Page 1: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

FRP Plant (160 TTPY products)

1

Page 2: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

2

Page 3: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

100

155

220

0

50

100

150

200

250

Today Tomorrow (5.5%) Tomorrow (12%)

KT

Total Production and Consumption of Aluminum Flat Products in IRAN

Total (Tons)

Total Production 45000

Consumption 100,000

Persian Gulf Zone GARMCO Foil, Bahrain- 40,000 Tons foil-Usage 120,000 in 2012-ME

’Based on Global Growth

5.5% CAGR

IRAN’s Demand Outlook, 2025

Based on Internal Growth (12%)

3

Page 4: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

Technical specifications of the

proposed line for producing

1- 20TTPY hot sheet

2- 90TTPY Foil

3-50TTPY Can Sheet (body and

end)

Minimum 2+1 rolling stands for hot rolling

One 4-Hi and one 6-Hi cold roll

Pusher furnace for homogenizing and pre-heating

4 melting furnace, 2 holding furnace, 2 slab caster

2 annealing furnace4

Page 5: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

Financial Analysis´ Based on 2000$/T ingot price, average product price is around 3700$/t

´ IRR ≈ 19.77

´ Estimated total Capex ≈ 560,000 Euro

5

Page 6: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

location6

ÿ Ò ÿ ÿ² Ðã B’

Parsian Energy Intesive Industries Special zone

Lamerd special zone

Page 7: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

Graphite Electrode´ Total investment: 208 m Euro

´ Capacity: 30 TTPY

´ Location: Iran, Yazd Province, Ardakan

´ Invested up to now ≈ 17 m Euro

´ All the infrastructures of the project are ready and installed

7

Page 8: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

Persian Gulf alumina refinery plant

MTPY of primary aluminum. Based on that, 1.5 is to produce 2025 Iran’s plan for

. So we have planned to establish an MTPY alumina3 about we will need

in southern part of Iran MTPA1.6 alumina plant with the capacity of

(PARSIAN Energy intensive Industries Special Zone, the site location is

attached) based on imported Bauxite.

8

Page 9: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

Scope of Works of Persian Gulf alumina refinery plant1. Introduction

Persian Gulf Alumina Refinery Plant owned by Iranian Mines and Mining Industries Development and Renovation Organization (IMIDRO) will be located in PARSIAN Energy intensive Industries Special Zone (PSZ) at HormozganProvince, 30 km east of Assaluyeh Airport, and 1.5 km from Jetty Facilities at Persian Gulf.

State-owned Iranian Mines and Mining Industries intention is to construct an Alumina Refinery Plant in the PARSIAN Zone in order to produce Alumina for feeding Aluminium Plants in the country.

2. Production Capacity

The overall capacity of Persian Gulf Alumina Refinery Plant is 1.6 metric million tons per year Alumina. The Bauxite feed for the plant will be imported.

3. Refinery Plant Description

The Persian Gulf Alumina Refinery Plant will include but not limited the following sections.

´ Process Units: considering all required process units and the area required for future expansion of process units and equipment.

´ Utility Units: considering all required utility units and the area required for future expansion of Utility Units and equipment.

´ Semi-industrial and non-industrial buildings

´ Site Common Facilities and misc. services

9

Page 10: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

ÿ Ò ÿ ÿ ÐãBÐÄ

Parsian Energy Intesive Industries Special zone

location10

Page 11: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

Financial Analysis

´ IRR ≈ 13.5

´ Estimated total Capex ≈ 1,000,000 Euro

11

Page 12: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

The Proposed Process Block Diagram12

Page 13: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

Petroleum Coke production plant Establishment Project

Page 14: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

Project Description´ Iranian Mines & Mining Industries Development & Renovation Organization (IMIDRO)

has the project to construct a grassroots anode grade coke production unit at ArvandFree Zone,Khoramshahr,Khoozestan Province,Iran.

´ This project is defined in order to meet the needs of Aluminum, Steel and other ferroalloy industries in the country.

´ The plant will target a 200 Kt/y anode grade production considering 27000 BPD of feed constituted by 75% of Vaccum residue (VR) and 25% of Clarified slurry oil (CSO).

Page 15: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

Project Location

Page 16: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

Petroleum Coke in Aluminum industries :According to coke consumption in Aluminum industry production, Calcined petroleum coke consumption is equal to 450 kg per tone for Aluminum, currently needed consumption rate in the country is estimated around 202 thousand ton which is provided from china.in accordance with country’s industrial development vision for 2025, with production of 1.5 million ton Aluminum, this consumption rate will reach to approximately 675 thousand calcined coke. In this regard Establishment of Petroleum coke production plant is one of the Aluminum Industry's priorities.

Page 17: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

Actions taken so far

• Opening the pilot of project Sep.2015.• Allocating and purchasing a land (50 Hectare)

from IMIDRO.• Receiving Environmental License.• Receiving feed allocation license from Oil

Ministry.• conducting B.F.S By Axens.• Selecting a contractor for wall operation for

project plan.

Page 18: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

Opening of the pilot in sep.2015

Pilot

Page 19: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

Produced Products Capacity:

Capacity Kt/y Product

172Coke

244VGO

715Gasoil

213Naphtha

2019

C3C4

43Sulfur

Page 20: FRP Plant (160 TTPY products) - IMIDROimidro.gov.ir/parameters/imidro/modules/cdk/upload/...100 155 220 0 50 100 150 200 250 Today Tomorrow (5 . 5 %) Tomorrow (12 %) T Total Production

Economic Results:Economic Index:

900 MM €Total Capital Requirement

22.6%Internal rate of Return

40 % Internal rate of Return on Equity capital

131% Profitability Index

4yr Pay out Time