GARP: Energy Risk Professional (ERP)

Physical Commodity Markets

Study Notes – Based on 2013 ERP Course Pack

Page 2: Garp Erp Study Notes

Oil and Gas

Source Rock, transported to Resevoir Rock

Kerogen

Sediments

1.11Origins of Oil and Gas

For hydrocarbons to accumulate, three conditions must be met –

Sedimentary basin must be created – results from movement of the Earth’s crust, which creates large depressions within which sediments from elevated areas are transported to over time.

Sediments in such basins must contain a high level of organic matter – this matter becomes part of the sedimentary material to create source rock.

Elevated temperature and pressure – these conditions must be sufficient to convert the material in the source rock into oil and gas. Maturity describes the degree to which petroleum generation has occurred. Heavy, thick oil is considered immature having been generated at relatively low temperatures. Mature oil – lighter or less viscous – forms at high temperatures.

An important process, called migration, sees the hydrocarbons moving out of the source rock through cracks, faults and fissures and into porous and permeable reservoir rock (movement is typically upwards). This reservoir rock must be configured (from prior geologic activity) in a way that retains the hydrocarbons within structures called traps. This allows oil and gas to accumulate in sufficient volumes.

Initial microbial action (in the presence of oxygen dissolved in seawater) returns part of the sediment’s carbon to the atmosphere as carbon dioxide. As the sediment layer gets thicker, subsequent bacterial processes at work in the deep seabed mud (with little or no oxygen present in the mud itself or the water immediately above it) convert the remaining organic matter into a waxy material called kerogen. Kerogen is a complex mixture of large organic molecules whose appearance and characteristics depend on the nature and concentration of materials of which it is composed. Kerogen concentrations as low as 1-3% are generally sufficient to produce source rock suitable for commercial exploitation.

Black shale is the most common kind of source rock. Oil source rocks can contain up to 40% organic matter, and the level approaches 100% for some types of coal.

Temperature plays a key role in the generation of oil and gas from kerogen. As the organic-rich source rock undergoes progressive burial (as additional sediments are laid down above it), the rock becomes

progressively hotter. This phenomenon reflects what is called the geothermal gradient of the Earth. The gradient is variable approximately 60-122 meters below the Earth’s surface, owing to atmospheric influences and circulating groundwater. Below 122 meters, temperature rises steadily with depth circa 1.5-2°C per 30.5 meters. The term oil window is used to describe the range of

Proprietary & Confidential 2

Page 3: Garp Erp Study Notes

temperatures or depths within which most of the oil’s complex constituents are produced. Peak conversion occurs at around 100°C, however, if the temperature rises above 130°C, then the crude oil itself begins to break into smaller molecules, and gas begins to be produced. Wet gas contains high levels of relatively heavy hydrocarbons, whilst dry gas contains lighter hydrocarbon gases. Other factors which can affect the rate of oil generation are pressure (imposed by overlying rock and sediment), the presence of heat-tolerant bacteria that act on the oil, and the presence of hydrogen and oxygen (from water).

Oil and gas typically move around within (and eventually expelled from) source rock after generation, typically driven by the pressure of overlying rock layers and aided by the presence of faults and cracks in the source rock and nearby rock layers. Oil very rarely collects in large underground pools of liquid, accumulating instead in the pores of highly permeable reservoir rock. Permeable rock has extensive and well-connected pores that enable substantial hydrocarbon flow to a drilled wellbone. Water is virtually found in the pore spaces of reservoir rock, intermingled with oil and gas. For this reason, most wells pump not only oil and gas, but also mineral-laden water called brine. The saline water is heavier than most forms of crude and generally sinks beneath it.

Reservoir rock with good porosity and permeability is generally classified as either a clastic or a carbonate system. Clastic sediments are formed from fragments of various rocks that were transported and redeposited to create new formations. Carbonate rock is typically formed by a chemical reaction between calcium and carbonate ions in shallow seas, or by a process called biomineralization.

There are several types of traps, all of which have been created by prior deformation of the Earth’s crust. Highly impermeable rocks above and around the trap seal it in a way which prevents significant movement of hydrocarbons.

Structural trap – formed by tectonic processes, the movement of the rock plates that comprise the top of the Earth’s crust.

Stratigraphic trap – created when a seal or barrier is formed above and around an oil or gas bearing formation by sedimentary deposition of impermeable rock.

Combination trap – formed by a combination of processes that occurred in the sediments during the time of deposition of the reservoir bed.

1.11 Oil Overview

Petroleum in its most common liquid form is referred to as crude oil. Crude oil is a mixture of a very large number of hydrocarbons with arcane names depending on the number of carbon atoms they contain (in addition to functional groups). The type, variety, and structure of the hydrocarbon molecules in crude oil determine its physical and chemical properties.

The petroleum industry uses three major parameters to classify crude oil –

Geographic location – affects the cost of transporting the crude to a refinery API gravity – an oil industry measure of density. Light crude oil = low density. Oil with an API

gravity less than 10 is classified as extraheavy. Sulphur content – considered sweet if it contains little sulphur, or sour if it contains

substantial amounts.

Light crude oil is more desirable than heavy oil because it produces a higher yield of gasoline, a highly valued petroleum product for transportation use. Sweet oil commands a higher price than sour oil because it has fewer environmental problems and requires less refining.

Proprietary & Confidential 3

Page 4: Garp Erp Study Notes

Oil from an area in which its molecular characteristics have been determined is used as a pricing reference, or benchmark, in global oil markets. Some common reference crudes are-

West Texas Intermediate (WTI) – a very high quality, sweet and light oil delivered at Cushing, Oklahoma. It is the most widely traded oil futures contract in the world.

Brent Blend – made up of 15 oils from fields in the Brent and Ninian systems in the East Shetland Basin in the North Sea. Oil production from Europe, Africa and the Middle East, tends to be priced using this benchmark.

Dubai-Oman – used to benchmark for Middle Eastern sour crude flowing to the Asia-Pacific region.

OPEC Reference Basket – a weighted average of oils and blends from the 12 nations that make up the Organization of the Petroleum Exporting Countries.

Midway-Sunset Heavy – by which heavy oil in California is priced. Midway-Sunset is a large oil field in Kern County, California.

Declining amounts of the above benchmark oils are being produced each year, so other oils are more commonly what is actually delivered in the futures contract.

Methane is the simplest hydrocarbon and is the primary component of natural gas.

Several types of oil resources are called unconventional, to distinguish them from oil that can be extracted using traditional oil field methods. These include tar sands and shale oil.

Tar/oil sands – crude oil is sometimes found in semisolid form, mixed with sand and water. Tar sands contain bitumen-a kind of heavy crude oil. The sticky, black, tarlike material is so thick, that it must be hated or chemically diluted before it will flow. Oil-eating bacteria have destroyed some of the lighter fractions of crude oil in such oil sands, leaving behind the heavier bitumen fractions.

Shale oil – shale oil is found in shale source rock that has not been exposed to heat or pressure long enough to convert trapped hydrocarbons into crude oil. They are usually relatively hard rocks called marls – composed primarily of clay and calcium carbonate – containing the waxy substance kerogen. The trapped kerogen can be converted into crude oil using heat and pressure to simulate natural processes.

If an oil and gas reservoir has low permeability, procedures exist to increase the flow of oil or gas through the formation to the wellbore. One method used to increase the flow from a ‘tight’ formation is fracturing. This method usually involves introducing sand mixed with water or oil into the formation under high pressure to open or clean channels between the pores. Another common method used to increase the permeability of the formation is acidizing. Acidizing usually involves introducing hydrochloric acid into the formation to enlarge or reopen the channels between the pores.

As the world’s reserves of conventional light and medium oil are depleted, oil refineries are investing in the more-complex and expensive systems needed to process increased volumes of heavy oil and bitumen. Heavier crude oils have too much carbon and not enough hydrogen, so these systems generally involve removing carbon or adding hydrogen, to convert the longer, more-complex molecules in the oil to the shorter, simpler ones that characterise end-product fuels.

The total estimated amount of oil in a reservoir, including both producible and non-producible oil, is called oil in place (OIP). However, because of reservoir characteristics and the limits of extraction technologies, only a fraction of this oil can be brought to the surface. This producible fraction comprises the reserves. The ratio of producible oil reserves to total OIP for a given field is often referred to as the recovery factor. Reserves are further categorised by the level of certainty

Proprietary & Confidential 4

Page 5: Garp Erp Study Notes

associated with the estimates of their magnitude. 1P (90% probability) > 2P (50% probability) > 3P (10% probability). History shows that initial estimates of the size of newly discovered oil fields are usually too low. The term reserve growth refers to the increases in estimated ultimate recovery that occur as oil fields are developed and produced. Energy companies sometimes use the parameter barrels of oil equivalent (BOE) as a way to report oil plus gas reserves or production as a single figure.

1.12Developing Oil and Gas Projects

Upstream development opportunities originate in many ways. The classic vertical integration opportunity comes from a firm’s exploration activities in which the exploration arm of the firm identifies a potential resource and the development arm performs an investment appraisal that may or may not lead to project development. With this sequence, the firm controls all aspects of exploration, development appraisal, project development, and production management, and in turn, bears all costs and risks of drilling. Given the increasing technological complexity of projects, firms typically bring in partners to assist in execution.

An upstream development project begins with a prospect or development opportunity. The next step is to perform an appraisal and analysis of the opportunity by evaluating risk, economic returns, project feasibility, and competitive challenges. If the project is deemed viable as it moves through the various review phases, a decision must be made about financing sources for the project. If the decision is to develop, the development design is done and reviewed, followed by the actual execution of the project and handover to the operators.

In the initial days of the oil industry, the first principle of oil production was ‘fast is better’. The industry soon realised that an oil reservoir or filed should be developed with its geophysical properties in mind, particularly the maintenance of its natural drives which force the oil and gas to the surface. Studies yielded the maximum efficient rate (MER) of field production, which was soon the standard used by both industry and regulators.

The arguments against competitive production are clear: excessive wells drilled, greater surface disturbance and excessive surface storage requirements. The longer term result is higher extraction costs because subsurface pressures are inefficiently depleted, which reduces overall oil and gas

Proprietary & Confidential 5

Figure 1 - Project Development Stages

Page 6: Garp Erp Study Notes

recovery. The development of compulsory field unitisation required private parties to coordinate reservoir production to minimise surface and production costs while managing reservoir pressure to maximise recovery.

Present Value= FutureValue¿¿

The discount rate is defined as the risk-adjusted cost of capital for the specific project at hand. In practice, most companies will expect that any investment will yield some minimum amount above the weighted average cost of capital (WACC) - this is called the corporate hurdle rate. The WACC value includes weighted costs of both debt and equity. The company’s WACC represents the average cost of raising capital for general company purposes at current market rates.

The internal rate of return (IRR) is the discount rate that results in the NPV of the expected cash flow stream having a value of exactly zero. A project with an IRR greater than the sponsor’s minimum rate of return (the hurdle rate) is an acceptable investment.

Flexibility in the development plan is necessary. The original development plan should nearly always be reworked, which may result in short delays, but will result in a stronger final outcome.

Technical challenges should be expected in upstream projects. Deep coordination and integration between contractors and project developers is critical for

success. Project developers and firms must be willing to take measured risks and think creatively.

1.13Upstream Oil and Gas Operations

Upstream activities include exploration, acquisition, drilling, developing and producing oil and gas – exploration and production activities (E&P). Downstream activities generally include refining, processing, marketing and distribution. Some activities that have characteristics of both upstream and downstream activities are referred to as midstream.

For accounting, the classification of oil and gas activities as being upstream, midstream, or downstream is of special significance. This is due to the fact that a specialised set of accounting rules and standards apply to the financial accounting for a reporting of upstream oil and gas operations.

Proprietary & Confidential 6

Page 7: Garp Erp Study Notes

A reconnaissance survey is a geological and geophysical (G&G) study, covering large or broad area. A detailed survey is a G&G study covering a smaller area, called an area of interest. A successful well is a well that finds reserves in economically producible quantities.

The right to explore, develop, and produce any minerals that may exist beneath the property is referred to a mineral interest or an economic interest. This specific type of mineral interest that is owned largely determines how costs and revenues are shared. In the US, most mineral rights are owned by individuals. Therefore, oil and gas companies wishing to obtain a mineral interest in the US must typically do so by executing lease agreements with individuals. In most locations outside the US, ownership of mineral rights resides with a governmental entity.

US law assumes that for ownership purposes, the surface of a piece of property can be separated from minerals existing underneath the surface. When a piece of land is purchased, one may acquire ownership of the surface rights only, the mineral rights only, or both. An ownership of both the surface and mineral rights is called a fee interest. If the mineral rights are owned by one party and the surface is owned by another, the surface owner must allow the mineral rights owner, or his lessee, access to the surface area that is required to conduct exploration and production operations.

A mineral interest (MI) is an economic interest or ownership of minerals-in-place, giving the owner the right to a share of the minerals produced either in-kind or in the proceeds from the sale of the minerals. Sharing in-kind means the company or individual has elected to receive the oil or gas itself rather than the proceeds from the sale of the minerals. When the owner of the mineral rights enters into a lease agreement or contract, two types of mineral interests are created – a working interest and a royalty interest. The working interest is stated in terms of how the costs are to be shared (100%), while the royalty interest is stated in terms of its share of gross revenue (1/8).

Working Interest or operating interest (WI) – this interest is created via leasing and is responsible for the exploration, development, and operation of a property. The working interest owner bears all of the costs related to drilling, completion, testing, and other similar costs. However, most leases provide that the royalty owner bear a proportionate share of postproduction costs. Post production costs typically include costs related to the transportation of the saleable product as well as costs necessary to get the product into marketable condition. A working interest can be either an undivided interest (interest in total minerals extracted from ground) or a divided interest (interest in all minerals extracted from ground in a select portion of an estate).

Royalty interest (RI) – this type of mineral interest is created by leasing. The royalty interest is retained by the owner of the mineral rights when that owner enters into a lease agreement with another party. The royalty interest typically receives a specified portion of the minerals produced or a specific portion of the gross revenue from selling the production, free and clear of any costs associated with exploring, developing, or operating the property. A 1/8 royalty is common in the US. This interest is referred to as a non-working/operating interest.

Joint working interest – is an undivided working interest owned by two or more parties. Sharing the working interest is common in the oil and gas industry, as it provides a means for companies to share the costs and risks of operations. Here, one of the parties is designated as the operator of the property, and all the other working interest owners are called non-operators. In a typical E&P joint venture operation, each working interest owner accounts for its own share of costs. This practice is referred to as proportionate consolidation.

Overriding royalty interest (ORI) – a non-working interest crated from the working interest. The ORI’s share of revenue is a stated percentage of the share of revenue belonging to the

Proprietary & Confidential 7

Page 8: Garp Erp Study Notes

working interest from which it was created. Like a royalty interest, the owner of an ORI does not pay any of the exploration, development, or operating costs, but is responsible for tis share of any severance or production taxes. A carved-out ORI is created when the working interest owner sells or transfers the ORI and retains the working interest.

Production payment interest (PPI) – a non-working interest created out of a working interest and is similar to an ORI, except that the production payment interest is limited to a specified amount of oil or gas, money, or time, after which it reverts back to the interest from which it was created and ceases to exist.

Net profits interest (NPI) – a non-working interest created on onshore property typically from the working interest. Offshore, a net profits interest is the type of interest that the government, as the mineral rights owner, often retains when leasing an offshore block to a petroleum company. This type of interest is similar to a royalty interest or an ORI except that the amount to be received is a specific percentage of net profit from the property versus a percentage of the gross revenues from the property. They are not responsible for any portion of losses incurred in property development and operations. These losses, however, may be recovered by the working interest owner from future profits.

Pooled or unitized working interest – this type of interest is created when the working interests as well as the non-working interests in two or more properties are combined. Each interest owner now owns the same type of interest (but a smaller percentage) in the total combined property as they held previously in the separate property. The properties are operated as one unit, resulting in a more efficient, economical operation.

o Pooling is commonly used to describe the amalgamation of undrilled acreage to form a drilling unit.

o Unitization is used to refer to a larger combination involving an entire producing field or reservoir for purposes of enhanced oil and gas recovery.

Overriding royalty interests and production payments are created out of the working interest. These interests are often created by the working interest owner in order to obtain financing or assistance in exploring and developing a property and to spread the risk involved.

In the US, oil and gas leases are typically obtained through the use of a landman, an individual who specialises in searching for and obtaining leases. A landman acts as an agent for an undisclosed principal in trying to obtain a lease at the lowest possible price. The lessor is the mineral rights owner who leases the property to another party and retains a royalty interest. The lessee, the party leasing the property, receives a working interest.

Lease bonus – initial amount paid to the mineral rights owner in return for the rights to explore, drill and produce. Lease bonus payments are usually a dollar amount per acre.

Royalty provision – specified fraction of the oil and gas produced free and clear of any costs (except severance taxes and certain costs to market the product) to which the royalty interest owner is entitled.

Primary term – initial term of the lease. The primary term is the maximum time that the lessee has to begin drilling or commence production from the property. In the absence of drilling or production, the lessee can keep the lease in effect during this term by making an annual payment called a delay rental payment. Some short-term leases (two or three year primary terms), called paid up leases, require the lessee to pay the delay rentals at the inception of the lease. After the primary term, a delay rental payment can no longer keep the lease from terminating.

Shut-in payments – if the well is capable of producing oil or gas in paying quantities but is shut in (not producing), the lease may hold the lease by making shut-in payments. Shut-in

Proprietary & Confidential 8

Page 9: Garp Erp Study Notes

payments are usually made in natural gas situations where access to a pipeline or an oversupply of gas exists.

Right to assign interest – the rights of each party may be assigned in whole or in part without the approval of the other party. For example. The working interest owner may carve out a production payment interest or ORI from the working interest without notifying the royalty interest owner.

Rights to free use of resources for lease operations – the operator usually has the right to use, without cost, any oil or gas produced on the lease to carry out operations on that lease.

Option payment - payment made to obtain a preleasing agreement that gives the oil company (the lessee) a specified period of time to obtain a lease from the entity receiving the payment. In addition to specifying the period of time within which the lessee may lease the property, the option contract will also typically specify the lease form, royalty interest, bonus to be paid etc.

Offset clause – if a producing well is drilled on Lease B close to the property line of Lease A, within a distance specified on the lease contract, the offset clause requires the lessee of Lease A to drill an offset well on Lease A, within a specified period of time, in order to prevent the well in Lease B from draining the reservoir. If however, the leases are within a state with forced pooling or unitization, the leases can be forced to be pooled and operated as one, and the offset clause becomes irrelevant. If the state in question does not have forced pooling or unitization, then the only recourse for the interest owners of Lease A is for the lessee to assume the burden of offset drilling.

Minimum royalty – a minimum royalty clause provides for the payment of a stipulated amount to the lessor regardless of production. A minimum royalty is similar to a shut-in royalty except that it is commonly recoverable from future royalty payments.

Pooling provisions – modern lease forms provide that if the working interest owner forms a pool or unit with other leases, the royalty interest and other non-working interest owners may also be forced to combine their interests with the non-working interest owners of the other leases forming the unit.

A drilling contract is an agreement between the lessee (working interest owners) and a drilling contractor for the drilling of a well. Drilling contracts generally provide payment on a day rate (payment based on the number of days drilled), a footage rate (payment based on the number of feet drilled), or a turnkey basis (payment of a fixed sum of money based on drilling to a certain depth or stage of completion).

The first step in drilling an oil and gas well is selecting the actual drill site. Seismic studies, particularly in 3-D are usually performed, and the results of the studies are examined to determine the optimal site for the well. The well site is normally surveyed and staked, then access roads are built, and the site is graded and levelled. Reserve and waste pits are also prepared, and a water supply is obtained. After the site is prepared, often the initial 20 to 100 feet of the well will be drilled with a small truck-mounted rig. The drilling rig and related equipment are next moved in and set up, a process called rigging up. The well is then ready to be spudded in. The spud date is the date the rotary drilling bit touches the ground.

Routine rotary drilling consists of rotating a drill bit downwards through the formations towards target depth, cutting away pieces of the formations called cuttings. During the drilling process, drilling fluid (mud) is constantly circulated down the wellbore. Drilling mud serves several purposes – raises the cuttings to the surface, lubricates the drilling bit, and keeps formation fluids from entering the wellbore. Approximately every 30 feet as the hole is deepened, a joint of drill pipe is added, a process called making a mousehole connection. Periodically, when the drill bit becomes worn or damaged, the entire drill pipe has to be removed from the hole in a process called tripping out. Tripping out is also necessary when casing must be set. Casing is steel pipe that is set (cemented into

Proprietary & Confidential 9

Page 10: Garp Erp Study Notes

the wellbore), which prevents caving in of the hole, protects fresh water sands, excludes water from the producing formations, confines production to the wellbore and controls formation pressure. After a new drill bit is attached, the pipe is lowered back into the hole, called tripping in. Normally the drill pipe is removed and lowered three joints at a time, depending upon the height of the derrick or mast. A derrick or mast is a four-legged, load bearing structure that is part of the drilling rig. The height of the derrick correlates with the depth of the well, since the derrick must support the weight of the drill string when suspended downhole. i.e. – the drill pipe, etc.

Although most onshore wellbores are drilled vertically, some wells are drilled at an angle. Directional wells are wells that are drilled straight to a predetermined depth and then curved or angled so that the bottom of the wellbore is at the desired location. Horizontal wells are also initially drilled straight down, but then are gradually curved until the hole runs parallel to the Earth’s surface, with drilling actually achieving a horizontal direction through the formation.

Directional drilling is used in situations where the drilling objective cannot be achieved with a vertical wellbore. For example, directional drilling may be necessary in urban locations where limitations exist regarding well location or to side-track around an obstruction. Offshore, directional drilling is normally necessary so that multiple wells can be drilled from a single offshore platform. Horizontal drilling is a subset of directional drilling. Unlike a directional well that is drilled to position a reservoir entry point, a horizontal well is commonly defined as any well in which the lower part of the wellbore parallels the pay zone. The angle of the wellbore does not have to reach 90 degrees for the well to be considered a horizontal well. The objective of horizontal drilling is to expose more reservoir rock to the wellbore than would have been possible with a conventional vertical well. Most oil and gas reservoirs have greater horizontal dimensions than vertical thickness. By drilling a portion of a well parallel to the reservoir, the well is capable of accessing oil and gas that would otherwise not be accessible. Horizontal wells have become a preferred method of recovering hydrocarbons from reservoirs in which the oil and gas bearing zones are more or less horizontal. The cost of drilling horizontally directed wells may be two or three times that of drilling conventional vertical wells. However, the production factor can be enhanced by as much as 15 or 20 times.

During drilling operations, the petroleum engineer or geologist examines data from a number of sources in order to determine whether this is sufficient oil or gas to justify the cost of completing and producing the well. As the well is drilled, mud is circulated in the hole. The mud and cuttings are analysed to identify evidence of hydrocarbons and to gain insight into possible fluid content and rock structure. Core samples, are analysed to determine formation rock characteristics, sequence of rock layers in the earth, and fluid content of the formation. Seismic data, is also often used to ait this analysis.

Proprietary & Confidential 10

Page 11: Garp Erp Study Notes

After total depth has been reached, the well is logged by lowering a device to the bottom of the well and then pulling it back up to the surface. As the device passes up the hole, it measures and records properties of the formations and the fluids residing in them. Based on the results of the analyses and the test method discussed above, as well as other evaluation methods, a decision is made as to whether to complete the well. If the well is judged incapable of providing oil or gas in commercial quantities, it is plugged and abandoned. Activities incident to completing a well and placing it on production include the following –

Obtaining and installing production casing Installing tubing (steel pipe suspended in the well through which the oil and gas are

produced) Perforating (setting off charges to create holes in the casing and cement so formation fluids

can flow from the formation into the wellbore) Installing the Christmas tree (valves and fittings controlling production at the wellhead) Constructing production facilities and installing flow lines

Activities incident to plugging and abandoning a well would include removal of any equipment possible and cementing the wellbore to seal the hole.

Some wells penetrate more than one zone containing oil or gas in commercial quantities. In these cases, the wells maybe completed either to produce from only one zone or from multiple zones. In a multiple completion, the well is capable of simultaneous production from multiple zones containing oil or gas.

The activities involved in offshore drilling are somewhat different than in onshore operations. In territorial waters offshore the U.S, operators may acquire mineral leases from state governments or from the federal government. In contrast to most onshore federal leases, offshore federal leases are obtained through a system of closed competitive bidding on available offshore tracts. Normally, the federal government keeps a 1/6 royalty on the tracts. Drilling operations are much more expensive offshore. Some offshore drilling contracts today are as high as $800,000 per day. As a result, most offshore drilling is done in the form of a joint venture, or joint interest operation. In some offshore areas, very little may be known about the types and depths of the subsurface formations. In those areas, a stratigraphic test well, a well drilled for information only, may be drilled. Often, such a well will be drilled prior to the bidding process and paid for by multiple companies who agree to share the information. Exploratory drilling offshore is almost always done from mobile rigs –

Drilling barges and ships – towed to location Jack-up drilling platforms – these platforms are towed to location, and then the legs are

lowered to the ocean floor, and the structure body is jacked up. Submersible and semi-submersible drilling platforms – platforms are towed to location, and

then the pontoon-like legs are flooded with water for extra stability in the open ocean.

Development wells, which produce a reservoir that has been discovered with exploratory drilling, are often drilled from fixed platforms containing production and well maintenance facilities. The drilling operations of an offshore rig are similar to those of onshore rigs, with the exception of specialised technical adaptations that have been made to deal with the hostile marine environment. Directional drilling is commonly used offshore, since that technique can reach thousands of feet away from the platform. This allows the drilling of multiple wells (as many as 40 or more) from the same development platform. Offshore production may also be achieved via subsea completions. Subsea completions are subsea satellite wells that are suited on the ocean floor. The production from these wells is moved directly to platforms, floating production/storage/offloading vessels (FPSOs), or to the shore, where it is processed and stored pending sale.

Proprietary & Confidential 11

Page 12: Garp Erp Study Notes

Many industry experts predict that the future of the offshore industry is in ultra-deepwater areas. Ultra deepwater is defined as outer continental areas where the water depths are 1,500 meters or greater. The cost of drilling in these areas is extremely high.

Several types of production processes may be employed in order to move the oil or gas from the reservoir to the well. These production processes are commonly divided into three types of recovery methods –

Initial or primary recovery of oil and gas is either by natural reservoir drive or by pumping. Natural drive occurs when sufficient water or gas exists in the reservoir under high pressure to provide the natural energy required to drive the oil to the wellbore. If insufficient natural drive exists, the oil may be pumped to the surface using a beam pumping unit.

When the maximum of oil and gas has been recovered by primary methods, and the reservoir pressure has been largely depleted, secondary recovery methods may be used. This consists of inducing an artificial drive into the formation to replace the natural drive. The most common method is waterflooding, which involves injecting water under pressure into the formation to drive the oil to the wellbore.

The distinction between secondary and tertiary recovery methods may be obscure. Tertiary recovery includes injection of chemicals, gas, or heat into the well to modify the fluid properties and thereby enhance the movement of the oil through the formation. A newer form of tertiary recovery uses microwave technology, which introduces microwaves into reservoirs in northern climates to warm the oil.

Even with the best recovery methods, a large amount of oil remains locked in the formation. Some experts have estimated that 50% or more of the oil cannot be recovered with current technology.

Fluids produced from a well normally will contain a combination of crude oil and natural gas, as well as basic sediment and water (BS&W). Before the oil and gas are sold, the well fluid must be separated, treated, and measured. The amount of oil transferred from the storage tanks is recorded on a document called a run ticket. The amount of payment for the oil is based upon information contained in the run ticket. The gas settlement statement is used to record similar information for the production and sale of gas.

In the 1920s and 1930s, overdrilling was commonplace. Since then, many states have established agencies to oversee oil and gas drilling, with the passing of regulations to eliminate waste and uneconomical methods of producing oil and gas. One common regulation is related to well spacing. The fact that mineral rights in the U.S can be owned by individual parties results in numerous leases that often cover a relatively small acreage. Unless the lease is large, it is unlikely that an oil and gas reservoir would be within a single lease. Without regulations, many more wells than necessary (and wells that are too closely spaced) would be drilled on the typically multiple leases associated with given reservoirs. Today the various states regulate the number of wells drilled into a reservoir through the use of spacing and density regulations in order to prevent economic waste and to maximise reservoir recovery. Economic waste occurs when too many wells are drilled, since an increased number of wells drilled does not necessarily increase oil and gas recovery. The reservoir’s natural drive may be depleted via overdrilling through premature water or gas encroachment. Another common regulation relates to drilling permits. Prior to starting the drilling process, whether on public or private land, a drilling permit is generally required from the state, or if on federal lands or water, from the federal government. Generally, the drilling permit will not be granted unless the well spacing requirements are met or an exception is granted. Another important state regulation deals with restrictions of production. If demand is adequate, states will typically allow all wells and leases to produce at the maximum efficient rate (MER). The MER is the maximum rate at which oil or

Proprietary & Confidential 12

Page 13: Garp Erp Study Notes

gas can be produced without damaging the reservoir’s natural energy. In periods where there is low demand for oil and gas, states frequently restrict production by a proration process. An agency decides the amount to be produced within the state for a given period of time, typically a month, and then prorated this amount the state’s producing fields.

1.14Accounting for International Petroleum Operations

This chapter provides an overview of some of the issues and difficulties encountered in international oil and gas operations. Of special interest are contracts between oil and gas companies and governments that dictate how costs, revenues, and reserves are to be shared.

The agreement between a oil and gas company and the government of the foreign country who owns a given mineral right must state what collective payments are to be received by the government in return for allowing the company to operate. Collectively these payments are referred to as the fiscal system of the country. Examples of such payments include –

Upfront bonuses paid to the host country Royalties paid to the host country Federal and provincial income taxes Infrastructure development for the host country

The exact nature of payments that the government receives is determined by the legal system in the country. Countries that collect payment for oil and gas produced primarily in the form of royalties and taxes are referred to as having concessionary systems. In a concessionary system, the contract conducts exploration, drilling, and possibly development and production activities at its sole risk and cost. Some countries allow foreign oil companies to own minerals in place, while others do not. Countries where the government does not rely entirely on taxes and royalties are referred to as having contractual systems. In a contractual system, the oil and gas company must contract with the local government for the right to share in revenue from oil and gas production. A wide variety of contracts are found in contractual systems, including production sharing contracts (PSCs) and service contracts, with PSCs being the most popular. In a PSC, the foreign oil and gas company, referred to as the contractor, is allowed to recover certain costs and receives a share of the profits. The contractor typically receives payment in-kind (in the form of oil or gas). In a typical service contract, the contractor receives money representing a fee for conducting exploration, development, and production activities. In practice, contracts have numerous different terms and conditions that often make it difficult to classify them as being either PSCs or service contracts. Contracts and agreements generated by a given country may be contractual in nature, but may have some aspects that resemble a concessionary contract and vice versa.

One variation of a concessionary agreement involves the host government participating in the oil and gas operations as a working interest owner. This type of arrangement is generally referred to as

Proprietary & Confidential 13

Page 14: Garp Erp Study Notes

government participation. The government typically sets up a state-owned oil company to participate. This arrangement may also be referred to as a joint venture arrangement. This arrangement may also be referred to as a joint venture arrangement. Here, the contractor may agree to pay 100% of the exploration-type expenditures. If commercial reserves are found, the government retains the right to participate or back in to the development and production operations as a working interest owner at an interest of up to 51%. If the state-owned oil company elects to participate, then it becomes liable for its proportionate share of all future drilling, development, and production costs. The agreement may allow the contractor to recover all or a portion of its up-front exploration-related expenditures. If this is the case, there are two methods of recovery. One is direct payment by the government to the contract. The other, more frequently used method is to allow the contractor to recover some or all of its costs by the contractor keeping the state oil company’s share of production until the contractor has recouped the allowed costs. The oil (or gas) that goes to the parties to allow them to recover their costs is referred to as cost oil or cost gas. Typically, there is a ceiling or maximum amount of production available for cost recovery. This maximum amount of production that can be used for cost recovery is referred to as a cost oil cap. In most contracts, recoverable costs that are not recovered in any given year can be carried forward.

In most contractual systems, any equipment or facilities brought into the country by the contractor become the property of the local government. This does not apply to equipment and facilities that are owned by service companies, equipment brought into the country temporarily, or to leased equipment.

Under a concessionary agreement (where the government is not a working interest owner), the government has little or no involvement in the management and decision making related to day-to-day drilling and operations. Governments historically looked to expand their role in the management of petroleum operations. These factors, as well as other issues, including legal constraints related to the ownership of minerals, largely led to the trend toward production sharing contracts.

A common feature of both concessionary agreements and PSCs is that the contractor agrees to pay the government an up-front bonus for singing the agreement. This bonus is often referred to as a signing bonus or signature bonus. In some instances, a lump sum of money is paid at the singing of the contract, and subsequent payments are made to the government when production reaches an agreed-upon level. These later payments are referred to as production bonuses.

In order to avoid royalty payments from discouraging capital investment, some contracts contain sliding scale royalties. A sliding scale royalty provides for a lower royalty amount when production is lower and increases as production increases. Thus in marginal situations where production is lower, the lower royalty may allow production that would otherwise not have been profitable.

Government sometimes provide incentives to companies in an effort to maximise the amount of money the companies will invest in exploration, drilling and development. These incentives may appear in PSCs or result from other negotiations –

Capital uplifts – sometimes referred to as an investment credit, is an additional amount of cost recovery on capital expenditures over and above actual amounts spent. For example, if a company spends $1,000,000 in recoverable capital expenditures, and there is a 10% capital uplift in the contract, the company will be allowed to recover $110 of actual spending, or $1,100,000.

Ringfencing – generally, each contract area stands alone when computing cost recovery. There is an imaginary boundary around the contract area – neither costs nor production can be transferred outside the boundary. If production in that area is insufficient to allow for full recovery, costs cannot be transferred to another contract area where production is higher and recovered from that production. Incentives that governments may provide is to un-

Proprietary & Confidential 14

Page 15: Garp Erp Study Notes

ringfence or allow cross-fence recovery. This incentive is most effective when the government is seeking to increase exploration in a particular area by allowing a company to immediately recover certain exploration expenditures in the new, frontier area against production from a different, currently producing area. Ringfencing and cross-fence allowance may also be used as tax-related incentives in computing certain petroleum taxes.

Domestic market obligation – some contracts specify that a certain percentage of the contractor’s share of the profit oil be sold to the local government, perhaps at a price that is less than the current market price.

Royalty holidays and tax holidays – incentives governments may use to encourage contractors to maximise investment early in the life of production. Here, the government specifies a period of time during which the royalty provision is waived, resulting in the contractor paying no royalty on production during that period of time. It also leaves the contractor with more money to reinvest in additional drilling and development.

The second type of agreement prevalent in a contractual system is a service agreement. Service agreements can be classified as being either risk service contracts or non-risk service contracts. Risk service contracts are much more common. Here, the contractor bears all of the costs and risks related to exploration, development and production activities. In return, if production is achieved, the contractor is allowed to recover its costs as production is sold. In addition, the government pays the contractor a fee for its services. The fee is typically based on production. In non-risk service agreements, the contractor provides services in the form of such activities as exploration, development and production and is paid a fee by the government that covers all costs. In practice, non-risk service agreements are rare.

In joint interest accounting, one of the key tasks is to determine the proper amount of costs and revenues to be shared by each of the parties. As a general rule, costs that are defined as direct costs in domestic joint operating agreements are likely to be recoverable under the PSC or risk service contract. In a domestic joint operating agreement, recoupment of indirect costs by the operator is specificed via application of overhead rates. Overhead rates (often known as sliding scale rates) are also frequently used in PSCs and risk service contracts to determine the amounts of recoverable indirect costs.

Reserve estimation under a PSC, or risk service contract is much more complex than reserve estimation under a concessionary contract. Basically, if estimating working interest reserves under a concessionary contract, gross recoverable reserves would first be estimated. Then, reserves attributable to royalty interests or other non-operating interest would be substracted. The remainder would be allocated to the working interest owners based on their relative working interests. When estimating working interest reserves under a PSC or risk service contract, the net proved reserves remaining after deducting reserves related to royalties and other non-operating interests would be allocated between the parties. The allocation is based on the amounts to which they are entitled as per the contract terms.

1.15Transportation

The transportation of oil and gas from wellhead or field to refining and then to customer markets is a critical component of the global oil industry value chain. It has become a highly capital-intensive link in the global oil and gas market place, which is often driven as much by geopolitics as it is by traditional business concerns.

Distance – the distance that crude needs to be moved often dictates the mode of movement. Shorter distances may be dominated by trucking, medium distances by barge or rail, and longer distances by tanker or pipeline.

Proprietary & Confidential 15

Page 16: Garp Erp Study Notes

Oil versus gas – oil has always been transportable as a heavy liquid. Gas, however, has always been distinguished by its lack of portability. If gas is to find its way to global markets, it must be liquefied and then moved by most traditional transportation means available to oil.

Ownership and geopolitics – thousands of different owners, organisations, governments and interests are involved in the complex web of transport.

Environmental safety – truck rollovers, railroad de-railings, pipeline leakages and accidents have all led to an intense focus on safety, security, and environmental protection to a degree not seen in many other industries.

Impact on prices paid to producers – transportation costs have an enormous impact on the price paid to the producer at the wellhead. If market prices are relatively competitive for similar crudes delivered to any specific refining facility, the price paid the producer is backed out of the refining purchase price for that specific grade of crude, including transportation cost.

Moving crude oil (black oil) and natural gas from the field to the refinery today is about pipelines across land and supertankers across water. With increasing distances, there is no real competitive choice other than the modern supertanker. Although every case is different, the sheer scale economies, flexibility and speed to market that the world’s crude oil tanker fleet provides is insurmountable. Pipelines have a critical role to play in the global oil industry, specifically in those land-locked areas of the glove in which new (or old) oil and gas reserves are now being developed.

Pipelines

A production field with multiple wells must first combine or gather the crude oil before initial processing and shipping. This initial network of pipes, the flowline network, moves the oil to a central processing plant and/or shipping point. Within gathering systems, there are two categories – radial systems and trunkline systems. A radial system integrates multiple flow lines to a central header where the oil fluids are collected. The trunkline system is an advanced radial system which integrates multiple remote headers into a single collection and processing facility, used in the largest fields. The various lines running from individual pipeline webs are then integrated at a field-level gathering point. From here, they move to large volume crude pipelines or tankers. Some of the most complex and critical forms of gathering systems today are those for deepwater collection.

Because most hubs provide a number of alternative oil or gas supplies to a single point, they often serve a very important role – price setting in the industry. The biggest obstacle in constructing pipelines has been aligning the interests – business and political.

Different products such as regular gasoline, premium gasoline, or jet fuel, are moved through the same pipeline in batches. Once the different batches arrive at their respective destinations, they are

Proprietary & Confidential 16

Page 17: Garp Erp Study Notes

pulled out of the line – batch cutting – into other lines or tankage through a complex set of valves. Some mixing of product occurs at the interface of adjacent product grade batches. This volume can sometimes be mixed into one or both of the adjacent batches and still meet product specification. When products are significantly different grade and value, for example, that between jet fuel and regular gasoline, the product interface, called transmix, must be diverted to tanks and either reprocessed or returned to a refinery. The transmix then has to be reprocessed via a costly procedure into marketable qualities of the two products. Many companies today are working to reduce overwash, the tendency to cut too much of the premium batch interface into the lower grade batch ‘just to be safe’.

A crude oil tanker is a ship constructed specifically for moving crude oil, usually long distances from production areas to refineries. Product tankers, typically much smaller in size, carry petrochemical products of refineries closer to final consumer markets – the downstream market. There are three basic types of tanker charter: spot charters, contract of affreightment, and period charters. Spot charters are single voyage charters to move a single cargo load for a one-time journey. In contract of affreightment charters, a specific crude quantity is named and time and places for loading and delivery are specified, but the specific vessel is not specified. Period charters are roughly equivalent to a longer term contract and may specify a series of charters of a specific vessel for the same or multiple routes. There are a number of different types of contracts commonly in use in shipping today –

Free onboard (FOB) – obligates the buyer to be responsible for shipping the LNG from the liquefaction facility to receiving terminal.

Cargo, insurance and freight (CIF) – makes shipping costs the responsibility of the seller. An important feature is that ownership of the crude is transferred in the midst of the voyage, typically in international waters (and not the point of delivery).

Delivered ex-ship (DES) – the seller is responsible for all shipping and delivery costs, the transfer of crude ownership not occurring until transferred to the buyer at the receiving terminal.

1.16Refining

A petroleum refiner, like most manufacturers, is caught between two markets: the raw materials he needs to purchase and the finished products he offers for sale. As such, refiners and non0integrated marketers can be at enormous risk when the prices of crude oil rise while the prices of the finished products remain static, or even decline. Because refiners are on both sides of the market at once, their exposure to market risk can be greater than that incurred by companies who simply sell crude oil at the wellhead, or sell products to the wholesale and retail markets.

Proprietary & Confidential 17

Page 18: Garp Erp Study Notes

The refining process is critical to the petroleum industry value chain because crude oil has no value until it is transformed into products such as gasoline, diesel, heating oil, and petrochemical inputs. Thus, to a refiner, the value of crude is nothing other than the value of its derivative products. Global refining capacity has been steadily growing over the past decade, largely driven by demand from emerging markets.

It is often said that IOCs, unlike independent refiners, have a natural hedge against adverse price movements of the refining spread components because they control their entire supply chain. In contrast, an independent refiner exposed to the risk of increasing crude oil costs and falling refined product prices runs the risk that refining margins will be less than anticipated. While it is true that IOCs are involved in multiple activities, to efficiently manage their complex network of assets, they buy and sell crude with other refiners. ExxonMobil refines more than twice as much crude as it produces. It is therefore most likely that the primary advantage the IOCs have relative to stand alone refiners is that the integration between refining and upstream activities allows the IOCs to minimise short-term cyclical effects in either branch of the business, rather than a theoretical argument over their ability to hedge crude prices. A merchant refiner can buy crude from any supplier and sell refined product to any customer.

Crude oil often contains water, inorganic salts, suspended solids, and water-soluble trace metals. As a first step in the refining process, to reduce corrosion, plugging, and fouling of equipment and to prevent poisoning the catalysts in processing units, these contaminants must be removed by desalting (dehydrating). The next step is distillation. Cracking breaks the heavier, higher boiling-point petroleum fractions into more valuable products such as gasoline and diesel. The two basic types of cracking are thermal cracking, using heat and pressure, and catalytic cracking.

Hydrotreating is a hydrogenation process used to remove contaminants such as nitrogen, sulphur, oxygen, and metals from liquid petroleum fractions. The contaminants, if not removed from the petroleum fractions as they travel through the refinery processing units, can have detrimental effects on the equipment, the catalysts, and the quality of the finished product. Hydrotreating is usually done prior to processes such as catalytic reforming so that the catalyst is not contaminanted by untreated feedstock.

The value of crude oil is a function of the value of the products that are refined. Refiners evaluate crude oils by what they can earn from the products the different crude oils produce. No two refineries will achieve the same margin for a given crude oil or the same mix of refined products.

The topping refinery separates the crude into its constituent petroleum products by distillation, known as atmospheric distillation. Hydroskimming refineries are equipped with atmospheric distillation, naphtha reforming, and necessary treating processes. The cracking refinery is, in addition to the above, equipped with vacuum distillation and catalytic cracking. The cracking refinery adds one more level of complexity to the hydroskimming refinery by reducing fuel oil conversion to light distillates and middle distillates. The coking refinery can process the vacuum residue into high-value products using the delayed coking process. The coking refinery adds further complexity to the cracking refinery by high conversion of fuel oil into distillates and petroleum coke. Catalytic cracking, coking and other conversion units are referred to as M-secondary processing units. The Nelson Complexity Index captures the proportion of the secondary conversion unit capacities relative to the primary distillation or topping capacity, or the complexity factor to each major refining unit based on its complexity and cost in comparison to crude distillation, which is assigned a complexity factor of 1.0. The higher the index number, the greater the cost of the refinery and the higher the value of tis refined products.

The refining value of crude oil, sometimes referred to as technical value, is the value a refiner expects to realise for the refined products less the operating costs for processing the crude. The

Proprietary & Confidential 18

Page 19: Garp Erp Study Notes

refining value less the cost of the crude equals the refining margin. To facilitate greater transparency in financial markets with regard to refining margins, the concept of crack spread was created. Refiners’ profits are tied directly to the spread between the price of crude oil and the prices of refined products. Crack spread is a term used by the refining industry for the difference between the price of crude oil and refined petroleum products. The crack spread represents the theoretical refining margin and is quoted in dollars per barrel.

Adverse price movements in crude and finished products can present a significant economic risk. Given a target optimal product mix, an independent oil refiner can attempt to hedge itself against adverse price movements by buying oil futures and selling futures for its primary refined products according to the proportions of tis optimal mix. In 1995, NYMEX created the crack spread contract to help refiners lock in a crude oil price and heating oil and unleaded gasoline price simultaneously in order to establish a fixed refining margin. For example, if a refiner expects crude prices to hold steady, or rise somewhat, while product prices fall (a declining crack spread), the refiner would ‘sell the crack’, that is, the refiner would buy crude futures and sell gasoline and heating oil futures.

For protection from increasing product prices and decreasing crude oil prices, the refinery can use a short hedge against crude and a long hedge against products. The outcome is the same as purchasing the crack spread, i.e. sell crude futures and buy gasoline and heating oil futures.

A refinery’s capacity utilisation theoretically can range from 0% to 100%. In reality, 100% utilisation for a refinery or for any plant is extremely difficult to achieve. The optimum rate of capacity utilisation in the US is considered to be 90%-95%, with a 95% utilisation rate considered to be full capacity. Rates below 90% suggest many units are down for maintenance or that refining margins are so depressed that capacity was taken offline.

Given the price differentials for lower quality crudes, refiners in the past had a strong economic incentive to increase imports of sour and high-acid crudes. The discounts on lower quality crude oils can be substantial. For a specific refinery, the most valuable or profitable choice is not necessarily the lowest cost crude oil nor the lightest or sweetest crude. Refiners, in the future, will also have to deal with the quality gap – the growing demand for higher quality products by consumers and regulators coupled with the declining quality of crude oil.

1.17Simple and Complex Refineries

Refineries are about making money, and some refineries make more than others, just because the assembly of processing units in them. Recognition that the prices for crude oil, gasoline, distillates, and residual fuels are connected to each other in a profound way. The kinds of hardware in refineries around the world not only had impact on the profitability of refineries. They set, in large part, the margins between crude and products and the differences between crudes and products themselves.

Simple refinery – crude distillation, cat reforming ad hydro-treating distillates. Complexity factor between two to five.

Complex refinery 0 simple refinery plus a vacuum flasher, cat cracker, alkyl plant, and gas processing. Complexity factor between eight to 12.

Very complex refinery – complex refinery plus a coker, which eliminates residual fuel production. Complexity factor above 15.

As you move from simple to complex to very complex refineries, the gasoline (lighter product) yield goes up and the residual yield goes down. You can note the following things about processing the same type of crude in two different refineries –

Proprietary & Confidential 19

Page 20: Garp Erp Study Notes

1) The light oil yield is lower in the simple refinery.2) This lower yield gives lower revenue. 3) The simple refinery’s operating costs are lower.4) The profitability of the simple refinery is also lower.

The extra margin is what the owner of the complex refinery hopes for and expects as compensation for spending additional funds on extra processing units.

If two refineries are now processing a (cheaper) heavier crude to the example above, the following observations can be seen –

1) Compared to running the medium crude, the light oil yield is significantly less than in the simple refinery.

2) The complex refinery has sufficient conversion capacity to turn the heavy part of the heavy crude into light products, and it will want to run heavy crude oil.

3) The heavy crude price is lower than the medium crude price, but not low enough to keep the simple refinery interested. The simple refinery does not have enough conversion capacity to take advantage of the price difference between the light oils and residual fuel (the light/heavy differential). It will want to run light crude oil.

A hypothetical world with only these two refineries, running at capacity and running only these two crudes, 50% each. The market forces make the world unstable. One or more of the following must happen –

1) The positive margins of both refineries indicate that this world needs to have both the simple and complex refinery stay in business.

2) The complex refinery has incentive to switch to heavier crude oil, but the simple refinery has incentive to switch to lighter crude oil.

3) As they do, the amount of light products increases on the margin, pushing the light oil price down and the residual fuel price up. That hurts the complex refinery more than the simple refinery and reduces the incentive for the complex refinery to run as much heavy crude oil.

4) That reduces the demand (and price) for heavy crude oil and increases the price for light crude oil, which reduces the incentive for the simple refinery to run as much light crude oil.

Any or all of the above changes, put continuous but volatile pressure on the crude and products market and cause crude prices to change relative to each other, and the product prices to do the same thing. Refineries typically model the simple, complex, and very complex refineries and calculate the results of running a selection of light, medium, and heavy crudes.

There are not many simple refineries in the world and hardly any in the developed countries where gasoline is a big part of the market. Product yields and crude composition need conversion capacity in refinery configurations.

As a refiner runs the distilling unit at ever-higher rates, typically the coker fills up first. It is the most profitable unit in the refinery because it converts low-valued heavy oil to high-valued light oil. When that happens, the next increment of crude does not return the same profit as the previous volume. There is no room in the coker, but there may well be some in the cat cracker. So the refinery running the last few barrels per day behaves, on the margin, like a complex (cat cracker) refinery. The refinery slips from a very complex mode to a complex mode. As the distilling unit processes more crude and the cat cracker fills up, the returns slip again. The last increment of crude runs through the distilling unit gets simple yields and lower margins. So a very complex refinery can operate on the margin in any of the three modes.

Proprietary & Confidential 20

Page 21: Garp Erp Study Notes

1.18Natural Gas

The natural gas market is one of the largest, most established energy markets. Natural gas is a mixture of hydrocarbon gases, the most abundant of which is methane. Natural gas is considered ‘dry’ when it is almost pure methane, and ‘wet’ when it contains substantial quantities of the other hydrocarbons. Because the composition of natural gas varies so widely, it is commonly traded in units of heat energy such as British Thermal Units (BTUs).

There are approximately 1,000 BTUs per cubic foot of dry natural gas.

Pipelines are used to transport natural gas as the primary component, methane, contains a relatively low amount of energy per volume. Longer chain hydrocarbons like propane or butane contain enough heat energy to make it practical to transport them in pressurised metal containers. Larger hydrocarbons, like propane and butane, turn into liquids at a warmer temperature than smaller hydrocarbons, like methane. As a result, they need to be removed from the natural gas to prevent liquid from building up in a pipeline.

The terminology for natural gas trading is different than other financial markets. When natural gas prices are quoted by a trader, the quote is usually in relation to the Henry Hub price – the basis price. The basis price quoted by traders is similar to a transportation price to get gas from the Henry Hub to another area. The index price of natural gas is the price at the Henry Hub. The actual price of natural gas, the all-in price, is the combination of the index price and basis price.

An actual position means being exposed to the outright price of gas in some location. For example, a trader who owns the gas physically located somewhere is exposed to the actual price. Sometimes, this is called an all-in position. A basis position means an exposure to a basis price rather than an outright price. Since the basis price is a spread, a basis position is an exposure to two locations – the basis location and the index location. A long basis position at Waha Hub is similar to being long gas physically located at Waha Hub and short gas physically located at the Henry Hub.

To trade natural gas, traders usually enter into two trades: a futures trade at the Henry Hub and a basis swap that exchanges the Henry Hub exposure for an exposure at some other location. The market is structured this way to help traders find trading partners.

There are several common types of natural gas trades. The simplest possible type is a directional bet on the entire natural gas market. However, since natural gas prices are cyclical, it is more common for traders to try to speculate on one aspect of the natural gas market by entering into spread trades. Spread trades are trades where a trader benefits from the price difference between two securities by buying one security and selling another. These trades are popular because they eliminate a trader’s exposure to the entire market moving up and down.

Location spreads – these speculate on the price difference between two locations. Depending on demand, natural gas prices can be substantially different between two locations. Natural gas transportation is not instantaneous, and storage is often limited.

Heat rates – these trades speculate on the relationship between natural gas prices and electricity prices. As two different mechanisms are used to determine the prices of power and natural gas, they don’t move together all of the time and it is possible for a trader to benefit from that volatility.

Time spreads – these speculate on the price difference between periods of high and low demand. For example, it might be possible to speculate on a colder than normal winter by betting that gas prices will be high. The trader might buy winter gas and sell spring gas to eliminate directional exposure to the entire market.

Proprietary & Confidential 21

Page 22: Garp Erp Study Notes

Swing trades – these spread trades rely on the physical ability of the trader to store natural gas over short periods. It is possible to pick up inexpensive natural gas when demand is low, and resell it when demand is high. This requires the ability to store the natural gas.

In the forward markets, prices are determined by macroeconomic issues – the expected average relationship of supply and demand in the future. In the spot market, prices are based on the supply that is on hand right now and consumer demand right now. As a result, the spot markets are substantially more volatile than the forward markets. In markets where spot and forward commodity markets are linked, usually there is a constant amount of the commodity, and it isn’t consumed when it is used. The spot and forward markets for those products are linked by the ability to buy the commodity in the spot market and store it for future delivery. Since the commodity is never used up (like gold, or a stock certificate), those assets are affected by short-term fluctuations in supply. Natural gas does not work the same way. Long term buy-and-hold strategies are of limited use in natural gas trading. Gas has no intrinsic by itself – it is the products created by burning natural gas that are valuable. Moreover, gas in storage is no easier to deliver than gas newly extracted from the ground, unless the storage is located near a consuming area.

Looking at the forward market, prices are determined by seasonal expectations of supply and demand rather than on the current spot price and storage costs. Seasonal expectations of supply and demand are generally the same every year. Consequently, prices in the forward market tend to mirror consumer demand – both are high during winter and fall dramatically in the spring of every year. The price of natural gas becomes less certain close to delivery, rather than further away, unlike most markets. This is because short-term directions to supplies have a big effect on prices. However, unless prices change for a lasting fundamental reason, large price movements in the spot market do not have a great effect on future prices. Forward prices tend to revert to prices based on typical consumer demand and expected supplies.

Movements in spot prices are very different from the highly predictable prices in the forward market. Part of the reason for this difference is the complexity of storing, or transporting natural gas on short notice. Natural gas in one location can’t just be exchanged for natural gas in a different location – it has to be physically moved there. Natural gas requires specialised facilities to store it. If someone doesn’t have access to a storage facility – and most market participants do not – they can’t buy the commodity early for delivery at a later date.

When very long time frames are considered, the assumption that natural gas prices are a function of supply and demand is misleading. For exploration and development purposes, the supply of natural gas depends on its price. Higher natural gas prices make the extraction of natural gas from difficult-to-reach reserves more economical. In other words, in the long run, supply depends on prices and demand rather than the other way around. As a result, predictions about future prices are mostly a function of expected demand for natural gas.

1.19The Basics

Natural gas is the most flexible of all primary fossil fuels as it can be burned directly to generate power and heat, converted to diesel for transportation fuel, and chemically altered to produce a plethora of useful products. Such products include liquid vehicle fuels, fertilizer, chemicals and plastics. It can do all of this at competitive costs and from a plentiful supply, while emitting significantly fewer harmful pollutants than other fuels.

Pressure and volume relationships are particularly important in the production of natural gas. Gas in the reservoirs may exist in dense phase, with liquid and vapour phases mixed together in equilibrium. Pressures and temperatures above which the dense phase occurs are called cricondenbar (CB) and cricondentherm (CT) levels, respectively. As the natural gas comes to the

Proprietary & Confidential 22

Page 23: Garp Erp Study Notes

surface, decreased temperatures and pressures result in a drop below the cricondenbar and cricondentherm levels. This leads to the separation of liquid and vapour components.

Methane is the main component of natural gas, usually accounting for 70-90% of the total volume produced. If gas contains more than 95% methane, it is sometimes termed dry gas or lean gas, and it will produce few, if any, liquids when brought to the surface.

Gas containing less than 95% methane and more than 5% heavier hydrocarbon molecules is sometimes called rich gas or wet gas. This gas usually produces hydrocarbon liquids during production.

Methane is the most common component transported by pipelines and converted to liquefied natural gas (LNG). LNG is the liquid product produced by cooling methane to−161.5℃. This allows for efficient transport to markets, usually by special ships, where it is heated back to STP and converted to gaseous methane. Liquefied petroleum gas (LPG) refers specifically to propane and butane when they are stored, transported, and marketed in pressurised containers. Natural gas liquids (NGL) include components that remain gaseous at both reservoir and surface conditions. These include ethane, propane and butane, and components that exist with the gas in the reservoir but become liquid on the surface, such as condensates and natural gasoline. Condensates are low-density liquid mixtures of pentanes and other heavier hydrocarbons.

The heavier the hydrocarbon component, the more carbon molecules are present, and the more heat generated when it is burned. If significant quantities of non-methane components are present, the components are separated and sold separately, often at large premiums to the price of pure methane. A large gas development project can often earn as much revenue from selling non-methane components as from methane sales, even though methane may comprise 90% or more of the total volume produced.

Natural gas can also contain non-hydrocarbon components such as carbon dioxide, hydrogen sulphide, hydrogen, nitrogen, helium and argon. All of these impurities, especially the initial two, must be removed from the natural gas stream prior to sale. Carbon dioxide and hydrogen sulphide can corrode pipelines and are significant components of air pollution. Hydrogen sulphide, if left in the gas stream, results in emission of sulphur oxides, a component of acid rain and other air pollution effects. Gases with high levels of hydrogen sulphide are called sour gases, referring to the sour smell of sulphur. Conversely, gases with low levels are termed sweet gases and can be directly sold to consumers. Carbon dioxide is a greenhouse gas, which has been blamed for contributing to global warming.

Contrary to popular belief, gas is not generally sold per unit of volume, but rather per unit of energy that can be produced by burning the gas. End-use customers of gas are interested in the heat energy that combusting the gas will generate. The heat energy of a particular gas stream is measured by units of calorific value, which is defined by the number of heat units released when a unit of volume of the gas burns. Typical units of calorific values are British thermal units (Btu), joules (J) and kilocalories (kcal). A British thermal unit is the energy required to raise the temperature of 1 pound of water by 1℉. Most industrial and residential customers receive gas via a pipeline connection with a gas meter that measures the volume of gas delivered. This volume measurements is subsequently converted, using the average calorific value per volume factor, into the number of energy units consumed by the end user.

Most fields of the world produce raw gas with calorific values ranging up to 1,800Bt u / ft3, which processing reduces to between 960 Btu/ ft3 and 1,050Btu / ft3 for sale to market. A factor of 1,000Btu / ft3 is commonly used.

Gas Formation

Proprietary & Confidential 23

Page 24: Garp Erp Study Notes

The earth’s outermost layer, called the crust, ranges from 10050km in thickness. The crust contains three types of rocks –

Igneous rocks – cooled from volcanic magma or lava. Common examples are granite and basalt.

Sedimentary rocks. These are-o Fragments of other rocks deposited on land or under the sea, mainly by water and

wind. Examples include sandstone and shale.o Chemically precipitated from evaporating waters. Common examples are halite and

gypsum.o Formed by organic activity, including from coral reefs. A common example is

limestone. Metamorphic rocks - of igneous, sedimentary or metamorphic origin, the structure of which

has been changed by pressure and heat. Examples include slate and marble.

Sedimentary rocks are the most important type of rock for producing and storing gas and other hydrocarbons. Though there are differing theories on the origin of hydrocarbons, the organic theory is the more widely held and studied hypothesis. The chemical composition of hydrocarbons, consisting of carbon, hydrogen, and oxygen, are the same materials found in life forms today. That oil and gas reserves are found within sedimentary rocks commonly associated with marine fossils has added to the organic theory. Sedimentary rocks are much more likely to have properties that allow hydrocarbons to generate, migrate, and be stored between their grains. Sedimentary rocks that accumulate in water-rich environments, such as lakes, and oceans in particular, tend to preserve and generate hydrocarbons more efficiently. Once the hydrocarbons are formed, they are lighter than water and can migrate over vast distances under the influence of gravity. Thus, hydrocarbons are often discovered in non-marine environments today, but there is strong evidence indicating they were originally in the marine environment before migrating to their present locations. Marine life, from the simplest plankton and single-celled life forms to the more complex crustaceans and fish species, contain carbon molecules. As these animals die and decay over millions of years, carbon molecules, through processes of heat and pressure, degrade into hydrocarbon compounds. Sufficient volumes of accumulations may form oil and gas reservoirs over time. Generally, the lower the temperature and shallower the depth, the heavier the hydrocarbon component formed. Through temperature is the critical factor, the amount of time that the organic material is exposed to heat and pressure is also an important factor in the production of hydrocarbons. These factors determine the relative amounts of natural gas versus oil that is found in a particular reservoir. In a simple sense, gas, oil and solid hydrocarbons such as coal are merely different stages in the creation of hydrocarbons from organic matter.

Any basin in which commercial quantities of hydrocarbons are found must contain at least one rock layer that hosted the conversion of organic matter to hydrocarbon. This layer is the source rock. Source rocks are usually clay-rich sedimentary rocks commonly called shale. Shales are predominantly found in deeper parts of marine environments, originally having high porosity. Reservoir rocks must have a pathway from the source rocks to allow hydrocarbons to migrate. A sediment capable of becoming a source rock for oil may also produce gas. In this case, gas produced will be associated gas, occurring in the same reservoir and coexisting with crude oil. However, not all sediment capable of producing gas will also produce oil, leading to the huge reserves of non-associated gas, or gas without oil. As a result of these factors, gas reserves are more widely distributed than oil reserves. Both associated and non-associated gas reservoirs are broadly termed as conventional gas resources. In contrast, unconventional gas resources are gas molecules that occur with coal, ice crystals, or in otherwise difficult rock conditions. If there is no market for the gas, it may be flared, but this is considered wasteful and environmentally damaging. Associated gas may be used to power filed generation, or heating and compression equipment. It can also be reinjected

Proprietary & Confidential 24

Page 25: Garp Erp Study Notes

into the reservoir to maintain pressure, mixed with oil to reduce viscosity, or used to increase oil production via gas lift.

Understanding porosity and permeability is critical to visualising how these fluids reside in reservoir rocks. Igneous and metamorphic rocks, which generally do not contain sufficient space between the grains to store hydrocarbons and water, lack sufficient porosity and permeability to become commercial reservoir rocks. If the oil and gas pressure is higher than the pressure in the well, the hydrocarbon is forced to come out of the well. If, on the other hand, the reservoir has been producing for some time, the fluid (hydrocarbon) pressure may not be sufficient to push the fluid to the surface. In this case, mechanical pumps or other methods may be required to extract the hydrocarbon from the reservoir. Sedimentary rocks are the most important rocks for both hydrocarbon formation (source rocks) and hydrocarbon reserves (reservoir rocks). Reservoir rocks must have the ability to store liquids between the sediment grains (measured by porosity). They must also have the ability for the liquids to move through the rock via connecting channels (measured by permeability).

Porosity is the percentage of total volume of a rock that is void space that may be filled with recoverable oil and gas, or by water, or left void. By definition - total volume−grain volume

total volume=porosity

Porosities of more than 10-15% are considered fair, and porosities of greater than 20% are considered very good. The rocks porosity is largely a function of the relative sorting of the grains and the grain size. The more uniform the grains size, the higher the porosity found in the rock. Permeability is the ease with which fluid flows through the connected pore spaces of a reservoir rock, and it is measured in units of darcies or millidarcies. A reservoir may have a high porosity that is filled with hydrocarbons. If the permeability is low and the hydrocarbons are unable to flow through the reservoir into the well bore, the reservoir may be called tight, and it could be uncommercial to produce. In some cases, pumping viscous fluids under high pressure into the reservoir can improve flow rates. The force of the liquid fractures the rocks, allowing reservoir fluids to flow along the cracks into the well bore, potentially increasing conduits or pathways that ease gas production and increase recovery rates. This process, called fracturing, may have to be repeated as the forced cracks collapse, and the results are rarely as good as natural permeability.

Because of density differences, oil will accumulate above the water layer and gas, if present, will accumulate above the oil layer and collect in the highest part of the trap, forming a gas cap above

Proprietary & Confidential 25

Page 26: Garp Erp Study Notes

the liquid layers. Density also helps to explain why oil and gas migrates to the highest point in a formation, if sufficient porosity and permeability conditions exist. Natural gas components may also exist dissolved within the oil layers, separating on the surface when the pressure is reduced.

Two significant factors that have to be estimated from known data are the gas expansions factor and recovery factor. As a reservoir is produced, gas and oil are brought from high-pressure reservoir conditions to lower pressure and lower temperature surface conditions. During this process, the volumes of oil, if present, will decrease as natural gas dissolved with crude oil comes out of solution, and the volume of gas will increase as gas expands in the lower pressure environment. The recovery factor is a measure of the proportion of gas that will ultimately be recovered from the total volume of gas present in the reservoir. The total volume of gas in the reservoir is known as gas initially in place (GIIP). A certain proportion of GIIP volumes will not be recovered. This could be either because it is stuck in pores that are not connected to other pores, or because the surface tension between the gas molecules and the pores of the rock (or water in the reservoir) prevent the gas from moving towards the producing well. Modern production techniques can increase recovery factors to as high as 75-90% of GIIP. However, without sufficient production and reservoir pressure data in place, accurately determining this factor ahead of time is a challenge.

Unfortunately, oil and gas company management use reserve definitions to boost the value of the company and promote the stock price. At current, there is no standard industry-wide definitions of reserves.

Generally, proved reserves have known reservoir characteristics supported by actual or specific production tests and are commercial in the current economic climate. In some instances, proved reserves are assigned on the basis of specific data, such as well logs and core analysis, and are analogous to reservoirs in the same area that are producing. Proved reserves, also called ‘1P’ or ‘P’ reserves can be further classified as developed and undeveloped. Proved developed reserves are expected to be produced from existing wells and infrastructure. Proved undeveloped reserves (PUDs) are located near existing infrastructure, and it is reasonably certain that they will be developed in the future, requiring additional investments to ensure their production. Probable reserves are unproved reserves that analysis of geological and engineering data suggests are likely to be recoverable. In this case, there should be at least a 50% probability that the quantities actually recovered will equal or exceed the sum of provide plus probable reserves (P + Probable = 2P). possible reserves are unproved reserves that are less likely to be recoverable than probable reserves, with at least a 10% probability that the quantities actually recovered will equal or exceed the sum of proved plus probable plus possible reserves, also known as ‘P + Probable + Possible = 3P’ reserves.

The exploration processes for oil and gas are the same. Both oil and gas reservoirs are buried deep underground, at depths of a few hundred meters to many thousands of meters. Other than the obvious usage of boats versus land surface vehicles and the presence of surface features, there is relatively little difference between exploration on land or water. As recently as 50 years ago, the

Proprietary & Confidential 26

Page 27: Garp Erp Study Notes

primary method of discovering hydrocarbon methods was based on clues and indicators visible on the surface. The presence of oil seeps (and to a limited extent, gas seeps) often led to the discovery of the first hydrocarbons. The study of geophysics uses physical properties measured either on the surface or inside wells to determine the property and structure of rocks below the surface. The first geophysical methods were simple gravity and magnetic surveys on the surface, progressing to subsurface measurements of seismic energy waves, radioactivity, and sonic properties.

Gravity surveys – measure the slight variations in gravity readings to locate subsurface rocks of different densities.

Magnetic surveys – measure the changes in the magnetic field over an area to locate sedimentary rocks, which have a lower magnetic field than igneous and metamorphic rocks.

Mapping the variations in gravity and magnetic readings over a large area produces subsurface maps showing the lateral extent of potential reservoir rocks. By drilling at the high point of the sedimentary rock formations, exploration professionals hoped to locate the peak of the anticlinal trap and find a hydrocarbon reservoir. This simple methodology as not reliable, since drilling at the top of a dome-shaped feature did not necessarily mean hydrocarbons were there to be found. Also, these methods did not provide the resolution required to find the faults and other structural changes that would impact the presence and trapping of hydrocarbons. Because of the methodology’s inaccuracy, companies found commercial quantities of hydrocarbons less than one-half of the time.

The development of seismic technology may be the most profound development in the hydrocarbon industry since the discovery of the first oil wells. Explosives, air guns, or vibrating pads directly on the surface generate low-frequency energy waves, which reflect and refract as they pass through the different rock layers. The speed at which waves travel is related to the density of the individual rock layers. Each rock layer has its own density, which determines the time it takes for the waves to pass through the layer (refracted into the next deeper layer) or to be reflected back to the surface. Sensitive microphones (known as geophones on land and hydrophones on the surface of the sea) record the time taken for the waves to return to the surface after they have been refracted and reflected in the earth.

Combining the hundreds of measurements of each source location and repeating the measurements after moving the source hundreds of times can produce a fairly accurate representation of the subsurface geometry. A significant advancement over the past decade or so has been the ability to visualise direct hydrocarbon indicators (DHIs) through sophisticated processing of seismic data. Under ideal conditions, gas reserves, due to their density contrasts, can be directly shown on a processed seismic image. DHIs for oil reserves have provide more difficult to show.

Proprietary & Confidential 27

Page 28: Garp Erp Study Notes

The process of drilling an exploration well is deceptively simple. Drilling a producing well is similar to drilling an exploration well. The main difference between the two types of wells is the amount of information known before drilling. Exploration drilling is riskier because the well and reservoir conditions are not well-known. Penetration of zones with unknown pressures and hydrocarbon content can result in the uncontrolled release of hydrocarbons which, if ignited or released to the surface, could result in human disaster and financial loss. Wireline logging surveys follow the drilling of exploration wells. A spool and data-transmission cable lower sophisticated sensors into the well bore. The sensors measure various physical and chemical properties of the rock layers and the fluids present in the pores of the rock. Common measurements include resistivity, sonic porosity, and nuclear radiation and density.

Once a reservoir has been identified and confirmed by exploration wells, petroleum professionals formulate filed development plans specific to the reservoir. In many countries, development plans have to be approved, as per conditions specified in legal contracts, by the national government via the national oil company or designated ministry prior to beginning any activities. Gas production methodology is a function of the type of gas reservoir and the production stage in the life of the particular reservoir. A simple oil and gas reservoir may initially produce high volumes of oil relative to gas, but as the oil production and reservoir pressure decline, an increasing amount of gas may be produced. This increases the gas/oil ratio (GOR) of the produced hydrocarbons. Reservoir management may dictate producing oil first, using the natural gas pressure to increase oil recovery rates. As the FOR increases, reservoir pressure may become too low for natural production, and without secondary production methods, production will eventually cease from the reservoir. In this case, the total recovery factor could be as low as 20-40%.

An offshore field is developed differently from an onshore field. Offshore development wells are usually tied to a fixed platform with a set number of slots or well bore. A platform may have a large number of slots, each leading to a well deviating away from the platform, draining a specific portion of the reservoir. A more recent innovation for offshore development uses subsea completions. Wells are drilled from mobile rigs, once the wells are completed and all the piping and valves have been installed, the wells are connected to a central hub, also on the seafloor. This allows wells to be further apart than if they were all drilled from a single fixed platform.

Wells are usually drilled by rotating bits connected to drill pipe. As the drill bit penetrates the ground, drill pipes are continuously added to the surface joint, extending the reach of the drill string and keeping the drill bit at the end of the assembly. Wells may be as deep as 15,000 – 20,000ft (4,500 to 7,000m). to prevent sections of well from collapsing after drilling, and to prevent fluid movement between different reservoirs, heavier pipes, called casings, are lowered into the well bores and cemented in place. Drill bits, which start at the surface at diameters of up to 30 inches (75cm), have to be successively smaller to pass through multiple levels of casings. Accordingly, the diameter of the well decreases as the depth increases. Well diameters at the reservoir depth are typically 7 inches (18cm) or smaller with producing pipes, called tubing, inserted inside the casing.

Proprietary & Confidential 28

Page 29: Garp Erp Study Notes

After a well is drilled, data is usually collected to determine the type and extent of reservoir. Cores are actual samples of the rock and fluids in the rock. They are obtained during the drilling process using hollow drill bits. As in the exploration process, wireline logging surveys can be used for measuring various geophysical and chemical properties to indicate reservoir characteristics. After a well is cored or logged, or both, casing cemented into place prevents hydrocarbons and water from entering the well bore. Explosive guns with shaped charges at precise depths perforate the casing to allow hydrocarbons to flow into the well bore and to the surface. This allows selective production from the hydrocarbon zones and prevents undesired water from entering the well bore and mixing with produced hydrocarbons.

Oil wells in early production stages may be produced using natural reservoir energy. Pressure differentials between the lower pressure well bore and the higher pressure virgin reservoir allow oil and gas to flow naturally into the well bore. As the reservoirs mature, declining reservoir pressure allows dissolved gases to vaporise into bubbles in the oil column. As oil flows up the tubing, the pressure continues to decrease, and gas bubbles expand further. Expanding bubbles help to reduce the density and weight of the fluid in the wells, assisting the natural flow of the well. However, continued reduction in reservoir pressure increases the GOR to the point that gas bubbles begin to form within the reservoir itself. These reservoir gas bubbles eventually form continuous channels of gas, leaving some of the oil behind in the well bore, unable to rise to the surface. At this stage, energy from external sources, such as in-well pumps, may be needed to produce the remaining oil. Gas may be injected into the oil well to help reduce the weight of the oil in the well bore to assist oil

Proprietary & Confidential 29

Page 30: Garp Erp Study Notes

production. Gas injected into an overlying gas reservoir can also be used to maintain oil reservoir pressure.

Similar to the process of conversion of organic matter to natural gas, the natural conversion of organic materials to coal also generates large amounts of methane. Methane is stored within the coal bed in much larger quantities per volume of rock than conventional rock reservoirs. Much of coal, and thus much of the methane contained within the seams, occurs close to the surface. This allows cheaper exploration and production from less-expensive, but less-productive (because of lower reservoir pressure), shallow wells. Methane produced from coal seams is called coal bed methane, coal seam methane, or coal seam natural gas. Other than usually having a lower heat value because of the lack of heavier gas compounds, it is similar to gas produced from conventional gas reservoirs. Water permeates coal seams, and water pressure traps any coal bed methane present. Producing coal bed methane requires first removing water to decrease pressure on the coal matrix, allowing free gas to flow into the well bore. The water is usually saline, and disposing of it can add significant costs to coal bed methane production. Conventional gas is produced from relatively homogeneous reservoirs with predictable drainage and flow rates. By contrast, coal seams are variable in terms of their thickness, gas saturation, and dispositional environment. Consequently, the production profile of CBM is very different from conventional gas production. CBM fields require ongoing well drilling and water disposal investments; however, this results in a longer ‘plateau’ production profile and longer field life. CBM, along with tight gas sands, shale gas, and gas hydrates, are collectively termed unconventional gas resources. Shale gas is methane trapped in fractures and within the pore spaces of impermeable shale layers. Gas hydrates are methane trapped within ice crystals, and tight gas sands are gas deposits in very low permeability sedimentary rocks.

The type and extent of natural gas processing depends on the original gas composition and the specifications of the customer. These plants range from relatively simple plants, where oil, impurities and water are removed from the produced gas, to complex plants. In the latter, various hydrocarbon compounds are separated from the gas stream and large quantities of gas, liquids and water are handled. The largest operating cost component in gas processing is compressor fuel cost required to move gas between the various processing units.

Gas processing is necessary for the following reasons-

Sales gas specifications – customers demand that gas delivered to them meet certain compositional and pressure specifications.

Pipeline transport – pipelines, especially those that aggregate gas from multiple gas fields, often limit the composition of the feed gas to maintain pipeline flow and reduce corrosion. Produced field gas may be processed to remove solids (such as sand), water, carbon dioxide and hydrogen sulphide.

Liquids recovery – natural gas liquids (NGL) such as ethane, propane, butane and condensates, that can be recovered as liquids on the surface are often removed from the natural gas stream and sold separately. Petrochemical and other consumers often buy NGLs directly from the gas producer.

LNG and feedstock specifications – LNG plants have rigid and tight specifications for their feed gas. Any impurities in the gas, especially water, carbon dioxide and heavier hydrocarbons will seriously impact their LNG production.

Water, which is often produced with natural gas, must be removed to prevent corrosion. Freezing water in pipelines may form hydrates (ice-like compounds of water and hydrocarbon) that can block pipes and damage processing units. Dehydrating gas is usually achieved by –

Physical separation involving cooling the gas to below the initial dew point, forcing the water to separate by gravity;

Proprietary & Confidential 30

Page 31: Garp Erp Study Notes

Contacting gas to solid drying agents such as silica or alumina, which attract water molecules;

Contacting the gas to liquid absorbers such as glycol.

Produced gas may also contain sand and other solid particles such as scale or corrosion products. Sand is a particular problem due to its destructive impact inside pipelines. Transporting gas containing high levels of sand can blast the inside walls of the pipeline and is a leading cause of pipeline aging. Large filters are often installed at the inlet of the pipeline systems to prevent these particles from entering the pipe.

Carbon dioxide is another compound that must be kept below specified limits as dictated by the gas market. Even where removing carbon dioxide is viable, disposal is often a problem, as most places in the world prohibit direct venting due to greenhouse gas emission limits. Carbon dioxide can be reinjected into porous rock layers in the ground however; the cost of wells and compression may make this option uneconomic, thereby limiting the exploitation of the gas resource.

During the gas combustion process, hydrogen sulphide is released as sulphate, which is an air pollutant, and its emissions are controlled in most markets. Gas sales contracts nearly always state the upper acceptable maximum threshold, often to values of 10 ppm or less.

The reduction in the volume of input natural gas due to removal of NGLs, water, impurities, and plant fuel is called shrinkage. This volume can be significant when input gas is rich or contains a high proportion of impurities such as carbon dioxide.

Extracting NGLs from natural gas is usually achieved by first separating methane from the liquids, followed by separating the remaining NGLs into ethanes, propanes, butanes, and condensates. Refrigeration is the most common method of removing methane. The gas stream is dropped to the temperature at which the heavier NGL liquids liquefy and separate from methane, which liquefies at much lower temperatures than NGLs. Another method to separate methane is the absorption method, which relies on an oil substance with an affinity to attract only NGL molecules, thus separating the methane. Once methane has been removed, the remaining NGL stream is usually sent to fractionation units where the temperatures are increased, allowing the different hydrocarbons to reach their boiling point in separate stages. De-ethaniser → de-propaniser → de-butaniser

1.20Transport and Storage

The biggest challenge – after initial gas field discovery – is transporting the gas from the field to the consumer. Depending on seasonal variations, methane may be added and withdrawn from gas storage facilities before sale. At normal surface conditions, produced gas has a relatively low energy density. This density must be increased via compression, to allow gas, like water or other fluids, to move from high-pressure environments to low-pressure environments. The cost of transporting one ‘energy unit’ of gas via an onshore pipeline is three to five times higher than transporting the equivalent ‘energy unit’ of oil. As a result of difficulties in transporting natural gas, many stranded gas reserves have been discovered and mapped, but their size, composition, and distances to market make them uneconomic to develop.

The first step in transporting gas occurs once gas reaches the surface via the tubing pipe. Produced gas flows through surface valves and flanges collectively known as wellhead or Christmas tree assembly. From the wellhead, the fluids may be separated into phases using simple gravity separators and sent to a central processing plant.

Pipelines are the most common, and usually the most economic, delivery system to transport gas from the field to the consumer. Pipelines are a fixed, long-term investment that can be uneconomic

Proprietary & Confidential 31

Page 32: Garp Erp Study Notes

for smaller and more remote gas fields. The volume of gas that can be transported in a pipeline depends on two main factors – the pipeline operating pressure and pipe diameter. In order to handle the increasing demand, it is likely that operating pressures will increase rather than the size of the pipe. In some parts of the world, such as the Middle East, reservoir pressure alone may be sufficient to power the local pipeline network. If the gas to be transmitted is rich, containing heavier compounds such as ethane and propane, these compounds may form liquid slugs inside the pipe as the pressure decreases, resulting in two-phase flow inside the pipe. If the pipe operates at a higher pressure, the gas maintains a dense phase that is neither liquid nor vapour. Rather, it is a tight mixture of the two phases, avoiding the difficulties of two-phase flow.

Deciding which type of compressor is a function of-

Cost of gas versus electricity – the amount of fuel gas used by a compressor can be significant, and may materially impact on the quantity of gas available for sale.

Operating expenses – gas compressors are more complicated, with a higher number of moving parts.

Regulatory constraints – gas compressors are louder and have more emissions than electrical compressors. Obtaining permits to operate gas compressors near urban areas may be difficult.

Availability of electricity – many long-distance gas transmissions lines cross remote areas where reliable electrical power may be a problem. Gas compressors allow the pipeline to be independent of the local electrical utility.

Maintenance and emergency plans – compressors require periodic preventive maintenance to maintain efficiency.

Steel, the main component of pipelines, is susceptible to oxidation, cracking and corrosion. Electrons in exposed steel surfaces, especially in humid or wet soil environments, flow away from the pipe, which becomes oxidised and brittle. Modern pipelines are coated, either at the factory or prior to installation, with a variety of materials to mitigate the effect of oxidation and reduce the exposed surface area. Cathodic protection, used when the pipeline is buried or submerged in water, applies a direct current to the surface of the pipeline. This offsets the corrosion current by causing electron flow in the opposite direction of corrosion flow, mitigating the flow of electrons and drastically reducing the level of corrosion in the pipeline. Long-distance pipelines are often segmented with a number of sectionalizing valves. If an incident causes the pipeline pressure to suddenly drop, the nearest sectionalizing valve can be shut off remotely or manually to reduce the amount of escaping gas and minimise the safety hazard.

The gas industry uses an interesting unit to measure pipeline costs, dollars per inch kilometre, measuring the cost of 1 inch diameter per kilometre length. In North America and Europe, pipeline companies that do not own the gas that they transport operate most long distance pipelines. These pipelines operate as open access carriers, and the owners of the gas contract with the pipeline companies to transport the gas for a fee, or tariff. If requests for space on the pipeline exceed the line’s capacity, the space is allocated among shippers in a non-discriminatory manner, usually on a first-come, first-served basis. A local or federal government agency monitors the tariff rate based on an allowed rate of return and valuations of the assets to regulate the tariff that the pipeline may charge.

LNG currently represents the most exciting aspect of the international gas landscape. LNG is simply an alternative method to transport methane from the producer to the consumer. Methane is cooled to −161.5℃, converting its gaseous phase into an easily transportable liquid whose volume is approximately 600 times less than the equivalent volume of methane. At the receiving location, liquid methane is offloaded from the ship and heated, allowing its physical phase to return from liquid to gas this gas is then transported to gas consumers by pipeline in the same manner as actual

Proprietary & Confidential 32

Page 33: Garp Erp Study Notes

gas produced from a natural gas produced from a natural local gas field. The LNG process is more complex than pipeline transportation. The “LNG chain” consists of discrete sections: upstream, midstream, liquefaction plant, shipping, regasification, and distribution. Ownership of each component is usually not consistent, necessitating complex agreements between all parties.

LNG technology is not new. The first commercial LNG facility was built in the United States in 1941 in Cleveland as a peak load shaving facility. Gas was liquefied during hours or seasons of low demand and heated back to gaseous phase to be pumped into the pipeline grid during periods of high demand. The decision to commercialise a gas field by either LNG or direct pipeline is related to the distance to market from the gas reservoir. Rules of thumb typically followed include –

Gas market is more than 2,000 km from the field The gas field contains at least 3-5 tcf (trillion cubic feet) of recoverable gas Gas production costs are less than $1/MMBtu, delivered to the liquefaction plant The gas contains minimal impurities, such as carbon dioxide or sulphur Presence of a marine port

Units used in the LNG trade can be confusing. Produced gas is measured in volume (cubic metres/cubic feet), but once it is converted into LNG, it is measured in mass units usually tons or million tons.

The upstream and midstream sections of the LNG chain are identical to traditional gas systems, with identical gas wells, wellheads, and field processing facilities. Because LNG requires gas to be cooled to very low temperatures, care must be taken to remove all impurities, especially water, from the methane stream prior to processing by the liquefaction plant. Gas from a number of fields may be commingled prior to liquefaction. An important consideration for the evaluation of an LNG project is the cost of geed gas. Since each component of the LNG chain adds cost to the process, yet the final product must be competitive with other energy sources in the consuming market, the initial cost of the feed gas must be as low as possible. Typically, this gas must be delivered to the LNG plant at a cost of less than $1/MMBtu for the LNG project to be economic. Any heavier hydrocarbons removed from the methane stream will be sold, either by the LNG plant or the upstream resource holders, and could have a significant impact on overall plant economics. The importance of non-methane sales in overall project economics cannot be discounted.

An LNG plant is divided into independent trains operating in parallel process. The figure below shows the components of a typical train.

Proprietary & Confidential 33

Page 34: Garp Erp Study Notes

The LNG market has adopted two main liquefaction processes – the pure refrigerant cascade process (also known as the Phillips process), and the precooled propane mixed refrigerant MCR process. Competing LNG processes are evaluated by their relative thermal efficiency, measuring the output energy of the LNG versus input energy of the feed gas. The difference between these values relates to the energy consumed in the liquefaction process and depends on the efficiency of the process. It also reflects the efficiency of the refrigeration compressors, the quality of the feed gas, and the ambient temperature of the region.

The cascade process uses three refrigeration circuits – propane, ethylene and methane – to cool the purified gas to the required temperature. The figure below shows a simplified cascade process flow diagram.

Cascade Process. In the first circuit, compressor propane cools feed gas to the liquid temperature of propane (−30℃) through a series of evaporators. The second circuit repeats the process with ethylene, cooling the gas to the liquid temperature of ethane (−100℃). The third circuit uses methane to further drop the temperature to −160℃. Boil-off (when liquid LNG heats back to gaseous phase) from the final tanks in further compressed and injected back into the circuit to increase efficiency.

Precooled mixed refrigerant process. In contrast to the cascade process, where separate circuits step down the temperature of feed gas to the desired liquefaction temperature, the mixed refrigerant process uses a combined mixture of methane, ethane, propane, nitrogen, butane, and pentane gases as the refrigerant.

Air Products improved the mixed refrigerant process, marketing it as the Multi-Component Refrigerant process. To increase process efficiency, the system first precools the gas to −30℃ by

Proprietary & Confidential 34

Page 35: Garp Erp Study Notes

propane in a process similar to the first circuit of the cascade process. The next cycle uses a combination of nitrogen, propane, ethane, and methane refrigerants to bring the temperature down to −161.5℃ in a series of stages. Liquefaction is achieved when methane gas is allowed to come in contact with cold metal spiral tube heat exchangers containing the liquefied refrigerant mixture that cools the temperature of the gas. Liquefaction plants are typically the most expensive element in an LNG project. Because 8-10% of gas delivered to the plant is used to fuel the refrigeration process, overall operating costs are high. As economies of scale can be significant, newer LNG plants have larger, more efficient trains, and may have shared facilities, minimising unit costs.

All LNG projects initially market their production based on nameplate or design estimates of plant capacities. History has shown that this estimate is often too conservative, and the actual LNG available for sale exceeds the nameplate capacities. Once a plant has been operational, additional production is often available when engineering modifications and equipment upgrades (known as debottlenecking) increase efficiencies.

LNG is usually transported to the gas consumer by specially designed refrigerated ships. The ships operate at low atmospheric pressure (unlike LPG carriers, which operate at much higher pressures), transporting the LNG in individual insulated tanks to dramatically reduce the chance of a catastrophic explosion. Insulation around the tanks maintains the temperature of the liquid cargo, keeping the boil-off (conversion back to gas) to a minimum. Because most older ships do not have active refrigeration systems onboard, ships use the produced boil-off gas as engine fuel. Newer ships have the capacity to convert the boil-off back to LNG. The thickness and effectiveness of the insulations system, the surface area of the tanks, ambient temperature conditions, and distance to market all determine the quantity of boil-off produced. On a typical voyage, an estimated 0.1-0.25% of the cargo converts to gaseous phase daily. In a typical 20-day return voyage from the LNG plant to the customer, the total loss, net of voyage and loading/unloading boil-off, is 2-6% of the total volume.

Because regular steel becomes brittle at low temperatures, ship tanks use special alloys of steel with nickel and aluminium. LNG ship size is expressed in cubic meters of maximum LNG volume capacity. Shipping costs are usually expressed as daily charter rates, which can vary between $27,000/day for smaller ships to $150,000/day for the larger, more efficient ships. Most LNG plants have their own dedicated fleet of LNG ships, operating a ‘virtual’ pipeline.

LNG receiving terminals, also called regasification facilities, receive LNG ships, store the LNG until required, and sent out gaseous methane into the local pipeline grid. Some terminals, especially in the United States, also load LNG into trucks, which deliver to smaller satellite markets not connected to the main pipeline grid. Historically, terminals were built by LNG buyers who restricted third-party access to other potential importers. This is, however, likely to change, especially in Europe, where legislation supports requiring terminal owners to open their facilities to users willing to pay the specified service fee. The main components of a regas facility are the offloading berths and port facilities, LNG storage tanks, vaporisers to convert the LNG into gaseous phase, and pipeline link to the local gas grid. Storage tanks and vaporiser process units typically account for 25-35% respectively, of the facility capital costs. Safety features, unloading berths, and general construction absorb the remaining 40% of costs.

Proprietary & Confidential 35

Page 36: Garp Erp Study Notes

Berths allow the LNG ships to connect to the terminal via unloading arms. Traditionally, berths are located in existing port facilities. LNG tankers may also be offloaded offshore, away from congested and shallow ports. This is accomplished using a floating mooring system via undersea insulated LNG pipelines to a land-based regas facility. This plan requires the LNG tanker to be stationed at the offshore regas facility for the duration of the regas process, around three to four days versus one to two days for conventional unloading. Thus increased shipping costs and possible risks may make this venture economically questionable. Cost savings resulting from eliminating the need for storage tanks and large onshore facilities where regulatory permits make locating facilities difficult may prove this to be a viable alternative, however, especially for seasonal gas deliveries. The tank size is a function of the volume and frequency of deliveries expected from a particular LNG plant, as well as the gas demand from the market.

The largest component of receiving terminal capital cost is the vaporiser process equipment. Vaporisers warm LNG from −161.5℃ to more than 5℃ , converting methane from liquid phase into gas. Conceptually, vaporisers are relatively simple units in which LNG is pumped through tubular or panelled heat exchangers, allowing the temperature to rise.

The storage of natural gas is an important component of the gas transportation system. This is true especially in North America and Europe, where gas production areas are located far from gas consuming areas, and demand for gas depends on seasonal weather. Undoubtedly, as demand increases and seasonal demand swings increase, storage will enter the transportation equations of markets such as the Middle East and Asia.

There are basically two uses for natural gas in storage facilities, meeting longer term base load (seasonal swing) requirements and meeting shorter term peak load (daily or inter-day swing) requirements. In regions where natural gas is predominantly used for power generation, these swings will match electrical power demand cycles. Base load storage capacity meets seasonal demand increases. Typically, the turnover rate for natural gas in these facilities is seasonal; natural gas is generally injected during low-demand months and withdrawn during the high-demand season. These reservoirs are larger, but their delivery rates are relatively low, meaning the amount of natural gas that can be extracted on any particular day is limited. Instead, these facilities provide a prolonged, steady supply of natural gas. Peak load storage facilities, on the other hand, are designed to have high deliverability for short periods of time, allowing natural gas to be withdrawn from storage quickly should the demand increase beyond immediate supply. The simplest form of peak load storage is to use the pipeline itself. Depending on the pipeline length, available free volume, and safe operating pressure limits of a particular pipeline system, the pipeline may be line packed by injecting additional gas during periods when demand is less than produced gas supply. This results in an increase in gas pressure inside the pipe. During peak load periods, when demand exceeds

Proprietary & Confidential 36

Page 37: Garp Erp Study Notes

production capacity, the additional gas will be used by consumers, allowing gas pressure to fall back to lower levels.

The more complex forms of peak load storage are located underground. These facilities cannot hold as much volume as underground base load facilities; however, they can deliver smaller amounts of gas more quickly and can also be replenished in a shorter amount of time than base load facilities. Underground peak load facilities can have turnover rates as short as a few days or weeks. In North America and Europe, salt caverns are the most common type of underground peak load storage facility, although aquifers may meet these demands as well. For all types of underground gas storage, the process is quite simple: lean natural gas is injected into the formation at a pressure exceeding the natural pressure of gas and other fluids in the storage facility. When gas is required for consumption, it is produced using standard gas wells and facilities. Thus, similar to standard gas wells, the higher the pressure in the storage facility, the more readily the gas may be extracted. Once the pressure drops to below that of the wellhead, there is no pressure differential left to push the natural gas out of the storage facility. This means that, in any underground storage facility, a certain amount of gas must always remain in place. This physically unrecoverable volume of gas, known as base gas or cushion gas, has been permanently embedded in the formation. It must remain as permanent inventory in the storage facility to provide the required pressurisation to extract the storage gas at minimum deliverability rates. The actual volume of natural gas in the storage reservoir that can be extracted during the normal operation of the storage facility is known as working gas. This is gas that is stored and withdrawn on each cycle, minus base gas quantity. At the beginning of a withdrawal cycle, the pressure inside the storage facility is as its highest, meaning working gas can be withdrawn at a high rate.

Natural gas is usually stored underground in large storage reservoirs. There are three main types of underground storage; depleted gas reservoirs, aquifers, and salt caverns. LNG, on the other hand, is always stored in special thermally-isolated steel tanks that are either buried or at the surface.

Depleted gas reservoirs – the most prominent and common form of underground storage. Depleted reservoirs have been tapped of all their recoverable natural gas. This leaves an underground formation that is geologically capable of holding natural gas. In addition, there are also facilities, both above the ground and wells into the reservoir, left over from when the field was productive. Depleted reservoirs are also attractive because their geological characteristics are already well-known, thus minimising leaks, and are the cheapest and easiest to develop, operate and maintain.

Aquifers – aquifers are porous, permeable rock formations underground that may act as natural water reservoirs. In certain situations, these water containing formations may be reconditioned and used as natural gas storage facilities. As they are more expensive to develop than depleted reservoirs, these types of storage facilities are usually used only in areas where there are no nearby depleted reservoirs. Aquifers are the least desirable and most expensive type of natural gas storage facility. The geological characteristics of aquifer formations are not as thoroughly known as depleted reservoirs. Significant time and capital go into defining the geological characteristics of an aquifer and determining its suitability as a natural gas storage facility. Since no prior equipment exists, associated infrastructure must also be developed. Since aquifers are naturally full of water, in some instances powerful injection equipment must be used to allow sufficient injection pressure to push down the resident water and replace it with natural gas. In addition to these considerations, aquifer formations typically require a great deal more cushion gas than do depleted reservoirs. In some cases, cushion gas requirements can be as high as 80% of the total gas volume.

Salt caverns – underground salt formations offer another option for natural gas storage. Typically, these thick formations were created from natural salt deposits that, over time, leach up through overlying sedimentary layers to form large dome-type structures. Salt

Proprietary & Confidential 37

Page 38: Garp Erp Study Notes

formations are strong and homogeneous, thus minimising the escape of injected gas. Once a suitable salt dome or salt bed deposit is discovered, it is necessary to develop a cavern within the formation to actually store the gas. Injected water is used to dissolve and extract a calculated amount of salt from the deposit, leaving a large empty space surrounded by non-dissolved salt that will act as a trap for injected gas. Though the leaching process is quite expensive, once treated, the cavern offers an underground natural gas storage vessel with high deliverability and minimal leakage. In addition, cushion gas requirements are the lowest of all three storage types, with salt caverns requiring only about 33% of total gas capacity to be used as cushion gas. They cannot hold the volume of gas necessary to meet base load storage requirements. Deliverability from salt caverns is typically much higher than from either aquifers or depleted reservoirs. Natural gas stored in a salt cavern, therefore, may be more readily and quickly withdrawn, and caverns may be replenished with natural gas more quickly than either of the other types of storage facilities. Sophisticated salt cavern operators may be able to cycle their storage four or five times a year, often charging fees higher than other storage operators.

1.21Contracts and Project Development

Before any exploration or production activity takes place, a legal framework must be agreed upon by all parties to ensure adequate value sharing of the resource. These agreements involve the companies wishing to explore and produce the potential resource and the host government or the national oil company representing the host government. Ideally, revenue sharing regulations should be clear, specific, transparent, and auditable. Unfortunately, the opposite is often the case in developing countries. The resulting contracts are often kept secret, revenues are often siphoned off by corrupt officials, and the company wishing to explore does not always receive the security and stability that it requires to conduct its operations.

Concession contract. The tax/royalty concession contract is the conventional type of contract system in North America, Argentina, Australia, and in occasionally in the Middle East. Under this contract, the oil or gas company owns the assets and installations and receives all the production from the assets. In return, it bears all the operating risks, costs, and investments and agrees to pay the host government a royalty calculated on the amount of production in addition to income tax and any other tax provided for under local legislation. The royalty is a percentage of gross production (either in cash or in gas volumes) paid to the host government before any cost deductions. Income tax, on the other hand, is a percentage of net income or profits paid to the government after deducting costs and royalties. Government take is comprised of total government revenues, including royalty and taxes. Net company revenues are called company take.

Production sharing contract. Also known as production sharing agreement (PSA), this contract is more legally complex than a concession contract. It has become the de facto standard in Asia, Africa, and parts of South America and the Middle East. Conceptually, under a PSC, the gas company is a contractor, without ownership of the minerals in the ground. The oil and gas company supplies the risk capital and is compensated from a share of potential future earnings according to a predetermined sharing arrangement. If financing is required, reserves may be used as collateral for the loan. Any assets placed by the company to produce the assets eventually become the property of the host government, which will repay the costs of such assets to the company out of the share of the production, known as cost recovery. The host government, via its national oil company, may also participate in the operational decision-making process. Under a PSC regime, the company agrees to perform and finance exploration operations at its sole risk. The host government contract specifies the amount of exploration work to be performed in number of wells or seismic survey kilometres. If

Proprietary & Confidential 38

Page 39: Garp Erp Study Notes

commercial quantities of hydrocarbons are found, both the company and the host government collaboratively declare commerciality. This allows the company to begin a field development program. The company receives a portion of production known as cost gas which it can sell to cover its investments and operating costs. There is typically an upper cost recovery limit on the amount of cost gas that may be charged in a given year, calculated as a percentage of total production value. The company and the host government share the remaining production volumes, known as profit gas.

Other host government agreements are pure service contracts, where the company is paid a set fee (possibly a fee per unit of gas produced) for its technical services. In buyback contracts, adopted by Iran, the company pays for all investments and is reimbursed its expenses plus a set rate of return from future revenues. Under these contracts, the company usually has no claim to the reserves or the production.

The volume of gas available for sale by the oil and gas company is a function of the volume of gas produced and the fiscal terms in place. Cost of production, taxes, government controls, or market forces set by local or regional supply and demand often determine the price of gas sold. In the case of LNG or international pipelines, sales price is often determined by market forces in the importing country. It may be net-back calculated (by deducting transportation, terminal, and re-gas costs) back to the producing company to determine income for the producing company or government.

A gas buyer receiving gas from an LDC will pay a price that may include the long-distance transmission tariff and a much higher LDC tariff. LDC tariffs tend to be two or three times higher than long-distance tariffs due to smaller volumes, smaller-diameter pipelines, and higher costs of laying and maintaining urban pipeline networks. Transmission tariffs may be based on distance transmitted or on a postage-stamp basis, where all consumers pay the same tariffs regardless of distance transmitted. Tariffs may also be a function of the volume reserved for a particular buyer (a set capacity charge) and a variable based on the pipeline volume actually consumed by the buyer (a commodity charge).

The pipeline gas sales agreement (GSA) is also known as a gas purchase agreement (GPA) or a gas sales and purchase agreement (GSPA). These agreements between a producing company or sales agent (seller) and a consuming company (buyer) usually cover a number of provisions.

The term of a GSA can be as short as one day or as long as the economic life of the field from which the gas is produced. Spot markets generally have terms under one month. Internationally, especially where a gas development project will have a limited number of potential customers, the terms could reach 20 or 30 years. Financial institutions may require these long terms to ensure that the producing company has adequate cash flows to cover the debt that may be required to develop the project.

Generally speaking, there are two distinct types of volume commitment contracts: depletion contracts and the more common supply contracts. Under depletion contracts, also called output contracts, the producing company dedicates the entire production from a particular field, or reserve to a buyer. The annual delivery quantities are calculated on estimated physical performance of the field. In this case, buyers usually require independent engineering companies to analyse data provided by the producing company in order to certify the reserve volumes. In contrast, supply contracts commit the seller to supply a fixed volume of gas to the buyer for a fixed term, typically 20 to 25 years. The seller is responsible for sourcing the gas, either from its own reserves or from third parties, if its own reserves are inadequate.

Gas must be priced at a level competitive with alternate fuels in the marketplace and provide an adequate return for all parties in the chain. Pricing may be fixed, fixed with escalators, or floating. A fixed price with an escalator is a fixed price that changes by a

Proprietary & Confidential 39

Page 40: Garp Erp Study Notes

certain percentage every year or other specified time frame to reflect an inflator or an index of a known variable. Index may be linked to inflation, published price, or a combination of substitute fuels. This ensures gas price competitiveness to alternate fuels and helps to integrate changes in the marketplace without renegotiating long-term contracts. Alternatively, a floating price varies according to prices reported by unbiased sources, such as newspapers and NYMEX quotations. In this case, the contracts are revalued every month or week according to the reported prices. All price philosophies may be limited to a maximum ceiling price or a minimum floor price for the term of the contracts. Contracts may also have combinations of fixed and floating prices.

The terms of delivery may be firm or flexible. Firm delivery implies an obligation by the producing company or seller to deliver the specified quantities over the term of the contract. Flexible delivery obligates the producing company to make attempt to fulfil the delivery obligations but does not require fulfilment of all the delivery obligations. Some contracts specify a set number of days, usually the highest demand days, when the supplier may be subjected to liquidated damages for failure to fulfil the obligations. Flexible delivery contracts may have cheaper prices because gas supply is interruptible by the seller and may be acceptable to buyers willing to occasionally substitute gas fuel for alternate energy sources.

The basic premise of take-or-pay is that the buyer is obliged to pay for a percentage of the contracted quantity, usually 60-95% of the ACQ. This is true even if the buyer is unable to or fails to take the gas supplied by the seller. Some contracts allow the buyer to ‘make up’ gas volumes paid for but not taken in a period. TOP issues increase during periods when gas prices are higher than alternative fuels, encouraging buyers to forego their gas contracts and switch to cheaper fuels.

Delivery point it the physical location where gas is delivered to the buyer. This is often, but not always, the same geographic point where custody transfer (the transfer of ownership and responsibility) of the gas takes place.

The GSA clearly states the quality of gas, including tis maximum and minimum heating values; maximum level of impurities like oxygen, carbon dioxide, sulphide containing compounds etc. In addition, the delivery pressure and water vapour content.

There are certain conditions that must be satisfied before any of the obligations in the GSA can be legally binding – conditions precedent. These may include government approvals for the development of the field or for permitting a pipeline.

During the nomination procedure, the buyer communicates its weekly gas volume requirements to the seller. This is particularly important when multiple buyers are supplied by a single supplier who must manage all the delivery requirements in an efficient and fair manner.

Force majeure refers to ‘acts of god’, such as flood, fire, earthquakes, and other events outside the party’s reasonable control that may interrupt gas delivery or gas consumption. Liabilities and obligations of all parties, including those resulting from negligence, must be clearly stated in the GSA. A lengthy force majeure event may result in annulment of the agreement.

Stabilisation clauses – specifies remedies in the case of changes in law or taxation rates, keeping the seller or buyer economically whole.

As a result of the large capital expenditures, the international nature of the business and number of discrete elements in the value chain, the LNG business requires numerous legal agreements. The LNG equivalent of the GSA, often known as the LNG sales and purchase agreement (SPA), is the most complex of all agreements. Because of the long-term nature of the contracts, flexible and trusting relationships between all parties are critical for the success of each component of the LNG chain. A failure in one link of the chain will have adverse impacts on all other links, potentially

Proprietary & Confidential 40

Page 41: Garp Erp Study Notes

destroying the economics of the entire venture. The LNG SPA shares many of the features of the pipeline-delivered GSA described previously, but includes additional unique features.

The LNG SPA exists between the LNG exporting company, joint venture, plant operator, or sales agent, and the importing facility or buyer. Most LNG exporting entities are LNG project companies that own the liquefaction plant. By contrast, LNG plant operators in Indonesia, Egypt, and certain trains in Trinidad operate their plants on a ‘rolling’ service basis, charging a tariff to the gas owners in return for converting their gas into LNG. In this case, the gas owners, the plant owner, and LNG buying entity all sign the SPA. The Japanese model has been a benchmark in the industry, especially in the Pacific region. The main features of the agreement remain relatively unchanged since the first contract was signed in 1969. There are a number of features that are important to LNG SPAs-

Typically, Pacific region LNG buyers are large, government-supported, credit worthy LDC gas or power utilities. These utilities may have a monopoly over their local region and therefore are able to commit to long-term purchase guarantees in return for less-volatile and more predictable supplies.

Historically, utilities, especially the Japanese gas and power companies, needed long-term stable supply. Ideally, they wanted to be the sole buyers of all the output from a particular LNG export facility, which eliminated the prospect of direct competition and gave the utility more control over its supplier.

When companies negotiated the first generation of SPAs, many of the power plants operated by Japanese utilities were able to use either oil or natural gas to generate electricity, so the price of LNG was linked to the price of oil. Linking the prices allowed both commodities to remain competitive and guaranteed a market for imported LNG. The linking of the prices is achieved through mathematical formulas comprising a fixed component plus a variable component indexed, or linked, to a JCC price. This is typically called the Japan Crude Cocktail or Japan Customs Clearing price. The JCC price is based on a delivered price of a basket of typical crude oils imported into Japan over a defined period plus an inflation factor. The added advantage of this formula was that LNG prices were much less volatility than crude prices because the indexing was calculated on a monthly or longer basis. Almost all the contracts required payment in U.S. dollars, thereby transferring currency exchange rate risks to the utility.

Depending on the terms, SPAs may allow the buyer a degree of flexibility in terms of scheduling or final destination of LNG. Many of the legacy Japanese contracts did not allow such flexibility, requiring buyers to invest in large LNG storage and receiving facilities to minimise off-loading disruptions and TOP liabilities. Pipeline GSAs more frequently allow weekly or monthly nomination changes, allowing both the buyer and the seller to modify their obligations over the short-term.

Deliveries may be on-o Free-on-board (FOB) basis – where the buyer takes ownership of LNG as it is loaded

on ships at the export LNG facility. The buyer is responsible for LNG delivery, either on its own ships or ships chartered by the buyer. The contracted sale price does not include transportation costs.

o Cost-insurance-freight (CIF) basis – where the buyer takes legal ownership of the LNG at some point during the voyage from the loading port to the receiving port. The contracted sales price includes insurance and transportation costs.

o Delivered ex-ship (DES) basis – where the buyer takes ownership of the LNG at the receiving port. The seller is responsible for LNG delivery, and the contracted sales price includes insurance and transportation costs.

o Many buyers prefer FOB contracts, which give them more control over shipping costs and may allow them to trade surplus LNG cargoes with other importers if explicitly allowed in the LNG sales agreement.

Proprietary & Confidential 41

Page 42: Garp Erp Study Notes

Under the CIF contract, transfer of title or ownership of the LNG cargo and associated risks can legally occur at the re-gas facility, the international marine boundary, or any other mutually agreeable point on the ship voyage. DES contracts usually involve transfer of title at the unloading berth at the loading terminal of the liquefaction facility. Taxation, legal and strategic reasons influence the choice of contract type, and these issues will increase in complexity in the future a governments increase their scrutiny of the LNG trade.

Buyers are no longer exclusively large monopoly utilities. Deregulation has created a host of smaller energy suppliers, many of whom are willing to sign LNG contracts and have access to receiving and storage facilities.

As compared to the traditional 20 to 30 year contracts, today’s buyers are negotiating terms as short as 5 to 10 years. At the end of the term, the contract may be renewed or renegotiated, or the buyer may decide to source from a different facility. Buyers are reluctant to lock themselves to one supplier, especially in a market where cheap gas supplies from Qatar and elsewhere are forecast to increase.

Recent changes have seen the basic formula evolve from fixed escalation pricing to a shorter-term rice basis. The JCC index common in Japanese markets kept LN prices relatively stable, especially when compared to more volatile crude prices.

Buyers, especially those negotiating with existing plants, resist agreeing to high TOP levels demanded by a seller operating an existing LNG facility. The original justification for the high TOP conditions was a requirement to obtain financing for the initial project investments.

As LNG competes with pipeline gas, byers are demanding volume flexibility. Buyers may be reluctant to purchase relatively higher priced LNG gas when local domestic gas is available during periods of lower demand.

Buyers may demand relaxation of traditional destination clause that limit the ability of LNG buyers to resell their cargoes to other potential buyers. Flexible destinations clauses allow buyers to collaborate taking advantage of varying season demand, shipping capacity or price differentials between markets.

Taking a gas project from concept to operation is a complicated and lengthy process involving numerous parties with convergent and divergent motivations relative to the project sponsor. Ideally, the project sponsor, or the party leading the project development effort, will have sufficient control and decision-making authority to ensure that other participants and investors are in agreement with the project sponsor’s decisions and schedules. In reality, project partners, host governments, lenders and consumers all paly an influential role during the process.

A typical development process is shown below –

The first stage, concept identification, asks and answers the fundamental question, ‘is the project realistic and achievable?’ steps in this stage include identifying the project objectives, determining alignment with company strategy, developing a list of specific success factors, reviewing project fundamentals. The second stage is feasibility and option selection. During this stage, financial and commercial models are created, engineers are engaged, risks are identified and preferred technical options are highlighted. Also at this stage, the memorandum of understanding (MOU) or heads of

Proprietary & Confidential 42

Page 43: Garp Erp Study Notes

agreement (HOA) letters, are solicited from the resource holder and the potential consumers. Financial models are a crucial component at this stage. CAPEX and OPEX estimates at this stage have an accuracy range of ±30% and a contingency range of 15-20%. These estimates are developed using similar projects in the area and general estimates of materials and construction costs. Stage three, the project definition stage, is the critical go/no go stage where key agreements have to be secured and costs and revenues ranges must be finalised to secure financing. The gas sales agreements, transportation agreements, environmental impact studies, and permits must be secured by the end of this phase. Partners should finalise a joint operating agreement (JOA) before moving to the next phase. Project costs, scope, and timing must also be finalised before financing can be secured and procurement may begin. At this stage, the financial and commercial models are refined with CAPEX and OPEX estimates within 10-15% accuracy and less than 10$ contingency. To achieve this level of accuracy, an engineering company contracted by the project sponsor completes a front-end engineering design (FEED). This phase of the project, which may take six months to a year depending on the size and complexity of the project, can cost as much as 1-2% of the total CAPEX. At the end of this phase, financing for the project should be secure.

In a project-financed project, project debt is taken on by a special purpose entity that owns the project assets, and financial lenders are repaid their loan directly by project cash flow, often with limited recourse or liability to the sponsors. In this case, the project sponsor’s liability is limited to their equity investments in the project (typically 25-30% of the total project investment). Project financing may be preferred when the revenues are guaranteed, leveraged economic returns are preferred, and where the sponsors may not have the financial strength to take on the full risks of the project. The fourth stage of project development is project execution.

An EPC contract is usually on a turnkey, lump-sum basis. The EPC contractor responsible for the detailed engineering, design, procurement of the equipment, and construction of the project bears some or most of the risks from cost overruns or construction delays. The EPC company executes all subcontracts under its own name and delivers the complete facility to the sponsors. An EPCM contract is similar to an EPC contract, except that the engineering company acts as an extension of the sponsor company. The engineering company executes contracts and procurement on behalf of the sponsor company and is compensated a management fee on either a lump-sum or reimbursable basis. The EPCM is often a preferred system as it tends to achieve the best quality project at lower cost, but at a higher risk of cost overrun and increased responsibility to the project sponsor for overall plant performance. The better defined the project is prior to execution stage, and the better the quality of the FEED study, the more likely it is the execution stage will be successful. As EPC and EPCM processes are detailed and manpower intensive, they can cost up to 5% of the total CAPEX of the project. Project financing may be preferred when the revenues are guaranteed, leveraged economic returns are preferred, and where the sponsors may not have the financial strength to take on the full risks of the project. The fourth stage of project development is project execution.

1.22Liquefied Natural Gas

Natural gas has long possessed a collection of qualities seen as highly desirable in major applications such as commercial power production and residential heating. Lack of transportability, a primary technical drawback for many years, was resolved more than 50 years ago with liquefaction and regasification development. The commercialisation of that technology, however, has only recently reached the cost efficiencies and industry scale that allow true global competitiveness.

Proprietary & Confidential 43

Page 44: Garp Erp Study Notes

The capital intensity and cost of LNG have resulted in integrated contractual arrangements that often commit gas, the LNG plant, the LNG vessels, and the LNG terminus facilities to a specific customer for a 20 to 30 year period. The contracts are frequently strict in form and inflexible on price and volume and include automatic escalator costs for fuel cost changes, input, and labour cost charges over time. The contracts also use a take or pay framework: if the supplier meets all contractual commitments, the customer receiving LNG is required to pay for the gas regardless of whether they need it or take it. Intermediate steps are covered by a sale and purchase agreement (SPA) between the supplier and receiving terminal, and a gas sale agreement between the receiving terminal and end-users.

The initial stage of LNG development involves the upstream activities of exploration, development and production. The gas reserves identified for LNG development must meet three fundamental criteria – composition, size and sustainability. The gas must be a certain composition that is economic to produce. Natural gas is often found with a combination of associated components. The size of the gas field for development (the proven gas reserve base) must be large enough to support at least 1 million tons of LNG production per annum (mtpa) for 20 years. Most LNG liquefaction facilities are devoted to specific gas reserves and are dependent on the reserves being sufficient to supply production needs over time. The field must also be sustainable over time and must possess a sufficiently large reserve base left in the field at the end of the project life span in order to maintain the field’s production over time (plateau level).

Getting gas from the field to processing and liquefaction facilities is a critical activity. If quantity and quality are not a limitation, the development and transportation of gas to liquefaction passes on to the development and production agreement’s associated with reserve development. There are three business structures typically used in LNG production and transportation –

Integrated projects – here, the ownership structure is the same for both upstream development and liquefaction. This structure allows a high degree of alignment and the business agreements may be simpler than for the other structures. For example , unless there is a government, there is often no need to establish a gas transfer price between the gas producer and liquefaction facility.

Transfer pricing agreements – often used when ownership of gas reserves is separate from the LNG sponsors. This is frequently the case in countries using production sharing agreements (PSAs) or production sharing contracts (PSCs) and the government retains ownership of the gas. The different ownership structures will require a transfer pricing agreement to set the price of the natural gas feedstock for transportation and liquefaction. The actual transfer policy will have a significant impact on the returns to the two parties.

Proprietary & Confidential 44

Page 45: Garp Erp Study Notes

Throughput agreements – is a contractual structure in which the owner of the upstream reserves pays a contractual toll for transportation and liquefaction, retaining ownership of the gas for post-liquefaction, marketing and sale. This structure is growing in interest as upstream owners such as sovereign governments, attempts to retain more ownership and control over the sale and profitability of their gas. Recently, a number of IOCs have purchased or leased their own ships and are now pursuing throughput agreements in order to do their own marketing and sales.

Once gas feedstock reaches a liquefaction facility, it enters a series of processing and storage steps called the LNG train. Past LNG developments often consisted of at least two trains to gain economies of scale and still retain the operational efficiencies, flexibility and reliability of individual trains. Recent technological developments have resulted in much larger single trains, making single-train LNG facility developments economic.

Liquefaction is expensive. Capital costs of LNG trains are by far the most significant cost, making up on average more than 80% of liquefaction cost. The industry has seen real capital cost reduction over time, falling from more than $500 per ton per year in the 1970s to under $240 per ton per year in 2004. Much of this capital cost reduction has been achieved by expanding the scale of trains.

Once liquefied, LNG must be transported to market. The ownership of LNG ships is usually separate from LNG ownership. Gas shippers may own, lease, or charter the ships used for LNG transport. There are two basic ship designs used for LNG shipping. The Kvaerner-Moss design stores the LNG in large spherical tanks welded into the ship’s hull. The tanks extend vertically far above the ship’s deck, giving the ships their unmistakable look of a series of balls. The second structure, the membrane design, has LNG tanks built into the insulated hull of the ship. This design also has the ability to reliquefy the boil-off gas to reduce volume loss. This has proved important in cost reduction, particularly in longer delivery, making distant markets competitively viable. Transportation costs of LNG to market can prove to be the critical element in project competitiveness. Many LNG developments result in very similar FOB costs of LNG, and as a result, whichever can reach a specific market, a receiving and regasification terminal, at lowest delivered cost can win the long-term supply agreement.

The cost of receiving terminals and regasification facilities, like liquefaction facilities, are very site-specific. An industry rule-of-thumb is that a complete receiving terminal and regasification plant cost will run $1billion per billion cubic feet of gas per day capacity. Regasification of LNG is a much simpler and less costly process than liquefaction. Storage tanks make up the single largest component of capital costs (about one-third of the costs), as significant storage capacity is needed to assure a dependable supply of gas to retail customers. There have been several significant innovations in recent years. One is the development of the floating regas vessel, which is an LNG carrier with onboard LNG vaporizers. A second innovation is offshore regasification terminals that take advantage of limited onshore space and ‘not in my backyard’ concerns.

To date, LNG projects have been demand/buyer driven. As a result, once a true buyer is identified, particularly for a long-term purchase agreement, the lowest delivered cost of a sufficiently large and reliable supplier will prevail. Therefore, many LNG projects are driven by the buyer’s willingness to sign a long-term purchase agreement with the most competitive long-term supplier.

The LNG market was created from the older natural gas market. Natural gas has long been sold under long-term agreements between producer and buyer, shipped via pipeline. But, as the LNG market grew, new forms of contractual arrangements were needed as a result of the following-

After securing long-term concessions or PSAs for the development of upstream gas, LNG developers put massive amounts of capital at risk by building pipelines and liquefaction

Proprietary & Confidential 45

Page 46: Garp Erp Study Notes

facilities. The developers need to secure long-term sale agreements that assure them of a return on their sizeable capital investment.

LNG buyers without access to pipeline gas must secure long-term supplier assurances of regular shipments in order to supply electrical power plants, and residential and commercial gas needs.

Buyers and sellers use a series of sale and purchase agreements that tend to escalate towards a full commitment of resources – specifically the capital associated with the construction of pipelines, liquefaction facilities, shipping arrangement, and regasification terminals – for completion of the LNG chain. The marketability and competitiveness of LNG is based on its delivered cost to the customer.

The LNG industry evolved around two separate regional markets, the Atlantic Basin and the Asia Pacific. The Asia Pacific market is the larger of the two regional markets and is driven by Japan (the world’s largest LNG buyer), Korea, and Taiwan. Pricing in this market was based primarily on the Japan crude cocktail (JCC) in Japan and South Asia, as imported crude oil was deemed the benchmark competitive alternative. The Japan customs-cleared crude is the average price of customers-cleared crude oil imports into Japan (formerly the average of the top 20 crude oils by volume).

The Atlantic Basin LNG market developed later than the Asia Pacific market. Buyers were primarily European-based and attempted to supplement pipeline gas from the former Soviet Union. The market was supplied nearly exclusively out of North Africa. Pricing in the Atlantic Basin was significantly more complex than in the Asia Pacific. As LNG agreements generally follow gas pricing structures used in natural gas markets, this meant that prices reflected traditional pricing by region: 1) the mix of NBP pricing in the UK and the long-term pipeline pricing agreements in continental Europe, and 2) Henry Hub in the U.S., where pipeline gas was the widely available competitive alternative.

Over the last 10 to 15 years, the LNG market has shifted from its traditional regionalisation to a market that is increasingly global. LNG production has expanded far beyond the original North African, small Persian Gulf, and large Southeast Asian liquefaction centres. These original production areas have been supplemented by new LNG liquefaction facilities in West Africa and the Caribbean. At the same time, LNG regasification and receiving facilities have expanded rapidly in Europe, the U.S., Mexico and the Caribbean, China, Taiwan and India. Volumes move across the traditional regions on both a long-term contract basis and increasingly a short-term market basis. The growth in the short-term spot market for LNG is an added sign that the LNG market is moving towards a more global structure. The drivers for change have risen from both the sellers and the buyers –

Buyers – unexpected supply disruptions like that of Hurricanes Katrina and Rita on the US Gulf Coast in 2005 disrupted production significantly. Supply disruptions have led to serious price spikes, pushing buyers to seek more short-term supply options. LNG buyers have also experienced large fluctuations in demand for gas. Extremely cold weather in January 2008 forced Russia to reduce offered volumes to Eastern and Western European markets, forcing buyers to look for short-term alternatives.

Suppliers – many long-term production areas have experienced declining production. As a result, buyers have sought short-term alternatives to fill growing supply gaps. As more production capability comes online, there are an increasing number of delivered cost-competitive alternatives for buyers. For example, the recent development of shale gas in North America to search out short-term sale alternatives in Europe or the Asian-Pacific.

A complex combination of events in Asia between 2007 and 2009 was particularly instrumental in expanding the short-term flexibility in the LNG market. Market demand in Asia unexpectedly soared

Proprietary & Confidential 46

Page 47: Garp Erp Study Notes

because of various factors, including a large nuclear power outage in Japan. Gas supplies in the Asia Pacific basin suddenly and unexpectedly declined as several producers encountered dwindling production and others suffered new construction delays. The market shortfall was rapidly filled by volume from the Atlantic Basin, roughly 15% of its continuing volume. The ability of these producers to respond quickly to a short-term supply problem is evidence of new market flexibility and, in particular, of producer’s willingness to create divertible volumes. The influx of short-term volumes into a market traditionally dominated by long-term supplier agreements and long-term contract prices upset much of the regional pricing structures. Most of the Atlantic Basin volumes diverted to the Asian market have been at spot market prices based purely on supply and demand on the open market, something nearly unknown in the prior 40 years of LNG trade.

The cost and complexity of many LNG projects have led to a significant spread of break-even prices on the actual gas produced by many LNG field projects. The variance in break-even costs and prices may contribute an additional impetus to the growth and development of global LNG trade in the near future.

Demand for LNG in the Asia Pacific region is expected to more than double between 2005 and 2015. The major Asia Pacific markets, and the only countries importing LNG in 2000 – Japan, South Korea and Taiwan, will continue to make up the majority of Asia Pacific LNG purchases. Substantial new demand is expected from China, India, Mexico and Singapore.

Another liquefaction process gaining interest and investment in recent years is the process known as gas to liquids (GTL). GTL turns natural gas into a clean-burning synthetic diesel fuel. GTL fuels ignite more easily than conventional fuels, improving the performance of car engines. Although GTL fuel is clean burning, the process generates significant carbon dioxide emissions that, if regulated, could prove extremely costly. Shells Pearl GTL in the Middle East is the largest GTL project to date.

1.23Coal Analysis

Coal is an organic sedimentary rock that contains varying amount of carbon, hydrogen, nitrogen, oxygen, sulphur as well as trace amounts of other elements including mineral matter. Generally, coal was not mined to any large extent during the early Middle Ages (prior to A.D. 1000). However, the use of coal expanded rapidly, throughout the nineteenth and early twentieth centuries.

Coal is a solid, brittle, combustible, carbonaceous rock formed by the decomposition and alteration of vegetation by compaction, temperature and pressure. It varies in colour from brown to black and is usually stratified (divided according to subgroups). The source of the vegetation is often moss and other low plant forms, but some coal contain significant amounts of materials that originated from woody precursors. The plant precursors that eventually formed coal were compacted, hardened, chemically altered, and metamorphosed by heat and pressure over geologic time. It is suspected that coal was formed from prehistoric plants that grew in swamp ecosystems. When such plants died, their biomass was deposited in anaerobic, aquatic environments where low oxygen levels prevented their reduction (rotting and release of carbon dioxide). Successive generations of this type of plant growth and death formed deep deposits of unoxidised organic matter that were subsequently covered by sediments and compacted into carboniferous deposits such as peat or bituminous or anthracite coal. Coal deposits, usually called beds or seams, can range from fractions of an inch to hundreds of feet in thickness. Coal consists of more than 50% by weight and more than 70% by volume of carbonaceous material (including inherent moisture). It is used primarily as a solid fuel to produce heat by burning, which produces carbon dioxide, a greenhouse gas, along with sulphur dioxide. This produces sulphuric acid, which is responsible for the formation of sulphate aerosol and acid rain. Coal contains many trace elements, including arsenic and mercury, which are dangerous if released into the environment. Coal also contains low levels of uranium, thorium, and other natural occurring radioactive isotopes, whose release into the environment may lead to

Proprietary & Confidential 47

Page 48: Garp Erp Study Notes

radioactive contamination. Although these substances are trace impurities, a great deal of coal is burned, releasing significant amounts of these substances. When coal is used to in electricity generation, the heat is used to create steam, which is then used to power turbine generators. Modern coal power plants utilise a variety of techniques to limit the harmfulness of their waste products and to improve the efficiency of burning, although these techniques are not widely implemented in some countries, as they add to the capital cost of the power plant.

Coal exists, or is classified, as various types, and each type has distinctly different properties from other types. Anthracite, the highest rank of coal, is used primarily for residential and commercial space heating. It is hard, brittle, and black lustrous coal, often referred to as hard coal, containing a high percentage of fixed carbon and a low percentage of volatile matter. The moisture content of fresh-mined anthracite is generally less than 15%. The heat content of anthracite ranges from 22-28 million Btu/tonne on a moist, mineral matter free basis. Bituminous coal is a dense coal, usually black, sometimes dark brown, often with well-defined bands of bright and dull material, used primarily as fuel in steam-electric power generation, with substantial quantities also used for heat and power applications in manufacturing and to make coke. The moisture content of bituminous coal is usually less than 20% by weight. The heat content of bituminous coal ranges from 21-30 million Btu/tonne on a moist, mineral matter-free basis. Subbituminous coal is coal whose properties range from those of lignite to those of bituminous coal, used primarily as fuel for steam-electric power generation. It may be dull, dark brown to black, and soft and crumbly at the lower end of the range, to bright, black, hard, and relatively strong at the upper end. Subbituminous coal contained 20-30% inherent moisture by weight. The heat content of subbituminous coal ranges from 17-24 million Btu/ton on a moist, mineral matter-free basis. Lignite is the lowest rank f coal, often referred to as brown coal, used almost exclusively as fuel for steam-electric power generation. It is brownish black and has high inherent moisture content, sometimes as high as 45%. The heat content of lignite ranges from 9-17 million Btu/ton on a moist, mineral matter-free basis.

The data obtained from coal analyses establish the price of the coal by allocation of production costs as well as to control mining and cleaning operations and to determine plant efficiency. However, the limitations of the analytical methods must be recognised. In commercial operations, the price of coal not only reflects the quantity of coal but also invariably reflects the relationship of a desirable property or even a combination of properties to performance of coal under service conditions.

Proprietary & Confidential 48

Page 49: Garp Erp Study Notes

There are many problems associated with the analysis of coal, not the least of which is its heterogeneous nature. Other problems include the tendency of coal to gain or lose moisture and to undergo oxidation when exposed to the atmosphere. In addition, the large number of tests and analyses require characterising coal adequately also raise issues. Many of the test methods applied to coal analysis are empirical in nature, and strict adherence to the procedural guidelines is necessary to obtain repeatable and reproducible results. The type of analysis normally requested by the coal industry may be a proximate analysis (moisture, ash, volatile matter, and fixed carbon) or an ultimate analysis (carbon, hydrogen, sulphur, nitrogen, oxygen and ash).

The formation of various national standards associations has led to the development of methods for coal evaluation. For example, the American Society for Testing and Materials (ASTM) has carried out uninterrupted work in this field for many decades, and investigations on the development of the standardisation of methods for coal evaluations has occurred in all major coal-producing countries.

In any form of analysis, accuracy and precision are required; otherwise, the analytical data are suspect and cannot be used with any degree of certainty. This is especially true of analytical data used for commercial operations where the material is sold on the basis of purity. At present, when multi-seam blended coal samples ranging from 10% by weight mineral matter to as much as 30% by weight mineral matter occur, such precision could result in a corresponding difference as large as 4-5%, with corresponding differences in the amount of ash that remains after combustion. The response to such concerns is the design of a sampling program that will take into consideration the potential for differences in the analytical data. Such a program should involve acquiring samples from several planned and designated points within the coal pile so that allowance is made for changes in the character of the coal as well as for the segregation of the mineral matter during and up to that point in the coal’s history. That is, the sampling characteristics of the coal play an extremely important role in the application of text methods to produce data for sales.

Analyses may be reported on different bases with regard to moisture and ash content. Indeed, results that are as-determined refer to the moisture condition of the sample during analyses in the laboratory. A frequent practice is to air-dry the sample, thereby bringing the moisture content to approximate equilibrium with the laboratory atmosphere in order to minimise gain or loss during sampling operations. Loss of weight during air drying is determined to enable calculation on an as-received basis (the moisture condition when the sample arrived in the laboratory). This is equivalent to the as-sampled basis if no gain or loss of moisture occurs during transportation to the laboratory from the sampling site. Attempts to retain the moisture at the as-sampled level include shipping in sealed containers with sealed plastic liners. Analysis reported on a dry basis is calculated on the basis that there is no moisture associated with the sample. The moisture value is used for converting as determined data to the dry basis. Analytical data that are reported on a dry, ash-free basis are calculated on the assumption that there is no moisture or mineral matter associated with the sample. The values obtained for moisture determination and ash determination are used for the conversion. Finally, data calculated on an equilibrium moisture basis are calculated to the moisture level determined as the equilibrium (capacity) moisture. Hydrogen and oxygen reported on the moist basis may or may not contain the hydrogen and oxygen of the associated moisture, and the analytical report should stipulate which is the case because of the variation in conversion factors. These factors apply to calorific values as well as to proximate analysis and to ultimate analysis.

Just as a relationship exists between the various properties of petroleum with parameters such as depth of burial of the reservoir, similar relationships exist for the properties of coal. Variations in hydrogen content with carbon content or oxygen content with carbon content and with each other have also been noted. Other relationships also exist, such as variations of natural bed moisture with depth of burial as well as the variations in volatile matter content of vitrinite macerals obtained from different depths. The latter observation (i.e. the decrease in volatile mater with the depth of burial

Proprietary & Confidential 49

Page 50: Garp Erp Study Notes

of the seam) is a striking contrast to parallel observations for petroleum, where an increase in the depth of the reservoir is accompanied by an increase in the proportion of lower-molecular weight (more volatile) materials.

Coal classification is the grouping of different coals according to certain qualities or properties, such as coal type, rank, carbon-hydrogen ratio, and volatile matter. Thus, due to the worldwide occurrence of coal deposits, the numerous varieties of coal that are available, and its many uses, many national coal classification systems have been developed. These systems often are based on characteristics of domestic coals without reference to coals of other countries. However, it is unfortunate that the terms used to describe similar or identical coals are not used uniformly in the various systems. In the U.S., coal is classified according to the degree of metamorphism, or progressive alteration, in the series from lignite (low rank)( to anthracite (high rank). The basis for the classification is according to yield of fixed carbon and calorific value, both calculated on a mineral matter-free basis. Higher-rank coals are classified according to fixed carbon on a dry, mineral matter-free basis. Lower-rank coals are classed according to their calorific values on a moist, mineral matter-free basis. The agglomerating character is also used to differentiate certain classes of coals. Thus, to classify coal, the calorific value and a proximate analysis (moisture, ash, volatile matter, and fixed carbon by difference) are needed. For lower-rank coals, the equilibrium moisture must also be determined.

1.24Electricity

For electricity markets, supply and demand must constantly be matched, resulting in highly volatile prices. In the U.S., each regional market is coordinated by its own Transmission Service Operator (TSO). Some TSOs are government-sponsored monopolies, whilst others are Independent Service Operators (ISOs) or Regional Transmission Organisations (RTOs). ISOs are limited to doing service in a single state and are exempt from federal jurisdiction. RTOs do business across several states and fall under federal jurisdiction. Many RTOs began in a single state as ISOs and became RTOs when they expanded across state boundaries.

A deregulated market is a service area where an RTO/ISO, rather than a government-sponsored monopoly, coordinates generation and transmission. In these areas, anyone can own a power plant and connect it to the transmission grid to sell power. All participants in a deregulated market are guaranteed equal access to transmission lines, and economic innovation is encouraged. As a general rule, deregulated markets use economic incentives to effect changes, while regulated markets use legislative mandates. Most energy trading occurs in deregulated markets. The most important characteristics of a deregulated market are daily power auctions, or non-discriminatory auctions, which set the price of power for a transmission grid. Power producers submit the price at which they are willing to supply power, and are activated in order from the lowest to highest bid. These are called non-discriminatory auctions because all winning bidders get paid the same price regardless of their bids. The price of power for every producer and every wholesale consumer is set to a single price called the clearing price, or the wholesale price. Smaller customers pay a slightly higher price for their power – the retail price for power. The cost of bringing the last unit of electricity into the market is called the marginal price of power, and the most recently activated plant is the marginal producer. Usually there are two types of auctions coordinated by RTO/ISOs. A day-ahead auction sets the price of power for the following day in one-hour increments. This auction is commonly completed in the early afternoon on the day before delivery. This allows power producers time to arrange fuel and operating schedules for the delivery day. The actual demand for power isn’t known when the day-ahead auction occurs, instead, this auction is based on a prediction of the next day’s required load. The second auction is a real-time auction, which is run continuously throughout the actual delivery day. This auction valances the actual demand against the predictions made the previous day. It is typically bid in five-minute increments. If a power plant is not chosen to operate in

Proprietary & Confidential 50

Page 51: Garp Erp Study Notes

the day-ahead auction, it can still participate in the real-time auction. However, the real-time auctions require power plants to turn on and off quickly, and not every plant has this capability.

The forward market depends on the prices set by the daily auctions, but they are very different markets. The daily auctions are open only to power providers with the ability to generate power and place it on the transmission grid. In contrast, the forward market is much more accessible. The forward market doesn’t require any ability to generate power at all – it is possible to trade both physical contracts (requiring delivery of power) and financial contracts (which settle in cash). The forward markets trade large blocks of power at a limited number of locations around the country. This is a critical difference between the daily auctions and the forward markets. It is possible to buy spot power in arbitrarily small sizes for immediate use anywhere in the country. However, it is only possible to trade in monthly blocks at about 20 locations. The forward markets limit the number of trading locations so a sufficient number of buyers and sellers are forced to be active in each contract. Trading power in large units at a limited number of locations makes it easier to standardise contracts and find trading partners. Getting an exact price at a specific location commonly requires additional trades that may or may not be possible. As a result, power is often traded in two pieces – standardised forward trades made at major hubs to get the desired regional exposure approximately correct, and then smaller fine-tuning trades to lock in an exact price.

In the daily auction market, the assumption that all power providers are equally able to deliver power isn’t always true. In periods of heavy demand, power lines can become overloaded and may require electricity to be routed around the congestion. The primary way of rerouting power is to activate power plants closer to the areas of high demand. Because low cost generators are normally activated first, turning on a generator closer to the demand means that a high cost plant is being activated out-of-merit order. If that price was allowed to set the clearing price of power for the whole grid, there would be a jump in everyone’s costs for the sake of a small minority of customers. In most deregulated power grids, rather than having the entire grid pay the higher price, it is paid only by the affected parties. Because this price only occurs for a single location, this is known as a Locational Marginal Price (LMP). Aligning power prices with the actual cost of delivering power was one of the major reasons energy markets deregulated. The alternative to deregulated markets – having prices legislated by local governments – actually interferes with matching prices to costs. If prices are always going to match costs, there is no need for legislation – the market is deregulated. Congestion costs are just paid by consumers, power producers pay them too. There is a charge for routing power into a high load area over congested power lines, and a credit for producing power that bypasses the congestion. Another part of the standard market design is a penalty for remote generation. If a generator is a long distance from the demand, line losses on the intervening transmission could substantially decrease the amount of power actually delivered to customers. Under an LMP methodology, power producers only get paid for deliverable power- not on the gross power placed onto a power grid. These two changes have had a huge effect on the business of selling power. In addition to fuel costs and efficiency, location has become a major factor determining the profitability of a power plant. Implementing the FERC’s standard market design requires assigning different prices to different locations on a power grid. In most regions, this price (the locational marginal price) consists of three parts – a clearing price, a congestion charge, and a line loss charge. The clearing price for power is the same everywhere on a power grid, but the congestion and line loss charges are specific to each location. Under the SMD, there are several types of locations for which prices are calculated –

Node prices – correspond directly to the price of power at a specific piece of physical hardware. Commonly this is an interface, called an ‘electrical bus’, where power enters or leaves the transmission grid. Generators get paid the nodal price of the electrical bus where they deliver power into the transmission grid.

Proprietary & Confidential 51

Page 52: Garp Erp Study Notes

Zone prices – average of all nodal prices within a limited geographical area. Usually, electrical buyers pay the zone price for the power they receive. Zone prices are used for customers, since they require less detailed metering equipment.

Hub prices – average of selected nodal prices across several zones. The hub price serves as the benchmark price for a power grid. Hub rices are used extensively in the forward market for trading. In most ISO/RTO regions, the clearing price for power and the hub price are synonymous.

Closely linked to the concept of Locational Marginal Prices is a financial instrument called a Financial Transmission Right (FTR). These instruments help customers manage the price risk of having purchased or sold power at a major hub and then being forced to pay a different price when they deliver or receive power at a specific node. FTRs are tradable contracts made between two parties. These parties take opposite sides of an obligation to pay or receive the difference in price between two nodes. However, if there is no congestion, the price at the two nodes will be the same. However, if there is congestion, one party will need to pay the other. FTR options can allow one party to pay an upfront fee (premium) to avoid paying congestion charges. Essentially, buying an FTR option is like buying insurance against higher prices due to congestion.

Because of the way power auctions work – where power plants are activated until the expected demand is fully met – predicting customer demand for power before it occurs is a critical part of power trading. The actual demand for power changes constantly. As electricity can’t be stored, this changing demand must constantly be matched against supply. Making accurate estimates of the future load on the power grid is a key factor in ensuring affordable power.

Fossil fuel plants can burn oil, natural gas, or coal to produce steam. All of these fossil fuels produce greenhouse gases like carbon dioxide, when they are burned. The amount of pollution depends on the efficiency of the power plant. Nuclear generators use nuclear fission to turn water into steam. Nuclear fuel provides a lot of electricity per weight – a pound of highly enriched uranium is approximately equal to a million gallons of gasoline. But like fossil fuels, enriched uranium is subject to severe shortages and prevents environmental problems. Hydroelectricity is a relatively common form of power generation. Hydroelectric dams use flowing water to drive a turbine directly. The most common description of a fossil fuel power plant relates to its efficiency in converting fuel into electricity. This efficiency is called a heat rate, and it is typically expressed as a ratio of heat input to work output (Btu/KWh). A lower heat rate indicates a more efficient power plant.

Electricity is usually generated by manipulating the relationship between magnetic fields and electricity, which are two parts of the same force (electromagnetism). Spinning a wire in a magnetic field creates a current in the wire. The easiest way to generate electricity is to rotate a coiled wire inside a pair of magnets. As the wire spins, it will start to build up a magnetic charge that can be removed in the form of electricity. The speed at which the current flows through the wire depends on the voltage and load. The more work the electrons need to do on their way through the wire, the slower they travel. This is a very important relationship, because if the current moves too fast, the wire will heat up and potentially melt. The only way to prevent transmission wires from melting is to match the level of production (the voltage) and the demand for electrical power (the load). Generating too little power will cause brownouts, and generating too much power will melt the transmission lines and cause a blackout.

About 80% of the world’s power is generated through the use of steam turbines. Regardless of complexity, all steam turbines operate in a similar manner. Superheated steam is created by heating water in a boiler. When the water turns into steam, it expands, moving past a turbine, causing the turbine to spin. The turbine is attached to a generator, causing it to spin as well. Spinning the generator causes electrical power to be generated. After moving past the turbine, the steam enters a cool metal chamber (the condenser). As the steam touches the cool sides of the condenser, it

Proprietary & Confidential 52

Page 53: Garp Erp Study Notes

turns back into water and is then sent back into the boiler to begin the process again. The most fuel-consuming part of operating a steam turbine is heating the system when it starts up. After the water is heated up, keeping the steam turbine continually operating is a very efficient way to produce more electricity. As a result, it is often worthwhile for power plant operators to keep their plant operational, and take a loss in low demand periods, in order to avoid the costs associated with a cold start.

When cogeneration is a result of using waste heat produced from a condenser, it is called topping cycle cogeneration. If heat from an industrial process provides heat to the boiler, the fuel necessary to run the plant can be reduced or eliminated. This type of cogeneration is called bottoming cycle cogeneration.

Gas turbines skip the step of producing steam by creating superheated gas directly through combustion. A mixture of natural gas and air is ignited in an explosive reaction that sends superheated gas past a turbine. Since the waste gas can’t be reused in a gas turbine, it is less efficient than a steam turbine. However, gas turbines are much simpler to build and maintain. Also, there is no lengthy process required to heat up the water into steam, s gas turbines can start producing power at peak efficiency as soon as they are turned on.

In the same way that a bottoming cycle cogeneration plant uses heat from an industrial process in its boiler, a steam turbine can use exhaust heat of a gas turbine. The primary waste product of a gas turbine is superheated gas. This gas is extremely hot, but since it isn’t expanding anymore, it can’t be used to power a second gas turbine. However, it is perfect for heating water to produce steam. A combined cycle power plant is a gas turbine whose exhaust gases power a steam turbine.

The efficiency at which a plant converts fuel into electricity is called its heat rate. This quantity is usually expressed in terms of British thermal units per kilowatt hour (Btu/kWh). Lower heat rates imply a more efficiency power plant since less fuel is required to produce the same amount of electricity.

Heat Rate= Quantityof FuelUsedQuantity of Power Produced

The heat rate of a plant is an easy way of determining when a power plant can operate profitably. For example, if a natural gas fired power plant has a heat rate of 8.5 MMBtu/MWh, it can sell power profitable when the price of power is 8.5 times the price of natural gas. Since this comparison is so common, the ratio of power to fuel prices has its own terminology. That ratio is called the marked implied heat rate and is also in units of Btu/kWh.

Marked Implied Heat Rate= Power PriceFuel Price

As a rule of thumb, natural gas power plants commonly have heat rates between 7-10 MMBtu/MWh. Power plants closer to the 7 MMBtu/MWh level are extremely efficient.

The heat rate of a power plant provides a way to estimate profitability. This estimate, called a spark spread, is the theoretical profit that a natural gas generator can make from buying fuel and selling power at current market prices. This profit estimates does not include any charges for operating costs.

Spark Spread=Price of Electricity−(Price of Gas× Heat Rate )

When multiple spark spreads are discussed, it is necessary to specify the heat rate and pricing location. If products other than natural gas are examined, different terms are used to describe the

Proprietary & Confidential 53

Page 54: Garp Erp Study Notes

profitability spread. Dark spread refers to coal-based generation plants. When emission credits are included in the profitability estimates, the name of the spread typically has the word clean or green in the front.

Once power is generated, it needs to be brought to the customer. A higher voltage makes it easier to transfer power over long distances, but it is also more dangerous. As part of the generation process, power plants use several different types of power lines – high voltage lines are used for long distance transmission and lower voltage lines for residential distribution. Transformers and substations step the voltage up or down between different types of power lines. Transmission refers to the bulk transfer of power form the power plant to a substation via high voltage lines. Distribution refers to the transfer of power from a substation to various consumers using much lower voltage lines.

In the U.S., there are three major integrated power grids: the Eastern Interconnect, the Western Interconnect and the ERCOT. Inside each interconnection, all of the transmission lines are synchronised. This allows power to be transported across long distances within those interconnections. However, differences in population, industry, and weather still make electrical prices a regional phenomenon. Because of this, long distance transmission of power (called wheeling) between fundamentally different markets is the source of a large number of trading opportunities.

1.25The Generation Stack

In deregulated areas, the coordinating ISO/RTO for the area holds daily auctions to determine the price of power. The physical capabilities of each generator are a major factor in their bidding strategies. As a result, the primary way to estimate power prices is to examine power providers ordered by their cost of production. This ordering is called a generation stack. Dispatch capacity, often just called capacity, indicates how much power each power plant can produce. The break-even cost indicates the minimum price the power plant can accept for its power and still make a profit. In most cases, power plants will place bids above their own cost of generation, and below the costs of the next type of unit in the stack.

In both real-time and day ahead auctions, generators participate by submitting offer curves (their generation levels associated with prices they are willing to accept) and their technical constraints (start-up costs, minimum up time). After collecting offers from generators, the ISO selects the winning generators that minimise the cost to the market. In deregulated markets, Load Serving Entities are placed into economic dispatch order based on the results of the day-ahead and real-time auctions held by each TSO. The lowest bidding LSEs are activated first, followed by higher bidders. The order in which power plants are turned on is called the dispatch stack. This is a last on, first off ordering similar to a stack of plates.

The basic decision on whether to actively participate in the bidding process, and risk being inactive, often comes down to how much money a power plant stands to lose if it isn’t activated. A power plant’s profit is the spread between the price of power and the power plant’s cost of production. If a power plant has a very low cost of production, it will give up substantially more profit by being inactive than a plant with a higher cost of production. For example, it might be possible for a power plant to increase the price of power by $1 if it is willing to bid aggressively into the day-ahead market. However, if aggressive bidders stand a 10% chance of being inactive, the decision is complicated for providers that are already highly profitable. If the price of power is around $100, it wouldn’t be worthwhile for a plant with a cost basis of zero to give up $10 (a 10% chance of being inactive and giving up $100) for a chance to make an extra $0.90 (making an extra dollar 90% of the time).

Proprietary & Confidential 54

Page 55: Garp Erp Study Notes

Most generators split their bid into several smaller bids. It is not uncommon for some of these bids to be offered at or below the generator’s cost of production. Since most generators are steam turbines that cost money to bring online, unaggressive bids ensure that the generator can avoid unnecessary stoppages. A power plant will often submit bids at higher prices in an attempt to maximise profits. Generally, the placement of the higher bids will depend on who else is bidding at that point. For example, if a generator can profitably sell power at $50 and the next plant in the generation stack becomes profitable at $60, the first generator is likely to split their bid into two pieces – a piece below $50 to minimise the risk of being completely inactive, and the rest of their bid just under the $60 mark. Generally, this second bid will be as high as possible without tempting the next generator in the stack to undercut that price. Bidding in this manner requires an in-depth knowledge of all the power plants around a certain point in the generation stack.

In many cases variable power providers can’t turn off their power supplies or guarantee delivery. For example, once power is scheduled to be imported from another power grid, it can’t be easily cancelled. Solar, wind, and hydro generators also can’t shut down on short notice, nor can they guarantee that they will be able to deliver their power. As a result, these power supplies will be price takers – they will bid zero cost for their power and get paid the clearing price set by other market participants. Even small changes to the generation stack can have a major effect on prices because the top of the generation stack is getting displaced.

To predict power prices, it is necessary to look at historical prices and estimate the generation stack from other pieces of information. Of this other information, fuel prices are the most common way to estimate changing power prices. For fuel-dependent load providers, the cost of fuel and the conversion efficiency of their power plant combine to determine where they become cost effective.

1.26Tolling Agreements

A tolling agreement is a contract to rent a power plant from its owners. These agreements give the renter the ability to convert one physical commodity (fuel) into a different commodity (electricity). Owning (or renting) a power plant gives a trader the option of converting fuel into power. If power prices are sufficiently high, a power plant can burn fuel to produce electricity at a profit. Otherwise, the trader will usually leave the power plant inactive. This is very similar to the behaviour of financial option contracts. As a result, the value of a power plant is often approximated as a portfolio of those contracts.

The general mechanism for outsourcing trading responsibility is to rent the power plant to a power marketer, a company specialising in power trading, through a tolling agreement. These agreements can run for any length of time (often 20 to 30 years) and divide the job of running a power plant between the two parties. The owner gets paid a fee to maintain the power plant, while the power marketer makes all of the economic decisions. The marketer is responsible for supplying fuel to the plant and selling the resulting electricity into a competitive market. The power marketer takes on all of the economic risks and earns al the profits above the fixed maintenance fee.

Calculating the profit from the conversion of a low cost commodity into a high cost commodity is a standard net profit calculation; a power plant’s profit is the sale price of its product minus its cost of materials and operating costs. In most cases, since fuel costs are much larger than other operating costs, the operating costs are ignored and the net profit of a power plant is approximated only by the conversion efficiency of the plant. For a single unit of output, this estimate of net profit is called a spark spread, a concept that was also introduced earlier. Since spark spreads can be negative, the ability of the power plant to turn off means that its profit needs to be approximated by a spark spread option rather than a spark spread. A spark spread option is a spark spread whose owner has the option of taking a zero profit, which is similar to a power plant shutting down. When spark spreads are positive, the power plant’s total profit is its per-unit profit (the spark spread) multipled

Proprietary & Confidential 55

Page 56: Garp Erp Study Notes

by the total units of electricity the power plant can produce. When the spark spread is negative, the power plant has zero profit. As a general rule, whenever spark spreads are positive, the owner will take the profit. Any time they are unprofitable, the owner will try to opt for zero payment by shutting down the power plant. Because the power marketer isn’t going to make just one decision on the power plant, a large number of options are required to approximate the physical behaviour of a power plant. Most commonly, a power plant will make operating decisions on an hourly, daily, or monthly basis. Typically, a model of a tolling agreement will create an option for each operating decision. Each leg of the trade will represent a set of decisions occurring around the same point in time. The primary factor in choosing an appropriate number of legs is the availability of market data and the physical capabilities power plant. If the only available prices come from the forward market, which trades monthly contracts, there isn’t much benefit in choosing a daily model or hourly model.

Each leg of a tolling agreement requires electricity and fuel prices at the right time and location. Unless storage is easy, energy products are not eh same commodity at different points in the year. This has a big effect on risk management – any measure that tries to aggregate risk between multiple legs has to account for fundamentally different underlying exposures. Both the efficiency of the plant and its total output determine its profitability. The total profitability of a power plant depends on its per-unit profit (the spark spread) and the quantity of electricity that it can produce (the dispatch rate). These two factors need to be balanced against one another. Higher levels of production are less efficient – they require more fuel per megawatt of power. As a result, the per-unit profit decreases as more power is produced. To a large extent, the value of a tolling agreement depends on the expected correlation between power and fuel prices. Highly correlated power and fuel prices mean less volatility and lower profits. Small changes to the correlation between these prices can have a major impact on the value of a tolling agreement.

Some of the value of a tolling agreement is known immediately. At a minimum, it is worth its intrinsic value – its value if all the operating decisions were made immediately. This can be done by arranging firm agreements to buy fuel and sell electricity through the forward market. However, there is a second component to an option’s value. Uncertainty benefits the owner of an option. The downside risk of owning an option is capped. A 50/50 chance of making extra money is a great investment when losing doesn’t involve spending more money. The payoff of a spark spread option is based on the spread between power and gas prices. Today’s prediction of those prices is the forward spread. The spread at the time of expiration probably won’t be identical to the spread predicted today. However, it is likely to be distributed around the forward spread. Mathematically, the likely range of spreads is described by a statistical distribution centred on the forward spread. Some of the possible spreads will be at points where it is profitable to produce electricity. Other spreads will be at points where it is unprofitable to operate the power plant. The efficiency of the power plant (its heat rate) determines which spreads are profitable and which spreads are unprofitable.

There are dangers to using options to approximate physical behaviour – a spread option model can ignore important physical aspects of generation like the time it takes to turn on (ramp up or cycle) and variable operating costs. For example, a generator might take longer and use more fuel to start operating in the winter than during the summer. Options also assume power plant decisions can be made instantaneously. No matter how quickly a power plant can be cycled, it is going to be slower than instantaneous decisions implied by a spark spread model. As spark spread option models are less constrained than actual generators, they run the risk of overestimating profitability. This overestimation can be as high as 20-30%.

Proprietary & Confidential 56

Page 57: Garp Erp Study Notes

1.27Location

Network theory was well developed in the twentieth century and was concerned principally with static optimisation under deterministic conditions. The enhanced responsivity of participants that comes with liberalisation drove extensive theoretical development around the turn of the century on the time element of power – that is the stochastic evolution of prices. Whilst location has always been a part of system design and operation, it has not been a key element of electricity market design until very recently. The increasing importance and profile of location is due to four key factors-

Increasing commercial complexity of networks due to the interconnection of markets and the wheeling of power across long distances.

The increasing importance of barriers and constraints, electrical and otherwise. Increasing geographical widening between fossil fuel sourcing, large scale production,

consumption and environmental impact, and the associated impact on security of supply. Increasing extent of small scale renewable generation, embedded in the distribution

networks.

Substantial maintenance is required for lines, towers, insulators, transformers, breakers, relays, busbars, static var condensers, capacitors and a variety of other equipment. The true cost incurred by the transportation company is equal to the ‘shallow’ (nearby) connection cost, plus the long term infrastructure requirements caused by the new load in relation to both current and anticipated loads. This it he ‘deep’ entry cost. The problem is that with such high cost and long life, allocation of the full cost to the new load that may only be around for a few years, is excessive. Hence, the transmission owner must extract the rent from the lines over a longer period of time. Over and above the build and maintain costs for the transportation owner is the research and development necessary for the application of new equipment for more active management of the system. This is true for distribution as well as transmission companies, since management of distribution networks are becoming more active due to the increase in intermittent embedded generation.

The treatment of losses is different in the transmission and distribution networks. In transmission, the system operator retains a close identity to losses and has the ability to measure them with real time import and export meters. In distribution, the distribution company commonly has no direct relationship to losses, has a much wider and less certain infrastructure, and exit metering that is commonly late, of low temporal resolution and with varying degrees of accuracy. Hence a distribution loss factors is assigned rather than measured and reconciled.

The provision of reactive power by generators is essential to maintain voltage and stability. This provision is costly for the generator, and unless mandatory and uncompensated as part of the statutory grid code (in which case generators load the costs in their prices for real power, which is economically inefficient), requires compensation to the generators.

The general assumption in consumer contracts is that the energy (and capacity) is ‘firm’, in an immature market, voluntary demand management and interruptibility is hard to execute and in this situation, system security is a public rather than a private good. This is reinforced by the fact that regardless of private willingness to accept interruption in return for lower prices, lost load has high media and government attention. In the absence then of voluntary payment for security of supply, the network operator (and by implication the generators) must levy an involuntary charge for security of supply.

Constraint incurs a cost in real time due to the need to re-dispatch plant relative to the unconstrained optimum, and the continuation of this causes a long term cost of constraint. This cost

Proprietary & Confidential 57

Page 58: Garp Erp Study Notes

is felt by consumers. Constraint cost can be reduced by network build, and hence the system operator must be correctly incentivised to do so.

‘Commercial losses’ is a commonly used term for the electricity that is consumed but which is not paid for. Electricity can be dishonestly consumed directly from the distribution network (by wire or transformer), or by a variety of tampering activities with and around the meter.

Electricity wheeled the whole way across the country or control area may increase losses or cost of constraint, and in fact would usually do so, since wheeling ‘against the flow’ is unlikely. This causes an increase in the cost of infrastructure. The effect on system security depends on the interruptibility of the wheeling. If it is interruptible, then security of supply is increased and if it is not then security of supply is usually decreased.

A possible ESI design might be to cost transportation on a ‘point to point’ basis. So, generators sell to the transmission or distribution networks at the respective entry nodes, and consumers pay the networks at the exit nodes, and distribution companies pay transmission companies for electricity at transmission exit/distribution entry and sell to consumers at the distribution exit. This would be enormously complicated for the consumer, and there are numerous complications in relation to reconciliation to the consumer meter. The common model instead is for the consumer to have a single interface – to the supply company, and for the supply company to pay generators for energy and network operators for transportation.

The connection charge is the charge applied to either generators or consumers when connecting to the network for the first time. It is quite possible to have no connection charge, and simply amortise the connection cost and smear across the whole system by collecting just use of system charges. Similarly, it is possible to charge only generators, only consumers, only generators connected to the transmission infrastructure, or only consumers connected only to the transmission infrastructure. The use of system charge is closely associated with the connection charge, and represents that part of system build and maintain costs (plus various other costs) that is not captured by connection charges, plus designated other costs that may include the various forms of frequency response and reserve, reactive power and black start.

The incremental costs for the system operator incurred by one participant are greatest if the period of maximum demand for the participant coincides with the period of maximum system demand.

Loss costs are applied separately to the transmission and distribution sectors, and can have different splits of generator and demand costs, just as for use of system costs. Electrical losses on the high voltage grid are relatively low compared to distribution losses. Typical losses in the developed economies, which are more densely populated than developing economies, are of the order of 2-4%. Losses can be reduced b –

Reducing net flow and distance Flow routing, for example the path of least resistance. Electricity will do this by itself, but the

configuration of breakers in the network for loss minimisation is different to that for least cost of re-dispatch to resolve constraints.

Improving physical performance (for example reducing resistance by increasing line redundancy, or reducing line losses by raising voltage or using direct current) and technological performance.

Physical changes such as raising voltages, using direct current for long lines, and adding lines.

In the short term, losses act as a netting off of generation submitted to the grid and this can act as an economic signal.

Proprietary & Confidential 58

Page 59: Garp Erp Study Notes

1.28Details of the Integrated Trading Model

The existence of a visible spot price is central to efficient operations. Some reasons include –

Permits incentive-compatible handling of imbalances and congestion. Induces least-cost operation by being the de factor penalty for unavailable plants. Used in the pricing for final customers, permitting real-time price response and increasing

reliability. Permits small plants to enter the market because they have automatic back up if the plant is

unavailable. This reduces market concentration. The spot price feeds back into the contract market; the expected value of the future spot

prices determines the contract price. Therefore, the spot price is an important determinant of the willingness of investors to construct new generating capacity.

If efforts are made to move spot trading out of the system operator and into private markets, not only does the spot price become much less transparent and much less efficient at doing the above tasks, but also the inevitable rules necessary to suppress the system operator’s imbalance market will drive traders to consolidate, increasing concentration. As such, the preferred trading model is therefore the integrated model, in which short-run market and system operations are integrated.

Prices need to rise at the peak times to provide enough to cover the investment of the last generator on the system, and in fact, it can be shown that all the generators need this amount to recover their investment. It is the prospect of these returns that induces generators to invest.

There are three workable methods of ensuring that prices rise in times of tight supply to the level set by demand –

Demand bidding – Capacity payment – charging the marginal cost at all hours will, in a well-planned system,

give generators just enough revenue if they also charge the ‘marginal cost of capacity’ (the investment costs not recovered through marginal cost pricing) at peak times.

System of capacity obligations – requires all load serving entities that serve final customers to acquire capacity tickets, which must cover the expected peak load for their customers, multiplied by a multiple (1+X). Where X is calculated as a reserve margin, sufficient to meet some pre-planned level of reliability to cope with random generator outages. Sellers of the tickets must be generators.

o Workable, but there are problems. Relies on administrative forecast of demand, which is problematic. They don’t deal with retail competition very well because retailer’s loads and reserve requirements change too quickly.

1.29Nuclear Power Energy Plants

The already high cost estimates for constructing new nuclear power plants versus other forms of energy power plants suddenly rose to take into account the many anticipated extra costs of earthquake and tsunami protection that would be required worldwide, and also the new government safety precautions and wide range of new tests that would be required for final authorization of new nuclear power plants. There was also a spike in projected costs because of the widely anticipated cancellation of many nuclear power plants in various nations.

The cost of mining the uranium or other radioactive ore such as plutonium and thorium (a less radioactive ore), as well as the cost of then transforming ore into a safe form of ‘yellow cake’ or

Proprietary & Confidential 59

Page 60: Garp Erp Study Notes

other transportable substance, were really on the first basic costs, compared to the total all-in cost of obtaining all government regulatory permissions, designing the plant, and constructing the plant, and final completion tests and numerous safety evaluation procedures, which were often subject to very long delays and changes. The costs of fuel once the plant was fully built and approved were relatively small, since the nuclear fuel lasted so long and could generate electricity for decades.

One recent innovation of new nuclear power plant planning in a number of nations is the requirement of a ‘geological disposal facility’, which is a guaranteed financial commitment to pay for the safe disposal of the nuclear waste created by each nuclear power plant. This prepayment program is especially reasonable because the cost of new advanced methods of creating nuclear power will have to be originally factored into the cost of their ‘reprocessing’ their ‘spent or waste nuclear material’. As a result of financial planning and budgeting in advance, the extra added life span of the original nuclear fuel that will be reprocessed, and the safe number of times it can be reprocessed, while it will cost more initially than it would have originally, the nuclear plant will have a prepaid right to reprocess this nuclear fuel. This lowers the average all-in disposal cost of spent nuclear fuel by reducing the ultimate amount of totally spent nuclear fuel.

The future of global nuclear power plants today is a far more complex forecast than it would have been before the 2011 Japanese earthquake, tsunami, and three nuclear power plant meltdowns. The entire nuclear power industry is under intense nationally and internationally mandated investigations to test whether any of their nuclear power plants are at risk from a level 9 earthquake.

1.30Hydropower Plants

As it is for wind and solar power projects, it is tough in the current market to make the economics work on the development of a new hydropower plant. Older, operating hydropower plants with power purchase agreements that are indexed to avoided cost are good restructuring candidates. Since avoided cost is typically determined by natural gas in most markets, this tends to be a natural gas-fired power plant. Unlike wind and solar projects, most hydro projects have a relatively high yearly availability.

Hydro projects are optimised at the time of development and have to be optimised to take maximum advantage of current average annual river flows. This optimisation can include new hydraulic power units, new governors, remote pond control, and movable forebay wall gate. Pumped storage facilities pump water to a higher elevation in order to turn a turbine to produce electricity. The water is moved using cheaper power during off-peak periods. During on-peak periods, the water is released to drive a hydro turbine. The concept is that since wind turbines produce nonfarm power, a pumped storage facility would act like a battery to store power.

1.31Geothermal Power Plants

Under the Earth’s surface there is a layer of hot molten rock called magma, which is the source of geothermal energy. Today, this magma drives 8,900 MW in large-scale industrial power plant in 24 nations. The places in the world with the highest temperatures underground often have active young volcanoes that are sometimes called hot spots. These occur where the giant continental tectonic plates meet each other and the Earth’s crust is thin, enabling heat, fire or geysers to break through the Earth’s surface.

The largest collection of hot spots in the world is in northern California, where dry steam spouts from many cracks in the earth’s rocky crust and continues every day. The dry steam from many of these cracks in the earth rises directly into turbines of many geothermal power plants that are placed on top of these geologic cracks. The dry steam drives the turbines, which directly drive electric generators that capture the geothermal energy, and transfers that power directly to the

Proprietary & Confidential 60

Page 61: Garp Erp Study Notes

electric power station. The Geysers plants use an evaporating water-cooling process to create a vacuum that pulls steam through the turbines more efficiently. However, this water-cooled process loses 60-80% of the steam into the air. It does not inject is back into the ground. Therefore, when the steam pressure declines, the rocks underneath remain very hot. The result is that 11 million gallons of water every day is treated separately, and must be transported to the geothermal plants from a wide radius.

The dry steam required the power plant to be built actually to sit on top of the crack in the earth where the dry steam escaped. This limited the amount of geothermal power that could be obtained from the earth, and so a second new technology was created. Boreholes were drilled into the earth in many nearby locations, where the geothermal liquid could be obtained. That geothermal liquid, could now be used to spray into a giant contained holding different liquid that was held at much lower pressure than the geothermal fluid and thus cause the new fluid to instantly ‘flash steam’. That flash steam could then drive a turbine, which could drive an electric generator. However, after a number of years, it was discovered that most geothermal regions have moderate-temperature water in them that is lower than the hottest geothermal fluid. Scientists found that energy could be extracted from these lower-temperature fluids and thereby developed what become known as a binary-cycle power plant due to the use of two different fluids. Both the geothermal fluid and a secondary fluid that has a much lower boiling point than water pass through a heat exchanger. Heat from the geothermal liquid causes the secondary fluid to flash into vapour, which then drive the turbines and then the electric generator. This binary-cycle power plant is a closed-loop system so that almost nothing escapes into the atmosphere.

Geothermal power plant projects are very expensive compared to natural gas-fired power plants. These projects involve drilling risk from project inception and during operations. Existing well continue to need maintenance and may quit after a certain operating period.

A geothermal heat pump or ground-source heat pump extracts underground heat in the winter for heating houses, and then transfers the heat back into the ground in the summer for cooling. Open-loop heat pumps use natural ground water.

Geothermal energy is widely predicted to be heavily funded by many governments because it is among the lowest-cost heating and cooling systems, and because it has been found to available all around the world. Spent fluids from geothermal electric plants can be used subsequently for direct-use applications called cascaded operations. Savings can be as much as 80% under the cost of fossil fuels.

Hot rock enhanced geothermal reservoirs require drilling wells down into hot rocks and fracturing the rock sufficiently to enable water to flow between the wells. The water flows along what are called permeable pathways picking up heat, and finally exit the reservoir production wells to complete the circulation loop.

Proprietary & Confidential 61