Page 1: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

For Official Use Only

Network divisions

Future operating model –

proposed structure8 March 2013

For information

Page 2: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

2 For Official Use Only

Agenda

Background

Rationale for structures

Guiding principles

Network Operations, Network Development, Engineering–

Current structure

Functions

Proposed structure

Feedback process

Implementation

Group roles

FAQs

Page 3: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

3 For Official Use Only

Background

Changes will be implemented in a manner consistent with our values.

We are seeking to achieve: •

A common structure across Endeavour Energy, Ausgrid and Essential Energy

Clearly identify the functions and objectives to be delivered in

each area

Improve efficiency, reduce duplication and reduce operating costs

Why we are making the changes •

To keep our commitment to customers to limit future network electricity price increases to CPI or less.

Page 4: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

4 For Official Use Only

Rationale for structures

Clear accountability

Structural efficiency

Minimise process handovers

Activity definition separate from activity delivery

Page 5: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

5 For Official Use Only

Guiding principles

1. Internal •

The priority will be to select internal candidates

2. Open•

The process will be open to all employees with the necessary qualifications and experience

3. Fair •

There will be a standardised application and selection process for shortlisted candidates and the interview panels will be led by the relevant Managers

The process may also include direct appointment as an option when taking into account factors such as incumbency in unchanged

positions in the new structure or redeployment of existing employees with appropriately matched skills and experience.

Page 6: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

6 For Official Use Only

Network Operations

Accountable for overall management of the network to deliver a safe, reliable and sustainable outcome

Page 7: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

7 For Official Use Only

General Manager Network Operations

David Pengilly

Executive AssistantsAmy Hill (Pt secondment)Clare Cullen (Pt)

Executive Manager

System Control &

Transmission ServicesSam Sofi

Executive Manager

Operations East

Lynton Jamieson

A/Executive Manager

Operations South

Jeff Barnsley

A/Executive Manager Lower

Hunter & Central Coast

Tom Wilcox

A/Executive Manager

Operations North

Peter Gledhill

A/Executive Manager Upper

Hunter

Steve Andrews

A/Executive Manager

Security & Management

ServicesJohn Cola

A/Executive Manager

Transmission Mains

Tony Boakes

Current structure – Network Operations

Page 8: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

8 For Official Use Only

Reg

ions

Syst

em C

ontr

ol

System Operations►Control room►Area operations / district operators►Despatch co-ordination►Emergency services►Maintain technical data and plans

Network Security►Network diagrams►Loads and ratings►Network access authorisations

Network Management►Incident response►Emergency risk►Outage management►Business continuity►Network call centre

Ope

ratio

nal P

erfo

rman

ceM

anag

emen

t

Operations Performance & Improvement►Regional operations analysis►Operational performance reporting►Benchmarking productivity & operational efficiency

Network Connections►Overall framework►Customer contact and admin. (incl. data mgnt)►Connection handling►Installation inspection / audit►Manage service standards►Quality audits of ASPs

Project Coordination►Regional coordination, portfolio & program management►Project estimation standards & templates►External stakeholder process definition►Distribution property & easement needs identification►Centralised scheduling

Works Delivery (Internal to Co.) Including:►

Identify competing demands between projects and programs of work

Distribution project design and estimation►

Local stakeholder management►

Environmental impact assessments►

Environmental, community & planning approvals

Equipment ordering & warranties►

Resource allocation to works►

Work crew switching►

Frontline customer service (for works)►

Project & maintenance delivery►

Work Types include:►

Faults and emergency works►

Preventative & corrective maintenance►

Replacement & relocation►

Installation & construction►

Decommissioning and removal►

TestingIncluding internal provision of:►

Street lighting works

Cen

tres

of

Exce

llenc

e Transmission Expertise ►

Trans. UG –

Oil & Gas Cables►

Trans. OH –

Tower Lines►

Trans./zone Substations ►

Specialised Testing►

Operational Eng. Support

Apprentice Management►Facilitation of requests & allocations►Apprentice training and assessment oversight

Network Operations – proposed functions

Page 9: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

9 For Official Use Only

Network Operations – proposed regions

Works delivery (internal to Ausgrid) Including:

►Identify competing demands between projects and programs of work

►Distribution project design and estimation

►Local stakeholder management►Environmental impact assessments►Environmental, community &

planning approvals►Equipment ordering & warranties►Resource allocation to works►Work crew switching►Frontline customer service (for

works)►Project & maintenance delivery

Work types include:►Faults and emergency works►Preventative & corrective

maintenance►Replacement & relocation► Installation & construction►Decommissioning and removal►Testing

Including internal provision of:►Street lighting works

Page 10: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

10 For Official Use Only

Network Operations – proposed operational performance management

Operations Performance & Improvement► Regional operations analysis► Operational performance reporting► Benchmarking productivity & operational efficiency

Project Coordination► Regional coordination, portfolio & program management► Project estimation standards & templates► External stakeholder process definition► Distribution property & easement needs identification► Centralised scheduling

Apprentice Management► Facilitation of requests & allocations► Apprentice training and assessment oversight

Page 11: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

11 For Official Use Only

Network Operations – proposed system control

System Operations► Control room► Area operations / district operators► Despatch co-ordination► Emergency services► Maintain technical data and plans

Network Security► Network diagrams► Loads and ratings► Network access authorisations

Network Management► Incident response► Emergency risk► Outage management► Business continuity► Network call centre

Page 12: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

12 For Official Use Only

Network Operations – proposed network connections

Network Connections► Overall framework► Customer contact and admin. (incl. data mgnt)► Connection handling► Installation inspection / audit► Manage service standards► Quality audits of ASPs

Page 13: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

13 For Official Use Only

Network Operations – proposed transmission services

Transmission Expertise ►Trans. UG –

Oil & Gas Cables

►Trans. OH –

Tower Lines►Trans./zone Substations ►Specialised Testing►Operational Eng. Support

Page 14: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

14 For Official Use Only

Proposed structure – Network Operations

8 March 2013

General Manager Network

Operations

Region -

South

Operational Performance Management

System Control

Network Connections

Transmission Services

Region -

Central

Region -

North

Page 15: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

15 For Official Use Only

Network Development

Accountable for overall program management and delivery of network capital and maintenance programs

Page 16: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

16 For Official Use Only

General Manager Network Development

Brett Hooper

Executive AssistantBelinda Thompson

Interim Manager Technical

Ross Hughes

Manager Investment

Development & Analysis

Greg Harris

Exec Manager Distribution Contracts

Ian Whitehurst

A/Manager Project

Development & Approvals

Wilma Penrose

Interim Manager Portfolio

Program & Project Office

Peter Eedy

Exec Manager Projects

John Merlino

Manager Works Co- ordination

Unit

Judith Meeske

25 February 2013

Exec Manager Maintenance

& Replacement

PlanningCraig Moody

Exec Manager Safety, People

& Change

Martene

Archer

A/Manager Engineering

Policy (Barangaroo)

Mark de Lacey

Current structure – Network Development

Page 17: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

17 For Official Use Only

Network Development – proposed functions

Project Management►

End to end management of major projects ►

Resolve competing demands between projects►

Equipment ordering and warranties►

Post implementation reviews►

Contract management (ie

external delivery contracts)

Engineering Design & Development ►

For transmission & externally delivered distribution projects►

Engineering, electrical, civil, mechanical and protection design►

Environmental, community & planning approvals►

Environmental impact assessments►

Environmental assessment framework for projects►

External stakeholder management►

Project estimates►

Property & easements (needs / identification)►

Project and program approval

Major ProjectsPortfolio Management Office

Capital Programs

Network Company Portfolio Management►Resource & delivery planning►Project & program budgeting & reporting►Commercial delivery support►Project documentation governance, change control►Benchmarking internal versus external

Program Management►End to end management of capital programs►Resolve competing demands between programs►Contract management (ie

external delivery contracts)

Project DevelopmentNetwork Services / Maintenance

Network Services / Maintenance►End to end management of maintenance programs►Resolve competing demands between maintenance programs►Contract management (ie

external delivery contracts)

Governance Framework►Governance framework development and management►Manage risk assessed prioritisation and optimisation for Networks NSW►Change management

Portfolio and Program Reporting►Capital and maintenance performance and delivery reporting for Networks NSW►Metric development and benchmarking

Net

wor

ks N

SWN

etw

ork

Bus

ines

ses

Page 18: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

18 For Official Use Only

Network Development – proposed PMO

Portfolio Management Office

Network Company Portfolio Management►Resource & delivery planning►Project & program budgeting & reporting►Commercial delivery support►Project documentation governance, change control►Benchmarking internal versus external

Page 19: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

19 For Official Use Only

Network Development – proposed project development

Engineering Design & Development ►For transmission & externally delivered distribution projects►Engineering, electrical, civil, mechanical and protection design►Environmental, community & planning approvals►Environmental impact assessments►Environmental assessment framework for projects►External stakeholder management►Project estimates►Property & easements (needs / identification)►Project and program approval

Project Development

Page 20: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

20 For Official Use Only

Network Development – proposed major projects

Project Management►End to end management of major projects ►Resolve competing demands between projects►Equipment ordering and warranties►Post implementation reviews►Contract management (ie

external delivery contracts)

Major Projects

Page 21: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

21 For Official Use Only

Network Development – proposed capital programs

Capital Programs

Program Management►End to end management of capital programs►Resolve competing demands between programs►Contract management (ie

external delivery contracts)

Page 22: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

22 For Official Use Only

Network Development – proposed services/maintenance

Network Services / Maintenance►End to end management of maintenance programs►Resolve competing demands between maintenance programs►Contract management (ie

external delivery contracts)

Page 23: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

23 For Official Use Only

Project DevelopmentPMO Major Projects

General Manager Network

Development

Capital Programs

Network Services

Maintenance

Proposed structure – Network Development

8 March 2013

Page 24: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

24 For Official Use Only

Engineering

Accountable for stewardship of the network

Page 25: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

25 For Official Use Only22 October 2012

Chief Engineer

Pamela Henderson

A/Chief Technology

OfficerAdrian Clark

A/Exec Manager

Major Customer

ConnectionsRob Baxter

A/GM Design & Engineering

Terry Lampard

Executive Manager System

Planning Neil Gordon

A/Executive Manager

Distribution Services

Peter Gaudron

A/Executive AssistantKathy Panas

Current structure – Engineering

Page 26: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

26 For Official Use Only

Specifications►

Technical asset specifications►

Factory accreditation►

Technical compliance review►

Training requirements

Prim

ary

Syst

ems

Engi

neer

ing

Chief Engineer – proposed functions

Network Standards►

Definition of standards►

Application of standards

Network Performance Management►Network performance monitoring & reporting►Asset performance monitoring and reporting►Asset incident investigations►Non compliance investigations►Licence compliance

Electrical Safety►

Electrical Safety Rules

Electrical Safety Rules and other technical curriculum development

Authorisations (inc ASP)

Safety rules compliance & investigations

CE to be point of accountability for policy but all to contribute to polices related to their area under leadership of Group

Elec

tric

al S

afet

y &

A

utho

risat

ions

Seco

ndar

ySy

stem

s En

gine

erin

g

Network Standards►

Definition of standards ►

Application of standards

Specifications►

Technical asset specifications►

Factory accreditation►

Technical compliance review►

Training requirements►

Protection, SCADA, AF settings

Network Technology Leadership►

Pilots & trials, change mgmt.►

Network telecoms. plan

Asset Specific Expertise►

Detailed asset analysis & advice►

Asset Documentation & Manuals

AM Plan Development►

Develop asset management plans►

Develop network strategies (tactical responses) –

ie

planning, metering, risk management

Network Planning►

Growth, Reliability, Maintenance & Renewal planning

Forecasting

Needs analysis

Option analysis (inc Demand Management)

Program and project initiation / approval►

Major network connections analysis (as support to Network Connections group)

Network Asset Information►

Information strategy –

inc AMS & GIS►

Specification of requirements►

Oversight of major platform changes►

Master data management (eg

cadastre slides)►

Data issue for 3rd

party use (incl. DBYD)►

Field data collection & entry (cable recorders)►

GIS data entry

Net

wor

k &

Ass

et P

lann

ing

Net

wor

k &

Ass

et P

erfo

rman

ce

Rep

ortin

g an

d In

form

atio

n M

anag

emen

t

Page 27: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

27 For Official Use Only

Chief Engineer – proposed primary systems

Specifications► Technical asset specifications► Factory accreditation► Technical compliance review► Training requirements

Primary Systems Engineering

Network Standards► Definition of standards► Application of standards

Asset Specific Expertise►Detailed asset analysis & advice►Asset Documentation & Manuals

Page 28: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

28 For Official Use Only

Chief Engineer – proposed secondary systems

Secondary Systems Engineering

Network Standards►Definition of standards►Application

of standards

Specifications► Technical asset specifications► Factory accreditation► Technical compliance review► Training requirements► Protection, SCADA, AF settings

Network Technology Leadership► Pilots & trials, change mgmt.► Network telecoms. plan

Page 29: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

29 For Official Use Only

Chief Engineer – proposed planning

AM Plan Development► Develop asset management plans

► Develop network strategies (tactical responses) –

ie

planning, metering, risk management

Network Planning► Growth, Reliability, Maintenance & Renewal planning

Forecasting

Needs analysis

Option analysis (inc Demand Management)

Program and project initiation / approval

► Major network connections analysis (as support to Network Connections group)

Network & Asset Planning

Page 30: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

30 For Official Use Only

Chief Engineer – proposed performance

Network Performance Management► Network performance monitoring & reporting► Asset performance monitoring and reporting► Asset incident investigations► Non compliance investigations► Licence compliance

Network Asset Information► Information strategy –

inc AMS & GIS

► Specification of requirements► Oversight of major platform changes► Master data management (eg

cadastre slides)

► Data issue for 3rd

party use (incl. DBYD)► Field data collection & entry (cable recorders)► GIS data entry

Network & Asset Performance Reporting and Information Management

Page 31: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

31 For Official Use Only

Chief Engineer – proposed electrical safety

Electrical Safety► Electrical Safety Rules► Electrical Safety Rules and other technical curriculum development► Authorisations (inc ASP)► Safety rules compliance & investigations

Electrical Safety & Authorisations

Page 32: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

32 For Official Use Only

Proposed structure – Engineering

Secondary Systems

Engineering

Primary Systems

Engineering

Network & Asset Planning

Chief Engineer

Performance Reporting & Information

Management

Electrical Safety & Authorisations

8 March 2013

Page 33: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

33 For Official Use Only

Next steps

Review of proposed structure

Feedback on the proposed structure is welcomed and should be

provided to David Pengilly/Brett Hooper/Pamela Henderson by COB

15 March.

Should you have questions on the proposed structure, contact

David/Brett/Pamela to discuss

The same information and timelines have been provided to unions

for their feedback.

Page 34: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

34 For Official Use Only

Implementation

Feedback will be considered

Structure and position descriptions will then be finalised incorporating any relevant feedback. You will be provided with copies of the final structure once consultation has been completed

Recruitment process will be confirmed and communicated with you. The recruitment process will then begin for new roles in line with the

guiding principles

Page 35: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

35 For Official Use Only

FAQs

How do I provide feedback on the draft structure?Feedback should be provided directly to David Pengilly/Brett Hooper/Pamela Henderson via email

What if I have questions on the proposed structure? Contact David/Brett/Pamela to discuss your questions on the proposed structure.

When can I see the position descriptions? Position descriptions will be provided once feedback on the structure has been received and considered.

What happens in the meantime? Business as usual will be conducted during the consultation and implementation stage. We thank you for your patience and support during this time of change.

Will I have to reapply for my position? Where the role is unchanged, there will be no need to reapply. However, you will have the opportunity to apply for a new role.

What is happening with Group positions?

Further details of these positions and the application process will be provided shortly.

Page 36: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

36 For Official Use Only

Questions?

Page 37: Future operating model – proposed structure 8 March 2013 · admin. (incl. data mgnt) Connection handling Installation inspection / audit Manage service standards Quality audits

37 For Official Use Only

Employee Assistance Program (EAP)

Independent, confidential counselling service

To make an appointment contact PPC Worldwide

Tel 1300 361 008–

www.au.ppcworldwide.com

[email protected]

Further information is available on The Wire