Project Route Title/Sponsor Improvement
08/06/2014 12:41 PM 2015-2026 Twelve Year Program
Period
Page 33 of 267
Study PE FD UTL ROW CON PRA Total
Cost ($000)
Date:Rpt# TYP210
Mode: Transit County: EriePlanning Partner: Erie
77131 Acquire Shop Equipment First 100 100Erie Metropolitan Transit Authority
77128 Engines/Transmissions First 400 400Erie Metropolitan Transit Authority
95296 FY 2015 Operating Subsidy First 9,531 9,531Erie Metropolitan Transit Authority
95297 FY 2016 Operating Subsidy First 9,531 9,531Erie Metropolitan Transit Authority
90075 Replace Fareboxes First 625 625Erie Metropolitan Transit Authority
77126 Replace Fixed Route Buses First 5,600 5,600Erie Metropolitan Transit Authority
95298 Replace Non-Revenue Veh First 100 100Erie Metropolitan Transit Authority
77129 Replace Paratransit Buses First 1,800 1,800Erie Metropolitan Transit Authority
83750 Replace Radio System First 625 625Erie Metropolitan Transit Authority
77135 Technology Upgrades First 100 100Erie Metropolitan Transit Authority
Mode: Highway County: FranklinPlanning Partner: Franklin
87808 Reserve Line Item First 1,282 1,282CMAQ Line Item
87808 Reserve Line Item Second 3,844 3,844CMAQ Line Item
87808 Reserve Line Item Third 3,844 3,844CMAQ Line Item
87810 Reserve Line Item First 1,600 800 2,400Delivery/Consult Assist
87804 Reserve Line Item First 60 60Franklin Bridge Reserve
87804 Reserve Line Item Second 6,729 6,729Franklin Bridge Reserve
87804 Reserve Line Item Third 1,446 1,446Franklin Bridge Reserve
101395 Reserve Line Item First 1,500 1,500Franklin RBR Initiative
101395 Reserve Line Item Second 4,000 4,000Franklin RBR Initiative
101395 Reserve Line Item Third 1,000 1,000Franklin RBR Initiative
102384 Air Quality First 250 200 1,728 2,178Franklin Signal Improvemt
87805 Reserve Line Item First 1,270 1,270Highway Reserve
87805 Reserve Line Item Second 8,396 8,396Highway Reserve
87805 Reserve Line Item Third 12,549 12,549Highway Reserve
87816 Reserve Line Item First 1,111 1,111HSIP Line Item
87816 Reserve Line Item Second 4,488 4,488HSIP Line Item
87816 Reserve Line Item Third 4,490 4,490HSIP Line Item
102147 Reserve Line Item First 3,124 3,124Roadway Maint Line Item
88666 Congestion Reduction First 383 383SRTP Rideshare Program
![Page 2: Franklin County projects on the Pennsylvania 12-Year Program](https://reader036.vdocuments.us/reader036/viewer/2022073106/577cc62c1a28aba7119dde15/html5/thumbnails/2.jpg)
Project Route Title/Sponsor Improvement
08/06/2014 12:41 PM 2015-2026 Twelve Year Program
Period
Page 34 of 267
Study PE FD UTL ROW CON PRA Total
Cost ($000)
Date:Rpt# TYP210
Mode: Highway County: FranklinPlanning Partner: Franklin
100308 11 Highway Restoration Third 150 1,500 1,650US 11/Molly Pitcher Hghwy
86970 11 Safety Improvement First 153 200 900 2,255 3,509US11 & PA997 Intersection
100287 16 Highway Restoration Third 150 1,500 1,650Buchanan Trail West 2
90898 16 Highway Restoration Third 150 804 954Main Street Resurface
99810 16 Highway Restoration Third 150 1,250 1,400PA16/Buchanan Trail Resur
90205 16 Safety Improvement Third 150 150SR 16 Retaining Wall
100303 30 Highway Restoration Third 150 3,500 3,650Lincoln Hghwy Resurfacing
97964 75 Highway Restoration Third 150 1,400 1,550Path Valley Rd Resurf #3
86886 75 Highway Restoration First 1,520 1,520Path Valley Road
90997 75 Highway Restoration First 1,800 1,800Path Valley Road 2
93055 81 Highway Reconstruction First 4,000 2,458 6,458I-81 New Interchange
93055 81 Highway Reconstruction Second 5,042 1,000 1,500 20,362 27,904I-81 New Interchange
93055 81 Highway Reconstruction Third 10,181 10,181I-81 New Interchange
96291 233 Highway Restoration First 4,400 4,400PA 233 Resurface
96367 416 Highway Restoration First 2,100 2,100Mercersburg Rd Resurf #1
91183 416 Highway Restoration Third 150 1,360 1,510Mercersburg Road
90918 456 Highway Restoration Third 150 3,315 3,465Little Cove Rd Resurface
90905 533 Highway Restoration Third 150 2,589 2,739Orrstown Road Resurface
90214 696 Highway Restoration Third 150 150Franklin Co. Resurfacing
79700 1006 Highway Reconstruction First 450 350 350 350 2,622 4,122Main Street-Scotland
79700 1006 Highway Reconstruction Second 1,378 1,378Main Street-Scotland
91184 2010 Highway Restoration Third 150 875 1,025Old Route 16 Resurfacing
91187 4004 Highway Restoration Third 150 755 905Horse Valley Rd Resurface
Mode: Bridge County: FranklinPlanning Partner: Franklin
84433 Bridge Restoration First 949 949Martin's Mill Bridge
87680 11 Bridge Replacement First 350 200 75 75 700Falling Spring Run Bridge
87680 11 Bridge Replacement Second 1,000 1,000Falling Spring Run Bridge
74894 11 Bridge Replacement First 300 15 15 2,660 2,990Philadelphia Ave Bridge
87461 11 Bridge Replacement Third 50 223 273Trib Conococheague Cr Br
87446 11 Bridge Replacement First 75 75US 11 Conococheague Cr Br
![Page 3: Franklin County projects on the Pennsylvania 12-Year Program](https://reader036.vdocuments.us/reader036/viewer/2022073106/577cc62c1a28aba7119dde15/html5/thumbnails/3.jpg)
Project Route Title/Sponsor Improvement
08/06/2014 12:41 PM 2015-2026 Twelve Year Program
Period
Page 35 of 267
Study PE FD UTL ROW CON PRA Total
Cost ($000)
Date:Rpt# TYP210
Mode: Bridge County: FranklinPlanning Partner: Franklin
100054 11 Bridge Replacement Third 50 50US 11 over Muddy Run
100132 11 Bridge Replacement Third 150 150US11 over Wet Weather str
19304 11 Bridge Replacement First 209 209West King Street Bridge
82977 16 Bridge Replacement First 1,330 1,330Buchanan Trail Bridge 3
90812 16 Bridge Replacement Third 150 150Buck Run Bridge
100016 16 Bridge Replacement Third 150 150Main Street Bridge 2
90813 16 Bridge Restoration First 150 200 50 50 450Marsh Run Road
90813 16 Bridge Restoration Second 800 800Marsh Run Road
100009 16 Bridge Preservation - Federal First 100 150 50 50 700 1,050PA 16 over Conococheague
100028 16 Bridge Replacement Third 150 150PA 16 over Red Run 3
100012 16 Bridge Preservation - Federal Third 150 150PA16 Bridge PM 1
74889 16 Bridge Replacement First 1,960 1,960PA-16 Memorial Bridge
100023 16 Bridge Replacement Third 150 150PA16 over Red Run 1
100027 16 Bridge Replacement Third 150 150PA16 over Red Run 2
90322 30 Bridge Replacement First 185 125 50 50 750 1,160Lincoln Highway Bridge 1
90323 30 Bridge Replacement First 175 175Lincoln Highway Bridge 2
90323 30 Bridge Replacement Second 125 50 50 225Lincoln Highway Bridge 2
90324 30 Bridge Replacement First 175 125 50 50 653 1,053Lincoln Highway Bridge 3
90324 30 Bridge Replacement Second 97 97Lincoln Highway Bridge 3
90839 30 Bridge Replacement First 50 50 2,500 2,600Rocky Mountain Creek Br
90839 30 Bridge Replacement Second 2,500 2,500Rocky Mountain Creek Br
100046 30 Bridge Replacement First 200 200US 30 over Campbell Run
100237 30 Bridge Preservation - Federal First 100 15 15 300 430US30 over Conococheague
100051 30 Bridge Replacement First 150 150US30 over trib of Back Cr
100174 30 Bridge Replacement Third 150 150US30/trib to Campbell Run
99180 75 Bridge Preservation - Federal First 705 705Frkln Grp G Preservations
87684 75 Bridge Replacement Third 150 250 400Path Valley Bridge
92588 75 Bridge Replacement Third 150 594 744Path Valley Road Bridge
90841 75 Bridge Replacement Third 50 50Wet Weather Stream Bridge
90845 233 Bridge Replacement Third 50 50Little Antietam Creek
![Page 4: Franklin County projects on the Pennsylvania 12-Year Program](https://reader036.vdocuments.us/reader036/viewer/2022073106/577cc62c1a28aba7119dde15/html5/thumbnails/4.jpg)
Project Route Title/Sponsor Improvement
08/06/2014 12:41 PM 2015-2026 Twelve Year Program
Period
Page 36 of 267
Study PE FD UTL ROW CON PRA Total
Cost ($000)
Date:Rpt# TYP210
Mode: Bridge County: FranklinPlanning Partner: Franklin
100149 233 Bridge Replacement First 200 200PA233 over Rocky Mtn Crk
87686 233 Bridge Replacement Third 150 150Rocky Mt Rd Bridge
100165 316 Bridge Replacement Third 150 150PA316/Little Antietam Crk
100169 316 Bridge Replacement Third 150 150PA316/trib to W Antietam
82978 416 Bridge Replacement First 2,500 2,500Mercersburg Rd Bridge
100267 433 Bridge Preservation - Federal Third 150 225 375Rowe Run Road ov Rowe Run
78691 456 Bridge Restoration First 250 20 100 965 1,335Little Cove Road Bridge
82979 533 Bridge Replacement First 150 50 1,250 1,450Orrstown Rd Bridge 2
100256 641 Bridge Preservation - Federal Third 110 110Newburg Road/Laughlin Run
101402 641 Bridge Preservation - Federal Third 110 110Spring Run Road Bridge PM
78692 641 Bridge Preservation - Federal Third 56 56SR 641 O/Trout Run
101401 696 Bridge Preservation - Federal Third 80 80South Fayette Road Bridge
101404 995 Bridge Preservation - Federal Third 90 90Welsh Run Road Bridge PM
99971 997 Bridge Preservation - Federal First 168 75 15 15 273Black Gap Rd bridge PM
99971 997 Bridge Preservation - Federal Second 350 350Black Gap Rd bridge PM
100003 997 Bridge Preservation - Federal First 150 15 15 180Black Gap Road over NS
100003 997 Bridge Preservation - Federal Second 370 370Black Gap Road over NS
87682 997 Bridge Replacement First 200 15 15 1,411 1,641Cumberland Highway Bridge
87444 997 Bridge Replacement First 200 15 15 3,177 3,407PA997 Over Conodoguinet 2
100039 997 Bridge Replacement Third 150 150PA997 over Conodoguinet 3
90856 997 Bridge Replacement First 75 75W Branch of Antietam Ck
100249 1001 Bridge Preservation - Federal Third 150 70 220Mount Pleasant Rd Bridge
100042 2002 Bridge Replacement Third 150 150Leitersburg RD/ Marsh Run
100225 2006 Bridge Preservation - Federal Third 150 150Iron Bridge Rd Bridge
78714 2007 Bridge Preservation - Federal Third 150 150SR2007 O/Little Antietam
63179 2016 Bridge Preservation - Federal First 50 50SR 2016/I-81 Bridge
93208 2031 Bridge Replacement First 75 50 15 25 165Mont Alto Road Bridge
93208 2031 Bridge Replacement Second 200 200Mont Alto Road Bridge
91340 3001 Bridge Replacement Third 150 200 350Williamsport Pike Bridge
19411 3002 Bridge Restoration First 250 20 20 901 1,191Williamson Road Bridge
![Page 5: Franklin County projects on the Pennsylvania 12-Year Program](https://reader036.vdocuments.us/reader036/viewer/2022073106/577cc62c1a28aba7119dde15/html5/thumbnails/5.jpg)
Project Route Title/Sponsor Improvement
08/06/2014 12:41 PM 2015-2026 Twelve Year Program
Period
Page 37 of 267
Study PE FD UTL ROW CON PRA Total
Cost ($000)
Date:Rpt# TYP210
Mode: Bridge County: FranklinPlanning Partner: Franklin
99967 3004 Bridge Preservation - Federal Third 405 405Bino Road Bridge PM
78699 3007 Bridge Preservation - Federal Third 150 150Lemar Road Bridge
100261 3009 Bridge Preservation - Federal Third 150 175 325Oregon St ov Steigers Run
100163 3011 Bridge Replacement Third 150 150Mountain Rd ovr Buck Run
101403 3011 Bridge Preservation - Federal Third 150 50 200Stoney Battery Rd Bridge
87447 3011 Bridge Replacement Third 150 150Stoney Battery Rd Bridge
91343 3012 Bridge Replacement Third 150 200 350Jack Road Bridge
90969 3012 Bridge Replacement First 250 250Jack Road Bridge 2
100245 3026 Bridge Preservation - Federal Third 50 50Mill Road over Carters Cr
99964 4001 Bridge Preservation - Federal Third 55 55Bear Valley Rd/ Broad Run
63180 4004 Bridge Restoration First 150 25 25 280 480Lower Horse Valley Rd Br
99938 4005 Bridge Preservation - Federal Third 50 50Amberson Road Bridge 3
99929 4005 Bridge Preservation - Federal Third 170 170Amberson Road Bridge2
63174 4006 Bridge Replacement Second 35 35Spring Run Road Bridge
99942 4007 Bridge Replacement Third 150 150Back Road over Dry Run
19373 4010 Bridge Replacement First 200 15 15 1,589 1,819Edenville Road Bridge
19188 4018 Bridge Replacement Third 50 50Maclays Mill Road Bridge
63175 4018 Bridge Replacement Third 50 50Paxton Run Rd Bridge
100138 4018 Bridge Replacement Third 50 50Paxton Run Rd Bridge 1
100143 4018 Bridge Replacement Third 50 50Paxton Run Road Bridge 2
92542 7202 Bridge Replacement First 750 750Store Lane Bridge
92543 7209 Bridge Replacement First 250 150 20 33 564 1,017Heisey Road T330 CO#121
92543 7209 Bridge Replacement Second 1,686 1,686Heisey Road T330 CO#121
Mode: Highway County: CumberlandPlanning Partner: Harrisburg
97337 PA Community Transportation Initiative First 400 400Carlisle West End Trail
93175 Transportation Enhancement First 600 600CVRT Shippensburg Connctr
101966 New Alignment First 150 105 1,903 2,158Gettysburg Rd Realignment
96290 11 Highway Restoration First 2,300 2,300Enola Road Resurface
101266 11 Highway Restoration Third 150 150Molly Pitcher Hwy Resurf