frederick grier_portfolio_2013

73
Frederick Schultz Grier Portfolio 2013

Upload: frederick-grier

Post on 22-Mar-2016

223 views

Category:

Documents


2 download

DESCRIPTION

Portfolio of work from JAHN, IIT, and Zoka Zola

TRANSCRIPT

  • Frederick Schultz GrierP o r t f o l i o 2 0 1 3

  • The first three projects of this portfolio are a small sample of the work Frederick Grier has recently completed with JAHN (formerly Murphy/Jahn Architects). Pulled from the Schematic Design and Design Development phases of three large-scale, international proj-ects under the leadership of Helmut Jahn, the samples illustrate Fredericks work responsibilities and interest in coordinating building systems, structural connections and designed details to produce simple solutions to complex problems.

    The following two projects explore universal sustainable space (hori-zontal and vertical context, respectively). These were the products of two semesters of research and design with international architect and professor Peter Land. Professor Land worked very closely in refining the details and connections that make these two projects successful. Their beauty and simplicity arrive through careful con-cept development and structural detailing.

    Interpolation represents work completed as an intern with Zoka Zola on an international design competition for social housing and com-munity development. The entry won First Place in 2008, and is now under construction near the coast of Rijeka, Croatia. Scheduled for completion at the end of 2013.

    Modulate is a pre-cast concrete project for Milwaukee Wisconsin, completed for a design studio sponsored by the Precast/Prestressed Concrete Institute (PCI). It features an economically modulated form with a shifted floor plate. Each unit has natural ventilation and daylight, city views, and a private outdoor space.

    The next section, Model, includes photos of work completed for ar-chitecture courses at IIT illustrating various modeling techniques and detail development. The last project presented is the final first year team project Post-Tension, exploring the use of post-tensioning us-ing milkcrates as a compression unit; scrap wood block shims were used to undulate the beams adding a sense of whimsy.

    This work stands on its own, so the use of text has been minimized. Please contact Frederick to discuss the complexities and challenges of these projects in greater depth.INTR

    ODU

    CTIO

    N

  • Doha Convention Center 2

    Shanghai Financial District 10

    Nanjing Tower + Podium 16

    Universal Wide Span 22

    Sustainable High-Rise 36

    Interpolation 44

    Modulate 50

    Philanthropic Design 60

    Model 64

    Post-Tension 68

  • DOHA

    CONV

    ENTION

    CENT

    ER

    Doha Convention Center Redesign Schematic Design through Construction DevelopmentMurphy/Jahn Architects (2011-current)

  • PAGE 3

    Image courtesy of Murphy/Jahn Architects

  • Architect:

    Date:

    Proj. Nr.:

    Checked:

    Size:

    Scale:

    1189x841

    Overview:

    Drawn

    Title:

    Structural Engineer:

    Design Development - Lower Levels Interim Demarcation (Variation Order 51)Phase:

    0.00 = 3.50 QND

    Sheet No. IndexBldg.

    Real Estate Investment Company

    Client:

    P.O. Box 23175 - Doha - Qatar

    Date DescriptionIndex

    Project:

    DCC Multi-Function Hall

    Turner InternationalProject Management:

    P.O. Box 24360 Pt. Roundabout, Doha Qatar - tel.: +974-441-4781x266

    Doha - Qatar

    Special Structure Engineers:

    M.E.P Engineers:

    Architect of Record:

    P. O Box 22235 , Doha, Qatar. Tel: +974-4833195, Fax: +974-4833196

    35 E Wacker Dr, Suite 1800, Chicago, IL 60601, Tel: +1-312 849-5612, Fax: +1-312 849-5611

    MURPHY/JAHN ARCHITECTS LLC - 35 EAST WACKER DRIVE - CHICAGO, ILLINOIS 60601 - TEL.: +1-312.427.7300 - FAX: +1-312.332.0274

    Qatari Diar

    REFERENCE LEVEL

    PLOT DATE: 26/04/2013 15:21:04

    Qibla

    Werner Sobek Stuttgart GmbH & Co. KGAlbstrae 1470597 Stuttgart/GermanyTel +49.711.76750-0Fax [email protected]

    J

    C 17.06.2011 66% Design DevelopmentD 20.07.2011 80% Design DevelopmentE 21.10.2011 100% Design Development - Base Contract; 100% SD - Expanded ScopeF 13.07.2012 100% Schematic Design - Grand BallroomG 14.08.2012 50% Reconciled Design DevelopmentH 17.12.2012 100% Reconciled Design Development (Variation Orders 33 & 41)I 15.03.2013 100% Design Development Lower Level Demarcation (Variation Order 51)J 25.04.2013 Response to Review Comments

    MH A1-01.03

    Ground Floor Overview Plan0.000

    04.APR.2011

    4785

    JK

    SC

    1:250

  • Architect:

    Date:

    Proj. Nr.:

    Checked:

    Size:

    Scale:

    1189x841

    Overview:

    Drawn

    Title:

    Structural Engineer:

    Design Development - Lower Levels Interim Demarcation (Variation Order 51)Phase:

    0.00 = 3.50 QND

    Sheet No. IndexBldg.

    Real Estate Investment Company

    Client:

    P.O. Box 23175 - Doha - Qatar

    Date DescriptionIndex

    Project:

    DCC Multi-Function Hall

    Turner InternationalProject Management:

    P.O. Box 24360 Pt. Roundabout, Doha Qatar - tel.: +974-441-4781x266

    Doha - Qatar

    Special Structure Engineers:

    M.E.P Engineers:

    Architect of Record:

    P. O Box 22235 , Doha, Qatar. Tel: +974-4833195, Fax: +974-4833196

    35 E Wacker Dr, Suite 1800, Chicago, IL 60601, Tel: +1-312 849-5612, Fax: +1-312 849-5611

    MURPHY/JAHN ARCHITECTS LLC - 35 EAST WACKER DRIVE - CHICAGO, ILLINOIS 60601 - TEL.: +1-312.427.7300 - FAX: +1-312.332.0274

    Qatari Diar

    REFERENCE LEVEL

    PLOT DATE: 26/04/2013 15:21:04

    Qibla

    Werner Sobek Stuttgart GmbH & Co. KGAlbstrae 1470597 Stuttgart/GermanyTel +49.711.76750-0Fax [email protected]

    J

    C 17.06.2011 66% Design DevelopmentD 20.07.2011 80% Design DevelopmentE 21.10.2011 100% Design Development - Base Contract; 100% SD - Expanded ScopeF 13.07.2012 100% Schematic Design - Grand BallroomG 14.08.2012 50% Reconciled Design DevelopmentH 17.12.2012 100% Reconciled Design Development (Variation Orders 33 & 41)I 15.03.2013 100% Design Development Lower Level Demarcation (Variation Order 51)J 25.04.2013 Response to Review Comments

    MH A1-01.03

    Ground Floor Overview Plan0.000

    04.APR.2011

    4785

    JK

    SC

    1:250

  • PAGE 7

  • PAGE 9

  • SHAN

    GHAI F

    INAN

    CIAL

    DISTR

    ICT

    Shanghai International Financial Center Design Development Murphy/Jahn Architects (2012)

  • PAGE 5PAGE 11

  • PAGE 13

  • PAGE 15

  • NANJ

    ING

    TOWER

    + P

    ODIUM

    Office/Hotel/Residential Tower and Retail Podium ProjectSchematic Design through Design DevelopmentMurphy/Jahn Architects (2010-2011) Images courtesy of Murphy/Jahn Architects

  • PAGE 17

  • PAGE 19

  • PAGE 21

  • UNIVE

    RSAL

    WIDE-SP

    AN

    Floating CanopyUniversal design with potential application for an airport terminalThird Year Studio (2009)

  • PAGE 23

  • PAGE 25

  • PAGE 27

  • PAGE 29

  • PAGE 31

  • PAGE 33

  • PAGE 35

  • SUST

    AINA

    BLE

    HIGH

    -RISE

    Wind TowerUniversal design with potential application for an office towerThird Year Studio (2010)

  • PAGE 37

  • PAGE 39

  • PAGE 41

  • PAGE 43

  • INTE

    RPOLA

    TION

    Social Housing Competition (Winner)Mixed-Residential Project for Croatia, under constructionZoka Zola Internship project (2008)

  • PAGE 45

    topographic analysis diagrams

    view diagramsnorth to forest; south to sea

  • A 3 fotomontaa

    333444

    A 2 situacija 1:500 S

    interpolacija

    A 4 parkiranje 1:500 S

    pozicija zgrada na parceli na postojee slojnice

    pozicija zgrada na parceli na interpolirane slojnice

    interpolirane slojnicaupotrebljive slojniceslojnice parcele

    4

    1

    3

    2

    4

    2

    1

    3

    4

    2

    1

    3

    c - oblik

    s - oblik

    2

    1

    s - oblik

    3

    c - oblik

    4

    4

    3

    2

    1

    3

    4

    2

    1

    parkiranje sa sporedne ulice

    parkiranje na lokaciji

    prilaz veem broju parkiralita

    daor

    yra

    mirp

    daor

    yra

    mirp

    daor

    yra

    dnoc

    es

    aor yradnoc

    es

    daor

    yrad

    noce

    s

    A 1 diagram interpolacije zgrada S

  • PAGE 47

  • PAGE 49

  • PreCast ConcreteMilwaukee Pre-cast Concrete Social Housing ProjectSecond Year Studio (2009)MODU

    LATE

  • PAGE 51

    concept diagrams

  • 5 15 30 50

  • 5 15 30 50

    PAGE 53

  • (typical) odd floor plan

  • (typical) even floor plan

    PAGE 55

  • CC

    C

    D

    D

    D

    detail section D

  • PAGE 57

    detail section C, construction study model (inset)

  • typical unit floor plans

  • PAGE 59

  • PHILAN

    TRHO

    PIC

    DESIGN

  • Stained-Glass Champagne Candle Wrap Aution item donated to the Chicago Houses Cham-pagne Wrapture - 2012 Fundraiser. Chicago House provides social and supportive services to families

    and individuals effected by HIV/AIDS.

    PAGE 61

  • Chase CAN-Tower14 tall tower of cans (10,000) to promote Fall 2012 Food drive at Chase Bank

  • FEED ME - CANstruction 2012 Submission6,570 cans

    Winner: Peoples Choice Award

    CAN-thedral - CANstruction 2011 Submission5,280 cans Winner: Best Meal National AwardWinner: AIA Make No Small Cans Award

    PAGE 63

  • Chicago site model (1:200 scale)MODE

    LS

  • Model of Naked House by Shigeru Ban

    PAGE 65

  • Vi

    sual

    izatio

    n:: A

    ssig

    nmen

    t #13

    Arch

    itect

    ure

    497

    :: Re

    vit &

    BIM

    Prof

    esso

    r Mar

    c Te

    er07

    .20.

    2009

    6" = 1'-0"1Interior_Artifical + Sunlight

    3" = 1'-0"2Interior_Artificial lighting only

    6" = 1'-0"3Interior_Sunlight only

    6" = 1'-0"5Exterior_Artificial lighting only

    6" = 1'-0"4Exterior_Sunlight only

    6" = 1'-0"6Exterior_Artificial + Sunlight

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRODUCED BY AN AUTO

    DESK STUDENT PRODUCT

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRO

    DUCE

    D BY

    AN

    AUTO

    DESK

    STU

    DENT

    PRO

    DUCT

    Vi

    sual

    izatio

    n:: A

    ssig

    nmen

    t #13

    Arch

    itect

    ure

    497

    :: Re

    vit &

    BIM

    Prof

    esso

    r Mar

    c Te

    er07

    .20.

    2009

    6" = 1'-0"1Interior_Artifical + Sunlight

    3" = 1'-0"2Interior_Artificial lighting only

    6" = 1'-0"3Interior_Sunlight only

    6" = 1'-0"5Exterior_Artificial lighting only

    6" = 1'-0"4Exterior_Sunlight only

    6" = 1'-0"6Exterior_Artificial + Sunlight

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRODUCED BY AN AUTO

    DESK STUDENT PRODUCT

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRO

    DUCE

    D BY

    AN

    AUTO

    DESK

    STU

    DENT

    PRO

    DUCT

    Revit model of Simmons Hall by Steven Holl (using geometry generated in Rhino)

  • De

    tails

    ; Par

    t 2 ::

    Ass

    ignm

    ent #

    10Ar

    chite

    ctur

    e 49

    7 ::

    Revit

    & B

    IMPr

    ofes

    sor M

    arc

    Teer

    07.0

    6.20

    09

    1 section detail perspective

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRODUCED BY AN AUTO

    DESK STUDENT PRODUCT

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRO

    DUCE

    D BY

    AN

    AUTO

    DESK

    STU

    DENT

    PRO

    DUCT

    Revit model detail of Simmons Hall

    PAGE 67

  • POST

    -TEN

    SION

    Structural Exploration in Post-tensionTeam project for IITs Open HouseFirst Year Studio (2008)

  • PAGE 69

  • PAGE 71