Garrett Office BuildingsEdmond, Oklahoma
Geothermal Building20,000 Sq. Ft.
VAV Building15,000 Sq. Ft.
Floor 2Conference
Floor 2 Private Office
Floor 2 Open Office Space
Typical Heat Pump
Geothermal BuildingFloor 2 Heat Pump Supply Ducts
141512x16
12x20
8
9 10
11
12
13
16
12x16 10” Typical ofAll BranchDuctsAll Heat Pumps
12x16
12x20
12x20
12x16
12x16
12x20
12x14
12x10
15x20
12x10
Loop Field Overview
Geothermal BuildingLoop Field Site Plan
LoopField
Details
Short headerlocation
2” PE Zone Supply Header - Return Similar3/4” PE borepiping back toheader
Notes:- 40 bores on 20 foot centers each with 3/4” PE pipe- Short header manifold in center of each loop zone of 10 bores- Each bore must have the same overall pipe length for balanced flow
(Coil excess piping in the header trench)
- Loop zone supply and returns done in same fashion- Bores must be grouted when completed
Typical bore
250 ft deep
GeothermalMechanical
Room
GeothermalMechanical
Room
2” PE typical
Heat Pump
Supply
Heat PumpReturn
Expansion
Air
Separator
CWS
Bypass
Pressure Reducer/Relief
Backflow Preventor
3/4”Air Vent
3” Copper
2” PE typical
125 GPM @ 70’
Pumps
Primary/Standby
Ground LoopSupply
Ground Loop
Return
Charging
Floor 1 Heat Pump Piping
Garrett Office BuildingsHighway View
Geothermal BuildingRoof View
VAV BuildingRoof View
VAV BuildingCentral Air Handler
VAV BuildingAir-Cooled Condensing Unit
VAV BuildingBoiler Room
1.50
2.00
2.50
$p
er
Sq
uare
Fo
ot
Garrett Buildings
Annual Energy and HVAC Maintenance Costs 2006-2007
-
0.50
1.00
$p
er
Sq
uare
Fo
ot
VAV System Geothermal
Total Electricity Gas Maintenance
50
60
70
80
90
kB
tup
er
Sq
uare
Fo
ot
Garrett Buildings
Annual Energy Use 2006-2007
-
10
20
30
40
50
kB
tup
er
Sq
uare
Fo
ot
VAV System Geothermal
Total Electricity Gas
40
45
50
Eq
uiv
ale
nt
per
Sq
uare
Fo
ot
Garrett Buildings
Annual CO2 Emissions 2006-2007
20
25
30
35
Lb
s.C
O2
Eq
uiv
ale
nt
per
Sq
uare
Fo
ot
VAV System Geothermal
Electricity Gas
Garrett Buildings
Monthly Energy Use
4
5
6
7
8
9
10
kB
tup
er
Sq
ua
reF
oo
t
0
1
2
3
4
Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07
kB
tup
er
Sq
ua
reF
oo
t
VAV System Geothermal
Garrett Buildings
Monthly Peak Demand
4.0
4.5
5.0
5.5
6.0
Watt
sp
er
Sq
uare
Fo
ot
2.0
2.5
3.0
3.5
Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07
Watt
sp
er
Sq
uare
Fo
ot
VAV System Geothermal
Garrett Buildings
Monthly Electricity Supply Load Factor
40
50
60
70
Lo
ad
Facto
r
20
30
Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07
VAV System Geothermal
Garrett Office BuildingsInstallation Costs
• Geothermal System circa 1998– Complete exterior loop, mechanical room,
interior PE piping, flushing and unit startup,heat pumps, duct work, exhausts, MUAsystem, timeclock-based controlssystem, timeclock-based controls
– $128,700 ($2,574 per ton)
• VAV System circa 1987– air-cooled condenser, VAV air handler,
boiler, VAV boxes with reheat coils,economizer, electronic controls
– $100,000 ($2000 per ton)
– costs per building owner do not includestructural or architectural