G G th iGas Gathering Final Rule
F d l R i tFederal Register Vol. 71, No. 50
Wednesday, March 15, 2006Pages 13289 - 13303
Presentation Topics
Identifying a gathering lineIdentifying a gathering line
Identifying a “regulated” segmentIdentifying a regulated segment
Compliance requirementsCompliance requirements
C iti l d t d d dliCritical dates and deadlines
Definition
As defined in §192 3 -As defined in §192.3
"Gathering Line" means a pipeline thatGathering Line means a pipeline that transports gas from a current production facility to a transmission line or main.facility to a transmission line or main.
Applicability§192.1 What is the scope of this part?(b) This part does not apply to–( ) p pp y
(b)(4) Onshore gathering of gas–(i) Through a pipeline that operates at less than 0 psig (0 kPa);(ii) Th h i li th t i t l t d(ii) Through a pipeline that is not a regulated onshore gathering line (as determined in §192.8); andand(iii) Within inlets of the Gulf of Mexico, except for the requirements in §192.612.
Incorporation by Reference
§192 7 What documents are incorporated§192.7 What documents are incorporated by reference partly or wholly in this part?
(4) API Recommended Practice 80 (API RP 80) “Guidelines for the Definition of )Onshore Gas Gathering Lines'' (1st edition, April 2000)
§192.8 How are onshore gathering lines and regulated onshore gathering
lines determined?
(a) An operator must use API RP 80 (incorporated by ( ) p ( p yreference, see §192.7), to determine if an onshore pipeline (or part of a connected series of pipelines) is an onshore gathering line The determination isis an onshore gathering line. The determination is subject to the limitations listed below. After making this determination, an operator must determine if , pthe onshore gathering line is a regulated onshore gathering line under paragraph (b) of this section.
Beginning of Gathering §192.8(a)(1)-
The beginning of gathering, under section 2 2(a)(1) of APIunder section 2.2(a)(1) of API RP 80, may not extend beyond the furthermost downstream point in a production operation as defined in section 2.3 of API RP 80RP 80.
API RP 80 - Gathering Line
2.2 Onshore Gathering Line
(a) means any pipeline or part of a connected series of pipelines used to
(1) transport gas from the furthermost downstream point in a production operation to the f th t d t f th f ll ifurthermost downstream of the following endpoints, …………
API RP 80 – Production Operation
2.3 “Production Operation” i i d i t d fmeans piping and equipment used for
production and preparation for transportation or delivery of hydrocarbon gas and/or liquids and y y gincludes the following processes:
(a) extraction and recovery lifting stabilization(a) extraction and recovery, lifting, stabilization, treatment, separation, production processing, storage, and measurement of hydrocarbon gas and/or liquids; andand/or liquids; and
(b) associated production compression, gas lift, i j ti f l lgas injection, or fuel gas supply.
Beginning of Gathering §192.8(a)(1)
Thi f th t d t i t d tThis furthermost downstream point does not include equipment that can be used in either
d ti t t ti h tproduction or transportation, such as separators or dehydrators, unless that equipment is i l d i th f “ d ti dinvolved in the processes of “production and preparation for transportation or delivery of h d b '' ithi th i fhydrocarbon gas'' within the meaning of “production operation.''
Beginning of Gathering
Meter
This means:
Production stops when singlewhen single phase flow starts.Separator
End of Production
Wells have separation, heater treaters and stock tanks. Flow lines transporting gas only.
Flow line
Gathering lineg
Well location
End of ProductionWells all flow to central tank battery (no treatment of well stream on location). Tank battery has separation, heater treaters and stock tanks.
Flow lines are transporting mixture of gas oil and/or watermixture of gas, oil and/or water.
Central TankCentral TankBattery
Flow lineFlow line
Gathering line
Well location
End of Production
Wells have no equipment because it is not needed.
Flow line
Gathering lineg
Well location
API RP 80 – Gas Quality
Commentary On Development Of Definitions
2.6.2.1 Physical Parameters
A h h id d d j d i h d l fAmong the approaches considered and rejected in the development of a gathering line definition were physical parameters such as line size, length, and operating pressures. Such factors are not sufficiently correlative to actual pipeline function to be useful. Also found to be i d t d t i ti b d litinadequate were determinations based on gas quality or gas throughput. These factors are often more dependent on producing reservoir characteristics than on surface operation. Neither gas quality nor gas throughput provides consistency in determining the nature of th f ilit h dli th d th f ith d d blthe facility handling the gas, and, therefore, neither are dependable indicators of pipeline function.
End of Gathering
To determine the end point of gathering, you have to use a combination of the gathering linehave to use a combination of the gathering line definition in API RP 80 with the limitations in 192.8(a)(2).192.8(a)(2).
The end of gathering is established by theThe end of gathering is established by the furthermost endpoint…….
API 80 - Gathering Line
2.2(a)(1)(A)
The inlet of the furthermost downstream natural gas processing plant, other than a g p g p ,natural gas processing plant located on a transmission line,
End of Gathering – Processing Plant
§192 8(a)(2) –§192.8(a)(2)
The endpoint of gathering under sectionThe endpoint of gathering, under section 2.2(a)(1)(A) of API RP 80, may not extend beyond the first downstream natural gasbeyond the first downstream natural gas processing plant, unless the operator can demonstrate using sound engineeringdemonstrate, using sound engineering principles, that gathering extends to a further downstream plant. p
API 80/Part 192 Combined –Processing Plant
The two combined……
2.2(a)(1)( )( )(A) the inlet of the furthermost firstdownstream natural gas processing plant, th th t l i l tother than a natural gas processing plant
located on a transmission line,
API 80 – Gas Treatment
2 2(a)(1)2.2(a)(1)
(B) the outlet of the furthermost(B) the outlet of the furthermost downstream gathering line gas treatment facility,y
API RP 80 - Gas Treatment2.2.1.2.2 Gas Treatment
Gas treatment often occurs in conjunction with gas processing or compression and in such cases is considered to be part of those operations. In some cases, however, gas treatment operations involve significant standtreatment operations involve significant stand-alone facilities (e.g., a sulfur recovery or large dehydration facility).y y)
End of Gathering – Gas Treatment
§192 8(a)§192.8(a)Regulation is silent on a limitation, but from the preamble of the final rule this endpointthe preamble of the final rule – this endpoint refers to a “gas treating plant” in the RP as a significant stand alone facilities (e g asignificant stand-alone facilities (e.g., a sulfur recovery or large dehydration facility) or similar facility and is not intended to be aor similar facility and is not intended to be a simple piece of equipment like a separator or dehydratoror dehydrator.
API 80 – Commingling
2 2(a)(1)2.2(a)(1)
(C) the furthermost downstream point(C) the furthermost downstream point where gas produced in the same production field or separate production fi ld i i l dfields is commingled,
End of Gathering - Commingling
§192 8(a)(3) –§192.8(a)(3)
If th d i t f th i d tiIf the endpoint of gathering, under section 2.2(a)(1)(C) of API RP 80, is determined by the commingling of gas from separate productioncommingling of gas from separate production fields, the fields may not be more than 50 miles from each other unless the Administrator findsfrom each other, unless the Administrator finds a longer separation distance is justified in a particular case (see 49 CFR §190.9).particular case (see 49 CFR §190.9).
API 80/Part 192 Combined –Commingling
2 2(a)(1)2.2(a)(1)
(C) the furthermost downstream point(C) the furthermost downstream point where gas produced in the same production field or separate production fi ld i i l d b t th fi ldfields is commingled, but the fields may not be more than 50 miles from each other
End of Gathering - Commingling
But…But…
PHMSA also considers the point ofPHMSA also considers the point of commingling on the line can’t be more than 50 milesthan 50 miles
ProductionField “C”
Production
Point “A ” to Point “B” – 6 milesPoint “B ” to Point “C” – 42 miles
Transmissi
Endpoint of Gas Gathering
ProductionField “A”
Point “B”
on Pipeline
Point “A”
Point “C”
ProductionField “D”LEGEND
Point A
ProductionField “B”
Field DLEGEND
Transmission Pipeline
Gathering pipeline
ProductionField “C”
Point “A” to Point “B” – 6 milesPoint “B” to Point “C” – 70 miles
Transm
ProductionField “A”
Point “B” Point “C” mission PipelineEndpoint of
Gas Gathering
e
Gas GatheringPoint “A”
Production
ProductionField “D”LEGEND
Transmission Pipeline
Gathering pipelineField “B”
g p p
ProductionField “C”
Production
Point “A ” to Point “B” – 6 milesPoint “B ” to Point “C” – 42 miles
Transmiss
ProductionField “A”
Point “B” Point “C”
sion Pipeline
Endpoint of Gas Gathering
Point “A”
ProductionField “B”
ProductionField “D”
LEGEND
Transmission Pipeline
Gathering pipelineField B
API 80 – Compressor
2.2(a)(1)
(D) the outlet of the furthermost downstream compressor station used to plower gathering line operating pressure to facilitate deliveries into the pipeline from production operations or to increaseproduction operations or to increase gathering line pressure for delivery to another pipeline, orp p ,
End of Gathering - Compressor §192.8(a)(4) –
The endpoint ofThe endpoint of gathering, under section 2.2(a)(1)(D) of API RP 80, may not extend beyond the furthermostfurthermost downstream compressor used to increase gathering line pressure for delivery to another pipelineanother pipeline.
API 80/Part 192 Combined -Compressor2.2(a)(1)
(D) the outlet of the furthermost downstream compressor station used to l th i li ti tlower gathering line operating pressure to facilitate deliveries into the pipeline from production operations or to increaseproduction operations or to increase gathering line pressure for delivery to another pipeline, or
No change…..
Transmission
Compression
CompressionLEGEND
Transmission Pipeline CompressionTransmission Pipeline
Gathering pipeline
API 80 – Connection to Another Pipeline
2 2(a)(1)2.2(a)(1)
(E) the connection to another pipeline(E) the connection to another pipeline downstream of:
(i) the furthermost downstream endpoint identified in (A), (B), (C) or (D), or (in the absence of such endpoint)(ii) the furthermost downstream production(ii) the furthermost downstream production operation; or
End of Gathering – Connection to Another Pipeline
Regulation limits the connection to another pipeline except for …..
API RP 2.2(a)(1)(B)( )( )( )Downstream of a treatment facility
Remember…..a significant stand-alone facility
API RP 80 – Incidental Gathering
2 2 1 2 6 Incidental Gathering2.2.1.2.6 Incidental Gathering
“Incidental Gathering” is the additionalIncidental Gathering is the additional downstream gathering pipeline sometimes needed to connect the outlet of an identified gathering endpoint with a transmission line, distribution line, or other pipeline facilitypipeline facility.
Transmission
Gas Treatment FacilityLEGEND
Transmission Pipeline
G th i i liGathering pipeline Incidental Gathering
API RP 80 – Connection to Another Pipeline
And also……And also……
2.2 Onshore Gathering Lineg(a) means any pipeline or part of a connected series of pipelines used to
(2) transport gas from a point other than in a production operation exclusively to points in or adjacent to one or more production operationsadjacent to one or more production operations or gathering facility sites for use as fuel, gas lift, or gas injection gas within those operations
Compressor
ProcessingPl t
Transmission
PlantFuel gas return to other
gathering or production operations)
Line ALine B
LEGEND
Transmission Pipeline
Gathering pipeline
API RP 80 - Gathering Line
2.2 Onshore Gathering Line
(a) means any pipeline or part of a connected series of pipelines used toseries of pipelines used to
(1) transport gas from the furthermost downstream point in a production operation to thedownstream point in a production operation to the furthermost downstream of the following endpoints, …………
ProductionField “C”
Point “A ” to Point “B” – 6 milesPoint “B ” to Point “C” – 42 miles
Transmis
Endpoint of Gas Gathering
ProductionField “A”
Point “B”
Processing ssion PipelinePoint “C”
ProcessingPlant
Production
Point “A”
ProductionField “B”
ProductionField “D”LEGEND
Transmission Pipeline
Gathering pipelineField B
Further most downstream…….
TransmissionN t l G TransmissionNatural Gas Processing
PlantCompression
C iCompressionLEGEND
Transmission PipelineGathering pipeline
Further most downstream…….
What are regulated segments?
(b) For purposes of §192.9, “regulated(b) For purposes of §192.9, regulated onshore gathering line'' means:
(1) Each onshore gathering line (or ( ) g g (segment of onshore gathering line) with a feature described in the second column that li i d ib d i th thi d llies in an area described in the third column; and
(2) As applicable additional lengths of line(2) As applicable, additional lengths of line described in the fourth column to provide a safety buffer:y
Categories of Gathering Lines
Type “A”Type A=> 20% SMYS; or Above 125 psig for non-metallicAbove 125 psig for non metallic
Type “B”yp< 20% SMYS; or At or below 125 psig for non-metallicp g
Regulated Type A
Type “A”Type A=> 20% SMYS; or Above 125 psig for non-metallicAbove 125 psig for non metallic
Located in Class Locations 2, 3 and 4C , 3
Regulated Type B
Type “B”Type B< 20% SMYS; or At or below 125 psig for non-metallicAt or below 125 psig for non metallic
Area 1 - Located in Class Locations 3 and 4C 3
Area 2 - Located in Class Location 2Area 2 - Located in Class Location 2
Regulated Type B – Area 2 Determinations
(a) A Class 2 location.
(b) An area extending 150 feet on each side of the centerline of any continuous 1 mile of pipeline and including more than 10 but fewer than 46 dwellings.
Total Regulated Pipeline Segment
Area 2(b) Application
Total Regulated Pipeline Segment
150 feet150 feet 150 feet
150 feet
1 Mile
Regulated Type B – Area 2 Determinations
(c) An area extending 150 feet on each side of the centerline of any continuous 1000of the centerline of any continuous 1000 feet of pipeline and including 5 or more dwellingsdwellings.
Area 2(c) Application
Segment A1000 feet
150 feet
150 feet
Segment B1000 feet000 eet
Segment C1000 feet
Total Regulated Pipeline Segment
Area 2(c) Application
Segment A1000 feet
150 feet
150 feet
150 feet
Segment B1000 feet
150 feet
000 eet
Compliance Activities
Type “A”Type AAll transmission line activities requiredactivities required by Part 192 except IM and ILI passage gcapability
Compliance Activities
Type “A”Type AHowever, an operator of a Type A regulated onshore gathering line in a Class 2 locationonshore gathering line in a Class 2 location may demonstrate compliance with subpart N by describing the processes it uses to y g pdetermine the qualification of persons performing operations and maintenance tasks
Compliance Activities
Type “B”Type BIf a line is new, replaced, relocated, or otherwise changed the designotherwise changed, the design, installation, construction, initial inspection and initial test must be ininspection, and initial test must be in accordance with this part for transmission linestransmission lines.
M h 15 2007March 15, 2007
Compliance Activities
Type “B”Type BIf the pipeline is metallic, control corrosion according to Subpart Ip
Damage Prevention Program under §192.614
Establish the MAOP of the line under §192.619
Line marking for transmission lines in §192.707;g §
Public Education Program under §192.616
Compliance DeadlinesRequirement Compliance deadline
Control corrosion according to Subpart April 15, 2009.g pI requirements for transmission lines.
p ,
Damage prevention program under 192 614
October 15, 2007. §192.614.Establish MAOP under §192.619 October 15, 2007.
Install line markers under §192 707 April 15 2008Install line markers under §192.707 April 15, 2008.
Public Education program under §192 616
April 15, 2008.§192.616.Other provisions of this part as required by paragraph (c) of this
ti f T A li
April 15, 2009.
section for Type A lines.
§192.619 What is the maximum allowable i f l l i i li ?operating pressure for steel or plastic pipelines?
(a)(3) The highest actual operating pressure to ( )( ) g p g pwhich the segment was subjected during the 5 years preceding the applicable date in the second column This pressure restriction appliessecond column. This pressure restriction applies unless the segment was tested according to the requirements in paragraph (a)(2) of this section q p g p ( )( )after the applicable date in the third column or the segment was uprated according to the requirements in subpart K of this partrequirements in subpart K of this part
5 Year Highest Operating Pressure
Pipeline segment Pressure date Test date
—Onshore gathering line that first became
March 15, 2006, or date line becomes subject to
5 years precedingthat first became
subject to this part (other than §192.612) after April 13 2006
line becomes subject to this part, whichever is later.
preceding applicable date in second columnafter April 13, 2006.
—Onshore transmission line that was a gathering line not
column.
g gsubject to this part before March 15, 2006.
MAOP
(c) The requirements on pressure restrictions in this(c) The requirements on pressure restrictions in this section do not apply in the following instance. An operator may operate a segment of pipeline found to b i ti f t diti id i it tibe in satisfactory condition, considering its operating and maintenance history, at the highest actual operating pressure to which the segment wasoperating pressure to which the segment was subjected during the 5 years preceding the applicable date in the second column of the table in paragraph (a)(3) of this section. An operator must still comply with §192.611
Questions
Compressor with associated treatment –Compressor with associated treatment dehy and/or amine tower – Compressor or Treatment Facility?yAnswer: What is the purpose of the compressor? To increase pressure forcompressor? To increase pressure for treatment or to get into another line. If it is to get into another line – Compressor Stationg p
Questions Cont…
If a gathering line was previouslyIf a gathering line was previously jurisdictional (inside city limits) and is operating less than 20% SMYS in a class 3 p g %area, does the operator have to continue to comply with all of Part 192.p y
No The operator only has to comply with theNo. The operator only has to comply with the requirements for a type “B” line.