g. dissertori ethz cms electronics 2002 1 ecal dcs : plans for 2003 g. dissertori ethz 27.11.2002
TRANSCRIPT
G. Dissertori ETHZ CMS Electronics 2002 1
ECAL DCS : Plans for 2003ECAL DCS : Plans for 2003
G. DissertoriETHZ
27.11.2002
G. Dissertori ETHZ CMS Electronics 2002 2
ECAL Electronics, DCSECAL Electronics, DCS
Description of the prototype slow control system
comments regarding each subsystem
Contents
G. Dissertori ETHZ CMS Electronics 2002 3
ECAL Electronics, DCSECAL Electronics, DCS
Main DCS console(PVSS, JCOP Framework)Main DCS console(PVSS, JCOP Framework)
HV (PVSS)HV
(PVSS)
LV (?)LV (?)
DSS (PVSS)DSS (PVSS) Cooling (?)
Cooling (?)
Laser (?)
Laser (?)
Temp/Humid.Moni
t. (PVSS)
Temp/Humid.Moni
t. (PVSS)
DAQDAQDB/ ArchiveDB/ Archive
DIM , XDAQ/PVSS
DIM ?DIM ?
G. Dissertori ETHZ CMS Electronics 2002 4
ECAL Electronics, DCSECAL Electronics, DCS
HV LV DSS Cooling
TEMP. + HUMID. Monit.
ALARMS
LASER DAQ
Main DCS Console
DB/ARCH
G. Dissertori ETHZ CMS Electronics 2002 5
ECAL Electronics, DCSECAL Electronics, DCS
had a meeting recently (HV, LV, TSS, F. Glege)
for mid-2003 (SM0) : first prototype of DCS software system in PVSS should include HV, LV, Temp.Monit., TSS, Cooling?, Framework with FSM, Partitioning,
communication with XDAQ and ECAL DAQ?
test of this prototype during 2003
beg. 2004: production setup for the SM calibration at H4 during 2004, probably all resources needed for calibration
beg. 2005: first tests of a setup for full ECAL (maybe start with reduced size) may have to find a location to do such a test
from mid 2005 on : install equipment and start testing of the full system
beg. 2006 : full system ready
Planning: Software
G. Dissertori ETHZ CMS Electronics 2002 6
ECAL Electronics, DCSECAL Electronics, DCS
up to end-2003 : subprojects software covered by responsible groups, framework covered, but I guess with substantial help/input needed (from Frank Glege, I guess)
end 2003 - 2004: have to shift manpower (1 person) to framework, probably from TSS and Temp. monitoring
in 2005 - 2006 : would like to get help for the test and integration of full system, also for the interfacing with the DAQ : 1 person (0.5 FTE ?)
Planning: Manpower
G. Dissertori ETHZ CMS Electronics 2002 7
ECAL Electronics, DCSECAL Electronics, DCS
we urge all subitems of DCS to look into PVSS (or a possible interface such as DIM) as soon as possible
when working with PVSS, follow rules when defining data points
please communicate, such as alarm types etc
Wishes/ Request / AOB
G. Dissertori ETHZ CMS Electronics 2002 8
ECAL Electronics, DCSECAL Electronics, DCS
HV issues
• they use CAEN PS. Supported by JCOP.
• Rome group will develop the HV PVSS application
• prototype should be ready for SM0• they will have Labview as backup
G. Dissertori ETHZ CMS Electronics 2002 9
ECAL Electronics, DCSECAL Electronics, DCS
LV issues
• exact system not yet defined ( in terms of hardware )
• planned to use DCUs (CCUs) to control the LVRs
• therefore: will use XDAQ
• therefore : will need PVSS - XDAQ interface
• hopefully a very first prototype ready for SM0
G. Dissertori ETHZ CMS Electronics 2002 10
ECAL Electronics, DCSECAL Electronics, DCS
DSS issues
• a first prototype already used in 2002 (M0’)
• the Belgrade group will build the application
• should be ready for SM0
• need good communication with DAQ, in order to get information from sensors integrated in PCBs
• needs communication with cooling
• sensors: as close as possible to final solution (2 sensors per module)
G. Dissertori ETHZ CMS Electronics 2002 11
ECAL Electronics, DCSECAL Electronics, DCS
Temp./Humid. Monit. issues
• a first prototype already used in 2002 (M0’)
• the Protvino group (together with ETHZ) will build the application
• should be ready for SM0
• needs communication with cooling (feedback ?)
• sensors : as close as possible to final solution : • 10 temp.sensors per supermodule (4 on grid, 4 on screen, 2 on IN/OUT pipes).• 1 humidity sensor per module
G. Dissertori ETHZ CMS Electronics 2002 12
ECAL Electronics, DCSECAL Electronics, DCS
Cooling issues
• need to start discussion now
• I think at the moment they use Labview
G. Dissertori ETHZ CMS Electronics 2002 13
ECAL Electronics, DCSECAL Electronics, DCS
Laser issues
• Need to start discussion now
• I assume they will have their own software (not PVSS)
• but at least we need software communication with the Laser system in order to know hardware status
G. Dissertori ETHZ CMS Electronics 2002 14
ECAL Electronics, DCSECAL Electronics, DCS
Communication with DAQ
• first tests for communication ECAL PVSS - XDAQ first half of 2003
• so hopefully ready for SM0
• As long as “J.Fay/J. Bourotte DAQ” is the run controller, have to communicate : best solution: DIM
• the DIM name server would run on the central DCS station• APIs exist for different platforms• in PVSS (JCOP framework) DIM is integrated (as API manager, built in via
particular definition of data points)• DIM could also be a candidate for other communications (eg. with
LASER)
G. Dissertori ETHZ CMS Electronics 2002 15
ECAL Electronics, DCSECAL Electronics, DCS
Database/Archiving
• Probably will use PVSS archiving tools
• what other kinds of databases will be used by others?
G. Dissertori ETHZ CMS Electronics 2002 16
ECAL Electronics, DCSECAL Electronics, DCS
FRAMEWORK issues
• A. Lister (ETHZ) just started to work on it
• hopefully first prototype ready for SM0
• with FSM, partitioning, alarm handling, XDAQ interface ...
• Note : planned that Alison leaves for CDF end 2003 (for some time). See man power issues....