from: abernant homes sent: to... · from: abernant homes sent: 29 august 2019 19:47 to: local plan...

14
From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further to your e-mail dated 14 th August 2019 - Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage). If I read this correctly you are asking for resubmission of any call for sites information submitted in 2014. There are two sites (adjacent to each other) which I feel should be taken forward into the next development plan. I have attached location plans (2) and copies of the original call for sites forms (2) which were submitted in 2014. The areas concerned are one of the few sites (and possibly the only sites) within Thorne & Moorends which are in Flood Zone 1. The areas are very close to the Town Centre. The areas have both previously been allocated as Residential Land in the UDP (1989?). Why have they not previously been developed? There are several historic reasons, but none which would prevent development now. We considered an application some time ago but the land was judged to be subject to the Greenfield Moratorium. (wrongly in my view but it matters little now). We were then told that the Council would not accept an outline application because the land neighbours (but is not within) the Thorne Conservation area. We did not want to risk making a full application (which would have to be detailed and expensive) without the comfort of knowing that the land would be allocated for housing. I can’t see why a Council would not accept a red-line outline application with all matters reserved, as the council still have control over all matters (including density and external appearance) but that is how it was. I did not argue the point – at least, not for too long. We then became otherwise engaged in building a LiDL supermarket on another piece of (immediately) adjacent land. This large retail store is now complete and trading and has made a valuable addition to the Thorne Town Centre retail offer. After that we started (and are now almost complete) on a small, very high-quality, residential development in Lock Lane, Thorne. These two sites should be our next project. The town council very much are in favour of these sites being developed (refer to Cllr S, Durant).

Upload: others

Post on 01-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: From: Abernant Homes Sent: To... · From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further

From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further to your e-mail dated 14th August 2019 - Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage). If I read this correctly you are asking for resubmission of any call for sites information submitted in 2014. There are two sites (adjacent to each other) which I feel should be taken forward into the next development plan. I have attached location plans (2) and copies of the original call for sites forms (2) which were submitted in 2014. The areas concerned are one of the few sites (and possibly the only sites) within Thorne & Moorends which are in Flood Zone 1. The areas are very close to the Town Centre. The areas have both previously been allocated as Residential Land in the UDP (1989?). Why have they not previously been developed? There are several historic reasons, but none which would prevent development now. We considered an application some time ago but the land was judged to be subject to the Greenfield Moratorium. (wrongly in my view but it matters little now). We were then told that the Council would not accept an outline application because the land neighbours (but is not within) the Thorne Conservation area. We did not want to risk making a full application (which would have to be detailed and expensive) without the comfort of knowing that the land would be allocated for housing. I can’t see why a Council would not accept a red-line outline application with all matters reserved, as the council still have control over all matters (including density and external appearance) but that is how it was. I did not argue the point – at least, not for too long. We then became otherwise engaged in building a LiDL supermarket on another piece of (immediately) adjacent land. This large retail store is now complete and trading and has made a valuable addition to the Thorne Town Centre retail offer. After that we started (and are now almost complete) on a small, very high-quality, residential development in Lock Lane, Thorne. These two sites should be our next project. The town council very much are in favour of these sites being developed (refer to Cllr S, Durant).

Page 2: From: Abernant Homes Sent: To... · From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further

I would request that they be included in the forthcoming development plan. We would like to keep an option open on the larger area for another retail development but for the most part the areas would be housing sites. Please give me a call if you have any questions. Peter Wailes Abernant Homes Ltd

Page 3: From: Abernant Homes Sent: To... · From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further

2

Section 1 – Contact Details (to be completed for all sites)

Landowner or developer Agent or person acting on behalf of landowner/developer

Name Abernant Homes Peter Wailes

Organisation

Address

3B Field Road, Thorne, Doncaster, DN8 4AG

Telephone

Email

LDF Customer Ref Number

Not known

Section 2 – Site Information (to be completed for all sites)

Site Address

Site Name (Known as) Land off St. Nicolas Road, Thorne

Ordnance Survey Grid Reference 468520 - 413474

Site size (hectares) 0.79 +

Has the site been brought to the Council’s attention before? (e.g. Strategic Housing Land Availability Assessment, Employment Land Review, Planning Application/other)? If yes, include any references.

Yes Appeared on UDP (in part) as a housing site. Previous request for LDF inclusion refused (because it had been allocated on UDP and never developed). Reasons for this - partly greenfield moratorium and partly refusal to accept O/L application.

PLEASE INCLUDE AN ORDNANCE SURVEY MAP WITH THE SITE BOUNDARY OUTLINED

IN RED; AND IF DESIRED ANY OTHER LAND YOU OWN IN BLUE.

The plan should preferably be on a scale of 1:1250 or 1:2500 (A4/A3) and must show the exact location of the site and its boundaries. An OS base map can be obtained from the

Ordnance Survey website at www.ordnancesurvey.co.uk.

Section 3 – Site Development (to be completed for all sites)

What is the proposed use? Please tick as appropriate. What is the proposed size/type/scale of development?

Proposed use: Size/type/scale of development:

Housing Tick 25-30 houses

Gypsies and Travellers/Travelling Showpeople site

Page 4: From: Abernant Homes Sent: To... · From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further

3

Employment

Retail

Minerals extraction (see section 9)

Mixed use

Other, please specify (e.g. leisure, greenspace etc)

Any other information:

Section 4 – Previous Use (to be completed for all sites)

4.1 What is the current land use? e.g. farmland, pasture. Vacant

4.2 If the site has been previously developed, are there any existing buildings on site?

No previous construction

4.3 If the site has been previously developed, are you aware of any possible contamination from that use?

None

4.4 What are the neighbouring/adjacent uses? Residential. Borders onto Conservation Area.

4.5 What utility services are on site? (e.g. gas, electricity, water, sewerage, high speed broadband)

None

Section 5 – Site Characteristics (to be completed for all sites)

Please tick as appropriate. Yes No Don’t know

5.1 Is the site flat? Yes

If no, please provide details.

5.2 Are there any trees on the site? Yes

If yes, please provide details. Not likely to prevent development

5.3 Are there any hedgerows on the site? No

If yes, please provide details.

5.4 Are there any ponds on the site? No

If yes, please provide details.

5.5 Are you aware if the site has ever been flooded? No

If yes, please provide details. Flood zone 1

5.6 Does the site have any flood defences? No

If yes, please provide details.

Page 5: From: Abernant Homes Sent: To... · From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further

4

5.7 Are there any footpaths or Public Rights of Way on/through the site? No

If yes, please provide details.

5.8 Are there any overhead power cables or phones lines on/through the site?

No

If yes, please provide details.

5.9 Are there any other constraints / limitations on the site? (e.g. bad neighbour uses, nearby proposed development etc)

Yes

If yes, please provide details. Border with conservation area.

Section 6 – Site Access (to be completed for all sites)

Please tick as appropriate. Yes No Don’t know

6.1 Does the site have access to an adopted highway? Please indicate on the site plan where this is.

Yes

If yes, please provide details. e.g. how far is it from the public highway?

Site borders Darley Road and also St Nicolas Road

If no, how would the site be accessed?

6.2 Is the site within 400m of a bus route? Yes

If yes, please provide bus route/number etc. 87 and 88

6.3 Is the site within 800m of a Railway station? Yes

Please provide the name of the nearest Railway station.

Thorne North

Section 7 – Site Appraisal (to be completed for all sites)

Availability

7.1 When do you expect the site to be available for development? (please tick)

0-5yrs Tick 6-10yrs Tick

11-15yrs 16yrs +

Please give reasons for this.

7.2 Is the site in single or multiple ownership? (please tick)

Single Ownership

Multiple

Ownership

Tick

7.3 What is the type of owner/controller to the site? e.g. Private land owner, developer, public authority, other (please state)

Owner/developer

7.4 If in multiple ownership, are all owners in support of the proposal you suggest? (tick)

Yes Tick

No Don’t Know

Please provide details.

7.5 Are there any unresolved ransom strip or tenancy issues which could affect the availability of this site? (if yes, please give details)

No

Page 6: From: Abernant Homes Sent: To... · From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further

5

Achievability

Please tick as appropriate. Yes No Don’t know

7.6 Is the site being actively marketed? No

If yes, please provide details. Already owned - Available

7.7 Is there a known developer interest in the site? Yes

If yes, please provide details.

7.8 Please provide information on the likely delivery rate for the development. Please include dwellings and/or floor space constructed per year and estimated start date allowing for necessary lead in times.

Not known

7.9 Given the above information, to what extent do you agree that; the proposed development is achievable on this site with a reasonable prospect that it will be delivered within the stated timescale.

Deliverable

Section 8 – Economic Viability (to be completed for all sites)

Please tick as appropriate. Yes No Don’t know

8.1 Are you aware of any abnormal costs associated with bringing forward the site for development? e.g. contaminated land, flood mitigation, ground conditions etc

No

If yes, please provide details. Cleared for ground abnormals

8.2 Which of the following contributions (either on site provision or a commuted sum) do you think your site could deliver if it was to be supported for allocation and come forward for development?

Affordable Housing Yes

Education No

Transportation/Highways No

Green Infrastructure, Biodiversity and Public Open Space No

Please give details of your above assumptions

8.3 Is there any other significant contributions or infrastructure that would be required to bring this site forward?

No

8.4 Do you consider the proposed use economically viable? N/K

If yes, what work has been carried out to test viability and come to this conclusion?

Section 9 - Additional Requirements for Proposed Minerals Sites (to be completed for

proposed mineral sites only)

9.1 Is the proposal a site extension or new quarry?

No

9.2 Mineral Type; (Magnesian Limestone, Sharp Sand and Gravel, Soft Sand, Silica Sand, Hydrocarbons, other?)

9.3 What is the estimated reserve for the site?

9.4 What is the estimated annual output?

Page 7: From: Abernant Homes Sent: To... · From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further

6

9.5 What is the estimated life of the operation?

9.8 What are the estimated traffic movements?

9.6 What is the access route for transporting mineral?

9.7 Are there any restoration proposals for the site?

Section 10 - Mandatory

Data Protection and Freedom of Information This information is collected by Doncaster Metropolitan Borough Council as data controller in accordance with the with data principles in the Data Protection Act 1998. The purposes for collecting data are: � To assist in the preparation of the Doncaster Local Plan; � To contact you regarding your answers given in your form; and � For evaluation by the Local Plans Team and other appointed stakeholder groups and consultees (as required by the Local Plans evidence base preparation), The above purposes may require public disclosure of any data excluding personal contact details received by Doncaster Metropolitan Borough Council in the consultation responses in accordance with the Freedom of Information Act 2000. Disclaimer It must be noted that the sites you are submitting data for is not an indication that it will be allocated through the Local Plan and/or planning permission will be granted for development. Planning proposals will be judged on their merits against the Local Plan Core Strategy policies unless material considerations indicate otherwise. The report may represent a material consideration in the determination of such planning proposals. I agree to the Data Protection and Freedom of Information Statement (please tick) Yes

I agree to the DMBC Disclaimer statement (please tick) Yes

I agree to site visits (please tick) unaccompanied accompanied Yes

I have attached a site location plan as required by section 2 of this form (please tick) Yes

Date 10 October 2014

Print Name P. Wailes

Completed forms and site plan should be returned to:

Local Plans Team

Doncaster Metropolitan Borough Council

Colonnades House

Duke Street

Doncaster

DN1 3ER

Email:

Deadline for submitting sites: 5pm Wednesday 19th November 2014

Page 8: From: Abernant Homes Sent: To... · From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further
Page 9: From: Abernant Homes Sent: To... · From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further

2

Section 1 – Contact Details (to be completed for all sites)

Landowner or developer Agent or person acting on behalf of landowner/developer

Name N. Cole As Left

Organisation Birkett Cole Lowe

As Left

Address Hawk Works, 105A Mary St, Sheffield, S1 4RT

As Left

Telephone As Left

Email As Left

LDF Customer Ref Number

Not known

Section 2 – Site Information (to be completed for all sites)

Site Address

Site Name (Known as) Land off St. Nicolas Road, Thorne

Ordnance Survey Grid Reference 468909 - 413480

Site size (hectares) 0.38

Has the site been brought to the Council’s attention before? (e.g. Strategic Housing Land Availability Assessment, Employment Land Review, Planning Application/other)? If yes, include any references.

Yes Appeared on UDP (in part) Previous request for LDF inclusion refused (because it had been allocated on UDP and never developed). Reasons for this - partly greenfield moratorium and partly refusal to accept O/L application.

PLEASE INCLUDE AN ORDNANCE SURVEY MAP WITH THE SITE BOUNDARY OUTLINED

IN RED; AND IF DESIRED ANY OTHER LAND YOU OWN IN BLUE.

The plan should preferably be on a scale of 1:1250 or 1:2500 (A4/A3) and must show the exact location of the site and its boundaries. An OS base map can be obtained from the

Ordnance Survey website at www.ordnancesurvey.co.uk.

Section 3 – Site Development (to be completed for all sites)

What is the proposed use? Please tick as appropriate. What is the proposed size/type/scale of development?

Proposed use: Size/type/scale of development:

Housing Tick 5 individual high-market housing units within private grounds.

Gypsies and Travellers/Travelling Showpeople site

Page 10: From: Abernant Homes Sent: To... · From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further

3

Employment

Retail

Minerals extraction (see section 9)

Mixed use

Other, please specify (e.g. leisure, greenspace etc)

Any other information: Site lies within Thorne Conservation Area.

Section 4 – Previous Use (to be completed for all sites)

4.1 What is the current land use? e.g. farmland, pasture. Vacant

4.2 If the site has been previously developed, are there any existing buildings on site?

No previous construction

4.3 If the site has been previously developed, are you aware of any possible contamination from that use?

None

4.4 What are the neighbouring/adjacent uses? Residential

4.5 What utility services are on site? (e.g. gas, electricity, water, sewerage, high speed broadband)

None

Section 5 – Site Characteristics (to be completed for all sites)

Please tick as appropriate. Yes No Don’t know

5.1 Is the site flat? Yes

If no, please provide details.

5.2 Are there any trees on the site? Yes

If yes, please provide details. Will not prevent development - but would need careful planning.

5.3 Are there any hedgerows on the site? No

If yes, please provide details.

5.4 Are there any ponds on the site? No

If yes, please provide details.

5.5 Are you aware if the site has ever been flooded? No

If yes, please provide details. Flood zone 1

5.6 Does the site have any flood defences? No

Page 11: From: Abernant Homes Sent: To... · From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further

4

If yes, please provide details.

5.7 Are there any footpaths or Public Rights of Way on/through the site? Yes

If yes, please provide details. Present (private) right of access can be legally extinguished and alternative provided.

5.8 Are there any overhead power cables or phones lines on/through the site?

No

If yes, please provide details.

5.9 Are there any other constraints / limitations on the site? (e.g. bad neighbour uses, nearby proposed development etc)

Yes

If yes, please provide details. Within conservation area.

Section 6 – Site Access (to be completed for all sites)

Please tick as appropriate. Yes No Don’t know

6.1 Does the site have access to an adopted highway? Please indicate on the site plan where this is.

Yes

If yes, please provide details. e.g. how far is it from the public highway?

Site borders St Nicolas Road with existing access

If no, how would the site be accessed?

6.2 Is the site within 400m of a bus route? Yes

If yes, please provide bus route/number etc. 87 and 88

6.3 Is the site within 800m of a Railway station? Yes

Please provide the name of the nearest Railway station.

Thorne North

Section 7 – Site Appraisal (to be completed for all sites)

Availability

7.1 When do you expect the site to be available for development? (please tick)

0-5yrs Tick 6-10yrs Tick

11-15yrs 16yrs +

Please give reasons for this.

7.2 Is the site in single or multiple ownership? (please tick)

Single Ownership

Tick

Multiple Ownershi

p

7.3 What is the type of owner/controller to the site? e.g. Private land owner, developer, public authority, other (please state)

Owner/developer

7.4 If in multiple ownership, are all owners in support of the proposal you suggest? (tick)

Yes No Don’t Know

Please provide details.

7.5 Are there any unresolved ransom strip or tenancy issues which could affect the availability of this site? (if yes, please give details)

No - other than access rights issue detailed above. The extinguishing of Present access rights is secure however - no third-party agreement required.

Page 12: From: Abernant Homes Sent: To... · From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further

5

Achievability

Please tick as appropriate. Yes No Don’t know

7.6 Is the site being actively marketed? No

If yes, please provide details. Already owned - Available

7.7 Is there a known developer interest in the site? Yes

If yes, please provide details.

7.8 Please provide information on the likely delivery rate for the development. Please include dwellings and/or floor space constructed per year and estimated start date allowing for necessary lead in times.

Not known. Development limited to 5 units (private access drive) and development will be dependent on tree issues (not insurmountable).

7.9 Given the above information, to what extent do you agree that; the proposed development is achievable on this site with a reasonable prospect that it will be delivered within the stated timescale.

Deliverable

Section 8 – Economic Viability (to be completed for all sites)

Please tick as appropriate. Yes No Don’t know

8.1 Are you aware of any abnormal costs associated with bringing forward the site for development? e.g. contaminated land, flood mitigation, ground conditions etc

No

If yes, please provide details. Tree issues.

8.2 Which of the following contributions (either on site provision or a commuted sum) do you think your site could deliver if it was to be supported for allocation and come forward for development?

Affordable Housing No

Education No

Transportation/Highways No

Green Infrastructure, Biodiversity and Public Open Space No

Please give details of your above assumptions

8.3 Is there any other significant contributions or infrastructure that would be required to bring this site forward?

No

8.4 Do you consider the proposed use economically viable? Yes

If yes, what work has been carried out to test viability and come to this conclusion?

Section 9 - Additional Requirements for Proposed Minerals Sites (to be completed for

proposed mineral sites only)

9.1 Is the proposal a site extension or new quarry?

No

9.2 Mineral Type; (Magnesian Limestone, Sharp Sand and Gravel, Soft Sand, Silica Sand, Hydrocarbons, other?)

Page 13: From: Abernant Homes Sent: To... · From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further

6

9.3 What is the estimated reserve for the site?

9.4 What is the estimated annual output?

9.5 What is the estimated life of the operation?

9.8 What are the estimated traffic movements?

9.6 What is the access route for transporting mineral?

9.7 Are there any restoration proposals for the site?

Section 10 - Mandatory

Data Protection and Freedom of Information This information is collected by Doncaster Metropolitan Borough Council as data controller in accordance with the with data principles in the Data Protection Act 1998. The purposes for collecting data are: � To assist in the preparation of the Doncaster Local Plan; � To contact you regarding your answers given in your form; and � For evaluation by the Local Plans Team and other appointed stakeholder groups and consultees (as required by the Local Plans evidence base preparation), The above purposes may require public disclosure of any data excluding personal contact details received by Doncaster Metropolitan Borough Council in the consultation responses in accordance with the Freedom of Information Act 2000. Disclaimer It must be noted that the sites you are submitting data for is not an indication that it will be allocated through the Local Plan and/or planning permission will be granted for development. Planning proposals will be judged on their merits against the Local Plan Core Strategy policies unless material considerations indicate otherwise. The report may represent a material consideration in the determination of such planning proposals. I agree to the Data Protection and Freedom of Information Statement (please tick) Yes

I agree to the DMBC Disclaimer statement (please tick) Yes

I agree to site visits (please tick) unaccompanied accompanied Yes

I have attached a site location plan as required by section 2 of this form (please tick) Yes

Date 10 October 2014

Print Name TBC

Completed forms and site plan should be returned to:

Local Plans Team

Doncaster Metropolitan Borough Council

Colonnades House

Duke Street

Doncaster

DN1 3ER

Email:

Deadline for submitting sites: 5pm Wednesday 19th November 2014

Page 14: From: Abernant Homes Sent: To... · From: Abernant Homes Sent: 29 August 2019 19:47 To: Local Plan Subject: Doncaster Local Plan 2015-2035 (Regulation 19 Publication Stage) Further