ACPELERLTED IH&IBUTION DEMONSTRION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) ACCESSION NBR:8806160300 'OC.DATE: 88/06/07 NOTARIZED: NO DOCKET FACIL:50-000 Generic Docket 05000000 50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St..Lucie Plant, Unit 2, Florida Power 6 Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Florida Power 6 Light Co. z.~ j- RECIP. NAME RECIPIENT AFFILIATION R Document Control Branch (Document Control Desk) SUBJECT: Forwards Rev 11 to FPLTQAR 1-76A, "Topical QA Rept." DISTRIBUTION CODE: Q004D COPIES RECEIVED:LTR J ENCL g SIZE, ~7 ~ i ~+ TITLE: QA Topical Report, Amendment, or Correspondence (Docket/U&iTi~ySpeci 8 NOTES: RECIPIENT ID CODE/NAME PD2-2 LA TOURIGNY,E INTERNAL: ACRS y4B~ QAB 10 EG FIL Ol EXTERNAL: DMB/DSS NRC PDR COPIES LTTR ENCL 1 1 1 1 '10 10 2 2 2 2 1 1 1 1 RECIPIENT ID CODE/NAME EDISON,G ARM/DAF/LFMB NUDOCS-ABSTRACT RGN2 FILE LPDR COPIES LTTR ENCL 1 1 1 1 1 1 1' 2 2 A A TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

Upload: others

Post on 13-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

ACPELERLTED IH&IBUTION DEMONSTRION SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8806160300 'OC.DATE: 88/06/07 NOTARIZED: NO DOCKETFACIL:50-000 Generic Docket 05000000

50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 0500025050-251 Turkey Point Plant, Unit 4, Florida Power and Light C 0500025150-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 0500033550-389 St..Lucie Plant, Unit 2, Florida Power 6 Light Co. 05000389

AUTH.NAME AUTHOR AFFILIATIONCONWAY,W.F. Florida Power 6 Light Co. z.~ j-

RECIP. NAME RECIPIENT AFFILIATION RDocument Control Branch (Document Control Desk)

SUBJECT: Forwards Rev 11 to FPLTQAR 1-76A, "Topical QA Rept."DISTRIBUTION CODE: Q004D COPIES RECEIVED:LTR J ENCL g SIZE, ~7 ~ i ~+TITLE: QA Topical Report, Amendment, or Correspondence (Docket/U&iTi~ySpeci

8NOTES:

RECIPIENTID CODE/NAME

PD2-2 LATOURIGNY,E

INTERNAL: ACRSy4B~ QAB 10

EG FIL Ol

EXTERNAL: DMB/DSSNRC PDR

COPIESLTTR ENCL

1 11 1

'10 102 22 2

1 11 1

RECIPIENTID CODE/NAME

EDISON,G

ARM/DAF/LFMBNUDOCS-ABSTRACTRGN2 FILE

LPDR

COPIESLTTR ENCL

1 1

1 11 11'

2 2

A

A

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

Page 2: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

E

Page 3: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

P. BOX 14000, JUNO BEACH, FL 33408-0420

@SU/@,

ri~(g~

U.S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, D.C. 20555

L-88-25610 CFR 50.54(a)

JUgg 7 1988

Gentlemen:

Re: Turkey Point Units Nos. 3 and 4Docket Nos. 50-250 and 50-251St. Lucie Units 1 and 2Docket Nos. 50-335 and 50-389To ical ualit Assurance Re ort FPLT AR 1-76A

Pursuant to 10 CFR 50.54(a)(3), please find attached twoenclosures representing the annual update of the Florida Power &Light Company Topical Quality Assurance Report [Revision ll,dated May ll, 1988].

Enclosure I is a summary of the change and a pen and inkmark-up of changed pages to the current Topical ReportRevision.

Enclosure II is the revised Topical Report Revision 11.Changes are indicated on the affected pages by bold verticalprint lines drawn adjacent to the portion actually changed.

The revisions made are minor and primarily show organizationalchanges. None of the changes made in our program descriptionreduce commitments which have been previously accepted by theNRC.

Should there be any questions, please contact us.

Very truly yours,

W. F. CSenior Vice President, — Nuclear

WFC/GRM/dd

Enclosures

cc: Dr. J. Nelson Grace, Regional Administrator, Region II, USNRCSenior Resident Inspector, USNRC, St. Lucie PlantSenior Resident Inspector, USNRC, Turkey Point Plant

'8806160300 880607PDR ADOCK 05000250p DCD an FPL Group company

Page 4: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

ENCLOSURE l

Summary of changes to Revision 10 of the Florida Power and Light Topical QualityAssurance Report (FPLTQAR 1-76A)

The title page has been revised to reflect the current revision and date ofchanges of the Topical Report.

2. Table of Contents

The Table of Contents has been revised to reflect the current revisions anddates of the individual sections.

3. ualit Assurance Pro ram Polic

This change is to reflect the new organization and title changes asdescribed in the Topical Report (TQR 1.0).

4. T R 1.0 - Or anization

The following sections have been revised to reflect the new Nuclear EnergyDepartment organization and new titles: Section 1.2, 1.2.3, 1.2.3.1, and1.2.'3.2.

5. T R 1 ~ 0 - Or anization

The following sections have been revised to reflect the title change of VicePresident Engineering, Project Management and Construction to Senior VicePresident: Sections 1.2.4, 1.2.7, and 1.2.12.

6. T R 1.0 - Or anization T R 10.0 - lns ection and T R 15.0 - NonconforminMaterials Parts Or Com onents

The following changes are grammar and punctuation changes: TQR 1.0 Sections1 2 lp 1 2 ~ 3 ~ 1g 1 ~ 2 ~ 3 ~ 2g 1 2 4g 1 2 6p 1 2 Sp 1 ~ 2 ~ 9g 1 ~ 2 10' ~ 2 ~ lip 1 2 12/and 1.2.13; TQR 10.0 Sections .10.1, 10.2.1, 10.2.2, 10.2.3, 10.2.4, and10.2.5; TQR 15.0 Sections 15.1, 15.2.1 and 15.2.4.

The three figures reflect the current organization changes of reportingrequirements and position titles.

.8806160300

Page 5: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

1

Page 6: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

8. A endix E - List of Cor orate ualit Assurance Procedures

o Added Quality Procedure (QP) 2.17, "Environmental Qualification (EQ) ofElectrical Equipment" to the QA Manual

0 Added Quality Procedure (QP) 6.7, "Control of Vendor Manuals and VendorTechnical Information" to the QA Manual

Added Quality Procedure (QP) 7.9, "Control of On-Site Vendor Services"to the QA Manual

0 The following procedures were combined into other Quality Procedures;9.2 was combined with 9.1; 11.1, 11.2, and 11.3 were combined with11.4; and 15.1 was combined with 15.2

Page 7: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:
Page 8: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

ENCLOSURE ZI

'

~ggyrsre ~ I(~ ~ p /0< fF M

FPLTQAR 1-76A

(PPL-NQA-100A)SIO

JUNE 10, 1987

FLORIDA POWER 5 LIGHTCOMPANY

Page 9: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

1

l

h11

Page 10: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT

Rev. 10

TABLE OP CONTENTS Date June 10, 1987

Page 1 of 2

REVISIONDATE

Title Page

AbstractNRC Staff Evaluation LetterTable of Contents ~Policy Statement ~Introduction

~We~ l><IP gPJuna 10, 1987

3 une 10, 1984

// ~kft~p /dg /M'8 une 7

(g W4g H~/5'une9 June 10, 1987 )

Topical Quality Requirements

TQR 1.0 OrganizationTQR 2.0

TQR 3.0Quality Assurance Program

Design ControlTQR 4.0 Procurement Document ControlTQR 5.0 Instruction, 'Procedures, & Drawings

TQR 6.0 Document ControlTQR 7.0 Control of Purchased Items & Services

TQR 8.0 Identification & Control of Materials,

+~ Jff <g /o//P8f u

7 June 10,

5 June 10,

June 10,

6 June 10,

4W June 10,4W June 10,

June 10',

987'987',

1986

1986

1986

1986

1986

1986

TQR 9.0

TQR 10.0

TQR 11.0

TQR 12.0

TQR 13.0

TQR 14.0

TQR 15.0

Parts.& Components

Control of Special Processes ~ 6H June 10,

Inspection g'77 titty(>~ rf un 0

Test Control 2 June 10,

Control of Measuring & Test Equipment 3 ~ June 10,

Handling, Storage & Shipping June 10,

Inspection, Test & Operating Status 6 ~ June 10;

Nonconforming Materials, Parts or P g-~ ~P /'ne 10,// /f~Components

1986

1986

1986

1985

1986

1986

19

ID~ EO

CV

D0:

TQR 16.0 Corrective ActionTQR 17.0 Quality Assurance Records

TQR 18.0 Audits

June 10, 1986

June 10, 1986

June 10, 1986

C0ZOl

E'04

Page 11: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT

Rev. 10

TABLE OP CONTENTS Date June 10, 1987

Page 2 Df 2

REVISIONDATE

Appendices

A - Organizations 6 Figures

Figure 1-1: Organization of Departments

Affecting QualityB - Qualification 6 Experience Requirements

for QA Personnel

C - Baseline Document MatrixD — Cancelled

~C ~0~~ /y /pg June 10, 1987/

June 10, 1986

June 10, 1984S

May 7, 1982

E - List of Corporate QA Procedures (QPs) /O~&ay/0//PMF - Topics to be Addressed in Safety Analysis 1

Reports

une 10 1986

May 7, 1982

Page 12: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITYASSURANCE REPORT

8 ev.

LORIOA POWER a LIGHT COMPANY

QUALITYASSURANCE PROGRAM POLICY Date3une 10, 1986

Page of

NEED FOR POLICY

To avoid undue risk to the health and safety of the public and company employees, it is

necessary to design, construct, operate and modify nuclear power plants with a high

degree of functional integrity, quality and reliability.

STATEMENT OF POLICY

It is the policy of Florida Power 4 Light to design, construct, operate and modify nuclear

power plants of a quality level that will meet or 'exceed government regulations and wHI

merit public confidence by providing electricity in a reliable, efficient, and safe manner.

RESPONSIBILITY

The President of Florida Power R Light Company is responsible for the execution of the

Quality Assurance Program for Florida Power R Light Company nuclear power plants.

The autho'rity for developing and verifying execution of the Program is delegated to the

the Director of Quality Assurance, through theg,cc PreS 'oC ~ e e 6 N«~e4 r E„argy

cC Pre c ~de ~e u ~ ~(cow-q a +e < 8 «~~ "< Vi c~ Pre J

T e cg~~c fb~e fror p~~aa ge.~~v c +i'om ~ v ~ Q~lp'ye r~~The head of each organization performing quality related activities is responsible for:

identifying those activities within his organization which are quality related as defined'I /

by the QA Program; establishing and clearly defining the duties and responsibilities of

personnel within his organization who execute those quality related activities; and

planning, selecting, and training personnel to meet the requirements of the QA Program.

Qe ~ so<

Vs

zO.

'I

e0

R. E. Talion, resident

Florida Power R Light Company

Page 13: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

4

jt

Page 14: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITYASSURANCE REPORT

Rev.

TQR 1.0

10

ORGANIZATION June 10, 1987

32

GENERAL RE UIREMENTS

The FPL organizational structure shall be defined such that theresponsibilities for establishment and implementation of the QualityAssurance Program are clearly identified. The authority and dutiesof individuals and organizations performing quality assurance and

quality control functions shall be described, and shall illustratethe organizational independence and authority necessary to identifyproblems; to initiate, recommend, or provide solutions; and toverify implementation of solutions. In addition, the description-.shall illustrate that persons or groups responsible for verifyingthe correct performance of an activity are independent of the personor groups responsible for performing the activity.

1.2 IMPLEMENTlLTION

The President of Florida Power 6 Light. is ultimately responsible forthe execution of the Quality Assurance Program for Florida Power 6

Light'ompany (FPL) nuclear power plants. The authority fordeveloping and verifying execution of the program is delegated tothe Director of Quality Assurance, tough th eeg~ice President

Sg n'og Vlc@ W~cstgo elglJ 0 0 /Rgbof Nuclear Energy and the Executive Vice President. The reportingrelationship of each department involved with the Quality Assurance

Program is shown in Appendix A, Figure 1-1.

To provide for a review and evaluation of QA Program policies and

activities, the President has established the QA Committee, chaired

by the Executive Vice President. This organization'sresponsibilities are defined in Section 1.2.1 below.

VlC0ZOl

CV

E0U.

Page 15: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT

Rev.

T R 1.0

10

ORGANIZATIONDate June 10, 1987

Page 2 of 32

1.2 IMPLEMENTATION: (Cont ')In addition, a Quality Assurance Program Review Committee (QAPRC)

(formerly the QA/QC Coordinators) has been established to reviewchanges to the QA Program and to provide an interface for qualitymatters in each department affecting quality. This organization'sresponsibilities are defined in Section 1.2.2 below.

The head of each department or organization performing qualityrelated activities is responsible for: a) identifying thoseactivities within the organization which are quality related as

defined by the QA Program; b) establishing and clearly defining theduties and responsibilities of personnel within his organization who

execute those quality related activities; and c) planning,selecting, and training personnel to meet the requirements of the QA

Program. The responsibility, authority, and organizationalrelationship for performing quality related activities within eachorganization shall be established and delineated in organizationalcharts and written job or functional descriptions.

A QA Program Review Committee (QAPRC) Member shall be designated bythe head of each department or organization except for the QualityAssurance'Coamittee, since thiw committee is a policy forming body(of which.- the Director of Quality Assurance is a member). The QAPRC

Member is the prime interface for coordination of quality relatedmatters within the member's department, with the QA Department, andwith other departments.

The organization chart, Appendix A, Figure 1-1, illustrates thelines of authority and areas of responsibility for each of theorganizations that are involved in quality related activities. The

Page 16: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT

Rev.

TQR 1.0

10

ORGANIZATION June 10; 1987

Page 3 of

1. 2 IMPLl96KNTATION (Cont ')Project Management organization shown in this figure is applicableduring. design, procurement, construction, repairs and preoperationalstart-up and testing of power plant and modifications of power

plants (determined by management on a case-by-case basis) as

described in Section 1.2.4. Be'low are listed the departments and

organizations that have Quality Assurance responsibilities.Specific organizational responsibilities for implementation of theQuality Assurance Program are described in the corresponding

section'umbers.

1.2.1

1.2.2'.2.3

1.2.41.2.51;2.61.2.71.2.8

Quality Assurance Committee

Quality Assurance Program

Review Committee

Nuclear Energy Department

-Nuclear Operations-Quality Assurance

-Nuclear Licensing

r

Project Management Department

Corporate Contracts Department

Environmental AffairsPower Plant EngineeringPurchasing

1.2.9 Construction1.2.10 Power Supply

1.2.11 Inventory Resources

1.2.12 Company Nuclear

Review Board

1.2.13 Nuclear Fuel

1.2.14 Corporate Records

Services,1.2.15 Documentary Files

VlC0ZOl

C4

F0

1.2. 1 Quality Assurance Committee

The Quality Assurance Committee, chaired by the Executive Vice~e.evi 6@v a b <

President, is comprised of executive level <management withresponsibilities for the execution of the Quality Assurance

Program within their responsibilities. 'his Committee's

Page 17: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY-ASSURANCE REPORT

Rev.

TQR 1.0

10

ORGANIZATION June 10, 1987

Page 4 of 32

Quality Assurance Committee (Cont'd)

composition is delineated in its current charter and it '

reporting relationship is shown in Appendix A, Figure 1-1.

The Quality Assurance Committee is responsible for reviewingand evaluating QA Program policies and activities. Policychanges shall be initiated when Committee findings indicate thenecessity. Quality Assurance Program status reports shall be

periodically prepared by the QA, Department and routed to themembers of th'e QA Committee for their review.

In addition, QA Committee meetings shall be held by theExecutive Vice President to keep members apprised of conditionsincluding significant problems that require management

attention. Th'e Quality Assurance Coaanittee shall be the finalauthority for resolution of contested quality policies,differences of opinion, and stop-work or other correctiveaction requests when lower level agreement cannot be reachedbetween QA or QC ahd other departments. Periodic audits of theQua'lity Assurance Department shall be performed by a team

independent of the QA Department, which is selected and

approved by the Chairman of the Quality Assuiance committee.1

The results of this audit are presented to the QA Committee.

Quality Assurance Program Review Committee (QAPRC)

The QAPRC (formerly the QA/QC Coordinators) was formed as an

organization with the responsibility to review and resolverecommended changes to the'A Program. This committee isadministered by the QA Services group. QA Program changes

reviewed by the QAPRC are reviewed and signed by the departmentheads or individuals listed on each Quality Procedure.

Page 18: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSUR1QKZ REPORT

ORGANIZATION

TQR 1.0

Rev. 10

June 10, 1987

Page g of 32

1.2.3 Nuclear Energy Department

-Nuclear Energy responsibility for the plant begins with theDepartment's acceptance of a system or portion thereof from FPL

Project Management; Throughout the remainder of plant life,Nuclear Energy maintains control of and responsibility for any

plant modifications coordinated by Nuclear Energy and for thepreoperational and . start-up testing, operation, maintenance,

refueling, and modification of the plant in accordance withwritten and approved procedures.

The organizational'tructure of Nuclear Energy is shown inSCic iOt

Appendix A, Figure 1-1. The~exp- Vice President of Nuclear

~eepy has overall responsibility for Nuclear Energy's .7fi,c S e.~'i a r Vi ca Pre a i o(«.~a IU ~ c. f«.o.ractivities. i ~ ~cr of S ~ o~ 4 01

4cl'~<roid o p c.c c.4 I~'i4y Te.c4N>C 4I $pc.c((ic'.a,7 iortgJIJ

Reporting to the~up Vice President ~Nuclear -Rnep~yre:7 t< 5ii~ Vlc.e Pves i'cA m~—S~ Lu. c-ic'> WC, Si+ Vc'c.c

tW< v;gc P'0't eQ ~ a g t0 fly c.~ p r~g'rgb ~+ jQ ec c.cc, c' M c. cga )

g0uC4 O

«ye- g/ 1. 2.3.g $ ~F~P

EN«.vga, iy I t.h+oel >0 44.Qp6 c V e c e 1 ~~ a i <e.~7 4 4. c-

ie 4a. E f.i y, ircc.i ~i„m<< +e~c /~

epee«.+i'«p c on+,+g j yf S+«.ff'cport'i~pTa Ae V.'cc- Prer:P>~~ g

o f pc2rSo~nc

/~glrive

For sapor vlaarp. ec

iops ~.( ewer«.T ~++)

hara i ]os Capforf)'a nwc. ea.c"

v c./t«. r e. cc ar o v.». ~ icf «.g'~ge ~~~ce <a~ccgcc-r

IDi0ci

~i

Ncc v/8. cir~ g««Jes- g ci.c. c.ar g ccc<ct

pic > t're c.+o r 0f. Qu.a(it Pgg u ircc

J Ne. ~cc. er oF V/c ~~)

Rv.v i ce.S ~'f4e- Plica.~cc. e.r 5F ic clecxp 7 rcc r rllg<

r~ ce. c lira c+e p 0 F Nu c./e ar Lcce <s<~y

Cc. wN < o~+v cafe

Vl00zcl

C4

E0c

Page 19: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT

Rev.

TQR 1. 0

10

ORGANIZATION June 10, 1987

Page, 6 of 32

1.2.3.1h) ta. t le ga p 7 O w t p 6 g sg C g 0- +s a ~

(Cont'd)

5y)+ Sr&The ~Vice President-St. Lucie and~Vice President-Turkey PointNuclear are accountable for the operation, maintenance, and

modification of their respective nuclear plant, as well as theselection, development and direction of the assigned staff.They will act as liaison between the plants and corporateheadquarters, and are accountable for assuring that company

policies and procedures are properly implemented and continuedat the nuclear site.

~ vggO gI~C+ '

) p The Manager Nuclear Energy Services is accountable fortechnical staf f support to the generating department andcertain centralized special functions. This group consists ofsection supervisors and technical specialists, with functionsincluding Health Physics, Chemistry, .Radiological Waste,Emergency Planning, .Plant Support, . and'Materials, Codes andInspections.

The Maintenance Manager Nuclear is responsible for directingactivities in support of major plant maintenance projects,modifications, and upgradings, as well as the development ofwork. methods, specifications and systems to promote increasedproductivity.

The Manager of Nuclear Training establish ~~company policy regarding nuclear training and secure thenecessary resources to ensure that Nuclear Energy personnel areadequately trained. 'hey must have adequate. technical and jobrelated. skills to provide safe, efficient operation whilecomplying with.NRC requirements.

Page 20: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT TQR 1.0

Rev. 10

ORGANIZATION Date June 10, 1987

Page 7 of 32

1.2.3.14 ~ c f~ c. ~ Pa ~ c. v Q ~~ e, ~a. +I 0 ~

(Cont'd)

The Plant Manager (Plant Manager Nuclear at PTN) through theVice Presidents - Turkey Point Nuclear and St. Lucie Plants (asapplicable) is responsible for the. oper'ation of the nuclearplant. The plant manager is additionally responsible for theestablishment and implementation of plant QC policy whichimplements the quality control aspects of the Quality Assurance

Program.

Reporting .directly to the Plant Manager is the plant Quality:Control Supervi'sor who has the authority and freedom toadminister the plant Quality Control program and, when

necessary, for stopping activities adverse to quality. The QC „

Supervisor, his staff, and personnel performing QC inspectionfunctions are required to be independent of groups or persons

performing activities that they may be required to verify orinspect. QC effort includes preparation and review of plantprocedures, PCMs, quality related inytructions and procurement

4, c. p~~sonpeI e.vc a/s~ ~spa~s/Pr /c Fardocuments; @he inspection, monitoring, surveillance, and reviewof plant activities to verify compliance with the provisionsof the facility,.operating license and the Quality Assurance

Manual. The QC Supervisor shall take corrective action for-deficiencies identified, where applicable, and shall follow up

on corrective action taken by other organizations 'until closeout. He shall receive quality program .direction from theDirector of Quality Assurance.

CO

CV

VlC0zOl

NC0

The Plant Nuclear Safety Committee (PNSC) at Turkey Point Plantor the Facility Review Group (FRG) at the St. Lucie Plant iscomprised of key plant management and staff personnel as

Page 21: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT TQR 1.0

Rev. 10

ORGANIZATION June 10, 1987

Page 8 of 32

Q~ ~ f4' g py ~ g '( Q+%rk'4 +4 pl 0

lb'Cont'd)

described in the plant Technical Specifications. The PNSC/FRG

serves the plant manager in a technical advisory capacity forthe review of all safety related procedures and activities thatimpact on plant safety. and the facility operating license.

] ~ c. ~ We ~mph

The Quality Assurance Department shall be responsible foradministering the FPL Quality Assurance Program. This includesdeveloping and verifying implementation of corporate policies,plans, requirements, and procedures affecting quality. This isaccomplished through the Quality Assurance Department. The

Quality Assurance Department retains responsibility fordelegated portions of the QA Program by performing initialevaluation and subsequent periodic audits of the

contractors'A

Programs. The QA Program responsibility further extends tothe performance of audits within the Company to assuremanagement that the established requirements and procedures arebeing implemented, and that, the. Program complies with thebaseline document requirements.

~ The organizational freedom of the QA function is accomplishedthrough the corporate structure, illustrated in Appendix A,which provides independence from those departments responsiblefor design, procurement, engineering, construction, and

operation. With Quality Assurance as the sole function of thisorganizationally independent department, the Director ofQuality Assurance and his staff, both on-s'ite and offsite, arecompletely free from the cost and scheduling pressures of

Page 22: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT TQR 1. 0

Rev. 10

ORGANIZATION Date June 10, 1997

Page 9 of 32

1.2.3.2

design, procurement, construction, and operation. The QualityAssurance Department has the freedom and authority to: a)identify quality problems; b) initiate, recommend or providecorrective action; c) verify implementation of the correctiveaction; and d) recommend the stoppage of work or operationsadverse to quality, when necessary.

L/ i c e

The Director of Quality Assurance reports to thq~ep Vice4ppggjrat.j'cgwwuvst.afro~acceds7oPresident of Nuclear Energy„. He is responsible for the

p'pc g

ionic

w+ AJ ale Ic.a vtechnical direction and the administrative control (e.g.,performance . appraisal, salary review, hire/fire, positionassignment) of all members of the Quality Assurance Department.

The Manager of Quality Assurance Services, the Manager ofQuality Assurance Procurement 6 Reliability, the Superintendentof Quality Assurance - St. Lucie and the Superintendent ofQuality Assurance - Turkey Point report administratively and

functionally to the Director .of Quality Assurance. The

Superintendents of QA receive technic'al direction from the

Manager of QA Services.

ED

Ol

~ DC

C0zOl

Ol

g g n (0 V

-- The Director of Quality Assurance, the ~amp-Vice President~~ Ae.vp

Nuclear ~ee.~, and the Vice President ~ Nuclear

are each members of the Quality Assurance Committee. This

reporting relationship and memberships on the QA Committee

assure that the QA Department has direct access.to the levelsof management necessary to assure effective implementation ofthe QA Program. Further, the Operations QC Supervisors of both

Turkey Point and St. Lucie receive quality program directionfrom the Director of QA.

Page 23: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT

Rev.

TQR 1.0

10

ORGANIZATION Date one 10, 1gS7

10 o< 32

g « ~~~ v'o v"p>~+~< s ~(i1.2.3.2 'Cont'd)

The Manager of QA Services directs and administers theCorporate Quality Assurance Program, including developing and

verifying implementation of policies, plans, requirements,procedures, and audits which assure compliance with thebaseline documents listed in Appendix C of this Topical QualityAssurance Report.

The duties, responsibilities, and authorities of each QualityAssurance group are described in the sections which follow.

a. Quality Assurance Services Group

Quality Assurance Services is responsible for thedevelopment and maintenance of 'he overall QA Program,including the following:0 Develop and maintain the QA Department Quality

Instructions, QA Department Training S OrganizationManual, and the corporat.e QA Manual; including theadministration of the QA Program Review Committee

(QAPRC)

Assist other departments in the development of QualityInstructions by review and comment and throughinterpretation of corporate Quality Assurancerequirements;

o Develop 'nd implement a Quality Assuranceindoctrination program for FPL supervisory personnel,and a training program for the Quality Assurance

Department;

Page 24: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT

Rev.

T R 1.0

10

ORGANIZATIONDate June 10, 1987

11 0 32

p) ~/ < < (0 spy ea.) c pQf61.2.3.2 'Cont'd)

o Prepare reports on Quality Assurance Program

activities for presentation to the Quality Assurance

Committee by the Manager of Quality Assurance

'ervices;o Maintain a file system for documentation of quality

assurance activities performed by the QA Department;

o Review Regulatory Guides, Codes, SAR Document

Commitments and Standards for impact on the Quality-.Assurance Program and recommend aPppropriate program'.

changes;

o Review documents submitted to the Company Nuclear

Review Board (CNRB) as requested 'by the QA Department

CNRB member;

o Plan, coordinate and implement a comprehensive system

of periodic internal audits with support from the

other Quality Assurance groups, when necessary;

o Initiate, recommend or provide solutions and verifyimplementation of solutions for quality problems

ident ifled~(o Review FPL originated design specifications for

inclusion of appropriate quality requirements.

b'. Quality Assurance Procurement and Reliability Group

lO

C4

D

The Manager of Procurement and Reliability is responsible

for assuring the quality of safety related items and

services, and their vendors, including the following:

vlC0ZOl~4

CV

C0

Page 25: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT TQR 1. 0

Rev. 10

ORGANIZATION Dam June 10, 1987

Page 12 of 32

1.2.3.2g~~/~ ~ < +~ijowa.~c s~CF

(Cont'd)

o Assist in the development and implementation ofpolicies, plans, requirements~and procedures for the

~ requisition and purchas'e of materials, equipment and

services related to nuclear power plants and to theacceptance and storage of equipment and material;

. o perform appropriate surveillance of hardware duringmanufacture;

o Develop and implement a program for auditing ofsupplier QA/QC programs including architect/engineer/NSSS Suppliers;

o Review and approve FPL procurement documents, and

changes to these documents to assure that thenecessary quality requirements are impose+J

o Assist other FPL departments in the identification ofquality problems associated with procurement and

storage; initiate, recommend, or provide solution; and

verify implementation of solutions;o Review, approve~ and periodically audit the execution

of FPL contractor quality assurance programs;o Maintain a file system for documentation of quality

assurance activities performed by the QA Procurement

group;o Evaluate the Quality Assurance capability of suppliers

requested by Purchasing and Corporate Contracts and

maintain the Quality Assurance Department "Approved

Suppliers List".

The responsibility of this group, in terms of phases of.procurement, .begins with the preparation of theprocurement document, extends through bid evaluation,

Page 26: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT

Rev.

TQR 1. 0

10

ORGANIZATION Date June 10, 1987

Page 13 of 32

pJ - /e A.v ~~go ~~~ ~Ft1.2.3.2 (Cont'd)

vendor selection, fabrication@ and shipment; and ends upon

receipt of shipment at the operating plant or warehouse.

This group, through audits and surveillances, assures thatthe contractor's organizations performing QA functions

*have sufficient authority and organizational freedom toimplement effective QA programs.

,c. Quality Assurance Group - Turkey Point

The Superintendent of QA-Turkey Poi.nt has responsibilityfor on-site development and implementation of the Quality

.Assurance Program, including the following:

o Coordinate in the development and implementation ofpolicies, plans, requirements, and procedures forportions of the quality assurance program related tothe operation and modification of nuclear power plantsat Turkey Point Units 3 and 4 (PTN);

Cl

C4

0~ICC

0 Perform audits, assessments~and other observations atPTN to verify compliance with QA Program commitments,

identify 'quality problems~ and ensure timelycorrective actions are taken in the areas of plantoperation, system turnover, . modificatio and

maintenance; including such areas as refueling,inservice inspection and te'sting, procurement ofspare/replacement parts, material storage, healthphysics, chemistry, plant security and fireprotection;

VlCOZOl

E0IL

Page 27: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITy ASSURANCE REPORT

Rev.

TQR 1.0

10

ORGANIZATION Oate June 10, lg87

P89B ] 4 of 32

/< a,r Ca wpoFa + ++61.2.3.2 'Cont'd)

o Identify requirements, ensure inclusion of commitments

in documents and verify implementation of the QualityAssurance Program during the backfit activities at PTN

through audits of FPL and contractor organizations;o Recommend stoppage of work or operations adverse to

equality at PTN in accordance with the appropriateQuality Procedures;

o Review and comment 'n Quality Instructions orequivalent quality related administrative proceduresprior to issue, with respect to the requirements ofthe FPL Quality Assurance Progr~> the PTN FinalSafety Analysis Report > and the PTN TechnicalSpecifications;

o Assure that the status is tracked for all PTN openitems .identified by the FPL QA Turkey Point group, and

inform appropriate management when there is an

indication that a commitment will not be met on time;o

o

Maintain. a file system for documentation of qualityassurance activities performed by the Turkey Pointgrou~ ~~

Assure design related activities performed by theArchitect/Engineer meet the quality aspects of thecontract;

o Review backfit procedures with respect to the FPL QA

Program ( for procedure review requirements see TQR

5.Q):o Review site generated FPL procurement documents and

changes to procurement documents in accordance withthe appropriate Quality Proceduresn .

Page 28: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASKJRANCE REPORT

Rev.

TQR 1.0

10

ORGANIZATION June 10, 1987

Page 15 of 32

1.2.3.2Q~ ~leww C o P

(Cont'd)

o Perform auditssuppliers both on-sitewith QAPGR.

of PTN architect(engineer(NSSSand off-site, in conjunction

The interface with the QA Procurement 6 Reliability groupends with the receipt of a shipment of nuclear safetyrelated equipment at the plant site. The QualityAssurance program for the shipment is then within the:purview of the QA Turkey Point group.

Off-site interfaces for the resolution of quality relatedproblems and NRC items age with Project Management, Power

Plant Engineering, <~Nuclear Energy Staff, and thearchitectppngineer)(NSSS Quality Assurance Department.

. This group is called upon to audit the Turkey Pointoperating plant. The Turkey Point group interfaces withthe Site Vice President and his staff on-site by assistingin the. resolution of quality related problems.

d. Quality assurance Group — St. Lucis (PZ I)

The Superintendent of QA St. Lucie has responsibility foron-site development and implementation of the QualityAssurance Program, including the following:

IDIO

ru

ulC0ZOl

cu

C0

o Coordinate in the development and. implementation ofpolicies, plans, requirements~ and procedures forportions of the quality assurance program related tothe operation or modification of St. Lucie Unit 1 &

Unit 2 (PSL);

Page 29: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSUEUQKE REPORT TQR 1.0

Rev. 10

ORGANIZATIONl

Oate June 10, 19S7

16 of 32

pJ et.g/g sm.( Ccs//Pip i'ss'fg 57 4.FF1.2.3.2 (Cont'd)

0 'Perform audits, assessment~s and other observations atPSL to verify compliance with QA Program commitments,

identify quality problems and ensure timely correctiveaction are taken in the areas of plant operation,system turnover, modificatio~ and maintenance;including such areas as refueling, inserviceinspection and testing, procurement ofspare/repiacement parts, material storage, healthphysics, chemistry, plant securit+y and fireprotection;

o Identify requirements, ensure inclusion of commitments

in documents and verify implementation of the QualityAssurance Program during. the backfit activities at PSL

through audits of FPL and contractor organizations;o Maintain a file system for documentation of quality

assurance activities performed by the St. LucieProjects-QA group;

0

o

Assure design related activities performed by thehrchitec+t ngineer meet the gcalitp aspects ct thecontract;Review backfit procedures with respect to the FPL QA

Program (for procedure review requirements see TQR

5.0);o Review site generated FPL procurement documents and

changes thereto, in accordance with appropriateQuality Procedures;

o Perform audits ofsuppliers both on-sitewith QAPGRg s

J

PSL architect/engineer/NSSSand off-site, in conjunction

Page 30: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT

Rev.

TQR 1. 0

10

ORGANIZATION Date June 10, 19S7

Page 17 of 32

1.2.3.2pJ + (~o ~ Qo pro ~fc

(Cont'd)

o Recommend stoppage of work or operations adverse toquality at PSL in accordance with the appropriateQuality Procedures;

o Review and comment on Quality Instructions orequivalent quality related 'dministrative proceduresprior to issue, with respect to the requirements ofthe FPL Quality Assurance Program+> the PSL FinalSafety Analysis Reports and the plant Technical:Specifications;

o Assure that the status is tracked for 'all PSL open

items identified by FPL St. Lucie Projects QA group,and inform appropriate management when there is an

indication that a commitment will not be met on time;

1

The interface with the QA Procurement 6 Reliability group ends

with the receipt of a shipment of nuclear safetyrelated'quipment

at the plant site. The Quality Assurance program forthe shipment is then within the purview of the St. Lucie

Projects QA groupg

Off-site interfaces'or the resolution of quality related- problems and NRC items are with Project Management, Power PlantEngineering, Nuclear Energy Staff~ and the

R eeg

aruhiteetpngineerp1SSS Quality nssuranne Department. ThisJf

group is called upon to audit the St. Lucie operating plant.The St. Lucie Projects QA group interfaces with the Site Vice

President and his staff on-site by assisting in the resolutionof quality related problems.

VlCOZgl

c ~

60IL

Page 31: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

'OPICAL QUALITY ASSUEULNCE REPORT TQR 1.0

Rev. 10

ORGANIZATION Date June 10, 1987

/ Q g ) i ~ g g c. fee.p co vpo r a c ~ ~A ~~((a»T +)

.9-.9—Nuclear Licensing

Page 18 of 32

The Director of Nuclear Licensing is responsible forcoordinating the NRC interface, distributing NRC documents

requiring actions, evaluating potential impactg and respondingto all NRC action items. He is also responsible for assuringthat the status is tracked for all open items identified by theNRC or other federal, local an'd state agenciegs, and forinforming appropriate management when there is an indicationthat a commitment will not be met on time.

1.2.4 Project Management Department

The Project Management Department, through the Project GeneralManager, exercises management control of assigned projects.This management control begins when a Project is assigned tothe Project Management Department and continues until thefacility is accepted for operation or the project is complete.This management '. control . includes the responsibility forprocurement,.'epair, construction and may includepreoperational start-up and testing of power plantmod&Xcations'The Project Management Department-organizationis shown in Appendix A, Figure 1-1.

The DirectorPresident

Se,~ IO<of Projects, reporting to the Vice

hasoverall responsibility for the activities of the ProjectManagement Department. A Project General Manager, reporting tothe Director of Projects, is responsible for completing theassigned project in compliance with technical and other project

Page 32: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT TQR 1.0

Rev. 10

ORGANIZATION Date June 10, 1997

Page 19 of 32

1.2e4 Project Management (Cont'd)

specifications, and for the application of the provisions ofthe Quality Assurance Manual during the project. The ProjectGeneral Manager is responsible for obtaining corrective actionfrom any contractor's management when corrective action cannotbe obtained at the project site management level and, when

necessary, can exercise his authority to stop work on projectactivities adverse to quality.

cscsol

s

VlC02gl

ce

EO

The overall responsibility for Plant Changes and Modifications.to operating plants is defined in each . plant's TechnicalSpecifications. However, frequently the work of,installationand administration of Plant Changes and Modifications is

Pq a r feeg 8 et gassigned to FPI Prefect Management. The Pro]ect Site Manager

will report to the appropriate nuclear site Vice President butwill also receive guidance and advice from the Project General

Manager. The Project Site Manager is additionally responsiblefor the functional direction of construction QC for the purposeof coordinating inspection activities which implement the

quality control aspects of the quality assurance program formodifications of - projects assigned to project management.

'ctivities affecting quality may be performed by FPL, orcontracted. Should any of these functions be contracted, thecontractor may perform the activities under his own QualityAssurance Program, which must have prior approval by FPL

Quality Assurance, or the contractor may directly adopt therequirements of the FPL Quality Assurance Manual. If thecontractor implements the Quality Control function directly tothe FPL QA Manual requirements, the contractor's QualityControl Supervisor shall have the authority and freedom toadminister the Quality Control program.

Page 33: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT

Rev.

TQR 1.0

10

ORGANIZATION June 10, 1987

Pege 20 0~ 32

1.2.4 Project Management (Cont'd)

Project Team Members are appointed by their home departmentheads as the departmental representative on the respectiveproject, when requested by the Project General Manager. Team

Members, other than Quality Assurance and Stores Department,report functionally to the Project General Manager, or theProject Site Manager, but continue to receive administrativesupport and technical direction from their home department.Team members are responsible to the Project General Manager forhome department support to the Project.

1.2.5 Corporate Contracts Department

The Corporate Contracts Department is responsible forgeneration, negotiationspecified time periods

and issuance of Contracts overand dollar limits . for turbine

generators, steam generators, nuclear steam supply systems(NSSS), new items, repairs, constructors, constructionmanagers, and Architect Engineer (A/E) and consultingservices. Corporate Contracts is also responsible for assuringthat technical and quality requirements developed by others areincorporated in such contracts, as appropriate, and that thesecontracts have the required approvals. Details of theactivities of the department in fulfilling this responsibilityshall be delineated in the appropriate Quality Procedures. The

Manager of Corporate Contracts reports to the Director ofCorporate Contracts. The Corporate Contracts Organization isshown in Appendix A,'igure 1-1.

Page 34: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT TQR 1. 0

Rev. 10

ORGANIZATION Date June 10, 1987

Page 21 of 32

1.2.6 Environmental Affairs

Environmental Affairs is responsible for obtaining the federaland state environmental permits required for FPL facilities and

operations. Environmental Affairs is responsible for overallcoordination of non-radiological environmental monitoring(federal and state) programs at the nuclear power plant sites.

The Manager of Environmental Technical Services, the Manager ofEnvironmental Resources and Planning~ and the Manager ofEnvironmental Permitting and Programs report to the Director ofEnvironmental Affairs as illustrated in Appendix A, Figure 1-1.The Director of Environmental Affairs has overallresponsibility for implementation of the EnvironmentalTechnical Specifications and Environmental Protection Plans atnuclear power plant sites.

lO

C4

DCC

The Environmental Affairs Department through its management ofthe Company Environmental Review Group (CERG) is responsiblefor overall coordination of environmental monitoring programs

and requirements related to the Environmental TechnicalSpecifications and Environmental Protection Plans. The CERG

- provides review of - proposed changes to the Environmental-'-Technical Specifications and Environmental Protection Plans,

review of any violations of monitoring and/or limitationrequirements and review of proposed plant changes and

modifications for environmental impact effects as requested by

the plant manager(s).

C0zOl

C4

60U

Page 35: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT TQR 1.0

Rev. 10

ORGANIZATION Date June 10, ].9@7

Page 22 of 32

1.2. 6 Environmental Affairs (Cont'd)

The CERG 'provides information to the Director of EnvironmentalAffairs and the Chairman of the CNRB on environmental mattersfor which requirements are included in the EnvironmentalTechnical Specifications and Environmental Protection Plans.

1.2.7 Power Plant Engineering

The Power Plant Engineering Department (JPE) is responsible forpower plant design related aspects of the FPL QA Program

throughout all phases of plant life except as specified for theFuel Resources Department in Section 1.2.13. Thisresponsibility extends from initial engineering evaluations ofplant design related site characteristics, through preliminaryand detailed design, const'ruction, operation and

decommissioning.

JPE performs design related activities and delegates designrelated activities to qualified contractors. For activitiesperformed by JPE, the work is governed by FPL's QA Program, and

JPE is responsible for approval of the design output.Delegated activities are performed in accordance with an FPL

approved QA Program and the contractor is responsible forapproval of design output. JPE is responsible for defining thescope of delegated activities and the responsibilities of thecontractor. Prior to the release of design outputs bycontractor organizations, JPE ensures that the contractor istechnically qualified to perform the design related activity.

Page 36: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASKJMHCE REPORT TQR 1.0

Rev. 10

ORGANIZATION Date June 10, ].987

Page 23 of 32

1.2.7 Power Plant Engineering (Cont'd)

JPE is responsible for development and maintenance of thedesign control program governing design related activitiesperformed by JPE and for providing technical support to theQuality Assurance Department for assessing the adequacy,implementation and effectiveness of contractor design controlprograms.

JPE is responsible for the preparation, revision, approval and

distribution of plant design drawings that are identified to be

maintained as "asconstructed" drawings during plant operation.I

Sc~ iOy.The Chief Engineer - Power Plants reports to the<Vice President

as shown inAppendix A, Figure 1-1.

1.2.8 Purchasing

The Purchasing Department is responsible for the purchase ofmaterials and services by FPL for its nuclear power plants withthe exception of those materials and services secured by

.,Corporate Contracts -and Nuclear Fuels. Materials and servicesfor nuclear safety related application are secured only from

approved suppliers, or as commercial grade, as applicable.

ID

NDC

The Department is responsible for assuring that technical ando v @-

quality requirements developed by others~ -a@i- reviewed and

approved by th'e designated quality departments as applicable,are incorporated in the procurement document which thedepartments authorizes. It is responsible for maintaining

C0ZOl

NE0U.

Page 37: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASKGRNCE REPORT

Rev.

TQR 1. 0

10

ORGANIZATION " June 10, 1987

Page 24 0~ 32

1.2.8 Purchasing (Cont'd)

traceability of purchase records from acceptance ofrequisitions through payment of the purchase order invoices.

The Manager of Purchasing reports to the Director ofProcurement and Materials Management who reports to the VicePresident of Corporate Services, Chief Financial Officer as

shown in Appendix A, Figure 1-1.

1.2. 9 Construction

The Construction Department is responsible for providingdirection and coordination regarding construction, supervisionand management, equipment utilization, quality control,welding, NDE and other construction support activities.

The Director of Construction reports directly to the VicePresident of Engineering, Projects and Construction. He isresponsible for directing and administering effectivemanagement of the Construction Department to ensure complianceto the corporate policies, pgactices and procedures. Reportingto the Director of Construction are the Manager of Plant

II

Construction and the Manager of. Construction QC, Welding andNDE.

The Manager of Plant Construction is responsible for providingqualified construction support personnel to the Project SiteManager. Reporting administratively to the Manager of PlantConstruction are the Construction Superintendents.

Page 38: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT

Rev.

TQR 1.0

10

ORGANIZATION June 10, 1987

P>9~, 25 «32

1.2.9 Construction (Cont'd)

The Construction Superintendent is responsible for conformance

of project construction activities to the requirements ofspecifications, codes, regulations and site procedures. He

supervises the construction personnel assigned to the project,coordinates construction activities including the scheduling ofconstruction personnel requested by the Project Site Manager.

The Manager of. Construction Quality Control, Welding and NDE is;responsible for directing and administering the Constr'uction QC

and Welding Programs and for the technical direction and

administrative control of all personnel within the ConstructionQC and Welding organizations. This includes the 'development

and implementation of policies, plans, and procedures to meet

the requirements of the QA program, codes and standards.

Reporting to the Manager of Construction QC, Welding and NDE

are the site Project QC Supervisors, NDE Level III Supervisor,FPL Welding Superintendent and a staff of QC Coordinators.

CO

C4

D

IllC0ZOl~4

NC0

The Construction QC Department is responsible for providingquality inspection as required, to assure that backfitactivities meet the requirements of engineering plans,

. specifications, codes and 'standards. This responsibilityextends from receipt- inspections of material on-site toacceptance of the installed items prior to turnover to the

Nuclear Energy Department. It also includes verification ofconformance of an item or activity accomplished during thisperiod to quality requirements (e.g., records review, NDE,

inspections).

Page 39: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT

Rev.

TQR 1. 0

10

ORGANIZATION June 10, 1987

P~ge 26 of 32

Construction (Cont'd)

Each nuclear power plant is assigned a Project Quality ControlSupervisor, who directs the on-site backfit QC organization.The Project QC Supervisor reports administratively and

technically to the Manager of Construction Quality Control,Welding and NDE, however, he,also reports functionally to theProject Site Manager for the purpose of coordinating andscheduling inspection activities. The functional/administrative reporting roles provide the necessaryindependence of the site Construction Quality Controlorganization and also maximizes the communication between theConstruction staff, the QC staff and the Nuclear Energy staff.

The Project QC Supervisor is responsible for first lineverification of the conformance of backfit activities toquality requirements, specifications, code~s and local, Stateand Federal regulations. He directs on-site implementation ofthe Construction QC Program which includes supervision>anddaily coordination>and scheduling of inspection activities, and

I

review of inspection results. The freedom and independence ofthe on-site QC organization to assure the effectiveness of theQC Program from pressures of cost and scheduling is derivedfrcm.-the Project QC Supervisors administrative and technicalreporting relationship. to the Manager of Construction QC,

Welding and NDE.- Both the Manager of Construction QualityControl, Welding and NDE, and the Project Quality ControlSupervisor have the authority to stop work or operationsadverse to quality if the need arises.

Page 40: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT TQR 1.0

Rev. 10

ORGANIZATION Date June 10, 1987

Page 27 Of 32

1.2.9 Construction (Cont'd)

The NDE Level III Supervisor is responsible for directing and

monitoring the NDE+ activitiesperformed under the control of the Construction Department. He

is responsible for preparation, revision and implementation ofNDE procedures, and the training, testing and qualification ofthe NDE personnel performing these activities. He is alsoresponsible for providing the programs and direction forperformance of NDE activities meeting the ASME, AWS and other:-

NDE code requirements.

The Quality Control Coordinators provide staff technical and

administrative support to the Manager of Construction QC,

Welding and NDE in the preparation, review, issue and

monitoring of the Construction QC program to ensure effectiveimplementation.

The FPL Welding Superintendent reports to the Manager ofConstruction QC, Welding and NDE. His responsibilities are todevelop, maintain and c'ontrol the.FPL Welding Control Manual

with assistance from Power Plant Engineering to originate and

qualify welding 'rocedure specifications and qualification of'elders and welding operators to meet the - applicable code

requirements,. He provides administrative and technicaldirection to the personnel within the FPL welding controlprogram to meet engineering welding standards and code

requirements. Reporting to the FPL Welding Superintendent are

the Welding Supervisors at each Nuclear site.

VlC0zOl

CV

0

The organization structure of the Construction Department isillustrated in Appendix A, Figure 1-1.

Page 41: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT TQR 1.0

Rev. 10

ORGANIZATION Date June 10, 1997

Pege 28 of 32

1.2. 10 Power Supply

Within the Power Supply Department only equipment and servicesprovided by the System Protection Group and Power SupplyTechnical Services are subject to the requirements of theQuality Assurance Program. Appendix A Figure 1-1 illustratesthe reporting relationship.

System Protection is responsible for test, calibrationg andmaintenance of certain high voltage electrical protectiverelays for safety related systems of the nuclear plant.Activities of System Protection include final wiring connectionchecks, preoperational check-out and test of system protectiondevice~s and providing inspection of equipment under theircognizance.

Power Supply Technical Services is responsible for providing toSystem Protection certain setpoint and checkpoint values forprotective devices.

1.2.11 Inventory Resources

The ,Inventory Resources" Department is responsible for thereceipt, handling, storage, shippin and issue of itemsreceived at the plant site for control by Inventory Resources.This responsibility encompasses spare and replacement parts and

components for plant equipment through all phases of plantlife.

Page 42: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT

Rev.

TQR 1. 0

10

ORGANIZATION June 10, 1987

Paga 29 of 32

J1.2.11 Inventory Resources (Cont'

During operations, Inventory Resources also performs additionalquality related activities such as handling and segregation fornonconforming items received for stores control. The Manager ofPower Plant Stores reports to the Manager of InventoryResources who reports to the Director af Procurement and

Material Management as shown in Appendix A, Figure 1-1.

1.2.12 Company Nuclear Review Board

cses

ce

D

The Company Nuclear Review Board (CNRB) reviews or directs theperformance of reviews of activities concerning the technicalaspects of the operating nuclear power. plant insofar as theyimpact on plant safetyg> the health and safety. of the pnhlicgiand laws, regulationsg and licensing commitmerits. In addition,audits of these areas are performed under the cognizance of theCNRB. Where necessary, the Board may use consulting servicesto perform required reviews. The management level to which theCNRB reports is illustrated in Appendix A, Figure 1-1. Its

I

composition is delineated in Section 6.0 of each facility's5 asa s o I V s cs- pre S s l e ++ rC s fTechnical Specifications.

p>~~r Vga,(sue.v cd «s.fr~c+po~, To~e.r V~+~~ g y ~~~~CrSA lp CJ~ACP Sh S A1 PeeP Crr+ sa]+ V<CZ Pr+ i

pc,r e cprm nelsSub)ects within the purview of the Board. are listed in the

appropriate plant Technical Specifications. The CNRB has the

authority to carry out its responsibilities by way of writtenaction letters, verbal direction, minutes of meetings orappointed subcommittees.

VlC0ZOl

cII

Eh0

Page 43: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT TQR 1. 0

Rev, 10

ORGANIZATION Date June 10 i ].9S7

Page 30 of

1.2.13 Nuclear Fuel

The Nuclear Fuel Section (FRN) of the'Fuel Resources Department

is responsible for the procurement, management, and

accountability of FPL's nuclear fuel assets, and for providingtechnical support to fuel users within FPL. The Nuclear FuelSection is under the direction of the Manager of Nuclear Fuelwho has the responsibilities described below:

o

0

o

o

0

io

o

0

Forecasting FPL's nuclear fuel requirements and theavailability and price of nuclear fuel;Preparing the procurement specifications for components ofthe nuclear fuel cycle;Determining sources of supply and evaluating alternatives;Making commercial arrangements, . including contractnegotiations with vendors for acquisition, processing and

delivery of nuclear fuel and related services for thenuclear fuel cycle;Assuring that technical and quality requirements includinginputs from other FPL departments are incorporated in fuelcontracts and letters of authorization and that thesedocuments have the necessary approvals;Administering and managing contracts for nuclear fuel and

related services to assure that contractual obligationsare met, and serving as FPL liaison in all matters ofnuclear fuel and fuel related contracts;Performing audits and coordinating accountabilityreporting on all nuclear fuel;Providing support to the QA Department for their auditingof nuclear fuel design and fuel assembly manufacturing;

Page 44: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT

Rev.

TQR 1.0

10

ORGANIZATION June 10, 1987

Page 3] of 32

1.2.13 Nuclear Fuel (Cont'd)

o Performing fuel management and safety analyses of nuclearcores to support plant licensing;

o Development and/or . review of fuel and nuclear physicsdesign;

o Performing the pro)ect management function with respect tonuclear fuel;

o Provide and maintain benchmarked computer codes and

procedures available for Fuel Resources line functions and-

other departments for daily use in maintaining records,performing safety analysis and core design, reporting ofoff-site nuclear fuel management activitiesg and providingeconomic data;

o . Maintain effective and controlled computer access toNuclear applications systems;

o Develop and provide, to appropriate FPL groups,information necessary to determine FPL's fuel. relatedcosts and to finance fuel related expenditures;

o Reviewing core related changes to Safety Analysis Reports

and Technical Specifications for compliance with design

criteria and regulatory requirements;o Participating kn start-.up physics tests'nd providing

other technical support for operating nuclear power

plantsg s

o Planning, maintenance and implementation of the Corporate

Special Nuclear Materials program.

Cu

~s

The Manager of Nuclear Fuel reports to the Director of Fuels as

shown in Appendix A, Figure 1-1.

lhC0Z

ce

E~ 0

IL

Page 45: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITY ASSURANCE REPORT

Rev.

TQR 1.0

10

ORGANIZATION June 10, 1987

Pa9e 32 of 32

1.2.14 Corporate Records Services

The Manager of Corporate Records Services is responsible for:ensuring the QA records program activities are managed inaccordance with applicable laws and regulations; assisting withthe development and implementation of effective and compatiblerecords and micrographics programs; developing, approving and

maintaining record retention schedules; establishing parametersfor indexing in the corporate records computerized RecordManagement System (RMS); locating acceptable record storageareas when requested; storage, retrieval and control ofrecords/documents as reqested by other departments; leading theevaluation of specially designated "QA approved" storagefacilities and maintaining the records of this evaluation. The

Corporate Records Services organization is shown in Appendix A,Figure 1-1.

1.2.15 Documentary Files

The Supervisor of Pocumentary Files is responsible forreceiving, maintaining, .retrieving and storing the QA recor'dsin connection with licenses and contracts received from otherdepartments. The Documentary Files organization is shown

in'ppendixA, Figure 1-1.

Page 46: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITYASSURANCE REPORTTQR 10.0

A POWER 8 LIGHTCOMPANY

INSPECTION

R ev.

3une 10, 1986

Page 2 Of 5

10.2.1 Inspection Responsibilities (Cont'd)

~ a el CLQ C. ~ C e +For these plant modifications, the Construction Department may delegate

the establishment and execution of this program to a contractor or otherdesignated FPL representative, but shall retain ultimate responsibility forthe program. For preoperational start-up and testing of plant modifications,Nuclear Energy personnel may report functionally to the Project Site

Manager and establ>sh plans, schedule@and procedurally required inspection,witness or hold points. In all cases, the personnel performing the inspection

shall be independent of the group performing the work. The ConstructionDepartment shall also be responsible for performing receiving and process

verification inspections for work under the jurisdiction of the ProjectCeneral Manager, or as requested by the Plant Manager.

ypg~ eqcjgg N 4 H 7

P ' 'I"'P

within their purview during operations. Inspections shall be performed in

accordance with approved, written procedures by qualified personnel.

Quality Procedures and Quality Instructions shall be written which delineate

the requirements and responsibilities for the performance of inspections.

10.2.2 Inspection Plans and Schedules

Documented inspection plans may be either a separate document or an

integral part of work instruction documents. The plans shall be based on

design specifications, procurement documents, drawings, other

specificationgsor previous experience; as appropriate. Inspections shall be

scheduled to assure that sufficient time and resources are available; and to

assure inspections are not inadvertently omitted or bypassed.

Page 47: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITYASSURANCE REPORT

Rev.

TQR 10.0

FLORIOA POWER 4 LIGHT COMPANY

INSPECTION Date June 10,

Page I rf 5

10.1 GENERAL RE UIREMENTS

A program for inspection shall be established and executed by or for FPL to

verify conformance with the documented instructions, procedure~cd drawings. for accomplishing an activity. Such inspections shall be performed by individuals

or groups other than those who performed .the activity being inspected.Examinations, measurement~and tests of materials or products processed shall

be performed for each work operation, where necessary, to assure conformanceto established requirements. If direct inspection of processed materials or

products is impossible or disadvantageous, indirect control by surveillance ar-

monitoring shall be provided. Mandatory inspection, witness, or hold points

beyond which work shall not proceed without the consent of FPL or a designatedrepresentative shall be indicated in the appropriate documents.

10e2 IMPLEMENTATION

l0.2.1 inspection Responsibilities

For plant operations activities, a program for on-site inspection of activitiesaffecting quality shall be established by the Nuclear Energy Department.Nuclear Energy shill perform inspections, surveillance~and monitoring of

plant activities and plant operations as required by established plans,

schedule~and/or procedurally required inspection, witnes@or hold points.I

IN all cases, the personnel performing the inspection shall be independent ofthe group performing the work.

For plant modifications assigned to Project Management Department or

when requested by the Plant Manager, a program for on-site inspection ofthese activities affecting quality shall be established and executed by the

Wgg srs ~5'r ~m C M,Construction Department to ensure conformance with documented

instructions, procedures and drawings.

Page 48: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITYASSURANCE REPORT

Rev.

T R l00

FLORIDA POWER S LIGHTCOMPANYINSPECTION Oate

3une l0, 1986

Page of

I0.2e3 Inspection Personnel

aa Inspections shall be performed by individuals other than those who

performed or directly supervised the activity being inspected.

Inspection personnel shall be qualified and certified in accordance with

appropriate codes, standard~ and/or company training programs.

Qualifications and certifications shall be kept current.

10.2.0

b. Prior to performing inspections, inspection personnel shall have access

to the drawings, procedures, specification~ or other documented

criteria necessary for performance of the inspection.

Inspection Procedures

aa Required inspection, surveillanc~or monitoring activities shall be

performed and documented according to written, approved instructionsor procedures. Inspection procedures, instruction~or checklists shall

contain the following:

o Identification of characteristics to be inspectedo

o Identification of the individual or groups responsible for performing

the inspectio~ '

Acceptance criteria or reference to the acceptance criteria '

A description of the method of inspection~ '

Verification of completion and certification of inspection.

b. Inspection records shall identify:

o Inspector or data recorder~~

Page 49: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITYASSURANCE REPORT

Rev.

FLORIDA POWER a LIGHTCOMPANYINSPECTION Date

3une 10 1986

Page of5

10.2.0 Inspections Procedures (Cont'd)

o Method or type of observationsg ~

o Test or inspection results'

o Statement of acceptabilityg '

Date of observation@

o Deficiencies and nonconformances, and the action taken in

connection with these deficient conditions, either by inclusion orby reference to other documents.'

Inspection procedures shall be reviewed by QC personnel to determinethe need for an independent inspection and the degree and method ifsuch an inspection is required, and to assure the identification ofinspection personnel 'and the method of documentation of inspectionresults.

d. Written approved instructions shall specify sQrveilhnce or monitoringof. processing methods, or'testing and operation of equipment when

inspection is impossible, inaccessible or not applicable.r

e. Modification, repair, replacement or rework items shall be inspected inaccordance with original inspection requirements or acceptablealternatives.

Page 50: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

FLORIDA POWER 1 LIGHTCOMPANY

TOPICAL QUALITYASSURANCE REPORT

INSPECTION

TQR I 0.0

Rev. 7

gune IP, I936

Page 5 of 5

I0.2.5 Inspection, Witness, and Hold Point Identification

Appropriate inspection, witnes~sor hold points shall appear in process

documents (e.g., construction, testing, operating and maintenance

procedures). These process procedures are subject to the review of the

appropriate Quality Control organization for adequacy of inspection,

witness, and hold points.

IVtandatory hold points shall be used when witnessing and inspecting must be

performed and signed-off by the responsible personnel before work can

proceed.

FPL shall indicate FPL witness or hold points applicable during the

manufacture of an item in procurement documents. A distinction shall be

made between witness points and mandatory hold points.

Page 51: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

IC

Page 52: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITYASSURANCE REPORT TQ'R 15.0

FLORIOA POWER 4 LIGHTCOMPANY

NONCONFORMING MATERIALS,

PARTS OR COMPONENTS

Rev.

Date 3une 10, 1986

Page 1 of

15.1 GENERAL RE UIREMENTS

Measures shall be established to control materials, parts, or components which

do not conform to requirements in order to prevent their inadvertent use or

installation. These measures shall include, as appropriate, procedures foridentification, documentation, 'egregation, dispositio~ and notification toaffected organizations. Nonconforming items shall be reviewed and accepted,

rejected, repaired or reworked in accordance with documented procedures.

15.2 IMPLEMENTATION

0 15.2.1 Program

Quality Procedures and Quality Instructions shall define the responsibilities

and methods for identifying, documenting,. segregating and dispositioning

nonconforming items. For procedure review requirements, see TQR 2.0 and

TQR 5.0. Each department shall be responsible for the identification,controg and disposition of nonconformances within the scope of their

departmental responsibilities.

Throughout plant life, FPL may delegate any portion of the identification .

and control of nonconforming items and services to an Architect/Engineer

(A/E), constructor, NSSS vendor or other'contractors. In any case,FPL'etains

the responsibility for assuring that requirements are met, and shall

assure that the contractor's actions conform to requirements set by'FPL.

Page 53: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITYASSURANCE REPORTTQR 15.0

FLORIDA POWER d LIGHTCOMPANY

NONCONFORMING MATERIALS,

PARTS OR COMPONENTS

Rev.

Date 3une 10, 1986

Page 2 of

15.2.2 Documenting and Controlling Nonconformances

All nonconformances in safety related items shall be documented and

reported for corrective action. Measures shall be delineated in QualityProcedures and Quality Instructions which control further processing,installation, or operation of nonconforming items. These measures shall

include:

a. Physical identification of the item as nonconforming.

b. Segregation of nonconforming items until properly dispositioned.

)Vhere physical segregation is not practical, suitable tags, marking ordocumentation shall be used to assure control.

15.2.3 Documentation

Documentation of the nonconforming item shall: identify the item; describe

the nonconformance; show disposition of the nonconformance and inspection

requirements; and include the signature of the person approving the

disposition.

15.2.0 Evaluation and Disposition

Ei**" "*' '' 'E~or the delegated contractor organization, as specified by procedure, shall

evaluate nonconformances and disposition them based on tlie results of theevaluations. These evaluations and dispositions shall be reviewed, approvedand documented in accordance with procedures.

Page 54: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITYASSURANCE REPORTTQR l 5.0

FLORIDA POWER 4 LIGHT COMPANY

NONCONFORMING.MATERIALS,

PARTS OR COMPONENTS

R ev.

Da«3une l0, l986

Page 3 of

15.2.0 Evaluation and Disposition (Cont'd)

An evaluation to determine the disposition of nonconforming items shall be

performed. The evaluation shall determine whether an item is to be

accepted as-is, repaired, reworke+or rejected. A technical evaluation shall

be performed when an item is accepted as-is or is repaired to an acceptable

condition. Records of the disposition of these items shall be made part ofthe nonconformance report. This evaluation shall assure that the finalcondition does not adversely effect safety, operability or maintainability ofthe item, or of the component or system in which it is installed.

The A/E, or other contractors on-site, shall be required to inform the FPLpfggaapc Mc H P

Construction or Nuclear Energy Department prior to use or installation of a

nonconforming item. The nature and extent of a nonconformance and the

reason for proposing its use or installation shall be jus'tified. Nonconforming

items dispositioned "accept as-is", or repaired to an acceptable condition,

shall be so identified. Nonconformance reports for those items shall be

made part of the item records and forwarded with the material to FPL.

Thc deter Inina tion of the need and the advisability o f releasing

nonconforming materials~ items, is made by the Power Plant Engineering,gaaapam e w IConstruction+or Nuclear Energy Departments. The following factors may be

appropriate considerations in making this determination:

a. Effect on the orderly progress of work if material or items are

released;

b. Safety of personnel;

c, Suitability of material or items in "as-is" condition, i.e, probability of

eventual satisfactory resolution of the nonconformance without repair,

rework, or replacement;

ZOl~ ~CV

aO4

Page 55: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

TOPICAL QUALITYASSURANCE REPORT TqR S5.O

FLORIDA POWER 8 LIGMTCOMPANY

NONCONFORMING MATERIALS,

PARTS OR COMPONENTS

Rev.

Oate June 10, 1936

Page Q of

15.2.0 Evaluation and Disposition (Cont'd)

d. Accessibility of material or items after release;

e. Cost of removal and repair of replacement should material or itemseventually have to be removed, repaired, or replaced;

f. Impact on plant safety.

Items shall be reworked or repaired in accordance with documented

procedures and shall be verified by reinspecting the item as originallyinspected or by a documented method which is at least equal to the originalinspection method.

Quality Assurance or Quality Control personnel shall periodically reviewnonconformance reports to identify quality trends. The results of these

analyses shall be reviewed with appropriate members of upper levelmanagement.

Page 56: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

twS IDENI

CICCUfillTICE t14$ IDlsl VICE taCSIDEN'I

SINIOATICC tal ~ IDENT

TICE AESIOENTCOAOAA C NAIICCS

AN0 CNIEFf IWAIC AI OFFICE ~

Se. I Or

Ulcc tMSIDcaf

OISEC'Ioa OfSlCLO

r OIAEC'los OfCoal IAWT ION

aawsla ofNUCLCAASWL

ylct PrtD,la~ fPf,~a Pt Pfst 5

Neo ~ UUUAINIIIN

el ISA4 ~ J.a ~ I~

4 I

CNIEF lallaCIAtoe41 tLAsf

OUALITI ASSVAMCECDM I'IIEC

DUTEIDCC Os 5VLIMI5

~ UICCtal ~ IDlslNWLCAA ONOAOI

0114CTOA OftaoUECIS

DIAICfOA~CO FO /CCow fAACI5

NAaslla OfCoatoaalcCONIAACI0

Coatasf NWLEM1Cellr 40110

TICC talllolal

CoatlsAIESCCAEIM'I

NANALIAofEoatoaaf 4

AECOAOS 541IICCS

OI1ICfOA OSlael1oalCNIAL

ASSAI 1 ~

SUtlarlfoa ofOOCINICNIMT IIlll

OIAECIOA OF~ AOCUAINEST

Aao~lsfla AL I

SAaASL 1

tVACUA5 I IN

SANALEA OfIselsfoaeACSOUACES

NANALEA Oftoela tLANI

5 IDAE5

Ol ~ ECIDOtoela

SWtLT

SANISI45'elfcataolllllos

MMSIA Of toeC1SWtLT IECNN ICAL

SlarlCES

Nass441 Of~LMI

coslfawlloN

cosSfawf losSWEOINTESOESI

CON 5 I1VC IIoatEASONNEL

NANALI1CONS I1W I I ON

OC, elLOIwAlro NOI

5 IAFf OCCooaolsafoa

~ 10ACI 00SWEAT I501

INE Llell IIISW41elloa

NANASEAtLMNINO aw

CONTAOL

taorccf CINEMASANASC 1

SAOUECT 'ICAa

NUCLEAA

ga

OIACCIMNUCLlw

LICENEIW

CsfA

4CT

Coat AN'IN'II1 DMIN IAI.siffle aaout

I NMASIA Of4 sr I1ossl s fAL

AISOUACI5 ~~\AMIN4

DIAECIOA4UALI II

ASSVAANCC

NANA541 OIINIIaowsl NIALECNNICAL $41IIC45

NANASIA OIINe Iaolsll s IALtCAalfllso ~taolaasl

~ ELDINSSW C 1 I1 I4 sol 1 f

5JVC etIVALEI toINf

IWCLEM

NANASCO NUCLCMENCMT SEATICll

Si LetSf ~ LLCIE

raalsmIANCE NasallySWEE M4AMI IN

SFEC If C ~ IllIsl5AS I ~ I IosNIINSNEMTIM lb) Safer

I

Stlclflc SIIEIflf Fs DAASAANIIAIIDN

IEAINNAEAA SWI1 I Nfl INLNIMENSA Ol SIC IE

assasla of EWE 1 I NIINOE N I NANASI1ovAL I le ASIUAANCI rase 41 taocsalalsl ~

$ 41elCES IUALET SOINI AILIINIL I II

NU5

I

Ear

LIIAEVI

IaeOUAI I I 'I A55UAANCI

SNSSAAN alelcsCOMI I'lCI OAFAC I

TOPICAL QUALITY ASSURANCE REPORT

OALMIIAIIONOf OESMINESI ~AFFECT INO OVALITT

SISUAC I IattCINIE 1

III I~

Ml~ Ill~ Ilacre rl,~ ~

CAO OC SA'I'Iltllal

Page 57: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:
Page 58: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

~ lit TICE Patslaal~tf POINT

PLMT NANAOENWCLTM

st1TICts NANAOENNOCLEM

OITE PAILNCTNANAOE1

Sift ENOINEE1IWNANAOE1

~LMT SECNNIIT~IptafloM SINE MONCIIM

SNPE NT ISM ETT ENOINEEOI~AOW CNAIMM

MCLEMMEITCOMITTtt

OPEMTIOWSINE 0 I4 ItWE1 I

NNCLEM

~NALITTCMTML

OIPEOTI MaTtOel ICaL

OEPMTMNT~NPEAT IOM

TMINIW~TIOM NalanaaattMStalaf tMENf

NNCLEM

NEAlf1~ATTICS

SOPEAT ISM

MACf01SINEATISM

OPEMTIOWsoptaf lsoa

CatalsfafONPENT IMa

ItCNIICALOTASS

IWTNOMNTAW CMTAOLsoft sf I soa

~INEAIN EINNNTMCNMICAI.NAINTENANCE

WCLEM

SNPEOINTEMENTtltCTAICALNalaftNANCE

WCLEM

NAOIAfION410 ItC I ION

1EACIONEWINIEN

MOust ATIsos

MCltMISMI

MOI4CMNI~I MIST

TECW ICALNOT ISM

IWCLEM NATCNEWINEEN

IMOI

NNCLEA1 Csaf10LCtNIl1 OPtAA'lsa

IAOI

INN. ICtAltoOPEMTMS

C40 OC G4-1 424$ 240

TOPLCAL QUALITY ASSURANCE REPORT

TUNEET POINT NUCLE4hSITE OhsaNIZATION

FISUNE I4PPENOIX 4

IS/lo/M

PAM ~ I

Page 59: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

I t

Page 60: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

KEE MRS~~~

KER ~

s ~ r I

Page 61: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

e+'

Page 62: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

F LORIOA POWER d LIGHTCOMPANY

TOPICAL QUALITYASSURANCE REPORT

LIST OF CORPORATE QUALITYASSURANCE PROCEDURES

APPENDIX E

Rev.9

Date3une 10 1986

lo

P NUMBER/TITLE

l. lCANCELLED

2.1CANCELLED(Terms and Definitions containedin the QA Manual Glossary)

2.2REVISION OF THE TOPICAL QUALITYASSURANCE REPORT

2.3QUALITYASSURANCE PROGRAMREVIEW

2.0PREPARATION AND REVISION OFQUALITYINSTRUCTIONS

2.5QUALITYASSURANCE INDOCTRINATIONAND DEPARTMENTALTRAINING

r

2.6CANCELLED

2.7IDENTIF!CATIONOF NUCLEAR SAFETYRELATED AND SAFETY RELATED DESIGNFEATURE STRUCTURES, SYSTEMSCOMPONENTS AND SERVICES

SECTION DESCRIPTION

Provides instructions for the revision ofthe Florida Power R Light CompanyTopical Quality Assurance Report .

(FPL TQAR).

Describes the instructions and methodsused for establishing, preparing, issuing,revising and controlling QualityProcedures employed in supporting qualityrequirements.

Provides the responsibilities, guidelinesand methods used for developing andrevising Quality Instructions, based uponQP's, that involve quality activitieswithin a department or organization andare unique to that activity.

Describes the requirements for theindoctrination and training of personnelwho perform, or are responsible foractivities that affeet quality.

Describes the development and approvalof documents identifying safety relatedand safety related design featurestructures, systems and components.

Page 63: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

FLORIDA POWER k LIGHTCOMPANY

TOPICAL QUALITYASSURANCE REPORT

LIST OF CORPORATE QUALITY- ASSURANCE PROCEDURES

APPEN E

R ev.

Date3une 10

Page of2 10

P NUMBER/TITLE

2.8CLEANLINESS CONTROL METHODS

2.9QUALIFICATIONOF QA AUDIT, QCINSPECTION AND CONSTRUCTION TESTPERSONNEL

2.10HOUSEKEEPING FOROPERATING PLANTS

2.11CANCELLED

SECTION DESCRIPTION

Provides criteria for securing good house-keeping. Assigns responsibilities forassuring that the cleanliness of material,systems and structures is maintained.

Describes the personnel qualifications thatare required to assure that competent QCinspectors, QA auditors, andconstruction test personnel performthese respective functions.

Describes the responsibilities and controlsfor housekeeping at operating nuclearpower plants.

Q

I K4

IIcn

IIZ

e

2.12FPL QA PROGRAM APPLICABILITYFOR FIRE PROTECTION SYSTEMS

2.13'PROCESSING OF NRC CORRESPONDENCE

2.10IMPLEMENTATIONOF ASME XI

gt l7 En~nonmenhaI Qualgiach~(Q)

~~I EI"'P"~3.1CANCELLED

3.2IDENTIFICATIONAND CONTROL OF

, DESIGN INTERFACES

Identifies the applicability of the FPLQuality Assurance Program for FireProtection Systems.

Describes the system for providingresponses to NRC initiated actionrequests.

Describes the program and responsibilitiesfor controlling activities defined by ASMESection XI.

~J+~ +e f ~~Qhoi)iKec OIt J t+pIl C.—

ate+~ trier mOinR~winq~e m~VIVOnn chal)ukfACdtbi~ d0 Augmf~~1~ ~Q~MI~»- ~

Describes measures employed foridentifying and controlling designinterfaces, changes in designinterfaces, and modifications thataffeet documents.

Page 64: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

FLORIDA POWER a LIGHTCOMPANY

TOPICAL QUALITYASSURANCE REPORT

. LIST OF CORPORATE QUALITYASSURANCE PROCEDURES

APPENDIX E

Rev. ~

Date 'une 10 1986

Page of5 lo

6i7 Go«o/ o, ev ovtel o w u a I a « ~oI'o+o/0 rScca /laic« I X Kf op~« 1 l4%

I

CJ fest'rc~c~ h +r ega Vo ~

(Qg ~ c+\ I vHA<4~$ 4ropcrWOs+cpgggrq+(gee7&4 7 'etrft ~ I/7~ 4

&7'ECTIONDESCRIPTION

7.1RECEIPT INSPECTION OF MATERIALS,PARTS AND COMPONENTS AT THE PLANTSITE

Provides instructions for receiptin'spection of materials, parts andcomponents which have been obtained foruse in nuclear safety applications at theoperating plant site.

7.2CANCELLED

7.3CANCELLED

7.0EVALUATIONOF SUPPLIERS OF SAFETYRELATED ITEMS OR SERVICES

Provides standards, measures, and guide-lines for the evaluation of QA Programs ofcontractors or suppliers supplying items orservices.

7.5CANCELLED

7.6ACCEPTANCE OF ITEMS u SERVICES

I

Describes the responsibilities andrequirements for accepting nuclearsafety related items or services that arebeing procured for nuclear power plants.

7.8REVIEW AND DISPOSITION OFSUPPLIER DEYIATIONNOTICES

Describes the responsibilities andrequirements for the review anddisposition of nonconformances identifiedwithin a supplier's facility which haveresulted or will result in an item whichdoes not fully comply with the FPLprocurement document quality andtechnical requirements. This procedureapplies to purchased items which have notyet been shipped.

3.1IDENTIFICATION8 CONTROL OF Delineates measures for assuring trace-MATERIALS,PARTS AND COMPONENTS ability, identification and control of.AT THE PLANT SITE items from the time they are received

4 through usage at operating plants.co~ Pro, o o n- s e~@ ge ~ Jo r $ 0%<ctg

r S g+c~ 0 sJ«vC pa ~ vw ~o(o (Sp ro c~ ot 4.(e prov i'd@ a. y l/ co~Vra c o r

o&o pfov~ 4c'a e ~ Te q~/A4./ +S 4

Page 65: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

FLORIDA POWER aL LIGHT COMPANY

TOPICAL QUALITYASSURANCE REPORT

LIST OF CORPORATE QUALITYASSURANCE PROCEDURES

Rev.

DateJune 10 1986

Page of6 10

P NUMBER/TITLE SECTION DESCRIPTION

8.2CANCELLED

9.1CONTROL OF SPECIAL'ROCESSES

9,2 C a n c.w /few

Delineates the responsibilities of organ-izations and personnel, and the control and,documentation of special processes that.are applied to safety related items.

(~ I 'agDes es measures to assu equatecontrol o s eci cesses applied to,.safety rela s during the operatingph nuclear po lants.

9.0CONTROL OF iVELDINCFOR NUCLEAR POPOVERPLANTS

10.1CANCELl,ED

Delineates responsibilities and require-ments for control FPL welding processesfor nuclear power plants.

10;2CANCELLED

10.3INSPECTION AND SURVEILLANCE

10.0CANCELLED

10.5CANCELLED

10.6CANCELLED

Delineates responsibilities andrequirements for the inspection andsurveillance of safety related plantmaintenance activities, operation of

'afety related systems, and fuel handlingactivities.

Page 66: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

FLORIDA POWER d LIGHTCOMPANY

TOPICAL QUALITYASSURANCE REPORT

LIST OF CORPORATE QUALITYASSURANCE PROCEDURES

APPENDIX E

Rev.9

Date3une 10, 1986

Page of

P NUMBER/TITLE SECTION DESCRIPTION

pe+ (c. ~( «'~ ~eW jf, Q)

II 2 c.~ ce ~~~CI (c.o 6, ~~ m i+ II 'I)

A

(( ~~Xi( a4I ~(Q II ')I

s 'es measures to assurecontractor 'n of sa relatedmaterial durin t constructionphase is rolled, accom 'd, and

ented.

cription of the proceduresand pra 'mployed b to controltesting of plant 's and materialthat are with e scop the QAProgra ring the plant opera

e.

the procedures acticesemploye ate the capabilitiesof a nuc ant isfy safety related

rmance specifications.

11.0TEST CONTROL Defines the measures for control of proof

test prior to installation, constructiontests, preoperational tests, startup tests,operational tests and retosts followingrepairs, replacements or modificatioI(s fornuclear safety related systems,structures, and components.

12.1CALIBRATIOHAND CONTROL OFMEASURING AND TEST EQUIPMENT

Delineates the responsibilities forimplementing the described program formaintenance, calibration and control ofmeasuring and test equipment (MATE).

12.2CALIBRATIONCONTROL OF INSTALLEDPLANT INSTRUMENTATIONAND CONTROLEQUIPMENT.

De'scribes the calibration program,delineates responsibilities, and ..establishes procedures for control over thecalibration of installed instrumentationand plant control equipment.

C4ZOl

Cll

e04

Page 67: Forwards Rev 11 to FPLTQAR 1-76A, 'Topical QA Rept' & marked … · 2018. 7. 31. · P. BOX 14000, JUNO BEACH, FL 33408-0420 @SU/@, ri~(g~ U.S. Nuclear Regulatory Commission Attn:

FLORIDA POWER 4 LIGHTCOMPANY

TOPICAL QUALITYASSURANCE REPORT

LIST OF CORPORATE QUALITYASSURANCE PROCEDURES

APPERev.

9

Date3une 10 1986

Page of8 10

P NUMBER/TITLE SECTION DESCRIPTION

13.1HANDLING,STORAGE AND SHIPPING OFMATERIALS,PARTS AND COMPONENTS

13.2CANCELLED

Establishes responsibilities and proceduresto assure that measures are employed byFPL and contractors to: (1) control thehandling, shipping and storage of material;(2) protect the quality of material byusing proper handling, shipping, andstorage techniques; (3) effectively controlthe disposition of discrepant items.

13.3CONTROL OF RESERVED CENTRALLYSTOREDELECTRICAL CABLE

10.1INSPECTION, TEST, AND OPERATINGSTATUS DURING PLANT OPERATION

Provtdes the requirements for the issuanceand controls of centrally stored electricalcable for use in all operating nuclearpower plants.

Specifies the respective responsibilitiesof FPL personnel and the measuresemployed for iden ti fying the s ta tus(Inspection-Test-Operation) of plantstructures, systetns and coInponents.

10.2INSPECTION TEST AND OPERATINGSTATUS DURING PLANT CONSTRUCTION

t

Provides requirements and responsibilitiesfor the identification of the inspection,test and operating status of plantequipment up to turnover of the plant

1~/ to the operating organization.4c v LeffeCX CC~>Icifies the responsibilities of

depar ts and the proc orexercising c 1 ov aterials,structures, or a ' that do notconform to ecifications atinadv nt use or installation ot

le