FOTO Implementation Scenarios for 4D CAD in Practice Marcel Broekmaat (HBG / Royal BAM Group) Bauke de Vries (TU/e)

Post on 19-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

FOTO

Implementation Scenariosfor 4D CAD in Practice

Marcel Broekmaat (HBG / Royal BAM Group)

Bauke de Vries (TU/e)

bam

consultancy and engineering

2

4D CAD

4D software3D CAD modelcontaining building parts

Schedule

task calendar

Time

4D construction processsimulation

bam

consultancy and engineering

3

Research goalsWork flow

How does 4D CAD fit in the existing working procedures, or is another procedure necessary?

Data management

Is the data needed for 4D CAD available in the right format from the existing CAD systems and planning systems?

User requirements

Can construction managers handle the application and does it support their work?

Organisational requirements

How is 4D CAD related to the other business processes (finances, resource management, document management, risc management, etc.)?

bam

consultancy and engineering

4

Research methodParticipatory research

• Shipping center Rotterdam• World Trade Center Amsterdam

Ivinzn (Stanford University – CIFE)

Questionnaire / Interviews

Hands On Session - Experiment

Process modeling

bam

consultancy and engineering

5

Invizn

Scheduled activities4D CAD

components

Activitytypes

3D CADcomponents

bam

consultancy and engineering

6

Example

bam

consultancy and engineering

7

Shipping Center RotterdamExperiment:

4D simulation presentation to foremen

Task:

Mention 3 most import construction issues

Result:

Differences between for and after presentation

bam

consultancy and engineering

8

Experiment:

Analysis of construction planning

Results:

Improved insight in construction sequence by

subcontractors

World Trade Center Amsterdam

bam

consultancy and engineering

9

3D/4D modeling processExperiences “captured”

Guideline for future 4D models

bam

consultancy and engineering

10

Hands-On Session

bam

consultancy and engineering

11

Work methods

UML current work method

(AS IS)

UML SAP work method(TO BE)

UML desired workmethod

(TO BE)

UML 4D supportedwork method

(AS IS)

work method

softwarefunctonality

work method

• Like current situation, 4D software is used as an extension

• Integrated work method• Fast generation of alternative

models

• Integrated work method, using SAP [and SAP WBS] - NO 3D/4D!

• Paper based• PowerProject software

bam

consultancy and engineering

12

Transition scenarios

UML current work method

(AS IS)

UML SAP work method(TO BE)

UML desired workmethod

(TO BE)

UML 4D supportedwork method

(AS IS)

work method

softwarefunctonality

work method

bam

consultancy and engineering

13

ConclusionsNaming convention

• Databases

• Facilitation of 4D model creation

• Consistency!

ERP software• Most effective basis for cooperative and integrated work method

Organisation structure of projects• Greatly influences opportunities for effectuation of intended work