EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
Mila J. JudeCogen 3 Country Coordinator
A Case Study on a Rice Husk
Cogeneration Power Plant
Capacity Development for the Clean Development Mechanism
26-27 March 2003Sunway Hotel, Phnom Penh, Cambodia
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 2/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
A Case Study on a Rice HuskCogeneration Power Plant
Presentation Outline
• Cogen3 Programme
• Cogeneration: How Does It Work?
• Angkor Prosperous Rice Mill
• Environmental and Economic Benefits• Conclusion
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 3/23
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 4/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
Cogeneration
Cogeneration (Combined Heat andPower or CHP) is the simultaneous
production of electricity and heat,both of which are used.
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 5/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 6/23
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 7/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
Angkor Rice Mill
website: www.angkorrice.com
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 8/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
Location Map of Angkor Rice Mill
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 9/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
Angkor Rice Mill
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 10/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
The rich, fertile soil of Central Cambodia provides optimal
environment for growing Neang Malis rice
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 11/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
Angkor Rice’s carefully selected planting area is in four provinces
in Central Cambodia: Kandal, Kampong Speu, Takeo and Kampot
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 12/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
A farmer transplanting seedlings
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 13/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
The region’s (central Cambodia) naturally fertile and sandy soil
enables farmers to grow Angkor Rice’s premium-quality Neang
Malis rice in a traditional way without chemicals.
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 14/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
More than 25,000 families are Angkor Rice’s members and growing
Neang Malis rice. There are no middlemen. Angkor Rice sets a
high standard. The Agriculture Division distributes high quality
seeds and instructs the farmers in planting rice.
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 15/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
Products of Angkor Rice: 100% Neang Malis
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 16/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 17/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
Proposed Rice Husk-Fired Cogeneration Power Plant
Angkor Rice Mill
• Steam turbine system with 1 MW electric capacity
• Present capacity of the mill is 10 tons/hour. Proposed
expansion of another 10 tons/hour
• Rice husk will be used as fuel• Two scenarios:
– steam has no value
– steam has value equal to 50% of the cost for steam
generation in a boiler using fuel oil
• Excess Electricity exported to other customers
• Utilization of heat for drying
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 18/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
Proposed Rice Husk-Fired Cogeneration Power Plant
Angkor Rice Mill
Scenario: Steam has no value• Total Investment Cost including contingency: 1.5 million euro
• Net Present Value: 3.1257 million euro
• IRR: 49.7%
• Discounted Payback Time: 2.3 years
• Cogeneration Project Lifetime: 20 years
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 19/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
Proposed Rice Husk-Fired Cogeneration Power Plant
Angkor Rice Mill
Scenario: Steam has value equal to 50% of fuel
oil cost• Total Investment Cost including contingency: 1.5 million euro
• Net Present Value: 4.659 million euro
• IRR: 64.4%
• Discounted Payback Time: 1.6 years
• Cogeneration Project Lifetime: 20 years
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 20/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
Cogen3 Pre-evaluation and Recommendations
• Project seems feasible
• Further investigations are recommended, concerning: – detailed design (electricity capacity of steam turbine,
utilization of capacity) – necessary investment
– real value of steam (benefits of drying using steam)
– necessary investment in drying process
– necessary investment in electricity distribution grid
– all issues, (especially government regulations) related toselling of electricity to other parties
• Requires a full feasibility study and investigation
8/11/2019 g-angkor rice-mj-mar03 (1).ppt
http://slidepdf.com/reader/full/g-angkor-rice-mj-mar03-1ppt 21/23
EC-ASEAN COGEN Programme Phase III
Proven, Clean & Efficient Biomass, Coal, Gas Cogeneration
Benefits of the Rice-Husk Cogeneration
Power PlantEnvironmental Benefits• Less pollution
• Uses rice husk, which is considered an agriculturalwaste
Economic Benefits• Savings (electricity production)
• Income generating (selling excess electricity, ashsales)
• Generates job
• Saves on fuel, no foreign currency needed
8/11/2019 g-angkor rice-mj-mar03 (1).ppt