Page 1: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

Benjamin FISCHER, Maksym KUTSENKO

Fronius International GmbH

Froniusplatz 1, 4600 Wels FRONIUS IN UKRAINE

Page 2: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

2000 FEMALE HEADED HOUSEHOLDS

Page 3: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

3

HOW IT ALL BEGAN

PETTENBACH

1945

Page 4: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

4

STABILITY ACROSS THE GENERATIONS

IN FAMILY

OWNERSHIP

YESTERDAY,

TODAY AND

BEYOND

Page 5: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

3 BU’S – ONE GOAL – CONVERTING ELECTRICITY

Page 6: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

> 1.500.000

Installed inverters

worldwide

FRONIUS IN NUMBERS

4.500Employees

13 GW

Installed inverter

power

95% Export

17 TWhProduced

energy/year

661 mio. €

Turnover 2017

28International

subsidiaries

4.140

Fronius Service

Partner

>250.000

Solar.web user

Page 7: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

Solar Energy

Page 8: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

FRONIUS SUNRISE (SINCE 1992)

/ still running (at Mr. Panhuber‘s house since 26 years working

without any failure)

/ still offering service if needed

/ partnership without expiry date!

Page 9: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

WHAT DRIVES US…

Page 10: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

SOLAR.WEB PREMIUM – IN KYRILLIC

Page 11: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

FRONIUS UKRAINE – LOCAL TRAININGS & WEBINARS (TSA/TSN)

Page 12: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

FRONIUS PARTNER NETWORK

Page 13: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

GEN24 OUTLOOK

Page 14: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

FRONIUS TAURO

14

2SERVICE

1 GUY ON SITE

3

50 – 100 kW

Fronius International GmbH / TAURO / 06.12.2018 - v03

Page 15: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

Offers a variety ofback-up power features

GEN24 PLUS

15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04

Page 16: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

MULTI FLOW

16 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04

Page 17: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

EXPERIENCE SINCE 27 YEARS IN SOLAR

Page 18: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

50 MW WITH FRONIUS ECO

Page 19: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

5MW UKRAINE

Page 20: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

AUSTRIA, FLACHAU 3.5MW

Page 21: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

SHAHREKORD 1.5MW IRAN

Page 22: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

22

SHOPPING CENTRE IN SAN FERNANDO CITY – PH/ Filipino real estate giant impresses with green energy movement

Reasons for purchasing Fronius products

/ Easy to install

/ Installers get invaluable support

/ One of the largest rooftop systems to

be installed on a shopping centre

/ Surplus energy will be supplied to

Filipino energy providers

Page 23: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

/ In Kenya, a constant power supply is not

something that can be taken for granted

/ Public grid is unstable and in a poor

condition

/ To ensure a constant supply of electricity a

source of power independent of the public

grid is advisable

MICROGRID-SYSTEM IN LAIKIPIA, KENYA

System size 80 kWp AC-coupled, 20 kWp DC-coupled

Type of system Commercial field installation, MicroGrid

Inverter 4 Fronius Symo 20.0-3-M

Inverter Charger Victron Quattro

Charge Controller Victron BlueSolar MPPT 150/85

Battery Sunlight Opzs

Special featureMicroGrid

100% self-consumption

Page 24: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

FRONIUS PV-GENSET SOLUTION, NORTHERN LEBANONPV system combined with a diesel generator powers irrigation plant, 144kWp, 40% degree of self-sufficiency

Page 25: Fronius International GmbH FRONIUS IN UKRAINE · 15 Fronius International GmbH / GEN24 Plus / 06.12.2018 - v04 . ... / Public grid is unstable and in a poor condition / To ensure

All information is without guarantee in spite of careful editing - liability excluded.

Intellectual property and copyright: all rights reserved. Copyright law and other laws protecting intellectual property apply to the content of this presentation and the documentation enclosed (including texts, pictures, graphics, animations

etc.) unless expressly indicated otherwise. It is not permitted to use, copy or alter the content of this presentation for private or commercial purposes without explicit consent of Fronius.

Area Sales Manager

Ukraine

+4366488635244

[email protected]

Technical Sales Advisor

Ukraine

+380503847495

[email protected]