LEADERSHIP Project Update UCPath Supporting Organizational Excellence FUTURE OPERATING MODEL FOM PAYROLL, ACADEMIC PERSONNEL, TIME KEEPING & HUMAN RESOURCES JULY 2016 KEY UCR SYSTEMS DEVELOPMENT UNDERWAY: UPDATES TO MAJOR UCR DATABASES IMPACTED BY UCPATH CREATION OF INTERFACES BETWEEN UCR SYSTEMS AND UCPATH MODIFICATIONS OF EXISTING UCR SYSTEMS FOR UCPATH AUGUST 2016 FOM | UCPath WEBSITE REDESIGN CONTINUING THROUGH AUGUST 2016 WORK IN KEY AREAS IS ON SCHEDULE: PROGRAMMING PEOPLESOFT PER UC REQUIREMENTS CONFIGURING PEOPLESOFT MODULES TO UC SPECIFICATIONS CONVERTING PPS DATA FOR UCPATH OCTOBER 2016 FIRST TEST OF CONVERTING PPS JOB AND EMPLOYEE DATA INTO THE UCPATH ENVIRONMENT COMPLETED PROJECT STATUS The current status of the project and the activities occurring within this month. MAJOR ACCOMPLISHMENTS Significant tasks accomplished within the most recent reporting period. SPOTLIGHT Major project achievement or highlight of the overall project. FACULTY & STAFF: PROJECT SMEs COLLABORATE ACROSS CAMPUS AUGUST 2016 BAS/CHASS GUARDIAN GO-LIVE SEPTEMBER 2016 PROCESS DESIGN AND OPERATING MODEL PLANS COMPLETE CAMPUS ENGAGEMENT Highlights the ways faculty, staff members and students are impacted by activities of the project. Approaching milestones and targeted dates. ON THE HORIZON FUTURE OPERATING MODEL DETAILED DESIGN CONTINUING THROUGH SEPTEMBER 2016 Project Subject Matter Experts collaborated with business units across the campus to collect information supporting the Future Operating Model business process detailed design activities. Collected data (forms, process diagrams, departmental instructions, web sites, etc.) will help optimize various UCR processes, from Onboarding to Leave Administration. The artifacts collected from across campus are as follows: AUGUST 2016 PPS DATA CLEANSING DRAFT OF PHASE 1 FOM DETAILED DESIGN APPROACH COMPLETE In an effort to improve the accuracy, efficiency, and compliance of new employee identity verification (commonly known as the I-9 process), UC is transitioning to the Guardian I-9 system, which is an end-to-end electronic I-9 solution. UCR began this transition with the successful launch, on July 1, 2016, of our early adopter units: SOM, CNAS and BAS Shared Services (University Library and University Advancement units only). This initial launch includes staff new hires only, but once UCR is fully implemented, Guardian will be used for all academic, staff and student hires. Phase Two will go live in Fall 2016 and the remainder of the campus is slated to move to the Guardian system by the August 2017, the UCPath go-live date. NOVEMBER 2016 GUARDIAN I-9 PHASE II GO-LIVE 70 EXTENDED LEAVE ADMINISTRATION 36 FAU MANAGEMENT 17 OFF-BOARDING 150 ON-BOARDING 14 POSITION MANAGEMENT ARTIFACTS COLLECTED BY BUSINESS PROCESS Using this data, UCPath SMEs and analysts from Human Resources, Academic Personnel, and Accounting will collaborate to produce detailed designs for enhanced campus business processes. AUGUST 2016 CAMPUS-WIDE COMMUNICATION & RELAUNCH OF WEBSITE CURRENT STATE I-9 PAPER PROCESS FUTURE STATE I-9 ONLINE PROCESS 16 TIME & ATTENDANCE 12 SALARY COST TRANSFER ANALYSIS AND DEFINITION OF UCPATH “DAY 1” REPORTS COMPLETED GUARDIAN I-9 EARLY ADOPTERS GO LIVE JULY 1ST, 2016 NOVEMBER 2016 UCPATH AND UCR INTERFACE TESTING UCPATH TECHNICAL DEVELOPMENT COMPLETED

Upload: dinhtuong

Post on 08-Sep-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

LEADERSHIP Project UpdateUCPathSupporting Organizational Excellence

F U T U R E O P E R AT I N G M O D E LFOM

PAYROLL, ACADEMIC PERSONNEL, TIME KEEPING & HUMAN RESOURCES JULY 2016

KEY UCR SYSTEMS DEVELOPMENT UNDERWAY:UPDATES TO MAJOR UCR DATABASES IMPACTED BY UCPATHCREATION OF INTERFACES BETWEEN UCR SYSTEMS AND UCPATHMODIFICATIONS OF EXISTING UCR SYSTEMS FOR UCPATH

AUGUST 2016

FOM | UCPath WEBSITE REDESIGN CONTINUING THROUGH AUGUST 2016

WORK IN KEY AREAS IS ON SCHEDULE:PROGRAMMING PEOPLESOFT PER UC REQUIREMENTSCONFIGURING PEOPLESOFT MODULES TO UC SPECIFICATIONSCONVERTING PPS DATA FOR UCPATH

OCTOBER 2016

FIRST TEST OF CONVERTING PPS JOB AND EMPLOYEE DATA INTO THE UCPATH ENVIRONMENT COMPLETED

PROJECT STATUSThe current status of the project and the activities occurring within this month.

MAJOR ACCOMPLISHMENTSSignificant tasks accomplished within the most recent reporting period.

SPOTLIGHTMajor project achievement or highlightof the overall project.

FACULTY & STAFF: PROJECT SMEs COLLABORATE ACROSS CAMPUS

AUGUST2016

BAS/CHASS GUARDIAN GO-LIVE

SEPTEMBER 2016

PROCESS DESIGN AND OPERATING MODEL PLANS

COMPLETE

CAMPUS ENGAGEMENTHighlights the ways faculty, staff members and students are impacted by activities of the project.

Approaching milestones and targeted dates.

ON THE HORIZON

FUTURE OPERATING MODEL DETAILED DESIGN CONTINUING THROUGH SEPTEMBER 2016

Project Subject Matter Experts collaborated with business units across the campus to collect information supporting the Future Operating Model business process detailed design activities. Collected data (forms, process diagrams, departmental instructions, web sites, etc.) will help optimize various UCR processes, from Onboarding to Leave Administration. The artifacts collected from across campus are as follows:

AUGUST2016

PPS DATA CLEANSING

DRAFT OF PHASE 1 FOM DETAILED DESIGN APPROACH COMPLETE

In an effort to improve the accuracy, efficiency, and compliance of new employee identity verification (commonly known

as the I-9 process), UC is transitioning to the Guardian I-9 system, which is an end-to-end electronic I-9 solution.

UCR began this transition with the successful launch, on July 1, 2016, of our early adopter units: SOM, CNAS and BAS

Shared Services (University Library and University Advancement units only). This initial launch includes staff new hires

only, but once UCR is fully implemented, Guardian will be used for all academic, staff and student hires. Phase Two

will go live in Fall 2016 and the remainder of the campus is slated to move to the Guardian system by the August

2017, the UCPath go-live date.

NOVEMBER 2016

GUARDIAN I-9 PHASE II GO-LIVE

70EXTENDED

LEAVE ADMINISTRATION

36FAU

MANAGEMENT

17OFF-BOARDING

150ON-BOARDING

14POSITION

MANAGEMENT

ARTIFACTS COLLECTED BY BUSINESS PROCESS

Using this data, UCPath SMEs and analysts from Human Resources, Academic Personnel, and Accounting will collaborate to produce detailed designs for enhanced campus business processes.

AUGUST2016

CAMPUS-WIDE COMMUNICATION & RELAUNCH OF

WEBSITE

CURRENT STATE I-9 PAPER PROCESS

FUTURE STATE I-9 ONLINE PROCESS

16TIME &

ATTENDANCE

12SALARY COST

TRANSFER

ANALYSIS AND DEFINITION OF UCPATH “DAY 1” REPORTS COMPLETED

GUARDIAN I-9 EARLY ADOPTERS GO LIVE JULY 1ST, 2016

NOVEMBER 2016

UCPATH AND UCR INTERFACE

TESTING