8/22/2019 FSS BW Operations -Scheduling,Delete a Job,Descheduling
1/15
PROCEDURE FOR SCHEDULING , DESCHEDULING ,HOW TO DELETE A JOB
Document Version / Dtails : Ver 1.0 / 22-APR-11
Record of Release
VersionNo.
Created / Modified By Reviewed By Release Date Modifications Done
1.0 Kishore Kumar Challa Kush Kashyap,Venkat RamanaReddy,pawan KumarChaturvedi
22/04/2011
Project ID: Project Name: FSS BW Operation
-
8/22/2019 FSS BW Operations -Scheduling,Delete a Job,Descheduling
2/15
Document Title:PROCEDURE FOR SCHEDULING,DESCHEDULING,DELETE OF THE JOB
PM-03-04
Ver 1.0/22-APR-11
Page 2 of 15
Scope of Document: This document helps us in Scheduling and Descheduling of the process chains and to
delete a job.
SCHEDULING
Step1: Go to sa38 transaction in the BW system.
Step2: Execute the program /SSA/BWT by clicking the execute button.
Step3: Execute the process chains by clicking the execute button.
Step4: Click the process chain analysis.
-
8/22/2019 FSS BW Operations -Scheduling,Delete a Job,Descheduling
3/15
Document Title:PROCEDURE FOR SCHEDULING,DESCHEDULING,DELETE OF THE JOB
PM-03-04
Ver 1.0/22-APR-11
Page 3 of 15
Step5: Provide the start date from where we want to see the running process chains from that date.
Generally start date will be given as one week before from the current date.
Click on the Execute button.
Step6: The following screen will appear showing the chains running from the start date.
Now we are going to schedule a process chain.
In this case we will schedule the preclosing chain ZCHECK_PC
Click on the log id of the process chain ZCHECK_PC
Step7: Then the following screen will come which will show the process flow ofZCHECK_PC
-
8/22/2019 FSS BW Operations -Scheduling,Delete a Job,Descheduling
4/15
Document Title:PROCEDURE FOR SCHEDULING,DESCHEDULING,DELETE OF THE JOB
PM-03-04
Ver 1.0/22-APR-11
Page 4 of 15
Click on the planning view button.
The following screen will appear.
Step8: Right click on the start and click the display variant
-
8/22/2019 FSS BW Operations -Scheduling,Delete a Job,Descheduling
5/15
Document Title:PROCEDURE FOR SCHEDULING,DESCHEDULING,DELETE OF THE JOB
PM-03-04
Ver 1.0/22-APR-11
Page 5 of 15
Step9: The following screen will appear .
In that click on the change button.
And click on the change selections button.
.
Step4: The following screen will come and we will provide the scheduled start time and start date.
In this there are several tabs such as immediate with which we can immediately run a processchain.
After job: with which we can we can run a process chain after a given job is completed
After event: with which we can we can run a process chain after given event is given
Date/Time: The job will start at the date and time specified, subject to job priority and theavailability of background work processes.
Since ZCHECK_PC load which will run multiple times in a time gap .so that time gap we canprovide in the periodic values.
-
8/22/2019 FSS BW Operations -Scheduling,Delete a Job,Descheduling
6/15
Document Title:PROCEDURE FOR SCHEDULING,DESCHEDULING,DELETE OF THE JOB
PM-03-04
Ver 1.0/22-APR-11
Page 6 of 15
We have selected the check box of periodic job
If we click the periodic values the following screen will appear.
If we click on the other period
Here we have provided that chain run should run for every 3 hours
Step5: we will save everything by clicking the save button.
Click on the save button. Click on the schedule button
-
8/22/2019 FSS BW Operations -Scheduling,Delete a Job,Descheduling
7/15
Document Title:PROCEDURE FOR SCHEDULING,DESCHEDULING,DELETE OF THE JOB
PM-03-04
Ver 1.0/22-APR-11
Page 7 of 15
Step6: Then the following screen will appear.
Step7: After clicking the tick mark the following screen will appear.
Select standard priority C
Step8: After clicking the tick mark the following screen will appear showing us that chain was activatedand scheduled.
In this way scheduling will be done.
-
8/22/2019 FSS BW Operations -Scheduling,Delete a Job,Descheduling
8/15
Document Title:PROCEDURE FOR SCHEDULING,DESCHEDULING,DELETE OF THE JOB
PM-03-04
Ver 1.0/22-APR-11
Page 8 of 15
HOW TO DELETE A JOB
Step1: Go to RSPC1 transaction in the BW system.
Step2: The following screen will appear
Step3: Provide the require process chain id which we want to deschedule.
And click on the execute button
The process chain will be displayed
-
8/22/2019 FSS BW Operations -Scheduling,Delete a Job,Descheduling
9/15
Document Title:PROCEDURE FOR SCHEDULING,DESCHEDULING,DELETE OF THE JOB
PM-03-04
Ver 1.0/22-APR-11
Page 9 of 15
After right click on the start of the process chain the following process screen will come.
Step4: Click on the displaying scheduling job(s)
The following screen will appear
Step5: Select the job and click the delete button.
The following screen will come.
Click on yes.
Then the following screen will come.
This implies that job has been deleted. In this way the jobs will be deleted.
-
8/22/2019 FSS BW Operations -Scheduling,Delete a Job,Descheduling
10/15
Document Title:PROCEDURE FOR SCHEDULING,DESCHEDULING,DELETE OF THE JOB
PM-03-04
Ver 1.0/22-APR-11
Page 10 of 15
ANOTHER WAY OF DELETING A JOB
This is screen what we get after going into transaction SA38.
These are all the process chains which are running from the start date what we have given.
Step1: Click on the logid of the process chain which we want to delete the job from the server
The following screen will appear
Step2: Click on the planning view button.
-
8/22/2019 FSS BW Operations -Scheduling,Delete a Job,Descheduling
11/15
Document Title:PROCEDURE FOR SCHEDULING,DESCHEDULING,DELETE OF THE JOB
PM-03-04
Ver 1.0/22-APR-11
Page 11 of 15
The following screen will appear
After right click on the start of the process chain the following process screen will come.
Step4: Click on the displaying scheduling job(s)
The following screen will appear
Step5: Select the job and click the delete button.
The following screen will come.
-
8/22/2019 FSS BW Operations -Scheduling,Delete a Job,Descheduling
12/15
Document Title:PROCEDURE FOR SCHEDULING,DESCHEDULING,DELETE OF THE JOB
PM-03-04
Ver 1.0/22-APR-11
Page 12 of 15
Click on yes.
Then the following screen will come.
This implies that job has been deleted. In this way the jobs will be deleted
Descheduling continues.
-
8/22/2019 FSS BW Operations -Scheduling,Delete a Job,Descheduling
13/15
Document Title:PROCEDURE FOR SCHEDULING,DESCHEDULING,DELETE OF THE JOB
PM-03-04
Ver 1.0/22-APR-11
Page 13 of 15
DESCHEDULING
Step1: In this case we will schedule the preclosing chain ZCHECK_PC
Click on the log id of the process chain ZCHECK_PC
Step2: Then the following screen will come which will show the process flow ofZCHECK_PC
Step3: Click on the planning view button.
-
8/22/2019 FSS BW Operations -Scheduling,Delete a Job,Descheduling
14/15
Document Title:PROCEDURE FOR SCHEDULING,DESCHEDULING,DELETE OF THE JOB
PM-03-04
Ver 1.0/22-APR-11
Page 14 of 15
The following screen will appear.
Step4: Select the start of the ZCHECK_PC
Click on the execution tab
In that click the remove from schedule
In this way the process chain will be descheduled.
-
8/22/2019 FSS BW Operations -Scheduling,Delete a Job,Descheduling
15/15
Document Title:PROCEDURE FOR SCHEDULING,DESCHEDULING,DELETE OF THE JOB
PM-03-04
Ver 1.0/22-APR-11
Page 15 of 15