    ADVANCE POLYELECTRIC SYSTEMS, INC.25-B Bayani St., Brgy. San Isidro, Galas, Quezon City

    Tel. No. 413-3806 / Telefax No. 731-5238______________________________________________________________________

    REF: QPE10-124

    September 18, 2010

    FRONTIER POWER TECHNOLOGIESAguilar Compound, 683 Magsaysay Road,Bgy. San Antonio,San Pedro, Laguna

    Attention : MIKE KAQUILALASubject : INSTALLATION OF 1500KW PRIME GENSET AND

    CONSTRUCTION OF GENSET HOUSEProject : FORT BONI

    Dear Sir:

    We are pleased to submit our quote for the above stated subject as follows:Supply of labor and materials with technical supervision and use of tools for the following scope of works:

    Fort Boni PS New 1500KW GENSET Schedule of Quantities

    ITEM

    NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL

    A GENERAL ITEMS

    1. Mobilization/Demobilization Lot 1 50,000.00 50,000.00

    2 Implementation of construction Health and SafetyProgram

    Lot 1 30,000.00 30,000.00

    3 Permits Lot 1 100,000.00 100,000.00

    Sub-total 180,000.00

    B ELECTRO-MEECHANICAL-CIVIL WORKS (Design,Supply, Construction and Installation)

    1 Design, supply and construction of genset houserated for 1500 KW

    Lot 1 1,260,000.00 1,260,000.00

    2 Genset house soundproofing ( 50mm thk Rockwool

    type, 2-hours fire rated)

    Lot 1 700,000.00 700,000.00

    3 Supply and installation of main feeder breaker(3200At) rated for genset to be located at existingMCC (GCB)

    Lot 1 375,000.00 375,000.00

    4 Re-routing / tapping of existing tapping point of1135KW genset (existing) to other side of MCCbusbar

    Lot 1 150,000.00 150,000.00

    5 Supply and installation of mechanical and electricalinterlocking device system for Meralco and gensetpower switching

    Lot 1 250,000.00 250,000.00

    6 Fuel Tank, Transfer pump and Fuel piping Lot 1 400,000.00 400,000.00

  • 8/8/2019 Frontier Fort Bonil 124[1]

    2/2

    7 Exhaust muffler Lot 1 300,000.00 300,000.00

    8 Radiator duct Lot 1 80,000.00 80,000.00

    9 3,200AT, ACB, ATS Lot 1 950,000.00 950,000.00

    10 Supply and installation of 8 sets:3x250mm THHNfrom genset to GCB

    Lot 1 795,000.00 795,000.00

    11 Supply and installation of 8 sets:3x250mm THHNfrom GCB to MTS

    Lot 1 4,257,000.00 4,257,000.00

    12 Supply and installation of 8 sets:3x250mm THHNfrom MTS to existing MDP

    Lot 1 1,175,000.00 1,175,000.00

    13 Testing and commissioning (ASSIST) Lot 1 50,000.00 50,000.00

    Sub-total 10,742,000.00

    Grand-total 10,922,000.00

    TERMS AND CONDITIONS:

    A. Payment : 30% Downpayment balance thru progress billingB. Completion : Within 90 days from receipt of PO, downpayment

    and approval of shopdrawings whichever comes latest.

    C. Warranty : One (1) year on materials against force majeure

    D. Validity : One (1) month from receipt of this quote.

    Thank you very much for giving us the opportunity to quote. We look forward to have a good workingrelationship with you.

    Truly yours,

    MANOLITO M. GAMBOAGeneral Manager