From Subject Reference CMT Recommendation1 Carolyn Wilds Kalbeeba footpaths etc 17/36105 Review needs during 2017/18 for assessment in 2018/19 budget.
Rezoning on hold due to new PDI Act. Refer speed limits to Gawler Council.
2 Loris Pullen Tanunda footpaths 17/30867 On schedule 2017/18 - eastern side preferred alignment due to existing infrastructure.
3 Steve Smithson Wage increase 17/37112 Noted.4 Lynne Scrivens Craneford Road
Resheeting17/37115 Resheeting not required - undertaken new retyning in June and will
continue to monitor.5 Chris Pfeiffer -
Tourism BarossaTourism Barossa funding
17/38746 For Council to determine. Leave budget arrangement as is and deal with new three year agreement (current amount $30,000).
6 Dr Shelley Spencer John Street Tanunda drainage
17/39070 Undertake further investigations and bring back to Council - not responsible for private works, infrastructure not currently understood to be at risk.
7 Nakita Pitman Queen Street Lyndoch footpath
17/40021 It is understood this is Williamstown - is in the program for future investment but current investment is to resolve existing infrastructure. Consider designing in 2017/18 for investment in 2018/19.
8 Craig Doecke - Angaston Transport Service
Vegetation clearance - rural road network
17/40031 Ongoing management underway, provide a listing for priority areas.
9 Barossa Valley Machinery Preservation Society
Request for Support 17/40697 Already included in base budget for additional contribution with corresponding reduction in loan.
10 Greg Grace Council Rates and Elected Member Allowances
17/40893 Reply sent by Facebook re: link to Elected Member Allowances in Annual Report. Member allowances set by independent tribunal, inform resident of process and how he can make submission to the tribunal on a four yearly basis.Further reponse received from Greg Grace.
11 Cr Lange Footpath program 17/41289 Review footpath program to ascertain need for kerbing and gutter on the footpath construction and bring to a future Council meeting. CMT's view is to leave budget as is and principle of kerbing and guttering is reviewed on a case by case basis and township boundaries.
Summary of Public Consultation Submissions 2017/18
Border of 46 and 48 John St 2
Border of 46 and 48 John St 1
48 John St backyard flooded
Entering 48 John St from 46
10 Facebook submission
Barossa Council response:
Greg Grace response: