Future Submarine Through-life Support Cost Modelling in the Concept Phase
Nira Chamberlain CMath FIMA CSciModelling and Simulation Capability Lead.
![Page 2: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/2.jpg)
LSC is a Consultancy and Systems Integration services
company
LSC is a Consultancy and Systems Integration services
company
LSC Group
We work closely with clients to enhance their decision-
making capabilities
We work closely with clients to enhance their decision-
making capabilities
200 people across 4 key locations and numerous
customer sites
200 people across 4 key locations and numerous
customer sites
Defence market focus across Maritime, Air, Land & MoD
centre
Defence market focus across Maritime, Air, Land & MoD
centre
Our mission is to make complex decision-making
informed, precise and collaborative …..
Our mission is to make complex decision-making
informed, precise and collaborative …..
…enabling better decisions throughout the asset life
cycle
…enabling better decisions throughout the asset life
cycle
![Page 3: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/3.jpg)
Modelling and Simulation roles
• LSC Groups Modelling and Simulation Lead
• Future Submarine Design for Minimum Cost Manager
• Concept phase investment appraisal through life cost studies for systems selection.
![Page 4: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/4.jpg)
The Problem
• Most of the problems within the concept phase of a project are messy and complex, often entailing considerable uncertainty
![Page 5: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/5.jpg)
The Challenge
• Because of the nature of the project the cost team were being asked Demonstration Phase style questions within the concept phase.
• It was widely believed that there is a relatively small window in which significant whole life cost savings can be engineered into the boat.
![Page 6: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/6.jpg)
Window of Opportunity
• This is due to the well known fact that 75-80% of the cost of a product is determined during the design phase.
Concept Assessment Demonstration Manufacture In Service
Cumulative Life Cycle Cost
Committed CostsIncurred Costs
![Page 7: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/7.jpg)
Traditional Approach
• “Wet finger in the air”
• Cost estimates based on physical characteristics.
![Page 8: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/8.jpg)
Issues with traditional approach
• In terms of “Wet finger in the air”
• The assumptions become the solution.
• A guess will always be replaced with a guess.
![Page 9: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/9.jpg)
Issues with traditional approach
• In terms of cost estimating based on physical characteristics; finding significant cost deltas between the options proved to be problematic.
![Page 10: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/10.jpg)
The Approach
• Recognise that we are being asked different questions
• Instead of bending the client to fit the model, we have to develop the model(s) to fit the client.
![Page 11: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/11.jpg)
Modelling Philosophy
• A “guess will always be replaced by a guess but a logical argument evolves”
![Page 12: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/12.jpg)
Guess Guess Guess Guess
Concept DesignConcept Concept Design
Logical Argument
Logical Argument
Logical Argument
Logical Argument
![Page 13: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/13.jpg)
Addressing the Challenge:
![Page 14: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/14.jpg)
Addressing the Challenge:
What are the cost consequences of the design characteristics?
![Page 15: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/15.jpg)
Logical Argument Based Model
• LABM uses advanced quantitative methods, modelling, problem structuring, analytical techniques to examine assumptions, facilitate an in -depth understanding and from this develop a practical solution which is transparent and challengeable.
![Page 16: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/16.jpg)
Addressing the Challenge:
![Page 17: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/17.jpg)
Another challenge
• What happens when the client ask about maintenance cost of a system that never existed on the previous platform?
![Page 18: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/18.jpg)
Modelling Philosophy
• A “guess will always be replaced by a guess but a logical argument evolves”
![Page 19: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/19.jpg)
Addressing the Challenge:
![Page 20: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/20.jpg)
Addressing the Challenge:
![Page 21: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/21.jpg)
Addressing the Challenge:
![Page 22: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/22.jpg)
The challenge
• How can we relate cost to performance and requirement?
![Page 23: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/23.jpg)
Case Study Demonstration:
![Page 24: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/24.jpg)
Other Bespoken Cost Models
1. The Dynamical Probability Analysis Tool.
– Rapid fire but robust Monte-Carlo Simulation Tool.
2. The Spend to Save Model– Measure the effectiveness of cost reduction
strategies.
3. Heuristic Engineering Analysis Tool– Captures the Engineering Impact of costed
solutions.
![Page 25: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/25.jpg)
Integrating models into a suite of tools
LABM
DPAT
CPTO
MM
Simulation
HEAT
![Page 26: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/26.jpg)
Conclusion
• In the concept phase if the client ask you Through Life demonstration phase style of questions; it is better to adapt your model(s) to the client than trying to adapt the client to the models.
• A guess will always be replaced by a guess but a logical argument will always evolve.
![Page 27: Future Submarine Through-life Support Cost Modelling … LSC Group Presentation.… · Future Submarine Through-life Support Cost Modelling in the Concept Phase Nira Chamberlain CMath](https://reader031.vdocuments.us/reader031/viewer/2022022016/5b5d12db7f8b9ad21d8d6df1/html5/thumbnails/27.jpg)