from polders to palm island · excellence in dubai the dutch fight against the water van oord...

98
Remediation Technologies Symposium 2007 October 25, 2007 Banff, Alberta Joep Athmer, Managing Director Van Oord Offshore From Polders to Palm Island

Upload: others

Post on 18-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Remediation Technologies Symposium 2007October 25, 2007

Banff, Alberta

Joep Athmer, Managing Director

Van Oord Offshore

From Polders to Palm Island

Page 2: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Some personal data…

• Married, 4 children, no dog (yet)

• 30 years experience, living 22 years abroad(Saudi Arabia, U.A.E., U.K., Canada, South Korea and Hong Kong)

• From Mud to Management• Achieving succeses with

people Love my job and……..

Page 3: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Some personal data…

….. my Triumph Vitesse….

Page 4: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Theme of Presentation

The Dutch identity is closely linked with excellence in dredging and marine engineering & construction and

water management

In the Netherlands we had extensive discussions on the Dutch Identity when the Scientific Council for Government Policy published a report called “Identificatie met Nederland “

Page 5: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Van Oord Dredging and Marine Contractors

Excellence in DubaiThe Dutch fight against the water

Van Oord Offshore

The Dutch identity

Environmental engineering

is closely linked with excellence in dredging and marine engineering & construction and

water management

Theme of Presentation

Page 6: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Contents of Presentation

Van Oord Dredging and Marine Contractors

Excellence in Dubai

The Dutch fight against Water

Environmental Engineering

Van Oord Offshore

From Polders to Palm Island

Page 7: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Van Oord in 2007

• Specialists in dredging, offshore, coastal construction, and marine infrastructure – Dredging is High Tech !

• Independent, non listed company, worldwide presence• Reputed for creative ‘design & construct’ solutions

and innovative partnering• Mission is ‘to be the best in the business’• > 3000 well trained professionals• Turnover 2006 C$ 2.0 billion • Order portfolio > C$ 5 billion• Global leader in dredging and marine contracting

Page 8: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

I am in control!

Page 9: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Organisation Van Oord

Board of DirectorsKoos van OordPeter de RidderJohn van HerwijnenArjan van de Kerk

AreasUnited Kingdom, IrelandBert Groenewoud

Belgium, FranceHan Crucq

The NetherlandsJohan Kloet / Luuk de Boer

Mediterranean & AfricaLeffert Kuik

GermanyFrank Broekhoven

North East EuropeFreek de Wit

South West AsiaJohan van Wijland

North East AsiaJaap de Ruijter

South East AsiaPeter Bunschoten

AustraliaJohan Pronk

Middle EastPieter van Oord

Dubai ProjectsJan Schaart

AmericaSimon Boon

OffshoreJoep Athmer

Page 10: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Installation of Offshore Windmills

Windpark Northsea, UK

Page 11: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

This is -some of- our equipment

Page 12: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

These are our People

Page 13: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

These are our projects

Page 14: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering
Page 15: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

How Safe are You?

• “Who cares as long as we don’t get caught”

• “HSE meetings are a waste of time”

• “I accept that injuries are unavoidable in this

kind of work”

• “I dislike when HSE officers go on about HSE”

• “I think we have so many Client audit and

inspections, I’ll never get the work done”

• “It’s all about paper work”

Let’s talk about attitudes and behavior,because quotes like

this still exist:

Page 16: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

What can I do personally to improve

our Environment?

Change your Mindset!

Page 17: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

What we have achieved: 2000-2006

Sakhalin 2005

0,00

0,50

1,00

1,50

2,00

2,50

3,00

3,50

4,00

4,50

2000 2001 2002 2003 2004 2005 2006

Year

LTI f

r

0

500000

1000000

1500000

2000000

2500000

3000000

Hour

s W

orke

d

Page 18: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

QHSE: Initiatives to enhance HSE in Van Oord

Initiatives to enhance HSE in Van Oord:

• Mandatory near-miss reporting (is

linked to the individual bonus system)

• Bi-monthly safety flash

• Commitment of director & management

team to regularly audit Project &

Vessels

• Evaluation of major incidents by Top

Management

Page 19: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Contents of Presentation

Van Oord Dredging and Marine Contractors

Excellence in Dubai

The Dutch fight against Water

Environmental Engineering

Van Oord Offshore

From Polders to Palm Island

Page 20: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Van Oord Offshore

• Subsea Rock Installation

• Pipeline Shore Approaches

• Trenching and Backfilling

• SPM / PLEM Installation

Malampaya Sakhalin 1 EPC2

Ormen Lange

Page 21: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Ormen Lange

• water depths between 20 and 890 metres

• sea currents of 2.5 knots

• harsh winter weather conditions, causing wave heights >20m

• extremely uneven seabed conditions

• a wide variety of soil conditions along the pipeline route,

varying from rock to soft clay

• > 1000 vessel days, 4 years,

> 2,5 mio tonnes of rock,

> 100 mio Euro turn-over

Page 22: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Subsea Rock Installation

Pre-Lay Supports & Counterfills

Page 23: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Ormen Lange SubSea Rock Installation

Project location:Norway, 120km off the coast of Kristiansund

Client:Norsk Hydro

Year of Execution:2004 - 2007

Scope of Work: Installation of rock for support and protection of Ormen Lange’s pipelines and umbilicals from shore at Nyhamna in Mid-Norway to the field development area in water depths to 850m

Page 24: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Engineering (Ormen Lange)

DesignInstallation of Pre-lay supports with counterfills

Page 25: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Post-survey (as installed on Ormen Lange project)

Engineering (Ormen Lange)

Installation of Pre-lay supports with counterfills

Page 26: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Pipeline Shore Approaches

Offshore Construction and Installation works include landfall construction, drilling & blasting, trenching and backfilling and near shore pipeline installation

South Pars Phase 2 & 3, IranBesos Outfall, Spain

Blue Stream Turkish shore approach, Turkey

Page 27: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Sakhalin 1 EPC 2 – Tatar Strait pipeline

Project location:Sakhalin Island, Russia

Client:ExxonMobil/ Nippon Steel Corporation

Year of Execution:2004 - 2005

Scope of Work: 20km pipeline crossing for 24" pipeline from Sakhalin island to Russian mainland. Two landfalls, including pipepull, of 3500m and 800m. Post-trenching and Installation and burial of 20km fibre optic cable

Page 28: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Goldeneye and Atlantic Cromarty

Project location:St. Fergus, N.E. Scotland

Client:Shell U.K. Exploration and Production

Year of Execution:September 2002 – October 2003

Scope of Work: Construction of landfall and pull ashore of two piggybacked pipelines, onshore pipeline installation and post-trenching of 1200m offshore pipelines. Environmentally sensitive area

Page 29: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Sable (SOEP) Shore Approach

Project location:Canada, Country Harbour (Goldboro), Nova Scotia

Client:Sable Offshore Energy Inc.Allseas Canada Ltd.

Year of Execution:1998

Scope of Work: Trenching, backfilling and pulling of 1400m 26” pipeline to shore

Page 30: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Outfalls Water discharge

Page 31: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Water Injection Dredging

Cost effective technique, which removes sediment with the help of gravity, suitable for: •Levelling of the sea bottom for pipelines •Increasing the depth of cables and pipelines•Large scale Maintenance dredging & Mud removalKochi Project, India (2007)

Page 32: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Water Injection Dredging

Mumbai, India

Page 33: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Mass Flow Excavation®

Large amounts of water are pumped through the nozzles in the jetframe.The flow of water thus created, reaches the seabed with high velocity and moves the sand or gravel in a controlled manner to the side.

Page 34: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

“Ripping” technique

The “ripping” technique has been successfully applied during recent projects in the Middle East.

Further improvements on the design will be made

Efficient and economic wayto remove hard/compactedsoils

Mobin project, Iran (2005)

Page 35: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Offshore Construction

Installation of flexibles and offshore support

Page 36: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering
Page 37: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

SPM and PLEM Installation

SPM (Single Point Mooring) installation works includepipe pull to buoy location, installation of PLEM (Pipeline End Manifold) and SPM system, subsea & floating hoses, anchor chains

Page 38: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Hibernia GBS ballasting

Project location:Canada, 300km off the coast of Newfoundland

Client:Hibernia Management and Development Company (HMDC)

Year of Execution:1997

Scope of Work: Ballasting of the Hibernia Gravity Base Structure with 411,000 tonnes of iron ore

Page 39: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Project location:Canada, Beaufort Sea

Client:Dome PetroleumGulf Canada Resources Inc.

Year of Execution:During 1980’s

Scope of Work: Construction of artificial islands to construct a stable working platform for the drill rigs. The islands are able to withstand the ice loads and other forces of the Arctic enabling a year-around drilling program.

Beaufort Sea

Page 40: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Tar Sands

Project location:Onshore Canada (Alberta)

Clients:Various major oil and gas operators

Scope of Work: Dredging of overburden before refining process) and dredging of tailings (after refining process)

Challenges:-Purpose-built equipment-Environmental requirements-Management of Basins

Page 41: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Contents of Presentation

Van Oord Dredging and Marine Contractors

Excellence in Dubai

The Dutch fight against Water

Environmental Engineering

Van Oord Offshore

From Polders to Palm Island

Page 42: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Environmental Know How and Experience

• Consultancy

• Equipment development

• Sustainable Solutions

• Environmental Monitoring & Management

• Research

Page 43: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Auger Dredger HAM 291 - ….2 inches

Page 44: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Cooking Pot – Underwater controlled….

Page 45: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Environmental Valve – Minimum Turbidity

Page 46: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Ketelmeer Project – Large scale safe storage

Page 47: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Contaminated

Holocene

Pleistocene

SILT, clayey 13-15 kN/m3

[1-5 kPa]

CLAY, with peat 13-15 kN/m3

[3-7 kPa]

PEAT, with clay 10-12 kN/m3

[5-15 kPa]

SAND 19-20 kN/m3

Ketelmeer Project

Page 48: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Ketelmeer Project

• Construction of depot for contaminated materials

• All polluted materials to stay inside project area with minimal dispersion

• Cleaning of Ketelmeer, contaminated materials to be disposed in depot

• Construction of nature areas

Page 49: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Most Important Quantities :

• Sheet Pile Walls: 8.700 m1• Contaminated Materials phase 1: 2.000.000 m3• Holocene materials: 3.000.000 m3• Pleistocene materials: 15.000.000 m3• Armour stone: 200.000 ton• Total capacity of depot: 23.000.000 m3• Contaminated Materials phase 2: 6.000.000 m3

Ketelmeer Project

Page 50: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Responsible in a Sensitive EnvironmentEnvironmental Management: Caucedo Project

20

15

R2

R1

C4

C3

C2

C1

C0

20

1510105

105

P1

P2

P3

P4

4333

00 E

4338

00 E

4343

00 E

4348

00 E

2036500 N

2037000 N

2037500 N

2038000 N

Figure 1 Dredge and reclamation areasDredge areaReclamation area

24 hour continuous turbidity monitoring station24 hour continuous monitoring station at C0 and C3

In situ measurements combined with water sample collection for SS analysis at C0 to C4, P1 to P4 [3 times per week, once per day]

1 st settlement basin

Reclamation area on land

2nd settlement basin

Pipeline for discharge of water from settlement basin 2Outlet at 40m water depth

Reclamation area behind breakwater, Discharge of access water in harbour basin behind a silt screen

Pipeline for discharge of water from Reclamation area behind breakwaterSiltscreen [yellow line] to retain suspended solids from discharge

Page 51: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Responsible in a Sensitive EnvironmentEnvironmental Monitoring & Management

Caucedo, Dom. Republic (2002-2003)

24 Hrs continuous on-line monitoring:• Turbidity• Current speed and direction• Wind speed and direction• Temperature• Salinity• Suspended sediments

Page 52: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Responsible in a Sensitive EnvironmentEnvironmental Management: Øresund Project

Scope of Work

Dredging:Tunnel Trench (Limestone): 2,230,000 m3Dredging for Temporary Facilities: 303,000 m3Navigation Channels: 890,000 m3Compensation Dredging: 630,000 m3

Reclamation:Island: 4,150,000 m3Peninsula: 800,000 m3

Page 53: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Responsible in a Sensitive EnvironmentEnvironmental Management: Øresund Project

Main concern:

Mussel Beds and Eel Grass close to the project area damaged due to increased turbidity and sedimentation.

• Max 5% spill

• Weekly and daily limits

Page 54: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Responsible in a Sensitive EnvironmentEnvironmental Management: Øresund Project

Øresund Project (1995-2000)

In-house developed Monitoring Vessels:

• ADCP• Streamer with Turbidity and Depth

Sensors• Water Sampler• Echo Sounder• Positioning

Page 55: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Øresund Project

Øresund Project, Denmark (1995-2000)• 24 / 7 Spill monitoring system

• Early Warning System

• Detailed work methods to minimize sediment loss

• In-house developed Monitoring Vessels

Page 56: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Penny’s Bay Project

Penny’s Bay, Hong Kong (2000-2002)

• Monitoring at pre-defined locations

• Production limitation based on sediment loss per dredger

• Detailed work method statements to comply with EMP

Page 57: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Responsible in a Sensitive EnvironmentEnvironmental Management: Penny’s Bay Project

Dredging of approximately 45 million m3 of mud/clayReclaiming approximately 70 million m3 of sand

Environmental issues:• The reclamation site located in the vicinity of fish

farms areas with coral habitat.• Marine borrow areas were located near environmental

sensitive areas• Execution under Environmental Management System

(EMS) and Environmental Monitoring and Auditing Manual (EM&A)

Page 58: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Responsible in a Sensitive EnvironmentEnvironmental Management: Penny’s Bay ProjectReclamation site Monitoring Requirements Summary

Monitoring No. of stations Frequency Parameters to be measured

Marine Water Quality

19 This number was increased to 30 during the development of the project

3 times per week twice per dayDuring wet season:7 days per week twice per day

Temperature, Salinity, Dissolved Oxygen, Turbidity, Suspended Solids, Total Inorganic Nitrogen and Un-ionised Ammonia

6 3 times per week twice per day

TBT, PAHs and PCBs

Marine Mammals

Fixed transect being sailed through the monitoring area

Twice per month Dolphin sighting

Sub-tidal ecology

2 Once every 6 months

Presence of sub-tidal species, depth distributions and mortality

Page 59: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Responsible in a Sensitive Environment Research

• Quality dredging process waterPublic Works Department & Hydraulic Consultant (Alkyon)

Research

• Predicting turbidity caused by TSHD operations HR Wallingford & US Corps of Eng.

• Remote Sensing as tool for turbidity monitoring dredging Delft Hydraulics & Aerospace Institute of the Netherlands (NLR)

Page 60: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Contents of Presentation

Van Oord Dredging and Marine Contractors

Excellence in Dubai

The Dutch fight against Water

Environmental engineering

Van Oord Offshore

From Polders to Palm Island

Page 61: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

The Netherlands, build by nature and men

• Three European rivers form low lying delta• People start to live on - man made - higher grounds• From the 11th century construction of dikes• From 17th century ‘polders’• In 20th century Delta Plan• Without defences 65% of the country would be

subject to flooding• 70% of our GDP is generated ‘under water’

Page 62: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

17th century construction of ‘polders’

Page 63: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Water, an everlasting challenge

• We suffered from many disastrous floods

• Flood of 1953 shocked the world (1835 casualties)

• Additional protection needed more than ever

• Massive investments to close ‘Zuyder Zee’ (€ 50 mln. In 1930) and ‘Delta Plan’ (€ 9 bln. in 20 years)

• Total of 1000 km of sea defences, shortening the coast by 700 km

• One of the world’s largest engineering challenges

Page 64: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

If there were no defences

1932

1997

flooded

1993 & 1995

Page 65: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Closure ‘Zuyder Zee’ (1927-1932)

Page 66: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Flooded area in 1953

Page 67: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Flood (1953)

Page 68: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Fighting the sea (1953)

Page 69: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Delta Plan

Page 70: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Reclamation of IJsselmeer polders

Page 71: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

River flooding scenario (1995)

Page 72: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Recent flooding in Northern NL (2007)

Page 73: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

From Polders to …..

• Delta Plan fosters continious technological development in dredging and marine construction

• As a country we have learned to adapt to climate challenges

• Recent floods show that permanent vigilance is required

• Expected future climate changes require additional protective measures

Page 74: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

…..to Palm Island

• Clear vision of leadership of Dubai to – develop a sustainable economy– become one of the most attractive tourist

destination – become a leading commercial and trading ‘hub’

• Determination to implement vision• Realisation of projects unprecedented in terms of

design, planning, speed and size

Page 75: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Contents of Presentation

Van Oord Dredging and Marine Contractors

Excellence in Dubai

The Dutch fight against the water

Environmental engineering

Van Oord Offshore

From Polders to Palm Island

Page 76: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

PALM DEIRA

THE WORLD

PALM JUMEIRAH

PALM ISLAND JEBEL ALI

DUBAI MARITIME CITY

LOGO ISLAND ILOGO ISLAND II DEIRA CORNICHE

WATERFRONT

Page 77: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Van Oord Dubai Key Numbers

Original coast line 60 km

Palms add 130 km – 650 HaWorld adds 257 km – 500 HaDeira Corniche adds 67.5 km – 1350 HaPalm Deira adds 360 km – 2650 Ha

Dubai Water Front adds 850 km

Page 78: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Palm Jumeirah

Size: 5 X 5 km incl crescent

Sand volume: 110 million m3

Rock volume: 9 million tonnes (3rd party)

Start execution: Aug. 2001Completion: Oct. 2003

Page 79: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Palm Jumeirah

Breakwater: 13 km

Trunk: 2,000 x 500 m wide

17 fronds: 500 m to 2,500 m long88 m wide

Adds 65 km of coastline

Page 80: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Extension fronds

Atlantis hotel

Widening trunk

Extra works

Page 81: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Logo Islands Design and Construct

Size: 200 X 1000 m Sand volume: 4,4 million m3Rock volume: 1 million tonnesQuay wall: 270 m

Start execution: June 2003 Completion: February 2005

Page 82: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Palm Jumeirah, Dubai

Page 83: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering
Page 84: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

The World

Cluster of 300 artificial islands in the shape of the continents

Size : 9 X 7 kmIsland size : 1,6 - 5,4 haSand volume : 325 million m3Rock volume : 32 million tonnesSize breakwater : 25 km

Start execution : August 2003Completion: End 2007

Page 85: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

The World, Dubai

Page 86: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

The World’s quantities

• In total 320 million m3 of sand and 40 million tons of rock

• Sand volume equals a ‘Chinese Wall’ of sand, 2 metres wide, 4 metres high, ……… all around the globe !!

• We fill each week,……… 70 soccer fields with a 10 meter layer of sand

• Each week we empty…….. a Feyenoord soccer stadium filled to the top with rock

Page 87: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Dubai Maritime City – Quay Wall

Sand volume: 6 million m3

Rock volume: 2 million m3

Start execution: February 2006Completion: November 2007

Page 88: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Palm Deira, Dubai

Page 89: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Deira Corniche

Size: 13 km2

Sand volume: 250 million m3

Rock volume: 26 million tonnes

Start execution: September 2003Completion : End 2009

Page 90: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Deira Corniche, Dubai

Page 91: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Palm Deira

Size : 16,5 x 9 km

Sand volume : 1 billion m3….8000 Saddledomes…

Rock volume : 45 milliontonnes

Start project: end 2005Completion: end 2013

Page 92: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Contracting

Partnering: new approach to contracting, increasinglyused in the UK and Internationally

• Long-term agreement between all parties involved (client, engineer, contractors) carrying out the execution as One Team – Frame Agreements

• Pro-active approach to problem solving as a project team –most valuable on high-risk construction projects – Risk Register and Risk Sharing

• Joint ownership of common objectives and commitment –Target Sums and pain/gain

• Project Board

Page 93: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Contracting

Pro-active management of risk as one team

Page 94: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Nation and company branding

Page 95: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Spin off Dubai projects

• World wide attention for outstanding developments in Dubai – Recognition that Dredging is a modern High Tech industry with optimum Proces and Environment control

• Dutch identity (excellence in dredging and marine engineering) found it’s way in Dubai’s Vision

• Van Oord’s involvement in Dubai projects strengthened its identity and,….

• In turn supports the Dutch Identity

Page 96: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Our profession and remediation

Your business ?Our business ?

Two sides of the same coin !

We remove, place, compact, cover and shape…..You treat, contain and protect…..

Page 97: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Van Oord: a Sea of Opportunity

www.vanoord.com

Page 98: From Polders to Palm Island · Excellence in Dubai The Dutch fight against the water Van Oord Offshore The Dutch identity ... Post-survey (as installed on Ormen Lange project) Engineering

Thank you for your kind attention

Questions ?