fy-13 scheduled contracts fy-14 planned contracts · 2012. 10. 25. · us army corps of engineers...
TRANSCRIPT
![Page 1: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/1.jpg)
US Army Corps of Engineers BUILDING STRONG®
Galveston District – 2012 Dredging Conference
Custodians of the Coast
FY-13 Scheduled Contracts FY-14 Planned Contracts
Christopher Frabotta Deputy Chief, Operations Division / Chief, Navigation Branch Southwestern Division - Galveston District October 24, 2012
![Page 2: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/2.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
SWG - Galveston District
OPERATIONS MANAGERS Paula Wise Alicia Rea Tricia Campbell Eddie Irigoyen Eric Russek
![Page 3: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/3.jpg)
US Army Corps of Engineers BUILDING STRONG®
Galveston District – 2012 Dredging Conference
Custodians of the Coast
Corpus Christi Ship Channel Sabine-Neches Waterway Texas City Channel
Paula Rankin Wise
Operations Manager
Navigation Branch
24 October 2012
![Page 4: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/4.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Paula Wise Operations Manager
Corpus Christi Ship Channel Sabine-Neches Waterway Texas City Channel Cedar Bayou Trinity River & Tributaries Double Bayou Clear Creek & Clear Lake Dickinson Bayou
![Page 5: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/5.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2013 Contracts Corpus Christi Ship Channel
![Page 6: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/6.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Corpus Christi Ship Channel PA 1 Levee Raising / DAMP
Type of Work: Improvements / DAMP
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: NA
Placement Area: PA 1
Distance to Placement Area: NA
Type of Equipment: Bull dozers; Excavators
Env. Window: NA
Reason for Window: NA
Est. Start Date: Sept 9, 2013
Est. Completion Date: Jan 9, 2014
Corpus Christi Ship Channel
Ingleside Nueces
Bay
Corpus Christi
Port Aransas
Aransas Pass
BC
N 8
2 2
1
PA 1
![Page 7: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/7.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Corpus Christi Ship Channel PA 10 /13 Rock Stabilization
Type of Work: Improvements
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: NA
Placement Area: PA 10; PA 13
Distance to Placement Area: NA
Type of Equipment: Bull dozers; Excavators
Env. Window: NA
Reason for Window: NA
Est. Start Date: TBD
Est. Completion Date: TBD
Corpus Christi Ship Channel
Ingleside Nueces
Bay
Corpus Christi
Port Aransas
Aransas Pass
BC
N 8
2 2
1
PA 10
PA 13
![Page 8: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/8.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2014 Contracts Corpus Christi Ship Channel
![Page 9: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/9.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Corpus Christi Ship Channel
Ingleside Nueces
Bay
Corpus Christi
Port Aransas
Aransas Pass
BC
N 8
2 2
1
Project: Corpus Christi Ship Channel Entrance / Jetty Channel
Dredging Depth: 49 - 47 ft. Required Depth
Dredging Width: 700 - 600 ft.
Dredging Length: Varies
Dredging Quantity: 900,000 cubic yards
Material Type: Silt/Sand
Placement Area: Offshore
Distance to Placement Area: 2.5 Mile Avg.
Type of Equipment: Hopper
Env. Window: Dec. 1 thru Mar. 31
Reason for Window: Sea Turtles
Award: 2nd Quarter
![Page 10: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/10.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Corpus Christi Ship Channel Inner Basin to Main Turning
Basin
Dredging Depth: 47 ft. Required Depth
Dredging Width: 400 - 600 ft
Dredging Length: Varies
Dredging Quantity: 2,500,000 cubic yards
Material Type: Silt/Sand
Placement Area: Open Water/Upland
Distance to Place Area: 1 Mile Avg.
Type of Equipment: Pipeline
Env. Window: Sept. – Mar.
Reason for Window: Turtles and Nesting Birds
Award: 3rd Quarter
Ingleside Nueces Bay
La Quinta Channel
Corpus Christi
Port Aransas
Aransas Pass
11
14-A
14
-B
PA 10 15
-A
15-B
16
-A
16-B
17
-A
17-B
B
CN
82
PA 6
2
PAs 7 & 8
PA 2
![Page 11: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/11.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2013 Contracts Sabine-Neches Waterway
![Page 12: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/12.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
1
2
3
4
Sabine Project: Sabine-Neches Waterway Outer Bar and Bank
Channel
Dredging Depth: 44 ft. Required Depth
Dredging Width: 800 ft.
Dredging Length: Varies
Dredging Quantity: 2,500,000 cubic yards
Material Type: Silt/Clay
Placement Area: Offshore
Distance to Placement Area: 3 Mile Avg.
Type of Equipment: Hopper
Env. Window: Dec. 1 thru Mar. 31
Reason for Window: Sea Turtles
Est. Start Date: September 24, 2013
Est. Completion Date: January 8, 2014
![Page 13: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/13.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Sabine-Neches Waterway Neches River
Dredging Depth: 42 ft. Required Depth
Dredging Width: 1400 - 200 ft.
Dredging Length: Varies
Dredging Quantity: 2,500,000 cubic yards
Material Type: Silt/Clay
Placement Area: Various Upland PAs
Distance to Placement Area: 1 Mile Avg.
Type of Equipment: Pipeline
Env. Window: NA
Reason for Window: NA
Est. Start Date: September 30, 2013
Est. Completion Date: March 18, 2014
![Page 14: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/14.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2014 Contracts Sabine-Neches Waterway
![Page 15: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/15.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Sabine-Neches Waterway Port Arthur Canal, Turning
Basin, Junction Area and Taylors Bayou
Dredging Depth: 42 ft. Required Depth
Dredging Width: 400 - 1200 ft.
Dredging Length: Varies
Dredging Quantity: 2,500,000 cubic yards
Material Type: Silt/Clay
Placement Area: PA 8 and PA 9
Distance to Place Area: 1.5 - 2 Miles Avg.
Type of Equipment: Pipeline
Env. Window: NA
Reason for Window: NA
Award: 1st Quarter
9
8
Port Arthur
Port Arthur Turning Basins
Junction Area
![Page 16: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/16.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
1
2
3
4
Sabine Project: Sabine-Neches Waterway Outer Bar and Bank
Channel
Dredging Depth: 44 ft. Required Depth
Dredging Width: 800 ft.
Dredging Length: Varies
Dredging Quantity: 3,000,000 cubic yards
Material Type: Silt/Clay
Placement Area: Offshore
Distance to Placement Area: 3 Mile Avg.
Type of Equipment: Hopper
Env. Window: Dec. 1 thru Mar. 31
Reason for Window: Sea Turtles
Award: 3rd Quarter
![Page 17: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/17.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Sabine-Neches Waterway Sabine Pass Channel
Dredging Depth: 42 ft. Required Depth
Dredging Width: 500 - 1150 ft.
Dredging Length: Varies
Dredging Quantity: 2,000,000 cubic yards
Material Type: Silt/Sand
Placement Area: PA 5A, 5B and 5C
Distance to Place Area: 3.5 Mile Avg.
Type of Equipment: Pipeline
Env. Window: NA
Reason for Window: NA
Award: 4th Quarter
Sabine
Gulf of Mexico
5 6
![Page 18: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/18.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2013 Contract Texas City Channel
![Page 19: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/19.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Texas City
Project: Texas City Channel DAMP of Placement Area
5&6
Type of Work: Dewatering
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: NA
Placement Area: PA 5&6
Distance to Placement Area: NA
Type of Equipment: Excavators; Dozers; Marsh Buggy
Env. Window: NA
Reason for Window: NA
Est. Start Date: September 27, 2013
Est. Completion Date: March 12, 2014
![Page 20: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/20.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2014 Contract Texas City Channel
![Page 21: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/21.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Texas City Channel Main Channel and Turning
Basin
Dredging Depth: 48 ft. Required Depth
Dredging Width: 400 - 1200 ft.
Dredging Length: Varies
Dredging Quantity: 2,000,000 cubic yards
Material Type: Silt/Sand
Placement Area: PA 5/6; SPPA’s 3, 4, 5
Distance to Place Area: 1 Mile Avg.
Type of Equipment: Pipeline
Env. Window: NA
Reason for Window: NA
Award: 4th Quarter
![Page 22: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/22.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
For more information, contact:
Paula Rankin Wise Operations Manager
Navigation Branch, Operations Division
U.S. Army Corps of Engineers, Galveston 409-766-3948
Questions Comments?
For more information, contact:
Paula Rankin Wise Operations Manager
Navigation Branch, Operations Division
U.S. Army Corps of Engineers, Galveston 409-766-3948
![Page 23: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/23.jpg)
US Army Corps of Engineers BUILDING STRONG®
Galveston District – 2012 Dredging Conference
Custodians of the Coast
Alicia D. Rea
Operation Manager
Navigation Branch
24 October 2012
Brazos Island Harbor Gulf Intracoastal Waterway, TX Matagorda Ship Channel
![Page 24: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/24.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Brazos Island Harbor (Brownsville) Gulf Intracoastal Waterway, TX Matagorda Ship Channel Channel to Port Mansfield Channel to Port Isabel Channel to Palacios Channel to Aransas Channel to Harlingen Channel to Port Bolivar
Alicia Rea Operations Manager
![Page 25: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/25.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Beneficial Use: South Padre Island, Texas
![Page 26: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/26.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
West Bay Mooring Beneficial Use Site
GIWW
![Page 27: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/27.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
MSC-Placement Area 16 Bird Island
![Page 28: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/28.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2013 Contracts Brazos Island Harbor (Brownsville Harbor)
![Page 29: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/29.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
1 Port Isabel
2 3 4
5
7 8
Port of Brownsville
T E X A S
M E X I C O
Project: Brazos Island Harbor Brownsville Ship Channel
Dredging Depth: 46 ft. Required Depth
Dredging Width: 300 - 400 ft.
Dredging Length: Varies
Dredging Quantity: 350,000 cubic yards
Material Type: Silt
Placement Area: Upland
Distance to Place Area: 1 Mile Avg.
Type of Equipment: Pipeline
Env. Window: NA
Reason for Window: NA
Est. Start Date: June 15, 2013
Est. Completion Date: October 15, 2013
![Page 30: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/30.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
1 Port Isabel
2 3 4
5
7 8
Port of Brownsville
T E X A S
M E X I C O
Project: Brazos Island Harbor Brownsville Jetty Channel
Dredging Depth: 46 ft. Required Depth
Dredging Width: 300 - 400 ft.
Dredging Length: Varies
Dredging Quantity: 350,000 cubic yards
Material Type: Sand
Placement Area: Beach/BU
Distance to Place Area: 2 Miles Avg.
Type of Equipment: Hopper/Pipeline
Env. Window: Oct-Mar
Reason for Window: Turtle/Tourism
Est. Start Date: October 1, 2013
Est. Completion Date: December 15, 2013
![Page 31: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/31.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2014 Contract Brazos Island Harbor (Brownsville Harbor)
![Page 32: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/32.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
1 Port Isabel
2 3 4
5
7 8
Port of Brownsville
T E X A S
M E X I C O
Project: Brazos Island Harbor Brownsville Jetty Channel
Dredging Depth: 46 ft. Required Depth
Dredging Width: 300 - 400 ft.
Dredging Length: Varies
Dredging Quantity: 350,000 cubic yards
Material Type: Sand
Placement Area: Beach/BU
Distance to Place Area: 2 Miles Avg.
Type of Equipment: Hopper/Pipeline
Env. Window: Oct-Mar
Reason for Window: Turtle/Tourism
Award: 4th Quarter
![Page 33: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/33.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2013 Contracts Gulf Intracoastal Waterway, TX
![Page 34: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/34.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Aransas Bay
Project: Gulf Intracoastal Waterway Construct Beneficial Use
(BU) Site at Aransas National Wildlife Refuge
Type of Work: BU Site
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: Silt/Clay
Placement Area: NA
Distance to Place Area: NA
Type of Equipment: Marsh Buggy
Env. Window: NA
Reason for Window: NA
Est. Start Date: April 15, 2013
Est. Completion Date: September 30, 2013
![Page 35: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/35.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Provide a map of that shows the work package. Add as many maps as you need
Port O’Connor
117
117-a
118
118
119
119
120
120 121
121-A 122
1 2
123
Project: Gulf Intracoastal Waterway Port O’Connor to San
Antonio Bay
Dredging Depth: 14 - 16 ft. Required Depth
Dredging Width: 125 ft.
Dredging Length: Varies
Dredging Quantity: 750,000 cubic yards
Material Type: Sand/Silt
Placement Area: Upland/Open Water/BU
Distance to Place Area: 1.0 Mile Avg.
Type of Equipment: Pipeline
Env. Window: April thru October
Reason for Window: Nesting Bird
Est. Start Date: May 1, 2013
Est. Completion Date: October 30, 2013
![Page 36: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/36.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Provide a map of that shows the work package. Add as many maps as you need
Project: Gulf Intracoastal Waterway Main Channel Across
Aransas Bay
Dredging Depth: 14 - 16 ft. Required Depth
Dredging Width: 125 ft.
Dredging Length: Varies
Dredging Quantity: 600,000 cubic yards
Material Type: Sand/Silt
Placement Area: Open / BU
Distance to Place Area: 1 Mile Avg.
Type of Equipment: Pipeline
Env. Window: April thru Oct
Reason for Window: Whooping Crane/Nesting Birds
Est. Start Date: July 15, 2013
Est. Completion Date: December 15, 2013
![Page 37: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/37.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Rollover Pass
28 29 30 31
32 33 34 35
36
Beach Nourishment Area
37 38
39 40
41
42
Bolivar Marsh 43
Bolivar Ferry Port Bolivar
Smith Point
Project: Gulf Intracoastal Waterway High Island to Bolivar, Channel to
Port Bolivar, and Across Galveston Bay
Dredging Depth: 16 ft. Required Depth
Dredging Width: 125 ft.
Dredging Length: Varies
Dredging Quantity: 400,000 cubic yards
Material Type: Fine Sand/Silt
Placement Area: Open / Upland Confined/BU
Distance to Place Area: 2 Miles Avg.
Type of Equipment: Pipeline
Env. Window: Oct-Mar
Reason for Window: Nesting Turtles
Est. Start Date: October 1, 2013
Est. Completion Date: February 15, 2014
![Page 38: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/38.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2014 Contracts Gulf Intracoastal Waterway, TX
![Page 39: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/39.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Gulf Intracoastal Waterway Corpus Christi to Port Isabel
Dredging Depth: 16 ft. Required Depth
Dredging Width: 125 ft.
Dredging Length: Varies
Dredging Quantity: 2,000,000 cubic yards
Material Type: Fine Silt/Sand
Placement Area: Open/BU Sites
Distance to Placement Area: 3 Miles Avg.
Type of Equipment: Pipeline
Env. Window: Oct. – Mar.
Reason for Window: Seagrass
Award: 1st Quarter
Arroyo Colorado 227 226
225 224
223
222
221
Port Mansfield
229 230
231 232
233
234
235 236
Port Isabel
Rio Hondo
228-A 228-B
237 239 240 241
3
Arroyo City
208
208-B
207-B
208-A 208
208
209
210
211
220 / 7
212
213
214
215
216
217
218 219
221
Port Mansfield
![Page 40: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/40.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
99
100
101-A 101 Boggy Bayou
104-A
103 104-B
104
105
106
106
108 108-A
109
Baxter Island
3
Colorado River Locks
Project: Gulf Intracoastal Waterway Boggy Bayou to Colorado
River
Dredging Depth: 16 ft. Required Depth
Dredging Width: 125 ft.
Dredging Length: Varies
Dredging Quantity: 1,000,000 cubic yards
Material Type: Fine Silt/Sand
Placement Area: Open/Upland Confined
Distance to Placement Area: 1 Miles Avg.
Type of Equipment: Pipeline
Env. Window: NA
Reason for Window: NA
Award: 1st Quarter
![Page 41: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/41.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Gulf Intracoastal Waterway Freeport to Brazos River
Crossing
Dredging Depth: 16 ft. Required Depth
Dredging Width: 125 ft.
Dredging Length: Varies
Dredging Quantity: 1,000,000 cubic yards
Material Type: Fine Silt/Sand
Placement Area: Open/Upland Confined/BU Sites
Distance to Placement Area: 2 Miles Avg.
Type of Equipment: Pipeline
Env. Window: NA
Reason for Window: NA
Award: 2nd Quarter
![Page 42: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/42.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Gulf Intracoastal Waterway Turnstake to Live Oak
Dredging Depth: 16 ft. Required Depth
Dredging Width: 125 ft.
Dredging Length: Varies
Dredging Quantity: 1,200,000 cubic yards
Material Type: Fine Silt/Sand
Placement Area: Open/BU Sites
Distance to Placement Area: 1 Mile Avg.
Type of Equipment: Pipeline
Env. Window: Apr. – Oct.
Reason for Window: Whooping Cranes
Award: 3rd Quarter
Beneficial Use Site ‘B’
Beneficial Use Site ‘A’
1 2
![Page 43: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/43.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Gulf Intracoastal Waterway Colorado River to Upper
Matagorda Bay
Dredging Depth: 16 ft. Required Depth
Dredging Width: 125 ft.
Dredging Length: Varies
Dredging Quantity: 2,000,000 cubic yards
Material Type: Fine Silt/Sand
Placement Area: Open/Upland Confined
Distance to Placement Area: 1 Miles Avg.
Type of Equipment: Pipeline
Env. Window: NA
Reason for Window: NA
Award: 4th Quarter
106
108 108-A
109
Baxter Island 3
Colorado River Locks
110
111
112-A
112-A 112-B
112-C 113 114
115 116
![Page 44: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/44.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Gulf Intracoastal Waterway High Island to Port Bolivar
Dredging Depth: 16 ft. Required Depth
Dredging Width: 125 ft.
Dredging Length: Varies
Dredging Quantity: 1,000,000 cubic yards
Material Type: Fine Silt/Sand
Placement Area: Open/Upland Confined/BU
Distance to Placement Area: 2 Miles Avg.
Type of Equipment: Pipeline
Env. Window: Oct. – Mar.
Reason for Window: Nesting Turtles
Award: 4th Quarter
![Page 45: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/45.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2013 Contract Matagorda Ship Channel
![Page 46: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/46.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
1 2
3
4
5
6
7 8 9 10
11
12
13 14
Port O’Connor
Point Comfort
Port Lavaca
Lavaca Bay
Palacios
Keller Bay
5
6 7 8
9
10
11 12
14 15
16 17 18 19
1
Carancahua Bay
20 21
22 23
117-a
Lavaca Bay
Red Bluff
Harbor Of Refuge
115 114 113 112-C
112-B 112-A
116
Project: Matagorda Ship Channel Matagorda Peninsula to
Point Comfort
Dredging Depth: 38 ft. Required Depth
Dredging Width: 200 - 1000 ft.
Dredging Length: Varies
Dredging Quantity: 1,100,000 cubic yards
Material Type: Sand/Silt
Placement Area: BU/Open Water
Distance to Place Area: 1 Mile Avg.
Type of Equipment: Pipeline Dredge
Env. Window: NA
Reason for Window: NA
Est. Start Date: November 20, 2012
Est. Completion Date: March 15, 2012
![Page 47: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/47.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2014 Contract Matagorda Ship Channel
![Page 48: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/48.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
1 2
3
4
5
6
7 8 9 10
11
12
13 14
Port O’Connor
Point Comfort
Port Lavaca
Lavaca Bay
Palacios
Keller Bay
5
6 7 8
9
10
11 12
14 15
16 17 18 19
1
Carancahua Bay
20 21
22 23
117-a
Lavaca Bay
Red Bluff
Harbor Of Refuge
115 114 113 112-C
112-B 112-A
116
Project: Matagorda Ship Channel Peninsula to Point Comfort
Dredging Depth: 38 ft. Required Depth
Dredging Width: 200 - 1000 ft.
Dredging Length: Varies
Dredging Quantity: 1,200,000 cubic yards
Material Type: Sand/Silt
Placement Area: BU/Open Water
Distance to Place Area: 1 Mile Avg.
Type of Equipment: Pipeline Dredge
Env. Window: NA
Reason for Window: NA
Award: 4th Quarter
![Page 49: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/49.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Matagorda Ship Channel – Construct Beneficial Use
Site
Type of Work: BU Site
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: Silt/Clay
Placement Area: NA
Distance to Place Area: NA
Type of Equipment: Marsh Buggy
Env. Window: NA
Reason for Window: NA
Award: 2nd Quarter
1 2
3
4
5
6
7 8 9 10
11
12
13 14
Port O’Connor
Point Comfort
Port Lavaca
Lavaca Bay
Palacios
Keller Bay
5
6 7 8
9
10
11 12
14 15
16 17 18 19
1
Carancahua Bay
20 21
22 23
117-a
Lavaca Bay
Red Bluff
Harbor Of Refuge
115 114 113 112-C
112-B 112-A
116
![Page 50: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/50.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
For more information, contact:
Paula Rankin Wise Operations Manager
Navigation Branch, Operations Division
U.S. Army Corps of Engineers, Galveston 409-766-3948
Questions Comments?
For more information, contact:
Alicia Rea Operations Manager
Navigation Branch, Operations Division
U.S. Army Corps of Engineers, Galveston 409-766-3995
![Page 51: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/51.jpg)
US Army Corps of Engineers BUILDING STRONG®
Galveston District – 2012 Dredging Conference
Custodians of the Coast
Galveston Harbor & Houston Ship Channel - Barbours Cut - Bayport Ship Channel - Greens Bayou
Tricia Campbell, P.E.
Operations Manager
Navigation Branch
24 October 2012
![Page 52: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/52.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Tricia Campbell Operations Manager
Galveston Harbor Houston Ship Channel - Bayport Ship Channel - Barbour's Terminal Channel - Green's Bayou Channel
![Page 53: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/53.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Galveston Notable Projects
Galveston Entrance Channel—Rental Job to alleviate draft restrictions
![Page 54: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/54.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2013 Contracts Galveston Harbor
![Page 55: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/55.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Pelican Island San Jacinto
San Jacinto PA DAMP
Project: Galveston Harbor & Channel - San Jacinto PA
Disposal Area Management Plan (DAMP)
Type of Work: DAMP
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: Silt/Clay
Placement Area: San Jacinto
Distance to Place Area: NA
Type of Equipment: Marsh Buggy
Env. Window: NA
Reason for Window: NA
Est. Start Date: December 11, 2012
Est. Completion Date: June 13, 2012
![Page 56: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/56.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Galveston Harbor & Channel - Galveston Entrance, Outer and Inner Bar – (w/option for HSC
South of Redfish High Shoal Reach
Dredging Depth: 47-49 ft. Required Depth
Dredging Width: 800-1000 ft.
Dredging Length: Varies
Dredging Quantity: 3,500,000 cubic yards
Material Type: Silt/Sand
Placement Area: Offshore/BU
Distance to Place Area: 4 Mile Avg.
Type of Equipment: Hopper
Env. Window: NA
Reason for Window: NA
Est. Start Date: July 11,2013
Est. Completion Date: February 13, 2014
![Page 57: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/57.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2014 Contract Galveston Harbor
![Page 58: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/58.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Galveston Harbor & Channel - Galveston Entrance, Outer and
Inner Bar
Dredging Depth: 47-49 ft. Required Depth
Dredging Width: 800 ft.
Dredging Length: Varies
Dredging Quantity: 1,500,000 cubic yards
Material Type: Silt/Sand
Placement Area: Offshore/BU
Distance to Place Area: 4 Mile Avg.
Type of Equipment: Hopper
Env. Window: NA
Reason for Window: NA
Award: 3rd Quarter
![Page 59: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/59.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
HSC Notable Projects
Lost Lake Placement Area—Deep Soil Mixing
HSC Sunken Barge Removal
![Page 60: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/60.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2013 Contracts Houston Ship Channel
- Barbours Terminal - Bayport Ship Channel - Greens Bayou
![Page 61: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/61.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Morgan’s Point Project: Houston Ship Channel South of Redfish High Shoal Reach (Option on Galveston Entrance Channel Contract)
Dredging Depth: 47 ft. Required Depth
Dredging Width: 530 ft.
Dredging Length: Varies
Dredging Quantity: 1,000,000 cubic yards
Material Type: Sand
Placement Area: Offshore
Distance to Place Area: Varies
Type of Equipment: Pipeline
Env. Window: NA
Reason for Window: NA
Est. Start Date: July 11, 2013
Est. Completion Date: February 13, 2014
![Page 62: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/62.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
15
14
Atkinson Is. La Porte
Spilman Is.
16
Project: Bayport Ship Channel Bayport Channel and
Turning Basin
Dredging Depth: 41 ft. Required Depth
Dredging Width: 300 - 5243 ft.
Dredging Length: Varies
Dredging Quantity: 500,000 cubic yards
Material Type: Silt
Placement Area: PA15
Distance to Place Area: 4 Mile Avg.
Type of Equipment: Pipeline Dredge
Env. Window: NA
Reason for Window: NA
Est. Start Date: December 4, 2012
Est. Completion Date: June 24, 2013
![Page 63: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/63.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Barbours Terminal Main Channel and Turning
Basin & Houston Ship Channel Morgan’s Point to SH-146
Dredging Depth: 42 ft. (Barbours) & 49 ft. (HSC) Required Depth
Dredging Width: 1222 - 300 ft.
Dredging Length: Varies
Dredging Quantity: 1,200,000 cubic yards
Material Type: Silt
Placement Area: Spilman
Distance to Place Area: 1 Mile Avg.
Type of Equipment: Pipeline
Env. Window: NA
Reason for Window: NA
Est. Start Date: April 15, 2013
Est. Completion Date: December 15, 2013
15
14
Atkinson Is. La Porte
Spilman Is.
16
![Page 64: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/64.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Alexander Island PA DAMP Spilman
Island
Peggy Lake
Alexander Island
Atkinson Is.
16
14
15
La Porte
Project: Houston Ship Channel Alexander Island PA
Disposal Area Management Plan (DAMP)
Type of Work: DAMP
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: Silt/Clay
Placement Area: San Jacinto
Distance to Place Area: NA
Type of Equipment: Marsh Buggy
Env. Window: NA
Reason for Window: NA
Est. Start Date: June 17, 2013
Est. Completion Date: December 6, 2013
![Page 65: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/65.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Houston Ship Channel Mid-Bay PA - Disposal Area
Management Plan
Type of Work: DAMP
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: Silt
Placement Area: Midbay
Distance to Place Area: NA
Type of Equipment: Marsh Buggy
Env. Window: NA
Reason for Window: NA
Est. Start Date: August 5, 2013
Est. Completion Date: February 8, 2014
Morgan’s Point
![Page 66: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/66.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Houston Ship Channel Carpenters Bayou to Greens Bayou; with Greens Bayou
Dredging Depth: 47 ft. Required Depth
Dredging Width: 915 - 300 ft.
Dredging Length: Varies
Dredging Quantity: 900,000 cubic yards
Material Type: Silt
Placement Area: Lost Lake & Clinton PA
Distance to Place Area: 2.5 Mile Avg.
Type of Equipment: Pipeline
Env. Window: NA
Reason for Window: NA
Est. Start Date: September 13, 2013
Est. Completion Date: March 10, 2014
Lost Lake
Peggy Lake
West & East Jones
Green’s Bayou PA
Alexander Island PA
Goat Island
![Page 67: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/67.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Houston Ship Channel Peggy Lake Improvements
Type of Work: Improvements
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: Silt/Clay
Placement Area: NA
Distance to Place Area: NA
Type of Equipment: Drag-line, varies
Env. Window: NA
Reason for Window: NA
Est. Start Date: August 21, 2013
Est. Completion Date: April 4, 2014
Lost Lake
West & East Jones
Green’s Bayou PA
Alexander Island PA
Goat Island
Peggy Lake Peggy Lake Improvements
![Page 68: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/68.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2014 Contracts Houston Ship Channel
- Barbours Terminal - Bayport Ship Channel - Greens Bayou
![Page 69: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/69.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
15
14
Atkinson Is. La Porte
Spilman Is.
16
Project: Houston Ship Channel Bayport Flare and Bayport
to Morgan’s Point
Dredging Depth: 47 ft. Required Depth
Dredging Width: 300 - 5243 ft.
Dredging Length: Varies
Dredging Quantity: 1,500,000 cubic yards
Material Type: Silt
Placement Area: PA14 and 15
Distance to Place Area: 4 Mile Avg.
Type of Equipment: Pipeline Dredge
Env. Window: NA
Reason for Window: NA
Award: 1st Quarter
![Page 70: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/70.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Houston Ship Channel Sims Bayou to Turning
Basin
Dredging Depth: 38 ft. Required Depth
Dredging Width: 300 - 250 ft.
Dredging Length: Varies
Dredging Quantity: 1,000,000 cubic yards
Material Type: Silt
Placement Area: Clinton
Distance to Place Area: 3 Miles Avg.
Type of Equipment: Pipeline Dredge
Env. Window: NA
Reason for Window: NA
Award: 1st Quarter
![Page 71: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/71.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Alexander Island PA Levee Raise Spilman
Island
Peggy Lake
Alexander Island
Atkinson Is.
16
14
15
La Porte
Project: Houston Ship Channel Alexander Island PA Levee
Raise
Type of Work: Improvements
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: Silt/Clay
Placement Area: Alexander Island
Distance to Place Area: NA
Type of Equipment: Dragline
Env. Window: NA
Reason for Window: NA
Award: 2nd Quarter
![Page 72: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/72.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Lost Lake
Peggy Lake
Alexander Island
Goat Island
Spilman Island
Project: Houston Ship Channel Spilman Island PA Disposal
Area Management Plan (DAMP)
Type of Work: DAMP
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: Silt/Clay
Placement Area: Spilman Island
Distance to Place Area: NA
Type of Equipment: Marsh Buggy/ Excavation Equipment
Env. Window: NA
Reason for Window: NA
Award: 4th Quarter
![Page 73: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/73.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Glendale
House-Stimson Tracts Filter-Bed
Project: Houston Ship Channel House Tract & Glendale
Levee Raise
Type of Work: Improvements
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: Silt/Clay
Placement Area: House Tract & Glendale
Distance to Place Area: NA
Type of Equipment: Dragline
Env. Window: NA
Reason for Window: NA
Award: 4th Quarter
![Page 74: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/74.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
For more information, contact:
Paula Rankin Wise Operations Manager
Navigation Branch, Operations Division
U.S. Army Corps of Engineers, Galveston 409-766-3948
Questions Comments?
For more information, contact:
Tricia Campbell Operations Manager
Navigation Branch, Operations Division
U.S. Army Corps of Engineers, Galveston 409-766-3153
![Page 75: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/75.jpg)
US Army Corps of Engineers BUILDING STRONG®
Galveston District – 2012 Dredging Conference
Custodians of the Coast
Freeport Harbor Channel to Victoria Chocolate Bayou
Eddie Irigoyen
Operations Manager
Navigation Branch
24 October 2012
![Page 76: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/76.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Freeport Harbor Channel to Victoria Chocolate Bayou
Eddie Irigoyen Operations Manager
![Page 77: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/77.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2013 Contracts Freeport Harbor
![Page 78: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/78.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Freeport Harbor Inside Channel
Dredging Depth: 47- & 49-ft. Required Depth
Dredging Width: 280 - 1190 ft.
Dredging Length: Varies
Dredging Quantity: 400,000 cubic yards
Material Type: Sand/Silt
Placement Area: PA 1
Distance to Place Area: 2.5 Mile Avg.
Type of Equipment: Pipeline
Env. Window: NA
Reason for Window: NA
Est. Start Date: June 2013
Est. Completion Date: Sep 2013
![Page 79: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/79.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
1 Quintana
Surfside
85
7
Brazosport Turning Basin
Brazos Harbor Turning Basin and Channel
Upper Turning Basin
1-A
88
Stauffer Channel (De-Authorized)
Buffer Zone
Limits of Discharge
Project: Freeport Harbor Entrance Channel
Dredging Depth: 47- & 49-ft. Required Depth
Dredging Width: 400 ft.
Dredging Length: Varies
Dredging Quantity: 1,000,000 cubic yards
Material Type: Sand/Silt
Placement Area: Offshore
Distance to Place Area: 2.5 Mile Avg.
Type of Equipment: Hopper
Env. Window: NA
Reason for Window: NA
Est. Start Date: July 17, 2013
Est. Completion Date: September 30, 2013
![Page 80: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/80.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2014 Contract Freeport Harbor
![Page 81: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/81.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
1 Quintana
Surfside
85
7
Brazosport Turning Basin
Brazos Harbor Turning Basin and Channel
Upper Turning Basin
1-A
88
Stauffer Channel (De-Authorized)
Buffer Zone
Limits of Discharge
Project: Freeport Harbor Entrance Channel
Dredging Depth: 47- & 49-ft. Required Depth
Dredging Width: 400 ft.
Dredging Length: Varies
Dredging Quantity: 1,500,000 cubic yards
Material Type: Sand/Silt
Placement Area: Offshore
Distance to Place Area: 2.5 Mile Avg.
Type of Equipment: Hopper
Env. Window: NA
Reason for Window: NA
Award: 4th Quarter
![Page 82: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/82.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2013 Contract Channel to Victoria
![Page 83: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/83.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Channel to Victoria Raise Levee PA 2
Type of Work: Raise Levees
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: Cohesive material (silt & clay)
Placement Area: PA 2
Distance to Place Area: NA
Type of Equipment: Varies
Env. Window: NA
Reason for Window: NA
Est. Start Date: May 2013
Est. Completion Date: Sep 2013
Channel to Seadrift
PA 2
1
Raise Levees
![Page 84: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/84.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2014 Contract Channel to Victoria
![Page 85: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/85.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
9
10 & 11
13
Turning Basin
8-C
8-B
12
7 6-A
Green Lake 8-A
Project: Channel to Victoria Upper Reach
Dredging Depth: 14-ft. Required Depth
Dredging Width: 125 – 818 ft.
Dredging Length: Varies
Dredging Quantity: 500,000 cubic yards
Material Type: Silt/Sand
Placement Area: Upland Confined
Distance to Placement Area: 2.5 Mile Avg.
Type of Equipment: Pipeline Dredge
Env. Window: NA
Reason for Window: NA
Award: 3rd Quarter
![Page 86: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/86.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
FY 2014 Contract Chocolate Bayou
![Page 87: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/87.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Chocolate Bayou
Dredging Depth: 14 ft. Required Depth
Dredging Width: 125 ft.
Dredging Length: Varies
Dredging Quantity: 800,000 cubic yards
Material Type: Silt/Sand
Placement Area: BU / Upland Confined
Distance to Placement Area: 1.5 Mile Avg.
Type of Equipment: Pipeline Dredge
Env. Window: NA
Reason for Window: NA
Award: 4th Quarter
70
65 66
67
68
69
![Page 88: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/88.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
For more information, contact:
Paula Rankin Wise Operations Manager
Navigation Branch, Operations Division
U.S. Army Corps of Engineers, Galveston 409-766-3948
Questions Comments?
For more information, contact:
Eddie Irigoyen Operations Manager
Navigation Branch, Operations Division
U.S. Army Corps of Engineers, Galveston 409-766-3130
![Page 89: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/89.jpg)
US Army Corps of Engineers BUILDING STRONG®
Galveston District – 2012 Dredging Conference
Custodians of the Coast
Brazos River Floodgates, Colorado River Locks & Mooring Buoy Maintenance
Eric Russek, P.E. Operations Manager
Project Operations Br, Galveston
24 October 2012
![Page 90: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/90.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Brazos River Floodgates Colorado River Locks Mooring Buoy Maintenance Mouth of Colorado River Walkway Neches River Saltwater Barrier
Eric Russek, P.E. Operations Manager
![Page 91: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/91.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Brazos River Floodgates Freeport, TX
![Page 92: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/92.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Colorado River Locks Matagorda, TX
![Page 93: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/93.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Brazos River Flood Gates
Rehab 4 Sector Gates, Mechanical & Electrical Systems
Dredging Depth: NA
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: NA
Placement Area: NA
Distance to Placement Area: NA
Type of Equipment: Construction, Mechanical & Electrical
Est. Start Date: November 11, 2010
Est. Completion Date: March 31. 2013
Contract Completion: September 30 , 2013
Contract Amount: $10,277,359.10
Contractor: K&K Industries, Inc.
![Page 94: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/94.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Brazos River Flood Gates
*West Road Repair
Dredging Depth: NA
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: NA
Placement Area: NA
Type of Equipment: Excavation & Paving
Env. Window: NA
Reason for Window: NA
Est. Start Date: September 29, 2013
Est. Completion Date: March 1, 2014
*
![Page 95: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/95.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Project: Colorado River Locks
Impressed Current Cathodic Protection
on 8 Sector Gates Dredging Depth: NA
Dredging Width: NA
Dredging Length: NA
Dredging Quantity: NA
Material Type: NA
Placement Area: NA
Type of Equipment: Mechanical & Electrical
Env. Window: NA
Reason for Window: NA
Est. Start Date: June 11, 2013
Est. Completion Date: February 15, 2014
![Page 96: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/96.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
Galveston District Mooring Basins
Port Arthur Bolivar Peninsula Pelican Island
Chocolate Bayou
Brazos River Flood Gates
Colorado River Locks Oyster Lake Port O’Connor
Channel to Victoria Aransas National Wildlife Refuge
Corpus Christi Ship Channel Arroyo Colorado
![Page 97: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/97.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
‘Can’ Buoy ‘Anvil’ Buoy
Damaged ‘Can’ Buoy Buoy Yard at Brazos River Flood Gates
![Page 98: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of](https://reader036.vdocuments.us/reader036/viewer/2022071509/6129aed0bc4a45124136ffc7/html5/thumbnails/98.jpg)
BUILDING STRONG®
Galveston District – 2012 Dredging Conference - Custodians of the Coast
For more information, contact:
Paula Rankin Wise Operations Manager
Navigation Branch, Operations Division
U.S. Army Corps of Engineers, Galveston 409-766-3948
Questions Comments?
For more information, contact:
Eric Russek Operations Manager
Project Operation Branch, Operations Division
U.S. Army Corps of Engineers, Galveston 409-766-3007