    PARKING

    Parking Methods:

    1. On street Parking allotted at the sides of theroads and streets. For efficiency it is divided into3 types

    Angular parking - at angles.

    Parallel parking vehicles one behind the other.

    Perpendicular parking at right angle to road.

    2. Off street means parking area is designedadjacent to road or in a place or building which isnot a part of road.

    Parking lots Bypass roads

    Multistory parking

    Parking lanes

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    3/162

    In all there were 4 entries, 2 main entries,1

    service entry and 1 entry was not in use.

    On street parking was there in fortune landmark.

    Two wheelers where not allowed inside campus

    For two wheelers there was on street parking.

    Approximately ,400m length parking along the

    road was of fortune landmark.

    150 four wheelers can be parked at a time inside.

    Drivers accommodation was also there.

    Flooring was of kadapa stone and RCC panels in

    between them.

    PARKINGATFORTUNE

    LANDMARK

    Showing on street parking

    outside

    Showing 9m wide entrance

    gate and flooring

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    4/162

    COMPARISION

    STANDARD Hotel 1 parking/dwelling unit

    Restaurants and banquets 0.3

    parking/seat

    ON SITE so, 87 parking space for 87 dwelling

    unit.

    So, accordingly 330 vehicles parking

    space for banquets and restaurants. Overall, parking for 420 vehicles isrequired but there was only 150parking space in the premises, reston street.

    car bay should be 2.4 x 6 mwith 1.5 m spacing in between.

    Width of parking lane should be

    8ft.or 2.4 metes.

    On site, space in between

    car parking was not

    appropriate.

    There was 6 metes wide parking

    lane 2 vehicles can easily cross

    at a time.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    5/162

    Passenger Car

    Outer turning radius 256 or 7.8 m

    Inner turning radius 138 or 4.2 m

    Service vehicles

    Outer turning radius 441 or 13.4 m

    Inner turning radius - 276 or 8.4 m

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    6/162

    Showing the plan of parking layout

    Positive points

    Trees were planted for

    shading purpose.

    Perpendicular parking was there,

    so vehicles can be reversed easily.

    Its place was appropriate according

    to zoning.

    Negative points

    No drains were there for water

    runoff.Two wheelers parking was on

    street totally so, no guarantee of

    security.

    Insufficient area for parking.

    CONCLUSION

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    7/162

    PORCHSize is 10x10m.

    Height 5m.Its an RCC

    structure.

    This is foremost area after entrance of the building which

    provide many types of service areas like shops, bars, food and

    beverage office, restaurant, no. of entries and exits, waiting and

    many other services..

    GREETINGAREA

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    8/162

    GREETING

    ZONE

    PORCH

    ENTRANCE

    LOBBY OR

    FOYER

    RECEPTION

    WAITING

    COFFEE

    SHOP

    WAY TO

    BANQUET

    HALL

    LIFTS

    LOBBY

    WAY TO

    SEMINAR HALL

    BARADMINISTRATION

    TOILETS

    RESTAURANT

    BUSINESS

    CENTRE

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    9/162

    ENTRANCE

    Plinth level is 300mm.Ramp has been provided for handicapped persons.

    There are three gates- one for entry and other two for exit.

    Each gate is 3m wide.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    10/162

    LOBBY,RECEPTIONAND WAITING

    LOBBY (10m x 8m) RECEPTION (4m x 2m)

    There are two waiting zones each for twelve persons

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    11/162

    WAYTO BANQUETHALL

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    12/162

    LOBBY

    Public space-

    Lobby and front office- 1,100sq.Ft.

    Lounge- 600sq.Ft.

    Corridors adjoining- 200sq.Ft. Every hotel, regardless of its size, must have a lobby.

    The size of the lobby is largely determined by the no. of guestrooms as well as by the type of hotel.

    There is no definite thumb rule to determine the size of lobby.

    A hotel lobby sets the mood of hotel.

    This space more than any other, will create the first andusually the most lasting impression.

    STANDARDS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    13/162

    Residing Zones

    Total 87 suites covered in three top most floors.

    They are divided into 5 categories:-

    a) Standard suites

    b) Fortune club suites

    c) New fortune club suites

    d) Executive suites

    e) Presidential or deluxe suites

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    14/162

    New fortune club roomNew fortune club room

    Area- 4m x 4m

    Clear height- 3500mm Flooring- white marble and granite

    Window- 2.5m(width) x 2m(height)

    Sill level -500 mm

    Lintel level-3000 mm Door- 1200mm(width) x 2500mm(height)

    Room comprises of- bed

    side tables with control panel

    sitting for 5 person

    wardrobe

    luggage carrier

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    15/162

    Attached Bathroom - 2.5m x 2.5m

    - wash basin

    - western closet- bathing area

    Bed size- 2100mm x 1800mm

    One duct was provided in between two bathrooms.

    A.C. ducts were at the height of 3200mm.

    Fall ceiling

    Walls are partially covered with wallpaper

    Architraves of Plaster of Paris .

    Control panel at one of the side tables.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    16/162

    New fortune club room

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    17/162

    Executive suiteExecutive suite--

    Area- 6m x 6m

    Clear height- 3500mmFlooring- wooden flooring

    Window- 2.5m(width) x 2m(height)

    Sill level- 500mm

    Lintel level-3000mm Door- 1200mm(width) x 2500mm(height)

    Walls were partially covered with wallpaper.

    Bed size- 2100mm x 2100mm

    A.C. ducts were at the height of 3200mm.

    Fall ceiling

    Architraves of Plaster of Paris .

    Control panels at one of the side tables

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    18/162

    Room comprises of- bed

    side tables with control panel

    sitting for 5 personwardrobe

    luggage carrier

    two LCDs

    Attached Bathroom -2.5m x 1.5m

    - wash basin

    - western closet

    -bathing area

    - circular shower area enclosed with

    frosted glass.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    19/162

    EXECUTIVE SUITE

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    20/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    21/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    22/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    23/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    24/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    25/162

    BEDROOMS

    Bedrooms are the core of the hotel industry. For flexibility

    most rooms have a double bed or twin beds. Bedrooms normally

    have en-suite bathrooms.Areas

    Corridor widths and bedroom sizes are greater in more expensive

    hotels.

    Minimum area of a bedroom for 5 star hotel is 36m

    OrientationTake account of sunlight. Bedroom blocks with the long axis

    nearer northsouth than eastwest are preferable. Position bedrooms to minimize noise

    from traffic, machinery, kitchens, and the

    hotels public rooms.

    Terraces and balconies

    These are pleasant but costly. They lead to an increase in thevolume of the building, and to problems of security, wind and

    waterproofing

    guestroom: a single module containing a bedroom with its own

    bathroom Suite: two or more modules incor oratin bedrooms bathrooms

    Types of room

    STANDARDS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    26/162

    Form

    The bedroom areas are formed from relatively small units divided

    by separating walls, with many service ducts.

    Widths vary From 1.8 to 2.0 m wide for 5-star.

    Bedroom corridors

    Corridors in bedroom areas should be minimized.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    27/162

    Bedroom planning

    Rooms must be designed and furnished to facilitate access,

    cleaning, making up and servicing. The shape and to some extent

    the size will be governed by the placing of the bathroom. Some common

    arrangements are-

    Bathroom on external wall This gives natural ventilation to the

    bathroom,

    Bathrooms between bedrooms The main disadvantage is the

    elongation of the corridor and the increased external wall

    Internal bathrooms These necessitate a lobby, but it is

    generally used for the furnishings and so can be subtracted from

    the bedroom area

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    28/162

    wardrobe

    Beside tables forsinglebed

    Beside table for

    doublebed

    dressing\writing tableLuggage carrier

    Spacerequirements forhotel

    bedroom furniture

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    29/162

    EARTHEN OVEN

    North Indian CuisineRestaurant.

    Open Restaurant

    Capacity Of 250 People

    Separate Kitchen

    Bar

    Separate Toilet

    BackArea Of Kitchen

    4.8 x 5 m

    RESTAURANTS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    30/162

    PLAN OF EARTHEN OVEN RESTAURANT

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    31/162

    KITCHENOF EARTHENOVEN DISHWASH AREA

    SERVICE CORRIDOR

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    32/162

    AMBROSIARESTAURANT

    Multi cuisine Restaurant.

    Total capacity of Restaurant 80 Person.

    Bar 60 Person.

    They served buffet during lunch time on regular basis. Seating arrangements 2,4,6,8.

    Bar area and restaurant sitting space was separated by araised platform.

    Size of bar platform - 6.5 x 3 m.

    Height of ambrosia - 5m

    No. of openings - 5

    size of openings 4m x 2m

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    33/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    34/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    35/162

    STANDARDS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    36/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    37/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    38/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    39/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    40/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    41/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    42/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    43/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    44/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    45/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    46/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    47/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    48/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    49/162

    Entry from here

    Way to Board Rooms

    Main Waiting for 8 to 10 persons

    ADMINISTRATIONAND

    BUSINESS CENTER

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    50/162

    SECRETARYS CABIN

    Photocopy machine, fax, printer, Wi-Fi,

    scanner, phone facility were there.

    Drawbacks-

    Secretarys cabin was open.

    No washroom was provided within the

    zone.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    51/162

    BOARDROOMI

    Entry from here

    The board room was very congested.

    It lacked Modern equipments such as projectors, L.C.D)

    The seats were shabby, and didnt match each other.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    52/162

    WAITING OUTSIDE

    GMS CABIN

    Way to GMsCabin GMs cabin

    X The waiting was very congested.

    X nothing to entertain the guests

    (Viz. Magazine, newspaper).

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    53/162

    BOARDROOMII

    Entry

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    54/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    55/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    56/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    57/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    58/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    59/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    60/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    61/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    62/162

    BANQUETHALLS

    There were 5 banquet hallsThere were 5 banquet halls

    ShankhShankh

    Surya 1Surya 1 Surya 2Surya 2

    Devashri 1Devashri 1

    Devashri 2Devashri 2

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    63/162

    SHANKH

    AREA : 9.5*13 m

    CAPACITY: 100 PERSONs

    MATERIAL USED:

    1) IN CEILING : GYPSUM BOARDS ARE USED

    2) IN FLOORING:CARPET

    3) ON COLUMNS:GLASS IS USED FOR AESTHETIC PURPOSE

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    64/162

    SURYA

    Surya, is exclusively designed 2640 Sq. Ft. banquet hall ideal for

    social functions or business events as it can comfortably

    accommodate to 125 persons or more. There are various styles

    and seating arrangements available to enhance the experience of

    event.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    65/162

    ARRANGEMENT CAPACITY

    THEATRE STYLE 125-130

    U SHAPE SEATING 50-55

    DOUBLE U SHAPE

    CLASSROOM SEATING WITH

    TABLES

    70-75

    BOARD ROOM SEATING 50-55

    ROUND TABLE SEATING 60-65

    ARRANGEMENT OF SEATING

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    66/162

    DEVSHRI HALL

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    67/162

    DEVASHRIIANDDEVSHRIII

    The grand Devashri hall can be divided into two breakaway halls

    as per the need of the occasion or theme of the event.

    1) AREA:

    Devashri I ( 1050 sq ft)Devashri II ( 2496 sq ft)

    2)MATERIAL:

    In ceiling : Gypsum board

    In flooring: Carpet

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    68/162

    ARRANGEMENT CAPACITY

    THEATRE STYLE 20-25

    U SHAPED 15-20

    DOUBLE U SHAPED

    CLAS ROOM SEATING WITH

    TABLE

    15-20

    BOARD ROOM SEATING 20-25

    ROUND TABLE SEATING 15-20

    SEATINGARRANGEMENT FOR DEVSHRI 1

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    69/162

    ARRANGEMENT CAPACITY

    THEATRE STYLE 100-105

    U SHAPED 40-45

    DOUBLE U SHAPED 60-65

    CLASS ROOM SEATING WITH

    TABLE

    55-60

    BOARD ROOM SEATING 40-45

    ROUND TABLE SEATING 50-55

    SEATINGARRANGEMENT FOR DEVSHRIII

    STANDARDS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    70/162

    The rooms vary in size to accommodate anywhere from 10 to as

    many as 100 people. Wherever it is feasible, the meeting rooms arranged in a straight

    line, so that the walls separating one room from the other can be

    made movable.

    Movable, separating walls make it possible to achieve a great

    flexibility in the size of the rooms to accommodate meetings of

    various sizes.

    If two meeting rooms which might seat 25 people are thrown open

    to one, we would have a meeting room to take 50 people.

    If another wall is opened, we would be able to seat 75 people, and soon and vice versa.

    In many instances both arrangements will be found in hotel,so that

    there are lines of meeting rooms of a smaller nature, all sub divisible,

    and a really large space that is also sub divisible.

    STANDARDS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    71/162

    Most of these spaces will also be used to serve meals.

    These meals may consist of small luncheons or dinners for 10

    or 12 people and go on up to accommodate as many as 1000people seated at tables for dining .

    In the really large convention halls, realizing that food must be

    brought to all these rooms, their position to serving ,kitchens is

    highly important in arranging the plan . For the most part, food should be brought directly from

    banquet kitchens to the banquet spaces .

    In subdividing these spaces, the subdivision must be so planned

    that each space is contiguous to the kitchen and has its own

    doors to enable waiters to come and go between the banquet

    spaces and the banquet kitchen .

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    72/162

    In large meeting, banquet, and convention facilities, space must be

    provided which is normally called "preconvention assembly space .' This

    is a sort of foyer or gathering place for people before they go to the

    various meeting rooms or where they may congregate before going in toa banquet .

    Since most of the people who are standing are those who will eventually

    be seated, the proportions of the preconvention foyer space will be

    determined by the number of people who will be eventually seated .

    As a rule of thumb, a person standing in fairly close quarters will take up

    approximately 5 sq ft .

    A person seated at a table will take up anywhere from 10 to 15 sq ft . A

    person seated for a seminar or a meeting will require 8 or 9 sq ft.

    It thus becomes apparent that the ideal preconvention, prebanquet , orassembly space should be at least one-third of the area of tire actual

    dining and meeting spaces .

    Tire one-third proportion may not be possible, and it has been found

    proper to use as little as 25 percent of the spare for this preassembly

    foyer .

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    73/162

    COMPARISON

    STANDARD

    Food should be brought directly

    from banquet kitchens to the

    banquet spaces.

    its own doors to enable waiters to

    come and go between the banquet

    spaces and the banquet kitchen .

    The size of hall for capacity of

    100 is 1575 sq.ft.

    Preconvention space should be

    provided.

    ON SITE

    There is only one kitchen for all

    the banquet halls.

    The hall had different doors for

    waiter.

    The size of hall for the capacity of

    100-105 is 2496 sq.ft.

    Preconvention space is designed

    acc. To standards.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    74/162

    Gymnasium

    (workout area)

    Gymnasium

    (cardio

    section)

    Lockerroom

    Beauty

    parlour

    HYDRO-

    THEREPY

    AREA

    MASSAGE

    AREA

    ENTRY

    FITNESS CENTER

    The fitness center at

    Fortune landmark

    included-

    GymnasiumHydrotherapy area

    Massage area

    This entry has been

    temporarily closed

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    75/162

    The gymnasium area threemeter was divided into two-

    Cardio area

    Main workout area

    Entrance to the other section of the

    gymnasium

    GYMNASIUM

    The cardio section (5m x 7m) included

    many types of cardiovascular training-

    related equipment such as treadmills

    etc.This area also had LCD in order to

    keep exercisers entertained during long

    cardio workout sessions.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    76/162

    Photograph showing the direct entrance to the

    gymnasium which is temporarily closed

    The main workout area (9m x8m), primarily

    consists of free weights including dumbbells,

    exercise machines.

    This area often includes

    mirrors so that exercisers can

    monitor and maintain correct

    posture during their workout.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    77/162

    Industrial grade gym rubber flooring

    was used for gymnasium.

    The ceiling of the gymnasium was

    acoustically treated by using perforated

    tiles.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    78/162

    HYDROTHERAPY AREA

    The hydrotherapy

    area included-

    Steam roomJacuzzi

    Jacuzzi

    Steam

    roomMachine

    room

    I h (2 1 5 2 1 ) il

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    79/162

    JACUZZI

    (2.5m x 2.5m)

    MASSAGE ROOM

    (2.5m x 2m)

    In the steam room (2m x 1.5m x 2.1m) tiles

    were used for flooring. The floor must always

    slope towards a floor drain.

    Walls-The walls were finished with stone.

    Steam rooms are commonly maintained at a

    temperature of 41 degrees Celsius or above

    STEAMROOM

    STANDARDS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    80/162

    Rowing machine

    and exercise bike

    Stomach exercising

    bench wit pull up bar

    and wall bar

    STANDARDSGYMNASIUM

    Clear room height should be 3m.The minimum room size of 40m2 is suitable for

    12 users.

    For an optimum double row arrangement of

    machines, room should be at least 6m wide.

    To allow clear supervision , the room length

    needs to be 15m or less.

    The ceiling should be acoustically treated.

    Doors should be constructed wide enough to

    accommodate the movement of equipment to

    other areas.

    Several full length mirrors should be installedon the walls.

    The floor should be covered with a durable,

    resilient material.

    Work out bench Multi exercise

    centre

    SAUNA

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    81/162

    SAUNASauna is a dry heat bath taken

    in a well insulated room lined

    with untreated, kiln driedsoftwood and heated by

    igneous rocks.

    A sauna suite offers a

    complete heating and cooling

    cycle with indoor and outdoor

    cooling areas.

    A 610mm wide, 2030mm high non lockable door that

    opens outward has to be provided.

    Saunas should be located near a

    shower for the cool down portion of

    the sauna.

    The ceiling should be kept as low as possible

    within the limits imposed by benches, whichgenerally require 2.1m clear height.

    SAUNA SUITE PLAN

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    82/162

    Wheelchair access is discouraged to protect the metal and plastic components from

    excessive heat.An attendant generally assists wheelchair bound sauna users.

    Indirect lighting is recommended. The best position is above and slightly behindbather's normal field of view. The switch is always outside the room.

    FINISHES-Softwoods are used to finish wall surfaces and bench construction of a

    sauna.

    Design benches

    for a width of

    610mm per

    person (sitting)and a length of

    1830mm per

    person (reclining)

    TYPICAL SAUNA PLAN CONFIGURATIONS

    SAUNA BENCH

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    83/162

    STEAMROOM

    Steam room ceilings should be sloped a minimum of 16mm per m toprevent condensation from collecting and dripping.

    The ceiling should not be more than 2.4m high.

    Flooring should be skid resistant, with floor drain for condensation

    runoff and cleaning.

    Walls, ceiling, floor, and benches must be completely covered with

    waterproof finish, such as tile, marble or acrylic.

    Exposed gypsum board or plaster is not recommended.All joints mustbe filled with water sealant.

    Vents are not recommended inside a steam room.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    84/162

    CAFETERIA

    Size of the cafeteria is 5x5m

    Space for 16 people sit at a time in the cafeteria

    2 m wide space to enter in cafeteria

    6 tables and 16 chairs for sitting

    One side folding door partition

    Wash area provide back side of cafeteria

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    85/162

    WASH AREA

    WAITING AREA

    Height of the counter

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    86/162

    COUNTER

    Height of the counter

    is 2m

    Width of the counter 1.5m

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    87/162

    FOLDINNG DOOR PARTITION

    SITTING SPACE

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    88/162

    PRIMARY

    ENTRY

    SECONDARY

    ENTRY PARKING

    PORCH

    LOBBY

    RECEPTION

    SITTING

    EXIT

    OPEN RESTAURANT

    (EARTHEN OWEN)

    KITCHEN

    TOILE

    STAIRS

    (DN)

    BAR

    LOUNGE

    LIFTFIRE

    EXIT

    BUSINESS

    CENTRE

    ZODIAC HALLS & BANQUET HALLOPEN

    KITCHEN

    CAFE

    AREA

    SERVICE

    STAIRS

    (DOWN)

    LADIES

    TOILET

    GENTS

    TOILET

    LUGGAGE

    ROOM

    RESTAURANT

    (AMBROSIA)

    SEWAGE TREATMENTZONING OF LOWER

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    89/162

    ENGINEERING DEPARTMENT

    HUMANRESOURSE

    DEPARTMENT

    HOUSE

    KEEPING

    TIME

    KEEPING

    SERVICE

    STAIRCASE(FROM

    GROUND FLOOR)

    STORE

    SERVICE EXIT

    LPG

    ROOMS

    (3NO.S)

    GARBAGE

    ROOMKITCHEN

    FROM SERVICE ENTRY

    NEW PEMISE

    (UNDER CONSTRUCTION)

    BANQUETHALLS

    GROUND LEVEL

    STANDARDS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    90/162

    Average space requirements inWoodwork workshops

    (Without open store rooms) :-

    70-80 sqm Per employee .

    Up to 10 employee production

    flow can be in a line or l-shaped.

    In medium-sized companies with

    More than ten employees, a

    U-shaped or circular arrangement

    Gives a better flow.

    Machines should be set up to matchSequence of work.All workstations

    Should face light. Window

    Area should be approximately

    1/8 of a floor.

    CARPANTRY SHOP

    STANDARDS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    91/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    92/162

    Trolleys are used to move

    Different wooden items

    In the work shop.

    ENGGINERING REPAIR(METAL WORKS)

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    93/162

    In large cases of

    Engineering metal works,

    The work areas are divided

    As per the figure on right

    Side:-

    ENGGINERINGREPAIR(METAL WORKS)

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    94/162

    Capacity of storage system examples:

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    95/162

    Shelving with brackets:- width w=1.0m; height h=2.0m; length l=6.0m

    Enclosed shelving space:- v=l*b*h=1.0*2.0*6.0=12.0 cu.m.

    Effect of density(r):- r=v*r(r=total weight).

    If 8 number of employees use 7.5 tonne mat./Person/year in different repair or new

    work annual requirement

    8*7.5=60 tonne.

    Store turnover frequency/r=60/10=6.

    However a lot of space is covered by shelves itself, so rack can never be fully used.

    CONCLUSION

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    96/162

    Conclusion drawn on comparison of live case study of fortune landmark and the

    standard data as regards to engineering department is that:-

    There should be separate workshops for different work like carpentry,

    Plumbing, electrical etc. Which was not so in live case study.

    In live case study the space provided in live case study to the department was

    Less as compared to the standards.

    While designing the hotel placement and space allotation for different sectors

    Of engineering department is very vital.

    The engineering department is must for proper functioning of the building.

    Haphazard planning can cause disturbance in functionality of services.

    CONCLUSION

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    97/162

    Housekeeping is the

    department that deals

    essentially with cleanliness

    and all auxillary service

    attached to that.

    Hotel offer laundry, dry

    leaning facilities for guest

    clothes.

    Room cleaning is performedonce or several times a day.

    HOUSEKEEPING

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    98/162

    For record IDS software is used.

    Red indicates occupied rooms

    Yellow indicates dirty roomsBlue indicates coming guests

    Laundry Maid the laundry maids maintained the bedding and towels,

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    99/162

    and also washed, dried, and ironed clothes for the whole hotel including the

    servants.

    FLOORPLANS OF HOUSEKEEPINGROOM

    Stitching

    room

    Housekeepers

    room

    Window for

    taking in

    and giving out

    laundry material

    Comp.

    desk

    Entry

    Staff laundry

    room

    up

    Divided in 2 floor

    Each of 2.5 m ht.

    Storage space for

    housekeeping

    amenities

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    100/162

    PLACE FOR IRONING

    CLOTHES

    STITCHING

    ROOM

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    101/162

    Mezzanine floor accommodating

    staff laundry and hotel

    housekeeping amenities

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    102/162

    STANDARDS FOR HOUSEKEEPING

    No. ofrooms Area in m2

    100 rooms 1.40

    250 rooms 1.11

    500 rooms 0.93

    1000 rooms 0.94

    Service areas in m2 according to numberof guest rooms

    BASIC LAYOUTOF

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    103/162

    BASIC LAYOUTOF

    HOUSEKEEPINGROOM

    TROLLEY STANDARDS

    Linen trolley(cart): fabric

    -900x700x900

    Chambermaids trolley

    (cart)- 610x1550x1380

    Soiled

    linen bag

    Racks forutensils , linen

    etc.

    rubbish

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    104/162

    Building Services

    ZonesThe necessary service zones which is to be provided

    in a building for the functioning of the building.

    N i t b id d i high i b ildi g

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    105/162

    Necessary services to be provided in any high rise building as per

    Standards

    Plant to service the buildings itself can be a major space user. Some equipment

    can be accommodated within general areas; but some for one reason or another,

    requires dedicated and segregated space.

    Plant areas needed in all kind of buildings :- In Hotel Fortune Landmark

    Intake room for water, gas, electricity X

    and communications

    Transformer chamber and switch rooms Y

    Standby generator room Y

    Boiler and calorifier rooms Y Sewage pump rooms Y

    Lift motor rooms Y

    Air handling and conditioning plant rooms and Y

    Building management system control rooms Y

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    106/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    107/162

    Zones Included -

    Electrical Services

    Kitchen Services

    Services through Ducts

    All Services zone were

    at the lower ground

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    108/162

    Service Entry

    Transformer

    Meter

    Room

    ControlRoom

    Generato

    r room

    KitchenLoading/

    Unloading

    area

    Kitchen

    Store

    Garbage

    Area

    To Hotel

    Kitchen

    Loading / Unloading of vegetables and other utilities

    IMC Vans take off the garbage

    Electric Line into hotel through

    IMC Elec. Pole

    MainRo

    ad

    at the lower ground

    level

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    109/162

    Electrical ServicesAt Hotel Fortune Landmark

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    110/162

    Two separate transformers for the campus.

    Transformer

    M t R (5 3 )

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    111/162

    Meter Room (5m x 3m)

    Controlling Units

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    112/162

    FlowChart of Electric Lines

    AirBlower

    Controlling

    Units

    Generator room (5m x 2.5m)

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    113/162

    Two generators of

    550 KVA

    250 KVA

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    114/162

    Engineers room (3m x 3m)

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    115/162

    Kitchen ServicesAt Hotel Fortune Landmark

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    116/162

    Service entry to hotel

    Loading / Unloading area

    Opening 2 m wide

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    117/162

    Storage Area for Kitchen and other utilities

    (6m x 14m)

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    118/162

    1.2 m wide opening

    3 LPG rooms (2.5mx2.5m) each

    30 cylinders in one room

    Gas outlet pipe

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    119/162

    GARBAGE ROOM (6m x 3m)Divided in three parts

    One for storage

    One for dry garbage and,

    One for wet garbage

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    120/162

    Services through DuctsAt Hotel Fortune Landmark

    Vertical DUCTS (1m x .8m)

    On the residing floor ducts

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    121/162

    On the residing floor ducts

    have been provided between

    adjacent rooms for water

    supply and sanitation

    Horizontal DUCTS (1.5m x .5m)

    On the residing floor horizontal ducts have

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    122/162

    been provided in corridors for fresh Air

    supply, electrical supply, AC systems and

    sanitation.

    PLUMBING SERVICES

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    123/162

    Water Softening Tank

    PLUMBING SERVICESThe pipes, fixtures, and other apparatus of a water, gas, or sewage

    system in a building.Room Size 6m x 3m

    PNEUMATIC SYSTEM

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    124/162

    PIPELINES

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    125/162

    100mm dia pipes

    BOILERS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    126/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    127/162

    Sewage suction pump

    Sewage Treatment Plant

    Sewage Treatment Plant

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    128/162

    FIRE CONTROL

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    129/162

    FIRE CONTROL

    Advanced systems used for detecting the fire infected area.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    130/162

    Fire engine: It immediately stopped the electric current supply

    .

    Hydrant & jockey pump: Controlled the water pressure.

    Water sprinklers attached with pipes of 20 mm dia & carrying

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    131/162

    Water sprinklers attached with pipes of 20 mm dia & carrying

    a pressure of 6kg & smoke detectors were installed on the roof

    ceilings.

    Lower ground & basement area were equipped with water

    hose with 100mm dia pipe.

    Fi ti i h

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    132/162

    Fire extinguishers

    containing compressed

    carbon dioxide & drychemical powder ,were

    placed in kitchens &

    corridors.

    Fire Alarming buzzer

    HOSE RACKS

    STANDARDS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    133/162

    HOSE RACKS

    Cabinets hold up to a standard of 1 1.5 sq

    ft hose racks assembly. Hose rack assembly

    come with complete rack which carry 50-

    100 ft hoze pipe ,nozzel and valve

    Water sprinklers

    Water sprinklers are of two

    types :

    i.)Umbrella sprinkler:It

    covers an area from 4.6 to

    6 mt

    ii.)normal sprinkler:- it

    covers an area upto 3.75

    mt.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    134/162

    HVAC

    AC UNITOF \FORTUNE LANDMARK[

    WHAT IS HVAC..??

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    135/162

    WHATIS HVAC..??

    HVAC stands for Heating, Ventilation, and Air-

    Conditioningthree closely related fundamental functions

    found in homes, offices, and other building structures.

    There are also central HVAC units called heat pumps that

    combine both the heating and cooling functions.

    Warmed or cooled or dehumidified air flows through a

    series of tubes - called ducts - to be distributed to all the

    rooms of your house.

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    136/162

    CONTROLER/SWITCHES OF AHUS & VENT S & EXHAUST

    IN CONTROL ROOM OF ENGG. DEPARTMENT

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    137/162

    AHU

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    138/162

    CHILLER /AHU

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    139/162

    AHU

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    140/162

    AHU

    Unit of ahu/chiller plant is 124tr,250tr,500tr.

    Tr- ton refrigeration.

    An ahu is a combined system of blower, heating and cooling

    elements, filter racks or chambers whose main function is to

    provide pure air passing through pipes and ducts & reducesmoisture from the area by providing clean& cool air. It is a

    part of HVAC system.

    Having 3 plant of ahu.

    Used according to requirement; depends on the rush or peakhour and time.

    PIPES AND DUCT

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    141/162

    PIPES ANDDUCT

    Thermal insulation of ducts in HVAC:INSULATION DONE

    by THERMACOLAND THEN COVERED BY CEMENT.

    Wrap insulation on pipes.

    This insulation product includes a heavier foil facing on one

    side of the material that is installed facing away from the duct

    exposed to the elements. When used to insulate exteriorHVAC duct work, outdoor duct insulation helps to reduce

    needless air infiltration, and increases the overall energy

    efficiency of the hvac system.

    THERMALINSULATION OF AHUPIPES

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    142/162

    COVERED BY CEMENT

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    143/162

    DUCTS(PIPES)

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    144/162

    DUCTS(PIPES)

    AC DIFFUSERS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    145/162

    IN CORRIDORS & IN HALLS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    146/162

    DIFFUSERS DIRECTLYON CEILING

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    147/162

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    148/162

    C/C

    DISTANCE

    BETWEEN

    TWO

    DIFFUSERS IN

    CORRIDORIS

    2.5-3 MT.

    STANDARDDIMENSIONS OF AHUUNIT

    TONES LENGTH WIDTH HEIGHT

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    149/162

    50 3.5 1.5 2.4

    200 5.7 1.2 2.6

    500 5.9 2.3 3.7

    750 7.8 2.3 3.7

    1000 10.5 2.3 4.2

    Ventilations and air conditioning system should be considered primarily,

    as they have major influence on building design.

    Plant room are placed should be as near as possible to the room air-conditioned.

    The walls should be of masonry, plastered , with a washable coating.

    SPACE REQUIREMENT FOR PLANT ROOMS

    DATACONTROLLING

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    150/162

    The principal behind a CCTV

    control room is to improve

    security management and the

    operating environment for staff.

    Closed-circuit

    television (CCTV) is the useof video cameras to transmit a

    signal to a specific place, on a

    limited set of monitors.

    Server room is provided for

    internet and telephones

    connections

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    151/162

    Data controlling room

    ( 3.5mx3m)

    upEntry Fire exit

    staircase

    STORE

    corridor

    Door ht. 1.4 m

    Door width 1.2m

    Door was not prominently

    visible

    1.4 m

    KEYPLAN SHOWING DATA CONTROLLINGROOM

    There are two engineers appointed to manage the data controlling room

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    152/162

    All the internet connections in the entire premises were being handled

    from the control room.

    All the data from the CCTV cameras installed in the hotel building and

    its premises were being monitored from the same.

    There was a LCD screen where 16 views from different zones of thehotel were being displayed thus, making helping the engineers to keep a

    check on all the activities.

    There were no openings in the room.

    Server controlling was done in the same room.

    Two sprinklers were provided for fire safety.

    Computer place high demands on electrical, mechanical and floor systems

    AS PER STANDARDS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    153/162

    The surface must be conductive and grounded to avoid static electricity

    and dust accumulation.

    Control room should be separated from all other occupancies within

    buildings by fire-resistant wall, floors and ceilings with a resistance rating

    of not less than 1 hour.

    Package air conditioning units are suitable for control rooms.

    The server room is attached with main control room. room

    AUXIALLARY SERVICES

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    154/162

    AUXIALLARY SERVICES

    This are the additional or supplementary services

    This services majorly act as a supporting system to the

    circulation of a building

    Auxiliary services includes :-

    a) Lifts

    b) Stairs

    c) Corridorsd) Powder rooms

    e) Lobby

    LIFTS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    155/162

    Total no. of lifts - 4

    Guest lifts - 2

    Size 1m x 1.5m

    Service lifts - 2Size 2m x 2m

    Company OTIS

    Flooring material - Marble

    Wooden interior

    STAIRS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    156/162

    Stairs from lower ground

    Floor to upper ground floor

    Total Steps- 30

    4 Landings Width -1.7m

    Tread -300mm

    Riser -150mm

    Material-marble

    Glass Railing With Wooden Handrails

    Fire exit stairs

    (Width 1.25m)

    CORRIDORS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    157/162

    Width- 3.2m

    Width-2m

    POWDERROOMS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    158/162

    ATGROUND

    FLOOR

    AT LOWER GROUND FLOOR

    TYPICAL LAYOUT PLAN OF FIRST, SECOND &THIRD FLOOR

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    159/162

    Standardsuites(10)

    Presidential suites(8)

    New fortune

    Clubsuites

    (4)

    Fortune

    Clubsuite

    (3)

    Executiv Suites(3)

    STANDARDS

    CORRIDORS

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    160/162

    CORRIDORSCorridors in bedroom areas should be minimized

    Widths of corridors vary from 1.8m to 2.0m

    Dead end corridors with one exit are limited to 7.6m

    LIFTSGuest and service lift, normally in the ratio 2:1,3:2 or 4:3, are often sited back

    to back for economy, the service lifts rising from back of house areas and

    opening into a separated service lobby on each floor.

    Lifts should be located such that they are immediately visible, either from the

    entrance lobby or from the registration area.

    STAIRSAs a rule, emergency stairs must be sited at or near the ends of each

    corridor

    Minimum widths of the stairs varies from 1.2m to 1.5m

    PROVISIONS FORGUESTS WITH DISABILITIES

  • 8/2/2019 FORTUNE....Pptx Auto Saved]

    161/162

    Requirements include:

    Ramps- 1:20Width of corridors- at least 1000 mm

    Doors- 815 mm clear opening with lobbies 460mm wider than the door

    Between beds and furniture, 910 mm space is required

    685 mm for knee space

    Switches set 1.2 m highWheelchair eye level( 1.07 m- 1.37 m) must be considered for window sills,

    placement of mirrors,etc.

    Bathrooms require:

    1.52 m central turning space and 2.75 m width

    Specially designed fittings and grab bars