futaba presentation futaba europe gmbh november 2009
TRANSCRIPT
![Page 1: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/1.jpg)
Futaba Presentation
Futaba Europe GmbH November 2009
![Page 2: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/2.jpg)
VFD Operation Principle
- applied voltage heats up filament which causes thermionic emission
- when positive voltage is applied to grids, electrons are accelerated towards anodes
- when positive voltage is applied to phosphor coated anode, electrons collide with anodes and excite phosphor resulting in light emission
![Page 3: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/3.jpg)
Function of Grids and Anodes
Non Light Emmision
(Grid - & Anode +/-)
Light Emmision
(Grid + & Anode +)
Non Light Emmision
(Grid + & Anode -)
![Page 4: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/4.jpg)
Lead
Getter
ExhaustTip
Grid
GlassSubstrate
ContactLead
AnodeWiring
InsulationLayer
Filament
Anode
VFD Construction
![Page 5: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/5.jpg)
GND
Grid
Ano
de
CLK
LAT
SI
BK
VDD
VH
Filament
VFDDriv
er C
hip
VFD Driver
Base Glass
Filament LeadIC Input LeadFilament Lead
CIG (Chip-in-Glass) VFD Construction
![Page 6: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/6.jpg)
How to drive a Graphic CIG VFD ?
![Page 7: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/7.jpg)
CIG Shift Registor Operation
Driver
Block Diagram
Driver
Timing Chart
![Page 8: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/8.jpg)
Grid Scan Timing
![Page 9: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/9.jpg)
Anode & Grid Construction (e.g. GP1184AI)
![Page 10: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/10.jpg)
Anode & Grid Timing (e.g. GP1184AI)
![Page 11: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/11.jpg)
Grid 1 Grid 2
Anode & Grid Timing Sequence
![Page 12: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/12.jpg)
Grid 1 Grid 2
Anode & Grid Timing Sequence
![Page 13: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/13.jpg)
Grid 3Grid 2
Anode & Grid Timing Sequence
![Page 14: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/14.jpg)
Anode & Grid Timing Sequence (e.g. GP1184AI)
![Page 15: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/15.jpg)
Anode & Grid Timing Sequence
![Page 16: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/16.jpg)
Anode & Grid Timing Sequence
![Page 17: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/17.jpg)
Shift Register Block Diagram
Anode Data (128bit) Grid Data (64 bit)
![Page 18: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/18.jpg)
Shift Register Assignment
Anode Data
Grid Data
![Page 19: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/19.jpg)
Dimming
![Page 20: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/20.jpg)
VFD Power Supply Methods
![Page 21: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/21.jpg)
Power Supply Solution 1: Royer circuit
Advantage: low component cost & high input voltage possible
Disadvantage: custom designed transformer required
![Page 22: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/22.jpg)
Power Supply Solution 2:
For small Displays(high voltage)
LM9022
MC34063
Disadvantage:
higher component cost
& max. 5Vdc input
Advantage:
only standard
components required
![Page 23: Futaba Presentation Futaba Europe GmbH November 2009](https://reader031.vdocuments.us/reader031/viewer/2022020105/5513e40f55034646298b5a13/html5/thumbnails/23.jpg)
Cut-off Bias Requirement (Ek)
Background: Electron Leakage