Project Team
City of Burlington
John Taylor, Councillor, Ward 3Scott Hamilton, Manager of Design and ConstructionDave Meyer, Project ManagerTom Georgiadis, Contract AdministratorAna Maria Troncoso, Senior Design Technician
![Page 3: from Britannia Rd to Kilbride St](https://reader033.vdocuments.us/reader033/viewer/2022042405/625dbb9a1b471458da652e16/html5/thumbnails/3.jpg)
2. PROJECT OVERVIEWCedar Springs Road
2. PROJECT OVERVIEW
![Page 4: from Britannia Rd to Kilbride St](https://reader033.vdocuments.us/reader033/viewer/2022042405/625dbb9a1b471458da652e16/html5/thumbnails/4.jpg)
![Page 5: from Britannia Rd to Kilbride St](https://reader033.vdocuments.us/reader033/viewer/2022042405/625dbb9a1b471458da652e16/html5/thumbnails/5.jpg)
Project Overview
• Road resurfacing and reconstruction with proposed shoulder pavement (width variesproposed shoulder pavement (width varies from 1.00 to 1.50m) for bikes.
• Replacement of road crossing and driveway CSP culverts.
• Replacement of 1000mm concrete culvert.l d d l• Spot replacements and some new guide rails.
• Spot driveway apron replacements.• Areas to be re graded to improve drainage• Areas to be re‐graded to improve drainage.
![Page 6: from Britannia Rd to Kilbride St](https://reader033.vdocuments.us/reader033/viewer/2022042405/625dbb9a1b471458da652e16/html5/thumbnails/6.jpg)
Existing Conditions
![Page 7: from Britannia Rd to Kilbride St](https://reader033.vdocuments.us/reader033/viewer/2022042405/625dbb9a1b471458da652e16/html5/thumbnails/7.jpg)
Existing Conditions
![Page 8: from Britannia Rd to Kilbride St](https://reader033.vdocuments.us/reader033/viewer/2022042405/625dbb9a1b471458da652e16/html5/thumbnails/8.jpg)
Proposed Cross‐Sectionp
![Page 9: from Britannia Rd to Kilbride St](https://reader033.vdocuments.us/reader033/viewer/2022042405/625dbb9a1b471458da652e16/html5/thumbnails/9.jpg)
Project BudgetRoad Reconstruction $2,800,000Concrete Culvert 1000mm $975,000
TOTAL BUDGET $3,775,000
T t ti S h d lTentative SchedulePublic Information Centre: September 2016*Road Construction: 2017*Concrete Culvert 1000mm Construction 2017*Ti i bj t t di ti ith Ni E t*Timing subject to co-ordination with Niagara Escarpment Commission and Conservation Halton for permits, and property acquisition.
![Page 10: from Britannia Rd to Kilbride St](https://reader033.vdocuments.us/reader033/viewer/2022042405/625dbb9a1b471458da652e16/html5/thumbnails/10.jpg)
PIC LOCATION
Date: Wednesday, September 28, 2016Location: Conservation HaltonLocation: Conservation Halton,
Grindstone Room2596 Britannia Road West
Time: 6:00 pm to 7:30 pm.
![Page 11: from Britannia Rd to Kilbride St](https://reader033.vdocuments.us/reader033/viewer/2022042405/625dbb9a1b471458da652e16/html5/thumbnails/11.jpg)
Communications
• Keep up to date on the project by:• Keep up to date on the project by:– Visiting project webpage (Coming Soon)– Project updates by ad mailj p y– Sign up for email notifications– Contact project team
![Page 12: from Britannia Rd to Kilbride St](https://reader033.vdocuments.us/reader033/viewer/2022042405/625dbb9a1b471458da652e16/html5/thumbnails/12.jpg)
Project Team ContactsCit f B li tCity of Burlington
John Taylor 905‐335‐7600 Ext. 7459Councillor Ward 3 [email protected] @ g
Dave Meyer 905‐335‐7600 Ext. 7818Project Manager [email protected]
Tom Georgiadis 905‐335‐7600 Ext. 7806Contract Administrator [email protected]
Ana Maria Troncoso 905 335 7600 Ext 7665Ana Maria Troncoso 905‐335‐7600 Ext. 7665Senior Designer [email protected]
![Page 13: from Britannia Rd to Kilbride St](https://reader033.vdocuments.us/reader033/viewer/2022042405/625dbb9a1b471458da652e16/html5/thumbnails/13.jpg)
Comments
• Take a project information package:• Take a project information package:– Fill out comments form here or submit latersubmit later
• Project team contacts provided in handouthandout