fsh 2409.18 timber sale preparation handbookchapter …
TRANSCRIPT
![Page 1: FSH 2409.18 TIMBER SALE PREPARATION HANDBOOKCHAPTER …](https://reader035.vdocuments.us/reader035/viewer/2022071613/61575c77b2ca00337a49babf/html5/thumbnails/1.jpg)
FOREST SERVICE HANDBOOK PACIFIC SOUTHWEST REGION (R5) VALLEJO, CALIFORNIA FSH 2409.18 TIMBER SALE PREPARATION HANDBOOK CHAPTER 30 - PROJECT ANALYSIS AND DESIGN - GATE 2
Supplement No.: 2409.18-2019-1
Effective Date: 4/25/2019
Duration: This supplement expires 5 years from the effective date unless superseded orremoved earlier.
Approved: Randy Moore, Regional Forester
Date Approved: 4/11/2019
Posting Instructions: Handbook supplements are numbered consecutively by Handbooknumber and calendar year. Post by document; remove the entire document and replace it with this supplement. Retain this transmittal as the first page(s) of this document.
Last Change: 2409.18 Chapter 40, Change 2018-2, Date 11/2/2018
New Document: 2409.18_30
Superseded Document(s): 2409.18-2014-1
Digest: Reviewed and made only minor style changes.
![Page 2: FSH 2409.18 TIMBER SALE PREPARATION HANDBOOKCHAPTER …](https://reader035.vdocuments.us/reader035/viewer/2022071613/61575c77b2ca00337a49babf/html5/thumbnails/2.jpg)
FSH 2409.18 TIMBER SALE PREPARATION HANDBOOK CHAPTER 30 - PROJECT ANALYSIS AND DESIGN - GATE 2 Supplement No.:2409.18-2019-1 - Effective Date: 4/25/2019
P a g e 2
TABLE OF CONTENTS 31.2 – Documentation ............................................................................................................. 3
![Page 3: FSH 2409.18 TIMBER SALE PREPARATION HANDBOOKCHAPTER …](https://reader035.vdocuments.us/reader035/viewer/2022071613/61575c77b2ca00337a49babf/html5/thumbnails/3.jpg)
FSH 2409.18 TIMBER SALE PREPARATION HANDBOOK CHAPTER 30 - PROJECT ANALYSIS AND DESIGN - GATE 2 Supplement No.:2409.18-2019-1 - Effective Date: 4/25/2019
P a g e 3
31.2 – Documentation Use regional form R5 2400-202 to document cutting unit information to facilitate sale plan implementation at Gate 3.
![Page 4: FSH 2409.18 TIMBER SALE PREPARATION HANDBOOKCHAPTER …](https://reader035.vdocuments.us/reader035/viewer/2022071613/61575c77b2ca00337a49babf/html5/thumbnails/4.jpg)
![Page 5: FSH 2409.18 TIMBER SALE PREPARATION HANDBOOKCHAPTER …](https://reader035.vdocuments.us/reader035/viewer/2022071613/61575c77b2ca00337a49babf/html5/thumbnails/5.jpg)
![Page 6: FSH 2409.18 TIMBER SALE PREPARATION HANDBOOKCHAPTER …](https://reader035.vdocuments.us/reader035/viewer/2022071613/61575c77b2ca00337a49babf/html5/thumbnails/6.jpg)
FOREST SERVICE HANDBOOK PACIFIC SOUTHWEST REGION (R5) VALLEJO, CALIFORNIA FSH 2409.18 TIMBER SALE PREPARATION HANDBOOK CHAPTER 30 - PROJECT ANALYSIS AND DESIGN - GATE 2
Supplement No.: 2409.18-2019-1
Effective Date: 4/25/2019
Duration: This supplement expires 5 years from the effective date unless superseded or removed earlier.
Approved: Randy Moore, Regional Forester
Date Approved: 4/11/2019
Posting Instructions: Handbook supplements are numbered consecutively by Handbook number and calendar year. Post by document; remove the entire document and replace it with this supplement. Retain this transmittal as the first page(s) of this document.
Last Change: 2409.18 Chapter 40, Change 2018-2, Date 11/2/2018
New Document: 2409.18_30
Superseded Document(s): 2409.18-2014-1
Digest: Reviewed and made only minor style changes.
![Page 7: FSH 2409.18 TIMBER SALE PREPARATION HANDBOOKCHAPTER …](https://reader035.vdocuments.us/reader035/viewer/2022071613/61575c77b2ca00337a49babf/html5/thumbnails/7.jpg)
FSH 2409.18 TIMBER SALE PREPARATION HANDBOOK CHAPTER 30 - PROJECT ANALYSIS AND DESIGN - GATE 2 Supplement No.:2409.18-2019-1 - Effective Date: 4/25/2019
P a g e 2
TABLE OF CONTENTS 31.2 – Documentation ............................................................................................................. 3
![Page 8: FSH 2409.18 TIMBER SALE PREPARATION HANDBOOKCHAPTER …](https://reader035.vdocuments.us/reader035/viewer/2022071613/61575c77b2ca00337a49babf/html5/thumbnails/8.jpg)
FSH 2409.18 TIMBER SALE PREPARATION HANDBOOK CHAPTER 30 - PROJECT ANALYSIS AND DESIGN - GATE 2 Supplement No.:2409.18-2019-1 - Effective Date: 4/25/2019
P a g e 3
31.2 – Documentation Use regional form R5 2400-202 to document cutting unit information to facilitate sale plan implementation at Gate 3.