![Page 1: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/1.jpg)
KIOCL LIMITED BENGALURU
FORWARD AND BACKWARD INTEGRATION OF THE EXISTING BLAST FURNACE UNIT
TENDER DOCUMENT
FOR
GEOTECHNICAL INVESTIGATION
Tender Document No.: MEC/01/51/KIOCL/Geotech/273/PKG-002
VOLUME – I OF I
MECON LIMITED (A Govt. of India Undertaking)
Bangalore, India
DEC, 2019
![Page 2: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/2.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 1 of 18 “© 2019 MECON Limited. All rights reserved”
PART - I
CONTENTS
1.0 Notice Inviting Tender
2.0 Annexure – I : Technical Specification
3.0 Annexure – II (a) : Un-Priced Format
4.0 Annexure – III : No Deviation declaration
![Page 3: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/3.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 2 of 18 “© 2019 MECON Limited. All rights reserved”
NOTICE INVITING TENDER (NIT)
(E-Procurement Mode only)
Ref. No. : MEC/01/51/KIOCL/Geotech/273/PKG-002 Date: 23.12.2019
Sub: Tender Enquiry for Conducting Geotechnical investigation at Blast furnace
Unit, KIOCL Limited, Mangaluru.
We KIOCL Limited shall be utilizing the e-procurement service of MSTC
Limited, A Government of India Company having its registered office at 225-C,
AJC Bose Road, Kolkata- 700 020 for enabling us to procure goods, services and
works.
KIOCL Ltd invites online tenders from the prospective bidders of repute to
participate in our tender the mode of which happens to e-Procurement System
(Online Part-I - Techno-Commercial Bid and Part-II -Price Bid through
http://www.mstcecommerce.com/eprochome/kiocl of MSTC Ltd.)
MSTC Event No. & Date
Description Last date &
Time for
submission of offer
KIOCL/19-
20/ET/336
Conducting Geotechnical investigation at
Blast furnace Unit, KIOCL Limited,
Mangaluru in accordance with technical
specifications and other terms &
conditions of the tender.
04.01.2020 up to
5.30 PM
1) COST OF TENDER DOCUMENT (Tender Fee non refundable) :
The cost of Tender Document shall be Rs. 200/- (Rupees two hundred
only) payable by RTGS in favour of KIOCL Limited, payable at Bangalore.
2) EARNEST MONEY DEPOSIT (EMD)
a) The bidders shall furnish an interest free Earnest Money Deposit
(EMD) of Rs.10,000/- (Rupees Ten Thousand only) by way of RTGS in
favour of "KIOCL LIMITED", payable at Bangalore.
![Page 4: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/4.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 3 of 18 “© 2019 MECON Limited. All rights reserved”
b) The EMD will not carry any interest till it is returned. The EMD will be
returned without any interest to unsuccessful bidders on identification
of successful bidder and in the case of successful bidder, the EMD will
be returned after receipt of security deposit towards performance
guarantee.
c) In case the bidder withdraws their quotation before the tender validity
specified in this tender document, the EMD amount will be forfeited
irrespective of whether the bidder has offered shorter validity than the
validity stipulated in this tender document.
IMPORTANT NOTE:
i) The above payments should be deposited in one go and exact
amount should be reflected in our books of account on or before
the opening date & time of tender.
ii) Please note that Tenders without EMD, Tender Document Fee &
Tender Processing Fee or the proof of payments/exemption will
be rejected.
3) IMPORTANT DATES
1. TENDER ENQUIRY NO. : MEC/01/51/KIOCL/Geotech/273/PKG-
002 Date: 23.12.2019
2. ITEM DESCRIPTION :
Conducting Geotechnical Investigation
at Blast furnace Unit, KIOCL Limited,
Mangaluru
3. DUE DATE & TIME OF
SUBMISSION OF OFFER : 04.01.2020 at 17.30 Hrs
4. DATE & TIME OF OPENING OF
TECHNO-COMMERCIAL BID : 06.01.2020 at 11.00 Hrs
5. TENDER FEE :
Rs.200/- (inclusive of GST) in favour of
KIOCL Limited payable at Bengaluru
(Non-Refundable)
6. Earnest Money Deposit Rs.10,000/- in favour of KIOCL Limited
payable at Bengaluru
7. COMPLETION TIME : 60 days from the date of Letter of Intent
(LOI).
![Page 5: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/5.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 4 of 18 “© 2019 MECON Limited. All rights reserved”
4) SUBMISSION OF TECHNO-COMMERCIAL AND PRICE BIDS :
Bidder should submit their tenders in two parts through e-procurement
mode only. The instructions on the portal shall be followed, while
submitting the tender
Part - I : Techno-Commercial Bid
Part - II : Price Bid
Bidders are requested to upload the following documents in the
MSTC portal.
a) Proof of payment towards Tender document Fee & Earnest Money
Deposit as mentioned above.
b) Copy of GST registration Certificate & Complete contact details of the
bidder
c) Documentary evidence for Pre Qualification Requirement.
d) Copy of the Price Bid without indicating Price
e) Particular for e-Payment
5) TENDER OPENING:
Part – I : The Techno-Commercial bid will be opened electronically on
specified date and time as mentioned above.
Part –II : Price bid will be opened electronically of only those bidder(s)
who have been techno-commercially found acceptable.
6) E-REVERSE AUCTION : After opening of the price bids, e-reverse auction
will be conducted amongst all the techno commercially acceptable
bidders. Schedule of e-reverse auction will be communicated separately.
7) CONFIDENTIALITY: You shall keep all the information shared with you as
confidential and shall not disclose the same under any circumstances to
any one, without obtaining written consent from KIOCL.
8) FRAUD PREVENTION POLICY OF KIOCL :Everyone make a note that
‘fraud prevention policy’ is being followed in KIOCL, which provides a
system for prevention/detection/reporting of any fraud. It also for bids
everyone from involvement in fraudulent activity & that where any
fraudulent activity is suspected by anyone, the matter must be reported to
the ‘Nodal Officer’ (Chief Vigilance Officer) as soon as he/she comes to
know of any fraud or suspected fraud.
![Page 6: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/6.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 5 of 18 “© 2019 MECON Limited. All rights reserved”
9) PURCHASE PREFERENCE CLAUSE: The purchaser reserves the option to
give a purchase preference to the offers from MSME Units, in accordance
with the policies of the Govt. from time-to-time. For more details please
visit our website link http://kioclltd.in/downloads/EMPANELMENT-OF-
MSEs.pdf . In case of SSIs /MSEs Firms need to submit notarized copies of
the relevant, valid registration certificates and/or Udyog Aadhar
Memorandum (UAM) Number for claiming exemption.
Thanking you,
For KIOCL Limited
(Noor Ahmed)
JGM(Projects & TS)
Mob: 08105133993
KIOCL Limited,
Bangalore
![Page 7: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/7.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 6 of 18 “© 2019 MECON Limited. All rights reserved”
APPENDIX - A
1.0 SCOPE OF WORK
1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the
entire area of proposed project sites for Forward and Backward Integration of the
existing Blast Furnace Unit at Mangaluru, Karnataka.
1.2 The detailed scope of work of the tender shall be as per the Technical
Specification (Annexure-I).
2.0 PRE-QUALIFICATION CRITERIA
2.1 Tenderer should have successfully completed similar Work(s) during the last
seven (7) years ending last day of the month previous to the one in which tenders
are invited as under:
a) One similar completed work costing not less than Rs.11,72,685/- (including
tax).
OR
b) Two similar completed works costing not less than Rs.7,32,930/- each.
(including tax).
OR
c) Three similar completed works costing not less than Rs.5,86,340/- each.
(including tax).
Definition of similar works completed work(s) is as under:
Tenderer should have carried out subsoil investigations in all types of soils,
soft/hard rocks, using rotary method of boring/core drilling/soil sampling below
ground level/water level including field and laboratory soil/rock testing.
Tenderer shall submit supporting documents like copies of work order,
agreements, certified final quantities, completion certificate etc. in respect of the
works under which prequalification is sought.
2.2 The Tenderer shall have average annual turnover of at least Rs.4,40,000/- during
the last three (3) financial years i.e 2016-17, 2017-18 and 2018-19.
The Tenderer shall submit audited annual financial reports for the financial years
2016-17, 2017-18 and 2018-19 in support of meeting the stipulated financial
requirements.
3.0 PRICE
![Page 8: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/8.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 7 of 18 “© 2019 MECON Limited. All rights reserved”
3.1 The quoted price for carrying out Geotechnical Investigation is on unit rate basis
with value cap and payment will be made based on the actual quantities
executed at site by the Contractor.
3.2 The quoted unit prices shall be firm and binding and shall not be subject to any
variation whatsoever on any account during the tenure of the Contract.
3.3 The quoted rate is inclusive of all charges towards materials, labour, equipment,
tools / tackles, transportation of materials, preparation of drawings / reports.
3.4 The quoted rate includes all costs for mobilising and de-mobilising necessary
equipment, tools, tackles, testing etc. and personnel to site to complete the
fieldwork within the stipulated time schedule.
3.5 The quoted rate is inclusive of all charges towards travel/ transportation, lodging
& boarding for the visits necessary to work site or any other place required to be
visited for the said scope of work.
3.6 If there is a discrepancy in quoted price between the unit rate and the line item
amount resulting from multiplying the unit rate by the quantity, the unit prate as
quoted will govern.
3.7 Evaluation and ordering shall be on overall Least Cost basis (excluding GST).
3.8 The successful Tenderer shall make his own arrangements for water, power,
accommodation, transport and all other facilities for his personnel and bear all
charges for same.
3.9 KIOCL/ MECON reserves the right to increase or decrease the quantities
indicated in Schedule of Quantities (Annexure-II). The payment shall be made for
the actual quantity of work executed at site. The unit rate as per the order shall
be valid for any variation in quantities.
4.0 TERMS OF PAYMENT
4.1 The payment terms shall be as follows:
i. 80% payment shall be made on submission of draft report as per the
Technical Specification, based on the unit rate indicated in the price
schedule and the actual quantities executed at site against submission of
invoice and certification by MECON engineer.
ii. Balance 20% of the total price shall be released on submission of final report
and completion of entire work as per the Technical Specification, against
submission of invoice and certification by MECON engineer.
4.2 TDS as per the statutory rules shall be effected from the above payments.
![Page 9: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/9.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 8 of 18 “© 2019 MECON Limited. All rights reserved”
4.3 All the payments shall be made through RTGS only.
4.4 The paying authority shall be DGM(Finance), KIOCL Limited, Mangaluru on
certification by the consultant and recommendation by KIOCL’s engineer-in-
charge.
5.0 TAXES AND DUTIES
5.1 The quoted prices shall be inclusive of all applicable taxes and duties excluding
Goods & Services Tax (GST). Statutory deduction on taxes and levies as
applicable for this contract shall be recovered from your bills.
5.2 The contractor shall submit the invoice indicating the GST number and KIOCL’s
GST number 29AAACK8438M1ZX shall be indicated in the contractor’s invoice.
6.0 COMPLETION SCHEDULE
6.1 Time schedule is the essence of the contract. The work shall be completed in all
respects within the time specified in the technical specification (Annexure-I).
7.0 LIQUIDATED DAMAGES
7.1 The contractor shall complete the entire work in accordance with the schedule
stipulated in the work order. If, however, the contractor fails in due performance
of this contract to complete the work in accordance with the time schedule or
within such extended time schedule as may be further granted, the contractor
shall be liable to pay as agreed liquidated damages, and not by way of penalty, a
sum of 0.25% of the total price per week or part thereof and such liquidated
damages shall be limited to a maximum ceiling of 10% of the total price. In case
the reasons for delay are not attributable to the Contractor, then the LD clause
shall not be applicable for such delay.
i) Delay for first 20 days @ 0.1% per day
ii) Delay beyond 20 days @ 0.15% per day
Subject to maximum of 5% of the total contract value.
8.0 PERIOD OF VALIDITY OF TENDER
8.1 Unless otherwise specified, the tenderer shall keep his tender valid initially for a
period of 90 (Ninety) days from the due date for receipt of the tender.
9.0 INSURANCE
9.1 The Contractor shall arrange for the required insurance coverage towards
accident, theft, fire, etc., for his own personnel, vehicles and equipment, third
party equipment, vehicles and material as per prevailing rules.
![Page 10: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/10.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 9 of 18 “© 2019 MECON Limited. All rights reserved”
9.2 KIOCL/ MECON shall not be responsible or make good any losses incurred by
the Contractor/ sub-contractor at site or en route on account of any accident, or
injury to any workmen, theft, fire etc. Contractor shall indemnify and keep
indemnified KIOCL/ MECON against all such damages, proceedings, charges
and expenses whatsoever in respect thereof or in relation thereto.
10.0 CANCELLATION OF WORK ORDER
10.1 The contractor shall carry out the work as per the work order placed and
complete the same within the prescribed time schedule. The progress will be
monitored as per the work plan submitted and approved by the Owner. In case
the progress is not satisfactory in terms of the quality of work or with respect to
the time schedule, KIOCL/ MECON has the right to terminate/ cancel the work
order.
10.2 In the event of inordinate delay, defective work or default from the Contractor in
executing the work, KIOCL/ MECON reserves the right to get the work done at
the risk and cost of the contractor.
11.0 COMPLIANCE WITH STATUTORY LAWS & OTHER REGULATIONS
11.1 The Contractor will be fully responsible for paying the minimum wages
applicable to the location and must also fulfill the obligation under the Labour
Laws such as ESIC Act, EPF Act, Workmen’s Compensation Act, Contract Labour
Act, etc. The Contractor will be fully responsible for paying these dues, as
required.
11.2 The Contractor shall indemnify KIOCL/ MECON and its staff against all the
actions, proceedings, claims, demands, costs, expenses, whatsoever arising out
of or in connection with the works and arising out of any failure by the Contractor
in the performance of his obligations under the contract.
11.3 The Contractor shall get himself registered with the concerned authorities as
provided under various applicable Acts and shall be directly responsible to such
authorities for compliance with the provisions thereof.
12.0 NON-COMPLIANCE
12.1 In case of non-compliance of any of the above terms and conditions and or if
found that false details/information are given, KIOCL shall have the right to
terminate the Contract forthwith without giving any notice.
13.0 CONFIDENTIALITY
13.1 Any information, details or data pertaining to this work/ study & report shall not
be disclosed to any other party or used for any other purpose without the prior
approval by KIOCL/ MECON.
14.0 FORCE MAJEURE
![Page 11: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/11.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 10 of 18 “© 2019 MECON Limited. All rights reserved”
14.1 If either of the two parties suffer delay in the due execution of its contractual
obligations due to the operation of one or more of the force majeure events such
as Acts of God, Acts of War or hostilities, acts or omissions of Government,
invasion, revolution, civil commotion, blockade, embargo, sabotage, fires,
severe earth quakes, typhoons, cyclones, lightning, plague, epidemic or other
act, omission or circumstances (excluding monsoon) which are beyond the
reasonable control of the parties affected which they could not have reasonably
foreseen and guarded against which by exercise of reasonable care and
diligence, they are unable to prevent (herein referred to after Force Majeure),
KIOCL shall be sole judge to decide and decision shall be final and binding.
Monsoon season is not considered as Force Majeure.
The Party affected by the occurrence of the event of Force Majeure shall
promptly notify within 10 days of such occurrence to the other part hereto at its
commencement and termination along with the copies of any documents, if any
showing the existing or termination of such event and its effect on the work.
Delay occasioned by Force majeure shall give rise to an extension of the time for
performance of either party obligation under this contract commensurate such
delay.
Should Contractor or Client be prevented from fulfilling his obligations as
provided for under this Contract by the existence of Force Majeure lasting
continuously for a period of 45 days, the Party which is so prevented shall prior
to the termination of the Force Majeure condition and after expiry of 45 days
have the option to terminate this contract without further liability to either party,
except that Contractor shall be paid for the work performed up to the date of
termination.
15.0 SECURITY DEPOSIT
Within 15 days of award of contract, the Contractor shall furnish Security Deposit
in the form of Demand Draft/ Bank Guarantee, from any of the Indian
Nationalised/Scheduled Banks for an amount of 10% of the total order value. The
Demand Draft shall be for the due and faithful performance of the contract and
shall remain in full force and effective during the period of contract.
i. Demand draft from any Nationalized /Scheduled Bank in favour of “KIOCL
LIMITED” payable at Bengaluru.
ii. Pay Order in favour of “KIOCL LIMITED” payable at Bengaluru.
iii. Through RTGS
UNION BANK OF INDIA
PBS (KORAMANGALA) BANGALURU -560 034
ACCOUNT NO. 515401010022015
IFSC CODE: UBIN0551546
iv. Through Bank Guarantee (for EMD amount) as per KIOCL Limited Format.
![Page 12: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/12.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 11 of 18 “© 2019 MECON Limited. All rights reserved”
16.0 Jurisdiction : The court at Bengaluru will have jurisdiction on any disputes
for adjudication arising out of the contract.
17.0 GENERAL
17.1 The laws applicable to this contract shall be laws in force in India. The courts of
Karnataka, Bengaluru shall have jurisdiction in all matters arising under this
contract.
17.2 The agency shall take all necessary measures to ensure safety of men and
material as per Industrial safety norms and other statutes. The agency shall keep
KIOCL completely absolved of all liabilities in this respect.
17.3 The bidders shall visit the site before submitting their offer and shall familiarize
themselves with all the requirements and scope of the tender. No claim due to
lack of knowledge shall be entertained at a later stage.
18.0 For any related clarifications please contact the following officers :
Sl. No. Name & Address Phone No. Fax No.
1 Mr. Noor Ahmed
Joint General Manager (Projects & TS)
KIOCL Limited
2ND Block, Koramangala
Bengaluru – 560 034.
Email: [email protected]
Mobile:
+918105133993
Phone:
080-25531461 –
466,
Extn no. 283
080 -
25532153
2 Mr. K. Satyan,
DGM I/c (Contracts Engg.)
MECON Limited
No. 89, South End Road, Basavanagudi
Bengaluru - 560 004
E-mail : [email protected],
080 - 2625 2105 080 – 2657
6452
![Page 13: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/13.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 12 of 18 “© 2019 MECON Limited. All rights reserved”
APPENDIX - B
BUSINESS RULES FOR E-REVERSE AUCTION
GENERAL TERMS AND CONDITIONS
1) Against this Enquiry for the subject item/system with detailed scope of
supply as per our specification, KIOCL Limited, hereinafter referred to
as KIOCL, may resort to “REVERSE AUCTION PROCEDURE” i.e. e-
REVERSE AUCTION on INTERNET.
2) For the proposed e-reverse auction, technically and commercially
acceptable bidders only shall be eligible to participate.
3) e-Reverse auction will be conducted on schedule date & time.
4) At the end of reverse auction event, the lowest bidder value will be
known on the network.
BUSINESS RULE FOR FINALIZATION OF THE PROCUREMENT:
KIOCL shall finalize the procurement of the item against this tender through
e-reverse auction mode. KIOCL has made arrangement with M/s. MSTC Ltd
who shall be KIOCL’s authorized service provider for the same. Please go
through the guidelines given below and submit your acceptance to the
same along with your Techno-Commercial Bid.
1) Computerized e-reverse auction shall be conducted by KIOCL, on pre-
specified date, while the vendors shall be quoting from their own
offices/ place of their choice. Internet connectivity shall have to be
ensured by vendors themselves. Failure of power at the premises of
vendors during the Reverse auction cannot be the cause for not
participating in the reverse auction. On account of this, the time for the
auction cannot be extended and neither KIOCL nor M/s. MSTC is
responsible for such eventualities.
2) M/s. MSTC shall arrange to train your nominated person(s), without any
cost to you. They shall also explain you, all the rules related to the e-
reverse auction to be adopted along with tender.
![Page 14: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/14.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 13 of 18 “© 2019 MECON Limited. All rights reserved”
3) UNIT OF MEASUREMENT in Lumspum and BIDDING CURRENCY:
Indian Rupees.
4) BID PRICE: LANDED COST ON M/s KIOCL Ltd, Mangalore Basis
excluding Taxes and Duties.
5) The technical & commercial terms are as per KIOCL Tender No.
MEC/01/51/KIOCL/TSurvey/272/PKG-001
6) VALIDITY OF BIDS: The Bid price shall be firm specified in the tender
document and shall not be subjected any change whatsoever.
7) The detailed process for e-reverse auction is explained below:
The computer screen will display Start Bid Price and which shall be
visible to the all vendors. You will be required to start bidding after
announcement of Start Bid Price and decrement amount. Also, please
note that the start price of an item in e-reverse auction is open to all the
participating bidders. Any bidder can start bidding, in the e-reverse
auction, from the start bid price itself. If the start bid price is your own
price, you still need to bid in the e- reverse auction. Also, please note
that the first online bid that comes in the system during the e-reverse
auction should be lesser than the auction's start bid price by one
decrement or should be lesser than the auction's start bid price by
multiples of decrement and so on.
a) e-Reverse (no ties) Auction shall be for a period of one hour. If a
bidder places a bid in the last 5 minutes of closing of the e-Reverse
Auction and if that bid gets accepted, then the auction’s duration shall
get extended automatically for 5 minutes, for the particular Event/Lot.
Please note that the auto-extension will take place only if a bid comes
in those last 5 minutes and if that bid gets accepted. If the bid does
not get accepted, the auto-extension will not take place even if that
bid might have come in the last 5 minutes. In case, there is no bid in
the last 5 minutes of closing of e-Reverse Auction, the auction shall
get closed automatically without any extension. However, the
bidders are advised not to wait till the last minute or last few seconds
to enter their bid during the auto-extension period to avoid
complications related with internet connectivity, network problems,
system crash down, power failure, etc.
b) The weightage factor (multiplication factor), bid decrement amount
shall be specified by KIOCL before start of online bidding. The
bidder can bid lower than the start bid price in e-reverse auction by
a bid decrement or multiple of Bid decrement.
![Page 15: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/15.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 14 of 18 “© 2019 MECON Limited. All rights reserved”
c) The start bid price for the e-reverse auction is L1 price arrived based
on the evaluation and comparison of bids as mentioned above.
d) Bidder will be able to view the following on your screen along with
the necessary fields in the English Reverse (no ties) {Reverse
Auction}:
i). Leading Bid in the Auction
ii). Bid Placed by you
iii). Your Own Rank
iv). Start Bid Price & Bid Decrement value.
e) After the completion of e- Reverse (no ties), the Closing Price (CP)
shall be available.
f) Final price received from bidder will be taken as an offer to supply as
per terms and conditions of tender document. Bids once made by the
bidders, cannot be cancelled / withdrawn.
g) During the e-reverse auction, if no bid is received in the auction
system/website within the specified time duration, then KIOCL, at its
discretion, may scrap the e-reverse auction process and considered
sealed price bids of all technically and commercially acceptable
bidders submitted earlier along with techno-commercial bids.
h) KIOCL’s decision on award of Contract shall be final and binding on
all the Bidders. KIOCL shall be at liberty to cancel the reverse auction
process / tender at any time, before ordering, without assigning any
reason. KIOCL shall not have any liability to bidders for any
interruption or delay in access to the site irrespective of the cause.
Other terms and conditions shall be as per your techno-commercial
offers and other correspondences till date.
19.0 NO CLAIM OR COMPENSATION FOR SUBMISSION OF TENDER
19.1 In the event the Tenderer’s bid is not accepted or if KIOCL/ MECON elects
to withdraw the Notice Inviting Tender, the Tenderer shall not be entitled
to claim any costs, charges or expenses incidental to or incurred by him
through or in connection with this tender.
Yours faithfully,
for and on behalf of KIOCL
Joint General Manager ( Projects & TS)
KIOCL Limited, Bengaluru
![Page 16: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/16.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 15 of 18 “© 2019 MECON Limited. All rights reserved”
APPENDIX – C IMPORTANT INSTRUCTIONS FOR E-PROCUREMENT
I) Process of E-tender:
A) Registration: The process involves vendors registration with
MSTC Limited e-procurement portal (www.
mstcecommerce.com) which is free of cost. Only after
registration, the vendor(s) can submit his/their bids
electronically. Electronic Bidding for submission of Techno-
Commercial Bid as well as Price Bid over the internet will be
done. The vendor should posses Class III signing type digital
certificate. Vendors are to make their own arrangement for
bidding from a Personal Computer connected with Internet.
MSTC Ltd is not responsible for making such arrangement.
(Bids will not be recorded without Digital Signature).
SPECIAL NOTE: THE PRICE BID AND THE
COMMERCIAL BID HAS TO BE SUBMITTED ON-
LINE AT http://www.mstcecommerce.com/ eprochome/kiocl/
1) Vendors are required to register themselves online with
http://www.mstcecommerce.com/eprochome/kiocl/
→Register as Vendor (Vendors) Filling up details and
creating own user id and password→ Submit.
2) Vendors will receive a system generated mail confirming
their registration in their email which has been provided
during filling the registration form.
In case of any clarification, please contact MSTC Limited,
(before the scheduled time of the e- tender).
Contact Persons at MSTC Ltd are as under
Shriyansh Jain J.Damodaran
Email: [email protected] Email:
[email protected] Mobile : 7411651015 Mobile :
Land Line : 080 22260054/22266417 Extn 205
B) System Requirement:
i) Windows 98 /XP-SP3 & above/Windows 7 Operating
System
ii) IE-7 and above Internet browser
![Page 17: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/17.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 16 of 18 “© 2019 MECON Limited. All rights reserved”
iii) Signing type digital signature - Class 3.
iv) JRE 8 update 144 and above software to be downloaded
and installed in the system.
v) To enable ALL active X controls and disable “use pop up
blocker‟ under Tools→ Internet Options→ custom level
FOR DETAILS PLEASE GO THROUGH THE VENDOR GUIDE AND
THE VIDEO UNDER “VIEW VIDEO” LINK AT
www.mstcecommerce.com/eprochome
➢ Vendor
GuideLinkhttp://www.mstcecommerce.com/eprochome/User
ManualVendor.pdf.
➢ Video
Link.http://www.mstcecommerce.com/auctionhome/RenderFi
leViewVideo.jsp?file=IE- Configuration.mp4
1) The Bidders are advised to offer their most competitive prices while
submitting the price bid.
2) All entries in the tender should be entered in online Technical &
Commercial Formats without any ambiguity.
3) Bidders are instructed to use Attach Documents through the attach
document button present under event number selected. Multiple
documents can be uploaded. Maximum size of single document for
upload is 5 MB.
4) For further assistance please follow instruction of vendor guide
http://www.mstcecommerce.com/eprochome/UserManualVendor.pd
f
5) All notices and correspondence to the bidder(s) shall be sent through
email during the process till finalization of tender by KIOCL Ltd.
Hence the bidders are required to ensure that their email I.D
provided is valid and updated at the stage of registration of vendor.
Bidders are also requested to ensure validity of their DSC (Digital
Signature Certificate).
6) Please note that there is no provision to take out the list of parties who
are downloading the tender document from the web site mentioned in
NIT. As such, bidders are requested to see the web site once again
before the due date of tender opening to ensure that they have not
missed any corrigendum uploaded against the said tender after
downloading the tender document. The responsibility of downloading
the related corrigendum, if any, will be that of the bidders.
![Page 18: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/18.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 17 of 18 “© 2019 MECON Limited. All rights reserved”
7) No separate intimation in respect of corrigendum to this NIT (if any)
will be sent to bidders who have downloaded the documents
from web site. Please see website
www.mstcecommerce.com/eprochome/kiocl of MSTC Ltd. or
www.kiocl.co.in of KIOCL Ltd.
8) E-tender cannot be accessed after the due date and time mentioned in
NIT.
9) Bidding in e-tender:
a) The process involves Electronic Bidding for submission of
Techno Commercial Bid as well as Price Bid
b) The bidder(s) can submit their Techno Commercial Bids and
Price Bid through internet in MSTC Ltd website
www.mstcecommerce.com/eprochome/kiocl→ Vendor Login →
My menu→ Auction Floor Manager→ live event →Selection of
the live event→ Techno Commercial Bid.
c) The bidder should allow to run an application namely enApple
by accepting the risk and clicking on run. This exercise has to
be done twice immediately after clicking on the Techno-
Commercial bid. If this application is not run then the bidders
will not be able to save/submit his/her bid.
d) After filling the Techno-Commercial Bid, bidders should click„
save for recording their Techno-Commercial bid. Once the
same is done, the Price Bid link becomes active and the same
has to filled up and then bidders should click on “save” to
record their price bid. Then once both the Techno-Commercial
bid & price bid has been saved, the bidders can click on the
“Submit” button to register their bid
NOTE: - The Techno-Commercial Bid & price bid cannot be
revised once the submit button has been clicked by the bidders.
e) In all cases, bidders should use their own ID and Password
along with Digital Signature at the time of submission of their
bid.
f) During the entire e-tender process, the bidders will remain
completely anonymous to one another and also to everybody
else.
g) The e-tender floor shall remain open from the pre-announced
date & time and for as much duration as mentioned above.
h) All electronic bids submitted during the e-tender process shall
be legally binding on the bidders. Any bid will be considered
as the valid bid offered by that bidder and acceptance of the
![Page 19: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/19.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/273/PKG-002 Page 18 of 18 “© 2019 MECON Limited. All rights reserved”
same by KIOCL Ltd will form a binding contract between KIOCL
Ltd and the Bidder for execution of work. Such successful
bidder shall be called hereafter Contractor.
i) It is mandatory that all the bids are submitted with digital
signature certificate otherwise the same will not be accepted
by the system.
j) KIOCL Ltd reserves the right to cancel or reject or accept or
withdraw or extend the tender in full or part as the case may be
without assigning any reason thereof.
k) No deviation in the terms and conditions of the tender
document is acceptable. Submission of bid in the e-tender floor
by any bidder confirms his acceptance of terms & conditions of
the tender.
l) Unit of Measure (UOM) is indicated in the e-tender Floor. Rate
to be quoted should be in Indian Rupee as per UOM indicated
in the e-tender floor/tender document.
10) Any order resulting from this e-tender shall be governed by the terms
and conditions mentioned therein as well as in the tender document.
11) After submitting online bid, the bidder cannot access the tender, once
it has been submitted with digital signature
12) The bidders must upload all the documents required as per terms of
NIT. Any other document uploaded which is not required as per the
terms of the NIT shall not be considered.
13) The bid will be evaluated based on the filled-in technical &
commercial formats.
![Page 20: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/20.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 1 of 35
TECHNICAL SPECIFICATION
FOR
GEOTECHNICAL INVESTIGATION
TS No. MEC/01/11/KIOCL/TS/273/PKG 002
CONTENTS
Sl. No. DESCRIPTION
![Page 21: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/21.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 2 of 35
1. INTRODUCTION
2. SCOPE OF WORK
3. GENERAL
4. TECHNICAL REQUIREMENTS
5. TENDER DRAWING
6. CODES AND STANDARDS
7. FIELD INVESTIGATION - SOIL
8. LABORATORY INVESTIGATION
9. LEVEL & COORDINATES OF TEST
LOCATION
10. REPORT
11. RATES & MEASUREMENTS
12. TIME PERIOD
13. DRAWINGS
14. SCHEDULE OF QUANTITIES
1.0 INTRODUCTION
KIOCL intends to upgrade its existing 350Cum Blast furnace and set up a
Ductile Iron spun pipe plant and a Heat recovery coke oven unit as a part
of Forward and Backward integration of the existing BF unit at Mangaluru,
Karnataka.
![Page 22: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/22.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 3 of 35
The purpose of this standard is to define specifications to be followed for
Soil Investigation work at the proposed location for setting up new units
as defined under clause no. 3 of this Technical Specification, in the
existing blast furnace unit of M/s KIOCL at Mangaluru, Karnataka.
The work shall be executed in accordance with the specification and
good standard of practice necessary to fulfill the objectives of the soil
investigation work strictly as per the instructions and to the satisfaction of
the Engineer Incharge. The area for carrying out the geotechnical
investigation is as per the drawing attached herewith.
2 .0 SCOPE
These specifications cover the procedure for carrying out geotechnical
investigations required for design of foundations on item rate basis. The
work shall be carried out in accordance with the specification set out
below and as directed by the Engineer-in-charge, wherever necessary.
These Specifications conform to the relevant Indian Standards on Soils
and Foundations for field investigations and Laboratory testing.
Reference to any code in these specifications shall mean the latest
revision of the code unless otherwise mentioned. In the event of any
conflict between the requirements in these specifications and the
referred codes, the former shall govern.
3.0 GENERAL
The area of the proposed plant shall be of about 124 acres (501828 sqm)
approx.).
The nearest major railway station is Mangaluru Central and the nearest
airport is Mangaluru International Airport located about 10 kms and 8
kms respectively from the project site.
The following are the major facilities planned for the forward and
backward integration of the existing BF unit in Mangaluru, Karnataka.
a) Coking Coal Storage Area
b) Heat recovery Coke Ovens
c) Coke Storage area
d) Coal storage for PCI
e) PCI
f) Ductile Iron Spun Pipe Plant
g) Fuel Oil Storage
![Page 23: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/23.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 4 of 35
h) Area Office for Coke Oven
i) Area Office for DISP
j) Co-gen Power Plant
k) Augmentation of MRSS
l) Augmentation of Water system
Structures will include facilities like Overhead water tank, RCC chimney,
conveyors, Quenching tower, Crushers, Coal bins, Fuel oil tanks, Sump
and Pump houses, Equipment foundations, Structural storage sheds,
Roads, Culverts, Coke oven battery foundations, Steam Turbine
Generator etc.
4.0 TECHNICAL REQUIREMENTS
4.1 GENERAL
The purpose of the proposed sub-soil investigation program is to provide
adequate information on sub-surface and surface conditions for the
foundations and other sub-structures for the proposed project, leading to
their economical and safe designs.
The planning of the work, choice of the method of boring, selection of the
type of samples and procedure for sampling are indicated in the Tender.
Contractor, however, shall furnish his tentative program regarding the
above along with his offer which, necessarily, should take into account
the site conditions and time schedule for completing the work,
comprising subsurface features, borings, in-situ tests, sampling, visual
observations and laboratory tests of samples, reporting of the test results,
including discussions, correlating the field and the laboratory test values
and recommendations.
4.1.1 Location plan for soil exploration
In tender drawing, approximate location of bore holes, trial pits etc. are
shown. The exploration program in the site will be finalized by the
successful bidder in consultation with Engineer-in-charge as suited to the
site conditions.
4.1.2 General Requirements from the Contractor
The CONTRACTOR shall have on site all required survey instruments to
carry out the work accurately according to specifications and drawings.
All the specified locations for boreholes and field tests shall be set out at
![Page 24: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/24.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 5 of 35
site by the CONTRACTOR from two established reference grid lines
which will be shown to him by the ENGINEER IN-CHARGE. If required,
the CONTRACTOR shall set out the base lines and the locations of
boreholes and field tests with reference to the property line as indicated
by the ENGINEER IN-CHARGE. At each location of boreholes, plate load
tests and other field tests, the CONTRACTOR shall establish the ground
level prior to commencing of the operations. The ground level shall be
related to an established benchmark or to a GTS benchmark or as
directed by the ENGINEER IN-CHARGE.
If the area, where the field tests are located, is likely to be inundated by
water, the field work shall include provision for temporary fill, erection
and removal of platforms, making good the ground, access, etc., as
necessary for carrying out the work in this area. In case the area of work
is filled with bushes/shrubs, the same shall be removed by the
successful bidder. The cost of the same shall be catered for in rates
quoted for relevant items and no extra claims shall be entertained on
this account.
The Contractor shall submit with his bid the list of equipment / apparatus
he proposes to mobilize at site, if work is awarded to him (A minimum
of two boring rigs is a must) for the approval of Engineer Incharge. To
complete the work within the stipulated time, the Contractor shall, if
necessary, mobilize additional equipment without additional cost to
KIOCL Limited.
4.1.3 Mobilisation
The work shall include mobilization of all necessary equipment,
providing necessary engineering supervision and technical personnel,
skilled and unskilled labor, arranging all facilities and labor for drilling
etc., as required to carry out the entire field as well as laboratory
investigation, analysis and interpretation of test data collected and
preparation of a geotechnical report. The entire field as well as
laboratory investigation work shall be supervised by a graduate in Civil
engineering with at least 3 years of site experience in respective
areas of geotechnical investigation work. The scheduling of laboratory
tests, analysis and interpretation of test results, drafting of report and
recommendations shall be carried out by a soil engineering expert with
M.Tech/M.E in soil engineering/ geotechnical engineering with at
least 5 years of experience. The testing laboratory shall have NABL
![Page 25: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/25.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 6 of 35
accreditation. The rates quoted shall be deemed to be inclusive of these
mentioned above.
This scope also includes demobilisation of all equipment / personnel in
orderly manner so as to keep the site clean for any further work by
KIOCL Limited. This should be to the satisfaction of KIOCL Limited and
Consultant's representative. Charges for these items of work are
inclusive in the BOQ item; no extra payment will be made for subsequent
mobilization of any accessory and equipment.
Based on the field examination or tests, bore logs shall be prepared in
accordance with IS:1498. On completion of the field records, the
successful Contractor shall discuss and decide in consultation with the
Engineer Incharge, the schedule of tests to be performed and the exact
number of samples to be tested for each test.
4.1.4 The successful Contractor shall make his own arrangements for locating
the coordinates and position of bore holes, trial pits and other field tests
as per the drawings/sketches supplied to him and for determining the
reduced levels at these locations with respect to the bench mark
indicated by the Engineer-in-Charge. Two established reference lines
will be indicated to the contractor. The contractor has to provide at the
site all the required survey instruments including experienced surveyor
to the satisfaction of the Engineer-in-Charge so that the work can be
carried out accurately according to the specification and drawings.
4.1.5 All the field data shall be recorded in the proforma as recommended in
Indian Standard Codes and the field records shall be counter signed by
the Engineer-in-Charge. The contractor shall submit 4 copies of the field
bore-logs to the Engineer-in-Charge soon after the completion of each
bore hole. All the investigations are to be carried out by the contractor as
per the priority requirements of the Engineer-in-Charge.
4.1.6 The contractor shall intimate the Engineer-in-Charge giving reasons, if
any, of additional specific tests he considers necessary to be carried out
duly considering local sub-soil conditions for the consideration of the
Engineer Incharge and his approvals.
4.1.7 Whenever the contractor is unable to extract undisturbed samples, he
should immediately inform the Engineer-In-charge. In such a case
payment for boring charges shall be subject to the Engineer-In-charge
![Page 26: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/26.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 7 of 35
being satisfied that adequate effort has been made to extract undisturbed
samples.
4.1.8 All the laboratory test data shall be recorded in the proforma
recommended in the Indian Standard Codes and a copy of these shall be
sent to the engineer-in-charge every week during the progress of
laboratory testing. Whenever desired during the progress of work the
KIOCL Limited/ Engineer-in-Charge may be present at the laboratory
where the contractor is arranging for execution of the laboratory tests.
4.1.9 The contractor shall interact with the Engineer-in-Charge to get
acquainted with the different type of structures envisaged and in
assessing the load intensities on the foundations for the various structures
of the project in order to enable him to make specific recommendation
for the depth & type of foundation and the allowable bearing pressure.
The contractor shall submit detailed geotechnical report after
incorporating the comments on the draft report.
4.1.10 In areas which have already been developed, the contractor shall take
advantage of existing local knowledge, record of trial pits, bore holes etc
in the vicinity and the type of foundations adopted and behavior of
existing structures particularly those of similar nature to the ones
proposed for this project.
4.1.11 The contractor shall make use of information gathered from quarries,
unlined wells, cuttings from nearby areas etc. The general topography of
the nearby areas will often give some indication about the variation of the
soil conditions which are likely to exist.
4.1.12 The contractor shall gather data regarding the removal of overburden by
excavation, erosion or landslides in the areas which may give an idea of
the amount of reconsolidation that the soil strata have undergone.
Similarly, data regarding recent fills shall also be studied to determine
the characteristics of the fill as well as the original strata.
4.1.13 The water level in streams and water courses, if any, in the neighborhood
shall be noted. Reliable information regarding ground water level shall
also be gathered from water level in the nearby wells.
4.1.14 The contractor shall make enquiries and verify regarding earlier use of
the site which can have important bearing on its suitability for the
proposed structures. This is important particularly in areas where there
![Page 27: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/27.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 8 of 35
have been underground works e.g. worked out ballast pits, quarries, old
brick fields, mines, mineral workings etc. The possibility of damage to
the structures, sewers, conduits and drainage system by subsidence shall
also be investigated.
4.1.15 It is essential that the equipment/instruments are properly calibrated at
the commencement of the work so that they represent true values and
submit the test reports to the engineer-in-charge. If the engineer in-
charge so desires, the contractor shall arrange for having the instruments
tested in presence of the engineer at an approved laboratory at the
contractor's cost and the test reports shall be submitted to the engineer-
in-charge. When blasting with explosives is involved, agency/contractor
shall arrange statutory clearances and also the portable magazine for
storing/carrying the explosives.
4.1.16 The Contractor is supposed to be acquainted with the site conditions and
the nature, type, scope of work and involvement. The rates quoted shall
remain firm during the entire period of execution till completion of the
work and any additional claim for lack of knowledge shall not be
entertained.
5.0 TENDER DRAWING
5.1 The Geotechnical Investigation Layout Drawing indicating the tentative
location of the bore holes and field tests/areas to be investigated for
locating various facilities/building structures of the project shall be
issued by MECON at the time of issuing LOA for subject project/before
commencement of work at site. The location, extent and depth of bore
holes & field tests/area(s) indicated in the drawing shall be subject to
change that may be necessary during actual execution of the work. No
claim whatsoever shall be entertained for differences between the
location, extent and depth / area(s) etc of soil tests indicated on the
construction drawings and those actually done as per instruction of
Engineer at site. The work shall be carried out as per the instructions of
the engineer-in-charge.
6.0 CODES AND STANDARDS
6.1 All standards, specification and codes of practice referred to herein shall
be the latest editions including all applicable official amendments and
revisions.
![Page 28: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/28.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 9 of 35
6.2 In case of conflict between this specification and those (IS codes and
standards etc) referred to hereunder, the former shall prevail. All work
shall be carried out as per the specification and the following standards
and codes.
Sl. No. IS Code No Description
1 IS: 1080
Code of practice for design and construction of simple
spread foundations
2 IS: 1498 Classification and identification of soils for general
engineering purposes
3 IS: 1888 Method of load test on soils
4 IS: 1892 Code of practice for subsurface Investigation for
foundation
5 IS:1904 Code of practice for design and construction of
foundations in soils: General requirements
6 IS: 2131 Method of standard penetration test for soils
7 IS: 2132
Code of practice for thin walled tube sampling of soils
8 IS: 2470 Code of practice for design and construction of septic
tanks Part-I
9 IS: 2720 Method of test for soils (Relevant parts)
10 IS: 2809
Glossary of terms and symbols relating to soil
engineering
11 IS: 2810 Glossary of terms relating to soil dynamics
12 IS:2911
Code of practice for design and construction of pile
foundations (Relevant parts)
13 IS:2950
Part-I
Code of practice for design and construction of raft
foundation
14 IS: 3025 Methods of sampling and testing (Physical and
chemical) for water used in Industry
15 IS: 3043 Code of practice for earthing
16 IS: 4078 Code of practice for indexing and storage of drill
cores
17 IS: 4434 Code of practice for in-situ vane shear test for soil
18 IS: 4453 Code of practice for exploration by pits, trenches,
drifts and shaft
19 IS: 4464 Code of practice for presentation of drilling
information and core description in foundation
investigation
20 IS: 4968
Part -II
Method for subsurface sounding for soils- Dynamic
method using cone and bentonite slurry
21 IS: 4968
Part-III
Method for subsurface sounding for soils- Static cone
penetration test
![Page 29: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/29.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 10 of 35
Sl.
No.
Is Code
No.
Description
22 IS: 5249 Method of test for determination of in-situ dynamic
properties of soil
23 IS: 5313 Guide for core drilling observations
24 IS: 5529
Part-I
Code of practice for in-situ permeability test - Test in
overburden
25 IS: 5529
Part-II
Code of practice for in-situ permeability test - Test in
bed rock
26 IS: 6065
Recommendation for the preparation of geological
and geotechnical maps for river valley project
27 IS: 6403 Code of practice for determination of allowable
bearing pressure on shallow foundation
28 IS: 6926 Code of practice for diamond core drilling for site
investigation of river valley projects
29 IS: 6935 Method of determination of water level in a bore hole
30 IS: 6955 Code of practice of subsurface exploration for earth
and rockfill dams
31 IS: 7422
Symbols and abbreviations for use in geological
maps, sections and subsurface exploratory logs
(Relevant parts)
32 IS: 8009
Part-I
Code of practice for calculation of settlement of
foundation subjected to symmetrical vertical loads
Shallow foundations
33 IS: 8009 Code of practice for calculation of settlement of
foundation subjected to symmetrical vertical loads
Deep foundations
34 IS: 8763 Guide for undisturbed sampling of sands
35 IS: 8764 Method for determination of point load strength index
of rocks
36 IS: 9143 Method for the determination of unconfined
compressive strength of rock materials
37 IS: 9179 Method for preparation of rock specimen for
laboratory testing
38 IS: 9198 Compaction rammer for soil testing
39 IS: 9214 Determination of modulus of sub-grade reaction in
field
40 IS: 9259 Specifications for liquid limit apparatus
41 IS: 9640 Specifications for split spoon sampler
42 IS: 9669 Specifications for CBR mould and its accessories
43 IS:
10050
Method for determination of slake durability index of
rocks
44 IS: 10074 Specification for compaction mould assembly for light
and heavy compaction
![Page 30: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/30.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 11 of 35
Sl.
No.
Is Code
No.
Description
45 IS:
10108
Code of practice for sampling by thin wall sampler
with stationary piston
46 IS:
10589
Equipment for determination of subsurface sounding
of soils
47 IS:
10837
Specifications of moulds for determination of relative
density and its accessories
48 IS:
11229
Specifications for shear box testing of soils
49 IS:
11315
Part-II
Description of discontinuities in rock mass – Core
recovery and rock quality
50 IS:
12070
Code of practice for design and construction of
shallow foundations on rocks
51 IS:13372
(Part I &
II)
Seismic testing of rock mass - Code of practice
7.0 FIELD INVESTIGATION - SOIL
7.1 Boring
7.1.1 General Requirements
a) Bore holes shall be drilled at specified locations to obtain information
about the sub-soil profile, its nature, strength and to collect soil
samples for strata identification and conducting laboratory tests. The
diameter of the bore hole shall be 150 mm and boring shall be
carried out in accordance with the provisions of IS: 1892 and as per
this specification.
b) All bore holes shall extend up to a maximum depth of 40m or as
directed by the Engineer-In-Charge. If the strata with standard
penetration test (SPT) 'N' value greater than 100 with characteristics
of rock is met with earlier, the bore hole shall be advanced further
by core drilling upto a depth of 1m within the hard rock layer.
Identification of rock strata shall be on the basis of visual examination
of SPT sample and rock fragments. Core sample shall be collected
and preserved for further laboratory tests. An additional standard
penetration test shall be carried out at the termination depth.
![Page 31: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/31.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 12 of 35
c) Casing pipe shall be used in the borehole to support its sides when
side-fall is suspected to occur inside the borehole. When casing pipe
is used, it shall be ensured that its bottom end is at all times 15 cm
above the bottom of the bore hole. In case of cohesion less soils, the
advancement of the casing pipe shall be such that it does not disturb
the soil to be tested or sampled. The casing shall be advanced by
slowly turning the casing pipe and not by driving.
d) In-situ tests and collection of undisturbed samples (UDS) shall be
carried out at regular intervals and at change of strata or as decided
by the Engineer-in-charge. Representative disturbed and
undisturbed samples shall be preserved for conducting various tests
in the laboratory. Water table in the borehole shall be carefully
recorded and reported. No water/drilling mud shall be added while
boring above ground water table. For cohesion less soil below water
table, the water level in the borehole shall all times be maintained at
slightly above the water table.
e) The bore hole shall be cleaned using suitable tools up to the depth of
testing or sampling ensuring that there is minimum disturbance of soil
at the bottom of the bore hole. The process of jetting through an open
tube sampler shall not be permitted. In cohesive soils, the borehole
may be cleaned using a bailer with a flap valve. Gentle circulation of
drilling fluid shall be done when rotary mud circulation boring is
adopted.
f) On completion of the borehole, the portion drilled in soil shall be
backfilled with sand unless otherwise directed by the engineer-in-
charge. Wash boring shall not be adopted. The location of the
boreholes shall be marked with permanent location marker. The unit
rate quoted shall be inclusive of all the above.
7.1.2 Rotary Mud Circulation Drilling
This method can be used in all types of soil. In this method, boring shall
be done by rotating the bit fixed at the bottom of the drill rod. Proper
care shall be taken to keep a firm contact between the bit and the bottom
of the borehole. Bentonite or mud laden fluids shall be used as the
drilling fluid to serve as the protective surface inside the borehole.
![Page 32: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/32.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 13 of 35
7.2 Standard Penetration Test (SPT)
This test shall be conducted in all types of soil deposits met within the
bore hole to find the variation in the soil stratification by correlating with
the number of blows required for unit penetration of a standard
penetrometer. This test shall be conducted at 3.0m intervals, (Alternately
SPT and UDS at every 1.5m each shall be carried out), at every change of
strata, at depths wherever undisturbed soil samples could not be
collected and as per the directions of the engineer-in charge. The
starting depth of performing SPT shall be at 1.0m depth max. below
ground level. The depth interval between the top level of standard
penetration test and to that of (next) undisturbed sampling shall not be
less than 1m. The specification for equipment and other accessories,
procedure for conducting the test, presentation of test results and
collection of disturbed soil samples etc shall conform to IS: 2131.
This test shall be carried out by driving a standard split spoon sampler in
the borehole by means of a 650N hammer having a free fall of 0.75m. The
sampler shall be driven using the hammer for 450 mm penetration. While
driving, the number of blows for every 150 mm penetration and the
penetration for every 50 blows shall be recorded. The number of blows
for the last 300 mm drive shall be reported as 'N' value. This test shall be
discontinued when the blow count is equal to 100 and the penetration
shall be recorded. Refusal shall be considered to be met with when the
blow count is equal to 100. At the location where the test is discontinued,
the penetration and the corresponding number of blows shall be
reported. Sufficient quantity of disturbed soil samples shall be collected
from the split spoon sampler for identification and laboratory testing. The
samples shall be visually classified & recorded at the site and shall be
properly preserved and labelled for future identification & testing.
7.3 Sampling
7.3.1 General
a) Sufficient number of soil samples shall be collected for reliable
estimation of soil properties. The samples collected shall be either
disturbed or undisturbed. Disturbed soil samples shall be collected for
field identification and conducting laboratory tests such as sieve analysis,
index properties, specific gravity, chemical analysis etc. Undisturbed
samples shall be collected to estimate physical, strength and settlement
properties of the soil.
![Page 33: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/33.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 14 of 35
b) All the accessories required for sampling and the method of sampling
shall conform to IS:2132. All disturbed and undisturbed samples
collected in the field shall be classified at site as per IS: 1498.
c) All the samples shall be identified with date, borehole or trial pit number,
depth of sampling etc. It is also essential to mark an arrow pointing
towards the top surface of the undisturbed sample as the soil was in-situ.
Care shall be taken to keep the undisturbed soil samples and box
samples vertically with the arrow directing upwards. The tube samples
shall be properly trimmed at both ends and suitably sealed with molten
paraffin wax at both ends immediately after extracting the samples from
the bore hole/trial pit and suitably capped on both sides.
d) When the contractor fails to collect undisturbed soil sample at a specified
depth, the borehole shall be advanced by 0.50m and shall be performed
with a standard penetration test. The reason for not obtaining the
undisturbed soil sample shall be indicated in the bore log.
e) Precaution shall be taken to ensure that there shall not be any change in
moisture content and disturbance of the soil samples and they shall be
placed in a temporary store at the end of the day's work. All the samples
shall be kept over a bed of sand, jute bags, saw dust etc. and covered
over the top with similar material. The bed and top cover shall be kept
moist till they are properly packed in wooden boxes. The contractor shall
be responsible for packing and transporting of all the samples from site
to the laboratory within seven days after sampling with proper protection
against loss and damage.
f) All the samples shall be suitably packed in wooden boxes using sand, saw
dust etc. all around the samples before transporting to the laboratory for
testing.
7.3.2 Disturbed Samples
a) Disturbed soil samples shall be collected from cuttings and from split
spoon sampler in boreholes at regular intervals to provide complete
description of soil profile and its variation. The samples shall be
immediately stored in airtight jars or polythene bags and labelled with
borehole/trial pit number and depth.
![Page 34: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/34.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 15 of 35
b) In elevated areas, if superficial material is available in plenty, then bulk
samples from a depth of about 0.5m below ground level shall be
collected to establish all required properties to use it as a fill material.
Disturbed samples weighing about 250N shall be collected at shallow
depths and immediately stored in polythene bags as per IS: 1892. The
bags shall be sealed properly and shall be kept in wooden boxes.
7.3.3 Undisturbed Samples
In each borehole, undisturbed sample (UDS) shall be collected at
regular intervals of 3m (Alternately SPT and UDS at every 1.5m each
shall be carried out) and as directed by the engineer-in-charge. The
starting depth shall be staggered in alternate boreholes. Undisturbed
samples shall be of 50mm diameter and 600mm length. Samples shall be
collected in such a manner that the structure of soil and its moisture
content do not get altered. The specification for the accessories required
for sampling and the sampling procedure shall conform to IS:1892 and
IS:2132. Undisturbed sampling in sand shall be done using compressed
air technique as mentioned in IS:8763. Thin walled sampler shall be used
to collect undisturbed samples by pushing the tube into the soil. The
sampling tube shall have a smooth finish on both surfaces and minimum
effective length of 450mm. The area ratio of sampling tubes shall be less
than 12.5%. However in case of very stiff soils, area ratio upto 20% shall
be permitted.
a) Undisturbed Sampling in Cohesive Soil
Undisturbed samples in soft to stiff cohesive soils shall be obtained using
a thin walled sampler. In order to reduce wall friction, suitable
precautions such as oiling the surfaces shall be taken. The bore hole shall
be cleaned and the depth of sampling below ground level shall be noted.
The sampler shall then be attached to the bottom of boring rods and
lowered into the borehole. The sampler shall be pushed into the clay
layer by hand or by jacking and soil sample of specified length shall be
collected without disturbing the soil. The distance by which the sampler
penetrates into the soil strata shall be checked. Care shall be taken to
ensure that the sampler is not driven too far as this will compress the soil.
The sampler shall be rotated to break the core at bottom of the sampler
and then steadily drawn up.
![Page 35: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/35.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 16 of 35
b) Undisturbed Sampling Using Piston Sampler
Undisturbed samples in very loose saturated sandy & silty soils and very
soft clays shall be obtained by using a piston sampler consisting of a
sampling cylinder and piston system. In soft clays and silty clays with
water standing in the casing pipe, piston sampler shall be used to collect
undisturbed samples. During this method of sampling expert supervision
is called for. The interior surface of the sampler shall be smooth, clean
and corrosion resistant. Its cutting edge and the ring seals shall be
inspected for wear and tear and rejected, if worn. Check shall be done to
ensure that the moving parts of the sampler function freely before the
sampler is lowered into the borehole. While pushing the system into the
soil and till the beginning of the sampling operations, the bottom of the
piston shall be flushed with the cutting edge of the sampler. At the depth
of sampling, the piston should be fixed relative to the ground and the
sampler cylinder shall be independently pressed down smoothly and
continuously into the ground. If an obstruction is met with, the sampler
shall be withdrawn and another sample be taken after the obstruction is
removed. Accurate measurements of the depth of sampling, height of
sampler, stroke and length of sample recovery shall be noted and
recorded. After the sampler is pushed to the required depth, both the
sampler cylinder and the piston system shall be drawn up together
ensuring that there shall not be any disturbance to the sample which shall
then be protected from changes in moisture content.
c) Undisturbed Sampling in Cohesion less Soils
Undisturbed samples in cohesion less soils shall be obtained as per the
procedure given in 1S:8763. Compressed air sampler shall be used to
take the samples of cohesion less soil below water table. Precautions
shall be taken to clean the borehole before sampling. Thin walled tube
samplers of 60mm internal diameter shall be used. The height and other
dimensions of the sampler shall be recorded before use. Proper care
shall be taken to maintain the water level in the bore hole slightly above
the ground water table before and during sampling operations.
Immediately after the sample is obtained, the ends of the sample shall be
waxed and capped to avoid moisture content changes.
7.3.4 Relaxation during Sampling
a) The sampler shall be pushed into the soil and driving of sampler shall
be resorted to only when it cannot be pushed into the soil. This shall be
![Page 36: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/36.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 17 of 35
done only with the permission of the engineer-in-charge and all the
details about the same shall be recorded in the bore logs.
b) In clays when 'N' value is greater than 50, the undisturbed sampling
may be replaced by standard penetration test.
7.4 Ground Water
7.4.1 One of the following methods shall be adopted for determining the
ground water table in bore holes as per 1S:6935 and as per the
instructions of the engineer-in-charge.
a) In permeable soils, the water level in borehole shall be allowed to
stabilize after lowering it adequately by bailing. When water level inside
the borehole is found to be stable, the depth of water level below ground
level shall be measured. Stability of sides and bottom of the borehole
shall be ensured at all times.
b) For both permeable and impermeable soils, the following method
shall be suitable. The borehole shall be filled with water and then bailed
out to various depths. Observation on the rise or fall of water level shall
be made at each depth. The level at which neither a fall nor a rise is
observed shall be considered as the water table elevation. This shall be
established by three successive readings of water level taken at an
interval of two hours.
7.4.2 In case any variation in the ground water level is observed in any specific
borehole, then the water level in these bore holes shall be recorded
daily during the course of field investigation. Levels in nearby wells,
streams etc., if any, shall also be noted whenever these readings are
taken. If so called for, observation wells shall be drilled for the purpose
of long term studies on the fluctuation in ground water levels and
pressure. Either stand pipe or piezometer shall be installed at the
specified depths in the selected previously drilled bore holes or
specially drilled bore holes for this purpose as per the specification and
instructions of the engineer-in-charge. Daily water level readings shall
be recorded immediately following the installation upto the time of
leaving the site. At the end of field work, these installations shall be
handed over in satisfactory working condition to the engineer-in-charge
without disturbing their position so that the KIOCL Limited can continue
further observations.
![Page 37: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/37.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 18 of 35
7.4.3 Stand pipes and piezometers shall consist of 19mm internal diameter
rigid unplasticised (UPVC) tubing. All the joints in the tubing shall be
made of coupling sleeves. The top of UPVC tubing shall be enclosed in a
75mm diameter galvanised steel pipe of 105m length having a
galvanised steel screw cap with well greased threads and the caps shall
be tightened such that it would be impossible to loosen by hand. The
lower end of the pipe shall have four legs of 6mm thick and 100mm long
and welded to have projection of 25mm. The pipe shall be sealed into the
ground with cement grout so that it does not rotate. The top end of the
pipe shall project about 300mm above ground level unless otherwise
specified by the engineer-in-charge. The perforated tubing for the
porous element shall be surrounded by a response zone of well graded
sand from 500mm below to 150mm above the lower end of the stand pipe
or piezometer and the bore hole above the response zone shall be back
filled with natural soil or well graded sand.
a) Stand pipe
Stand pipes shall be installed to measure the water level in soils with high
permeability such as sand and gravel. The stand pipe shall consist of a
perforated tubing attached to the bottom of the UPVC tubing. The
perforated tube shall be 150mm long.
b) Piezometers
Piezometers shall be installed to measure the pore pressures in soil with
medium to low permeability. Piezometer shall consist of a porous filter
attached to the bottom of the UPVC tubing. The filter shall be 300mm in
length and shall be placed in the bore hole and sealed at top and bottom
by grouting. Hydraulic piezometers with double line are to be used to
remove the air trapped in the system.
However, the above mentioned specifications are wholesome and the
relevant ones in congruence with the specific BOQ item shall be
referred to as required.
7.4.4 Sub-Soil Water Samples
a) Sub-soil water samples shall be collected for carrying out chemical
analysis. Representative samples of ground water shall be collected when
it is first encountered in boreholes before the addition of water to aid
boring or drilling. Water samples shall not be collected when bentonite
![Page 38: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/38.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 19 of 35
slurry or mud has been used for drilling operations. If water has been
added for drilling purposes or if ground water has been diluted by
surface rain water, then the bore hole shall be dewatered and water be
allowed to rise from which the sample may be taken. The sampling
apparatus shall be such that the water at the desired depth can be
collected directly without any disturbance and any change in
concentration of constituents like dissolved gases etc. Undue agitation
shall be avoided. An ordinary suction pump with its suction end inserted
upto the required depth in the borehole shall be used for this purpose.
b) The sample shall be collected in a clean vessel and allowed to settle so
that the supernatural liquid can be poured into a clean well rinsed glass
or polythene bottle. Sufficient quantity and number of samples shall be
collected to carry out the chemical analysis and sent to a laboratory in
airtight bottles with proper labelling. Chemical analysis of water samples
shall include determination of pH value, turbidity, sulphate, carbonate,
nitrate & chloride contents, presence of organic matter and suspended
solids etc.
c) In some cases constituents may be mixed and analyzed later as
specified in the specific test methods. Chemical preservatives may be
added to the sample for cases as specified in the test method/IS codes.
This shall only be done if analysis cannot be conducted within an hour of
collection and shall have the prior written permission and approval of the
engineer-in-charge.
7.5 TRIAL PIT
7.5.1 Trial pits shall be of 2m x 2m size so as to permit easy access for visual
examination of walls of the pit and to facilitate sampling and in-situ
testing operations. Pits shall be excavated up to a maximum depth of 3m
below ground level or as per the directions of the engineer-in-charge.
Precautions shall be taken to ensure the stability of pit walls including
provision of shoring, if necessary, as per IS: 4453. Precautions shall be
taken to prevent surface water draining into the pit. Arrangements shall
be made for dewatering if the pit is extended below water table. Trial
pits shall be kept dry and a ladder shall be provided for easy access to
the bottom of the pit. In-situ tests shall be conducted and undisturbed
samples shall be collected immediately on reaching the specified depth
so as to avoid substantial changes in moisture content of the subsoil.
Arrangements shall be made for barriers, protective measures and
lighting necessary for the period the pits remain open.
![Page 39: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/39.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 20 of 35
7.5.2 A note on the visual examination of soil strata shall be prepared. This
should include the nature, color, consistency and visual classification of
the soil, thickness of soil strata, thickness of expansive soil & ground
water table, if any etc.
7.5.3 Undisturbed samples shall be collected at 1m, 2m and depths beyond 2m
as well as at the termination depth in all the pits in line with the site
conditions and as per the instructions of the Engineer Incharge.
a) Chunk Samples
In cohesive soils, undisturbed samples of regular shapes shall be
collected. The samples shall be cut and trimmed to a size of 0.3m x 0.3m
x 0.3m. A square area of 0.35m x 0.35m shall be marked at the centre of
the levelled surface at the bottom of the pit. Without disturbing the soil
inside the marked area, the soil around this marking shall be carefully
removed upto a depth of 0.35m. The four vertical faces of the soil block
protruding at the centre shall be trimmed slowly so that its size reduces
to 0.3m x 0.3m. Wax paper cut to suitable size shall be wrapped
uniformly and covered with two layers of thin cloth over all the five
exposed surfaces of the soil block and sealed properly using molten wax.
A firmly constructed wooden box of size 0.35m x 0.35m x 0.35m (internal
dimensions) with the top and bottom open shall be placed around the soil
block and held such that its top edge protrudes just above the surface of
the block. The space between the soil block and the box shall be filled
uniformly and tightly with moist saw dust. The top surface shall also be
covered with saw dust before nailing the wooden lid to cover the box
firmly taking care that the soil block is not disturbed. The area of contact
between the bottom portion of the block and the ground shall be
reduced slowly by removing soil in small quantities using small rods so
that the block can be separated from the ground slowly without
disturbance. After inverting the wooden box along with the soil block,
the bottom portion shall be trimmed and covered with wax paper, cloth
and to be sealed with molten wax. A wooden lid shall be nailed to the
box after providing proper saw dust cushion below it. An arrow mark
shall be made on the vertical face of the wooden box to indicate the top
surface of the sample along with the location, date and depth of
sampling.
![Page 40: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/40.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 21 of 35
b) Tube Samples
Undisturbed tube samples may also be obtained by means of 65mm
diameter sampling tubes with a cutting edge. The sampler shall be
slightly oiled or greased inside and outside to reduce friction. The
sampler shall be pushed into the soil and while doing so soil around the
tube shall be carefully removed. In case it is not possible to push the
sampler it may be driven by light blows from a "monkey".
7.5.4 In case it is not possible to collect undisturbed samples in the pit, in-situ
density of soil shall be determined by sand replacement method. The
specification, equipment, accessories etc. required for the test and the
procedure of testing shall be in accordance with IS: 2720, Part-XXVIII. No
separate payment shall be made for this test.
7.5.5 After the completion of the test, sampling and visual examination, the pit
shall be suitably backfilled as directed by the engineer-in-charge.
Unless otherwise specified, excavated soil shall be used for this purpose.
7.6 Vane Shear Test
Field vane shear test shall be performed inside the borehole to
determine the shear strength of cohesive soils, especially of soft and
sensitive clays which are highly susceptible to sampling disturbance.
This test shall be conducted by advancing a four winged vane of suitable
size (65mm or 75mm diameter as per the soil condition) into the soil upto
desired depth and measuring the torque required to rotate the vane. The
specification for equipment & accessories required, the test procedure
and field observations etc shall be as per IS: 4434. This test may also be
conducted by direct penetration from the ground surface. If the cuttings
at the test depth in the bore hole show any presence of gravel, sand,
shells, decomposed wood etc. which are likely to influence the test
results substantially, the test at that particular depth may be omitted with
the permission of the engineer-in-charge. However, the test shall be
conducted at a depth where these obstructions cease to occur. On
completion of the test, the results shall be reported in an approved
proforma as specified in IS: 4434. Appendix-A.
7.7 Static Cone Penetration Test
Static cone penetration test shall be conducted to know the soil
stratification and to estimate the various physical and engineering
![Page 41: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/41.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 22 of 35
properties of soil. The cone penetrometer shall be advanced by pushing
and the static force required for unit penetration shall be determined. The
test shall be conducted using a 200kN capacity mechanically operated
equipment up to the specified depth or refusal whichever is earlier. For
this test, 'refusal' means meeting very hard strata which cannot be
penetrated at the rate of at least 0.3cm/sec even when the equipment is
loaded to its full capacity. The specification for the equipment and
accessories required for performing the test, test procedure, field
observation and reporting of results shall conform to IS : 4968, Part-III . At
the ground level, pre-boring upto 0.5m depth shall be permitted if the
overlying strata are very hard. No extra payment shall be made on
account of this pre-boring. Continuous record of the penetration
resistance shall be maintained.
7.8 Dynamic Cone Penetration Test
Dynamic cone penetration test shall be conducted using bentonite slurry
by driving a standard size cone attached to the bottom of a string of drill
rods. The test shall be conducted up to the specified depth or refusal
whichever is earlier. Refusal shall be considered when the blow count
exceeds 150 for 300mm penetration. The specification for the equipment
and accessories required for performing the test, test procedure, field
observations and reporting of results shall conform to IS:4968, Part-II. The
driving system shall comprise of a 650N weight having a free fall of 0.75m.
The cone shall be of 65mm diameter provided with vents for continuous
flow of bentonite slurry through the cone and rods in order to avoid
friction between the rods and soil. On completion of the test, the results
shall be presented as a continuous record of number of blows required for
every 300mm penetration of the cone into the soil in a suitable chart
supplemented by a graphical plot.
7.9 Plate Load Test
7.9.1 Plate load test shall be conducted to determine the bearing capacity and
load/settlement characteristics of soil at shallow depth as per SOQ by
loading a plane and levelled steel plate kept at the desired depth and
measuring the settlement under different loads until a desired settlement
takes place or failure occurs. The specification for equipment and
accessories required for conducting the test, the test procedure, field
observations and reporting of results etc shall conform to IS: 1888. The
location and depth of the test shall be as given in the drawing or as
indicated by the engineer-in-charge. Undisturbed tube samples shall be
![Page 42: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/42.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 23 of 35
collected at 1m and 2.5m depths from the ground level for carrying out
laboratory tests.
7.9.2 The size of pit shall not be less than five times the plate size and the depth
shall be as specified in SOQ. All provisions regarding excavation and
visual examination of pit shall apply here also.
7.9.3 If the ground water table is at a depth higher than the specified test
depth, the ground water table shall be lowered and maintained at the test
depth for the entire duration of the test. Dewatering shall be at the cost of
the contractor.
7.9.4 Unless otherwise specified, the reaction method of loading (kentledge)
shall be adopted. Settlement shall be recorded from dial gauges placed
at four diametrically opposite ends of the test plate. The test plate shall
be of 600mm x 600mm size and at least 25mm thick. The bottom of the pit
shall be levelled before placing the plate in position for conducting the
test. If required, for proper seating, sand layer upto a max. of 10mm
maybe placed below the plate.
7.9.5 All testing methodology and observations, report preparations shall be
in conformance with IS 1888. The contractor shall submit a detailed
methodology to the Engineer Incharge for his approval w.r.t the testing
procedure.
7.9.6 Compacted backfilling of the pit shall be carried out in layers as per the
directions of the engineer-in-charge. Unless otherwise specified the
excavated soil shall be used for this purpose. The cost of the same shall
be inclusive in the quoted rates for the relevant item.
7.10 Field California Bearing Ratio Test (3 Point tests)
This test shall be carried out to obtain the properties of soil required for
the design of roads. The equipment and accessories required for
carrying out the test, test procedure, recording of observations and
presentation of results shall conform to IS: 2720 part XXXI. These tests
shall be conducted on soaked and unsoaked samples generally as per
IS: 2720 Part XVI. Bulk samples for laboratory tests shall be selected
randomly from various road locations and also from locations of stacking
areas in consultation with Engineer-in-Charge. The 3 point test shall
consist of preparation of samples with 15, 25, 35 blows per layer, which
will give three different densities to soil and then testing each for soaked
![Page 43: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/43.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 24 of 35
condition. The test locations and depth shall be as specified in the
drawings or as directed by the engineer-in-charge.
7.11 Electrical Resistivity Test
This test shall be conducted to determine the electrical resistivity of soil
required for designing safety grounding system for the entire plot area.
The specification for the equipment and other accessories required for
performing the test, test procedure and reporting of field observations
shall conform to IS:3043. The test shall be conducted using Wenner's four
electrode method as specified in IS:1892, Appendix-B2. Unless otherwise
specified, at each test location, the test shall be conducted along two
perpendicular lines parallel to the co-ordinate axes. On each line, a
minimum of 8 to 10 readings shall be taken by changing the spacing of
the electrodes from an initial small value of 0.5m upto a distance of 10m.
8.0 LABORATORY INVESTIGATION
8.1 Essential Requirements
a) All laboratory tests shall be conducted in an approved laboratory
using approved apparatus complying with the requirements and
specifications of Indian standards or other approved standards for this
class of work. It shall be checked that the apparatus are in good working
condition before starting the laboratory tests. Calibration of all the
instruments and their accessories shall be done carefully and precisely.
b) Depending on the type of sub strata encountered, appropriate
laboratory tests shall be conducted on soil and rock samples collected in
the field. Laboratory tests shall be scheduled and performed by qualified
and experienced personnel who are thoroughly conversant with the
work. Tests indicated in the schedule of items shall be performed on soil,
rock and water samples as per relevant IS codes. One copy of all the
laboratory test data records shall be submitted to the KIOCL Limited
progressively every week. Laboratory tests shall be carried out
concurrently with field investigation since initial laboratory test results
could be useful in planning the later part of field work. A schedule of
laboratory tests shall be established by the contractor and the same shall
be submitted and got approved by the engineer-in-charge before
starting of laboratory tests.
![Page 44: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/44.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 25 of 35
c) All samples whether undisturbed or disturbed shall be extracted,
prepared and examined by a competent personnel properly trained and
experienced in soil sampling, examination, testing and in using the
apparatus as per the specified standards.
d) Undisturbed soil samples retained in liners or seamless tube samplers
shall be taken out without causing any disturbance to the samples using
suitably designed extruder just prior to actual testing. If the extruder is
horizontal, proper support shall be provided to prevent the sample from
breaking. For screw type extruders the pushing head shall be free from
the screw shaft so that no torque is applied to the soil sample in contact
with the pushing head. For soft clay samples, the sample tube shall be cut
by means of a high speed hacksaw to specified test length and placed
over the mould before pushing the sample into it with a suitable piston.
a) While extracting a sample from a liner or tube care shall be taken to
see that its direction of movement is the same as that during sampling
to avoid stress reversal.
b) On all undisturbed soil samples tested for bulk density, water content,
grain size distribution, liquid limit and plastic limit tests shall also be
performed.
c) On all rock samples tested for unconfined compression test, bulk
density and water content tests shall also be performed.
i) After completion of all tests, a summary of test results for each soil and
rock sample shall be presented. Chemical test results on soil and water
samples shall be furnished in a tabular form separately.
8.2 Tests
Tests as indicated in this specification and as called for by the Engineer-
in-Charge shall be conducted. The following laboratory tests shall be
conducted on samples collected from the field covering all the bores
using procedures specified in the relevant Indian Standards. All the
Laboratory Tests shall be conducted by skilled personnel only.
8.2.1 Atterberg Limits
The tests result should include liquid limit and plastic limit of the soil
samples tested. These tests should be conducted as per IS:2720 Part V.
![Page 45: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/45.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 26 of 35
8.2.2 Natural Moisture Content
In case of organic soils, the oven temperature shall be 60 deg. C and not
105 deg.C.
8.2.3 Dry Bulk Density and Void Ratio
8.2.4 Specific Gravity
This test should be conducted as per IS:2720,
Part 3.
8.2.5 Grain Size Distribution
Wherever applicable both the sieve and hydrometer analysis shall be
conducted to indicate complete range of grain size in the soil sample
tested. Generally, Hydrometer analysis will be carried out, wherever
percentage passing No.200 sieve is greater than 30%.
8.2.6 Triaxial Tests
These tests shall be done on specimens saturated by the application of
back pressure. Only if the water table is at sufficient depth so that
chances of its rising to the base of the footing are meager or nil, shall the
triaxial tests be performed on specimens at Natural Moisture Content.
The magnitude of the back up pressure applied shall be indicated in the
report.
All stress diagrams as well as Mohr-circle envelopes shall be included
in the report. E-value shall be determined from the triaxial tests.
Relevant corrections applied to the computer 'E' shall be clearly
illustrated in the report.
8.2.7 Unconfined Compression Test
This test shall be conducted as per IS:2720,
Part X.
8.2.8 Free Swelling Index
This test shall be conducted as per IS:2911, Part III.
![Page 46: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/46.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 27 of 35
8.2.9 Swelling Pressure Test
This test shall be conducted as per Draft Standard circulated by Technical
Committee on Expansive Soils (TC-6) of International Society of Soil
Mechanics and Foundation Engineering; 'Evaluation of Swelling Pressure
of Expansive Soil in Laboratory' (circulated in November, 1990).
8.2.10 Consolidation Tests
The following loading stage shall be employed : 0, 0.1, 0.25, 1.0, 2.0, 4.0
and 8.0 kg / sq.cm. From e Vs log p curves, preconsolidation pressure
shall be determined to establish whether the soil is normally
consolidated or over consolidated. The point (e, p) showing initial
condition of the soil under test must be specifically marked on the
consolidation curves. Settlement predictions based on the field virgin
compression curve shall only be acceptable. The procedure adopted in
respect of obtaining compression indices from the field curve and that
for computing settlements for the type of clay under consideration shall
be clearly illustrated in the report.
It is to be noted that deviations from the standard procedure of
performing consolidation tests given in IS:2720 are permissible in order
to enable computation of settlements based on the above procedure i.e.
cycles (s) of loading, unloading and reloading shall be employed
wherever required.
The following curves shall be included in the report :
a) e vs : log p
b) e vs : p
c) Compression vs : log t or compression vs t.
The choice of relationship depends upon the shape of the plot, which
enables a clear determination of Cv, the coefficient of consolidation.
The time period required for 50% and 90% primary consolidation
should be given in the report.
Computation of secondary settlements, if significant, shall also be made
and included in the report.
![Page 47: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/47.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 28 of 35
8.2.11 Chemical Tests on Water & Soil
Chemical tests shall be conducted on soil and water samples to report the
following:
a) pH
b) Chloride
c) Sulphate
d) Sulphite
e) Organic contents
f) Total hardness
8.2.12 Chemical Tests (Suitability of water for Construction)
These tests shall be carried out to check suitability of water for
construction purpose as required by IS:456. Other Inorganic Tests as
required by World Health Organisation (WHO) to test suitability for
drinking purpose shall also be carried out.
8.2.13 CBR Tests for Sub-Grade soils (3 Point Tests)
These tests shall be conducted on soaked and unsoaked samples
generally as per IS: 2720 Part XVI. Bulk samples for laboratory tests shall
be selected randomly from various road locations and also from locations
of stacking areas in consultation with Engineer-in-Charge. The 3 point test
shall consist of
preparation of samples with 15, 25, 35 blows per layer, which will give
three different densities to soil and then testing each for soaked condition.
8.2.14 Proctor Density Tests
These tests shall be conducted as per IS: 2720 Part VII samples collected
randomly in consultation with Engineer-in-Charge.
9.0 Levels & Co-Ordinates of Test Location
Contractor shall establish and tabulate reduced levels and co-ordinates
of various test locations. Any expense on this account shall be deemed to
have been included in the quoted rates.
![Page 48: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/48.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 29 of 35
10.0 REPORT
10.1 General
a) On completion of all the field and laboratory works, the contractor shall
submit two copies of draft report containing geological information of
the region, procedure adopted for investigation, field observations,
summarized test data, conclusion and recommendations. The report
shall include detailed bore logs, sub-soil sections, field test results,
water table, chemical analysis on soils, any stabilization method
required, suitability of soil for backfilling, laboratory observations and
test results in both tabular as well as graphical forms, practical and
theoretical considerations for the interpretation of test results, the
supporting calculations for the conclusions drawn etc. Initially, the
contractor shall submit one copy of the report in draft form for KIOCL's
review.
b) After review of the draft report, the employer's comments will be
intimated to the contractor. The contractor shall incorporate the
comments and after getting the amended draft report approved, four
(4) copies of the detailed final report shall be submitted along with the
graphs, tables etc. Any expenditure on account of redrafting, finalising
the report etc. shall be deemed to have been included in the quoted
rates.
c) The detailed final report based on field observations, in-situ and
laboratory tests shall encompass theoretical as well as practical
considerations for foundations of different type of structures envisaged
in the area under investigation. The contractor shall acquaint himself
about the type of structures, foundation loads and other information
required from the engineer-in-charge.
10.2 Data to be Furnished
The report shall also include but not be limited to the following.
a) A plot plan showing the location and reduced levels of locations of all
field tests e.g, bore holes, trial pits, plate load tests, CBR tests, ERV
tests etc. properly drawn to scale and dimensioned with reference to
the established grid lines.
![Page 49: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/49.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 30 of 35
b) Geological information of the area such as geomorphology,
geological structure, lithology, stratigraphy and tectonic faults, core
recovery and rock quality designation etc.
c) Past observations and historical data, if available, for the area or for
other areas with similar soil profile for similar structures in the
surrounding areas.
d) A true cross section of all individual boreholes and trial pits with
reduced levels and co-ordinates showing the classification and
thickness of individual stratum, position of ground water table,
various in-situ tests conducted and samples collected at different
depths and the rock stratum if met with.
e) A set of longitudinal and transverse soil/rock profiles connecting
various bore holes in order to give a clear picture of the variation of
the subsoil strata as per IS: 6065.
f) Water level contours and rock level contours.
g) Plot of standard penetration test 'N' values (both uncorrected and
corrected) with depth for identified areas.
h) Results of all field tests in tabular as well as in graphical forms.
i) Results of all laboratory tests summarised (i) for each sample as well
as (ii) a consolidated table giving the layer-wise soil and rock
properties. All the relevant charts, tables, graphs, figures, supporting
calculations, conclusions and photographs of representative rock
cores and trial pits shall be furnished.
d) For all triaxial shear tests, stress vs strain diagrams as well as Mohr's
circle envelopes shall be furnished. If back pressure is applied for
saturation, the magnitude of the same shall be indicated. The value of
modulus of elasticity ' E' shall be furnished for all tests along with
relevant calculations.
j) For all consolidation tests the following curves shall be furnished.
• e vs log P.
• e vs P and
![Page 50: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/50.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 31 of 35
• Compression vs log t or square root of t (depending upon shape of
the plot for proper determination of coefficient of consolidation).
The point showing initial condition (eo, Po) of the soil shall be marked
on the curves.
k) Values of compression index, coefficient of volume compressibility etc
shall be furnished. The procedure adopted for calculating the
compression index from the field curve and settlement of soil strata
shall be clearly specified. The time required for 50% and 90% primary
consolidation along with secondary settlement if significant shall also
be calculated.
l) Values of cohesion, angle of internal friction, shear modulus and co-
efficient of sub-grade reaction along with sample calculations.
Calculation for allowable bearing pressures and corresponding total
settlements for shallow foundations and load carrying capacity
calculation of piles, if recommended, in various modes etc.
10.3 Recommendations
Recommendations shall be given area wise duly considering the type of
soil/rock, structure, foundation type and ground water table. The
recommendations shall include but not be limited to the following.
a) Type of foundation to be adopted for various structures duly
considering the sub strata characteristics, water table, and total
settlement permissible for the structures and equipments, minimum
depth and width of foundation etc.
b) For shallow foundations the following shall be indicated with
comprehensive supporting calculations.
i) Net safe bearing pressure for isolated square/rectangular footings
and continuous strip footings (if applicable) of sizes 1, 2, 3 and 4m at
different founding depths of 1, 2, 3 & 4m below ground level if
applicable considering both shear failure and settlement criteria
giving reasons for the type of shear failure adopted in the calculation.
ii) Net safe bearing pressure for raft foundations, if applicable
considering both shear failure and settlement criteria.
![Page 51: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/51.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 32 of 35
iii) Modulus of sub-grade reaction and modulus of elasticity from plate
load test results along with time-settlement curves and load
settlement curves in both natural and log-log graph.
c) If piling is envisaged, the following shall be furnished with
comprehensive supporting calculations.
i) Type of pile and reasons for recommending the same duly
considering the sub strata characteristics.
ii) Suitable founding strata for the pile.
iii) Estimated length (including socket) and diameter (commonly
adopted) of pile of various capacities and diameter shall be
recommended. End bearing and frictional resistance shall be
indicated separately. While calculating the load carrying capacity
of pile, the reduction in load carrying capacity due to negative
skin friction which may be developed in underlying loose soil due
to effect of land fill (surcharge) shall be considered. Safe lateral
and tensile load carrying capacities of pile with supporting
calculations.
d) Electrical resistivity of sub-soil based on electrical resistivity tests
including electrode spacing vs cumulative resistivity curves.
f) Suitability of the soil for construction of roads and embankments, their
stable slopes for shallow and deep excavations, active and passive earth
pressures, earth pressure at rest and modulus of elasticity as a function of
depths for the design of underground structures etc.
g) Suitability of locally available soils at site for filling and back filling
purposes.
e) If expansive soil is met with, then recommendation on removal or
retainment of the same under the structures/roads etc shall be given. In
the latter case, detailed specifications of any special treatment required
including specification for materials to be used, construction method,
equipments to be deployed etc shall be furnished.
k) Protective measures based on chemical nature of soil and ground water
with due regard to the potential deleterious effects on concrete, steel and
![Page 52: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/52.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 33 of 35
other building materials etc. Remedial measures for sulphate attack and
acidity shall be dealt in detail.
l) Susceptibility of sub soil strata due to liquefaction in the event of
earthquake and recommendation for remedial measures.
m) Identification of any other potential geotechnical problems & their
remedial measures.
n) Description of measures required for erosion control.
o) Identification of corrective measures required for the improvement of sub
surface conditions such as removal of poor sub soil/material and in-situ
densification etc. as an alternate to pile foundation. If ground
improvement (soil densification, geo synthetics etc.,) is recommended
then its detailed specification, specification for the materials to be used,
construction method, equipments to be deployed etc shall be furnished.
11.0 RATES & MEASUREMENTS
11.1 RATES
a) The item of work in the schedule of quantities describes the work very
briefly. The various items of the schedule of quantities shall be read in
conjunction with the corresponding sections in the technical
specification including amendments and additions, if any. For each item
in the schedule of quantities, the bidder's rates shall include all the
activities covered in the description of the items as well as for all
necessary operations in details described in the technical specification.
b) No claim shall be entertained if the details shown on the released for
construction drawings differ in any way (e.g. location and depth of
tests, number of tests etc) from those shown on the tender drawing.
c) The unit rates quoted shall include minor details which are obviously
and fairly intended and which may not have been included in these
documents but are essential for the satisfactory completion of the work.
d) The bidders quoted rates shall be inclusive of providing all
equipments, men, materials, skilled and unskilled labors, making
observations, establishing the ground level and coordinates at location
![Page 53: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/53.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 34 of 35
of each bore hole, test pit, plate load test locations, CBR locations, ERV
locations etc. by carrying levels from one established bench mark and
distances from one set of grid lines furnished by the engineer-in-
charge. Also, no extra payments shall be made for collection, packing
and transportation of all the samples and cores, recording of all results
and submitting them in approved formats etc.
e) The quoted rates for trial pits/plate load tests shall be inclusive of
dewatering and backfilling etc.
f) The quoted rates for boreholes shall be inclusive of the rates for
backfilling with sand and permanent marker.
g) The quoted rates for drilling in rock shall satisfy the requirements as
furnished in specification.
h) The rates quoted for laboratory tests shall include preparation of
samples, performing tests, recording, analysis and submission of data
etc.
i) The bidder shall submit a scheme showing the arrangement and
equipment proposed to be used for conducting the site work.
j) The quoted rates shall be inclusive of submission of draft as well as final
soil investigation report complete with recommendations.
11.2 MEASUREMENTS
a) All measurements shall be in SI Units.
b) Length shall be measured in metres (m) correct to two places of
decimals. Areas shall be worked out in square meters (Sqm) and
volume in cubic meters (Cum) rounded off to two decimals.
c) Certain tests have to be conducted in the bore holes and trial pits etc.
Such bore holes and trails pits etc shall be measured once only and not
again just because the tests are conducted therein.
d) The depth of penetration due to SPT at the bottom of bore hole shall not
be considered for the measurement of bore hole depth.
e) Pits shall be measured in Cum.
![Page 54: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/54.jpg)
TECHNICAL SPECIFICATION FOR GEOTECHNICAL
INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
MECON LIMITED
BANGALORE
ANNEXURE-I
TS No. MEC/01/11/KIOCL/TS/273/PKG-002 © 2019 MECON Limited. All rights reserved Page 35 of 35
f) Coring in rock with diamond bit shall be measured in length (metre)
correct to two places of decimal for the actual cored length satisfying
the criteria of specification.
12.0 TIME PERIOD
a) The field activities shall be completed with tests in the coke oven area
given priority and supplemented by a draft soil investigation report
by 45 (Forty five) days from the date of LOI. Data w.r.t soil
investigation in the coke oven area shall be intimated earlier.
b) Further to the above, the final soil investigation report shall be
submitted by the 60th (Sixtieth) day from the date of LOI.
13.0 DRAWING
Tender Drawing No MEC/01/11/U999/TS/002/0001- R00 indicating
approximate location of bore holes, plate load locations, trial pits, CBR
tests, ERV tests etc. is enclosed.
14.0 SCHEDULE OF QUANTITIES
The schedule of quantities is attached as Annexure-1A.
![Page 55: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/55.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT, KIOCL LIMITED, MANGALURU
ANNEXURE-II (a)
No. MEC/01/51/KIOCL/Geotech/PKG-002 Page 1 of 9 “© 2019 MECON Limited. All rights reserved”
GEOTECHNICAL INVESTIGATION FOR FORWARD AND BACKWARD INTEGRATION OF THE EXISTING BLAST FURNACE UNIT
Tender Document No.: MEC/01/51/KIOCL/ GEOTECH/273/PKG-002 Un-Priced Schedule
SL. No Description of work Unit Qty
Rate excluding
GST (Rs.)
Amount excluding
GST (Rs.)
HSN Code. GST Rate (%)
A B C = A X B
PART-A
1.
Making necessary arrangement for mobilisation of equipment, tools, plant and manpower required for soil investigation work at site. (Equipment - Minimum two numbers of rigs and associated equipment for boring, equipment required for other field tests)
Boring 150mm dia bore holes upto maximum 40m
depth through following type of strata by using
- - - -
![Page 56: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/56.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT, KIOCL LIMITED, MANGALURU
ANNEXURE-II (a)
No. MEC/01/51/KIOCL/Geotech/PKG-002 Page 2 of 9 “© 2019 MECON Limited. All rights reserved”
rotary drill method.
1(a) Any type of Soil - - - -
1 (a)(i) Depth from natural/formed ground level not exceeding 5.0m
Running
Metre 80.00
1 (a)(ii) Depth from natural ground/formed level exceeding 5.0m and upto 10.0m
Running
Metre 70.00
1 (a)(iii) Depth from natural ground/formed level exceeding 10.0m and upto 20.0m
Running
Metre 30.00
1 (a)(iv) Depth from natural/formed ground level exceeding 20.0m and upto 30.0m
Running
Metre 10.00
1 (a)(v) Depth from natural/formed ground level exceeding 30.0m and upto 40.0m
Running
Metre 5.00
1 (b) Soft Rock (Classification as per relevant IS) - - - -
1 (b) (i) Depth from natural/formed ground level not exceeding 5.0m
Running
Metre 20.00
![Page 57: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/57.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT, KIOCL LIMITED, MANGALURU
ANNEXURE-II (a)
No. MEC/01/51/KIOCL/Geotech/PKG-002 Page 3 of 9 “© 2019 MECON Limited. All rights reserved”
1 (b) (ii) Depth from natural ground/formed level exceeding 5.0m and upto 10.0m
Running
Metre 35.00
1 (b) (iii) Depth from natural ground/formed level exceeding 10.0m and upto 20.0m
Running
Metre 85.00
1 (b) (iv) Depth from natural/formed ground level exceeding 20.0m and upto 30.0m
Running
Metre 20.00
1 (b) (v) Depth from natural/formed ground level exceeding 30.0m and upto 40.0m
Running
Metre 10.00
1 (c) Hard Rock - - - -
1 (c) (i) Depth from natural/formed ground level not exceeding 5.0m
Running
Metre 5.00
1 (c) (ii) Depth from natural ground/formed level exceeding 5.0m and upto 10.0m
Running
Metre 10.00
1 (c) (iii) Depth from natural ground/formed level exceeding 10.0m and upto 20.0m
Running
Metre 10.00
![Page 58: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/58.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT, KIOCL LIMITED, MANGALURU
ANNEXURE-II (a)
No. MEC/01/51/KIOCL/Geotech/PKG-002 Page 4 of 9 “© 2019 MECON Limited. All rights reserved”
1 (c) (iv) Depth from natural/formed ground level exceeding 20.0m and upto 30.0m
Running
Metre 5.00
1 (c) (v) Depth from natural/formed ground level exceeding 30.0m and upto 40.0m
Running
Metre 5.00
2
Collection of undisturbed soil sample (UDS) at 3.0m intervals or at any change of stratas in 150mm bore using thin walled tube including waxing, sealing, packing and transporting to the lab. (Upto 40m depth)
- - - -
2 (a) Depth from natural/formed ground level not exceeding 5.0m
Each 30.00
2 (b) Depth from natural ground/formed level exceeding 5.0m and upto 10.0m
Each 30.00
2 (c) Depth from natural ground/formed level exceeding 10.0m and upto 20.0m
Each 20.00
2 (d) Depth from natural/formed ground level exceeding 20.0m and upto 30.0m
Each 5.00
![Page 59: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/59.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT, KIOCL LIMITED, MANGALURU
ANNEXURE-II (a)
No. MEC/01/51/KIOCL/Geotech/PKG-002 Page 5 of 9 “© 2019 MECON Limited. All rights reserved”
2 (e) Depth from natural/formed ground level exceeding 30.0m and upto 40.0m
Each 5.00
3
Carrying out Standard Penetration Test (SPT) including collection of disturbed soil samples in bore holes at every 3.0 M depth or any change of strata and submit the report with all requisite datas. (Upto 40m depth)
- - - -
3 (a) Depth from natural/formed ground level not exceeding 5.0m
Each 40.00
3 (b) Depth from natural ground/formed level exceeding 5.0m and upto 10.0m
Each 40.00
3 (c) Depth from natural ground/formed level exceeding 10.0m and upto 20.0m
Each 40.00
3 (d) Depth from natural/formed ground level exceeding 20.0m and upto 30.0m
Each 10.00
3 (e)
Depth from natural/formed ground level exceeding 30.0m and upto 40.0m
Each 10.00
![Page 60: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/60.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT, KIOCL LIMITED, MANGALURU
ANNEXURE-II (a)
No. MEC/01/51/KIOCL/Geotech/PKG-002 Page 6 of 9 “© 2019 MECON Limited. All rights reserved”
FIELD TEST
4
Excavation of Trial / Test Pit(2.0mx2.0m) in soil to depth not exceeding 3.0m below ground level. Rate to include necessary timbering, dewatering and backfilling after excavation ; Detailed geological logging of pit face and base including provision of photograph and collection of sample at every 1.0m including sending to laboratory as per Technical specification and provisions of relevant IS standards.
Each 5.00
5
Conducting plate load test on 60 cm x 60 cm plate as per specification and IS: 1888 at 2.5 m depth of the pit with Kentledge of 60 T for necessary reactions (Including cost of excavation, shoring, strutting, dewatering provision, provision of kentledge and necessary equipment for measurements etc.)
Each 2.00
6 Conducting Earth resistivity Test all as per IS : 3043 Provisions and direction of Engineer Incharge.
Nos. 6.00
![Page 61: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/61.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT, KIOCL LIMITED, MANGALURU
ANNEXURE-II (a)
No. MEC/01/51/KIOCL/Geotech/PKG-002 Page 7 of 9 “© 2019 MECON Limited. All rights reserved”
7 Conducting Field CBR Test as per provisions of IS : 2720 part 16 and direction of Engineer Incharge.
Nos. 12.00
8 Conducting necessary (laboratory) tests on all collected samples which includes the determination of :-
- - - -
8 (a) Atterberg limits (as per IS) Nos. 55.00
8 (b) Natural moisture content. Nos. 55.00
8 (c) Wet and dry density. Nos. 55.00
8 (d) Soil / Particle size using sieve hydrometer analysis.
Nos. 25.00
8 (e) Tri-axial shear test C & D Nos. 10.00
8 (f) Shrinkage limit. Nos. 20.00
8 (g) Consolidation test Nos. 20.00
8 (h) Specific gravity test. Nos. 55.00
![Page 62: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/62.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT, KIOCL LIMITED, MANGALURU
ANNEXURE-II (a)
No. MEC/01/51/KIOCL/Geotech/PKG-002 Page 8 of 9 “© 2019 MECON Limited. All rights reserved”
8 (i) Crushing strength of rock samples. Nos. 40.00
8 (j) Chemical analysis on Soil samples. Nos. 6.00
8 (k) Chemical analysis on Water samples. Nos. 6.00
8 (l) Laboratory CBR Test. Nos. 12.00
8 (m) Standard and Modified Proctor's density Test Nos. 15.00
8 (n) Unconfined Compressive Strength test on rock Nos. 40.00
9
Completing analysis of laboratory, field test results and submission of 2 sets of draft report (The tenderer shall submit the draft report to Engineer Incharge and obtain and attend to their comments and observations there in before submitting the final report along with recomendations on foundation system) and submission of four sets final report (alongwith soft copy) with detailed recommendation (all complete as per clause no.10 of tech. spec.) for selection of type of foundation with supporting design details of requirement of pile foundation, if any, and
Eacj Job 1.00
![Page 63: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/63.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT, KIOCL LIMITED, MANGALURU
ANNEXURE-II (a)
No. MEC/01/51/KIOCL/Geotech/PKG-002 Page 9 of 9 “© 2019 MECON Limited. All rights reserved”
measures for ground improvement.
I Sub Total (Rs.) (=1+2+3+4+5+6+7+8+9)
IA GST @ ……………….% on Subtotal (Rs.)
IB Total including GST (=I + IA)
![Page 64: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/64.jpg)
TENDER DOCUMENT FOR GEOTECHNICAL INVESTIGATION AT BLAST FURNACE UNIT,
KIOCL LIMITED, MANGALURU
No. MEC/01/51/KIOCL/Geotech/PKG-002 Page - 1 -of 1 “© 2019 MECON Limited. All rights reserved”
Annexure-III
FORMAT FOR DECLARATION OF NO DEVIATIONS
A declaration to be issued on your company letter head as below -
“IT IS HEREBY CONFIRMED THAT OUR OFFER IS STRICTLY AS PER TENDER
SPECIFICATION AND THERE IS NO DEVIATION TO THE TECHNICAL
SPECIFICATION AS PER YOUR TENDER ENQUIRY NO.
MEC/01/51/GEOTECH/273/PKG-002 DATED 23.12.2019. WE FURTHER
CONFIRM ACCEPTANCE OF ALL COMMERCIAL TERMS & CONDITIONS AS
PER ABOVE-REFERRED TENDER ENQUIRY WITHOUT ANY DEVIATION
WHATSOEVER.”
For & on behalf of
![Page 65: FORWARD AND BACKWARD INTEGRATION OF THE ......1.1 The scope of work is carrying out " Geotechnical Investigation Works" for the entire area of proposed project sites for Forward and](https://reader035.vdocuments.us/reader035/viewer/2022071501/611fd1187338cc58656f8376/html5/thumbnails/65.jpg)