game on – creative consent order solutions using green ......+ osis hgl issues – facility ground...
TRANSCRIPT
![Page 1: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/1.jpg)
Ryan Andrews
EMH&T
Game On – Creative Consent Order
Solutions Using Green
Technology
Paul Roseberry
Columbus - DOSD
![Page 2: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/2.jpg)
Background
+ City of Columbus Consent Order
– Effective August 2002
– Reduce SSOs and CSOs
+ Identified Berliner Park Area
– Susceptible to surface flooding & sewer overflows
– 126-in Olentangy-Scioto Interceptor Sewer (OSIS)
– 48-in “Old Dry Flow” (ODF) Combined Sewer
• History of overflows in park
![Page 3: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/3.jpg)
Flooding / Sewer Overflow Jan 2005
![Page 4: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/4.jpg)
Flooding/Sewer Overflow Jan 2005
![Page 5: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/5.jpg)
Site Location
![Page 6: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/6.jpg)
Existing Conditions
![Page 7: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/7.jpg)
Planned Improvements
+ System Wide Capacity Enhancement
– OSIS Augmentation Relief Sewer (OARS) Deep Tunnel
+ Local/Berliner Park Improvements
– Sewer separation and abandonment of ODF
– Reduce SSOs/CSOs
– Comply with OEPA Consent Order
![Page 8: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/8.jpg)
Project Challenges
+ Floodplain / facility elevations
+ Lack of a convenient storm outlet
+ Planned operational changes to OSIS
– Increase in HGL to approx. 705-ft
– Ground elevations in park: 697-ft to 702-ft
![Page 9: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/9.jpg)
Storm Water Separation
+ Evaluated several options
– Storm sewer
– Stormwater Pump Station
– Green Alternatives
• Infiltration trenches
• Dry Wells
• Exfiltration Structures
![Page 10: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/10.jpg)
Geotechnical Data
+ Soil borings taken at various locations to 15-ft
– 0 to 0.5-ft – Topsoil
– 0.5 to 6-ft – Clay
– 6-ft to 15-ft – Sand and Gravel
– Water at 6 to 9-ft
+ Natural sand and gravel strata at approx. 6-ft
![Page 11: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/11.jpg)
Storm Grading Plan
![Page 12: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/12.jpg)
+ Drain larger areas (parking, roadway, ball fields)
+ Permeable engineered soil mix
+ No. 2 stone to the depth of the native sand/gravel
+ Slope surface to the center of trench
+ Geotextile fabric
+ Observation well
+ Maintenance Plan
Infiltration Trenches
![Page 13: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/13.jpg)
+ Drain isolated low spots in the park
+ Standard manhole with open grate cover
+ Open bottom extending to natural sand and gravel
+ Inlet filter installed for maintenance
Dry Wells
![Page 14: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/14.jpg)
+ Replace existing storm sewer
+ Larger discharge structure allows storm water
to ex-filtrate to gravel strata
Exfiltration Structure
![Page 15: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/15.jpg)
Green Infrastructure – Design Procedure
+ Design procedure is not straight forward
+ Calculate water quality volume
+ Establish model using design storm that
produces WQv
+ Model infiltration trenches as ponds to
determine required size
![Page 16: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/16.jpg)
Sanitary Sewer Modifications
+ 4 facilities in the park discharging to ODF
+ OSIS HGL issues
– Facility ground elev. = 697 – 702-ft
– Proposed OSIS HGL elev. = 705-ft
+ Hydraulically disconnect the local collection
system from the OSIS
– Eliminate WIBs / surcharging at facilities
![Page 17: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/17.jpg)
Sanitary Plan
![Page 18: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/18.jpg)
Pressure Sewer Design
+ Four prepackaged grinder lift stations
+ Common force main(s)
+ Discharge structure with gate
+ Check valve structures at
junctions
![Page 19: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/19.jpg)
Old Dry Flow Abandonment
+ Clean / remove settled debris
+ Plug upstream of OSIS
+ Abandon / fill with flowable fill
+ Cut down manholes
![Page 20: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/20.jpg)
Construction
+ Coordination with Columbus Recreation and
Parks
+ Costs
+ Lessons learned
– Design
– O&M Considerations
![Page 21: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/21.jpg)
Construction / Photos
![Page 22: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/22.jpg)
Construction / Photos
![Page 23: Game On – Creative Consent Order Solutions Using Green ......+ OSIS HGL issues – Facility ground elev. = 697 – 702-ft – Proposed OSIS HGL elev. = 705-ft + Hydraulically disconnect](https://reader035.vdocuments.us/reader035/viewer/2022071301/609cdac68c82a07dcf28d24a/html5/thumbnails/23.jpg)
Questions