From: Rock, Brad Sent: Thursday, April 02, 2015 12:16 PM To: Lim, Debbie Subject: FW: A111 Smoke Control Testing Kick Off Attachments: M0.6 - Schedules Smoke Control.pdf; M4.5 - Riser Diagram HVAC.pdf; 150313_Site Observation Summary_Alley 111 Smoke Control_AEGIS.pdf RCL items Brad Rock Project Manager, LEED AP Skanska USA Building Operations www.skanska.com 221 Yale Avenue North; Suite 400 Seattle, WA 98109, United States Think twice before you press "print." This message, including any attachments hereto, may contain privileged or confidential information and is sent solely for the attention and use of the intended addressee(s). If you are not an intended addressee, you may neither use this message nor copy or deliver it to anyone. In such case, you should immediately destroy this message and kindly notify the sender by reply email. Thank you. From: Brian Thompson [mailto:[email protected]] Sent: Thursday, April 02, 2015 11:31 AM To: Bailey, Marlene; [email protected]; 'Krewedl, Mark' Cc: Rock, Brad; Germain, Stewart; [email protected]; 'Lou-Anne Caldwell'; 'Steve Murphy'; 'Andy Rasmussen'; 'Cameron Smith'; [email protected] Subject: RE: A111 Smoke Control Testing Kick Off Marlene asked me to distribute the field report regarding the site observations referenced in my e-mail yesterday; please find that document attached. For convenience, I have attached the sheets referenced in my e-mail as well. Also, while our observations have been stated presumptively, we would appreciate responses to the following project elements: 1. There appears to be a conflict between the description of on Sheet M0.6 and the riser diagram on Sheet M4.5. Drawings identifying each smoke control system component and its proper function are among the elements required by IBC Section 909.18.9 at the conclusion of the project. Please clarify the route of the air exhausted by the smoke control system. 2. Wood material and caulking around the annular space of the duct riser at the floor penetration was observed during our site visit. Please clarify the purpose of this material. If it is Mobile +1 206 437 6059 Fax +1 206 903 0979

Upload: nguyenliem

Post on 21-Apr-2018

224 views

Category:

Documents


4 download

TRANSCRIPT

From: Rock, Brad

Sent: Thursday, April 02, 2015 12:16 PM

To: Lim, Debbie

Subject: FW: A111 Smoke Control Testing Kick Off

Attachments: M0.6 - Schedules Smoke Control.pdf; M4.5 - Riser Diagram HVAC.pdf;

150313_Site Observation Summary_Alley 111 Smoke

Control_AEGIS.pdf

RCL items

Brad Rock Project Manager, LEED AP

Skanska USA Building Operations www.skanska.com

221 Yale Avenue North; Suite 400 Seattle, WA 98109, United States

Think twice before you press "print." This message, including any attachments hereto, may contain privileged or confidential information and is sent solely for the attention and use of the intended addressee(s). If you are not an intended addressee, you may neither use this message nor copy or deliver it to anyone. In such case, you should immediately destroy this message and kindly notify the sender by reply email. Thank you.

From: Brian Thompson [mailto:[email protected]] Sent: Thursday, April 02, 2015 11:31 AM To: Bailey, Marlene; [email protected]; 'Krewedl, Mark' Cc: Rock, Brad; Germain, Stewart; [email protected]; 'Lou-Anne Caldwell'; 'Steve Murphy'; 'Andy Rasmussen'; 'Cameron Smith'; [email protected] Subject: RE: A111 Smoke Control Testing Kick Off

Marlene asked me to distribute the field report regarding the site observations referenced in

my e-mail yesterday; please find that document attached. For convenience, I have attached the

sheets referenced in my e-mail as well.

Also, while our observations have been stated presumptively, we would appreciate responses

to the following project elements:

1. There appears to be a conflict between the description of on Sheet M0.6 and the riser

diagram on Sheet M4.5. Drawings identifying each smoke control system component and its

proper function are among the elements required by IBC Section 909.18.9 at the conclusion of

the project. Please clarify the route of the air exhausted by the smoke control system.

2. Wood material and caulking around the annular space of the duct riser at the floor

penetration was observed during our site visit. Please clarify the purpose of this material. If it is

Mobile +1 206 437 6059Fax +1 206 903 0979

to remain, specific approval should be sought from City of Bellevue in accordance with IBC

Section 603.1.

3. Please confirm the method of construction of the ductwork and joints.

Feel free to contact me with any questions.

Sincerely,

Brian

<<...>> <<...>> <<...>>

_____________________________________________ From: Brian Thompson [mailto:[email protected]] Sent: Wednesday, April 01, 2015 11:52 AM To: 'Bailey, Marlene' Cc: 'Rock, Brad'; 'Germain, Stewart'; 'Krewedl, Mark'; '[email protected]'; 'Lou-Anne Caldwell'; 'Steve Murphy'; 'Andy Rasmussen'; '[email protected]'; 'Cameron Smith ([email protected])'; '[email protected]' Subject: RE: A111 Smoke Control Testing Kick Off

Marlene:

As we have discussed, there seems to be some confusion regarding how corridor exhaust is

accomplished during smoke control.

During our meeting together, Bart explained the design approach involving use of the space

around the duct within the central corridor shaft, and Al mentioned how gypsum shafts can be

challenging based on Bellevue’s amendment for smoke control systems.

However, based on conditions observed during a site visit by AEGIS Engineering, it appears that

the space around the duct riser within the gypsum shaft enclosure is not intended to support

air movement.

This is consistent with the statement under Item 3 on Sheet M0.6 which identifies that the

smoke exhaust riser and HVAC riser share the same riser. Incidentally, the riser diagram on

Sheet M4.5 should be updated accordingly.

Therefore, we do not anticipate relying on the tightness of the gypsum shaft enclosure.

When we perform the duct pressure test, openings to the duct should be sealed so we are

observing leakage of the ductwork itself.

Feel free to contact me with any questions.

Project: Inspectio

PerformOBSERVA

ViewedLevel 4: blockedinstalledinsulatioLevel 7: Level 9: gypsum with exteto riser. floor filleperimetespace a

REMARK

1. Bas

2. Oa

3. Te

4. Wwa

Allon: Vis

of ed by: B. ATIONS

central shaCorridor shwith solid m

d in framingon friction-fi

Similar to Corridor shpanel; floo

ension stubExcess sea

ed by 2x4 ber of wood t deck abov

KS

Based on thppears mayhaft constru

Openings innd tape, du

Though no eexpect that sWith regard we expect thccordance

ley 111 – 1sual AssessSmoke ConThompson

aft on Levelhaft wall apmetal pane

g channels.it between fLevel 4, wi

haft liner inor track instabbed out towalant not vis

blocking andblocking. Ove (Level 10

e absence y be intenduction shou

n duct will neuring duct pexcess jointsome adeqto the woo

hat it is temwith some

Fire ProtectConsult ▪ D

SITE V

1011 NE 9t

sment of Apntrol Exhau

n, C. Smith

ls 4, 7 and 9ppeared coml with screwNo sealant

framing meithout insulastalled in fralled for remward largersible at joind OSB arou

OSB visible 0).

of open anded to occuruld not be reeed to be te

pressure test sealant wa

quate method material f

mporary for cprovision o

tion ▪ BuildinDesign ▪ En

VISIT SUMMA

th Street - Bpparent Tigust Shaft & A. de Bo

9. mplete withw-type fastet apparent a

embers. Shaation.raming chanmainder ofr supply opents betweenund duct peon two side

nnular spacr within the elied uponemporarily st.as visible aod of sealinfound sealeconstructionof IBC Secti

ng Codengineer

ARY

Bellevueghtness

oy

h 2 openingeners. Gypsat edges ofaft interior w

nnels with bshaft perimening; sealn duct segmerimeter wites of duct r

e, exhaust e ducting. In

to performsealed, suc

at joints betng these joined around tn or approvtion 603.1.

13024 BeverlM

www.AEGpho

f

Ref: IBC 9(w/ BellevuDate: 3/13/

gs to shaft.sum shaft lif gypsum pawas concea

both roughmeter. Duct lant visible ments. Annuth white cauriser throug

during smon such caseper IBC 90ch as with p

ween duct nts was emthe base of ved by City

ly Park Rd, StMukilteo, WA 9

ISengineeringone (425) 745fax (206) 801

09.10.2ue Amendm/15

Openingliner panelsanels. Batt aled.

openings iriser exposat connectiular space ulking aroun

gh annular

oke control e, the gypsu09.10.2. plastic shee

segments,mployed. f the ductwoy of Bellevue

te 20298275 g.com 5-4700 -5797

ment)

s

in sed ionat nd

um

eting

we

ork, e in

Jenny.Smith
Typewritten Text
Report #01

arch

ite

ctu

re

| in

te

rio

r d

esig

n | la

nd

sca

pe

a

rch

ite

ctu

re

| p

la

nn

in

g &

u

rb

an

d

esig

n

Fax: (206) 467-0627

http://www.gglo.com

Email: [email protected]

Seattle, WA 98101

Tel: (206) 467-5828

Suite 301

1301 First Avenue

G G L O

7717 Detroit Avenue SW

Seattle, WA 98106

Phone: 206-763-9400

Fax: 206-767-6773

www.macmiller.com

WA Lic No: MACDOFS980RU

7717 Detroit Avenue SW

Seattle, WA 98106

Phone: 206-763-9400

Fax: 206-767-6773

www.macmiller.com

WA Lic No: MACDOFS980RU

36163

SCHEDULES

SMOKE CNTRL

M0.6

arch

ite

ctu

re

| in

te

rio

r d

esig

n | la

nd

sca

pe

a

rch

ite

ctu

re

| p

la

nn

in

g &

u

rb

an

d

esig

n

Fax: (206) 467-0627

http://www.gglo.com

Email: [email protected]

Seattle, WA 98101

Tel: (206) 467-5828

Suite 301

1301 First Avenue

G G L O

7717 Detroit Avenue SW

Seattle, WA 98106

Phone: 206-763-9400

Fax: 206-767-6773

www.macmiller.com

WA Lic No: MACDOFS980RU

7717 Detroit Avenue SW

Seattle, WA 98106

Phone: 206-763-9400

Fax: 206-767-6773

www.macmiller.com

WA Lic No: MACDOFS980RU

36163

RISER

DIAGRAMS

HVAC

M4.5

arch

ite

ctu

re

| in

te

rio

r d

esig

n | la

nd

sca

pe

a

rch

ite

ctu

re

| p

la

nn

in

g &

u

rb

an

d

esig

n

Fax: (206) 467-0627

http://www.gglo.com

Email: [email protected]

Seattle, WA 98101

Tel: (206) 467-5828

Suite 301

1301 First Avenue

G G L O

7717 Detroit Avenue SW

Seattle, WA 98106

Phone: 206-763-9400

Fax: 206-767-6773

www.macmiller.com

WA Lic No: MACDOFS980RU

7717 Detroit Avenue SW

Seattle, WA 98106

Phone: 206-763-9400

Fax: 206-767-6773

www.macmiller.com

WA Lic No: MACDOFS980RU

36163

SCHEDULES

SMOKE CNTRL

M0.6

Project: Inspectio

PerformOBSERVA

ViewedLevel 4: blockedinstalledinsulatioLevel 7: Level 9: gypsum with exteto riser. floor filleperimetespace a

REMARK

1. Bas

2. Oa

3. Te

4. Wwa

Allon: Vis

of ed by: B. ATIONS

central shaCorridor shwith solid m

d in framingon friction-fi

Similar to Corridor shpanel; floo

ension stubExcess sea

ed by 2x4 ber of wood t deck abov

KS

Based on thppears mayhaft constru

Openings innd tape, du

Though no eexpect that sWith regard we expect thccordance

ley 111 – 1sual AssessSmoke ConThompson

aft on Levelhaft wall apmetal pane

g channels.it between fLevel 4, wi

haft liner inor track instabbed out towalant not vis

blocking andblocking. Ove (Level 10

e absence y be intenduction shou

n duct will neuring duct pexcess jointsome adeqto the woo

hat it is temwith some

Fire ProtectConsult ▪ D

SITE V

1011 NE 9t

sment of Apntrol Exhau

n, C. Smith

ls 4, 7 and 9ppeared coml with screwNo sealant

framing meithout insulastalled in fralled for remward largersible at joind OSB arou

OSB visible 0).

of open anded to occuruld not be reeed to be te

pressure test sealant wa

quate method material f

mporary for cprovision o

tion ▪ BuildinDesign ▪ En

VISIT SUMMA

th Street - Bpparent Tigust Shaft & A. de Bo

9. mplete withw-type fastet apparent a

embers. Shaation.raming chanmainder ofr supply opents betweenund duct peon two side

nnular spacr within the elied uponemporarily st.as visible aod of sealinfound sealeconstructionof IBC Secti

ng Codengineer

ARY

Bellevueghtness

oy

h 2 openingeners. Gypsat edges ofaft interior w

nnels with bshaft perimening; sealn duct segmerimeter wites of duct r

e, exhaust e ducting. In

to performsealed, suc

at joints betng these joined around tn or approvtion 603.1.

13024 BeverlM

www.AEGpho

f

Ref: IBC 9(w/ BellevuDate: 3/13/

gs to shaft.sum shaft lif gypsum pawas concea

both roughmeter. Duct lant visible ments. Annuth white cauriser throug

during smon such caseper IBC 90ch as with p

ween duct nts was emthe base of ved by City

ly Park Rd, StMukilteo, WA 9

ISengineeringone (425) 745fax (206) 801

09.10.2ue Amendm/15

Openingliner panelsanels. Batt aled.

openings iriser exposat connectiular space ulking aroun

gh annular

oke control e, the gypsu09.10.2. plastic shee

segments,mployed. f the ductwoy of Bellevue

te 20298275 g.com 5-4700 -5797

ment)

s

in sed ionat nd

um

eting

we

ork, e in

Jenny.Smith
Typewritten Text
Report #01

arch

ite

ctu

re

| in

te

rio

r d

esig

n | la

nd

sca

pe

a

rch

ite

ctu

re

| p

la

nn

in

g &

u

rb

an

d

esig

n

Fax: (206) 467-0627

http://www.gglo.com

Email: [email protected]

Seattle, WA 98101

Tel: (206) 467-5828

Suite 301

1301 First Avenue

G G L O

7717 Detroit Avenue SW

Seattle, WA 98106

Phone: 206-763-9400

Fax: 206-767-6773

www.macmiller.com

WA Lic No: MACDOFS980RU

7717 Detroit Avenue SW

Seattle, WA 98106

Phone: 206-763-9400

Fax: 206-767-6773

www.macmiller.com

WA Lic No: MACDOFS980RU

36163

RISER

DIAGRAMS

HVAC

M4.5