25
Simple Cycle Energy Center Core Engineering Consultant Arlington, Tx Dec 12, 2015 Team of Engineers Ali Shafikhani Haroon Rasheed Mohammed Muqtadar Chhokila Lama Sandeep Shah Tenzing Lama 1

Upload: haroon-rasheed-ahmed

Post on 22-Jan-2018

93 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Foundation Presentation .pptx

Simple Cycle Energy CenterCore Engineering Consultant

Arlington, Tx

Dec 12, 2015

Team of Engineers Ali Shafikhani

Haroon Rasheed

Mohammed Muqtadar

Chhokila Lama

Sandeep Shah

Tenzing Lama

1

Page 2: Foundation Presentation .pptx

Project Outline ● Project Introduction

● Scope: Foundation Design

● Conclusion and Recommendations

● References

➢Turbine

➢GSU Transformers and

Breakers

➢ Four Water Tank

2Speaker: Ali Shafikhani

Page 3: Foundation Presentation .pptx

IntroductionPlant Layout

3Speaker: Ali Shafikhani

543 megawatt simple cycle gas fired electric generating facility in

Maverick County, Texas

Water

Tanks

GSU Transformers &

Breakers

Turbines

Page 4: Foundation Presentation .pptx

Foundation Design

A TM2500 Gas Turbine

GSU Transformers and BreakersA Water Storage Tank 4

Speaker: Ali Shafikhani

Page 5: Foundation Presentation .pptx

Turbine Options

Speaker: Ali Shafikhani5

Page 6: Foundation Presentation .pptx

Mat Foundation Design(for 90% of loads)

● Strong sand layer over weak clay layerEliminating the top clay layer.

Speaker: Ali Shafikhani

Foundation dimension: 23*64 (ft) with huge safety factor

6

Page 7: Foundation Presentation .pptx

Mitigation of Turbine Vibration

loading EffectApplication of light weight high compressive strength geofoam blocks as structural

void fill material (Ɣ=0.7-2.85 pcf).

- To mitigate destructive vibration loading effect.

- In order to design a lightweight mat foundation to prevent subsequent

settlement.

- To make a cost effective design.

- To decrease construction time period.

Speaker: Ali Shafikhani

Resource:

(https://hayfieldhouse.wordpress.com/category/foundation/)Resource: (http://cenews.com/article/9649/geofoam-a-lightweight-fill-

alternative)

7

Page 8: Foundation Presentation .pptx

Lightweight foundation on expansive soil

8

Expansive soils:

- High settlement and swelling potential during seasonal rainfall.

- Load concentration motivates this settlement and swelling effect.

- differential settlement will occur.

Page 9: Foundation Presentation .pptx

Mitigation of Swelling effect of top

Clay layer

Speaker: Ali Shafikhani

Deep foundation dimension: 16*3*5 (ft)(Resource: Chen (1988), O’Nill (1988))

9

Page 10: Foundation Presentation .pptx

Combined Footing● Strong clay layer over weaker sand layer

Speaker: Ali Shafikhani

Foundation dimension: 4.5*10 (ft). F.S>4

10

Page 11: Foundation Presentation .pptx

Elastic Settlement Mat Foundation and Combined Footing:

● Sand layers:

● Clay layers:

● Mat Foundation: Se= 0.68 (in)● Combined Footing: Se= 0.36 (in)

Speaker: Ali Shafikhani

11

Page 12: Foundation Presentation .pptx

Elastic Settlement Drilled shaft:

● This case: Se= 0.48 inch

Speaker: Ali Shafikhani12

Page 13: Foundation Presentation .pptx

Storage TankWater 50,000 gal

Height of Steel Tank = 50 ft

Tank Thickness = 1.5 in

Structural load = Tank + Water

=

418 kips

Bore log 2

Speaker: Sandeep Shah 13

Page 14: Foundation Presentation .pptx

●2 X 2 Group Pile●Length of Piles= 20 ft ●Circular Concrete Pile●Diameter = 1.5 ft●Spacing (S) = 2.5 D

Dimensions

Speaker: Sandeep Shah14

Page 15: Foundation Presentation .pptx

Pile Capacity●Tip Resistance (Sand layer) Qp = 319 kips

(Meyerhof’s Method)●Skin Resistance (Clay+Sand) Qs = 74 kips

(Alpha & Meyerhof)●Ultimate bearing Capacity of 4 piles without the

group effect Qu = 1572 kips●Group efficiency = 1.11 (Piles behave individually)●Ultimate load bearing capacity of the group pile

Qg(u) = 1572 kips●F.S. = 3, Qall = 524 kips > 418 kips

Speaker: Sandeep Shah15

Page 16: Foundation Presentation .pptx

Settlements●Elastic Settlement

➢ Individual= 0.180 in

➢Group piles = 0.33 in

● Consolidation Settlement

➢ Group = 1.15 in

Total Settlement = 1.48in <1.5 in

● Pile Cap

➢ Dimension=6ft X 6ft

➢Thickness=3.3 ft.

➢Weight= 17.8kips

Group Pile Weight of 4 piles = 21.2 kips

Speaker: Sandeep Shah 16

Page 17: Foundation Presentation .pptx

GSU TRANSFORMERProperties of Transformer

Dimensions

Width : 65” = 5.41’

Length : 84” = 7’

Height : 96.625” = 8.05’

Weight

APPROX. WEIGHT:

CORE & COIL - 3832 lbs.

CASE - 3011 lbs.

LIQUID (343 gal.) -2744 lbs.

TOTAL - 9587 lbs.

17Speaker: Haroon Rasheed

Page 18: Foundation Presentation .pptx

GSU TRANSFORMERASSUMPTIONS:

● Pressure bulb reaches a depth of 2B (12’)

● The three layers from the depth of 4’ to 16’ are considered to be one sandy layer with a ᶲavg of 34⁰ and ϒavg of 115 psf

18

Speaker: Haroon Rasheed

Page 19: Foundation Presentation .pptx

FORMULAS

19Speaker: Haroon Rasheed

Page 20: Foundation Presentation .pptx

RESULTS● Qb = 13123.8 lbs● Qt = 22800 lbs● Qu = 21602.45 lbs● Qu < Qt Hence O.K.● Qall = 345639 lbs● Elastic Settlement = 0.6”● Elastic settlement is less than 1.5”

20

Speaker: Haroon Rasheed

Page 21: Foundation Presentation .pptx

GSU BREAKERProperties of GSU Breaker

Dimensions

•Length : 92” = 7.6’

•Width : 78” = 6.5’

Weight

•Weight with gas - 11180 lbs.

•Weight less gas - 10910 lbs.

21Speaker: Haroon Rasheed

Page 22: Foundation Presentation .pptx

GSU BREAKERASSUMPTIONS:

● Pressure bulb reaches a depth of 2B (12’)

● The three layers from the depth of 4’ to 16’ are considered to be one sandy layer with a ᶲavg of 34⁰ and ϒavg of 115 psf

22Speaker: Haroon Rasheed

Page 23: Foundation Presentation .pptx

RESULTS● Qb = 15311 lbs● Qt = 22800 lbs● Qu = 21289 lbs● Qu< Qt Hence O.K.● Qall = 745115 lbs● Elastic Settlement = 0.56”● Elastic settlement is less than 1.5”

23Speaker: Haroon Rasheed

Page 24: Foundation Presentation .pptx

Conclusion & Recommendation● Shallow Foundation is the best type of foundation to be considered for

the transformer

● The load of the transformer is less therefore foundations such as pile foundation and mat foundation are not recommended

● Geo form is used as an anticipate to fill the voids between reinforcing bars and a part of foundation as it increases compressive strength and absorbs the vibration of GSU

● For the water storage tank, Pile Foundation is Recommended

24Speaker: Haroon Rasheed

Turbine GSU Transformer &

Breaker

Water Storage Tank

Mat Foundation Shallow Foundation Pile Foundation

Page 25: Foundation Presentation .pptx

References●"Highland Tank - Steel Storage Tanks." Highland

Tank - Steel Storage Tanks. N.p., n.d. Web. 06 Dec. 2015.

●Das, Braja M. Principles of Foundation Engineering, SI, Stamford, CT: Cengage Learning, 2011, Print.

25Speaker: Haroon Rasheed