(foundry, welding, sheet metal) - dept of technical …dte.kar.nic.in/circulars/dvp/mhrd...
TRANSCRIPT
PROPOSAL FOR
UPGRADATION OF INFRASTRUCTURAL FACILITIES IN THE EXISTING POLYTECHNICS
GOVERNMENT POLYTECHNIC, IMMADIHALLI, BANGALORE-560066
KARNATAKA STATE
Under the Scheme of Sub-Mission on Polytechnics under the Coordinated Action for Skill Development
Submitted to
GOVERNMENT OF INDIAMINISTRY OF HUMAN RESOURCE DEVELOPMENT
[DEPARTMENT OF HIGHER EDUCATION]SHASTRI BHAVAN
NEW DELHI
FORMAT FOR UPGRADATION OF INFRASTRUCTURAL FACILITIES IN THE EXISTING POLYTECHNICS – SUB-MISSION ON POLYTECHNICS UNDER THE COORDINATED ACTION FOR SKILL DEVELOPMENT.
PART 1 : BASIC INFORMATION ABOUT THE POLYTECHNIC
1 a] Name of PolytechnicGovernment Polytechnic,
Immadihalli,Bangalore-560066.
b] Location [Road, Street Name, Locality, City, Pin Code]
Immadihalli,Bangalore-560066.
c] Year of Establishment 2009-10
d] Women/Co-educational Co-Educational
e] Government/Government Aided
GOVERNMENT
f] Nature of Institution Affiliated to Board Of Technical Education, Karnataka
2 a] Name of Principal/incharge Sri D.V.Srinivasa murthy
b] Office Address with Pin CodeOffice of the Principal,
Government Polytechnic,Immadihalli,
Bangalore-560066.c] Office Phone No. with STD
Code080-28454040
d] Residential Phone No. with STD Code
080-23626895
e] Telex/Fax No. on which message can be given
-
f] E-mail address [email protected]
3 a] Name of Vice Principal/Deputy in-charge Sri.SureshBabu.R
4 a] Name of Nearest Railway Station
White Field Railway Station
5 a] Name of Nearest Air Port Bangalore International Airport
PART-II::- CURRENT STATUS AND ACADEMIC DIMENSIONS OF THE POLYTECHNIC
1. Courses and sanctioned Intake in various programmesInformation to be filled in Table 1
2. Faculty Positions and Development StatusInformation to be filled in Table 2 & 3
3. Books and Learning Resources Utilization Centre [LRUC]
Information to be filled in Table 4
Rational strengthening LRUCsInformation to be filled in Table 5
4. Existing Laboratories and WorkshopsInformation to be filled in Table 6
5. Rational for Proposed Modernization of Laboratories and Workshops
Information to be filled in Table 7 & 8
6. New Courses/Programmes to be introduced in this Scheme [If
any]. Details thereof and estimates- No -
7. Estimated Cost for Upgradation of Infrastructural facilitiesInformation to be filled in Table 9
TABLE-1COURSES AND SANCTIONED INTAKE IN VARIOUS PROGRAMMES
Sl.No. Name of the Course Year of
StartingDiploma/
Post Diploma
Duration
Semester/Annual
Sanctioned student
intake
Actual enrolment all years [1st +2nd
+3rd year] upto 2010-11
Total
Male Female
01 Civil Engg. 2009-10 Diploma 03 Years Semester 60 50+11 03+0 64
02 Mechanical Engg. 2009-10 Diploma 03 Years Semester 60 59+22 1+0 82
03Electronics & Communication Engg. 2009-10 Diploma 03 Years Semester 60 45+13 15+4 77
04 Computer Sc. Engg. 2009-10 Diploma 03 Years Semester 60 38+5 15+5 63
* The Total enrolment of all course for entire duration to be given
TABLE-2CURRENT FACULTY STATUS
Category Total Posts Sanctioned
Post FilledRegular Adhoc Central Dual
ChargeTotal Grand
Total % filledM F M F M F M F M F
Principal 01 0 0 0 0 0 0 0 0 0 0 0 0Lecturers 24 5 3 5 6 0 0 0 0 0 0 19 79%Instructors including System Analyst
04 0 0 0 0 0 0 0 0 0 0 0 0
Asst. Instructor 05 1 0 0 0 0 0 0 0 1 0 1 20%
Mechanics 06 0 0 0 0 0 0 0 0 0 0 0 0
Helpers 08 0 0 0 0 0 0 0 0 0 0 0 0
TABLE-3CURRENT SUPPORTING STAFF STATUS
Category Total Posts Sanctioned
Post FilledRegular Adhoc Central Dual
ChargeTotal Grand
Total % filledM F M F M F M F M F
Registrar 01 0 0 0 0 0 0 0 0 0 0 0 0
Office Suptds. 02 0 0 1 0 0 0 0 0 0 0 1 50%
F.D.A 04 0 0 0 0 0 0 0 0 0 0 0 0
S.D.A 04 0 0 0 0 0 0 0 0 0 0 0 0
Typist 01 0 0 0 1 0 0 0 0 0 0 1 100%
Office Attenders 01 0 0 0 0 0 0 0 0 0 0 0 0
Group ‘D” 08 0 1 0 0 0 0 0 0 0 0 1 13%
TABLE-4
BOOKS AND LEARNING RESOURCES AVAILABLE CURRENT STATUS [NUMBER]
Sl.No. Type of LRs
TotalNumbers Amount
[In Rupees]1 Text Books 400 80,000/-
TABLE-5
BOOKS AND LEARNING RESOURCES PROPOSED TO BE PROCURED
Sl.No. Type of LRs
Total Quantity Required
Total Cost[Rs. In Million]
Procurement schedule with Approximate cost [Rupees in Lakh] during 11th Plan
Up to 31/03/2010
Year 2010-11
Year 2011-12
1 Text Books 4000 1.2 - 6 Lakhs 6 lakhs
2Educational CD’s 200 0.1 - 0.5 Lakhs 0.5 Lakhs
3Educational
Models200 1.0 - 5 Lakhs 5 Lakhs
4 Educational Charts 200 0.2 - 1 Lakh 1 Lakh
5 Technical Magazine
100 0.1 - 0.5 Lakh 0.5 Lakh
6 E – library(Desktop PC’s /Printers
/Modem/Internet facility
- 1.5 - 7.5 Lakh 7.5 lakh
7 Teaching Aid( LCD Projectors /OHP)
12 1.5 - 7.5 Lakh 7.5 Lakh
TABLE-6LABORATORIES AND EQUIPMENT AVAILABLE
i) DEPARTMENT OF CIVIL ENGINEERING
Sl. No. Laboratory/Workshop List of equipment each costing more than Rs.10,000/-
Availability of
documents manuals
Condition
Yes No In use Obsolete1 Survey Practice i) Electronic Theodolite 2 No’s Yes Yes2 MT lab Nil Yes Yes3 Hydraulics Environmental and
Plumbing LabNil Yes Yes
4 Civil Drawing using Cad 6 Computers Yes Yes
ii) DEPARTMENT OF MECHANICAL ENGINEERING
S.No Laboratory/ Workshop
List of equipment each costing more than Rs 10,000/-
Availability of documents/ manuals
Condition
Yes NO In use Obsolete
1 Carpentry Nil Yes -- -- --2 Fitting Nil Yes -- -- --3 Basic computer
skillscomputers yes
iii) DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING
S.No. Laboratory/Workshop List of equipment each costing more than Rs. 10,000/-Quantity available
Availability of documents/Manuals
Condition
Yes No In Use Obsolete
1 Digital Lab Handheld Digital IC Tester Model: HDIT20 01
YES YES
LCR Meter 01 YES YES8-channel Time division multiplexing and de-multiplexing trainer with power supply
01 YES YES
Amplitude Shift keying modulation and demodulation trainer kit with power supply
01 YES YES
Phase shift keying modulation and demodulation trainer kit with power supply
01 YES YES
Frequency shift keying modulation and demodulation trainer kit with power supply
01 YES YES
Frequency modulation and demodulation kit 01 YES YES30MHz dual trace Oscilloscope 02 YES YES1MHz signal generator with frequency counter model: 20140
02 YES YES
Digital IC Trainer 04 YES YES2 Analog Lab 1 MHz Function generator model FG1 MD 02 YES YES
Dual DC Regulated power supply 10 YES YES
iv) DEPARTMENT OF COMPUTER SCIENCE AND ENGINEERING
Sl. No.
Laboratory/Workshop List of equipment
each costing more than Rs.10,000/-
Availability of
documents manuals
Condition
Yes No In use Obsolete1 BCS Lab 8 Computers
a)5KVA UPSb)Dot Matrix Printerc)Scanner
Yes Yes
2 Networking and Hardware Lab 8 Computersa)Laser Printer
Yes Yes
3 Linux Lab 8 Computersb)Dot matrix printerc)Scanner
Yes Yes
TABLE-7
NAMES OF LABORATORIES AND WORKSHOPSi) DEPARTMENT OF CIVIL ENGINEERING
Name of Existing Additional requirement for current and new courses
Laboratories Workshops Laboratories WorkshopsBasic Computer Skills Plumbing Practice
Surveying Practice Construction work shop
Auto Cad
Material and Soil Testing
HydraulicsEnvironmental Engg
ii) DEPARTMENT OF MECHANICAL ENGINEERING
Name of Existing Additional requirement for current and new courses
Laboratories Workshops Laboratories WorkshopsBasic Computer Skills Basic Work Shop
Practice(carpentry,)CNC
Basic Electrical and Electronics
Basic Work Shop Practice( fitter,)
Mechatronics
Computer Aided Engg Graphics
Basic Work Shop Practice( Forging )
Material Testing and Metrology
Basic Work Shop Practice(Foundry)
Fluid Mechanics and Machines
Basic Work Shop Practice(Sheet Metal)
Pneumatic Basic Work Shop Practice(Welding)
Parametric modeling Machine Shop
(iii) DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING
Name of Existing Additional requirement for current and new courses
Laboratories Workshops Laboratories WorkshopsBasic computer skill PC hardware and
networks labBasic electrical and
electronics labDigital Communication
labDigital electronics lab Power Electronics and
PLC labSemiconductor devices
labAnalog Electronics labAnalog communication
labPCB design & Simulation labMicrocontoler
&application lab
v) DEPARTMENT OF COMPUTER SCIENCE AND ENGINEERING
Name of Existing Additional requirement for current and new courses
Laboratories Workshops Laboratories WorkshopsBasic computer skill JAVA Lab
Basic electrical and electronics lab
ASP.Net Lab
Programming in CDigital Electronics
Advanced Chardware and networks
Web Design LabD.B.M.S Lab
C++ LabLinux LabGUI Lab
vi) DEPARTMENT OF SCINCE AND HUMANITIES
Name of Existing Additional requirement for current and new courses
Laboratories Workshops Laboratories Workshops
Applied Science Language Lab
Sl. No
Name of the Course
Year of Starting
the course
Name of Laborato
ry
Equipment Total Quantit
y
Total Cost (Rs. In million)
Procurement Schedule with Approx. Cost (Rs. In million)
Upto 31.03.2010 Year 2010-11 Year 2011-12 No. Amt. No. Amt. No. Amt.1
Civi
l Eng
inee
ring
2009
Surv
ey P
racti
ce
i) Vernier Transit Theodolite
2 0.018 2 0.018
2)Digital Planimeter 2 0.1 2 0.1
3) Total Station 2 1.6 1 0.8 1 0.8
4) Electronic Theodolite 2 0.12 2 0.12
5)GPS 1 0.08 1 0.08
2
M
T la
b
1) Compression Testing Machine
1 0.1 1 0.1
2) Universal Testing Machine
1 0.25 1 0.25
3)Mechanical Sieve Shaker 1 0.01 1 0.01
4) Electrically Operated Sieve Shaker
1 0.022 1 0.022
5) Electronic Weighing Balance
1 0.01 1 0.01
7) Tables 1 0.05 1 0.05
3
Civi
l Eng
inee
ring
2009 Hy
drau
lics E
nviro
nmen
tal a
nd P
lum
bing
La
b
1) Centrifugal Pump Test Rig
6 0.06 6 0.06
2) Friction Through Pipes Apparatus
1 0.09 1 0.09
3) V notch Apparatus 1 0.09 1 0.09
4)pH Cum Conductivity meter
1 0.09 1 0.09
5) Turbidity Meter 1 0.025 1 0.025
1) Computers 1 0.030 1 0.030
4
Civi
l Dra
win
g us
ing
Cad
2)UPS 24 0.96 12 0.48 12 0.48
4)Plotter 1 0.1 1 0.1
5) Cieling Mounted LCD Projector
1 0.07 1 0.07
iii) DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING
Sl. No.
Nam
e of
the
cour
se
Year
of s
tarti
ng t
he
cour
se
Nam
e of
Labo
rato
ry
Name of the equipmentTotal Qty. required
Total Cost (Rs. In million)
Procurement Schedule with Approx. cost (Rs. In million)
Upto 31.03.2010
Year 2010-11 Year 2011-12
Nos. Cost in Rs Nos. Cost in Rs
1
Elec
tron
ics &
Com
mun
icati
on
2009
-10
Digi
tal C
omm
. Lab
Sampling theorem and Aliasing effect kit 10 0.13 05 0.065 05 0.065Pulse Code modulation and demodulation kit 10 0.14 05 0.07 05 0.07Delta modulation and demodulation kit 10 0.13 05 0.065 05 0.065Adaptive delta modulation and demodulation kit 10 0.15 05 0.075 05 0.075DPSK modulation and demodulation kit 10 0.15 05 0.075 05 0.075Optical fiber omm.. Trainer kit 03 0.24 02 0.16 01 0.08Dual Channel CRO 25MHz 10 0.25 05 0.125 05 0.125Function generator 1MHz 10 0.12 05 0.06 05 0.06Digital IC trainer kit 10 0.1 05 0.05 05 0.05Table 10 0.1 05 0.05 05 0.05Chairs 10 0.05 05 0.025 05 0.025
2
Mi
cro
co
Computer systems : Core 2 duo/dual core, 2 GB RAM, 320GB HDD 10 0.4 05 0.2 05 0.2Laser Printer 02 0.06 01 0.03 01 0.03Computer tables 10 0.1 05 0.05 05 0.05Chairs 10 0.05 05 0.025 05 0.025Sealing mounted LCD Projector 01 0.1 01 0.1 -- ---
3
PCB
Sim
ulati
on
Lab
Computer systems : Core 2 duo/dual core, 1 GB RAM, 150 HDD 20 0.8 10 0.4 10 0.4Computer tables 20 0.2 10 0.1 10 0.1Chairs 20 0.1 10 0.05 10 0.05
4
BCS
Lab Computer systems : Core 2 duo/dual core, 1 GB RAM,
150 HDD 20 0.8 10 0.4 10 0.4Computer Table 20 0.2 10 0.1 10 0.1
S.N
o
Nam
e of
the
Labo
rato
ry
Nam
e of
Equ
ipm
ent
Tota
l Qua
ntity
re
quire
d
Tota
l Cos
t (Rs
)
Procurement schedule with Approx. Cost ( Rupees)Up to 1.03.2010
Year 2010-11 Year 2011-12
No
Amou
nt
No
Amou
nt
No
Amou
nt
1 Basic of computer Skills
Computer 20 800000 10 400000 10 4000002 Computer Table 20 200000 10 100000 10 1000003 Computer Chair 20 100000 10 50000 10 500004 5KVA UPS 1 100000 1 1000005 Computer Aided
Engineering GraphicsEngineering Graphics Software 1 20000 1 20000
6 Mechanical Testing & Quality control Laboratory
flash and fire point Apparatus 2 30000 1 15000 1 150007 Universal Testing Machine 1 250000 1 2500008 Izod and Charpy’s tester 1 50000 1 500009 Brinnel &Rockwell
Hardness Tester1 45000 1 45000
10 Vicker hardnessTester
1 45000 1 45000
11 Redwood viscometer 1 30000 1 3000012 Thurston oil tester 1 25000 1 2500013 Dye penetrant tester 1 50000 1 5000014 Ultrasonic equipment. 1 45000 1 4500015 Tables for kit 8 80000 8 8000016 Basic workshop
practice-II
(Foundry, Welding, sheet metal)
Heavy dutyWelding Transformer with Tools
2 50000 1 25000 1 25000
17 Gas welding tools & equipment 2 40000 1 20000 1 2000018 MIG and TIG welding equipment 2 40000 1 20000 1 2000019 Foundry Tools 1set 20000 1 20000
20 Machine shop-I Medium duty Lathe with assoserries
20 3000000 10 1500000 10 1500000
21 Pillar Drillingmachine with assoserries
2 200000 1 100000 1 100000
22 Power hacksaw with assoserries 1 60000 1 6000023 Bench grinder with assoserries 2 40000 1 20000 1 20000
24 Shaping machinewith assoserries
2 200000 1 100000 1 100000
25 slotting machinewith assoserries
1 50000 1 50000
26 Fluid Power LAB Venturimeter Kit 1 25000 1 2500027 Notches Kit 1 25000 1 2500028 Pipe Friction Kit 1 30000 1 30000
Chairs 20 0.1 10 0.05 10 0.055
Anal
og E
lect
roni
cs
Lab
Dual Channel CRO 25 MHz 20 0.5 10 0.25 10 0.25Variable DC regulated power supply (dual) 20 0.3 10 0.15 10 0.15Function generator (0-10MHz) 20 0.2 10 0.1 10 0.1Signal generator (0-1 MHz) 20 0.2 10 0.1 10 0.1Linear /Analog Trainer kits with builtin Power supply and bread board 20 0.2 10 0.1 10 0.1Tables 20 0.2 10 0.1 10 0.1Chairs 20 0.1 10 0.05 10 0.05
6 B E E LCR meter 02 0.024 01 0.012 01 0.012
7
Adva
nced
M
icro
proc
esso
r Lab
Microprocessor kits with interfacing units 10 0.1 5 0.05 5 0.05Masm software 10 0.2 5 0.1 5 0.1Computer systems : Core 2 duo/dual core, 1 GB RAM, 150 HDD 20 0.8 10 0.4 10 0.4
Computer Table 20 0.2 10 0.1 10 0.1Chairs 20 0.1 10 0.05 10 0.05
8
Pow
er
Elec
tron
ics
and
PLC
Lab Dimmer stat 10 0.15 5 0.075 5 0.075
PLC Trainer kits with interfacing modules 16 0.2 8 0.1 8 0.1Computer Table 20 0.2 10 0.1 10 0.1Chairs 20 0.1 10 0.05 10 0.05
9
Pc
Hard
war
e&
Net
wor
ks Network accessories & Hardware Tools and Software
10 0.3 5 0.15 5 0.15
Total 8.544 4.362 4.182
iv) DEPARTMENT OF COMPUTER SCIENCE AND ENGINEERINGS.
No
Nam
e of
the
Cour
seYe
ar o
f sta
rting
th
e Co
urse
Nam
e of
the
Labo
rato
ry
Nam
e of
Eq
uipm
ent
Tota
l Qua
ntity
re
quire
d
Tota
l Cos
t (Rs
in
mill
ions
)
Procurement schedule with Approx. Cost ( Rupees in Lakh )Up to 31.03.2010
Year 2010-11 Year 2011-12
No
Amou
nt
No
Amou
nt
in R
s.
No
Amou
nt
in R
s.
COM
PUTE
R SC
IEN
CE (
Gen
eral
)
2009
-10
1 Basic computer Skills lab
Computer 10 400000=0.4 05 200000 05 2000002 Computer Table 10 100000=0.1 05 50000 05 500003 Computer Chair 10 50000=0.05 05 25000 05 250004 5KVA UPS 1 100000=0.1 1 100000 -- ---5 Laser Printer 1 13000=0.013 1 13000 - -6 Lcd Projector 1 100000=0.1 1 100000 - -7 AC 2 100000=0.1 1 50000 1 500008 Almarah 2 30000=0.03 1 15000 1 150009 Linux lab Computers 10 400000=0.4 05 200000 05 20000010 Computer table 10 100000=0.1 05 50000 05 5000011 Computer chair 10 50000=0.05 05 25000 05 2500012 5KVA UPS 1 100000=0.1 1 100000 --- ----13 AC 2 50000=0.05 1 25000 1 2500014 Software(CS Related
Syllabus Softwares)1 200000=0.2 1 200000 - -
15 Dot matrix Printer 1 11000=0.011 1 11000 - -16
Hardware & Networking Lab
Computers 10 400000=0.4 05 200000 05 20000017 Computer Table 10 100000=0.1 05 50000 05 5000018 5KVA UPS 1 100000=0.1 01 100000 - -19 Dot matrix printer 1 11000=0.011 - ---20 Digital Multimeters 20 40000=0.04 10 20000 10 2000021 RJ 45 Connectors 100 1000=0.001 50 500 50 50022 Tool Kit 20 10000=0.01 10 5000 10 5000
23 Crimping Tool RJ 45 10 10000=0.01 5 5000 5 5000
24 Wired Switch 1 35000=0.03525 Punching Cat 6
Cable500mts
10000=0.01
26 LAN Tester 5 5000=0.005 3 3000 2 200027 Punching Tool 5 5000=0.005 3 3000 2 200028 ADSL Modem 2 4000=0.004 1 2000 1 200029 I/O Connectors I/O
box +plate20 6000=0.006 10 3000 10 3000
30 NIC card Wired 25 6250=0.00625
15 3750 10 2500
31 NIC Card Wireless IEEE 802.11 Std.
25 50000=0.05 15 30000 10 20000
32 Spike buster 30 9000=0.009 15 4500 15 4500Total 2.60625 1593750 956500
TABLE-9
ESTIMATED COST FOR INFRASTRUCTURAL DEVELOPMENT
Sl.No.
Expenditure Category
Allocations sought [Rupees in Lakh]Upto 31/03/2010 Year 2010-11 Year 2011-12
A] Investment Cost
Books [+Journals] - 6.5 lakhs 6.5 lakhs
LRs. - 21.5 lakhs 21.5 lakhs
Sub-Total [A] - 28 lakhs 28 lakhs
B] RECURRING COSTConsumables - 14 lakhs 10 lakhs
Operation and Maintenance
- 7 lakhs 5 lakhs
Sub-Total [B] - 21 lakhs 15 lakhs
Grand Total [A] + [B] - 49 lakhs 43 lakhs
FINANCIAL RESOURCES
2006-07 2007-08 2008-09
01 Whether the Institution is receiving grants, if so details during last 3 years
a] State
b] Others [Pl. specify]
Recurring Non-Recurring
Recurring Non-Recurring
Recurring Non-Recurring
Whether the Institution received any grants from Central Government/and any other agencies such as Tech. Ed. I, II, & III during the last 15 years, if so given details
Scheme Year Amount Received Amount Spent
Nil 2009-10 NIL NIL
Total NIL NIL NILNote: Govt.Polytechnic, Immadihalli started during Academic Year 2009-10
Brief write up:
Karnataka’s Share in GDP is around 6%. Karnataka’s industrial policy 2009-14 intends to build a
prosperous Karnataka through development of human and natural resources in a systematic scientific and
sustainable manner. It aims to provide additional employment for about 10 lakh persons by 2014 by
attracting Rs 3,00,000Cr of investment and enhance the contribution of manufacturing sector to the states
GDP from current levelof 17% to 20% by 2014 focusing on skill and entrepreneurship development. The
recently concluded GIM has attracted investments to nearly Rs.5,00,000 Cr. with an employment potential
of one million jobs. Govt Polytechnic, Immadihalli will interact with Government of Karnataka and
industries who signed MOU’s to get collaboration and support in IFI and on site skill development of
Students. Availability of skilled human resources including trained technical manpower in Engg and
Technology is major reason for growing investments in the State.
Government Polytechnic, Immadihalli was established in the year 2009-10.The institution is
offering four diploma programmes of three years duration with annual intake of 60 for each programme
for each year. The programmes are.
1. Diploma in Civil Engg.
2. Diploma in Mechanical Engg.
3. Diploma in Electronics & Communication Engg.
4. Diploma in Computer Science Engg.
There are 285 students (academic year 2010-11) studying in the institute (boys 264 & girls 18) the
Institute having it is on threshold of establishing laboratories, workshop and construction of academic and
administrative blocks at an estimated cost of Rs. 800 lakhs, institute has a play ground, own bore well.
Majority of students hail from Bangalore rural and urban districts and very few from other parts of
Karnataka. The students studying in the polytechnic are from low income group family or middle income
group families with Kannada medium study back ground at their matriculation level. The student of the
Institute with their semi urban back up are potential and they are very good at work in the field and also on
shop floor.
Immadihalli is located in the outskirts of Bangalore. The average annual rainfall is 720mm. Immadihalli
is close to ITPL which is IT hub of silicon city Bangalore. In the neighbourhood we have Graphite, TCS,
HCL ,Hindustan Lever, GE, Tisco, HP, Seimens, Accenture, Dell, Secon Surveys, Vimoksha.
The Institution is having the committed and dedicated staff. The institute is fully funded by
Government of Karnataka as per allocation of the annual Budget.
Since the Institute is recently started from the academic year 2009-10 the existing laboratories,
workshop, library, computer lab etc. have to be strengthened, keeping in view of the modernization. By
modernization and strengthening of polytechnic with latest techniques, skills, software up gradation, skill
oriented training can be imparted to student community. Majority of students, in this rural based
polytechnic are poor in English and they scared of their communication in English language.
Though the students are potential and good at work, but the major draw back is lack of
communication skill. It is very important for the institute to develop and improve better communication
skill among the students, so that the can compete with the students of major cities. Keeping this in view,
along with modernization and strengthening of existing laboratories and workshop, it is highly needed to
establish A language and communication skill lab, Which helps the students to improve their English
language, their communication skill, in turn, indirectly personality development aspects.
OBJECTIVES
1. To Strengthen the existing Diploma Courses 2. To Upgrade the Laboratories with state of art equipment 3. To Establish the State of the art Learning Resource Utilization Centre4. To Provide a very safe , neat and tidy academic ambience to the students5. To impart competitive technical skills to the students with modernized Laboratory Setup
The main areas of our thrust are
1. Modernization of laboratories: The existing laboratories are to be
modernized with new Equipment.
2. Modernization of workshops: Improving the present condition and
Environment of teaching learning process for performing better
skills.
3. Furniture : Providing a pleasing and comfort
Environment for listening, writing,
Teaching-learning process in the
Workshop and laboratories
4. Teaching Aids (A-V aids) : Making the students the understand the
Subject and new technological aspect
Through audio-video aids.
5. Models (Machine models : Giving pictorial representation of
Turban pumps models components of a machine or of a
Pneumatics kit models structure of a concerned engineering.
Bridges Models, culvert discipline so those students can visualize
Models, irrigation models and imaging the plan, elevation and
Transmission towers, cross section views of that model .
Satellite signal receiving Models etc.,
6. Non conventional : Being technical students the students Energy aspects
should develop concerned towards Environment and natural
resources. Student must have awareness of solar energy, alternative
eco-Friendly energies
7. E-learning : Sitting at remote district, the student Should get exposures to modern
Technological development in their Concerned programmes by
Internet browsing
8. Language & : To make the student to know themselves
Communication Skills lab Why they are poor in communication?
What makes them to improve their Communication?
How to do effective communication?
How to improve their English Communication language?
Imparting training to boost their Personality development
Keeping all this in view, to impart still better technical know-how, and also for more effective
teaching-learning process in the institute, the project is submitted and justified from Government
Polytechnic, Immadihalli.
PRINCIPAL
(D.V. SRINIVASA MURTHY)