gabriel india limited_projectpresentation
TRANSCRIPT
INDUSTRIAL IN-PLANT TRAINING
UNDER THE GUIDANCE OF-Mr. M. MAGDUM (D.G.M. Mfg Engg.)Mr. A. HARISH (A. M. Mfg Engg.)
PROJECT
BY-AMEYA MARGAJPANKAJ KHAIRNARAISSMS COE, PUNE-1
ACTIVITIES JAN 2012
FEB 2012
MAR 2012
APRIL 2012
MAY 2012
JUNE 2012
FINALIZE PROJECT
GATHER DATA
ANALYSE DATA
SELECT SOLUTION
IMPLEMENT
CLOSURE
TIMELINE
STREAMLINING THE ZIG-ZAG FLOW AND LINE BALANCING
CONTENTS:1. Defined hourly outputs for all cells depending upon the
customer requirement (i.e. TAKT Time) and Preparation of Standardized Work Charts according to Line Balancing .
2. Streamlining the Zigzag Flow.3. Analysis of Downtimes in Peripheral Assembly.4. Improvement projects for reducing inventory (i.e. Reducing Cost).5. Stabilization of process by monitoring and analysis through process
capability (Cp) and process capability index (Cpk) for Critical Processes.
PROBLEMS :- Line Balancing
• More operator idle time.• Improving Human efficiency.• Less formation ratio.
DATA COLLECTION:- Line balanced according to the cycle times taken
LINK TO ALL C.T. LINK TO ONLINE PDI
1. DEFINE STANDARD CYCLE TIMES FOR SBC, ROD CELL, ASSEMBLY & PDI
1 2 30
2
4
6
8
10
12
1412
8 8
DIA 22 FR BEFORE
OPERATORS
TIM
E(SE
C)
1 20
2
4
6
8
10
12
14
16
18
12
16
DIA 22 FR AFTER
OPERATORS
TIM
E(SE
C)
LINE BALANCING FOR ONLINE PDI (STRUT LINE ASSY) Assembly C.T. = 16sec
LINE BALANCING FOR ONLINE PDI (STRUT LINE ASSY) Assembly C.T. = 23sec
LINE BALANCING FOR ONLINE PDI (NEW LINE ASSY) Assembly C.T. = 21 sec
Assembly C.T. = 32 sec
LINE BALANCING FOR ONLINE PDI (NEW LINE ASSY)
STREAMLINING THE ZIG-ZAG FLOW AND LINE BALANCING
CONTENTS:1. Defined hourly outputs for all cells depending upon the customer
requirement (i.e. TAKT Time) and Preparation of Standardized Work Charts according to Line Balancing .
2. Streamlining the Zigzag Flow.3. Analysis of Downtimes in Peripheral Assembly.4. Improvement projects for reducing inventory (i.e. Reducing Cost).5. Stabilization of process by monitoring and analysis through process
capability (Cp) and process capability index (Cpk) for Critical Processes.
2. STREAMLINING THE ZIG ZAG FLOW (IN ASSEMBLY CELL)
STRUT LINE: W201 FR (BEFORE)
T
I/T check& B/v
Pressing
Torquing & Stacking M/c Oil Filling
Rod Guide press
Damping Force
Checking
Spinning
Rod
I/T
O/T T T
Gas filling
Striker Cap
Pressing
Gas Load
Check
Rod Assy
Seal Deflection
M/c
CONVEYOR
PDI
Issues:-1.Distance 2. Output per shift 3. Quality
Distance : 10.5m
I/T
STRUT LINE: W201 FR (AFTER)
BENEFITS:-• Distance Reduced by 1.5m• Cycle time reduced by 6 sec.• Output per shift increased
by 100 NOS. • Improved Quality.
Sticker Cap
Pressing
I/T check& B/v
Pressing
Torquing & Stacking M/c
Oil FillingRod
Guide press
Damping Force
Checking
Spinning
Rod
O/T
T
T T
Gas fillingGas Load
Check
Rod Assy
Seal Deflection
M/c
CONVEYOR PDI
Distance : 9 m
T
STREAMLINING THE ZIG ZAG FLOW(IN STRUT BODY CELL)
KNUCKLE BKT
PRESSING-1 (PV)
ROBO WELDING
TWO TORCH
WELDING
LEAK TESTING
HYDRAULIC ROLL
MARKING O/T
END CAP
CRIMPING
PROOF LOAD
TESTING
ROBO WELD CELL ( PRESENT)
Distance : 9.44 m
SPRING SEAT & KNUCKLE
BKT PRESSING -2
Issues:-1.Distance 2. Output per shift
ROBO WELD CELL ( PROPOSED)
T
KNUCKLE BKT PRESSING-1 (PV)
ROBO WELDING
TWO TORCH
WELDING
LEAK TESTING
HYDRAULIC ROLL
MARKING O/T
END CAP
CRIMPING
PROOF LOAD
TESTING
Distance : 7.92 m
SPRING SEAT & KNUCKLE
BKT PRESSING -2
BENEFITS:-• Distance reduced by 1.5 m• Operator walking time reduced by 3 seconds• Output per shift will increase by 23 NOS.
STREAMLINING THE ZIG-ZAG FLOW AND LINE BALANCING
CONTENTS:1. Defined hourly outputs for all cells depending upon the customer
requirement (i.e. TAKT Time) and Preparation of Standardized Work Charts according to Line Balancing
2. Streamlining the Zigzag Flow3. Analysis of Downtimes in Peripheral Assembly4. Improvement projects for reducing inventory (i.e. Reducing Cost)5. Stabilization of process by monitoring and analysis through process
capability (Cp) and process capability index (Cpk) for Critical Processes.
3. ANALYSIS OF DOWNTIMES IN PERIPHERAL ASSEMBLY
• PROBLEMS:-1. Material Shortage2. Trolley Shortage3. High Downtimes
• DATA COLLECTION:-1. Monitored line production for complete shift for 3 weeks.LINK TO DOWNTIME ANALYSIS SHEET.xls
• SOLUTIONS:-o Complete material necessary for one shift provided at once.o Separate bush fitting machine provided at online PDI.(W201 RR)
BENEFITS-1) Downtime due to material
shortage reduced.2) TLT reduced by 0.5 shift3) Material Travel distance
reduced by 25 m
STREAMLINING THE ZIG-ZAG FLOW AND LINE BALANCING
CONTENTS:1. Defined hourly outputs for all cells depending upon the customer
requirement (i.e. TAKT Time) and Preparation of Standardized Work Charts according to Line Balancing
2. Streamlining the Zigzag Flow3. Analysis of Downtimes in Peripheral Assembly4. Improvement projects for reducing inventory (i.e. Reducing
Cost)5. Stabilization of process by monitoring and analysis through process
capability (Cp) and process capability index (Cpk) for Critical Processes
4. DEFINITION OF WIP IN BETWEEN DIFFERENT PROCESSES
• PROBLEMS:-1. Undefined WIP in between rod welding and assembly,
piercing and assembly, autophoretic and assembly, assembly and PDI.
2. Frequent shortages due to undefined WIP.
• SOLUTION:-1. Developed an inventory model wherein WIP will be defined
with respect to the process bottleneck cycle time.2. WIP ALL MSW-ASSY.xlsx3. Defined area to keep this WIP.
STREAMLINING THE ZIG-ZAG FLOW AND LINE BALANCING
CONTENTS:1. Defined hourly outputs for all cells depending upon the customer
requirement (i.e. TAKT Time) and Preparation of Standardized Work Charts according to Line Balancing
2. Streamlining the Zigzag Flow3. Analysis of Downtimes in Peripheral Assembly4. Improvement projects for reducing inventory (i.e. Reducing Cost)5. Stabilization of process by monitoring and analysis through
process capability (Cp) and process capability index (Cpk) for Critical Processes
5. STABILIZATION OF OIL FILLING PROCESS
• What is Oil Filling Process ??
• PROBLEMS1. Variation in oil quantity.2. Frequent adjustment of Stopper length.3. Wastage of oil during set-up confirmation.
SR. NO. READING IN CC WEIGHT
1 225 192
2 226 193
3 226 193
4 226 193
5 228 196
6 228 196
7 228 196
8 228 296
9 230 197
10 205 177
11 205 177
12 230 197
13 230 197
14 230 197
15 230 197
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15190
195
200
205
210
215
220
225
230
235
VW RR(HBK) BEFORE
ANALYSIS:
SOLUTIONS:• Time delay program changed• Play in the piston cylinder arrangement completely eliminated• Provision of fixed stoppers instead of adjustable ones.
• Time Delay Program not adjusted properly• Presence of the play in piston cylinder arrangement• Use of adjustable stoppers as time delay program not
adjusted properly.
• PROCESS CAPABILITY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15226
227
228
229
230
231
232
233
VW RR (HBK) AFTER
VW RR(HBK)
SR. NO. READINGS IN CC WEIGHT
1 230 197
2 230 197
3 230 197
4 228 196
5 230 197
6 230 197
7 230 197
8 230 197
9 230 197
10 230 197
11 232 198
12 232 198
13 230 197
14 230 197
15 230 197
BENEFITS:-
LINE BALANCING– Streamlined Process Flows.– Reduction in number of Operators by 2.– Human efficiency improvement for W201 FR from 43% to 60% – Increase in output per shift by 100 nos.
PROCESS CAPABILITY.– Quality improvement by process stabilization.
ANALYSIS OF DOWNTIMES– Material Shortage time reduced.
THANK YOU