineering Consultants

K

TTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeee SSSSyyyysssstttteeeemmmm ---- WWWWaaaatttteeeerrrr

QQQQuuuuaaaalllliiiittttyyyy

TTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeee SSSSyyyysssstttteeeemmmm ---- WWWWaaaatttteeeerrrrTTTTrrrreeeennnncccchhhh aaaannnndddd GGGGaaaatttteeee SSSSyyyysssstttteeeemmmm ---- WWWWaaaatttteeeerrrr

QQQQuuuuaaaalllliiiittttyyyyQQQQuuuuaaaalllliiiittttyyyyMonitoring

StationDate Benzene Toluene Ethylbenzene Xylenes TPH

(C3-C10)

CDWQG 0.005 0.024 0.0024 0.3 NC

ProductSeparation

Gate

09/24/01 0.0249 <0.0009 <0.0009 0.223 0.6

11/13/01 0.022 <0.002 <0.002 0.292 1.2

06/27/02 0.0552 0.0108 <0.0004 0.186 1.2

TreatmentGate

09/24/01 <0.0004 <0.0004 <0.0004 <0.0012 <0.1

11/13/01 <0.0004 <0.0004 <0.0004 <0.0012 <0.1

06/27/02 <0.0004 <0.0004 <0.0004 <0.0012 <0.1

MonitoringStation

Date Benzene Toluene Ethylbenzene Xylenes TPH(C3-C10)

CDWQG 0.005 0.024 0.0024 0.3 NC

ProductSeparation

Gate

09/24/01 0.0249 <0.0009 <0.0009 0.223 0.6

11/13/01 0.022 <0.002 <0.002 0.292 1.2

06/27/02 0.0552 0.0108 <0.0004 0.186 1.2

TreatmentGate

09/24/01 <0.0004 <0.0004 <0.0004 <0.0012 <0.1

11/13/01 <0.0004 <0.0004 <0.0004 <0.0012 <0.1

06/27/02 <0.0004 <0.0004 <0.0004 <0.0012 <0.1

All units in mg/L

Page 26: gas plant. Env o ment Prob em - · PDF fileKomex International Ltd. ... infrastructure/operations ... K T r e n c h a n d G a t e C o m p o n e n t s T r e n c h a n d G a t e C o

( Slide #: 26 )

Komex International Ltd.Environmental and Engineering Consultants

K

SSSSuuuummmmmmmmaaaarrrryyyySSSSuuuummmmmmmmaaaarrrryyyySSSSuuuummmmmmmmaaaarrrryyyy

Achieved Remedial Goals:

➾ prevented further expansion of free product anddissolved phase plumes;

➾ treated dissolved hydrocarbons at the downgradientedge; and,

➾ system is well positioned to capture downgradientfree product migration

Achieved Remedial Goals:Achieved Remedial Goals:

➾➾ prevented further expansion of free product andprevented further expansion of free product anddissolved phase plumes;dissolved phase plumes;

➾➾ treated dissolved hydrocarbons at the downgradienttreated dissolved hydrocarbons at the downgradientedge; and,edge; and,

➾➾ system is well positioned to capture downgradientsystem is well positioned to capture downgradientfree product migrationfree product migration