Page 1: Future Urban networks including Penlink - at › media › 1972716 › penlink... · • The project was given an HMM profile in the LTP. Total design and construction costs were

Future Urban networks including Penlink

January 2017

Page 2: Future Urban networks including Penlink - at › media › 1972716 › penlink... · • The project was given an HMM profile in the LTP. Total design and construction costs were

2

• Networks supported by

Auckland Transport, Auckland

Council and NZTA in late 2016

Page 3: Future Urban networks including Penlink - at › media › 1972716 › penlink... · • The project was given an HMM profile in the LTP. Total design and construction costs were

3

Insert updated growth movie

Page 4: Future Urban networks including Penlink - at › media › 1972716 › penlink... · • The project was given an HMM profile in the LTP. Total design and construction costs were

4

Unitary Plan Zoning

Page 5: Future Urban networks including Penlink - at › media › 1972716 › penlink... · • The project was given an HMM profile in the LTP. Total design and construction costs were

5

Penlink - Key ObjectivesPenlink is effective in reducing traffic through the Silverdale Interchange – thereby freeing

up transport capacity for housing development in Wainui, Silverdale West and approved

development on the Whangaparoa peninsula.

WAINUI

SILVERDALE

WESTLESS TRAFFIC

MORE TRAFFIC

SILVERDALE

INTERCHANGE

GOLF COURSE

REDEVELOPMENT

TOP HARBOUR

DEVELOPMENT

Page 6: Future Urban networks including Penlink - at › media › 1972716 › penlink... · • The project was given an HMM profile in the LTP. Total design and construction costs were

6

• https://www.youtube.com/watch?v=6emPmT9V2Lg

Penlink movie

Page 7: Future Urban networks including Penlink - at › media › 1972716 › penlink... · • The project was given an HMM profile in the LTP. Total design and construction costs were

7

Penlink Project Cost

The November 2013 business case for implementation of Penlink concluded the

project:

• Achieved the strategic objectives of improved travel times, improved

network performance and the promotion of economic activity.

• Had a sound economic case with a benefit cost ratio (BCR) of 2.9, giving

it a Medium efficiency funding rating in terms of the NZTA funding profile

at the time.

• The project was given an HMM profile in the LTP.

Total design and construction costs were

estimated to be $282m plus contingency of

$72m. Funding of the project through a

tolling regime and private financing was

considered. However funding constraints

consigned the project to the second decade

in the LTP.

Page 8: Future Urban networks including Penlink - at › media › 1972716 › penlink... · • The project was given an HMM profile in the LTP. Total design and construction costs were

8

Penlink - ATAP Strategic response

Page 9: Future Urban networks including Penlink - at › media › 1972716 › penlink... · • The project was given an HMM profile in the LTP. Total design and construction costs were

9

Page 10: Future Urban networks including Penlink - at › media › 1972716 › penlink... · • The project was given an HMM profile in the LTP. Total design and construction costs were

10

Page 11: Future Urban networks including Penlink - at › media › 1972716 › penlink... · • The project was given an HMM profile in the LTP. Total design and construction costs were

11

Proposed Proposed

Page 12: Future Urban networks including Penlink - at › media › 1972716 › penlink... · • The project was given an HMM profile in the LTP. Total design and construction costs were

12

Page 13: Future Urban networks including Penlink - at › media › 1972716 › penlink... · • The project was given an HMM profile in the LTP. Total design and construction costs were

13

• Penlink – business case completed / designation

secured / early works undertaken as part

of Weiti development

• Wainui Live zones – identification of arterial roads

with land owners

• Route protection of future urban strategic corridors by

2022

Current progress