FY2013 Infra Program/Glenn Degal/January 09, 2013 (2) (3) (4) ALBAY 1ST DEO 306,195.00 Rep. Edcel C. Lagaman 1.Albay 1st District 306,195.00 I. Locally-Funded Projects 306,195.00 a. National Arterial/Secondary Roads and Bridges 256,195.00 1. 108,707.00 a. 15.81 108,707.00 15.81 108,707.00 1. DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry 3.42 24,671.00 a. K0579 + 000 - K0579 + 1010 Overlay 50mm 1.01 7,461.00 b. K0580 + 000 - K0581 + 000 Overlay 50mm 1.02 6,840.00 c. K0582 + 037 - K0583 + 000 C_Overlay 50mm with corrections 0.97 7,216.00 d K0584 + 423 - K0584 + 850 Overlay 50mm 0.43 3,154.00 2. Ligao-Tabaco Rd 12.38 84,036.00 FY 2013 DPWH INFRASTRUCTURE PROGRAM Based on GAA Region V Amount Assets Preservation of National Roads Generated from Pavement Management System/Highway Development and Management-4 (HDM-4), Intermitent Sections Preventive Maintenance (Intermitent Sections) Arterial Implementing Office/Remark (1) Albay 1st DEO (24,671) PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical Target a. K0516 + 000 - K0517 + 005 C_Overlay 50mm with corrections 1.01 7,063.00 b. K0518 + 000 - K0519 + 000 Overlay 50mm 1.00 6,726.00 c. K0519 + 000 - K0520 + 000 C_Overlay 50mm with corrections 1.00 6,901.00 d. K0520 + 000 - K0526 + 010 Overlay 50mm 6.00 40,349.00 e. K0526 + 010 - K0527 + 062 C_Overlay 50mm with corrections 1.00 7,030.00 f. K0527 + 062 - K0527 + 1012 Overlay 50mm 0.95 6,389.00 g. K0528 + (-046) - K0528 + 931 Overlay 50mm 0.93 6,262.00 h. K0529 + 000 - K0529 + 493 Overlay 50mm 0.49 3,316.00 2. Roads to Address Critical Bottlenecks 141,888.00 a. 1. a. 2.68 66,888.00 Albay 1st DEO b. 1. a. Construction/Improvement 3.75 75,000.00 Regional Office V 3. National Bridges 8.00 5,600.00 a. 8.00 5,600.00 1. Replacement 8.00 5,600.00 Albay 1st DEO b. Flood Control and Drainage Projects 50,000.00 1. 50,000.00 a. 1.00 30,000.00 Albay 1st DEO b. 1.00 20,000.00 Albay 1st DEO Bonga Br. 2along DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry, Albay Construction/Rehabilitation/Improvement of River Control, Tabaco City National Road Traffic Decongestion Other Urban Areas Widening of Roads, Albay 1st Legislative District Construction/Widening/Upgrading/Rehabilitation of Access Roads to Airport, Major Seaports and Declared Tourism Destinations To Declared Tourism Destination Construction/Improvement-Cagraray Circumferential Road and Access Roads, Cagraray Island, Bagacay Regional Office V (84,036) Improvement of Flood Control Projects in Albay 1st District Rehabilitation/Reconstruction/Strengthening of Bridges along National Roads Construction/Rehabilitation/Improvement of Basud River Control, Bacacay 1

Upload: others

Post on 19-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

ALBAY 1ST DEO 306,195.00

Rep. Edcel C. Lagaman

1.Albay 1st District 306,195.00

I. Locally-Funded Projects 306,195.00

a. National Arterial/Secondary Roads and Bridges 256,195.00

1.

108,707.00

a.15.81 108,707.00

15.81 108,707.00

1. DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry 3.42 24,671.00

a. K0579 + 000 - K0579 + 1010 Overlay 50mm 1.01 7,461.00

b. K0580 + 000 - K0581 + 000 Overlay 50mm 1.02 6,840.00

c. K0582 + 037 - K0583 + 000 C_Overlay 50mm with corrections 0.97 7,216.00

d K0584 + 423 - K0584 + 850 Overlay 50mm 0.43 3,154.00

2. Ligao-Tabaco Rd 12.38 84,036.00

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development

and Management-4 (HDM-4), Intermitent Sections

Preventive Maintenance (Intermitent Sections)

Arterial

Implementing

Office/Remark

(1)

Albay 1st DEO

(24,671)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

a. K0516 + 000 - K0517 + 005 C_Overlay 50mm with corrections 1.01 7,063.00

b. K0518 + 000 - K0519 + 000 Overlay 50mm 1.00 6,726.00

c. K0519 + 000 - K0520 + 000 C_Overlay 50mm with corrections 1.00 6,901.00

d. K0520 + 000 - K0526 + 010 Overlay 50mm 6.00 40,349.00

e. K0526 + 010 - K0527 + 062 C_Overlay 50mm with corrections 1.00 7,030.00

f. K0527 + 062 - K0527 + 1012 Overlay 50mm 0.95 6,389.00

g. K0528 + (-046) - K0528 + 931 Overlay 50mm 0.93 6,262.00

h. K0529 + 000 - K0529 + 493 Overlay 50mm 0.49 3,316.00

2. Roads to Address Critical Bottlenecks 141,888.00

a.

1.

a. 2.68 66,888.00 Albay 1st DEO

b.

1.

a. Construction/Improvement 3.75 75,000.00 Regional Office V

3. National Bridges 8.00 5,600.00

a.8.00 5,600.00

1. Replacement 8.00 5,600.00 Albay 1st DEO

b. Flood Control and Drainage Projects 50,000.00

1. 50,000.00

a. 1.00 30,000.00 Albay 1st DEO

b. 1.00 20,000.00 Albay 1st DEO

Bonga Br. 2along DM Jct-Legazpi-Sto

Domingo-Tabaco-Cam. Sur Bdry, Albay

Construction/Rehabilitation/Improvement of River

Control, Tabaco City

National Road Traffic Decongestion

Other Urban Areas

Widening of Roads, Albay 1st Legislative

District

Construction/Widening/Upgrading/Rehabilitation

of Access Roads to Airport, Major Seaports and

Declared Tourism Destinations

To Declared Tourism Destination

Construction/Improvement-Cagraray

Circumferential Road and Access Roads,

Cagraray Island, Bagacay

Regional Office V

(84,036)

Improvement of Flood Control Projects in Albay 1st

District

Rehabilitation/Reconstruction/Strengthening of Bridges

along National Roads

Construction/Rehabilitation/Improvement of

Basud River Control, Bacacay

1

Page 2: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

ALBAY 2ND DEO 368,987.00

Rep. Al Francis A. Bichara

1.Albay 2nd District 368,987.00

I. Locally-Funded Projects 368,987.00

a. National Arterial/Secondary Roads and Bridges 368,987.00

1.

82,222.00

a. 78,329.00

50,551.00

1. Daang Maharlika (LZ) 1.17 16,712.00

a. K0522 + 839 - K0524 + 004 Overlay 50mm 1.17 16,712.00 Albay 2nd DEO

2.2.54 33,839.00

a. K0532 + 591 - K0532 + 701 C_Overlay 50mm with corrections 0.63 8,571.00

b. K0536 + 098 - K0537 + 1019 C_Overlay 50mm with corrections 1.91 25,268.00

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development

and Management-4 (HDM-4), Intermitent Sections

Preventive Maintenance (Intermitent Sections)

Arterial

DM Jct-Legazpi-Sto Domingo-Tabaco-Cam.

Sur Bdry

Secondary

Albay 2nd DEO

(33,839)

1.08 27,778.00

1. Lakandula Drive 1.08 27,778.00

a. K0531 + 000 - K0531 + 1076 Overlay 100mm 1.08 27,778.00 Albay 2nd DEO

b.0.11 3,893.00

0.11 3,893.00

1. Lakandula Drive

a. K0532 + 678 - K0532 + 788 Reconstruction PCCP 280mm 0.11 3,893.00 Albay 2nd DEO

Secondary

Rehabilitation/Reconstruction of damaged Paved

National Roads (Intermitent Sections)

Secondary

2

Page 3: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

2. 1.73 49,765.00

1.73 49,765.00

1. Legazpi City-Punta de Jesus Rd 1.32 39,450.00

a. K0580+(-791) - K0580+(-461) 0.33 9,900.00

b. K0580+(-350) - K0580+(-253) 0.10 2,910.00

c. K0580+081 - K0581+521 0.89 26,640.00

2. Banquerohan-Bariis-Sogoy-Sorsogon Bdry Rd 0.41 10,315.00

a. K0552+216 - K0553+(-417) 0.35 8,750.00

b. K0553+(-217) - K0553+(-155) 0.06 1,565.00

-

3. Roads to address critical Bottlenecks 2.50 187,000.00

a.

2.50 187,000.00

1. To Major Airports

a. Concreting 2.50 50,000.00 Albay 2nd DEO

Construction/Widening/Upgrading/Rehabilitation of

Access Roads to Airport, RORO Ports, Declared

Tourists Destinations

GuiCaDaLe Road Network to International

Road Upgrading (gravel to paved) based on Gravel

Road Strategies, Traffic Benchmark for upgrading to

paved road standard (HDM-4 Project Analysis)

(Intermitent Sections)

Secondary

Albay 2nd DEO

(10,315)

Albay 2nd DEO

(39,450)

a. Concreting 2.50 50,000.00 Albay 2nd DEO

2. 137,000.00

a. Upgrading (Gravel to Concrete) 5.00 100,000.00 Regional Office V

1. Reconstruction 0.60 12,000.00 Albay 2nd DEO

2. Rehabilitation/Concreting/Bridge

Construction (and ROW

acquisition)

1.25 25,000.00 Albay 2nd DEO

4. Various Infrastructure including Local Projects 50,000.00

a. Construction of Cagsawa Bridge,

Daraga, Albay

50,000.00 Albay 2nd DEO

GuiCaDaLe Road Network to International

Airport, Albay

To Declared Tourism Destination

Upgrading (Gravel to Concrete)-Road to

GUICADALE Platform Roads (Mayon-Bigao-

San Vicente-Ibaungan-Gogon Section),

Albay

Reconstruction - Cagsawa Ruins Access

Road and Spillway, Busay, Daraga, Albay

Rehabilitation/Concreting/Bridge

Construction (and ROW acquisition) -

GUICADALE Platform Roads (Cotmon-

Maninila-Taplacon-Taloto Section),

including bridges, Albay

3

Page 4: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

ALBAY 3RD DEO 373,081.00

Rep. Fernando V. Gonzalez

1.Albay 3rd District 373,081.00

I. Locally-Funded Projects 373,081.00

a. National Arterial/Secondary Roads and Bridges 373,081.00

1.

104,589.00

a. 7.13 77,095.00

2.11 40,891.00

1. Daang Maharlika (LZ) 2.11 27,373.00

a. K0492 + 000 - K0493 + 014 Overlay 100mm 1.03 14,800.00

b. K0493 + 014 - K0493 + 208 A_Overlay 80mm with corrections 0.20 2,508.00

c. K0510 + 347 - K0511 + 000 Overlay 80mm 0.65 7,684.00

d. K0511 + 000 - K0511 + 090 C_Overlay 50mm with corrections 0.09 728.00

e. K0511 + 090 - K0511 + 234 Overlay 80mm 0.14 1,653.00

2. Ligao-Tabaco Rd 2.01 13,518.00

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development

and Management-4 (HDM-4), Intermitent Sections

Preventive Maintenance (Intermitent Sections)

Arterial

Albay 3rd DEO

(27,373)

a. K0505 + 000 - K0507 + 000 Overlay 50mm 2.01 13,518.00 Albay 3rd DEO

5.02 36,204.00

1. Polangui Poblacion Rd 1.63 13,073.00

a. K0491 + (-923) - K0491 + 402 C_Overlay 50mm with corrections 1.33 10,702.00

b. K0491 + 700 - K0491 + 1000 C_Overlay 50mm with corrections 0.30 2,371.00

2. Oas Poblacion Rd 1.67 11,494.00

a. K0496 + 256 - K0496 + 886 Overlay 50mm 0.63 4,307.00

b. K0496 + 933 - K0498 + 007 C_Overlay 50mm with corrections 1.04 7,187.00

3. Guinobatan Poblacion Rd 1.72 11,637.00

K0511 + (-978) - K0511 + 740 Overlay 50mm 1.72 11,637.00 Albay 3rd DEO

b. 1.84 27,494.00

1.84 27,494.00

1. Daang Maharlika (LZ)

a. K0505 + 418 - K0506 + 397 Recon AC 80mm 0.91 16,211.00 Albay 3rd DEO

2. Ligao-Tabaco Rd

a. K0504 + 068 - K0505 + 000 Recon AC 50mm 0.93 11,283.00 Albay 3rd DEO

2. 116,554.00

5.55 116,554.00

a. Albay West Coast Rd 5.55 116,554.00

1. K0529+000 - K0530+055 1.05 22,050.00 Albay 3rd DEO

2. K0533+489 - K0535+000 1.37 28,791.00 Albay 3rd DEO

3. K0547+320 - K0549+600 2.10 44,100.00 Albay 3rd DEO

4. K0553+400 - K0554+500 1.03 21,613.00 Albay 3rd DEO

Secondary

Rehabilitation/Reconstruction of damaged Paved

National Roads (Intermitent Sections)

Albay 3rd DEO

(13,073)

Albay 3rd DEO

(11,494)

Arterial

Road Upgrading (gravel to paved) based on Gravel

Road Strategies, Traffic Benchmark for upgrading to

paved road standard (HDM-4 Project Analysis)

(Intermitent Sections)

Secondary

4

Page 5: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

3. Roads to address critical Bottlenecks 125,000.00

a.

125,000.00

1. 125,000.00

a. Construction/Improvement 5.00 100,000.00 Regional Office V

b. Rehabilitation/Concreting/Bridge

construction (and ROW

acquisition)

1.25 25,000.00 Albay 3rd DEO

4. 221.73 26,938.00

a.221.73 26,938.00

1. Tubgon Br.along Ligao-Tabaco Rd,

Albay

Rehabilitation/Strengthening 60.80 6,280.00 Albay 3rd DEO

2. Velasco Br.along Matacon-Libon-

Polangui Jct. Rd, Albay

Replacement 9.43 5,658.00 Albay 3rd DEO

3. Banao Bridge along Daang

Maharlika

Rehabilitation/Strengthening 68.00 5,000.00 Albay 3rd DEO

4. Binatagan Bridge along Daang Rehabilitation/Strengthening 83.50 10,000.00 Albay 3rd DEO

National Bridges

Construction/Widening/Upgrading/Rehabilitation of

Access Roads to Airport, RORO Ports, Declared

Tourists Destinations

Construction/Improvement - Guinobatan-

Jovellar-Donsol Road, Albay

To Declared Tourism Destination

Rehabilitation/Concreting/Bridge

construction (and ROW acquisition) -

GUICADALE Platform Roads, (Salvacion-

White Deer Section) including bridges,

Albay

Rehabilitation/Reconstruction/Strengthening of

Bridges along National Roads

4. Binatagan Bridge along Daang

Maharlika

Rehabilitation/Strengthening 83.50 10,000.00 Albay 3rd DEO

5

Page 6: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

922,504.00

Rep. Renato Unico Jr.

1. Camarines Norte 1st District 618,134.00

I. Locally-Funded Projects 618,134.00

a. National Arterial/Secondary Roads and Bridges 618,134.00

1. Roads to address critical Bottlenecks 325,000.00

a. 3.75 325,000.00

1. 325,000.00

a. Rehabilitation/Reconstruction/

Upgrading Gravel to concrete)

3.75 75,000.00 Regional Office V

b. 100,000.00

1. Widening with Slope Protection -

Daet-Talobatib-Batobalani-Paracale

Widening with slope protection 2.50 50,000.00 Camarines Norte

DEO

Rehabilitation/Reconstruction/Upgrading

(Gravel to concrete) - Labo-Tulay na Lupa

Road, Camarines Norte

Daet-Talobatib-Batobalani-Paracale Road

leading to Calaguas Island (Mahabang

Buhangin), Pulang Daga Beach &

Senakulo to Gumaus Beach and Bulalacao

Beach, Camarines Norte

To Declared Tourism Destination

CAMARINES NORTE

Construction/Widening/Upgrading/Rehabilitation of

Access Roads to Airport, RORO Ports, Declared

Tourists Destinations

Daet-Talobatib-Batobalani-Paracale

Road

DEO

2. Upgrading (Gravel to Concrete) -

Road leading to Calaguas Island

(Mahabang Buhangin), Pulang Daga

Beach & Senakulo to Gumaus Beach

and Bulalacao Beach

Upgrading (Gravel to Paved) 1.25 25,000.00 Camarines Norte

DEO

3. Pulang Daga-Gumaus Bridge

(Replacement from Temporary to

Permanent)

18.00 25,000.00 Camarines Norte

DEO

c. 150,000.00

1. Widening with slope protection -

Daet-Talobatib-Jose Panganiban

Road

Widening with slope protection 2.50 50,000.00 Camarines Norte

DEO

2. Upgrading (Gravel to Paved) - Road

Leading to Pag-asa Beach to Larap

to Caroline IslandUpgrading (Gravel to Paved)

1.75 25,000.00 Camarines Norte

DEO

3. Pag-asa Bridge (Replacement from

Temporary to Permanent) Replacement

20.00 25,000.00 Camarines Norte

DEO

4. Upgrading (Gravel to Paved) - Road

leading to Bulalakao Beach Upgrading (Gravel to Paved) 2.50 50,000.00 Camarines Norte

DEO

Daet-Talobatib-Jose Panganiban Road

Leading to Pag-asa Beach, Jose

Panganiban Monument (National Hero) to

Larap to Caroline Island

6

Page 7: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

3.110,707.00

a.110,707.00

1. 4.43 110,707.00

a. K0329+120 - K0331+171 1.66 41,502.00 Camarines Norte

DEO

b. K0261+000 - K0261+515 0.47 11,856.00 Camarines Norte

DEO

c. K0327+537 - K0329+120 1.40 35,048.00 Camarines Norte

DEO

d. K0263+401 - K0265+167 0.89 22,301.00 Camarines Norte

DEO

3. 20,000.00

a. 1.00 20,000.00 Camarines Norte

DEO

Reconstruction of Critical Sections along National

Roads, such as slips/emergencies/protection works

Rehabilitation of Roads Slips along

Bagong Silang-Capalonga Road (Phase I),

Talagpucao Section, Camarines Norte

Roads to address Bottleneck

Traffic Decongestion

Widening of Daang Maharlika (with exception),

Camarines Norte

4. 353.01 162,427.00

a. 214.40 70,000.00

1. 149.40 50,000.00 Camarines Norte

DEO

2. 30.00 10,000.00 Camarines Norte

DEO

3. 35.00 10,000.00 Camarines Norte

DEO

b.138.61 92,427.00

1. Bulala Br. 1along Daang Maharlika,

Camarines Norte

Replacement 49.50 35,000.00 Camarines Norte

DEO

2. Cabuluan Br.along Daang

Maharlika, Camarines Norte

Replacement 39.61 27,727.00 Camarines Norte

DEO

3. Paracale Br. along Batobalani-

Tawig-Tugos-Paracale

RdCamarines Norte,

Replacement 49.50 29,700.00 Camarines Norte

DEO

National Bridges

Rehabilitation/Reconstruction/Strengthening of

Bridges along National Roads

Completion of on-going Bridges (Including

Approaches

Labo Bridge along Daang Maharlika , Camarines

Norte, 1sl Legislative District

Guisican Bridge along Daang Maharlika,

Camarines Norte, 1sl Legislative District

Anameam Bridge along Daang Maharlika,

Camarines Norte, 1sl Legislative District

7

Page 8: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

Rep. Elmer Panotes

1. Camarines Norte 2nd District 304,370.00

I. Locally-Funded Projects 304,370.00

a. National Arterial/Secondary Roads and Bridges 304,370.00

1. 180,000.00

1. To Major Airports

a. Widening/Improvement 2.50 50,000.00 Camarines Norte

DEO

2. To Tourist Destination 100,000.00

a. Rehabilitation/Preventive

Maintenance/Upgrading (Gravel to

Concrete)

2.50 50,000.00 Camarines Norte

DEO

b. Widening/Improvement 2.50 50,000.00 Camarines Norte

DEO

3. To RORO Ports

a. Rehabilitation 1.50 30,000.00 Camarines Norte

DEO

Widening/Improvement - Talisay-Vinzons

Road, Camarines Norte

Construction/Widening/Upgrading/Rehabilitation of

access roads to Airport, RORO Ports and Delared

Tourists Destinations

Widening of Daet Airport Road, Camarines

Norte 2nd Legislative District

Rehabilitation/Preventive

Maintenance/Upgrading (Gravel to

Concrete) - Mercedes-Bagasbas Road,

Camarines Norte

Rehabilitation of Daet-Mercedes-PPA Fish

Port, Camarines Norte 2nd Legislative DEO

3.84,761.00

a.84,761.00

1. 0.29 5,788.00 Camarines Norte

DEO

2.3.16 78,973.00

a. K0347+557 - K0347+189 1.14 28,393.00 Camarines Norte

DEO

b. K0340+174 - K0343+679 1.74 43,518.00 Camarines Norte

DEO

c. K0335+657 - K0335+964 0.28 7,062.00 Camarines Norte

DEO

4. 56.77 39,609.00

a.56.77 39,609.00

1. Crucero Br.along Daang Maharlika, Camarines NorteReplacement 10.87 7,609.00 Camarines Norte

DEO

2. Laniton Br.along Daang Maharlika, Camarines NorteReplacement 27.00 20,000.00 Camarines Norte

DEO

3. Mabulao Br.along Tagas-Daet Poblacion-Magang Rd, Camarines NorteReplacement 9.90 6,000.00 Camarines Norte

DEO

4. Tagontong Br.along Daet-Mercedes Rd, Camarines NorteReplacement 9.00 6,000.00 Camarines Norte

DEO

National Bridges

Rehabilitation/Reconstruction/Strengthening of

Bridges along National Roads

Traffic Decongestion

Widening/Improvement of Daang Maharlika

(Vinsons-Talisay-Daet-Basud Section) Camarines

Norte 2nd Legislative District

Roads to address Bottleneck

Widening of Daang Maharlika (with exceptions),

Camarines Norte

Port, Camarines Norte 2nd Legislative

District

8

Page 9: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

CAMARINES SUR V DEO

Rep. Rolando Andaya Jr.

1.Camarines Sur 1st District 131,338.00

I. Locally-Funded Projects 98,520.00

a. National Arterial/Secondary Roads and Bridges 87,580.00

1. 7.19 87,580.00

a. 5.87 65,902.00

5.87 65,902.00

1. Rolando A Andaya Highway 5.87 65,902.00

a. K0283 + 480 - K0284 + 782 Overlay 100mm 1.31 18,845.00 Camarines Sur V

DEO

b. K0291 + 000 - K0293 + 647 Overlay 50mm 2.66 19,650.00

c. K0293 + 647 - K0295 + 542 Overlay 100mm 1.90 27,407.00

b. 1.33 21,678.00

0.70 9,387.00

1. Andaya Highway 0.70 9,387.00

a. K0300 + 500 - K0300 + 750 Recon AC 50mm 0.25 3,338.00

b. K0301 + 550 - K0302 + 000 Recon AC 50mm 0.45 6,049.00

Arterial

Camarines Sur V

DEO

Rehabilitation/Reconstruction of damaged Paved

National Roads (Intermitent Sections)

Arterial

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development

and Management-4 (HDM-4), Intermitent Sections

Preventive Maintenance (Intermitent Sections)

Camarines Sur V

DEO (9,837) b. K0301 + 550 - K0302 + 000 Recon AC 50mm 0.45 6,049.00

1 12,291.00

1. Sipocot-Cabusao Rd 0.62 12,291.00

a. K0400 + 800 - K0401 + 385 Reconstruction PCCP 280mm 0.62 12,291.00 Camarines Sur V

DEO

b. Flood Control and Drainage Projects 10,940.00

1. 10,940.00 Camarines Sur V

DEO

II. Foreign-Assisted Project(s)

a. Highways

1.

Sipocot-Baao (PBM-3) Cam. Sur 1st,

District

Repair/Maintenance of 2.2 km

road

2.20 32,818.00 J-RUPP

Management Office

GOP 2,848.00

LOAN 29,970.00

MVUC 3,309.00

Secondary

DEO (9,837)

Construction/Rehabilitation of Flood Control Projects,

Camarines Sur 1st LD

Road Upgrading and Preservation Project (J-RUPP),

JICA Loan No. PH-P247

9

Page 10: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

CAMARINES SUR 1ST DEO

Rep. Datu M. Arroyo

1. Camarines Sur 2nd District 135,125.00

I. Locally-Funded Projects 86,835.00

a. National Arterial/Secondary Roads and Bridges 36,835.00

1.

6,244.00

a.6,244.00

0.82 6,244.00

1. Milaor-Minalabac-Pili Rd 0.82 6,244.00

a. K0437 + 983 - K0438 + 252 Overlay 50mm 0.27 1,995.00

b. K0438 + 755 - K0438 + 845 Overlay 50mm 0.09 475.00

c. K0439 + 218 - K0439 + 418 Overlay 50mm 0.20 1,061.00

d. K0444 + 000 - K0444 + 260 C_Overlay 50mm with corrections 0.26 2,713.00

2. National Bridges 46.38 30,591.00

a. 46.38 30,591.00

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development

and Management-4 (HDM-4), Intermitent Sections

Preventive Maintenance (Intermitent Sections)

Secondary

Rehabilitation/Reconstruction/Strengthening of

Camarines Sur 1st

DEO (6,244)

a. 46.38 30,591.00

1. Naubod Br. 1along Daang

Maharlika, Camarines Sur

Replacement 15.80 11,060.00 Camarines Sur 1st

DEO

2. Naubod Br. 2along Daang

Maharlika, Camarines Sur

Replacement 11.83 8,281.00 Camarines Sur 1st

DEO

3. Quitang Br.along Danao-Pasacao

Rd, Camarines Sur

Replacement 18.75 11,250.00 Camarines Sur 1st

DEO

b. Flood Control and Drainage Projects 50,000.00

1. 50,000.00 Camarines Sur 1st

DEO

II. Foreign-Assisted Project(s)

a. Highways

1.

Sipocot-Baao (PBM-3) Cam. Sur 2nd

District

Repair/Maintenance of 2.2 km

road

2.20 48,290.00 J-RUPP

Management Office

GOP 2,848.00

LOAN 45,442.00

MVUC 3,309.00

Rehabilitation/Reconstruction/Strengthening of

Bridges along National Roads

Construction/Rehabilitation of Flood Control Projects,

Camarines Sur 2nd LD

Road Upgrading and Preservation Project (J-RUPP),

JICA Loan No. PH-P247

10

Page 11: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

CAMARINES SUR, 2ND DEO 422,886.00

Rep. Luis R. Villafuerte

1. Camarines Sur 3rdDistrict 422,886.00

I. Locally-Funded Projects 390,068.00

a. National Arterial/Secondary Roads and Bridges 390,068.00

1.

14.37 140,226.00

a.13.53 123,627.00

13.53 123,627.00

1. Naga-Carolina-Panicuason Rd 6.17 41,810.00

a. K0448 + 085 - K0450 + 255 Overlay 80mm 2.81 18,893.00

b. K0452 +279 - K0453 + 599 Overlay 50mm 1.15 7,716.00

c. K0440 + 000 - K0440 + 120 Overlay 50mm 0.12 807.00

d. K0440 + 944 - K0441 + 935 Overlay 50mm 1.08 7,264.00

f. K0442 + 000 - K0443 + 033 C_Overlay 50mm with corrections 1.01 7,130.00

2. Panganiban Rd 0.63 13,278.00

a. Chainage 0974 - Chainage 0602 Overlay 80mm 0.63 13,278.00 Camarines Sur 2nd

DEO

Secondary

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development

and Management-4 (HDM-4), Intermitent Sections

Preventive Maintenance (Intermitent Sections)

Camarines Sur 2nd

DEO (41,810)

DEO

3. Naga City Bdry-Calabanga-Balongay Rd 2.86 19,415.00

a. K0444 + 000 - K0444 + 760 Overlay 50mm 0.76 5,112.00

b. K0448 + 862 - K0448 + 1012 Overlay 50mm 0.15 1,108.00

c. K0453 + 000 - K0454 + 047 Overlay 50mm 1.00 6,726.00

d. K0454 + 047 - K0454 + 997 C_Overlay 50mm with corrections 0.95 6,469.00

4. Liboton-Magsaysay Rd 0.60 12,686.00

a. K0439 + (-869) - K0439 + (-269) Overlay 80mm 0.60 12,686.00 Camarines Sur 2nd

DEO

5. Pili Diversion Rd 2.36 17,543.00

a. K0450 + (-348) - K0451 + 000 C_Overlay 50mm with corrections 1.35 10,010.00

b. K0452 + 000 - K0453 + 000 C_Overlay 50mm with corrections 1.01 7,533.00

6.0.92 18,895.00

a. Chainage 2000 - Chainage 2917 Overlay 80mm 0.92 18,895.00 Camarines Sur 2nd

DEO

b. 0.84 16,599.00

0.84 16,599.00

1. Naga-Carolina-Panicuason Rd

a. K0440 + 120 - K0440 + 944 Reconstruction PCCP 280mm 0.84 16,599.00 Camarines Sur 2nd

DEO

2.

1.25 32,592.00

1.25 32,592.00

a. Manguiring-Tomagodtod-Sibobo Rd 1.25 32,592.00

1. K0462+(-487) - K0462+(-211) 0.28 8,280.00

2. K0465+134 - K0466+107 0.97 24,312.00

Fraternidad-Biak-na-Bato-E Angeles-

Bagumbayan Rd

Rehabilitation/Reconstruction of damaged Paved

National Roads (Intermitent Sections)

Camarines Sur 2nd

DEO (32,592)

Secondary

Secondary

Camarines Sur 2nd

DEO (17,543)

Road Upgrading (gravel to paved) based on Gravel

Road Strategies, Traffic Benchmark for upgrading to

paved road standard (HDM-4 Project Analysis)

(Intermitent Sections)

Camarines Sur 2nd

DEO (19,415)

11

Page 12: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

3. Roads to Address Critical Bottlenecks 187,920.00

a.

1.

a. 5.00 100,000.00 Regional Office V

b. 87,920.00

1.19.13 87,920.00

a. 19.13 87,920.00 Regional Office V

2. National Bridges 29,330.00

a. 83.80 29,330.00

1. Cadlan Br.along Daang Maharlika,

Camarines Sur

Rehabilitation/Strengthening 11.60 4,060.00 Camarines Sur 2nd

DEO

2. Hamorawon Br.along Daang

Maharlika, Camarines Sur

Rehabilitation/Strengthening 12.50 4,375.00 Camarines Sur 2nd

DEO

National Road Traffic Decongestion

Other Urban Areas

Widening of Daang Maharlika, Camarines

Sur 2nd DEO/3rd Legislative District

Rehabilitation/Reconstruction/Strengthening of

Bridges along National Roads

Construction/Widening/Upgrading/Rehabilitation

of access roads to Airport, RORO Ports and

Delared Tourists Destinations

To Declared/Strategic Tourist's Destination

(Roads and Bridges)

Rehabilitation/Improvement - Pili-Tigaon-

Albay Boundary Road,(Pili-Ocampo

Section), Camarines Sur, K0459+500 -

K0469+450, with exception

Maharlika, Camarines Sur DEO

3. San Jose Br.along Daang

Maharlika, Camarines Sur

Rehabilitation/Strengthening 59.70 20,895.00 Camarines Sur 2nd

DEO

II. Foreign-Assisted Project(s)

a. Highways

1.

Sipocot-Baao (PBM-3) Cam. Sur, 3rd

District

Repair/Maintenance of 2.2 km

road

2.20 32,818.00 J-RUPP

Management Office

GOP 2,848.00

LOAN 29,970.00

MVUC 3,309.00

Road Upgrading and Preservation Project (J-RUPP),

JICA Loan No. PH-P247

12

Page 13: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

CAMARINES SUR 3RD DEO 790,273.00

Rep. Arnulfo Fuenteballa

1.Camarines Sur 4th District 790,273.00

I. Locally-Funded Projects 790,273.00

a. National Arterial/Secondary Roads and Bridges 790,273.00

1.

2.06 31,308.00

a. 2.06 31,308.00

2.06 31,308.00

1. Goa-Digdigon-Sn Isidro Rd 1.87 28,421.00

a. K0492 + 160 - K0493 + 545 Upgrade to concrete 230mm 1.39 21,126.00

b. K0493 + 646 - K0494 + 150 Upgrade to concrete 230mm 0.48 7,295.00

2. Jct Digdigon (Goa)-Tinambac Rd 0.19 2,887.00

a. K0496 + (-448) - K0496 + (-

258)

Upgrade to concrete 230mm 0.19 2,887.00 Camarines Sur 3rd

DEO

2.

18.51 508,965.00

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development

and Management-4 (HDM-4), Intermitent Sections

Secondary

Road Upgrading (gravel to paved) based on Gravel

Road Strategies, Traffic Benchmark for upgrading to

paved road standard (HDM-4 Project Analysis)

Camarines Sur 3rd

DEO (28,421)

Rehabilitation/Reconstruction of damaged Paved

National Roads (Intermitent Sections)

18.51 508,965.00

18.51 508,965.00

a. Goa-Digdigon-Sn Isidro Rd 1.50 45,000.00

K0497+560 - K0499+000 1.50 45,000.00 Camarines Sur 3rd

DEO

b. Jct Teres-Garchitorena Rd 2.21 46,473.00

K0545+613 - K0547+627 2.21 46,473.00 Camarines Sur 3rd

DEO

paved road standard (HDM-4 Project Analysis)

(Intermitent Sections)

Secondary

13

Page 14: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

c. Tinambac-Siruma Rd 5.45 163,628.00

1. K0517+415 - K0519+000 1.55 46,500.00 Camarines Sur 3rd

DEO

2. K0522+790 - K0523+200 1.15 34,500.00 Camarines Sur 3rd

DEO

3.K0527+000 - K0528+366 1.37 41,100.00

Camarines Sur 3rd

DEO

4. K0532+000 - K0532+409 0.40 12,000.00

5. K0538+000 - K0540+000 0.98 29,528.00

d. Lagonoy-Presentation 5.55 166,579.00

1. K0503+297 - K0505+179 1.61 48,269.00

2. K0505+521 - K0505+737 0.18 5,300.00

3. K0505+849 - K0505+874 0.02 600.00

4. K0506+097 - K0507+295 1.02 30,550.00

5. K0507+358 - K0508+268 0.71 21,410.00

6. K0508+314 - K0508+620 0.25 7,600.00

7. K0513+007 - K0513+738 0.61 18,250.00

8. K0513+737 - K0513+902 0.13 3,950.00

9. K0514+098 - K0514+676 0.47 14,000.00

10. K0517+715 - K0517+965 0.20 5,950.00

11. K0518+101 - K0518+393 0.23 7,000.00

12. K0518+632 - K0518+791 0.12 3,700.00

e. Presenatcion-Maligaya 1.79 41,078.00

Camarines Sur 3rd

DEO (41,528)

Regional Office V

(113,729)

Regional Office V

(52,850)

1. K0537+200 - K0539+000 1.79 41,078.00 Camarines Sur 3rd

DEO

f. Caramoan-Guijalo 2.01 46,207.00

2. K0558+000 - K0560+000 2.01 46,207.00 Camarines Sur 3rd

DEO

3. Roads to address critical Bottlenecks 250,000.00

a.

12.50 250,000.00

1. 12.50 250,000.00

a. Upgrading (Gravel to Concrete) 7.50 150,000.00 Regional Office V

b. Upgrading (Gravel to Concrete) 5.00 100,000.00 Regional Office V

Construction/Widening/Upgrading/Rehabilitation of

Access Roads to Airport, RORO Ports, Declared

Tourists Destinations

To Declared Tourism Destination

Upgrading (Gravel to Concrete) - Tigaon-

Goa-San Jose-Guijalo Section Via San

Vicente Road, Camarines Sur

Upgrading (Gravel to Concrete) -

Caramoan-Panim-an Road

14

Page 15: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

CAMARINES SUR 4TH DEO 256,213.00

Rep. Salvio Fortuno

1.Camarines Sur 5th District 256,213.00

I. Locally-Funded Projects 223,394.00

a. National Arterial/Secondary Roads and Bridges 223,394.00

1.

213,394.00

a.

14.57 121,138.00

1. Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd 8.63 60,221.00

a. K0470 + (-367) - K0472 + 1003 C_Overlay 50mm with corrections 3.36 23,506.00

b. K0473 + 389 - K0473 + 999 Overlay 50mm 0.61 4,103.00

c. K0474 + 067 - K0476 + 907 C_Overlay 50mm with corrections 2.81 19,397.00

d. K0480 + 004 - K0480 + 744 C_Overlay 50mm with corrections 0.74 5,286.00

e. K0486 + 333 - K0487 + 445 C_Overlay 50mm with corrections 1.11 7,929.00

2. Nabua-Balatan Rd 0.80 10,523.00

a. K0493 + 192 - K0493 + 989 Overlay 100mm 0.80 10,523.00 Camarines Sur 4th

DEO

3. Baao-Iriga City-Nabua Rd 5.15 50,394.00

a. K0466 + (-1595) - K0466 + (-753) Overlay 50mm 0.84 6,205.00

Camarines Sur 4th

DEO (13,215)

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development

and Management-4 (HDM-4), Intermitent Sections

Secondary

Camarines Sur 4th

DEO (47,006)

Preventive Maintenance (Intermitent Sections)

a. K0466 + (-1595) - K0466 + (-753) Overlay 50mm 0.84 6,205.00

b. K0466 + 000 - K0467 + 468 C_Overlay 50mm with corrections 1.26 10,315.00

c. K0470 + 014 - K0470 + 474 C_Overlay 50mm with corrections 0.46 3,744.00

d. K0472 + 131 - K0473 + 533 Overlay 100mm 1.26 18,175.00

e. K0474 + 000 - K0474 + 517 C_Overlay 50mm with corrections 0.52 4,002.00

f. K0476 + 722 - K0477 + 530 C_Overlay 50mm with corrections 0.81 7,953.00

b. 4.77 92,256.00

4.77 92,256.00

1. Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd 0.09 1,118.00

a. K0474 + 000 - K0474 + 070 Recon AC 50mm 0.07 851.00

b. K0477 + 681 - K0477 + 701 Recon AC 50mm 0.02 267.00

2. Nabua-Balatan Rd 4.47 88,334.00

a. K0479 + 794 - K0480 + 367 Reconstruction PCCP 280mm 0.58 11,461.00

b. K0481 + 316 - K0482 + 315 Reconstruction PCCP 280mm 1.00 19,762.00

c. K0484 + 331 - K0486 + 002 Reconstruction PCCP 280mm 1.69 33,397.00

d. K0494 + 000 - K0495 + 203 Reconstruction PCCP 280mm 1.20 23,714.00 Camarines Sur 4th

DEO

3. Iriga City-Masoli Rd 0.21 2,804.00

a. K0475 + 000 - K0475 + 217 Recon AC 50mm 0.21 2,804.00 Camarines Sur 4th

DEO

2. 64.96 10,000.00

a. Pawili Br.along Daang Maharlika,

Camarines Sur

Rehabilitation/Strengthening 64.96 10,000.00 Camarines Sur 4th

DEO

Regional Office V

(64,620)

Regional Office V

(50,394)

Camarines Sur 4th

DEO (1,118)

Rehabilitation/Reconstruction of damaged Paved

National Roads (Intermitent Sections)

National Bridges

Rehabilitation/Reconstruction/Strengthening of Bridges

along National Roads

Secondary

15

Page 16: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

II. Foreign-Assisted Project(s)

a. Highways

1.

Sipocot-Baao (PBM-3) Cam. Sur 5th

District

Repair/Maintenance of 2.2 km

road

2.20 32,819.00 J-RUPP

Management Office

GOP 2,849.00

LOAN 29,970.00

MVUC 3,310.00

Road Upgrading and Preservation Project (J-RUPP),

JICA Loan No. PH-P247

16

Page 17: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

CATANDUANES DEO

Rep. Ceasar Sarmiento

1.Catanduanes Lone District 1,171,936.00

I. Locally-Funded Projects 681,694.00

a. National Arterial/Secondary Roads and Bridges 638,978.00

1. 17.58 404,242.00

a. Catanduanes Cir Rd 13.09 300,958.00

1. K0123+090 - K0125+000 1.82 41,745.00

2. K0127+000 - K0127+754 0.75 17,342.00

3. K0127+821 - K0127+994 0.17 3,979.00

4. K0128+021 - K0128+494 0.47 10,879.00

5. K0134+990 - K0136+300 1.28 29,357.00 Catanduanes DEO

6. K0140+250 - K0140+834 0.58 13,363.00

7. K0141+000 - K0141+500 0.49 11,339.00

Road Upgrading (gravel to paved) based on Gravel

Road Strategies, Traffic Benchmark for upgrading to

paved road standard (HDM-4 Project Analysis)

(Intermitent Sections)

Arterial

Regional Office V

(73,945)

Catanduanes DEO

(24,702) 7. K0141+000 - K0141+500 0.49 11,339.00

8. K0146+700 - K0147+782 1.00 22,954.00

9. K0147+820 - K0149+000 1.16 26,657.00

10. K0152+030 - K0153+000 1.02 23,437.00 Catanduanes DEO

11. K0156+850 - K0159+000 2.17 49,956.00 Catanduanes DEO

12. K0162+200 - K0163+000 0.78 17,986.00

13. K0166+000 - K0168+000 1.39 31,964.00

4.49 103,284.00

a. Baras-Gigmoto-Viga Rd 4.49 103,284.00

1. K0033+940 - K0036+000 1.39 32,016.00 Catanduanes DEO

2. K0039+300 - K0040+910 2.11 48,600.00 Catanduanes DEO

3. K0044+000 - K0045+000 0.99 22,668.00 Catanduanes DEO

2. Roads to address critical Bottlenecks 3.75 95,000.00

a.

3.75 75,000.00

1. 3.75 75,000.00

a. Upgrading (Gravel to Concrete) 3.75 75,000.00 Regional Office V

b.

a. 20,000.00 Catanduanes DEO

Reconstruction of Critical Sections along National

Roads, such as slips/emergencies/protection works

Road slip along Catanduanes

Circumferential Road, Catanduanes

Construction/Widening/Upgrading/Rehabilitation of

Access Roads to Airport, RORO Ports, Declared

Tourists Destinations

Catanduanes DEO

(49,950)

Catanduanes DEO

(49,611)

(24,702)

Upgrading (Gravel to Concrete) - Baras-

Puraran Road, Baras, Catanduanes

Secondary

To Declared Tourism Destination

17

Page 18: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

3. 248.08 139,736.00

a. 80.00 37,000.00

1. Inalmasenan Bridge along

Catanduanes Circumferential Road

Rehabilitation/Strengthening 80.00 37,000.00 Catanduanes DEO

a. 84.38 52,516.00

1. Buenavista Br. 1along Baras-

Gigmoto-Viga Rd, Catanduanes

Rehabilitation/Strengthening 13.00 7,800.00 Catanduanes DEO

2. Kanipaan Br.along Catanduanes Cir

Rd, Catanduanes

Replacement 8.90 6,230.00 Catanduanes DEO

3. Kanparel Br.along Catanduanes Cir

Rd, Catanduanes

Replacement 47.48 33,236.00 Catanduanes DEO

4. Sinibaan Br.along Catanduanes Cir

Rd, Catanduanes

Replacement 15.00 5,250.00 Catanduanes DEO

b. 83.70 50,220.00

1. Careango Br. along Jct Catanduanes

Cir Rd-Panganiban-Sabloyon Rd,

Catanduanes

25.20 15,120.00 Catanduanes DEO

2. Gavino Br.along Jct Catanduanes Cir 18.00 10,800.00 Catanduanes DEO

Rehabilitation/Reconstruction/Strengthening of

Bridges along National Roads

Replacement (Temporary to Permanent) of

Bridges along National Roads

National Bridges

Completion of On-Going Bridges (Including

Approaches)

2. Gavino Br.along Jct Catanduanes Cir

Rd-Panganiban-Sabloyon

Rd,Catanduanes

18.00 10,800.00 Catanduanes DEO

3. Haya Br.along Jct Catanduanes Cir

Rd-Panganiban-Sabloyon Rd'

Catanduanes

21.00 12,600.00 Catanduanes DEO

4. Sara-saraan Br.along Jct

Catanduanes Cir Rd-Panganiban-

Sabloyon Rd,Catanduanes

19.50 11,700.00 Catanduanes DEO

b. Flood Control and Drainage Projects 42,716.00

1. 20,000.00 Catanduanes DEO

2. 22,716.00

a. 1.00 5,000.00 Catanduanes DEO

b. 1.00 5,000.00 Catanduanes DEO

c. 1.00 5,000.00 Catanduanes DEO

d. 1.00 5,000.00 Catanduanes DEO

e. 1.00 2,716.00 Catanduanes DEO

II. Foreign-Assisted Project(s)

a. Highways

1.

a. Catanduanes Circumferential Road

II, Catanduanes Lone District

Upgrading (gravel to concrete) of

14.19 km road

14.19 490,242.00 J-RUPP

Management Office

GOP 76,613.00

LOAN 413,629.00

MVUC

Road Upgrading and Preservation Project (J-RUPP),

JICA Loan No. PH-P247

Sogod Sinamia Flood Control, Virac

Flood Control and Drainage System, Panganiban,

Catanduanes

Viga Pilot Channel Flood Control, Viga

Libod Flood Control, Pandan

Guinobatan Flood Control and Drainage, Bato

Ibong Sapa Flood Control, Virac

Construction of River Control and Drainage System,

Panganiban, Catanduanes

18

Page 19: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

MASBATE 1ST DEO 176,565.00

Rep. Antonio T. Kho

1.Masbate 2nd District 176,565.00

I. Locally-Funded Projects 176,565.00

a. National Arterial/Secondary Roads and Bridges 176,565.00

1. 7.70 105,197.00

a. 4.22 43,142.00

3.15 35,079.00

1. Jct Milagros-Baleno-Lagta Rd 1.32 14,187.00

a. K0044 + 443 - K0045 + 801 Overlay 80mm 1.32 14,187.00 Masbate 1st DEO

2. Masbate-Milagros Rd 1.83 20,892.00

a. K0019 + 681 - K0020 + 455 A_Overlay 80mm with corrections 0.80 9,133.00

b. K0024 + 000 - K0025 + 000 A_Overlay 80mm with corrections 1.03 11,759.00

1.07 8,063.00

1. Masbate Circumferential Rd 1.07 8,063.00

a. K0003 + 503 - K0004 + 560 C_Overlay 50mm with corrections 1.07 8,063.00 Masbate 1st DEO

a. 3.48 62,055.00

Arterial 3.08 54,151.00

1.

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development

and Management-4 (HDM-4), Intermitent Sections

Preventive Maintenance (Intermitent Sections)

Arterial

Masbate 1st DEO

(20,892)

Rehabilitation/Reconstruction of damaged Paved

National Roads (Intermitent Sections)

Secondary

1. Masbate-Cataingan-Placer Rd 1.30 22,361.00

a. K0007 + 138 - K0007 + 332 Recon AC 50mm 0.19 2,537.00

b. K0007 + 950 - K0007 + 992 Upgrade to concrete 280mm 0.04 715.00

c. K0017 + (-229) - K0018 + (-157) Upgrade to concrete 280mm 1.07 19,109.00

2. Masbate-Milagros Rd 1.78 31,790.00

a. K0021 + 500 - K0023 + 188 Upgrade to concrete 280mm 1.78 31,790.00 Masbate 1st DEO

Secondary

1. Masbate Circumferential Rd 0.40 7,904.00

a. K0003 + 101 - K0003 + 503 Reconstruction PCCP 280mm 0.40 7,904.00 Masbate 1st DEO

2. 2.38 71,368.00

Arterial 0.67 20,130.00

a. Masbate- Milagros Rd 0.10 3,090.00

1.K0006+428 - K0007+(-469) 0.07 2,010.00

2.K0007+(-387) - K0007+(-286) 0.04 1,080.00

b. Jct Milagros-Baleno-Lagta Rd 0.57 17,040.00

1. K0057+(-304) - K0057+(-237) 0.07 2,010.00

2. K0059+(-217) - K0059+(-181) 0.04 1,080.00

3. K0059+454 - K0059+459 0.01 150.00

4. K0069+040 - K0069+165 0.13 3,750.00

5. K0069+165 - K0069+437 0.23 6,800.00

6. K0070+(-328) - K0070+(-254) 0.06 1,850.00

7. K0073+217 - K0073+273 0.05 1,400.00

Secondary 1.71 51,238.00

a. Masbate Circumferential Rd 0.60 18,081.00

1. K0005+(-019) - K0006+(-212) 0.60 18,081.00 Masbate 1st DEO

b. Jct Tawad-Balud Rd 1.11 33,157.00

1. K0043+493 - K0044+593 1.11 33,157.00 Masbate 1st DEO

Masbate 1st DEO

(17,040)

Road Upgrading (gravel to paved) based on Gravel

Road Strategies, Traffic Benchmark for upgrading to

Masbate 1st DEO

(22,361)

Masbate 1st DEO

(3,090)

19

Page 20: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

MASBATE 2ND DEO 150,385.00

Rep. Scott Davies Lanete

1.Masbate 3rd District 150,385.00

I. Locally-Funded Projects 150,385.00

a. National Arterial/Secondary Roads and Bridges 150,385.00

1.

2.82 50,385.00

a. 2.82 50,385.00

Arterial 2.82 50,385.00

1. Masbate-Cataingan-Placer Rd 2.82 50,385.00

a. K0020 + 211 - K0020 + 670 Upgrade to concrete 280mm 0.46 8,236.00

b. K0021 + 781 - K0022 + 019 Upgrade to concrete 280mm 0.22 3,929.00 c. K0024 + 492 - K0025 + 440 Upgrade to concrete 280mm 0.96 17,146.00 d. K0034 + 961 - K0036 + 500 Upgrade to concrete 280mm 0.65 11,555.00 Masbate 2nd DEO

e. K0076 + 200 - K0076 + 733 Upgrade to concrete 280mm 0.53 9,519.00 Masbate 2nd DEO

2. 5.00 100,000.00

a.

Masbate 2nd DEO

(29,311)

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development

and Management-4 (HDM-4), Intermitent Sections

Construction/Widening/Upgrading/Rehabilitation

of access roads to Airport, RORO Ports and

Delared Tourists Destinations

Rehabilitation/Reconstruction of damaged Paved

National Roads (Intermitent Sections)

Roads to Address Critical Bottleneck

1. To RORO Ports

a. Widening/Improvement 5.00 100,000.00 Regional Office V

Delared Tourists Destinations

Junction Morning, Cataingan-Pio V.

Corpuz Road, Leading to RORO Ports,

Masbate 3rd Legislative District

20

Page 21: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

MASBATE 2ND SUB- DEO 197,313.00

Rep. Bravo

1.Masbate 1st District 197,313.00

I. Locally-Funded Projects 197,313.00

a. National Arterial/Secondary Roads and Bridges 197,313.00

1. 8.36 192,313.00

8.36 192,313.00

a. Sn Pascual-Claveria Rd 7.55 167,991.00

1. K0045+652 - K0046+000 0.36 9,025.00

2. K0046+000 - K0047+200 1.21 25,368.00

3. K0036+034 - K0038+000 1.99 49,850.00 Masbate 2nd Sub-

DEO

4. Chainage: 5234- Chainage 6313

1.08

22,659.00 Masbate 2nd Sub-

DEO

5. Chainage: 10744- Chainage 12807

2.06

43,323.00 Masbate 2nd Sub-

DEO

6. Chainage: 19000- Chainage 19846 0.85 17,766.00 Masbate 2nd Sub-

DEO

b. Sn Fernando-Talisay Rd 0.81 24,322.00

Masbate 2nd Sub-

DEO (34,393)

Road Upgrading (gravel to paved) based on Gravel

Road Strategies, Traffic Benchmark for upgrading to

paved road standard (HDM-4 Project Analysis)

Secondary

b. Sn Fernando-Talisay Rd 0.81 24,322.00

1. K0010+164 - K0010+246 0.08 2,460.00

2. K0010+288 - K0011+003 0.73 21,862.00

2. 5,000.00

a. Dorongan Bridge along San

Fernando North Road, Masbate 1st

Legislative District

11.10 3,500.00 Masbate 2nd Sub-

DEO

b. Morris Bridge along san Fernando

North Road, Masbate 1st Legislative

District

6.67 1,500.00 Masbate 2nd Sub-

DEO

Masbate 2nd Sub-

DEO (24,322)

National Bridges

Completion of On-going Bridges (Including

Approaches)

21

Page 22: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

SORSOGON 1ST DEO 314,526.00

Rep. Salvador Escudero

1.Sorsogon 1st District 314,526.00

I. Locally-Funded Projects 314,526.00

a. National Arterial/Secondary Roads and Bridges 314,526.00

1. 21.46 199,206.00

a. 19.23 160,626.00

Arterial 10.62 102,062.00

1. Daang Maharlika (LZ) 10.62 102,062.00

a. K0560 + 000 - K0561 + 000 Overlay 100mm 1.00 13,563.00 Sorsogon 1st DEO

b. K0576 + 000 - K0576 + 1000 Overlay 80mm 1.00 10,924.00

c. K0578 + 000 - K0578 + 250 Overlay 80mm 0.25 2,775.00

d. K0579 + 750 - K0579 + 991 Overlay 80mm 0.24 2,675.00

e. K0579 + 991 - K0581 + 000 Overlay 50mm 1.01 6,870.00

f. K0582 + 000 - K0582 + 781 Overlay 80mm 0.78 8,521.00

g. K0582 + 781 - K0583 + 000 C_Overlay 80mm with corrections 0.22 2,475.00

h. K0585 + 180 - K0588 + 000 Overlay 80mm 2.82 31,700.00

i. K0588 + 750 - K0590 + 181 Overlay 50mm 1.43 9,775.00

j. K0597 + 1128 - K0599 + 996 Overlay 50mm 1.87 12,784.00 Sorsogon 1st DEO

Secondary 8.62 58,564.00

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development

and Management-4 (HDM-4), Intermitent Sections

Preventive Maintenance (Intermitent Sections)

Regional Office V

(75,715)

1. Jct Abuyog-Gubat-Ariman Rd 0.36 2,618.00

a. K0590 + (-355) - K0590 + 005 C_Overlay 50mm with corrections 0.36 2,618.00 Sorsogon 1st DEO

2. Jct Putiao-Pilar-Donsol Rd 7.31 49,267.00

a. K0544 + (-988) - K0549 + 979 Overlay 50mm 6.95 46,752.00

b. K0550 + 529 - K0550 + 887 C_Overlay 50mm with corrections 0.36 2,515.00

3. Jct Sorsogon-Bacon-Manito Rd 0.95 6,679.00

a. K0593 + 000 - K0593 + 950 C_Overlay 50mm with corrections 0.95 6,679.00 Sorsogon 1st DEO

b. 2.22 38,580.00

Secondary 2.22 38,580.00

1. Bacon-Sawanga-Prieto Diaz Rd 2.22 38,580.00

a. K0604 + 715 - K0605 + 000 Reconstruction PCCP 230mm 0.28 4,934.00

b. K0606 + 425 - K0607 + 002 Reconstruction PCCP 230mm 0.58 10,026.00

c. K0607 + 600 - K0608 + 000 Reconstruction PCCP 230mm 0.40 6,950.00

d. K0609 + 000 - K0609 + 200 Reconstruction PCCP 230mm 0.20 3,475.00

e. K0609 + 920 - K0609 + 1000 Reconstruction PCCP 230mm 0.08 1,390.00

f. K0610 + 000 - K0610 + 680 Reconstruction PCCP 230mm 0.68 11,805.00

Sorsogon 1st DEO

(49,267)

Rehabilitation/Reconstruction of damaged Paved

National Roads (Intermitent Sections)

Sorsogon 1st DEO

(38,580)

22

Page 23: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

2. 2.18 65,320.00

Secondary 2.18 65,320.00

a. Banuang-Gurang-Albay Bdry Rd 0.26 7,870.00

1.Chainage: 0711 - Chainage 0970 0.26 7,870.00 Sorsogon 1st DEO

b. Jct Donsol-Banuang Gurang Rd 1.90 56,850.00

1. K0573+984 - K0574+264 0.24 7,075.00

2. K0580+452 K0582+(-054) 0.45 13,475.00

3. K0582+082 K0586+(-450) 0.55 16,450.00

4. K0587+(-187) K0589+106 0.66 19,850.00

c. Jct Putiao-Pilar-Donsol Rd 0.02 600.00

1. K0560+986 K0560+1006 0.02 600.00 Sorsogon 1st DEO

3.2.50 50,000.00

a. Construction/Widening/Upgrading/Rehabilitation

Road Upgrading (gravel to paved) based on Gravel

Road Strategies, Traffic Benchmark for upgrading to

paved road standard (HDM-4 Project Analysis)

(Intermitent Sections)

Roads to Address Critical Bottleneck

Regional Office V

(56,850)

a.

2.50 50,000.00

1. Construction/Upgrading 2.50 50,000.00 Sorsogon 1st DEOConstruction/Upgrading (Gravel to

Concrete) - Donsol-Sta. Cruz Road leading

to Tourist Attraction (Butanding) , Donsol,

Sorsogon

Construction/Widening/Upgrading/Rehabilitation

of Access Roads to Airport, RORO Ports, Declared

Tourists Destinations

23

Page 24: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

SORSOGON 2ND DEO 206,187.50

Rep. Deogracias Ramos

1.Sorsogon 2nd District 206,187.50

I. Locally-Funded Projects 206,187.50

a. National Arterial/Secondary Roads and Bridges 161,187.50

1.

18.52 144,937.00

a. 14.50 140,931.00

Arterial 5.63 81,282.00

1. Daang Maharlika (LZ) 5.63 81,282.00

a. K0611 + 378 - K0613 + 350 Overlay 100mm 2.00 28,849.00

b. K0614 + 546 - K0615 + 003 Overlay 100mm 0.47 6,794.00

c. K0628 + 000 - K0629 + 180 Overlay 100mm 1.18 17,021.00

d. K0635 + 000 - K0637 + 000 Overlay 100mm 1.98 28,618.00

Secondary 8.87 59,649.00

1. Jct Abuyog-Gubat-Ariman Rd 2.11 14,177.00

a. K0593 + (-896) - K0593 + 712 Overlay 50mm 1.61 10,815.00

b. K0598 + 503 - K0598 + 1003 Overlay 50mm 0.50 3,362.00

2. Ariman-Jct Bulusan Lake Rd 3.90 26,210.00

a. K0602 + (-633) - K0602 + 259 Overlay 50mm 0.89 5,999.00

b. K0606 + 101 - K0606 + 925 Overlay 50mm 0.82 5,542.00

d. K0615 + 682 - K0616 + 285 Overlay 50mm 0.88 5,885.00

Preventive Maintenance (Intermitent Sections)

Sorsogon 2nd DEO

Sorsogon 2nd DEO

(45,639)

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development

and Management-4 (HDM-4), Intermitent Sections

Sorsogon 2nd DEO

(14,177)

Sorsogon 2nd DEO

(35,643)

d. K0615 + 682 - K0616 + 285 Overlay 50mm 0.88 5,885.00

e. K0619 + 000 - K0619 + 256 Overlay 50mm 0.26 1,722.00

f. K0619 + 331 - K0620 + 010 Overlay 50mm 0.65 4,372.00

g. K0621 + 402 - K0621 + 802 Overlay 50mm 0.40 2,690.00

3. Jct. Gubat-Pto. Diaz Road 2.00 13,452.00

a. K0600 + 010 - K0601 + 000 Overlay 50mm 1.00 6,726.00

b. K0605 + 000 - K0606 + 000 Overlay 50mm 1.00 6,726.00

4. Irosin-Sn Roque-Bulusan Lake Rd 0.87 5,810.00

a. K0624 + (-466) - K0624 + (-101) Overlay 50mm 0.37 2,447.00

b. K0627 + 342 - K0627 + 842 Overlay 50mm 0.50 3,363.00

b. 4.02 4,006.00

Secondary 4.02 4,006.00

Arterial 0.30 4,006.00

1. Daang Maharlika (LZ) 0.30 4,006.00

a. K0625 + 000 - K0625 + 300 Recon AC 50mm 0.30 4,006.00 Sorsogon 2nd DEO

Rehabilitation/Reconstruction of damaged Paved

National Roads (Intermitent Sections)

Sorsogon 2nd DEO

(26,210)

Sorsogon 2nd DEO

(13,452)

Sorsogon 2nd DEO

(5,810)

24

Page 25: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

2.

0.66 13,923.00

Secondary 0.66 13,923.00

a. Bacon-Sawanga-Prieto Diaz Road 0.66 13,923.00

1. K0618+(-035) - K0618+457 0.49 10,332.00

2. K0618+484 - K0618+655 0.17 3,591.00

3. 6.65 2,327.50

6.65 2,327.50

a. Botong Br.along Jct Gubat-Prieto-

Diaz Rd, Sorsogon

Rehabilitation/Strengthening 6.65 2,327.50 Sorsogon 2nd DEO

b. Flood Control and Drainage Projects 45,000.00

1. Construction of River Control in Irosin

a. Macawayan River 1.00 15,000.00 Sorsogon 2nd DEO

b. Monbon River 1.00 15,000.00 Sorsogon 2nd DEO

c. Bacolod River 1.00 15,000.00 Sorsogon 2nd DEO

National Bridges

Rehabilitation/Reconstruction/Strengthening of Bridges

along National Roads

Road Upgrading (gravel to paved) based on Gravel

Road Strategies, Traffic Benchmark for upgrading to

paved road standard (HDM-4 Project Analysis)

(Intermitent Sections)

Sorsogon 2nd DEO

(13,923)

c. Bacolod River 1.00 15,000.00 Sorsogon 2nd DEO

25

Page 26: FY 2013 DPWH INFRASTRUCTURE PROGRAM PROJECT ......(Gravel to concrete) - Labo-Tulay na Lupa Road, Camarines Norte Daet-Talobatib-Batobalani-Paracale Road leading to Calaguas Island

FY2013 Infra Program/Glenn Degal/January 09, 2013

(2) (3) (4)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

Based on GAA

Region V

Amount Implementing

Office/Remark

(1)

PROJECT NAME/LOCATION/SCOPE OF WORK Scope of Work Physical

Target

REGIONWIDE 1,317,095.00

I. Locally-Funded Projects 1,317,095.00

a. National Arterial/Secondary Roads and Bridges 400,000.00

1. Urgent National Arterial/Secondary Roads and Bridges 300,000.00

a.

1. Other Urban Areas

a.

300,000.00 Regional Office V

2.100,000.00

a.

100,000.00

1. Construction100,000.00

a. Albay Section 2.00 50,000.00

b. Sorsogon Section 2.00 50,000.00

b. Flood Control and Drainage Projects 902,095.00

Regional Office V

(100,000)

Roads to address Bottleneck

Road Opening/Construction to close Gap Sections

with determined alignment of National

Roads(Including ROW)

Opening of Bacon-Manito Road

Roads/Bridges/Flyovers to Address Traffic

Decongestion

Camarines Sur/Albay Diversion Road (San

Fernando-Oas Section of the Philippine

Highway (PPH), Camarines Sur/Albay

including Bridges)

1.

455,000.00 Regional Office V

2. Legazpi City Urban Drainage Project 300,000.00 Regional Office V

3. Drainage/Protection works along National Roads 147,095.00

Bicol River Basin and Watershed Management Project

(Flood Mitigation Component)

26