garden centre and hardware & building supplies, endfield

4
Garden Centre and Hardware & Building Supplies, ENDFIELD 127 COSGROVE ROAD SOUTH STRATHFIELD NSW LANDSCAPE PLAN 31 July 2017 RevC PO BOX 265 SEAFORTH NSW 2092 P: 1300 22 44 55 E: julian@sdstudios.com.au www.sdstudios.com.au DRIP IRRIGATION PERFORMANCE SPECIFICATION All Garden Beds and Planter Boxes are to be provided with a drip irrigation system and two taps with removebale water keys, connected to a pump and the rainwater tank. Design, supply and install a permanent, fully automated drip irrigation system. The system is to cover all new garden areas to the extent shown on the drawings. Water is to be delivered via sub surface drippers and/or drip lines. The system is to be capable of supplying 32mm of water/week over all irrigated areas. It is to be designed to operate for a minimum of 10 years. All lines are to be buried below the finished ground level. Pits are to be set on a 200mm deep bed of gravel. Pit covers are to be level with the soil surface. Avoid seepage onto pavement, buildings or other structures. Include plumbing connection to main, main valve and backflow prevention. Central controller/programmer to be located in a lockable box in nominated location to be approved prior to installation. A dedicated GPO is to be provided for the controller to be plugged into. All work is to be approved by the local regulatory authority. Prepare as installed drawings and commission the system. The Contractor is to submit documents of the design and specification for the irrigation system for approval prior to commencement of work. Equipment is to comply with AS 2698.1 & as 2698.3. Connect to pumps connect to the rainwater tanks. LANDSCAPE MAINTENANCE THE CONTRACTOR SHALL CONTINUOUSLY MAINTAIN ALL AREAS OF THE CONTRACT DURING THE PROGRESS OF THE WORKS. THE CONTRACTOR SHALL COMMENCE AND FULLY IMPLEMENT THE SHORT-TERM MAINTENANCE AND ESTABLISHMENT AFTER PRACTICAL COMPLETION HAS BEEN CONFIRMED. SITE CONTROL: REPORT TO THE PRINCIPAL'S DESIGNATED REPRESENTATIVE ON ARRIVING AT AND BEFORE LEAVING THE SITE. PLANT ESTABLISHMENT PERIOD: THE PERIOD BETWEEN THE DATE OF PRACTICAL COMPLETION AND THE DATE OF FINAL COMPLETION. MAINTENANCE/ ESTABLISHMENT PERIOD: 12 MONTHS. PLANT ESTABLISHMENT: MAINTAIN THE CONTRACT AREA DURING THE PLANT ESTABLISHMENT PERIOD. ENSURE THE GENERAL APPEARANCE AND PRESENTATION OF THE LANDSCAPE AND THE QUALITY OF PLANT MATERIAL AT DATE OF PRACTICAL COMPLETION IS MAINTAINED FOR THE FULL PLANTING ESTABLISHMENT PERIOD. EXISTING PLANT MATERIAL: MAINTAIN EXISTING PLANTING WITHIN THE LANDSCAPE CONTRACT AREA AS SPECIFIED FOR NEW PLANTING. REPLACEMENTS: REPLACE FAILED, DEAD AND/OR DAMAGED PLANTS AT MINIMUM 3 WEEK INTERVALS AS NECESSARY THROUGHOUT THE FULL PLANT ESTABLISHMENT PERIOD. REPORTING: SUBMIT REGULAR REPORTS BY THE LAST FRIDAY OF EACH MONTH SUMMARISING THE GENERAL STATUS OF WORKS. INCLUDE A MAINTENANCE SCHEDULE, A LOG BOOK OF MAINTENANCE ACTIVITY, SOIL TEST RESULTS AS REQUIRED FOR ANY FERTILISING PROGRAMS, AND PLANT REPLACEMENT REQUIREMENTS. WATER RESTRICTIONS: COORDINATE THE WATER SUPPLY AND CONFIRM THE WATERING REGIME AGAINST RELEVANT GOVERNMENT LEGISLATION AND RESTRICTIONS AT THE TIME. STAKES AND TIES: REMOVE AT THE END OF THE PLANTING ESTABLISHMENT PERIOD. TEMPORARY FENCES: REMOVE TEMPORARY PROTECTIVE FENCES AT THE END OF THE PLANTING ESTABLISHMENT PERIOD. COMPLIANCE: PLANT ESTABLISHMENT SHALL BE DEEMED COMPLETE, SUBJECT TO THE FOLLOWING: * REPAIRS TO PLANTING MEDIA COMPLETED. * PESTS, DISEASE, OR NUTRIENT DEFICIENCIES OR TOXICITIES ARE NOT EVIDENT. * MULCHED SURFACES HAVE BEEN MAINTAINED IN A WEED FREE AND TIDY CONDITION AND TO THE SPECIFIED DEPTH. * VEGETATION IS ESTABLISHED AND WELL FORMED. * PLANTS HAVE HEALTHY ROOT SYSTEMS. * VEGETATION IS NOT RESTRICTING ESSENTIAL SIGHT LINES AND SIGNAGE. * COLLECTION AND REMOVAL OF LITTER COMPLETED. * REMOVAL OF MULCH FROM DRAINAGE AND ACCESS AREAS COMPLETED. * ALL DEFECTS NOTIFICATIONS HAVE BEEN CLOSED OUT. Planting Schedule Botanical Name Common Name Pot Size Height (m) Quantity TREES Acer palmatum Senkaki Coral Bark Maple 100L 8 3 Cercis siliquastrum Judas tree 75Lt 6 6 Elaeocarpus reticulatus Blueberry Ash 45L 8 30 Farxinus raywoodii Claret Ash 45L 8 1 Magnolia Soulangenea Magnolia 45L 6 3 Magnolia stellata Star Magnolia 45L 6 13 Prunus snofozam Little gem 45L 4 7 Prunus blireana Sweeper Foliage 45L 6 11 Pyrus calleryana Capital Pear 45L 9 14 Zelkova serrata Green Vase 100L 12 12 SHRUBS Callistemon endevour Endevour Bottlebrush 200mm 2 9 Cordyline fruticosa Ti Plant 200mm 1 80 Cordyline Red Sensation Red Sensation 200mm 1.5 37 Doryanthes excelsa Gymea Lilly 200mm 1.2 53 Gardenia augusta Gardenia 200mm 1 29 Murraya paniculata Orange Jassmine 200mm 2 10 Photinia robusta Photinia 200mm 1.5 115 Raphiolepis 'Oriental Pearl' Oriental Pearl 200mm 1 36 Viburnum odoratissimum Sweet Viburnum 200mm 2 116 GROUNDCOVERS/ACCENTS Acacia cognata Limelight Acacia 150mm 0.6 90 Ajuga reptans Carpet Bugle 150mm 0.2 180 Alcantarea purpurea Silver Plum 150mm 1 40 Angiozanthus sp Red kangoroo Paw 150mm 0.6 12 Agapanthus africanus African Lilly 150mm 0.6 130 Arthropodium cirratum Renga Lilly 150mm 0.6 130 Baekea virgata nana Dwarf Heath Myrtle 150mm 0.8 150 Banksia spinulosa Birthday Candles 150mm 0.5 110 Bergenia x schmitdtii Bergenia 150mm 0.5 90 Clivia minata Clivia 150mm 0.6 300 Dianella caerullea Flax Lilly 150mm 0.6 130 Dichondra silver falls Silver Falls Kidney Weed 150mm 0.2 250 Hemerocallis stella Daylilly 150mm 0.8 20 Liriope muscari Turf Lilly Royale Purple 150mm 0.5 100 Lomandra hystrix Slender Mat Rush 150mm 0.5 500 Lomandra Tanika Fine Leafed Mat Rush 150mm 0.5 500 Myoporum parvivolium Yareena Creeping Boobiala 150mm 0.5 100 Philodendron 'Xanadu' Xanadu 150mm 1 90 Viola hederacea Native Violet 150mm 0.1 50

Upload: others

Post on 19-Jun-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Garden Centre and Hardware & Building Supplies, ENDFIELD

Garden Centre and Hardware &Building Supplies, ENDFIELD127 COSGROVE ROAD SOUTHSTRATHFIELD NSW

LANDSCAPE PLAN31 July 2017 RevC

PO BOX 265 SEAFORTH NSW 2092P: 1300 22 44 55E: [email protected]

www.sdstudios.com.au

DRIP IRRIGATION PERFORMANCE SPECIFICATION

All Garden Beds and Planter Boxes are to be provided with a drip irrigation system and two taps with removebale water keys, connected to a pump and the rainwater tank.

Design, supply and install a permanent, fully automated drip irrigation system. The system is to cover all new garden areas to the extent shown on the drawings. Water is to be delivered via sub surface drippers and/or drip lines. The system is to be capable of supplying 32mm of water/week over all irrigated areas. It is to be designed to operate for a minimum of 10 years. All lines are to be buried below the finished ground level. Pits are to be set on a 200mm deep bed of gravel. Pit covers are to be level with the soil surface. Avoid seepage onto pavement, buildings or other structures. Include plumbing connection to main, main valve and backflow prevention. Central controller/programmer to be located in a lockable box in nominated location to be approved prior to installation. A dedicated GPO is to be provided for the controller to be plugged into. All work is to be approved by the local regulatory authority. Prepare as installed drawings and commission the system.The Contractor is to submit documents of the design and specification for the irrigation system for approval prior to commencement of work.Equipment is to comply with AS 2698.1 & as 2698.3.

Connect to pumps connect to the rainwater tanks.

LANDSCAPE MAINTENANCE

THE CONTRACTOR SHALL CONTINUOUSLY MAINTAIN ALL AREAS OF THE CONTRACT DURING THE PROGRESS OF THE WORKS. THE CONTRACTOR SHALL COMMENCE AND FULLY IMPLEMENT THE SHORT-TERM MAINTENANCE AND ESTABLISHMENT AFTER PRACTICAL COMPLETION HAS BEEN CONFIRMED.SITE CONTROL: REPORT TO THE PRINCIPAL'S DESIGNATED REPRESENTATIVE ON ARRIVING AT AND BEFORE LEAVING THE SITE.PLANT ESTABLISHMENT PERIOD: THE PERIOD BETWEEN THE DATE OF PRACTICAL COMPLETION AND THE DATE OF FINAL COMPLETION.MAINTENANCE/ ESTABLISHMENT PERIOD: 12 MONTHS.

PLANT ESTABLISHMENT: MAINTAIN THE CONTRACT AREA DURING THE PLANT ESTABLISHMENT PERIOD. ENSURE THE GENERAL APPEARANCE AND PRESENTATION OF THE LANDSCAPE AND THE QUALITY OF PLANT MATERIAL AT DATE OF PRACTICAL COMPLETION IS MAINTAINED FOR THE FULL PLANTING ESTABLISHMENT PERIOD.EXISTING PLANT MATERIAL: MAINTAIN EXISTING PLANTING WITHIN THE LANDSCAPE CONTRACT AREA AS SPECIFIED FOR NEW PLANTING.REPLACEMENTS: REPLACE FAILED, DEAD AND/OR DAMAGED PLANTS AT MINIMUM 3 WEEK INTERVALS AS NECESSARY THROUGHOUT THE FULL PLANT ESTABLISHMENT PERIOD.REPORTING: SUBMIT REGULAR REPORTS BY THE LAST FRIDAY OF EACH MONTH SUMMARISING THE GENERAL STATUS OF WORKS. INCLUDE A MAINTENANCE SCHEDULE, A LOG BOOK OF MAINTENANCE ACTIVITY, SOIL TEST RESULTS AS REQUIRED FOR ANY FERTILISING PROGRAMS, AND PLANT REPLACEMENT REQUIREMENTS.WATER RESTRICTIONS: COORDINATE THE WATER SUPPLY AND CONFIRM THE WATERING REGIME AGAINST RELEVANT GOVERNMENT LEGISLATION AND RESTRICTIONS AT THE TIME.STAKES AND TIES: REMOVE AT THE END OF THE PLANTING ESTABLISHMENT PERIOD.TEMPORARY FENCES: REMOVE TEMPORARY PROTECTIVE FENCES AT THE END OF THE PLANTING ESTABLISHMENT PERIOD.COMPLIANCE: PLANT ESTABLISHMENT SHALL BE DEEMED COMPLETE, SUBJECT TO THE FOLLOWING:* REPAIRS TO PLANTING MEDIA COMPLETED.* PESTS, DISEASE, OR NUTRIENT DEFICIENCIES OR TOXICITIES ARE NOT EVIDENT.* MULCHED SURFACES HAVE BEEN MAINTAINED IN A WEED FREE AND TIDY CONDITION AND TO THE SPECIFIED DEPTH.* VEGETATION IS ESTABLISHED AND WELL FORMED.* PLANTS HAVE HEALTHY ROOT SYSTEMS.* VEGETATION IS NOT RESTRICTING ESSENTIAL SIGHT LINES AND SIGNAGE.* COLLECTION AND REMOVAL OF LITTER COMPLETED.* REMOVAL OF MULCH FROM DRAINAGE AND ACCESS AREAS COMPLETED.* ALL DEFECTS NOTIFICATIONS HAVE BEEN CLOSED OUT.

Planting Schedule Botanical Name Common Name Pot Size Height (m) QuantityTREESAcer palmatum Senkaki Coral Bark Maple 100L 8 3Cercis siliquastrum Judas tree 75Lt 6 6Elaeocarpus reticulatus Blueberry Ash 45L 8 30Farxinus raywoodii Claret Ash 45L 8 1Magnolia Soulangenea Magnolia 45L 6 3Magnolia stellata Star Magnolia 45L 6 13Prunus snofozam Little gem 45L 4 7Prunus blireana Sweeper Foliage 45L 6 11Pyrus calleryana Capital Pear 45L 9 14Zelkova serrata Green Vase 100L 12 12

SHRUBSCallistemon endevour Endevour Bottlebrush 200mm 2 9Cordyline fruticosa Ti Plant 200mm 1 80Cordyline Red Sensation Red Sensation 200mm 1.5 37Doryanthes excelsa Gymea Lilly 200mm 1.2 53Gardenia augusta Gardenia 200mm 1 29Murraya paniculata Orange Jassmine 200mm 2 10Photinia robusta Photinia 200mm 1.5 115Raphiolepis 'Oriental Pearl' Oriental Pearl 200mm 1 36Viburnum odoratissimum Sweet Viburnum 200mm 2 116

GROUNDCOVERS/ACCENTSAcacia cognata Limelight Acacia 150mm 0.6 90Ajuga reptans Carpet Bugle 150mm 0.2 180Alcantarea purpurea Silver Plum 150mm 1 40Angiozanthus sp Red kangoroo Paw 150mm 0.6 12Agapanthus africanus African Lilly 150mm 0.6 130Arthropodium cirratum Renga Lilly 150mm 0.6 130Baekea virgata nana Dwarf Heath Myrtle 150mm 0.8 150Banksia spinulosa Birthday Candles 150mm 0.5 110Bergenia x schmitdtii Bergenia 150mm 0.5 90Clivia minata Clivia 150mm 0.6 300Dianella caerullea Flax Lilly 150mm 0.6 130Dichondra silver falls Silver Falls Kidney Weed 150mm 0.2 250Hemerocallis stella Daylilly 150mm 0.8 20Liriope muscari Turf Lilly Royale Purple 150mm 0.5 100Lomandra hystrix Slender Mat Rush 150mm 0.5 500Lomandra Tanika Fine Leafed Mat Rush 150mm 0.5 500Myoporum parvivolium Yareena Creeping Boobiala 150mm 0.5 100Philodendron 'Xanadu' Xanadu 150mm 1 90Viola hederacea Native Violet 150mm 0.1 50

Page 2: Garden Centre and Hardware & Building Supplies, ENDFIELD

AMENDMENTS -

NOTESGENERAL NOTESAll work to be carried out in accordance with the Building Code of Australia, all Local and State Government Ordinances, relevant Australian Standards, Local Authorities Regulations and all other relevant Authorities concerned. All structural work and site drainage to be subject to Engineer's details or certification where required by Council. This shall include r.c. slabs and footings, r.c. and steel beams & columns, wind bracing to AS 1170 and AS4055, anchor rods or bolts, tie downs, fixings etc., driveway slabs and drainage to Council's satisfaction. All timbers to be in accordance with SAA Timber Structure Code AS1720 and SAA Timber Framing Code AS 1684. All work to be carried out in a professional and workman- shiplike manner according to the plans and specification.NOTEDo not scale off the drawings unless otherwise stated and use figured dimensions in preference. All dimensions are to be checked and verified on site before the commencement of any work, all dimensions and levels are subject to final survey and set-outNo responsibility will be accepted by Sitedesign for any variations in design, builder's method of construction or materials used, deviation from specification without permission or accepted work practices resulting in inferior construction. Locate and protect all services prior to construction.COPYRIGHT CLAUSEThis drawing and design is the property of Sitedesign and should not be reproduced either in part or whole without the written consent of this firm.

ISSUE DATE COMMENT

PO BOX 265 SEAFORTH NSW 2092M: 0417 685 846

E: [email protected]

Project

Drawing Title

Address

Date Scale Drawing No.

Revision

Page

landscape architects // construction // maintenance // irrigationcreating gardens to live in and enjoy

Garden Centre & Hardware & Building Supplies, ENDFIELD

15-830LP011:500 @A1

FOR DEVELOPMENT APPLICATION ONLY

SITE LANDSCAPE PLAN127 COSGROVE ROAD STRATHFIELD NSW

17.03.16

A/3

A/3 31.07.17 ISSUE FOR APPROVAL

plan view

STAGGERED PATTERN TO

QUANITIES AS PER PLANTING PLAN

CONTAINERISED PLANT

AS PER PLANTING SCHEDULE

IMPORTED TOPSOIL AS SPECIFIED

GARDEN BED PLANTING

CONTAINERISED PLANT

AS PER PLANTING SCHEDULE

INSTALL 75MM DEPTH MULCH AS

SPECIFIED . NO MULCH WITHIN

50MM FROM BASE OF PLANT STEM

RIP SUBGRADE 150MM TO PROMOTE DRAINAGE AND IMPROVE PLANT GROWTH

38 x 38 x 1800 Hardwood stakesas specified

50mm wide hessian ties

75mm mulch as specified

form shallow dish drain to base of plant

excavate planting hole 200mmdeeper and 600mm wider than pot size

backfilled planting mix to be finished

flush with surrounding soil levels

rip subgrade 150mm

TREE PLANTING

Timber Edge Detail (L)

(L)

(L)

(L)

POND

RO

OF

25.9

1

SIGN SIGNTELSTRA

POLE

GRATE

SIGN

SIGN

POLE

POLE

SIGN

SIGN

GAS

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

RIDGE 30.36

RIDGE 30.35

GUTTER 25.72

RIDGE 25.05

GUTTER 23.24

ROOF 25.71

GU

TTE

R 2

3.53

GU

TTE

R23

.32

GUTTER24.45

GUTTER 25.75

GUTTER 25.69

STOPVALVE

STOPVALVE

AW

NIN

G

MARKER

GASMARKER

UNDERPASS(L)

(L)

(L)

(L)

POND

RO

OF

25.9

1

SIGN SIGNTELSTRA

POLE

GRATE

SIGN

SIGN

POLE

POLE

SIGN

SIGN

GAS

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

RIDGE 30.36

RIDGE 30.35

GUTTER 25.72

RIDGE 25.05

GUTTER 23.24

ROOF 25.71

GU

TTE

R 2

3.53

GU

TTE

R23

.32

GUTTER24.45

GUTTER 25.75

GUTTER 25.69

STOPVALVE

STOPVALVE

AW

NIN

G

MARKER

GASMARKER

UNDERPASS(L)

(L)

(L)

(L)

POND

RO

OF

25.9

1

SIGN SIGNTELSTRA

POLE

GRATE

SIGN

SIGN

POLE

POLE

SIGN

SIGN

GAS

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

RIDGE 30.36

RIDGE 30.35

GUTTER 25.72

RIDGE 25.05

GUTTER 23.24

ROOF 25.71

GU

TTE

R 2

3.53

GU

TTE

R23

.32

GUTTER24.45

GUTTER 25.75

GUTTER 25.69

STOPVALVE

STOPVALVE

AW

NIN

G

MARKER

GASMARKER

UNDERPASS(L)

(L)

(L)

(L)

POND

RO

OF

25.9

1

SIGN SIGNTELSTRA

POLE

GRATE

SIGN

SIGN

POLE

POLE

SIGN

SIGN

GAS

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

RIDGE 30.36

RIDGE 30.35

GUTTER 25.72

RIDGE 25.05

GUTTER 23.24

ROOF 25.71

GU

TTE

R 2

3.53

GU

TTE

R23

.32

GUTTER24.45

GUTTER 25.75

GUTTER 25.69

STOPVALVE

STOPVALVE

AW

NIN

G

MARKER

GASMARKER

UNDERPASS(L)

(L)

(L)

(L)

POND

RO

OF

25.9

1

SIGN SIGNTELSTRA

POLE

GRATE

SIGN

SIGN

POLE

POLE

SIGN

SIGN

GAS

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

RIDGE 30.36

RIDGE 30.35

GUTTER 25.72

RIDGE 25.05

GUTTER 23.24

ROOF 25.71

GU

TTE

R 2

3.53

GU

TTE

R23

.32

GUTTER24.45

GUTTER 25.75

GUTTER 25.69

STOPVALVE

STOPVALVE

AW

NIN

G

MARKER

GASMARKER

UNDERPASS

206 SpacesPROPOSED CAR PARK

(L)

(L)

(L)

(L)

POND

RO

OF

25.9

1

SIGN SIGNTELSTRA

POLE

GRATE

SIGN

SIGN

POLE

POLE

SIGN

SIGN

GAS

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

RIDGE 30.36

RIDGE 30.35

GUTTER 25.72

RIDGE 25.05

GUTTER 23.24

ROOF 25.71

GU

TTE

R 2

3.53

GU

TTE

R23

.32

GUTTER24.45

GUTTER 25.75

GUTTER 25.69

STOPVALVE

STOPVALVE

AW

NIN

G

MARKER

GASMARKER

UNDERPASS

26.07

26.07

25.73

25.72

26.02

26.09

22.05

21.53

21.53 21.

19

21.16

21.40

21.54

20.89

20.80

20.922

6.03

26.08

25.74

26.05

25.74

20.73

20.79

20.77

21.08

20.77 20.

67

20.50

20.39

20.44

20.49

20.39

20.18

20.14

26.09

26.09

25.75

25.77

26.09

25.96

25.73

26.09

26.10

19.87

19.63

19.46

19.21

19.15

19.27

19.60

19.41

19.77

21.74

21.43

21.46

20.99

21.01

25.76

26.09

26.09

25.72 25.74

26.08

26.07

25.76

25.74

26.08

26.11

26.10

25.77

20.41

20.41

20.43

20.41

20.69

20.73

22.04

22.04

21.74

21.74

20.90

20.94

20.84

20.70

20.89

20.88

20.91

20.95

20.58

20.55

20.56

20.57

20.15

20.18 19.47

30.66

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

CO*

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

GROUNDGROUND

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

GROUNDGROUND

GROUND

GROUND

GROUND

GROUND

GROUND

GROUNDGROUND

GROUND

GROUND

GROUND

GROUND

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

TOP CONC

TOP CONC

TOP CONC

TOP CONC

TOP CONC

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

TOP CONC

TOP CONC

TOP CONC

TOP CONC

TOP CONC

TOP CONC

TOP CONC

TOP CONC

TOP CONC

TOP CONC

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

GROUNDGROUND

GROUNDGROUND

GROUND

GROUND GROUND

GROUND

GROUND

U/S B

EAM

(L)

(L)

(L)

(L)

POND

RO

OF

25.9

1

SIGN SIGNTELSTRA

POLE

GRATE

SIGN

SIGN

POLE

POLE

SIGN

SIGN

GAS

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

RIDGE 30.36

RIDGE 30.35

GUTTER 25.72

RIDGE 25.05

ROOF 25.71

GU

TTE

R 2

3.53

GU

TTE

R23

.32

GUTTER24.45

GUTTER 25.79

GUTTER 25.75

GUTTER 25.69

STOPVALVE

STOPVALVE

AW

NIN

G

MARKER

GASMARKER

GAS

UNDERPASS(L)

(L)

(L)

(L)

POND

RO

OF

25.9

1

SIGN SIGNTELSTRA

POLELINTEL

GRATE

SIGN

SIGN

POLE

POLE

SIGN

SIGN

CONCLID

POLEGAS

GASMARKER

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

RIDGE 30.31 RIDGE 30.36

RIDGE 30.35RIDGE 30.36

GUTTER 25.71GUTTER 25.72

RIDGE 25.05

RIDGE 28.92

ROOF 25.71

GU

TTE

R 2

3.53

GU

TTE

R23

.32

GUTTER 23.28GUTTER

24.45

GUTTER 25.75

GAS

GAS

STOPVALVE

STOPVALVE

AWNING

AW

NIN

G

GASMARKER

GASMARKER

MARKER

GASMARKER

UNDERPASS

5653m2

GARDEN CENTREENTRY

140m2CAFE

SERVICE CORRIDOR

RL.22.00

RL.18.92

70m2

RL.22.00

LOADINGDOCK

BULK BAG STORAGE AREA

28m2KITCHEN

GATE

ENTRY/EXIT

KIDSPLAY AREA

OUTDOOR NURSERY[Indicative layout only]

125m2

1750m2

SITE BOUNDARY

SITE BOUNDARY

RL.21.40

AMENITIES

RL.21.50245m2

RL.21.75

GARDEN CENTRE / HARDWARE AND BUILDING SUPPLIES

RL.21.50

FLORIST50m2

COSGROVE ROAD

PUNCHBOW

L ROAD

PAVILLION50m2

TEA

LARGE OUTDOOR PRODUCT STORAGE ZONE

GATE

65m2

17m2

RL.19.00

RL.20.25

RL.20.50RL.22.00 RL.20.85RL.21.05

RL.22.00

RL.21.75 RL.21.50

Water Tanks

RL.15.65

RE

TAIN

EM

ER

GE

NC

Y

AC

CE

SS

TO

INTE

RM

OD

AL S

ITE

RL.16.10

RL.20.40

RL.19.60

RL.20.00

RL.20.40

Water Tanks

LPLPLPLPLPLPLPLP LP

LP

RE

2 ZO

NIN

G

RE

2 ZO

NIN

G :

10m

OFF

SE

T

ROAD

RL.20.50

ROAD

MEDIAN STRIP ON ZONE BOUNDARY

45m2SHED

ACCESS

CUSTOMER VEHICLEWAITING BAY

LP

RL.21.35

WASTE STORAGE AREA

BA

LE P

RE

SS

CA

RD

BO

AR

D

CA

RD

BO

AR

D

LAN

DF

ILL

CARDBOARDLANDFILL

ORGANICS

LAN

DF

ILL

MIX

ED

R/C

WASTE STORAGE AREA

WASTE STORAGE AREA

COOLROOMCONCRETE

TANK

RL.20.20

OUTDOORDINING

SIGNAGE

Train

AREA 1 AREA 2

LEGEND :

BOUNDARY

Building Area

As Selected Paver

Retaining Wall

A/2 17.03.16 ISSUE FOR APPROVAL

Page 3: Garden Centre and Hardware & Building Supplies, ENDFIELD

(L)

(L)

TELSTRA

POLE

GRATE

SIGN

SIGN

POLE

SIGN

SIGN

GAS

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

GUTTER 25.72

GUTTER 25.69

MARKER

GASMARKER

UNDER

(L)

(L)

TELSTRA

POLE

GRATE

SIGN

SIGN

POLE

SIGN

SIGN

GAS

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

GUTTER 25.72

GUTTER 25.69

MARKER

GASMARKER

UNDER

(L)

(L)

TELSTRA

POLE

GRATE

SIGN

SIGN

POLE

SIGN

SIGN

GAS

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

GUTTER 25.72

GUTTER 25.69

MARKER

GASMARKER

UNDER

(L)

(L)

TELSTRA

POLE

GRATE

SIGN

SIGN

POLE

SIGN

SIGN

GAS

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

GUTTER 25.72

GUTTER 25.69

MARKER

GASMARKER

UNDER

(L)

(L)

TELSTRA

POLE

GRATE

SIGN

SIGN

POLE

SIGN

SIGN

GAS

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

GUTTER 25.72

GUTTER 25.69

MARKER

GASMARKER

UNDER

206 SpacesPROPOSED CAR PARK

(L)

(L)

TELSTRA

POLE

GRATE

SIGN

SIGN

POLE

SIGN

SIGN

GAS

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

GUTTER 25.72

GUTTER 25.69

MARKER

GASMARKER

UNDER

26.07

26.07

25.7325.72

26.02

26.09

22.05

21.53

21.53 21

.19

21.16

21.40

21.54

20.89

20.80

20.92

26.03

26.08

25.74

26.05

25.74

20.73

20.79

20.77

21.08

20.77 20

.67

20.50

20.39

20.44

20.49

20.39

26.09

26.09

25.75

25.77

21.74

21.43

21.46

20.99

21.01

25.76

26.09

26.09

25.72 25.74

26.08

26.07

25.76

25.74

26.08

26.11

26.10

25.77

20.41

20.6920.73

22.04

22.04

21.74

21.74

20.90

20.94

20.84

20.70

20.89

20.88

20.91

20.95

20.58

20.55

20.56

20.57

20.15

20.18

30.66

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

CO*

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

GROUNDGROUND

GROUND

GROUND

GROUND

GROUND

GROUND

GROUNDGROUND

GROUND

GROUND

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

TOP CONC

TOP CONC

TOP CONC

TOP CONC

TOP CONC

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

TOP CONC

TOP CONC

TOP CONC

TOP CONC

TOP CONC

TOP CONC

TOP CONC

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

GROUNDGROUND

GROUNDGROUND

GROUND

GROUND GROUND

GROUND

U/S BEAM

(L)

(L)

TELSTRA

POLE

GRATE

SIGN

SIGN

POLE

SIGN

SIGN

GAS

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

GUTTER 25.72

GUTTER 25.69

MARKER

GASMARKER

GAS

UNDER

(L)

(L)

TELSTRA

POLELINTEL

GRATE

SIGN

SIGN

POLE

SIGN

SIGN

CONCLID

POLEGAS

GASMARKER

SIGNGASCONC

LID

TRAFFICLIGHT

GAS

STEELSTRUCTURE

RIDGE 30.31

RIDGE 30.36

GUTTER 25.72

GASMARKER

GASMARKER

MARKER

GASMARKER

UNDER

5653m2

GARDEN CENTREENTRY

140m2CAFE

RL.22.0070m2

RL.22.00

28m2KITCHEN

GATE

KIDSPLAY AREA

OUTDOOR NURSERY[Indicative layout only]

125m2

1750m2

SITE BOUNDARY

RL.21.40

AMENITIES RL.21.75

GARDEN CENTRE / HARDWARE AND BUILDING SUPPLIES

RL.21.50

FLORIST50m2

PAVILLION50m2

TEA

LARGE OUTDOOR PRODUCT STORAGE ZONE

GATE

65m2

17m2

RL.22.00

RL.22.00

RL.21.75 RL.21.50

Water Tanks

Water Tanks

LPLPLPLPLP

RL.21.35

CARDBOARDLANDFILL

ORGANICS

LAN

DFI

LLM

IXED

R/C

WASTE STORAGE AREA

CONCRETETANK

OUTDOORDINING

Train

AMENDMENTS -

NOTESGENERAL NOTESAll work to be carried out in accordance with the Building Code of Australia, all Local and State Government Ordinances, relevant Australian Standards, Local Authorities Regulations and all other relevant Authorities concerned. All structural work and site drainage to be subject to Engineer's details or certification where required by Council. This shall include r.c. slabs and footings, r.c. and steel beams & columns, wind bracing to AS 1170 and AS4055, anchor rods or bolts, tie downs, fixings etc., driveway slabs and drainage to Council's satisfaction. All timbers to be in accordance with SAA Timber Structure Code AS1720 and SAA Timber Framing Code AS 1684. All work to be carried out in a professional and workman- shiplike manner according to the plans and specification.NOTEDo not scale off the drawings unless otherwise stated and use figured dimensions in preference. All dimensions are to be checked and verified on site before the commencement of any work, all dimensions and levels are subject to final survey and set-outNo responsibility will be accepted by Sitedesign for any variations in design, builder's method of construction or materials used, deviation from specification without permission or accepted work practices resulting in inferior construction. Locate and protect all services prior to construction.COPYRIGHT CLAUSEThis drawing and design is the property of Sitedesign and should not be reproduced either in part or whole without the written consent of this firm.

ISSUE DATE COMMENT

PO BOX 265 SEAFORTH NSW 2092M: 0417 685 846

E: [email protected]

Project

Drawing Title

Address

Date Scale Drawing No.

Revision

Page

landscape architects // construction // maintenance // irrigationcreating gardens to live in and enjoy

Garden Centre & Hardware & Building Supplies, ENDFIELD

15-830LP021:200 @A1

FOR DEVELOPMENT APPLICATION ONLY

LANDSCAPE PLAN (AREA 1)127 COSGROVE ROAD STRATHFIELD NSW

17.03.16

A/3

1 Fraxinus g

3 Magnolia s

6 Zelkova s

3 Acer ps

1 Cercis s20 Baekea v

4 Prunus b

12 Elaeocarpus r

8 Pyrus c

4 Calistemon e

4 Magnolia st

4 Magnolia st

5 Magnolia st

9 Viburnum o11 Photinia r

15 Agapanthus a20 Arthropodium c50 Clivia m10 Viburnum o

12 Photinia r9 Viburnum o11 Photinia r

9 Viburnum o11 Photinia r

15 Agapanthus a20 Arthropodium c50 Clivia m

15 Agapanthus a20 Arthropodium c50 Clivia m

6 Cordyline r50 Bergenia x

10 Murraya p20 Raphiolepis o

20 Alcantarea p40 Acacia c

50 Acacia c50 Baekea v100 Lomandra h100 Lomandra t

100 Lomandra t100 Lomandra h20 Alcantarea p

10 Photinia r16 Raphiolepis o

40 Viburnum o29 Gardenia a

31 Cordyline r100 Ajuga r100 Dianella c250 Dichondra s

5 Calistemon e

3 Doryanthes e50 Viola h30 Bergenia x

LEGEND :

BOUNDARY

Building Area

As Selected Paver

Retaining Wall

GABION RETAINING WALLS FILLED WITHDIFFERENT ROCK TO SHOWRANGE IN MATERAILS

CORTEN STEEL RETAINING WALLS AS REPITITIONOF RAILWAY COAL LOADERS. ADD CARRIAGE NUMBERS - Historic Signage

FEATURE WALL

Succulent Roof Top GardenAs Roof of TEA PAVILLION

4 Doryanthes e30 Banksia s

40 Baeckea v

A/3 31.07.17 ISSUE FOR APPROVAL

A/2 17.03.16 ISSUE FOR APPROVAL

Page 4: Garden Centre and Hardware & Building Supplies, ENDFIELD

(L)

(L)

RO

OF

25.9

1

SIGN SIGN

RIDGE 30.36

RIDGE 30.35

RIDGE 25.05

GUTTER 23.24

ROOF 25.71

GU

TTER

23.

53

GU

TTER

23.3

2

GUTTER24.45

GUTTER 25.75

VALVE

AWN

ING

(L)

(L)

RO

OF

25.9

1

SIGN SIGN

RIDGE 30.36

RIDGE 30.35

RIDGE 25.05

GUTTER 23.24

ROOF 25.71

GU

TTER

23.

53

GU

TTER

23.3

2

GUTTER24.45

GUTTER 25.75

VALVE

AWN

ING

(L)

(L)

RO

OF

25.9

1

SIGN SIGN

RIDGE 30.36

RIDGE 30.35

RIDGE 25.05

GUTTER 23.24

ROOF 25.71

GU

TTER

23.

53

GU

TTER

23.3

2

GUTTER24.45

GUTTER 25.75

VALVE

AWN

ING

(L)

(L)

RO

OF

25.9

1

SIGN SIGN

RIDGE 30.36

RIDGE 30.35

RIDGE 25.05

GUTTER 23.24

ROOF 25.71

GU

TTER

23.

53

GU

TTER

23.3

2

GUTTER24.45

GUTTER 25.75

VALVE

AWN

ING

(L)

(L)

RO

OF

25.9

1

SIGN SIGN

RIDGE 30.36

RIDGE 30.35

RIDGE 25.05

GUTTER 23.24

ROOF 25.71

GU

TTER

23.

53

GU

TTER

23.3

2

GUTTER24.45

GUTTER 25.75

VALVE

AWN

ING

206 SpacesPROPOSED CAR PARK

(L)

(L)

RO

OF

25.9

1

SIGN SIGN

RIDGE 30.36

RIDGE 30.35

RIDGE 25.05

GUTTER 23.24

ROOF 25.71

GU

TTER

23.

53

GU

TTER

23.3

2

GUTTER24.45

GUTTER 25.75

VALVE

AWN

ING

20.18

20.14

26.09

25.96

25.73

26.09

26.10

19.87

19.63

19.46

19.21

19.15

19.27

19.60

19.41

19.77

25.74

26.08

26.11

26.10

25.77

20.41

20.41

20.43

20.41

20.69

19.47

GROUND

GROUND

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

U/S TRUSS

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

GROUND

U/S TRUSS

U/S TRUSS

U/S TRUSS

TOP CONC

TOP CONC

TOP CONC

TOP CONC

GROUND

(L)

(L)

RO

OF

25.9

1

SIGN SIGN

RIDGE 30.36

RIDGE 30.35

RIDGE 25.05

ROOF 25.71

GU

TTER

23.

53

GU

TTER

23.3

2

GUTTER24.45

GUTTER 25.79

GUTTER 25.75

VALVE

AWN

ING

(L)

(L)

RO

OF

25.9

1

SIGN SIGN

RIDGE 30.36

RIDGE 30.35

GUTTER 25.71

RIDGE 25.05

RIDGE 28.92

ROOF 25.71

GU

TTER

23.

53

GU

TTER

23.3

2

GUTTER 23.28GUTTER

24.45

GUTTER 25.75

GAS

GAS

VALVE

AWNING

AWN

ING

SERVICE CORRIDOR

RL.18.92

LOADINGDOCK

BULK BAG STORAGE AREA

ENTRY/EXIT

SITE BOUNDARY

RL.21.50245m2

RL.19.00

RL.20.25

RL.20.50RL.20.85RL.21.05

RL.15.65

RETAIN EMERG

ENCY

ACC

ESS TO

INTERM

OD

AL SITE

RL.16.10

RL.20.40

RL.19.60

RL.20.00

RL.20.40

LPLPLP LP LP

LP

RE2

ZON

ING

RE2

ZON

ING

: 10

m O

FFSE

T

ROAD

RL.20.50

ROAD

MEDIAN STRIP ON ZONE BOUNDARY

45m2SHED

ACCESS

CUSTOMER VEHICLEWAITING BAY

RL.21.35

WASTE STORAGE AREA

BALE

PR

ES

SC

AR

DB

OA

RD

CA

RD

BO

AR

D

LAN

DFI

LL

WASTE STORAGE AREA

COOLROOM

RL.20.20

SIGNAGE

AMENDMENTS -

NOTESGENERAL NOTESAll work to be carried out in accordance with the Building Code of Australia, all Local and State Government Ordinances, relevant Australian Standards, Local Authorities Regulations and all other relevant Authorities concerned. All structural work and site drainage to be subject to Engineer's details or certification where required by Council. This shall include r.c. slabs and footings, r.c. and steel beams & columns, wind bracing to AS 1170 and AS4055, anchor rods or bolts, tie downs, fixings etc., driveway slabs and drainage to Council's satisfaction. All timbers to be in accordance with SAA Timber Structure Code AS1720 and SAA Timber Framing Code AS 1684. All work to be carried out in a professional and workman- shiplike manner according to the plans and specification.NOTEDo not scale off the drawings unless otherwise stated and use figured dimensions in preference. All dimensions are to be checked and verified on site before the commencement of any work, all dimensions and levels are subject to final survey and set-outNo responsibility will be accepted by Sitedesign for any variations in design, builder's method of construction or materials used, deviation from specification without permission or accepted work practices resulting in inferior construction. Locate and protect all services prior to construction.COPYRIGHT CLAUSEThis drawing and design is the property of Sitedesign and should not be reproduced either in part or whole without the written consent of this firm.

ISSUE DATE COMMENT

PO BOX 265 SEAFORTH NSW 2092M: 0417 685 846

E: [email protected]

Project

Drawing Title

Address

Date Scale Drawing No.

Revision

Page

landscape architects // construction // maintenance // irrigationcreating gardens to live in and enjoy

Garden Centre & Hardware & Building Supplies, ENDFIELD

15-830LP031:200 @A1

FOR DEVELOPMENT APPLICATION ONLY

LANDSCAPE PLAN (AREA 2)127 COSGROVE ROAD STRATHFIELD NSW

17.03.16

A/3

plan view

STAGGERED PATTERN TO QUANITIES AS PER PLANTING PLANCONTAINERISED PLANT AS PER PLANTING SCHEDULE

IMPORTED TOPSOIL AS SPECIFIED

GARDEN BED PLANTING

CONTAINERISED PLANT AS PER PLANTING SCHEDULE

INSTALL 75MM DEPTH MULCH AS SPECIFIED. NO MULCH WITHIN 50MM FROM BASE OF PLANT STEM

RIP SUBGRADE 150MM TO PROMOTE DRAINAGE AND IMPROVE PLANT GROWTH

38 x 38 x 1800 Hardwood stakesas specified

50mm wide hessian ties

75mm mulch as specifiedform shallow dish drain to base of plant

excavate planting hole 200mmdeeper and 600mm wider than pot sizebackfilled planting mix to be finishedflush with surrounding soil levels

rip subgrade 150mm

TREE PLANTING

INDIVIDUAL PLANTING

EXISTING SUBGRADE

FERTILISE AS SPECIFIED

STAGGERED PLANTING PATTERN TO SUITEPLANT QUANITIES AS LOCATED ON THE LANDSCAPE PLAN

plan view

ww x 2

h x

2 h

CONTAINERISED PLANT AS PER PLANTING SCHEDULE

INSTALL 75MM DEPTH MULCH AS SPECIFIED. NO MULCH WITHIN 50MM FROM BASE OF PLANT STEM

CONTAINERISED PLANT AS PER PLANTING SCHEDULE

IMPORTED TOPSOIL AS SPECIFIED

1 Cercis s

4 Prunus b

3 Prunus s

12 Elaeocarpus r

6 Pyrus c

6 Zelkova s

4 Cercis s

9 Viburnum o11 Photinia r

9 Viburnum o11 Photinia r

7 Viburnum o9 Photinia r

30 Banksia s

8 Doryanthes e40 Philodendron x20 Banksia s

30 Dianella c20 Hymenocallis s100 Liriope m12 Angiozanthus sp

15 Agapanthus a20 Arthropodium c50 Clivia m

15 Agapanthus a20 Arthropodium c50 Clivia m

15 Agapanthus a20 Arthropodium c50 Clivia m

40 Banksia s

40 Baekea v

4 Prunus s80 Ajuga r

34 Doryanthes e80 Cordyline f300 Lomandra h300 Lomandra t100 myoporum p

LEGEND :

BOUNDARY

Building Area

As Selected Paver

Retaining Wall

14 Viburnum o29 Photinia r

30 Agapanthus a40 Arthropodium c50 Clivia m

4 Doryanthes e30 Banksia s

2 Prunus b

6 Elaeocarpus r

50 Philodendron x

1 Prunus b

A/3 31.07.17 ISSUE FOR APPROVAL

A/2 17.03.16 ISSUE FOR APPROVAL