formats for petition - getcogetco.co.in/getco_new/pages/files/formats.pdf · form no. tariff filing...

61
Appendix-C TARIFF FILING FORMS (TRANSMISSION) 101

Upload: vobao

Post on 09-Jun-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Appendix-C

TARIFF FILING FORMS (TRANSMISSION)

101

Page 2: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

INDEX

Form No. Tariff Filing Formats (Transmission) Tick

FORM-1 Summary sheet √

FORM-2 Details of Transmission Lines and Substations √

FORM-3 Normative Parameters considered for tariff calculations √

FORM- 4 Details of Foreign loans FORM-5 Abstract of Admitted Cost for the existing Projects FORM-5A Abstract of Project Cost Estimates and Schedule of Commissioning for

the new Projects

FORM-5B Break-up of Project Cost for Transmission System FORM-5C Break-up of Construction/Supply/Sevice packagesFORM-5D Details of elementwise costFORM- 6 Financial Package upto CODFORM- 7 Details of Project Specific Loans

FORM- 8 Details of Allocation of corporate loans to various transmission

elements

FORM-9 Statement of Additional Capitalisation after CODFORM-10 Financing of Additional Capitalisation

FORM-11 Statement of depreciationFORM-12 Calculation of depreciation rateFORM-13 Calculation of Weighted Average Rate of Interest on Actual LoansFORM-14 Calculation of Advance Against DepreciationFORM-15 Calculation of Interest on Working Capital FORM-16 Draw Down Schedule for Calculation of IDC & Financing Charges

Other Information/ Documents

Sl. No. Information/Document Tick

1 Certificate of incorporation, Certificate for Commencment of

Business, Memorandum of Association, & Articles of Association ( For

New Station setup by a company making tariff application for the first

time to CERC)2 Regionwise and Corporate audited Balance Sheet and Profit & Loss

Accounts with all the Schedules & annexures for the new

Transmission System & for the relevant years.3 Copies of relevant loan Agreements

4 Copies of the approval of Competent Authority for the Capital Cost

and Financial package.5 Copies of the Equity participation agreements and necessary approval

for the foreign equity.6 Copies of the BPTA/TSA with the beneficiaries, if any

7 Detailed note giving reasons of time and cost over run, if applicable.

8 Any other relevant information, (Please specify)Note: Electronic copy in the form of CD/Floppy disc shall also be

furnished.

Checklist of Forms and other information/ documents for tariff filing for

Transmission System

102

Page 3: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

FORM- 1

(Rs. in Crs)

S.No. Particulars2009-10

(Actual)

2010-11(Revised

Estimates)

2011-12(Projected)

2012-13(Projected)

2013-14(Projected)

2014-15(Projected)

2015-16(Projected)

1 2 3 4 5 6 7 8 9

1 Depreciation FORM- 11 322 392 499 615 735 855 964

2 Interest on Loan & financing charges FORM- 13A 223 301 414 541 659 766 846

Name of the Transmission System:

Name of the Region:

Summary Sheet

Gujarat Energy Transmission Corporation Ltd.

Gujarat

Name of the Tansmission Licensee

2 Interest on Loan & financing charges FORM- 13A 223 301 414 541 659 766 846

3 Return on Equity1 261 306 389 486 585 685 775

4 Advance against Depreciation FORM- 14 0 0 0 0 0 0 0

5 Interest on Working Capital FORM- 15 35 42 52 64 76 88 99

6 O & M Expenses* 601 617 707 797 884 982 1091

8 Provision for Taxes 15 61 77 97 117 136 154

9 Incentive 30 35 46 57 69 81 92

10 Less: Expenses Capitalized 132 145 160 176 193 213 234

11 Less: Other Income 103 103 103 103 103 103 103

12 Add: Revenue Gap of True Up of FY 2009-10 200

Total 1252 1507 2122 2378 2828 3278 3684

1 Details of calculations, considering equity as per regulation, to be furnished.

Petitioner

103

Page 4: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Form 2

DETAILS OF TRANSMISSION LINES & SUBSTATIONS

Name of Transmission Licensee : Gujarat Energy Transmission Corporation

Name of the Transmission System

Name of Region : Gujarat

Transmission lines

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

1 Asoj-Ukai AC S/C 400kV 140 22-3-88 Yes

2 Asoj-Wankabori AC S/C 400kV 76 22-3-86 Yes

3 Asoj-Amreli (Lilo Chorania) AC D/C 400kV 343 2/8/2000 Yes

4 Asoj-Chorania AC S/C on D/C 400kV 166 29-3-94 Yes

5 Asoj-SSP AC S/C on D/C 400kV 83 6/12/1994 Yes

6 Kasor-SSP AC S/C on D/C 400kV 146 7/12/2004 Yes

7 Kasor-GPEC AC S/C 400kV 98.5 29-4-99 Yes

8 Kasor-Chorania AC S/C on D/C 400kV 103 10/2/1997 Yes

9 Soja-PGCIL (Dehgam) AC S/C 400kV 40 29-3-05 Yes

10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes

11 Soja-Wanakbori AC S/C 400kV 95.1 22-10-88 Yes

12 Soja-Kansari AC S/C 400kV 135 8/2/2000 Yes

13 Amreli-Jetpur AC S/C 400kV 95 31-12-87 Yes

14 Chorania-Hadala (Lilo) AC S/C 400kV 115.47 19-10-93 Yes

15 Hadala-Jetpur (Lilo) AC S/C 400kV 59.47 10/19/1993 Yes

1 Navsari-Bhilad AC S/C 220kV 84 24.04-67 Yes

2 Navsari-Ambheta AC S/C 220kV 21.645 24.04.67 Yes

3 Ambheta- Vapi AC S/C 220kV 46.955 24.04.67 Yes

4 Ambheta-Mota-1 AC D/C 220kV 47.1 9/6/2008 Yes

5 Ambheta-Mota-2 AC D/C 220kV 47.1 9/6/2008 Yes

6 Navsari-Nasik 1 AC D/C 220kV 170.73 06.11.77 Yes

7 Navsari-Nasik 2 AC D/C 220kV 170.73 06.11.77 Yes

220KV LINES

400KV LINES

7 Navsari-Nasik 2 AC D/C 220kV 170.73 06.11.77 Yes

8 Navsari-Vav-1 AC S/C 220kV 33.3 24.06.67 Yes

9 Navsari-Kawas-1 AC D/C 220kV 49.231 21.08.91 Yes

10 Navsari-Kawas-2 AC D/C 220kV 49.231 21.08.91 Yes

11 Vapi-Kapp-1 AC D/C 220kV 116 30.07.93 Yes

12 Vapi-Kapp-2 AC D/C 220kV 116 30.07.93 Yes

13 Vapi-Bhilad-2 AC D/C 220kV 24 28.02.95 Yes

14 Bhilad-Taps AC D/C 220kV 62.372 24.04.67 Yes

15 Vapi-Tarapur-2 AC S/C 220kV 80.64 30.08.69 Yes

16 Bhilad-Magarwad(U/T)-1 AC D/C 220kV 20 13.03.03 Yes

17 Bhilad-Magarwad(U/T) -2 AC D/C 220kV 20 13.03.03 Yes

18 Bhilad-Kharadpada(U/T)-1 AC D/C 220kV 5.632 22.05.02 Yes

19 Bhilad-Kharadpada(U/T)-2 AC D/C 220kV 5.632 22.05.02 Yes

20 Vapi-Ambheti-1 AC S/C 220kV 14.18 25.08.05 Yes

21 Bhilad-Ambheti 1 AC S/C 220kV 20.77 25.08.05 Yes

22 Bhilad-Ambheti 2 AC S/C 220kV 21.74 Feb-08 Yes

23 Bhilad-Ambheti 3 AC S/C 220kV 21.74 Feb-08 Yes

24 Vav-Ukai(TH) Kapp-1 AC S/C 220kV 66 18.10.81 Yes

25 Vav-Mota AC S/C 220kV 27 15.11.81 Yes

26 Ukai(TH)-Mota AC S/C 220kV 44 15.11.81 Yes

27 Vav-Zagadia-1 (LILO Kim) AC S/C 220kV 60.38 25.04.81 Yes

28 Vav-Zagadia-2 (LILO Kim) AC S/C 220kV 60.38 25.04.81 Yes

29 Vav-Kawas AC S/C 220kV 36 20.07.93 Yes

30 Vav-Ichhapore AC S/C 220kV 42 14.08.93 Yes

31 Vav-Kapp-1 AC D/C 220kV 36 26.08.92 Yes

32 Vav-Kapp-2 AC D/C 220kV 36 26.08.92 Yes

33 Ukai(TH)-Ukai(HY)-1 AC D/C 220kV 2.5 10.08.75 Yes

34 Ukai(TH)-Ukai(HY)-2 AC D/C 220kV 2.5 10.08.75 Yes

35 Ichhapore-Kawas AC S/C 220kV 6 16.08.93 Yes

36 Ichhapore-Reliance-1 AC D/C 220kV 9 15.08.93 Yes

37 Ichhapore-Reliance-2 AC D/C 220kV 9 15.08.93 Yes

38 Ichhapore-Essar-1 AC D/C 220kV 16 23.05.94 Yes

39 Ichhapore-Essar-2 AC D/C 220kV 16 23.05.94 Yes

40 Vav-Talangpur AC S/C 220kV 38.54 24.04.67 Yes

41 Navsari-Talanpur AC S/C 220kV 30.94 24.04.67 Yes

42 Talangpur-Essar 1 AC D/C 220kV 30.6 17.5.74 Yes

43 Talangpur-Essar 2 AC D/C 220kV 30.6 19.5.74 Yes

44 Achhalia-Jambuva Line-1 AC D/C 220kV 47.00 17.5.74 Yes

45 Achhalia-Jambuva Line-2 AC D/C 220kV 47.00 19.5.74 Yes45 Achhalia-Jambuva Line-2 AC D/C 220kV 47.00 19.5.74 Yes

46 Achhalia-Jambuva Line-3 AC D/C 220kV 50.00 16.06.1999 Yes

47 Achhalia-Jambuva Line-4 AC D/C 220kV 50.00 28.01.1999 Yes

48 Dahej-GACL Line-1 AC D/C 220kV 1.50 13.05.1999 Yes

49 Dahej-GACL Line-2 AC D/C 220kV 1.50 11.09.1998 Yes

50 Haldarwa-Dahej Line-1 AC D/C 220kV 62.00 7.04.2004 Yes

51 Haldarwa-Dahej Line-2 AC D/C 220kV 62.00 21.01.2004 Yes

104

Page 5: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

52 Dahej- Petronet LNG Line-1 AC D/C 220kV 5.90 11.09.1998 Yes

53 Dahej- Petronet LNG Line-2 AC D/C 220kV 5.90 11.09.1998 Yes

54 Dahej-Indogulf Line-1 AC D/C 220kV 5.50 26.10.69 Yes

55 Dahej-Indogulf Line-2 AC D/C 220kV 5.50 18.09.1997 Yes

56 Haldarwa-Zagadia AC S/C on D/C 220kV 55.00 18.09.1997 Yes

57 Haldarwa-GPEC Line-1 AC D/C 220kV 10.29 9.12.1996 Yes

58 Haldarwa-GPEC Line-2 AC D/C 220kV 10.29 9.12.1996 Yes

59 Haldarwa-IPCL Line-1 AC D/C 220kV 59.20 26.10.69 Yes

60 Haldarwa-IPCL Line-2 AC D/C 220kV 59.20 06.06.1993 Yes

61 Haldarwa-Jambuva AC S/C on D/C 220kV 61.50 06.06.1993 Yes

62 Kim-Utran Line-1 AC D/C 220kV 22.20 09.05.2002 Yes

63 Kim-Utran Line-2 AC D/C 220kV 22.20 09.05.2002 Yes

64 Kim-GSEG Line-1 AC D/C 220kV 48.50 16.02.1995 Yes

65 Kim-GSEG Line-2 AC D/C 220kV 48.50 26.10.69 Yes

66 Kim-Vav AC S/C 220kV 21.00 20.02.2002 Yes

67 Kim-Zagadia AC S/C 220kV 47.00 20.02.2002 Yes

68 Kim - TPGL-1 AC D/C 220kV 7.08 Mar-08 Yes

69 Kim - TPGL-2 AC D/C 220kV 7.08 Mar-08 Yes

70 SLPP-Gavasad Line-1 AC D/C 220kV 107.20 17.5.74 Yes

71 SLPP-Gavasad Line-2 AC D/C 220kV 107.20 19.5.74 Yes

72 Achhalia-Ukai(Th) Line-1 AC D/C 220kV 84.00 10.1.89 Yes

73 Achhalia-Ukai(Th) Line-2 AC D/C 220kV 84.00 29.3.77 Yes

74 Achhalia-Ukai(Th) Line-3 AC S/C 220kV 84.00 26.10.69 Yes

75 Achhalia-Ukai(Hy) Line-1 AC D/C 220kV 83.00 30.8.69 Yes

76 Achhalia-Ukai(Hy) Line-2 AC D/C 220kV 83.00 29.10.98 Yes

77 Zagadia-Jambuva AC S/C 220kV 61.50 10.2.99 Yes

78 Zagadia-Mangrol Line-1 AC D/C 220kV 30.00 18.2.97 Yes

79 Zagadia-Mangrol Line-2 AC D/C 220kV 30.00 18-2-97 Yes

80 Zagadia-RMGL AC S/C 220kV 0.30 18-2-97 Yes

81 Karamsad - GPEC 1 AC D/C 220kV 99.00 28.01.99 Yes

82 Karamsad - GPEC 2 AC D/C 220kV 99.00 28.01.100 Yes

83 Jambuva - Karamsad 1 AC D/C 220kV 48.42 10/26/1969 Yes

84 Jambuva - Karamsad 2 AC D/C 220kV 48.42 10/26/1969 Yes

85 Jambuva - Waghodia AC S/C 220kV 26.32 9/9/1978 Yes

86 Godhra-Wanakbori AC S/C 220kV 35.00 2/21/1979 Yes86 Godhra-Wanakbori AC S/C 220kV 35.00 2/21/1979 Yes

87 Godhra-Chandrapura 1 AC D/C 220kV 35.00 5/1/1989 Yes

88 Godhra-Chandrapura 2 AC D/C 220kV 35.00 5/1/1989 Yes

89 Godhra-Kadana 1 AC D/C 220kV 80.00 7/18/1984 Yes

90 Godhra-Kadana 2 AC D/C 220kV 80.00 7/18/1984 Yes

91 Chandrapura-P.M.Steel AC S/C 220kV 9.00 1997 Yes

92 Karamsad - Salejada AC S/C 220kV 76.80 22.01.76 Yes

93 Karamsad-Ranasan 1 AC D/C 220kV 71.44 22.09.76 Yes

94 Karamsad-Ranasan 2 AC D/C 220kV 71.44 22.09.76 Yes

95 Karamsad-Kasor 1 AC D/C 220kV 12.00 28.06.97 Yes

96 Karamsad-Kasor 2 AC D/C 220kV 12.00 28.06.97 Yes

97 Karamsad-Kasor 3 AC S/C 220kV 12.50 28.05.97 Yes

98 Karamsad-Vartej AC S/C 220kV 191.20 10.05.78 Yes

99 Kasor-Vartej AC S/C 220kV 178.00 1977 Yes

100 Jambuva - Asoj AC S/C 220kV 24.50 1/2/1979 Yes

101 Waghodia - Asoj AC S/C 220kV 32.00 7/24/1993 Yes

102 Chandrapura-Asoj 1 AC D/C 220kV 32.00 1/5/1989 Yes

103 Chandrapura-Asoj 2 AC D/C 220kV 32.00 1/5/1989 Yes

104 Karamsad - Asoj 1 AC D/C 220kV 43.00 22.01.76 Yes

105 Karamsad - Asoj 2 AC D/C 220kV 43.00 22.01.76 Yes

106 Asoj-Wanakbori 1 AC D/C 220kV 63.00 25-7-85 Yes

107 Asoj-Wanakbori 2 AC D/C 220kV 63.00 15-9-83 Yes

108 Chorania-Dhrangadhra-1 AC D/C 220kV 65 22/02/1997 Yes

109 Chorania-Dhrangadhra-2 AC D/C 220kV 65 16/04/1991 Yes

110 Chorania-Gondal AC S/C 220kV 153 21/1/1976 Yes

111 Chorania-Limbdi-1 AC D/C 220kV 3.5 9/2/1995 Yes

112 Chorania-Limbdi-2 AC D/C 220kV 3.5 15/10/1994 Yes

113 Chorania-Viramgam AC S/C 220kV 72 7/6/1987 Yes

114 Dhrangadhra-Halwad AC S/C 220kV 27.11 30/05/1997 Yes

115 Dhrangadhra-Morbi AC S/C 220kV 68 30/05/1997 Yes

116 Halwad-Morbi AC S/C 220kV 43.14 10/4/2004 Yes

117 Kapadwanj-Ranasan AC S/C 220kV 63.52 18/03/1993 Yes

118 Khanpur-AECo.-1 AC D/C 220kV 30.69 1/8/1999 Yes

119 Khanpur-AECo.-2 AC D/C 220kV 30.69 1/8/1999 Yes

120 Khanpur-Kapadwanj-1 AC D/C 220kV 39.77 23/07/1998 Yes

121 Khanpur-Kapadwanj-2 AC D/C 220kV 39.77 23/07/1998 Yes

122 Khanpur-PGCL-1 AC D/C 220kV 11.77 16/12/1994 Yes

123 Khanpur-PGCL-2 AC D/C 220kV 11.77 16/12/1994 Yes

124 Ranasan-Gandhinagar-1 AC D/C 220kV 19.83 21/09/1976 Yes124 Ranasan-Gandhinagar-1 AC D/C 220kV 19.83 21/09/1976 Yes

125 Ranasan-Gandhinagar-2 AC D/C 220kV 19.83 15/11/1975 Yes

126 Ranasan-PGCL-1 AC D/C 220kV 19.63 16/12/1994 Yes

127 Ranasan-PGCL-2 AC D/C 220kV 19.63 16/6/1995 Yes

128 Ranasan-Wanakbori AC S/C 220kV 69.7 18/03/1982 Yes

129 Salejada-Chorania AC S/C 220kV 66.85 10/3/1998 Yes

130 Viramgam-Dhanki-1 AC D/C 220kV 30.45 17/01/2006 Yes

105

Page 6: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

131 Viramgam-Dhanki-2 AC D/C 220kV 30.45 17/01/2006 Yes

132 Wanakbori-Kapadwanj AC S/C 220kV 35.76 18/09/1993 Yes

133 220 D/C Salejada-Bhat 1 & 2 AC D/C 220 KV 26.30 19.6.10 Yes

134 220 D/C Viramgam- NANO D/C AC D/C 220 KV 26.84 27.10.09 Yes

135 220 kv Chorania - Bala D/C AC D/C 220 KV 59.12 17.04.09 Yes

136 220 KV Dhanki - Bala AC

S/C on D/C

Tower220 KV 15.00 22.10.09 Yes

137 220 KV Adalsar - Bala AC

S/C on D/C

Tower220 KV 11.00 22.10.09 Yes

138 220 KV Bala - Rajpar AC

S/C on D/C

Tower220 KV 5.50 20.10.09 Yes

139 220 KV Rajpar - Dudhrej AC

S/C on D/C

Tower220 KV 9.58 20.10.09 Yes

140 220 KV Bala - Dudhrej Line AC

S/C on D/C

Tower220 KV 15.03 20.10.09 Yes

141 220 Kv Viramgam - Bhat line D/C AC D/C 220 KV 71.48 29.05.10 Yes

142 220 Kv Viramgam - Bhat line No:

2AC D/C 220 KV 71.48 29.05.10 Yes

143 Agiol-Vijapur AC S/C 220kV 35.20 17-1-92 Yes

144 Chhatral-Viramgam AC S/C 220kV 56.00 28-1-04 Yes

145 Dhansura-Agiol-1 AC S/C 220kV 33.41 08/08/90 Yes

146 Dhansura-Agiol-2 AC D/C 220kV 35.20 28-9-00 Yes

147 G'nagar-Chhatral-1 AC S/C 220kV 27.30 25-3-78 Yes

148 G'nagar-Chhatral-2 AC S/C 220kV 27.30 15-5-84 Yes

149 G'nagar-Jamla-1 AC D/C 220kV 22.50 21-8-98 Yes

150 G'nagar-Jamla-2 AC D/C 220kV 22.50 21-8-98 Yes

151 G'nagar-Mehsana-1 AC D/C 220kV 52.00 30-3-79 Yes

152 G'nagar-Mehsana-2 AC D/C 220kV 52.00 18-5-94 Yes

153 G'nagar-Soja-1 AC S/C 220kV 16.00 26-11-86 Yes

154 G'nagar-Soja-2 AC S/C 220kV 16.00 26-11-86 Yes

155 Jamla-Kheralu-1 AC D/C 220kV 62.00 26-8-98 Yes

156 Jamla-Kheralu-2 AC D/C 220kV 62.00 26-8-98 Yes

157 Kadana-Dhansura-1 AC D/C 220kV 75.60 9/6/84 Yes157 Kadana-Dhansura-1 AC D/C 220kV 75.60 9/6/84 Yes

158 Kadana-Dhansura-2 AC D/C 220kV 75.60 24-12-91 Yes

159 Mehsana-Radhanpur AC S/C 220kV 95.00 31-3-79 Yes

160 Mehsana-Sankhari AC S/C 220kV 48.20 30-3-79 Yes

161 Mitha-Sankhri - 1 AC D/C 220kV 33.06 20-8-02 Yes

162 Mitha-Sankhri - 2 AC D/C 220kV 33.06 14-9-02 Yes

163 Mitha-Santhal AC S/C 220kV 9.00 29-9-96 Yes

164 Soja-Mitha AC D/C 220kV 45.80 29-9-96 Yes

165 Vadavi-Mitha AC D/C 220kV 43.37 11/5/2007 Yes

166 Soja-Jamla-1 AC D/C 220kV 3.50 30-3-95 Yes

167 Soja-Jamla-2 AC D/C 220kV 3.50 23-2-98 Yes

168 Soja-Mehsana-1 AC S/C 220kV 34.00 25-11-78 Yes

169 Soja-Mehsana-2 AC S/C 220kV 36.00 24-11-78 Yes

170 Soja-Santhal-1 AC S/C 220kV 37.00 29-9-96 Yes

171 Soja-Vijapur-1 AC D/C 220kV 27.5 21-3-87 Yes

172 Soja-Vijapur-2 AC D/C 220kV 27.5 11/01/91 Yes

173 W'bori-Dhansura-1 AC D/C 220kV 58.90 26-4-91 Yes

174 W'bori-Dhansura-2 AC D/C 220kV 58.90 13-10-92 Yes

175 Agiyol-Bhutiya-1 AC D/C 220kV 35.60 30-10-04 Yes

176 Agiyol-Bhutiya-2 AC D/C 220kV 35.60 30-10-04 Yes

177 Deodar-Anjar AC S/C 220kV 230 31.1.89 Yes

178 Kansari-Deodar-1 AC D/C 220kV 53 17.6.01 Yes

179 Kansari-Deodar-2 AC D/C 220kV 53 5.7.01 Yes

180 Kansari-Tharad-1 AC D/C 220kV 60 27.2.98 Yes

181 Kansari-Tharad-2 AC D/C 220kV 60 21.10.2000 Yes

182 Kheralu-Palanpur-1 AC D/C 220kV 43 26.12.88 Yes

183 Kheralu-Palanpur-2 AC D/C 220kV 43 24.3.095 Yes

184 Palanpur-Kansari-1 AC D/C 220kV 40 16.8.91 Yes

185 Palanpur-Kansari-2 AC D/C 220kV 40 2.11.95 Yes

186 Sankhari-Shivlakha AC S/C 220kV 185 14.8.95 Yes

187 Kansari-Jangral-1 AC D/C 220kV 37 16.9.03 Yes

188 Kansari-Jangral-2 AC D/C 220kV 37 16.9.03 Yes

189 Radhanpur-Deodar AC D/C 220kV 35 12.8.05 Yes

190 Kansari-Thavar AC D/C 220kV 28 18.1.06 Yes

191 Amreli-Dhasa line no.I AC D/C 220kV 15 30/01/99 Yes

192 Amreli-Dhasa line no.II AC D/C 220kV 15 30/01/99 Yes

193 Savarkundla-Visavader AC S/C 220kV 94.6 30/11/83 Yes

194 Savarkundla-Vartej AC S/C 220kV 94.6 7/7/1981 Yes

195 Savarkundla-Sagapara AC S/C 220kV 78 29/1/99 Yes195 Savarkundla-Sagapara AC S/C 220kV 78 29/1/99 Yes

196 Savarkundla-Dhokdwa AC S/C 220kV 65 8/2/1994 Yes

197 Savarkundla-Amreli-No.01 AC D/C 220kV 40.1 29/1/99 Yes

198 Savarkundla-Amreli-No.02 AC D/C 220kV 40.1 3/8/2000 Yes

199 Savarkundla-Otha No. 01 AC D/C 220kV 59 8/11/2001 Yes

200 Savarkundla-Otha No. 02 AC D/C 220kV 59 31/3/00 Yes

201 Savarkundla-Kovaya No 01 AC D/C 220kV 51 30/7/95 Yes

106

Page 7: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

202 Savarkundla-Kovaya No 02 AC D/C 220kV 51 30/7/95 Yes

203 Vartej - Sagapara AC S/C 220kV 38.6 2/7/1999 Yes

204 Dhokadva-Timbdi AC S/C 220kV 63 22/11/98 Yes

205 Jetpur-Gondal AC D/C 220kV 26 27.04.83 Yes

206 Gondal-Rajkot AC D/C 220kV 52 19.12.81 Yes

207 Jetpur-Rajkot AC D/C 220kV 76 27.04.83 Yes

208 Jetpur-Visavadar AC S/C 220kV 51.55 02.05.95 Yes

209 Jetpur-Keshod AC S/C 220kV 74.33 22.12.93 Yes

210 Jetpur-Sardargadh AC S/C 220kV 65 20.12.88 Yes

211 Jetpur-Ranavav AC S/C 220kV 104 27.10.83 Yes

212 Jetpur-Motipaneli AC S/C 220kV 76 27.10.83 Yes

213 Jetpur-Jamnagar-I AC D/C 220kV 92 30.09.95 Yes

214 Jamnagar-Essar-1 AC D/C 220kV 47.5 09.03.06 Yes

215 Jamnagar-Essar-2 AC D/C 220kV 47.5 09.03.06 Yes

216 Jetpur-Jamnagar-II AC D/C 220kV 92 30.09.95 Yes

217 Motipaneli-Ranavav AC S/C 220kV 64 4/7/1998 Yes

218 Sardargadh-Keshod AC S/C 220kV 69 12/18/1997 Yes

219 Keshod Timbadi AC S/C 220kV 66 1/9/1989 Yes

220 Motipaneli-Sadodar (Windfarm) AC D/C 220kV 26.82 10/25/2008 Yes

221 Nakhatrana - Akrimota No.1 AC S/C 220kV 99 2/18/2004 Yes

222 Nakhatrana - Akrimota No.2 AC S/C 220kV 99 2/18/2004 Yes

223 Anjar - Panandhro No. 1 AC S/C 220kV 152.17 21.12.87 Yes

224 Anjar - Panandhro No. 2 AC S/C 220kV 152.17 21.12.87 Yes

225 Morbi - Shivlakha (Chitrod) AC S/C 220kV 73 2/17/2004 Yes

226 Shivlakha - Tappar (Lilo) AC S/C 220kV 1.475 Jan-08 Yes

227 Shivlakha - Nanikhakhar (Lilo) AC S/C 220kV 1.275 Jan-08 Yes

228 Nakhatrana - Nanikhakhar-1 AC S/C 220kV 59 12/30/1997 Yes

229 Nakhatrana - Nanikhakhar-2 AC S/C 220kV 59 12/30/1997 Yes

230 Pandhro - Nakhatrana No. 1 AC S/C 220kV 75 21.1.97 Yes

231 Pandhro - Nakhatrana No. 2 AC S/C 220kV 75 21.1.97 Yes

232 Anjar - Shivlakha (Chitrod) AC S/C 220kV 71 30/07/74 Yes

233 Nanikhakhar-Chitrod No. 1 AC S/C 220kV 140 3/4/2004 Yes

234 Nanikhakhar-Chitrod No. 2 AC S/C 220kV 140 3/4/2004 Yes

235 Hadala-Nyara-1 AC S/C 220kV 12.11 8/16/2007 Yes

236 Hadala-Nyara-2 AC S/C 220kV 12.11 8/16/2007 Yes236 Hadala-Nyara-2 AC S/C 220kV 12.11 8/16/2007 Yes

237 Suthari-Sindhodi AC S/C 220kV 13.84 9/30/2007 Yes

238 Nanikhakhar-M/s Adani Power Ltd.AC D/C 220kV 16.2 2008 Yes

239 220KV Nani Khakhar-APL Line-1 AC S/C 220 KV 16.25 22.04.2009 Yes

240 220KV Anjar-Panandhro -1 Line

LILO to 220KV Kukma S/SAC S/C 220 KV 5.16 22.12.2009 Yes

241 220KV Mundra(Adani) -Tappar

Line No:1 AC S/C 220 KV 82.16 26.01.2010 Yes

242 220KV Mundra(Adani) -Tappar

Line No:2 AC S/C 220 KV 82.16 26.01.2010 Yes

243 220KV Shivlakha-Wandhiya Line-

1AC S/C 220 KV 21.65 13.03.2010 Yes

244 220KV Shivlakha-Wandhiya Line-

2AC S/C 220 KV 21.65 13.03.2010 Yes

245 220 KV Tappar - Morbi AC S/C 220 KV 34.06 04.04.2010 Yes

246 220 KV Tappar - Hadala AC S/C 220 KV 34.06 04.04.2010 Yes

1 Navsari-Bhestan-1 AC S/C 132kV 26 22.01.72 Yes

2 Navsari-Bhestan-2 AC S/C 132kV 27 22.12.83 Yes

3 Navsari-Atul AC D/C 132kV 48.12 22.10.72 Yes

4 Atul-Railways - 1 AC D/C 132kV 4.4 04.08.74 Yes

5 Atul-Railways - 2 AC D/C 132kV 4.4 04.08.74 Yes

6 Bhestan-Rly.-1 AC D/C 132kV 2.4 13.2.79 Yes

7 Bhestan-Rly.-2 AC D/C 132kV 2.4 13.9.80 Yes

8 Achhalia-Ankleshwar Line-1 AC D/C 132kV 35.00 16.1.79 Yes

9 Achhalia-Ankleshwar Line-2 AC D/C 132kV 35.00 19.3.81 Yes

10 Achhalia–GNFC Line-1 AC D/C 132kV 36.00 1.4.91 Yes

11 Achhalia–GNFC Line-2 AC D/C 132kV 36.00 11.2.89 Yes

12 Achhalia–Valia Line-1 AC D/C 132kV 26.00 25.11.96 Yes

13 Achhalia-Valia Line-2 AC D/C 132kV 26.00 11.2.90 Yes

14 Achhalia-RPL 1 AC D/C 132kV 7.20 27.03.1980 Yes

15 Achhalia-RPL 2 AC D/C 132kV 7.20 6.03.1978 Yes

16 Bharuch-Ankleshwar Line-1 AC D/C 132kV 12.00 15.07.1973 Yes

17 Bharuch-Ankleshwar Line-2 AC D/C 132kV 12.00 15.07.1973 Yes

18 Bharuch–Railway Line-1 AC D/C 132kV 1.20 12.12.1995 Yes

19 Bharuch–Railway Line-2 AC D/C 132kV 1.20 15.06.1989 Yes

20 Haldarwa–Bharuch AC S/C 132kV 8.70 28.09.1992 Yes

21 Haldarwa–Karjan AC S/C 132kV 35.36 28.09.1992 Yes

132KV LINES

21 Haldarwa–Karjan AC S/C 132kV 35.36 28.09.1992 Yes

22 Valia–Guj. Gardian Line-1 AC D/C 132kV 10.00 28-9-92 Yes

23 Valia–Guj. Gardian Line-2 AC D/C 132kV 10.00 28-9-92 Yes

24 Jambuva -Gotri 1 AC D/C 132kV 12.86 11/29/1976 Yes

25 Jambuva -Gotri 2 AC D/C 132kV 12.86 11/29/1976 Yes

26 Jambuva -J'nagar 1 AC D/C 132kV 37.00 1/15/1973 Yes

27 Jambuva -J'nagar 2 AC D/C 132kV 37.00 1/15/1973 Yes

107

Page 8: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

28 Jambuva- Rly 1 AC D/C 132kV 2.20 3/25/1976 Yes

29 Jambuva- Rly 2 AC D/C 132kV 2.20 3/25/1976 Yes

30 Jambuva-Karjan AC S/C 132kV 20.76 6/16/1975 Yes

31 Jambuva- Tilakwada AC S/C 132kV 52.50 3/27/1998 Yes

32 Jambuva-Mordern Petro 1 AC D/C 132kV 12.50 8/3/1995 Yes

33 Jambuva-Mordern Petro 2 AC D/C 132kV 12.50 8/3/1995 Yes

34 Dhuvaran-Gotri 1 AC D/C 132kV 46.50 7/25/1964 Yes

35 Dhuvaran-Gotri 2 AC D/C 132kV 46.50 7/25/1964 Yes

36 Gotri-F'nagar 1 AC D/C 132kV 10.23 11/30/1968 Yes

37 Gotri-F'nagar 2 AC D/C 132kV 10.23 11/30/1968 Yes

38 Karjan-Inox AC S/C 132kV 1.00 3/31/1994 Yes

39 Karjan- JCT AC S/C 132kV 6.50 5/9/1959 Yes

40 Godhra-Dahod AC S/C 132kV 65.43 1/18/1983 Yes

41 Godhra - C'udepur (Vasedi) AC S/C 132kV 76.60 12/11/1973 Yes

42 Godhra- Western Rly 1 AC D/C 132kV 7.00 4/30/1984 Yes

43 Godhra- Western Rly 2 AC D/C 132kV 7.00 4/30/1984 Yes

44 Dahod -Western Rly 1 AC D/C 132kV 2.85 9/24/1983 Yes

45 Dahod -Western Rly 2 AC D/C 132kV 2.85 9/24/1983 Yes

46 Karamsad-Dhuvaran 1 AC D/C 132kV 41.20 30.05.71 Yes

47 Karamsad-Dhuvaran 2 AC D/C 132kV 41.20 30.05.71 Yes

48 Karamsad - Nadiad AC S/C 132kV 27.15 15.06.74 Yes

49 Karamsad -Ode AC S/C 132kV 36.00 20.12.84 Yes

50 Ode - Anand Rly 1 AC D/C 132kV 17.30 20.12.84 Yes

51 Ode - Anand Rly 2 AC D/C 132kV 17.30 20.12.84 Yes

52 Dhuvaran-Undel AC S/C 132kV 15.60 05.07.97 Yes

53 F'nagar - J'nagar 1 AC D/C 132kV 7.10 31.7.84 Yes

54 F'nagar - J'nagar 2 AC D/C 132kV 7.10 31.7.84 Yes

55 F'nagar - GSFC 1 AC D/C 132kV 0.44 14.3.91 Yes

56 F'nagar - GSFC 2 AC D/C 132kV 0.22 14.3.91 Yes

57 Nandesari-GIPCL-1 AC D/C 132kV 1.80 13-2-91 Yes

58 Nandesari-GIPCL-2 AC D/C 132kV 1.80 3/2/1991 Yes

59 Jawaharnagar-GIPCL-3 AC D/C 132kV 8.80 18-2-97 Yes

60 Jawaharnagar-GIPCL-4 AC D/C 132kV 8.80 18-2-97 Yes

61 Manajusar-Nirma-1 AC D/C 132kV 5.47 14-2-98 Yes

62 Manajusar-Nirma-2 AC D/C 132kV 5.47 30-8-97 Yes62 Manajusar-Nirma-2 AC D/C 132kV 5.47 30-8-97 Yes

63 Asoj-F'nagar 1 AC D/C 132kV 12.00 31.7.84 Yes

64 Asoj-F'nagar 2 AC D/C 132kV 12.00 31.7.84 Yes

65 Asoj-Nandesari 1 AC D/C 132kV 19.00 24.7.82 Yes

66 Asoj-Nandesari 2 AC D/C 132kV 19.00 24.7.82 Yes

67 Asoj-Manjusar-1 AC D/C 132kV 10.00 20-8-97 Yes

68 Asoj-Manjusar-2 AC D/C 132kV 10.00 20-8-97 Yes

69 Asoj-Samlaya(Railway)-1 AC D/C 132kV 14.00 18-2-85 Yes

70 Asoj-Samlaya(Railway)-2 AC D/C 132kV 14.00 18-2-85 Yes

71 CCPP-Limbdi-1 AC D/C 132kV 0.22 18/11/1970 Yes

72 CCPP-Limbdi--2 AC D/C 132kV 138 18/11/1970 Yes

73 Chiloda-G'nagar-1 AC D/C 132kV 9.43 10/1/1995 Yes

74 Chiloda-G'nagar-2 AC D/C 132kV 9.43 10/1/1995 Yes

75 Chiloda-Talod AC S/C 132kV 26.92 9/12/1974 Yes

76 Dhandhuka-Barwala AC S/C 132kV 46.5 20/01/1973 Yes

77 Dhuvaran-Dhandhuka-1 AC D/C 132kV 95.6 20/01/1973 Yes

78 Dhuvaran-Dhandhuka-2 AC S/C 132kV 95.6 20/01/1973 Yes

79 Dhuvaran-Vatva-1 AC D/C 132kV 83.59 8/1/1965 Yes

80 Dhuvaran-Vatva-2 AC D/C 132kV 83.59 8/1/1965 Yes

81 Limbdi-Sitagadh AC S/C 132kV 54.46 18/04/1970 Yes

82 Limbdi-Wankaner AC S/C 132kV 106 18/04/1970 Yes

83 Mehmedabad W Rly. I AC D/C 132kV 2.14 6/3/1973 Yes

84 Mehmedabad W Rly.-II AC D/C 132kV 2.14 6/3/1973 Yes

85 Nadiad-Mehmedabad AC S/C 132kV 11.5 15/12/1969 Yes

86 Ranasan-Chiloda AC S/C 132kV 15.33 9/12/1974 Yes

87 Ranasan-PRL AC S/C 132kV 5.8 18/11/1986 Yes

88 Ranasan-S'mati-1 AC D/C 132kV 13.2 29/12/1969 Yes

89 Ranasan-S'mati-2 AC D/C 132kV 13.2 29/12/1969 Yes

90 Ranasan-Talod AC S/C 132kV 37.56 9/12/1974 Yes

91 Ranasan-Vatva-1 AC D/C 132kV 26.56 23/11/1969 Yes

92 Ranasan-Vatva-2 AC D/C 132kV 26.56 6/11/1969 Yes

93 Ranasan-Vijapur-Idar AC S/C 132kV 93.86 7/12/1973 Yes

94 Sabarmati-AECo.1 AC D/C 132kV 0.2 7/6/1986 Yes

95 Sabarmati-AECo.2 AC D/C 132kV 0.2 7/6/1986 Yes

96 Sitagadh-Maradia-Chem.-1 AC D/C 132kV 0.75 PDC Yes

97 Sitagadh-Maradia-Chem.-2 AC D/C 132kV 0.75 PDC Yes

98 Sitagadh-Wankaner AC S/C 132kV 41.3 30/10/1992 Yes

99 Vatva-Mehmedabad AC S/C 132kV 23.56 15/12/1971 Yes

100 Mehsana-Sidhpur-1 AC S/C 132kV 48.00 29-11-99 Yes100 Mehsana-Sidhpur-1 AC S/C 132kV 48.00 29-11-99 Yes

101 Mehsana-Sidhpur-2 AC S/C 132kV 35.00 25-1-80 Yes

102 Mehsana-Patan-1 AC D/C 132kV 35.00 08/11/95 Yes

103 Mehsana-Patan-2 AC D/C 132kV 35.00 08/11/95 Yes

104 Mehsana-Visnagar AC S/C 132kV 20.50 03/11/91 Yes

105 Agiol-Talod AC S/C 132kV 32.00 06/08/98 Yes

106 Agiol-Idar AC S/C 132kV 32.00 03/08/98 Yes

108

Page 9: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

107 Idar-Vijapur AC S/C 132kV 33.00 07/02/88 Yes

108 Vijapur-Visnagar AC S/C 132kV 28.00 19-9-69 Yes

109 Sidhpur-Deesa AC D/C 132kV 42 26-8-80 Yes

110 Barwala-Vallabhipur Line AC S/C 132kV 38 1971 Yes

111 Junagadh- Talala AC S/C 132kV 52.24 16/3/70 Yes

112 Haripur-Talala AC S/C 132kV 11 19/10/78 Yes

113 Timbdi-Talala No.1 AC D/C 132kV 22 16/12/96 Yes

114 Timbdi-Talala No.2 AC D/C 132kV 22 24/1/93 Yes

115 Timbdi-Ambuja No.1 AC D/C 132kV 12 22/12/92 Yes

116 Timbdi-Ambuja No.2 AC D/C 132kV 12 17/2/98 Yes

117 Timbdi-CCGL AC S/C 132kV 10 30/12/92 Yes

118 Vikram-Nyara AC S/C on D/C 132kV 33 03.03.00 Yes

119 Vikram-Vajdi AC S/C on D/C 132kV 18 28.08.99 Yes

120 Nyara-Vajdi AC S/C on D/C 132kV 15 03.03.02 Yes

121 Vikram-Dhandhuka AC S/C on D/C 132kV 181 06.07.88 Yes

122 Gondal-Jasdan AC S/C 132kV 50 15.04.65 Yes

123 Gondal-Vikram AC D/C 132kV 39 15.04.65 Yes

124 Gondal-Bhayavadar AC S/C 132kV 85.5 25.03.86 Yes

125 Jasdan-Dhanduka AC D/C 132kV 106 15.04.65 Yes

126 Gondal- Haripur AC S/C 132kV 100 19/10/78 Yes

127 Gondal-Dhoraji-Junagadh AC S/C 132kV 85.5 16.03.70 Yes

128 Jamnagar-Wankaner AC D/C 132kV 97 19.02.71 Yes

129 Jamnagar-Naghedi-I AC S/C+ D/C 132kV 12 31.01.71 Yes

130 Jamnagar-Naghedi-II AC S/C+ D/C 132kV 12 31.01.71 Yes

131 Sikka-Jamnagar I AC D/C 132kV 27 07.07.96 Yes

132 Sikka-Jamnagar II AC D/C 132kV 27 07.07.96 Yes

133 Sikka-Jamnagar III [1] AC S/C+ D/C 132kV 55 1992 Yes

134 Jamnagar-Dhrol [2] AC D/C 132kV 35 1971 Yes

135 Sikka-Naghedi AC S/C 132kV 30 31.01.71 Yes

136 Jamnagar-Khambhalia AC S/C 132kV 64 30.12.02 Yes

137 Khambhalia-Bhatia AC S/C 132kV 43 11.03.92 Yes

138 Sikka-Bhatia AC S/C 132kV 78.6 30.07.02 Yes

139 Bhatia-Enercon AC S/C 132kV 8.12 07.02.05 Yes

140 Wankaner Lalpar AC S/C 132kV 25 06.05.71 Yes

141 Wankaner Dhrol AC D/C 132kV 68 30.01.71 Yes141 Wankaner Dhrol AC D/C 132kV 68 30.01.71 Yes

142 Bhayavadar-Ranavav AC S/C 132kV 90 3/6/1997 Yes

143 SC&CI I AC D/C 132kV 0.5 3/7/1988 Yes

144 SC&CI II AC D/C 132kV 0.5 1/6/1989 Yes

145 Sikka-Ranavav AC S/C 132kV 103 9/4/2004 Yes

146 Anjar - Bhuj No- 1 AC S/C 132kV 40 5/6/1971 Yes

147 Anjar - Bhuj No- 2 AC S/C 132kV 40 6/21/1985 Yes

148 Anjar - Samakhiyali AC S/C 132kV 60 5/6/1971 Yes

149 Samkhiyali - Shikarpur AC S/C 132kV 22 2/8/2004 Yes

150 Lalpar - Samakhiyali AC S/C 132kV 81 5/6/1971 Yes

1 Navsari-Navsari AC S/C 66kV 0.05 14.01.69 Yes

2 Navsari-City -Chapra (UG) AC S/C 66kV 2.3 8/9/2008 Yes

3 Navsari-Godadra 1 AC D/C 66kV 35.2 14.02.69 Yes

4 Navsari-Godadra 2 AC D/C 66kV 35.2 14.02.69 Yes

5 Navsari- Eroo 1 AC D/C 66kV 5.85 15.08.72 Yes

6 Navsari- Eroo 2 AC D/C 66kV 5.85 15.08.72 Yes

7 Navsari-Bilimora-2 AC D/C 66kV 26 12.12.68 Yes

8 Navsari-Tata SSL. AC S/C 66kV 3 28.02.83 Yes

9 Navsari-Gandevi-1 AC S/C 66kV 20 17.12.52 Yes

10 Maroli-Sachin AC S/C 66kV 6.94 1994 Yes

11 Ambheta-Bilimora AC S/C 66kV 10 14.02.66 Yes

12 Ambheta-Chikhli AC S/C 66kV 2.5 19.02.66 Yes

13 Bilimora-Dungri AC D/C 66kV 18 26.05.00 Yes

14 Dungri-Atakpardi AC D/C 66kV 10 26.05.00 Yes

15 Chihkli-Tankal AC D/C 66kV 16.5 19.02.66 Yes

16 Tankal-Anaval AC D/C 66kV 21.2 19.02.66 Yes

17 Chikhli-Khergam AC S/C 66kV 68.79 14.03.94 Yes

18 Anaval-Dolvan AC S/C 66kV 12.6 16.01.90 Yes

19 Anaval-Vansda AC S/C 66kV 20.4 19.02.66 Yes

20 Vansda-Waghai AC S/C 66kV 21.2 19.02.66 Yes

21 Waghai-Ahwa AC S/C 66kV 26.6 27.02.99 Yes

22 Valod-Dolvan AC S/C 66kV 21.67 04.07.04 Yes

23 Tap line from Navsaro-Godadra

to Maroli line

ACS/C

66kV2.1

31.03.90 Yes

24 Bilimora-Gandevi 1 AC S/C 66kV 6 12.12.68 Yes

25 Gandevi - Amalsad AC S/C 66kV 8.7 02.09.02 Yes

66KV LINES

25 Gandevi - Amalsad AC S/C 66kV 8.7 02.09.02 Yes

26 Vapi-Atul 1 AC S/C 66kV 22 17.12.52 Yes

27 Vapi-Khadki AC S/C 66kV 10 29.04.80 Yes

28 Khadki-Atul AC S/C 66kV 12 29.04.80 Yes

29 Vapi-GIDC-1 AC D/C 66kV 3.5 29.04.80 Yes

30 Vapi-GIDC-2 AC D/C 66kV 3.5 29.04.80 Yes

31 Vapi-3RD Ph. AC S/C 66kV 8.2 10.03.84 Yes

109

Page 10: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

32 Vapi-Sarigam AC S/C 66kV 21.5 14.10.80 Yes

33 Vapi-Damanganga AC S/C 66kV 6 23.01.93 Yes

34 Vapi-Kachigam(UT) AC S/C 66kV 8 06.03.86 Yes

35 Vapi-Dabhel(UT) AC S/C 66kV 10 15.12.93 Yes

36 Vapi-IVTH Pahse AC S/C 66kV 8.8 06.03.86 Yes

37 Vapi Ph IV-Dadra(UT) AC S/C 66kV 5.2 26.03.86 Yes

38 Atul-Atak Pardi 1 AC D/C 66kV 9 1968 Yes

39 Atul-Atak Pardi 2 AC D/C 66kV 9 1968 Yes

40 Atul- Valsad 3 AC S/C 66kV 14.5 04.06.97 Yes

41 Atul - Atul Product 1 AC D/C 66kV 1.84 26.3.73 Yes

42 Atul - Atul Product 2 AC D/C 66kV 1.84 26.3.73 Yes

43 Atakpardi-Dharampur AC S/C 66kV 22 15.03.93 Yes

44 Vapi-DGPM AC S/C 66kV 13.65 18.11.97 Yes

45 Vapi- to Kakadkoper AC S/C 66kV 20.45 28.11.99 Yes

46 Kakadkoper-Kaprada AC S/C 66kV 15 16.06.00 Yes

47 Damanganga-Sarigam AC S/C 66kV 16 25.01.93 Yes

48 Bhilad-Sarigam AC D/C 66kV 7 01.09.94 Yes

49 Srigam-Umargam AC S/C 66kV 22 23.04.69 Yes

50 Bhilad-Silvassa 1(UT) AC S/C 66kV 13.5 01.09.94 Yes

51 Bhilad-Silvassa 2(UT) AC S/C 66kV 19 004.06.96 Yes

52 Bhilad-Silvassa 3(UT) AC S/C 66kV 15 13.10.00 Yes

53 Bhilad-Sanjan AC S/C 66kV 17.74 01.09.95 Yes

54 Sanjan-Umergam AC S/C 66kV 9.52 01.09.95 Yes

55 Vav-Jolva AC S/C 66kV 14.5 19.01.80 Yes

56 Vav-BRC AC S/C 66kV 20 15.04.91 Yes

57 Vav-S.E.CO.-ESTN. 1 AC D/C 66kV 17 03.09.93 Yes

58 Vav-S.E.CO.-ESTN. 2 AC D/C 66kV 17 03.09.93 Yes

59 Tap line - Sanjan AC S/C 66kV 3.17 15-6-04 Yes

60 3 RD Phase 4Th Phase AC S/C 66kV 0.79 10.06.05 Yes

61 Vav - Kamrej AC S/C 66kV 5.5 04.07.89 Yes

62 Vav - S.E.CO.-C STN. 1 AC S/C 66kV 16 01.07.80 Yes

63 Vav - S.E.CO.-C STN. 2 AC S/C 66kV 16 01.07.80 Yes

64 Vav - Sachin A AC S/C 66kV 20 27.03.85 Yes

65 Vav-Puna AC S/C on D/C 66kV 15.47 06.07.96 Yes

66 Puna-Vanz AC S/C 66kV 31.18 29.04.04 Yes66 Puna-Vanz AC S/C 66kV 31.18 29.04.04 Yes

67 Vanz-Sachin AC S/C 66kV 7.25 29.04.04 Yes

68 Van-Sarthana AC D/C 66kV 8.765 11.10.02 Yes

69 Vav- Tapi 1 AC D/C 66kV 12 03.07.91 Yes

70 Vav- Tapi 2 AC D/C 66kV 12 03.07.91 Yes

71 Vav- Tapi 3 AC D/C 66kV 13 03.09.80 Yes

72 Vav- Tapi 4 AC D/C 66kV 13 03.09.80 Yes

73 Mota-Mahuva AC S/C 66kV 19 17.05.85 Yes

74 Mahuva-Bamania AC S/C 66kV 15.4 7/13/2007 Yes

75 Mota-Bardoli AC S/C 66kV 9 09.08.03 Yes

76 Ukai(HY)Songadh-Uchhal AC S/C 66kV 25.8 05.01.72 Yes

77 Ukai(HY)-Ukai Songadh-1 AC D/C 66kV 5.65 01.01.04 Yes

78 Ukai(HY)- Songadh-2 AC D/C 66kV 5.65 01.01.04 Yes

79 Uchhal-Nizar AC S/C 66kV 60 05.01.72 Yes

80 Songadh-Vyara AC S/C 66kV 30.8 1965 Yes

81 Songadh-CPM AC S/C 66kV 0.7 02.06.94 Yes

82 Kadodra-Palsana AC S/C 66kV 10 15.12.95 Yes

83 Vav-Laskana-Utran-Kribhco-1 AC S/C 66kV 37.1 14.04.84 Yes

84 Vav-Laskana-Utran-2 AC S/C 66kV 37.1 14.04.84 Yes

85 Vav-Kadodra 1 AC D/C 66kV 9 01.09.75 Yes

86 Vav-Kadodra 2 AC D/C 66kV 9 01.09.75 Yes

87 Kadodra-Jolva AC S/C 66kV 5 15.12.95 Yes

88 Kadodra-Garden Vareli 1 AC D/C 66kV 3 01.09.75 Yes

89 Kadodra-Garden Vareli 2 AC D/C 66kV 3 01.09.75 Yes

90 Mahuwa-Valod AC S/C 66kV 18 05.11.92 Yes

91 Vav-Velanja-Kim AC S/C 66kV 12 04.07.89 Yes

92 Vav-Velanja-Variav AC S/C 66kV 26 23.11.89 Yes

93 Vav-Olpad-Variav AC S/C 66kV 36 23.11.89 Yes

94 Ukai(HY)-Mini(HY) AC D/C 66kV 1 08.12.87 Yes

95 Vyara-KAPP AC S/C 66kV 18 31.03.84 Yes

96 Vyara-Valod AC S/C 66kV 19 05.11.92 Yes

97 Valod-Bardoli AC S/C 66kV 16 30.11.99 Yes

98 Ichhapore-Pal AC S/C 66kV 13.5 23.11.89 Yes

99 Pal-Variav AC S/C 66kV 19.5 23.11.89 Yes

100 Ichhapore-Variav-Rama AC S/C 66kV 25 23.11.89 Yes

101 Ichhapore-HWP 1 AC D/C 66kV 6 20.04.90 Yes

102 Ichhapore-HWP 2 AC D/C 66kV 6 20.04.90 Yes

103 Ichhapore-ONGC 1 AC D/C 66kV 4 23.11.89 Yes

104 Ichhapore-ONGC 2 AC D/C 66kV 4 23.11.89 Yes104 Ichhapore-ONGC 2 AC D/C 66kV 4 23.11.89 Yes

105 Talangpur-Vesu-NCF 1 AC S/C 66kV 17.6 02.11.81 Yes

106 Talangpur-Vesu-NCF 2 AC S/C 66kV 17.6 02.11.81 Yes

107 Bhestan-CBL AC S/C 66kV 1.3 02.06.76 Yes

108 Bhestan-GPL AC S/C 66kV 18 16.01.74 Yes

109 Bhestan-NFL AC S/C 66kV 1.2 08.12.81 Yes

110 Bhestan-Govalak AC S/C 66kV 5 24.01.74 Yes

110

Page 11: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

111 Govalak-D2 AC S/C 66kV 2 24.01.74 Yes

112 Udhana-D2 AC S/C 66kV 1 24.01.74 Yes

113 Sachin- A to Sachin- B AC S/C 66kV 3 14.06.96 Yes

114 Sachin-Guj Ambuja Cement AC S/C 66kV 5.6 12/17/2007 Yes

115 Mota-Madhi(Rly.) AC S/C 66kV 20.25 15.07.03 Yes

116 Songdh-Navapur Rly. AC S/C 66kV 23.025. 21.02.04 Yes

117 Utran-Tapi-B-B2-STN. AC D/C 66kV 8 01.02.76 Yes

118 Tapi-Udhna-1 AC D/C 66kV 8.5 15.05.81 Yes

119 Tapi-Udhna-2 AC D/C 66kV 8.5 15.05.81 Yes

120 Tapi-S.E.CO.-A STN. AC S/C 66kV 4.3 12.08.99 Yes

121 Utran-S.E.CO. G.STN-1 AC D/C 66kV 5.5 14.02.69 Yes

122 Utran-S.E.CO. G.STN-2 AC D/C 66kV 5.5 14.02.69 Yes

123 Variav-F.STN. 1 AC D/C 66kV 2.5 06.01.01 Yes

124 Variav-F.STN. 2 AC D/C 66kV 2.5 06.01.01 Yes

125 Talangpur-Sachin B -1 AC D/C 66kV 3.5 21.03.00 Yes

126 Talangpur-Sachin B -2 AC D/C 66kV 3.5 21.03.00 Yes

127 Talangpur - Pandesara 1 AC D/C 66kV 13.4 01.03.02 Yes

128 Talangpur - Pandesara 2 AC D/C 66kV 13.4 01.03.02 Yes

129 Talangpur - S.E.Co.D stn 1 AC D/C 66kV 12 19.04.00 Yes

130 Talangpur - S.E.Co.D stn 2 AC D/C 66kV 12 19.04.00 Yes

131 Utran-S.E.CO. K.STN-1 AC D/C 66kV 5.5 06.10.05 Yes

132 Utran-S.E.CO. K.STN-2 AC D/C 66kV 5.5 06.10.05 Yes

133 Talangpur - Pandesara B-1 AC D/C 66kV 12.4 02.12.81 Yes

134 Talangpur - Pandesara B-2 AC D/C 66kV 13.4 02.12.81 Yes

135 Pandesara B - Pandesara A AC S/C 66kV 1 1.3.96 Yes

136 Jolva-Bardoli AC S/C 66kV 12.5 19.4.06 Yes

137 Vav-Kadod (Lilo Shampura) AC S/C 66kV 38.9 22.05.2006 Yes

138 Kadod-Madhi AC S/C 66kV 8.7 15.06.2006 Yes

139 66KV KHAJOD- JIAV AC S/C 66 KV 3.04 10/30/2009 Yes

140 66KV VAV-KRIBHCO-KOSAD-1 AC U/G 66 KV 1.00 5/1/2010 Yes

141 66KVT'pur- JIAV AC S/C 66 KV 7.67 01.05.10 Yes

142 66 KV Talangpur - Sachin C -1 AC D/C 66 KV 3.15 16.09.10 Yes

143 66 KV Talangpur - Sachin C -2 AC D/C 66 KV 3.15 16.09.10 Yes

144 Achhalia - P'nagar AC S/C 66kV 12.40 1.5.98 Yes144 Achhalia - P'nagar AC S/C 66kV 12.40 1.5.98 Yes

145 Achhalia - Panetha AC S/C 66kV 13.00 22.5.77 Yes

146 P'nagar - Rajpipla AC S/C 66kV 23.00 22.5.77 Yes

147 Achhalia - Rajpardi AC S/C 66kV 7.00 6.07.1984 Yes

148 Rajpardi - Bhacharwada AC S/C 66kV 8.66 11/16/2007 Yes

149 Ankleshwar - Zagadia AC S/C 66kV 21.00 11.09.1993 Yes

150 Ankleshwar – Ank GIDC A AC S/C 66kV 7.00 1964 Yes

151 Ankleshwar- UPL AC S/C 66kV 0.70 1964 Yes

152 Ankleshwar-Kosamba –1 AC D/C 66kV 10.00 Yes

153 Ankleshwar-Kosamba –2 AC D/C 66kV 10.00 16.07.2001 Yes

154 Bharuch B – Vagra - Vilayat AC S/C 66kV 38.50 20.05.1999 Yes

155 Chhidra Tapping line. AC S/C 66kV 28.053 8.12.1999 Yes

156 Dahej - BASF AC S/C 66kV 5.00 1965 Yes

157 Dahej - GCPTCL AC S/C 66kV 6.50 16.05.1992 Yes

158 Dahej - GFL AC S/C 66kV 2.25 Mar-08 Yes

159 Hald – Palej – 1 AC D/C 66kV 18.00 07.08.1993 Yes

160 Rarod Tapping line AC S/C 66kV 19.00 07.08.1993 Yes

161 Haldarwa – VNEL – 1 AC D/C 66kV 9.08 28.09.1992 Yes

162 Haldarwa – VNEL – 2 AC D/C 66kV 9.08 01.06.1994 Yes

163 Haldarwa – Zanor AC S/C 66kV 20.00 1965 Yes

164 Haldarwa – NCPL AC S/C 66kV 3.56 3.03.2003 Yes

165 Haldarwa – Palej – 2 AC D/C 66kV 18.00 3.03.2003 Yes

166 Haldarwa – Bharuch 1 AC D/C 66kV 5.50 13.03.1993 Yes

167 Haldarwa – Bharuch 2 AC D/C 66kV 5.50 13.03.1993 Yes

168 Haldarwa – Bharuch -B 1 AC D/C 66kV 13.00 26.03.2000 Yes

169 Haldarwa – Bharuch -B 2 AC D/C 66kV 13.00 27.09.1994 Yes

170 Haldarwa – Kadod AC D/C 66kV 8.37 12/16/2007 Yes

171 Hansot – Ank (Urban) AC S/C 66kV 20.50 18.12.1993 Yes

172 Kharach – Guj.Glass AC S/C 66kV 1.50 14.02.1997 Yes

173 Kim – Kamrej AC S/C 66kV 23.00 12.07.1995 Yes

174 Kim - Karanj AC S/C 66kV 4.00 07.12.1993 Yes

175 Kim – Mosali AC S/C 66kV 25.00 06.12.1993 Yes

176 Kim - Palod - 1 AC D/C 66kV 2.00 03.08.1993 Yes

177 Kim – Palod – 2 (GNL) AC D/C 66kV 20.00 28.03.1996 Yes

178 Kim - Pipodara AC S/C 66kV 4.00 05.03.1994 Yes

179 Kim – Velanja - Utran AC S/C 66kV 28.50 03.12.1986 Yes

180 Kosamba - Kharach AC S/C 66kV 13.50 28.2.89 Yes

181 Kosamba - Palod AC S/C 66kV 22.00 8/30/2007 Yes

182 Mandvi - Zankhvav AC S/C 66kV 24.00 07.02.2005 Yes182 Mandvi - Zankhvav AC S/C 66kV 24.00 07.02.2005 Yes

183 Netrang – Dediapada AC S/C 66kV 57.66 28.08.1986 Yes

184 Palej - PCBL AC S/C on D/C 66kV 1.50 03.11.1992 Yes

185 Palej - Vagra AC S/C 66kV 28.00 7.12.1993 Yes

186 Palej -Steelco AC S/C 66kV 0.50 27.02.1986 Yes

187 Palod – Kosamba-Borsara AC S/C 66kV 25.00 27.02.1986 Yes

188 Panoli tap line-1 AC S/C 66KV 3.40 31.05.1986 Yes

111

Page 12: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

189 Panoli tap line-2 AC S/C 66KV 3.40 12.07.1995 Yes

190 Panoli -Hansot AC S/C 66kV 31.00 30.12.96 Yes

191 Pipodara - Borsara AC S/C 66kV 8.50 24.04.1969 Yes

192 Randeri – MTZ AC S/C 66kV 2.80 24.04.1969 Yes

193 Sarbhan – Amod AC S/C 66kV 12.00 20.8.76 Yes

194 Amod - Jambusar AC S/C 66kV 11.50 28.08.1986 Yes

195 Ukai – Sagbara AC S/C 66kV 55.00 22.12.2000 Yes

196 Vagra – Dahej AC S/C 66kV 30.00 22.12.2000 Yes

197 Vagra – GAIL 1 AC D/C 66kV 9.40 09.11.1990 Yes

198 Vagra – GAIL 2 AC D/C 66kV 9.40 09.11.1990 Yes

199 Vagra – ONGC-1 AC D/C 66kV 13.00 28.1.82 Yes

200 Vagra – ONGC-2 AC D/C 66kV 13.00 12.3.91 Yes

201 Valia – Ankleshwar GIDC 'A' AC S/C 66kV 16.00 28.11.85 Yes

202 Valia – Godrej AC S/C 66kV 5.30 29.03.1984 Yes

203 Valia-Netrang AC S/C 66kV 23.00 24.12.97 Yes

204 Valia-Daheli AC S/C 66kV 7.88 6/13/2007 Yes

205 Vav – Mandvi AC S/C 66kV 40.00 22.5.77 Yes

206 Zagadia – Borosil AC S/C 66kV 6.00 30.12.96 Yes

207 Zagadia – Rajpardi AC S/C 66kV 17.00 11.12.95 Yes

208 Zagadia – Randeri AC S/C 66kV 5.30 3.5.97 Yes

209 Zagadia – Search Chem(UPL-5) AC S/C 66kV 3.75 3.5.97 Yes

210 Zagadia- Ank GIDC B AC S/C 66kV 22.00 12.5.2005 Yes

211 Zagadia– Rajeshwaranand AC S/C 66kV 8.00 8.12.2001 Yes

212 Zagadia– Zagadia AC S/C 66kV 6.00 12/5/2005 Yes

213 Zagadia -SWIL AC S/C 66kV 1.00 8/12/2001 Yes

214 Saddapani-Chikda AC S/C 66kV 21.60 5/30/2008 Yes

215 Jambuva-Dabhoi AC S/C 66kV 25.00 11/2/1972 Yes

216 Jambuva-Indrapuri AC S/C 66kV 12.22 6/20/1976 Yes

217 Jambuva-Tarsali-1 AC D/C 66kV 6.00 1969 Yes

218 Jambuva-Tarsali-2 AC D/C 66kV 6.00 1969 Yes

219 Makarpura- ERDA AC S/C 66kV 0.905 1/8/1998 Yes

220 Jambuva-Gajrawadi AC S/C

UG

66kV 14.20 2/7/1985 Yes

221 Gajrawadi-Waghodia AC S/C

UG

66kV 21.70 8/9/1993 Yes

UG

222 Gajrawadi- Motibaug U/G AC D/C 66kV 12.80 15.12.97 Yes

223 Dabhoi - Sankheda AC S/C 66kV 23.65 2/2/1984 Yes

224 Waghodia-Khatamba AC S/C 66kV 14.76 8/15/1994 Yes

225 Waghodia-Appolo AC S/C 66kV 4.00 8/9/1993 Yes

226 Khatamba- GAIL AC S/C 66kV 10.338 5/16/1992 Yes

227Khatamba - Indrapuri - Harni

AC S/C

UG

66kV9.00

28.12.91 Yes

228 Indrapuri - Harni AC S/C 66kV 5.00 3/27/1993 Yes

229 Harni-Sama AC S/C UG 66kV 6.40 3/29/2008 Yes

230 Gotri-Karjan 1 AC D/C 66kV 30.00 11/7/1974 Yes

231 Gotri-Karjan 2 D/C 66kV 30.00 11/7/1974

232 Atladra Tap Line 1 from Gotri-

Karjan D/C

AC D/C 66kV 5.75 10/3/1992 Yes

233 Atladra Tap Line 2 from Gotri-

Karjan D/C

AC D/C 66kV 5.75 10/3/1992 Yes

234 Makarpura TAP Line 1 from Gotri-

Karjan D/C

AC D/C 66kV 0.50 11/7/1974 Yes

235 Makarpura TAP Line 2 from Gotri-

Karjan D/C

AC D/C 66kV 0.50 11/7/1974 Yes

236 ABB Tap Line from Gotri-Karjan

D/C

AC D/C 66kV 0.00 11/7/1974 Yes

237 FAG India Tap Line from Gotri-

Karjan- 1

AC S/C 66kV 0.50 11/7/1974 Yes

238 Karjan-Palej AC S/C 66kV 13.80 11/7/1964 Yes

239 Karjan-PCBL LINE AC S/C 66kV 13.80 11/7/1964 Yes

240 Gotri-Vidyut nagar 1 AC D/C 66kV 3.09 3/22/1964 Yes

241 Gotri-Vidyut nagar 2 AC D/C 66kV 3.09 3/22/1964 Yes

242 Gotri-Subhanpura 1 AC D/C 66kV 4.50 11/7/1964 Yes

243 Gotri-Subhanpura 2 AC D/C 66kV 4.50 11/7/1964 Yes

244 S'pura-AlembicPharma AC S/C 66kV 0.25 7/14/1995 Yes

245 Gotri-Jambuva-1 AC D/C 66kV 29.40 19-6-64 Yes

246 Gotri-Jambuva-2 AC D/C 66kV 29.40 26-6-64 Yes

247 Samiala Tap Line from Gotri-

Jambuva line-2 LILO at Samiala

s/s

AC S/C 66kV 3.50 2/23/2006 Yes

248 Samiala-Padra AC S/C 66kV 7.00 6/26/1964 Yes

249 Gotri-Gorwa-Chhani-A-(Asoj Tap)-

Khakharia

AC S/C 66kV 52.00

2/19/1965

Yes

Khakharia 2/19/1965

250 Gotri-Gorwa-Chhani-A-Jarod AC S/C 66kV 24.60 2/19/1965 Yes

251 Gavasad-Mobha 1 AC D/C 66kV 2.00 4/22/2000 Yes

252 Gavasad-Mobha 2 AC D/C 66kV 2.00 4/22/2000 Yes

253 Gavasad-Masar road AC S/C 66kV 10.00 4/22/2000 Yes

254 Gavasad- Padra AC S/C 66kV 20.18 1/1/2002 Yes

255 Masar Road-GujaratGlass AC S/C 66kV 3.80 4/22/2000 Yes

112

Page 13: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

256 Mobha-Karkhadi AC S/C 66kV 5.33 2/22/1999 Yes

257 Mobha-Bharat starch AC S/C 66kV 6.06 5/23/1996 Yes

258 Chhani'A'toChhani'B'-1 AC D/C 66kV 1.89 11/10/1988 Yes

259 Chhani'A'toChhani'B'-2 AC D/C 66kV 1.89 11/10/1988 Yes

260 Karjan-Torrent( TGBL) AC D/C 66kV 61.00 3/29/1994 Yes

261 Karjan-Kashipura AC S/C 66kV 14.82 9/24/1997 Yes

262 Karjan-Sadhli AC S/C 66kV 12.30 4/10/1963 Yes

263 Karjan-Bodaka AC S/C 66kV 16.64 4/23/1969 Yes

264 Bodaka- Sarbhan AC S/C 66kV 14.80 10/3/2006 Yes

265 Gotri-Koyali-Anand-1 AC S/C 66kV 39.40 1972 Yes

266 Gotri-Koyali AC S/C 66kV 7.60 1972 Yes

267 Godhra-Lunawada AC S/C 66kV 40.00 9/23/1975 Yes

268 Jafrabad Tap line from Godhra

Lunawada line

AC S/C 66kV 2.256 3/26/1999 Yes

269 ShaheraTap line from Godhra-

Lunawada

AC S/C 66kV 0.90 9/8/1990 Yes

270 Godhra-Jafrabad AC S/C 66kV 7.00 3/2/1966 Yes

271 Jafrabad-Santroad AC S/C 66kV 17.00 3/2/1966 Yes

272 Santroad-Limkheda AC S/C 66kV 20.50 12/18/1986 Yes

273 DevgadhbariaTap line from

Santrod- Limkheda

AC S/C 66kV 10.75 10/2/1993 Yes

274 Godhra-Vejalpur AC S/C 66kV 13.00 2/19/1965 Yes

275 Godhra-Timba AC S/C 66kV 25.734 3/21/1991 Yes

276 Khakharia-Jarod AC S/C 66kV 25.73 12/25/1993 Yes

277 Khakharia-BaskaNeomer AC S/C 66kV 12.50 1/22/1997 Yes

278 Chandrapura-PMSteel AC S/C 66kV 18.37 3/11/1973 Yes

279 Chandrapura-Express AC S/C 66kV 14.10 4/16/1990 Yes

280 Chandrapura-GIDCHalol AC S/C 66kV 2.80 1/26/1989 Yes

281 Chandrapura-Khakharia AC S/C 66kV 3.43 2/19/1990 Yes

282 Chandrapura-GenerlMotors AC S/C 66kV 1.00 3/25/1992 Yes

283 Chandrapura- Madhavas AC D/C 66kV 6.20 6/3/1999 Yes

284 Kalol-PM steel AC S/C 66kV 1.44 1/26/1989 Yes

285 Kalol-Vejalpur AC S/C 66kV 21.00 2/19/1965 Yes

286 GIDC-Shivrajpur AC S/C 66kV 19.47 9/26/1987 Yes

287 Lunawada-Motakhanpur AC S/C 66kV 26.00 3/28/1987 Yes287 Lunawada-Motakhanpur AC S/C 66kV 26.00 3/28/1987 Yes

288 Lunawada-Kothamba AC S/C 66kV 15.38 6/20/2005 Yes

289 Kothamba-Timba AC S/C 66kV 27.50 6/20/2005 Yes

290 Dahod-Kharedi AC S/C 66kV 12.50 2/15/2005 Yes

291 Dahod-Zalod AC S/C 66kV 30.00 10/31/2002 Yes

292 Zalod-Saraswapur AC S/C 66kV 3.50 5/27/2008 Yes

293 Zalod-Santrampur AC S/C 66kV 30.00 4/12/2004 Yes

294 Tilakwada-Chandod 1 AC D/C 66kV 18.40 9/11/1974 Yes

295 Tilakwada-Chandod 2 AC D/C 66kV 18.40 9/11/1974 Yes

296 Tilakwada-Navagam 1 AC D/C 66kV 25.50 8/8/1990 Yes

297 Tilakwada-Navagam 2 AC D/C 66kV 25.50 8/8/1990 Yes

298 Tilakwada-Naswadi AC S/C 66kV 15.80 11/2/1989 Yes

299 Tilakwada-Dabhoi AC S/C 66kV 25.50 10/14/1985 Yes

300 Chandod-Rajpipla AC S/C 66kV 8.00 11/24/1985 Yes

301 Chandod-Sadhli AC S/C 66kV 18.10 4/10/1976 Yes

302 Sadhli-Sinor AC S/C 66kV 14.00 9/16/1974 Yes

303 Naswadi-Kawant AC S/C 66kV 40.00 3/15/1986 Yes

304 Kawant-Vasedi AC S/C 66kV 24.27 12/14/1997 Yes

305 Sankheda-Bodeli AC S/C 66kV 22.50 2/2/1984 Yes

306 Bodeli-Pavijetpur AC S/C 66kV 15.00 2/2/1984 Yes

307 Pavijetpur-Vasedi AC S/C 66kV 18.00 11/12/1997 Yes

308 Naswadi-Koshindra AC S/C 66kV 14.00 4/1/2005 Yes

309 Ghoghamba Tap AC S/C 66kV 12.00 6/1/1994 Yes

310 sadhli-Karvan AC S/C 66kV 14.00 10/18/1976 Yes

311 Karamsad-Anand 1 AC D/C 66kV 8.00 30.05.70 Yes

312 Karamsad-Anand 2 AC D/C 66kV 8.00 30.05.70 Yes

313 Karamsad-Borsad AC S/C 66kV 14.00 20.12.72 Yes

314 Karamsad- V.V.Nagar AC S/C 66kV 5.30 16.12.74 Yes

315 Karamsad- V.U.Nagar AC S/C 66kV 4.50 27.03.97 Yes

316 Karamsad-Petlad 1 AC D/C 66kV 10.50 06.06.71 Yes

317 Karamsad-Petlad 2 AC D/C 66kV 10.50 06.06.71 Yes

318 Karamsad-Virsad AC S/C 66kV 21.00 29.03.91 Yes

319 Ode-Vasad AC S/C 66kV 19.75 20.12.83 Yes

320 Undel-Ras AC S/C 66kV 16.69 16.06.96 Yes

321 Undel-Cambay 1 AC S/C 66kV 4.25 22.11.96 Yes

322 Undel-Cambay 2 AC S/C 66kV 4.93 22.11.96 Yes

323 Borsad-Anklav AC S/C 66kV 11.00 23.01.76 Yes

324 Petlad-Nar AC S/C 66kV 17.93 04.04.74 Yes

325 Cambay-Nar AC S/C 66kV 19.00 04.04.74 Yes325 Cambay-Nar AC S/C 66kV 19.00 04.04.74 Yes

326 Neja Tap(cambay-Nar) AC S/C 66kV 9.00 22.03.90 Yes

327 Virsad-Ras AC S/C 66kV 6.00 20.03.91 Yes

328 Anklav Tap( Gotri-Anand) AC S/C 66kV 11.40 21.11.73 Yes

329 Tapping to 66KVGopalpura from

Koyali-Mogar

AC S/C 66kV 3.80

28.01.72

Yes

113

Page 14: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

330 Tapping to 66KVGopalpura from

Anand-Mogar

AC S/C 66kV 0.50

28.01.72

Yes

331 Anand-Mogar AC S/C 66kV 9.30 1972 Yes

332 N'sari-II-Ranoli AC S/C 66kV 6.50 25.10.93 Yes

333 Tapping to 66KV N'sari( from

N'sari-II to Ranoli Line)

AC S/C 66kV 1.00

1.11.93

Yes

334 N'sari-II-Rania AC S/C 66kV 15.00 1.11.93 Yes

335 Lilo to 66 KV Poicha AC S/C 66kV 6.25 Jan-08 Yes

336 Tap Line To 66KV N'sari from

Gotri-Anand

AC S/C 66kV 2.00 28.01.70 Yes

337 Koyali-Mogar(LILO at Mogar) AC S/C 66kV 26.30 28.01.72 Yes

338 Tapping to Koyali-Mogar from

N'sari-II

AC S/C 66kV 2.00 10.12.00 Yes

339 Tap Line To 66KV N'sari from

Koyali-Mogar

AC S/C 66kV 2.00 24.10.02 Yes

340 Rania-Savli AC S/C 66kV 10.50 21.01.1981 Yes

341 Koyali-GRP 1 AC D/C 66kV 2.10 14.9.67 Yes

342 Koyali-GRP 2 AC D/C 66kV 2.10 14.9.67 Yes

343 F'nagar-GSFC 1 AC S/C 66kV 0.25 10.12.68 Yes

344 F'nagar-GSFC 2 AC S/C 66kV 0.15 10.12.68 Yes

345 F'nagar-GSFC 3 AC S/C 66kV 0.21 19.6.69 Yes

346 F'nagar-GSFC 4 AC S/C 66kV 0.07 20.9.72 Yes

347 F'nagar-GSFC 5 AC S/C 66kV 0.065 1.4.95 Yes

348 F'nagar-HWP AC S/C 66kV 0.12 2.4.73 Yes

349 Savli-Desar AC S/C 66kV 21.43 25.2.82 Yes

350 Desar-Timba AC S/C 66kV 19.50 10.8.91 Yes

351 Jarod-Tundav AC S/C 66kV 14.60 21.11.94 Yes

352 Jarod-Royal Vinyle AC S/C 66kV 2.10 29.6.95 Yes

353 N'sari-Deepak Nitrite AC S/C 66kV 0.22 12.5.95 Yes

354 Karath (Limbdi) - Zalod AC S/C 66kV 14.00 6/26/2008 Yes

355 Neja - Khanpur AC S/C 66kV 17.20 2008 Yes

356 66KV Anklav-Navakhal AC S/C 66 KV 4.07 29.09.09 Yes

357 66KV Dahod Nalvai AC S/C 66 KV 22.00 06.10.09 Yes

358 66kV Makarpura-Alstom line-

JambuvaAC S/C 66 KV 0.85 07.01.10 Yes

Jambuva

359 66kv Vasedi-Panavad-Kawant

LILO-BodeliAC S/C 66 KV 1.30 24.02.10 Yes

360 66 KV Lunavada-Santrampur

LILO MovasaAC S/C 66 KV 9.00 15.02.10 Yes

361 66 KV BITL-Manjusar line AC S/C 66 KV 2.17 14.02.09 Yes

362 66 KV Jarod - Kemrock AC S/C 66 KV 8.02 16.04.10 Yes

363 66 kv Chandrapura Ceat tyre AC S/C 66 KV 1.00 31.05.10 Yes

364 Attarsumba-Nirmali AC S/C 66kV 12 6/11/1991 Yes

365 Barejadi-Dehgam AC S/C 66kV 17.6 14/05/1962 Yes

366 Barejadi-Kanbha-Vehlal AC S/C 66kV 21 23/11/1990 Yes

367 Bopal-Sanand AC S/C 66kV 12.4 5/8/1998 Yes

368 Bahial -Kuha AC S/C 66kV 16.3 17/11/2005 Yes

369 Changa-Kasor AC S/C 66kV 8.5 12/10/1994 Yes

370 Changa-Uttarsanda AC S/C 66kV 12 9/11/1993 Yes

371 Changa-Vaso AC S/C 66kV 13.36 24/07/1977 Yes

372 Changodar tap linefrom Sanand-

Bavla

AC S/C 66kV 15 6/2/1993 Yes

373 Changodar-KISAN Ind. AC S/C 66kV 5.8 1/5/1997 Yes

374 Changodar-Moraiya AC S/C 66kV 5.91 6/12/1993 Yes

375 Chharodi-Bavla AC S/C 66kV 11.85 31/01/1997 Yes

376 Chiloda-Chhala AC S/C 66kV 12.65 8/7/1986 Yes

377 Chhala-Halisa AC S/C 66kV 7.4 31/1/2004 Yes

378 Chiloda-Sadra AC S/C 66kV 12.5 27/11/1980 Yes

379 Chuda-Ranpur AC S/C 66kV 24 22/05/1991 Yes

380 Demai tap line AC S/C 66kV 9.1 28/11/2003 Yes

381 Dehgam-Vehlal AC S/C 66kV 9.4 18/02/1986 Yes

382 Dhrangadhra-Chuli AC S/C 66kV 16.2 26/02/2000 Yes

383 D'dhra-D'dhra-1 AC S/C 66kV 7.3 16/04/1991 Yes

384 D'dhra-Halvad AC S/C 66kV 30 1/5/2004 Yes

385 D'dhra-Khodu-Sadla AC S/C 66kV 42 28/12/1998 Yes

386 Sadla-Dholia AC S/C 66kV 10.5 5/30/2007 Yes

387 Dholia - Umarda AC S/C 66kV 10.2 10/24/2008 Yes

388 D'dhra-Kankawati AC S/C 66kV 17 9/7/1991 Yes

389 D'dhra-Kondh AC S/C 66kV 20 1/1/1990 Yes

390 D'dhra-Narichana AC S/C 66kV 16 31/1/2000 Yes

391 D'dhra-Vavdi AC S/C 66kV 9 12/7/1996 Yes

392 Dungerpur Tapline AC S/C 66kV 5.1 11/9/2004 Yes

393 Halvad-Bhalgamda AC S/C 66kV 14 10/4/2004 Yes393 Halvad-Bhalgamda AC S/C 66kV 14 10/4/2004 Yes

394 Bhalgamda - Sara AC S/C 66kV 12 7/23/2008 Yes

395 Halvad-Chuli AC S/C 66kV 19.38 18/5/2005 Yes

396 Halvad-Ghanshyamgadh AC S/C 66kV 10 1/5/2004 Yes

397 Halwad-Halvad-1 AC S/C 66kV 3.5 24/7/2004 Yes

398 Halwad-Halvad-2 AC S/C 66kV 3.9 24/7/2004 Yes

399 Halwad-Ranakpur AC S/C 66kV 5.3 24/7/2004 Yes

114

Page 15: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

400 Jakhwada LILO(V'gam-Chharodi) ACS/C

66kV

1.5 6/2/2004

Yes

401 Jetalpur-Navagam AC S/C 66kV 9.09 3/5/1994 Yes

402 Juval Rupavati-Bavla AC S/C 66kV 7.3 2/12/1983 Yes

403 Juval Rupavati-Kerala AC S/C 66kV 7.8 10/9/1987 Yes

404 Juval Rupavati-Koth AC S/C 66kV 18.79 24/3/1987 Yes

405 Juval Rupavati-Lakhtar AC S/C 66kV 40.33 1/3/1955 Yes

406 Kanz-Vanod AC S/C 66kV 31.7 28/6/2000 Yes

407 Kamla-N.S.Mill AC S/C 66kV 1 27/1/1994 Yes

408 Kamalpur-Methan AC S/C 66kV 28.5 13/12/2003 Yes

409 Kapadwanj-Kapadwanj AC S/C 66kV 0.5 26/02/1997 Yes

410 Kapadwanj-Attarsumba AC S/C 66kV 13.4 3/4/1997 Yes

411 Kapadwanj-Kathlal AC S/C 66kV 24.5 8/6/1969 Yes

412 Kapadwanj-Torna AC S/C 66kV 11.8 20/10/1999 Yes

413 Kankawati-Malaniyad AC S/C 66kV 12 25/2/1999 Yes

414 Kapadwanj-Relia AC S/C 66kV 35 2008 Yes

415 Khanpur-Bahial AC S/C 66kV 20.29 28/3/1994 Yes

416 Khanpur-Dehgam-1 AC S/C 66kV 9 22/9/1994 Yes

417 Khanpur-Dehgam-2 AC S/C 66kV 9.8 21/9/1994 Yes

418 Khanpur-Jaludra-1 AC S/C 66kV 21.5 6/23/2007 Yes

419 Khanpur-Jaludra-2 AC S/C 66kV 21.5 6/23/2007 Yes

420 Khanpur-Halisa-1 AC S/C 66kV 9.05 23/3/1994 Yes

421 Khanpur-Halisa-2 AC S/C 66kV 9.05 29/4/2005 Yes

422 Khanpur-Kadjodara AC S/C 66kV 11.4 30/3/2002 Yes

423 Khanpur-Talod-1 AC S/C 66kV 30 21/1/1994 Yes

424 Khanpur-Talod-2 AC S/C 66kV 28.5 21/1/1994 Yes

425 Kheda-Dholka GIDC AC S/C 66kV 28.4 17/8/1991 Yes

426 Kheda-Samadra AC S/C 66kV 25.1 20/9/1992 Yes

427 Kondh-Sara AC S/C 66kV 14 14/12/2000 Yes

428 Limbdi-Chuda AC S/C 66kV 36 22/5/1991 Yes

429 Limbdi-Sayla- AC S/C 66kV 34 17/11/1984 Yes

430 Limbdi-S'nagar-1 AC D/C 66kV 30 8/1/1971 Yes

431 Limbdi-S'nagar-2 AC D/C 66kV 30 8/1/1971 Yes

432 M'bad-Barejadi-1 AC S/C 66kV 13.8 6/8/1969 Yes

433 M'bad-Barejadi-Kanbha AC S/C 66kV 31 6/8/1969 Yes433 M'bad-Barejadi-Kanbha AC S/C 66kV 31 6/8/1969 Yes

434 M'bad-Kathlal AC S/C 66kV 39 8/6/1969 Yes

435 M'bad-Kheda-Limbasi AC S/C 66kV 28.4 2/8/1973 Yes

436 M'bad-Mahudah-H'was AC S/C 66kV 37.4 6/6/1969 Yes

437 Moraiya Tap(Sanand-Bavla) AC S/C 66kV 7.56 13/02/2002 Yes

438 Moraiya-Dishman AC S/C 66kV 6.2 7/7/2007 Yes

439 Nadiad-Kamla AC S/C 66kV 2.6 29/08/1996 Yes

440 Nadiad-Kamla-Chaklasi-Umreth AC S/C 66kV 39.8 10/11/1979 Yes

441 Naranpura-Vadsar-Kalol AC S/C 66kV 11.04 8/11/1965 Yes

442 Narichana-Kondh AC S/C 66kV 12 31/1/2001 Yes

443 Narichana-Raigadh AC S/C 66kV 8.43 18/1/2006 Yes

444 Raigadh - Kuntalpur AC S/C 66kV 10 7/30/2008 Yes

445 Navagam tap(Salejada-B'jadi) AC S/C 66kV 3.8 31/08/1981 Yes

446 Navagam- ONGC AC S/C 66kV 0.85 24/8/1992 Yes

447 Ranasan-Bhat AC S/C 66kV 3.95 5/2/2003 Yes

448 Ranasan-Chiloda-Naroda-1 AC S/C 66kV 14 16/3/1985 Yes

449 Ranasan-Chiloda-2 AC S/C 66kV 23 24/11/1980 Yes

450 Ranasan-Reliance-1 AC S/C 66kV 1.9 27/11/1980 Yes

451 Ranasan-Reliance-2(Muthiya) AC S/C 66kV 3.48 1/10/1986 Yes

452 Ranasan-Hirpura AC S/C 66kV 12.37 6/30/2007 Yes

453 Rajsitapur-Dhrangadhra AC S/C 66kV 16 1992 Yes

454 Sabarmati-Bopal AC S/C 66kV 10.6 29/12/1969 Yes

455 Sabarmati-Bhadaj AC S/C 66kV 19.74 29/12/1969 Yes

456 Sabarmati-IFFCO AC S/C 66kV 23.6 11/4/1974 Yes

457 Salejada-Barejadi AC S/C 66kV 38 1/3/1955 Yes

458 Salejada-Bavla AC S/C 66kV 13.96 21/2/1982 Yes

459 Salejada-Dholka AC S/C 66kV 1.77 7/8/1980 Yes

460 Salejada-Juval Rupavati AC S/C 66kV 6.55 7/8/1980 Yes

461 Salejada-Simej AC S/C 66kV 22.34 31/3/2003 Yes

462 Salejada-Aia Engineering AC S/C 66kV 19.5 6/8/2007 Yes

463 Samadra tapline AC S/C 66kV 5.1 12/10/1992 Yes

464 Sanand-Bavla AC S/C 66kV 22.8 17/05/1988 Yes

465 Bavla-Clarish AC S/C 66kV 8.56 6/5/2007 Yes

466 Sanand-Chharodi tap line AC S/C 66kV 23.89 6/10/1994 Yes

467 Sarambhda tapline AC S/C 66kV 6 10/7/2001 Yes

468 Sayla-Muli AC S/C 66kv 14 28/02/1984 Yes

469 Sevalia-Balasinor AC S/C 66kV 16 30/01/1987 Yes

470 S'nagar-Dudhrej-R'sitapur AC S/C 66kV 20 16/09/1987 Yes

471 S'nagar-Lakhtar-R'sitapur AC S/C 66kV 29.3 25/03/1985 Yes471 S'nagar-Lakhtar-R'sitapur AC S/C 66kV 29.3 25/03/1985 Yes

472 Than-Sara tap line AC S/C 66kV 28 28/3/1988 Yes

473 LILO for Tarneter from Than-Sara AC S/C 66kV 0.77 5/9/2005 Yes

474 Umreth-Thasra-Sevalia AC S/C 66kV 31.1 19/01/1974 Yes

475 Vanod-Vadgam AC S/C 66kV 23 23/11/2000 Yes

476 Vatva-Barejadi-1 AC D/C 66kV 12.4 15/08/1965 Yes

115

Page 16: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

477 Vatva-Barejadi-2 AC D/C 66kV 12.4 15/08/1965 Yes

478 Vatva-Jetalpur AC S/C 66kV 10.34 3/5/1994 Yes

479 Vatva-Naranpura-1 AC D/C 66kV 13.83 17/06/1964 Yes

480 Vatva-Naranpura-2 AC D/C 66kV 13.83 17/06/1964 Yes

481 Vatva-Naroda-1 AC D/C 66kV 21.96 25/06/1966 Yes

482 Vatva-Naroda-2 AC D/C 66kV 21.96 25/06/1966 Yes

483 Viramgam-Changodar AC S/C 66kV 35.72 16/01/1998 Yes

484 Viramgam-Chharodi AC S/C 66kV 23.81 25/04/1996 Yes

485 Viramgam-CORE AC S/C 66kV 17.41 20/06/1995 Yes

486 Viramgam-Lakhtar AC S/C 66kV 64.0 17/08/1979 Yes

487 Viramgam-Link Line AC S/C 66kV 3.0 17/08/1977 Yes

488 Viramgam-Mandal-Patdi AC S/C 66kV 49.0 14/06/1983 Yes

489 Viramgam-Sanand AC S/C 66kV 38.0 29/01/1983 Yes

490 Viramgam-Kamalpur AC S/C 66kV 19.5 27/11/2003 Yes

491 Viramgam-Kanz AC S/C 66kV 25.7 14/11/1992 Yes

492 Viramgam-Khavad AC S/C 66kV 22.5 15/07/2000 Yes

493 LILO of Wadhwan from Snager-

Lakhter

AC S/C 66kV 2.1 22/12/2005 Yes

494 LILO of Zamp (Salejada-Lakhtar) ACS/C

66kV

0.7 11/3/2005

Yes

495 Dhanki-Bala AC S/C 66kV 20.7 Jan-08 Yes

496 66 KV Sathamba-Balasinor LILO

at JorapuraAC S/C 66 KV 6.50 29.4.10 Yes

497 LILOat Samadra s/s from 66KV

Kheda-Dholka GIDCAC S/C 66 KV 12.24 11.6.09 Yes

498 66 KV Changodar-Moraiya LILO

at 66kv BhatAC S/C 66 KV 1.09 19.11.09 Yes

499 66 KV Sanathal-Sanand AC S/C 66 KV 18.05 12.7.09 Yes

500 66kv Balasinor-Anjan Cement AC S/C 66 KV 12.50 4.11.09 Yes

501 LILO to 66kv Science City from

66kv Bhadaj-Bopal lineAC S/C 66 KV 1.05 25.12.09 Yes

502 LILO at Solankipura-from

Chiloda-DabhodaAC S/C 66 KV 6.19 8.5.10 Yes

503 LILO at Dabhoda from R'san-

ChilodaAC S/C 66 KV 3.34 28.7.10 Yes

Chiloda

504 LILO at Dholaka Ingoli Road-

From Salejada-SimejAC S/C 66 KV 3.44 27.3.10 Yes

505 66 KV LILO at Razoda from

sanand-BavlaAC S/C 66 KV 0.33 19.6.10 Yes

506 LILO to Rajoda from Nanidevti-

BavlaAC S/C 66 KV 0.33 19.6.10 Yes

507 LILO to Nanidevti from Sanand-

BavlaAC S/C 66 KV 0.44 30.3.10 Yes

508 66 KV Botad-Motivavdi AC S/C 66 KV 16.50 22.06.10 Yes

509 66 KV Dhandhuka-Panshina AC S/C 66 KV 15.00 17.06.10 Yes

510 Mehsana-Basna AC S/C 66kV 7.50 29-12-75 Yes

511 Mehsana-Palavasna-Kherva AC S/C 66kV 22.00 29-11-74 Yes

512 Mehsana-Linch AC S/C 66kV 16.50 12/02/04 Yes

513 Mehsana-Nagalpur AC S/C 66kV 14.40 21-8-01 Yes

514 Mehsana-Bhandu AC S/C 66kV 12.00 03/02/76 Yes

515 Mehsana-Motap AC S/C 66kV 15.00 16-12-92 Yes

516 Mitha-Motap-Santhal AC S/C 66kV 21.00 20-8-01 Yes

517 Mitha-Balol AC S/C 66kV 7.56 05/09/01 Yes

518 Mitha-Bechraji AC S/C 66kV 30.50 18-8-01 Yes

519 Mitha-Palavasna-Nagalpur AC S/C 66kV 10.40 05/09/01 Yes

520 Mitha-Jotana-Suraj AC S/C 66kV 14.40 02/02/02 Yes

521 Mitha-Linch-1 AC S/C 66kV 12.20 30-9-03 Yes

522 Mitha-Linch-Jotana AC S/C 66kV 20.00 12/02/04 Yes

523 Mitha- Modhera AC S/C 66kV 16.60 8/25/2007 Yes

524 Mitha- Andundra Pumping station AC S/C 66kV 24.90

01/26/00

Yes

525 Linch-Mandali AC S/C 66kV 16.40 18-10-77 Yes

526 Modhera-Pratapnagar AC S/C 66kV 15.50 22-12-96 Yes

527 Modhera- Pumping station -1 AC S/C 66kV 2.63 5/2/2007 Yes

528 Modhera- Pumping station -2 AC S/C 66kV 3.10 5/27/2007 Yes

529 Modhera - Maniyari AC S/C 66kV 10.50 2008 Yes

530 Kherva-Udalpur AC S/C 66kV 4.81 17-12-03 Yes

531 Bhandu-Valam AC S/C 66kV 11.70 06/07/04 Yes

532 Valam- Motibau AC S/C 66kV 8.86 5/3/2007 Yes

533 Dhinoj-Motap AC S/C 66kV 7.00 15-6-05 Yes

534 Chhatral-Kadi AC S/C 66kV 10.20 01/01/73 Yes

535 Chhatral-Karannagar AC S/C 66kV 6.00 23-1-92 Yes

536 Chhatra-Khavad-Kadi-Suraj at AC S/C 66kV 51.60 10/11/04 Yes536 Chhatra-Khavad-Kadi-Suraj at

Rangpurda S/s

AC S/C 66kV 51.60 10/11/04 Yes

537 Chhatral-Nardipur-1 AC D/C 66kV 14.00 24-11-79 Yes

538 Chhatral-Nardipur-2-Pansar tap AC S/C 66kV 19.50 09/01/81 Yes

539 Chhatral-Kalol AC S/C 66kV 10.40 20-5-79 Yes

540 Chhatral-Nandasan AC S/C 66kV 13.00 1979 Yes

541 Chhatral-Rajpur AC S/C 66kV 8.50 24-5-89 Yes

116

Page 17: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

542 Rajpur-Nandasan AC S/C 66kV 4.50 1993 Yes

543 Chhatral-GIDC AC S/C 66kV 5.00 11/05/89 Yes

544 Chhatral-IFFCO AC S/C 66kV 13.00 22-10-78 Yes

545 Chhatral-Borisana-1 AC S/C 66kV 7.00 10/03/89 Yes

546 Chhatral-Borisana-2 AC S/C 66kV 7.00 30-10-02 Yes

547 Vadavi- Borisana AC S/C 66kV 10.00 09/09/07 Yes

548 Vadavi- Kalol AC S/C 66kV 10.80 09/09/07 Yes

549 Nandasan-Nirma AC S/C 66kV 8.00 01/01/89 Yes

550 Borisana-Kalol AC S/C 66kV 3.60 10/06/81 Yes

551 Nardipur-Soja ( Randheja ) AC S/C 66kV 7.00 21-8-84 Yes

552 Borisana-Naranpura-Vadsar tap AC S/C 66kV 16.60 06/06/65 Yes

553 Borisana-Sabarmati-Adalaj tap AC S/C 66kV 26.00 06/06/65 Yes

554 Chhatral-Meadaadrj AC S/C 66kV 14.50 05/05/94 Yes

555 Medaadraj-Medha AC S/C 66kV 13.00 27-2-95 Yes

556 Chhatral-Santej-1 AC S/C 66kV 19.50 19-1-95 Yes

557 Chhatral-Santej-2 AC S/C 66kV 19.50 20-5-98 Yes

558 Santej-Shah alloys AC S/C 66kV 3.00 23-11-95 Yes

559 Santej-Arvind Mill AC S/C 66kV 0.75 22-1-98 Yes

560 Santej-Arvind Inter. AC S/C 66kV 5.00 15-5-96 Yes

561 Nandasan-Mandali-Langhnaj tap AC S/C 66kV 17.24 31-10-99 Yes

562 Randheja-AE Co. AC S/C 66kV 10.00 01/02/96 Yes

563 Borisana-CTF AC S/C 66kV 6.30 10/03/92 Yes

564 Suraj-Katosan AC S/C 66kV 12.80 01/07/80 Yes

565 Vijapur-Ranasan AC S/C 66kV 5.00 13-7-03 Yes

566 Vijapur-Sundarpur AC S/C 66kV 18.20 14-2-80 Yes

567 Vijapur-Lodra AC S/C 66kV 10.05 10/10/91 Yes

568 Lodra-Lodra pump. Stn. AC S/C 66kV 3.00 28-4-04 Yes

569 Vijapur-Vihar AC S/C 66kV 17.00 23-3-93 Yes

570 Vijapur-Mansa AC S/C 66kV 16.10 15-7-79 Yes

571 Vijapur-Tatosan AC S/C 66kV 14.10 22-1-77 Yes

572 Ranasan-Dedhrota-H'nagar AC S/C 66kV 29.00 20-10-69 Yes

573 Jamla-Mansa-1 AC D/C 66kV 9.00 13-3-99 Yes

574 Jamla-Mansa-2 AC D/C 66kV 10.00 12/06/97 Yes

575 Jamla-Gozaria-1 AC D/C 66kV 14.50 14-8-95 Yes575 Jamla-Gozaria-1 AC D/C 66kV 14.50 14-8-95 Yes

576 Jamla-Gozaria-2 AC D/C 66kV 14.00 18-12-75 Yes

577 Gozaria-Charada AC S/C 66kV 7.90 16-12-04 Yes

578 Jamla-Vasai AC S/C 66kV 18.50 05/02/02 Yes

579 Jamla-Langhnaj AC S/C 66kV 16.00 05/09/98 Yes

580 Jamla-Randheja-1 AC S/C 66kV 22.90 12/06/98 Yes

581 Jamla-Randheja-2 AC S/C 66kV 20.50 23-2-98 Yes

582 Randheja-Motiadaraj AC S/C 66kV 9.00 28-1-05 Yes

583 Vadavi - Motibhoyan AC S/C 66kV 9.22 3/8/2007 Yes

584 Jamla-Soja AC S/C 66kV 6.30 30-9-98 Yes

585 Jamla-Veda AC S/C 66kV 5.20 17-12-04 Yes

586 Visnagar-Vadnagar AC S/C 66kV 14.00 15-12-84 Yes

587 Visnagar-Tatosan AC S/C 66kV 14.00 29-12-75 Yes

588 Visnagar-Basna AC S/C 66kV 15.00 26-12-75 Yes

589 Visnagar-Bhalak AC S/C 66kV 8.00 18-3-05 Yes

590 Vihar-Vasai AC S/C 66kV 8.20 17-8-93 Yes

591 Gozaria-Vasai AC S/C 66kV 8.20 09/06/80 Yes

592 Sundarpur-Jantral AC S/C 66kV 8.30 26-6-92 Yes

593 Mansa-Lodra-Manekpur AC S/C 66kV 26.00 18-8-89 Yes

594 Vasai-Kada AC S/C 66kV 12.50 27-9-99 Yes

595 Sundarpur-Ladol AC S/C 66kV 7.10 08/04/03 Yes

596 Agiol-Gambhoi AC S/C 66kV 8.00 22-12-90 Yes

597 Agiol-Hansalpur AC S/C 66kV 14.00 12/02/93 Yes

598 Hansalpur-Jadar AC S/C 66kV 14.20 06/04/04 Yes

599 Agiol-Himatnagar AC S/C 66kV 11.00 28-12-90 Yes

600 Agiol-Ptantij-Amodara tap AC S/C 66kV 22.20 31-12-92 Yes

601 Agiol-Kaniyol AC S/C 66kV 13.20 05/03/75 Yes

602 Kaniyol-Chandarani AC S/C 66kV 12.30 2008 Yes

603 Agiol-Nikoda AC S/C 66kV 7.90 11/01/05 Yes

604 Idar-Bhiloda AC S/C 66kV 28.00 12/12/78 Yes

605 Idar-K'brahma AC S/C 66kV 27.20 03/07/72 Yes

606 Idar-Panol AC S/C 66kV 9.60 10/11/04 Yes

607 Panol-Vadali AC S/C 66kV 7.20 10/11/04 Yes

608 Idar-Jadar-Lai-Rsn AC S/C 66kV 25.70 22-8-82 Yes

609 Idar-Choriwad AC S/C 66kV 18.50 08/10/89 Yes

610 H'nagar-Prantij AC S/C 66kV 19.50 19-10-69 Yes

611 Vadali-K'brahma AC S/C 66kV 12.00 1972 Yes

612 K'brahma-M'champa AC S/C 66kV 28.00 09/11/86 Yes

613 Kaniyol-Badoli AC S/C 66kV 24.00 17-3-98 Yes613 Kaniyol-Badoli AC S/C 66kV 24.00 17-3-98 Yes

614 M'champa-Ambaji AC S/C 66kV 18.00 15-1-93 Yes

615 Choriwad-Kundla AC S/C 66kV 14.00 04/10/99 Yes

616 Lai-Rsn-Sundarpur AC S/C 66kV 11.00 08/03/01 Yes

617 Agiyol-Hajipur AC S/C 66kV 12.00 06/03/03 Yes

618 Bhiloda-Dantod AC S/C 66kV 22.60 03/03/02 Yes

619 Dantod-Vijaynagar AC S/C 66kV 18.10 13-2-05 Yes

117

Page 18: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

620 Talod-Ranasan AC S/C 66kV 20.94 20-1-73 Yes

621 Talod-Khanpur-1 AC D/C 66kV 24.20 25-2-75 Yes

622 Talod-Khanpur-2 AC D/C 66kV 11.50 04/02/89 Yes

623 Talod-Dhansura-1 AC D/C 66kV 28.74 01/08/72 Yes

624 Talod-Dhansura-2 AC D/C 66kV 29.16 07/02/79 Yes

625 Talod - Rozad AC S/C 66kV 15.00 07/02/79 Yes

626 Dhansura - Rozad AC S/C 66kV 14.16 07/02/79 Yes

627 Rozad - Madhavgadh AC S/C 66kV 11.80 09/01/08 Yes

628 R'san-Gambhoi-Medhasan tap AC S/C 66kV 25.36 28-11-80 Yes

629 Sathamba-Gabat AC S/C 66kV 8.50 09/03/93 Yes

630 Sathamba-Balasinor AC S/C 66kV 26.80 30-8-81 Yes

631 Sathamba-Virpur AC S/C 66kV 16.98 31-12-01 Yes

632 Dhansura-Sathamba AC S/C 66kV 27.69 30-6-76 Yes

633 Dhansura-A'yara AC S/C 66kV 21.23 20-3-90 Yes

634 Ambaliyara-Nirmali AC S/C 66kV 6.95 05/03/92 Yes

635 Dhansura-Bayad AC S/C 66kV 13.50 16-12-98 Yes

636 Dhansura-Modasa-1 AC D/C 66kV 18.20 30-12-76 Yes

637 Dhansura-Modasa-2 AC S/C 66kV 18.92 30-10-90 Yes

638 Modasa-Malpur AC S/C 66kV 22.56 17-3-85 Yes

639 Modasa-Meghraj AC S/C 66kV 24.98 30-4-70 Yes

640 Modasa-Tintoi AC S/C 66kV 17.15 14-6-84 Yes

641 Meghraj-Rellawada AC S/C 66kV 15.79 31-3-02 Yes

642 Rellawada-Kasana AC S/C 66kV 11.72 03/18/08 Yes

643 Talod-Prantij-Tajpur tap AC S/C 66kV 22.00 08/01/72 Yes

644 Tajpur-D'muvadi AC S/C 66kV 6.95 27-11-93 Yes

645 Dhansura-Bayal (D) AC S/C 66kV 14.00 30-12-00 Yes

646 66 kv LILO Borisana-Sabarmati

at Adalaj s/sAC S/C 66 KV 5.00 5/17/2010 Yes

647 66 KV Rangpurda-Sadara AC S/C 66 KV 13.28 4/14/2010 Yes

648 66 KV Varetha- Navasudasan

lineAC S/C 66 KV 8.54 3/23/2010 Yes

649 66 KV LILO Chhatral-Kadi at

Dhanot s/sAC S/C 66 KV 0.35 7/22/2010 Yes

650 66 KV Vadavi-Khatraj AC S/C 66 KV 11.00 8/23/2010 Yes

651 66kv Modhera- Maniyari AC S/C 66 KV 9.16 5/2/2009 Yes651 66kv Modhera- Maniyari AC S/C 66 KV 9.16 5/2/2009 Yes

652 Palanpur-Palanpur-I AC S/C 66kV 3.5 28.12.89 Yes

653 Palanpur-Palanpur-II AC S/C 66kV 0.3 27.4.93 Yes

654 Palanpur-Lalawada AC S/C 66kV 7 25.7.01 Yes

655 Palanpur-Palanpur-1 Ckt-2 AC S/C 66kV 18 27.7.01 Yes

656 Lalawada-Kanodar AC S/C 66kV 7 27.7.01 Yes

657 Palanpur-Jalotra AC S/C 66kV 18 6.3.90 Yes

658 Palanpur-Malan AC S/C 66kV 11 4.2.97 Yes

659 Palanpur-Hebatpur AC S/C 66kV 10 27.7.98 Yes

660 Palanpur-Chandisar AC S/C 66kV 20 25.2.91 Yes

661 Jalotra-Danta AC S/C 66kV 22 12.8.91 Yes

662 Basu-Gadh AC S/C 66kV 12 17.11.03 Yes

663 Palanpur-Vadgam AC S/C 66kV 13 5.1.95 Yes

664 Hebatpur-Iqbalgadh AC S/C 66kV 14 27.12.88 Yes

665 Iqbalgadh- Amirgadh AC S/C 66kV 18 28.8.89 Yes

666 Patan-Kansa AC S/C 66kV 16 8.12.90 Yes

667 Patan - Adia AC S/C 66kV 18 1.12.81 Yes

668 Sankhari-Saduthala AC S/C 66kV 30 21.7.97 Yes

669 Sankhari-Adia AC S/C 66kV 19 21.11.01 Yes

670 Sankhari-Manud AC S/C 66kV 17 14.7.99 Yes

671 Balisana-Manud AC S/C 66kV 12 20.3.92 Yes

672 Kansa-Aganwada AC S/C 66kV 13 26.10.97 Yes

673 Anawada-dunawada AC S/C 66kV 15 31.1.98 Yes

674 Adia-Harij-1 AC S/C 66kV 15 22.7.99 Yes

675 Adia-Harij-II AC S/C 66kV 15 30.4.04 Yes

676 Harij-Sami AC S/C 66kV 15 17.5.94 Yes

677 Sami-Sankheswar AC S/C 66kV 25 17.5.94 Yes

678 Chanasma-Kamboi AC S/C 66kV 12 10.11.92 Yes

679 Sankhari-Patan-I(Anawada) AC S/C 66kV 20 9.8.98 Yes

680 Sankhari-Patan-II AC S/C 66kV 13 9.8.98 Yes

681 Sankhari-Chanasma-I AC S/C 66kV 18 17.8.95 Yes

682 Sankhari-Chanasma-II AC S/C 66kV 18 17.8.95 Yes

683 Chanasma-Modhera AC S/C 66kV 16 11.11.83 Yes

684 Sankhari-Rajpur AC S/C 66kV 6 17.6.05 Yes

685 Patan-Khali-I(Kamliwada) AC S/C 66kV 10 1.12.81 Yes

686 Patan-Khali-II AC S/C 66kV 30 14.8.03 Yes

687 Kamboi-Anganwada AC S/C 66kV 14 5/11/1999 Yes

688 Sami-Mujapur AC S/C 66kV 14 5.11.99 Yes

689 Kamlivada-Khali AC S/C 66kV 13 18.4.03 Yes689 Kamlivada-Khali AC S/C 66kV 13 18.4.03 Yes

690 Chanasma-Keshni AC S/C 66kV 10 23.8.82 Yes

691 Keshni-Dhinoj AC S/C 66kV 10 18.3.05 Yes

692 Sankhari-Khorasam AC S/C 66kV 25 6.9.05 Yes

693 Jangral-Kimbuva AC S/C 66kV 15 16.1.01 Yes

694 Manund-Unava AC S/C 66kV 11.4 10.6.06 Yes

695 Jangral-Gadh AC S/C 66kV 12 27.7.81 Yes

118

Page 19: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

696 Deesa-Manekpura AC S/C 66kV 14 7.5.88 Yes

697 Manekpur-Unava AC S/C 66kV 6.3 2008 Yes

698 Zerda-Khimat AC S/C 66kV 17 1.2.91 Yes

699 Kansari-Shamserpura AC S/C 66kV 5.5 30.12.94 Yes

700 Kansari-Motakapra AC S/C 66kV 22 12.3.92 Yes

701 Khimat-Nanameda AC S/C 66kV 17 13.3.93 Yes

702 Khimat-Panthawada AC S/C 66kV 12 12.2.94 Yes

703 Kansari-Baiwada AC S/C 66kV 5 10.2.96 Yes

704 Baiwada- Vithodar AC S/C 66kV 10 13.3.02 Yes

705 MotaKapra-Shergadh AC S/C 66kV 11 10.3.2000 Yes

706 Deesa-Lorwada AC S/C 66kV 9 20.1.96 Yes

707 Deesa-Ranpur AC S/C 66kV 15 30.9.87 Yes

708 Ranpur-Dantiwada AC S/C 66kV 15 30.9.87 Yes

709 Bhildi -Arniwada AC S/C 66kV 11 29.6.01 Yes

710 Kansari-Zerda-I AC S/C 66kV 4 16.8.86 Yes

711 Kansari-Zerda-II AC S/C 66kV 4 30.7.01 Yes

712 Deesa-Kansari-I AC S/C 66kV 18 16.8.91 Yes

713 Deesa-Kansari -II(Lorwada) AC S/C 66kV 19 16.8.91 Yes

714 Kansari -Lorwada AC S/C 66kV 14 31.7.04 Yes

715 Lorwada-Bhildi AC S/C 66kV 10 10.2.96 Yes

716 Vithodar-Panthawada AC S/C 66kV 17 27.2.03 Yes

717 Kansari-Ramun AC S/C 66kV 4 27.3.89 Yes

718 Jangral -Jangral AC S/C 66kV 0.5 2.11.03 Yes

719 Jangral -Kalyan AC S/C 66kV 12 8/10/2007 Yes

720 Ramun-Dhanera AC S/C 66kV 14 21.3.02 Yes

721 Deesa-Gadh AC S/C 66kV 21 1.1.74 Yes

722 Manekpura-Samau AC S/C 66kV 20 29.12.03 Yes

723 Vithodar-Jegol AC S/C 66kV 20 21.3.05 Yes

724 Kansari-Devsari AC S/C 66kV 13 24.3.05 Yes

725 Devsari-Kotda(D) AC S/C 66kV 17 24.3.05 Yes

726 Jangral-samau AC S/C 66kV 13 27.6.05 Yes

727 Kansari-Vithodar AC S/C 66kV 15.7 13.3.02 Yes

728 Nanameda-Vaktapura AC S/C 66kV 8.5 2.5.06 Yes

729 Jangral-Samdhi AC S/C 66kV 18 30.3.06 Yes

730 Deodar-Bhabhar(Mera) AC S/C 66kV 35 25.5.89 Yes730 Deodar-Bhabhar(Mera) AC S/C 66kV 35 25.5.89 Yes

731 Deodar-Deodar AC S/C 66kV 6 27.12.89 Yes

732 Deodar-Raiya AC S/C 66kV 13 25.6.05 Yes

733 Raiya-Arnivada AC S/C 66kV 26 25.6.05 Yes

734 Deodar-Khoda AC S/C 66kV 18 11.11.92 Yes

735 Deodar-Padardi AC S/C 66kV 14 18.12.91 Yes

736 Deodar-Shihori AC S/C 66kV 20.5 18.12.91 Yes

737 Deodar-Thara-1 AC S/C 66kV 14 12.2.90 Yes

738 Deodar-Thara-2 AC S/C 66kV 14 11.10.03 Yes

739 Deodar-Lakhani AC S/C 66kV 35 5.1.90 Yes

740 Deodar-Terwada-I AC S/C 66kV 12 7.6.95 Yes

741 Deodar-Terwada-II AC S/C 66kV 12 28.6.2000 Yes

742 Padardi-Shihori AC S/C 66kV 10 18.12.91 Yes

743 Shihori-Kamboi ( F ) AC S/C 66kV 14 5.11.99 Yes

744 Shihori-Dungrason AC S/C 66kV 8 10.3.87 Yes

745 Thara-Dungrason AC S/C 66kV 8 10.3.87 Yes

746 Thara-UN AC S/C 66kV 12 28.12.99 Yes

747 Terwada-Radhanpur(s) AC S/C 66kV 31 12.8.05 Yes

748 Radhanpur-Daisar AC S/C 66kV 20 5.8.96 Yes

749 Radhanpur-UN AC S/C 66kV 22 12.8.05 Yes

750 Radhanpur-Varahi AC S/C 66kV 15 1.10.91 Yes

751 Varahi-Santalpur AC S/C 66kV 32.5 5.11.96 Yes

752 Radhanpur-Radhanpur-1 AC S/C 66kV 5 1.9.05 Yes

753 Radhanpur-Radhanpur-2 AC S/C 66kV 5 1.9.05 Yes

754 Vadiya-Mera AC S/C 66kV 13 27.2.06 Yes

755 Kheralu-Kheralu AC S/C 66kV 2.33 25.12.96 Yes

756 Kheralu-Satlasana AC S/C 66kV 29.16 2.2.87 Yes

757 Kheralu-Kodram-1 AC S/C 66kV 15 29.1.97 Yes

758 Kheralu-Kodram-2 AC S/C 66kV 15 24.12.05 Yes

759 Kheralu-Kahoda-Sidhpur AC S/C 66kV 27.6 6.2.94 Yes

760 Kheralu-Umta AC S/C 66kV 16 9.4.99 Yes

761 Kheralu-Vadnagar AC S/C 66kV 12 7.2.97 Yes

762 Kheralu - Khanpur AC S/C 66kV 13 9.9.02 Yes

763 Sidhapur-Unjha-Karli AC S/C 66kV 26 1.4.72 Yes

764 Sidhapur-Chhapi AC S/C 66kV 12 14.1.80 Yes

765 Sidhapur-Kakoshi AC S/C 66kV 19 15.2.90 Yes

766 Sidhapur-Khali AC S/C 66kV 3.5 10.12.99 Yes

767 Sidhapur-Kahoda AC S/C 66kV 13 2.6.90 Yes

768 Chhapi-Vadgam AC S/C 66kV 11.5 14.2.80 Yes768 Chhapi-Vadgam AC S/C 66kV 11.5 14.2.80 Yes

769 Umta-Karli AC S/C 66kV 12 19.4.01 Yes

770 66 kv Unjha-Bhandu AC S/C 66kV 15 30.11.91 Yes

771 Kodram-Vadgam-Gidasan AC S/C 66kV 22 13.3.93 Yes

772 Sidhapur-Kanodar AC S/C 66kV 22 20.3.96 Yes

773 Kakoshi-Basu AC S/C 66kV 11 18.1.79 Yes

774 Kheralu - Varetha AC S/C 66kV 15.5 2.3.04 Yes

119

Page 20: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

775 Khanpur-Rampura AC S/C 66kV 14 9.9.02 Yes

776 Kheralu-Mandali AC S/C 66kV 14 8.7.04 Yes

777 Vadnagar-Jantral AC S/C 66kV 14 2.11.99 Yes

778 Kodaram- Panchada AC S/C 66kV 12 20.8.05 Yes

779 Mandali-Dasaj AC S/C 66kV 11.8 5.8.05 Yes

780 Tharad-Tharad AC S/C 66kV 1.2 9.4.98 Yes

781 Tharad-Didarda-Piluda AC S/C 66kV 32 18.8.94 Yes

782 Tharad - Rah AC S/C 66kV 24 26.12.92 Yes

783 Rah-Jadiyali AC S/C 66kV 16 2.3.05 Yes

784 Tharad - Tithagam AC S/C 66kV 19 15.7.99 Yes

785 Tharad - Kuvana AC S/C 66kV 17 27.1.99 Yes

786 Kuvana-Lakhani AC S/C 66kV 8.6 31.1.2000 Yes

787 Lakhani-Agthala AC S/C 66kV 8 30.3.04 Yes

788 Agthala-Motakapra AC S/C 66kV 8 30.3.92 Yes

789 Lakhani-Motakapra AC S/C 66kV 16 30.3.92 Yes

790 Rah-Asodar AC S/C 66kV 12 30.3.96 Yes

791 Tharad-Asodar AC S/C 66kV 24 1.1.05 Yes

792 Tithagam-Bhabhar AC S/C 66kV 26 1.2.92 Yes

793 Kansari-Ramun AC S/C 66kV 18 27.3.89 Yes

794 Ramun-Dhanera AC S/C 66kV 28 21.3.02 Yes

795 Dhanera-Jadiya AC S/C 66kV 18 27.3.89 Yes

796 Tharad-Tadav AC S/C 66kV 25 15.1.96 Yes

797 Tharad-Pathamada AC S/C 66kV 13 5/16/2007 Yes

798 Jadiya-Lavara AC S/C 66kV 15 17.3.01 Yes

799 Tharad-Jaloya AC S/C 66kV 47 20.7.01 Yes

800 Tharad-Makhanu AC S/C 66kV 19 28.10.03 Yes

801 Makhanu- Mithipaldi AC S/C 66kV 6 25.8.05 Yes

802 Tithgam-Runi AC S/C 66kV 20 27-1-06 Yes

803 66KV Bhutedi -Dantiwada AC S/C 66 KV 8.00 7.7.09 Yes

804 66KV Jangral-Kamboii AC S/C 66 KV 17.00 15-7-09 Yes

805 66KV LILO Aseda line on ACSR

Panther Conductor from 66KV

Jangral-Samdhi line

AC D/C 66 KV 4.45 28.5.2010 Yes

806 66KV LILO Malotra line on ACSR

PantherConductor from 66KV AC S/C 66 KV 0.75 3.5.2010 YesPantherConductor from 66KV

Thavar-Nanameda line

AC S/C 66 KV 0.75 3.5.2010 Yes

807 66KV Asodar-Taruva line AC S/C 66 KV 4.20 9.7.2010 Yes

808 66KV LILO Balodhan line on

ACSR Dog Conductor from 66KV

Bhabhar-Tithgam line

AC D/C 66 KV 9.40 7.7.2010 Yes

809 66KV Pechhadal LILO line from

66KV Kansari-Devsari lineAC D/C 66 KV 0.91 20.7.2010 Yes

810 66KV LILO Sherpura line on

ACSR Dog Conductor from 66KV

Kansari-Ramun line

AC D/C 66 KV 4.65 15.6.2010 Yes

811 66KV LILO Talepura (Ghada)

line on ACSR Dog Conductor

from 66KV Baivada-Vithodar line

AC D/C 66 KV 6.50 2.7.2010 Yes

812 66KV LILO Mitha line from 66KV

Deodar-Bhabhar lineAC D/C 66 KV 0.70 3.9.2010 Yes

813 66KV Agthala-Aghtala AC S/C 66 KV 1 11.10.2010 Yes

814 66KV Agthala-Lakhani AC S/C 66 KV 7.5 4.10.2010 Yes

815 66KV Agthala-Taruva AC S/C 66 KV 19.84 4.10.2010 Yes

816 66KV Agthala-Kotda (D) AC S/C 66 KV 16.45 4.10.2010 Yes

817 66KV Agthala-Shergadh AC S/C 66 KV 11.36 4.10.2010 Yes

818 66KV Agthala-Kapra AC S/C 66 KV 1.5 11.10.2010 Yes

819 66 KV Bhutiya-Panol AC S/C 66 KV 5.28 5/4/2010 Yes

820 66 KV Hansalpur-Munpur AC S/C 66 KV 9.64 29.02.2010 Yes

821 66 KV Nikoda-Ghadi AC S/C 66 KV 12.26 2/6/2010 Yes

822 66 KV Langhanaj-Aakhaj AC S/C 66 KV 6.06 5/1/2010 Yes

823 66KV Bhiloda-Dantod line LILO

at 66KV Torda SSAC D/C 66 KV 10.00 7/15/2010 Yes

824 66 KV Manekpur-Unava AC S/C 66 KV 6.36 8/7/2009 Yes

825 66KV Chandarni-Kalidungri AC S/C 66 KV 16.27 3/24/2009 Yes

826 Paliyad-Botad No-I AC D/C 66kV 15 15/8/92 Yes

827 Paliyad-Botad No-II AC D/C 66kV 15 4/12/1992 Yes

828 Paliyad-Vichhiya AC S/C 66kV 25 16/10/93 Yes

829 Vichhiya-Bandhani AC S/C 66kV 17 7/13/2007 Yes

830 Botad - Salangpur AC S/C 66kV 22 5/12/1991 Yes

831 Salangpur-Lathidad AC S/C 66kV 7.5 27/2/93 Yes

832 Salangpur-Lakheni AC S/C 66kV 17 1993 Yes

833 Dhasa-Gadhada AC S/C 66kV 22 1990 Yes833 Dhasa-Gadhada AC S/C 66kV 22 1990 Yes

834 Paliyad - Turkha AC S/C 66kV 13 28/2/00S Yes

835 Paliyad - Sudamada AC S/C 66kV 29 20/9/02 Yes

836 Dhasa-Lathi AC S/C 66kV 16 27/6/66 Yes

837 Dhasa-Babra AC S/C 66kV 18 23/11/83 Yes

838 Dhasa-Songadh AC S/C 66kV 32 1966 Yes

839 Lathi - Amreli AC S/C 66kV 23 2000 Yes

120

Page 21: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

840 Babra - Jasdan AC S/C 66kV 28 1987 Yes

841 Babra - Chittal AC S/C 66kV 14 1993 Yes

842 Amreli - Chittal AC S/C 66kV 7 2001 Yes

843 Sagapara- N'vadar AC S/C 66kV 15 2001 Yes

844 Dhasa - Savarkundla AC S/C 66kV 43.21 1966 Yes

845 Botad - Gadhada AC S/C 66kV 22 29/3/91 Yes

846 Dhasa - Paliyad AC S/C 66kV 52 7/5/1965 Yes

847 Dhasa - Chavand AC S/C 66kV 12 2002 Yes

848 Vartej - Sihor -1 AC S/C 66kV 16 12/14/1987 Yes

849 Vartej - Sihor -2 AC S/C 66kV 20 2/16/1972 Yes

850 Vartej - Excel - 1 AC S/C 66kV 16 7/21/1971 Yes

851 Vartej - Excel - 2 AC S/C 66kV 16 7/21/1971 Yes

852 Vartej - Nari - 1 AC S/C 66kV 11.5 10/11/1978 Yes

853 Vartej - Nari - 2 AC S/C 66kV 11.5 10/19/1972 Yes

854 Vartej - Sagapara AC S/C 66kV 50 4/2/1966 Yes

855 Sagapara - Talaja and AC S/C 66kV 35 12/4/1981 Yes

856 Tap to Bagdana AC S/C 66kV 20 12/23/1995 Yes

857 Sagapara - Palitana - 1 AC S/C 66kV 5 9/12/1999 Yes

858 Sagapara - Palitana - 2 AC S/C 66kV 8 7/1/2000 Yes

859 Sagapra - Tana AC S/C 66kV 14 9/13/1999 Yes

860 Sagapara - Songadh AC S/C 66kV 21 9/17/1998 Yes

861 Otha - Talaja AC S/C 66kV 40 9/1/1998 Yes

862 Talaja - Manar AC S/C 66kV 16.33 2/28/1999 Yes

863 Sihor - Songadh AC S/C 66kV 10 6/29/1995 Yes

864 Songadh - Dhasa and AC S/C 66kV 35 9/1/1989 Yes

865 Tap to Dhola AC S/C 66kV 10 9/1/1989 Yes

866 Sidsar - Mamsa AC S/C 66kV 10 11/11/1993 Yes

867 Sidsar - Bhumbhli AC S/C 66kV 16.5 2/21/1999 Yes

868 Nari - Nirma O/G AC D/C 66kV 11.21 8/1/1999 Yes

869 Nari - Nirma I/C AC D/C 66kV 11.21 8/1/1999 Yes

870 Mamsa - Ukharala AC S/C 66kV 5.7 9/27/2003 Yes

871 Mamsa - Tansa AC S/C 66kV 25 11/10/1993 Yes

872 Pithalpur Tap AC S/C 66kV 14.631 21-6-04 Yes

873 Ghanghli - Vallbhipur AC S/C 66kV 18.5 1971 Yes

874 Savarkundla-Savarkundla AC S/C 66kV 2.9 17/12/87 Yes874 Savarkundla-Savarkundla AC S/C 66kV 2.9 17/12/87 Yes

875 Savarkundla-Amreli AC S/C 66kV 31.7 7/7/1981 Yes

876 Savarkundla-Khambha AC S/C 66kV 31.28 1985 Yes

877 Savarkundla-J'Bad No.1 AC S/C 66kV 54.9 3/8/1982 Yes

878 Savarkundla-J'Bad No.2 AC S/C 66kV 54.9 3/8/1982 Yes

879 Savarkundla-Vijapadi (Lilo Gadhkda) AC S/C 66kV 32 5/8/1984 Yes

880 Savarkundla-Rajula AC S/C 66kV 44.62 4/8/1984 Yes

881 Savarkundla-Vanda AC S/C 66kV 20 18/1/91 Yes

882 Savarkundla-Liliya AC S/C 66kV 24.3 30/5/92 Yes

883 Liliya - Gundaran AC S/C 66kV 16 9/9/2008 Yes

884 Savarkundla-Chalala No.1 AC S/C 66kV 20.15 28/3/90 Yes

885 Savarkundla-Chalala No.2 AC S/C 66kV 20.15 23/1/87 Yes

886 Savarkundla-Garayadhar AC S/C 66kV 25 9/2/1991 Yes

887 Chalala-Dhari AC S/C 66kV 15 30/9/90 Yes

888 Dhari-Dudhala AC S/C 66kV 25 23/11/97 Yes

889 Dhari-Bhader AC S/C 66kV 20 20/3/99 Yes

890 Chalala-Sarambhada AC S/C 66kV 15 26/3/99 Yes

891 Sarambhada-Bagasara AC S/C 66kV 15 26/3/99 Yes

892 Bagasara-Kukavav AC S/C 66kV 18.35 26/3/99 Yes

893 Rajula-Dunger AC S/C 66kV 18 1/10/1996 Yes

894 Vijapadi-Khuntawada AC S/C 66kV 24 16/1/78 Yes

895 Rajula-M.Barman AC S/C 66kV 18.37 2/8/1995 Yes

896 Mahuwa-Vadli AC S/C 66kV 10 16/1/90 Yes

897 Otha-Vadli AC S/C 66kV 18 26/5/01 Yes

898 Vanda-Jesar AC S/C 66kV 20.2 13/3/86 Yes

899 Amreli-Amreli'A' AC S/C 66kV 12 28/2/00 Yes

900 Amreili A - Amreli B AC S/C 66kV 7 Jan-08 Yes

901 Amreli-Amreli 'B' (Lilo Gavadka) AC S/C 66kV 20 20/1/00 Yes

902 Otha-Khuntawada AC S/C 66kV 38 3/9/2004 Yes

903 Otha-Mahuwa AC S/C 66kV 20 22/6/04 Yes

904 Mahuwa-Dunger (Lilo at Vangar) AC S/C 66kV 30.8 24/6/04 Yes

905 Vadli-Volvo AC S/C 66kV 6.5 16/6/97 Yes

906 Talala- Veraval No:1 AC D/C 66kV 24 16/10/70 Yes

907 Talala- Moraj AC D/C 66kV 24 16/10/70 Yes

908 Talala-Pranchi-Ankolwadi AC S/C 66kV 53.32 18/10/70 Yes

909 Talala - Jasadhar AC S/C 66kV 10.92 Feb-08 Yes

910 Timbdi-Pranchi AC S/C 66kV 3 16/2/90 Yes

911 Timbdi-Patan No.1 AC D/C 66kV 24 5/10/1996 Yes

912 Timbdi-Patan No.2 AC D/C 66kV 24 13/11/95 Yes912 Timbdi-Patan No.2 AC D/C 66kV 24 13/11/95 Yes

913 Timbdi-Kodinar AC S/C 66kV 16 16/2/90 Yes

914 Timbdi-Devli-Kodinar AC S/C 66kV 22 8/1/1998 Yes

915 Kansari-Kesariya-Una tap AC S/C 66kV 18 17/4/2006 Yes

916 Kesariya - Advi AC S/C 66kV 15 29/7/05 Yes

917 Una- Diu AC D/C 66kV 23 20/7/91 Yes

918 Kansari-Una AC S/C 66kV 9 12/8/1988 Yes

121

Page 22: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

919 Kansari-Dhokadava AC S/C 66kV 12 29/11/97 Yes

920 Dhokadava-Girgadhda AC S/C 66kV 18 18/1/97 Yes

921 Dhokadava-Khambha AC S/C 66kV 37 17/12/91 Yes

922 Timbdi-Ghantwad AC S/C 66kV 18 1999 Yes

923 Kansari-Samter AC S/C 66kV 10.5 26/2/00 Yes

924 Devli-Advi AC S/C 66kV 12 17/4/00 Yes

925 Kansari-Diu AC D/C 66kV 28.8 4/6/2002 Yes

926 66 KV Dhasa songadh LILO at

DharwalaAC D/C 66 KV 1.00

04.04.2009Yes

927 Lilo to 66KV Pasvi from 66KV

Otha -TalajaAC D/C 66 KV 0.80

02.05.2009Yes

928 Lilo to 66KV MalaviyaPipariya

from 66KV Amreli-LathiAC D/C 66 KV 4.00

02.05.2009Yes

929 Lilo to 66KV Malapara S/S from

66KV Dhasa -Paliyad lineAC D/C 66 KV 1.00

16.07.2009Yes

930 66 KV Jafrabad-PSL-2 AC S/C 66 KV 7.50 7.10.2008 Yes

931 Lilo to Ghodidhal from 66KV

Vartej SagaparaAC S/C 66 KV 0.80

20.05.2009Yes

932 LILO at Sardarnagar s/s from

66KV Vartej Excel No-1 AC U/C 66 KV 1.10

20.06.2009Yes

933 66 KV Vallabhipur - Moti Dharai

lineAC S/C 66 KV 14.00

21.07.2009Yes

934 66KV Vartej-Unity(City) AC S/C 66 KV 15.50 29.09.2009 Yes

935 66 KV Bagdana- Kadamgiri AC S/C 66 KV 13.52 30.11.2009 Yes

93666KV M Samadhiyala-Delval line AC S/C 66 KV 11.86

20.11.2009Yes

937 66KV Kotadapitha -Khambhada AC S/C 66 KV 18.00

01.02.2010Yes

938 66KV Khambha-Dokalva LILO at

66 KV RabarikaAC D/C 66 KV 1.00

04.03.2010Yes

939 66 KV Motidharai - Panvi AC S/C 66 KV 8.34 26.05.2010 Yes

940 66KV Salangpur -botad line is

conveted to 66 KV

Botad-Botad line and 66 KV

Botad-Salangpur

AC D/C 66 KV 6.00

11.06.2010

Yes

Botad-Salangpur 11.06.2010

941 66 KV Vartej - Ghodidhal LILO

at 66 KV Sar s/sAC D/C 66 KV 3.97

03.07.2010Yes

942 lilo from 66KV Rajujal -Dungar to 66KV Kadiyali Ss -AC D/C 66 KV 8.20 28.07.2010 Yes

943 Jasdan-Kamlapur (Lilo at

Jasdan2)AC S/C 66kV 31.4 22.02.01 Yes

944 Jetpur-Virpur AC S/C 66kV 13 15.04.65 Yes

945 Gondal-Virpur AC S/C 66kV 17 13.12.89 Yes

946 Gondal-Kolithad AC S/C 66kV 13.50 07.05.94 Yes

947 Kolithad-Kharedi AC S/C 66kV 21 15.04.65 Yes

948 Virpur-Lilakha AC S/C 66kV 8.5 12.07.94 Yes

949 Jetpur - Lilakha AC S/C 66kV 21.5 7/14/2008 Yes

950 Lilakha - Sultanpur AC S/C 66kV 14 3/31/2008 Yes

951 Gondal-Movia AC S/C 66kV 8 30.07.90 Yes

952 Movia-Vasavad AC S/C 66kV 22 30.07.90 Yes

953 Vasavad-Derdi AC S/C 66kV 12.5 20.03.96 Yes

954 Sultanpur - Derdi AC S/C 66kV 13 4/25/2008 Yes

955 Gondal-"K" s/S AC S/C 66kV 6 25.10.78 Yes

956 Tap to "K" s/S line AC S/C 66kV 1.2 28.11.90 Yes

957 Tap to Kotda laine AC S/C 66kV 9.5 08.06.91 Yes

958 Kotda-Sardhar AC S/C 66kV 17 20.04.91 Yes

959 Gondal-Siddheshwar-I AC S/C 66kV 26 15.04.65 Yes

960 Gondal-Siddheshwar-II AC S/C 66kV 26 15.04.65 Yes

961 Jasdan-Sardhar AC S/C 66kV 26 05.02.90 Yes

962 Jasdan-Motadadva AC S/C 66kV 14.2 6/28/2007 Yes

963 Tap to Lodhika AC S/C 66kV 14 30.12.89 Yes

964 Sardhar-Tramba AC S/C 66kV 17 01.09.03 Yes

965 Kharedi-Kalawad AC S/C 66kV 26 08.11.72 Yes

966 Liara-Dhrol AC S/C 66kV 18 04.06.03 Yes

967 Sikka -Sikka TPS I AC D/C 66kV 1.8 26.12.89 Yes

968 Sikka-Sikka TPS No.II AC D/C 66kV 1.8 26.12.89 Yes

969 Sikka-Naghedi-Tap to B-S/S AC D/C 66kV 28 29.03.94 Yes

970 Jamnagar-Matwa (Modpar) AC S/C 66kV 16 29.06.65 Yes

971 Matwa (Modpar) -Kalawad AC S/C 66kV 21 29.06.65 Yes

972 Matwa (Modpar) -Morvadi AC S/C 66kV 21.47 2008 Yes

973 Jamnagar-Lalpur AC S/C+ D/C 66kV 35 29.03.84 Yes

974 Jamnagar-Banugar AC S/C 66kV 19.4 21.01.98 Yes

975 Banugar-Jamvanthli AC S/C 66kV 20.2 21.01.98 Yes

976 Dhrol-Dhrol-1 AC S/C+ D/C 66kV 1.7 05.06.03 Yes976 Dhrol-Dhrol-1 AC S/C+ D/C 66kV 1.7 05.06.03 Yes

977 Dhrol-Dhrol-2 AC S/C+ D/C 66kV 1.5 02.06.03 Yes

978 Lalpur-Bhanvad AC S/C 66kV 41 15.08.91 Yes

979 Dhrol-Latipur AC S/C+ D/C 66kV 20 02.03.03 Yes

980 Dhrol-Jamdudhai AC S/C 66kV 26 19.05.93 Yes

981 Dhrol-Keshiya AC S/C 66kV 13 31.05.03 Yes

982 Naghedi-Bedeshwar AC S/C 66kV 6 24.05.86 Yes

122

Page 23: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

983 Naghedi-Satrasta (O/H) No.1 AC S/C 66kV 4 11.07.80 Yes

984 Naghedi-Satrasta (U/G) No.2 AC S/C 66kV 2.5 11.07.80 Yes

985 Jamnagar-Jamnagar "B"( DP ) AC S/C 66kV 8 19.06.65 Yes

986 Jamnagar-Jam "B"( Tower ) AC S/C+ D/C 66kV 14 16.02.04 Yes

987 Jamnagar-Hapa AC S/C on D/C 66kV 6 11.04.99 Yes

988 Naghedi-Jamnagar "C"(U/G) No.1 AC S/C 66kV 1.5 27.08.02 Yes

989 Naghedi-Jamnagar "C"(U/G) No.2 AC S/C 66kV 1.5 27.08.02 Yes

990 Jamnagar-Kalawad AC S/C 66kV 39 21.12.01 Yes

991 TPS-GSFC-1 AC D/C 66kV 8 09.07.90 Yes

992 TPS-GSFC-2 AC D/C 66kV 8 09.07.90 Yes

993 Pipli Tap Line AC S/C 66kV 8.696 25.03.05 Yes

994 Modpar-Pipartoda AC S/C 66kV 18.3 22.08.06 Yes

995 Sikka-Meghpar AC S/C 66kV 12 28.05.99 Yes

996 Sikka-Vadinar AC S/C 66kV 21 28.11.78 Yes

997 Meghpar-Khambhalia AC S/C 66kV 30 28.05.99 Yes

998 Khambhalia-Vadatra AC S/C 66kV 15.5 19.01.01 Yes

999 Bhatia-Kalyanpur AC S/C 66kV 18 07.05.95 Yes

1000 Bhatia-Varvala D/P line AC S/C 66kV 42 31.03.82 Yes

1001 Bhatia-Varvala (Tower) AC S/C 66kV 42 02.02.06 Yes

1002 Bhatia-Lamba D/P line (Lilo at

Lamba(GETCO)AC S/C 66kV 23.5 05.06.04 Yes

1003 Bhatia-Bhogat AC S/C 66kV 16 08.06.04 Yes

1004 Bhatia-Navadra AC S/C 66kV 28 23.06.04 Yes

1005 Kalyanpur-Patelka AC S/C 66kV 7.7 07.05.95 Yes

1006 Kalayanpur-Bhadthar AC S/C 66kV 23 09.04.05 Yes

1007 Varvala-Arambhada AC S/C 66kV 24 16.01.93 Yes

1008 Bhogat-Lamba AC S/C 66kV 11 24.07.03 Yes

1009 Navadra-Lamba AC S/C 66kV 7 23.05.04 Yes

1010 Vikram-Laxminagar AC S/C 66kV 9 20.01.88 Yes

1011 Puniitnagar-Laxminagar (U/G) AC S/C 66kV 4.60 10.11.98 Yes

1012 Dudhsagar-Navagam AC S/C 66kV 4 25.10.96 Yes

1013 Dudhsagar-GIDC AC S/C on D/C 66kV 4 21.05.92 Yes

1014 Padadhari-Liara AC S/C 66kV 18 20.03.98 Yes1014 Padadhari-Liara AC S/C 66kV 18 20.03.98 Yes

1015 Vikram-Kotharia AC S/C on D/C 66kV 6 17.10.87 Yes

1016 Vikram-Dudhsagar AC S/C on D/C 66kV 12 17.10.87 Yes

1017 Vikram-Punitnagar I AC D/C 66kV 5 05.05.97 Yes

1018 Vikram-Punitnagar-II AC D/C 66kV 5 05.05.97 Yes

1019 Vikram-Shapar I AC D/C 66kV 4 12.01.90 Yes

1020 Vikram-Shapar-II AC D/C 66kV 4 12.01.90 Yes

1021 Vikram-Vikram Steel AC S/C 66kV 0.05 14.02.97 Yes

1022 Nyara-Taraghadi AC S/C 66kV 15 25.11.96 Yes

1023 Nyara-Popatpara AC S/C 66kV 15 23.11.97 Yes

1024 Nyara-Ghanteshwar-I AC D/C 66kV 4 24.11.97 Yes

1025 Nyara-Ghanteshwar-II AC D/C 66kV 4 22.11.97 Yes

1026 Nyara-Nikava AC S/C 66kV 28 23.03.05 Yes

1027 Targhadi-Padadhari AC S/C 66kV 16 14.04.86 Yes

1028 Shapar-Siddheshwar-I AC D/C 66kV 3.58 29.6.96 Yes

1029 Shapar-Siddheshwar-II AC D/C 66kV 3.58 25.4.96 Yes

1030 G.I.D.C. - Kotharia AC S/C on D/C 66kV 6 21.9.02 Yes

1031 Popatpara-Navagam AC S/C 66kV 6 25.10.96 Yes

1032 Punitnagar-Rolex(Express) AC S/C 66kV 0.06 14.9.04 Yes

1033 66kv Nyara-Metoda AC S/C on D/C 66kV 15 21.7.06 Yes

1034 66kv Nyara-Raiyadhar AC S/C on D/C 66kV 15 21.7.06 Yes

1035 Wankaner Than AC S/C 66kV 25 25.11.76 Yes

1036 Wankaner Jadeshvar AC S/C 66kV 15 20.06.82 Yes

1037 Jadeshvar Tankara AC S/C 66kV 12 20.06.82 Yes

1038 Wankaner Dudhsagar Rajkot AC S/C 66kV 50 01.12.95 Yes

1039 Wankaner Lunsar AC S/C 66kV 16 31.03.87 Yes

1040 Lunsar Chupani AC S/C 66kV 18 31.03.87 Yes

1041 Pipali Morbi'A' 1 with Lilapar Tap

[1]

AC D/C 66kV 22.5 06.11.04 Yes

1042 Pipali Morbi ‘A’ 2 AC D/C 66kV 7.5 13.07.97 Yes

1043 Pipali Morbi ‘B’1 AC D/C 66kV 11.25 21.04.98 Yes

1044 Pipali Morbi'B' 2 with Pipalia Tap

[2]

AC D/C 66kV 34.25 30.05.97 Yes

1045 Pipali Jetpar AC S/C 66kV 25 30.05.97 Yes

1046 Morbi ‘B’ Tankara AC S/C 66kV 20 05.02.00 Yes

1047 Charadava Devaliya AC S/C 66kV 12 20.10.95 Yes

1048 Tankara Latipar (Lilo at

Bangavadi)AC S/C 66kV 21.5 18.09.88 Yes

1049 Pipali charadava No. 1 AC D/C 66kV 19 19.06.99 Yes1049 Pipali charadava No. 1 AC D/C 66kV 19 19.06.99 Yes

1050 Pipali charadava No. 2 AC D/C 66kV 19 19.06.99 Yes

1051 MTK Line (EHT express line)

Morbi-Timbdi-Khirai line

AC S/C 66kV 32 30.04.02 Yes

1052 Charadava Chupani line AC S/C 66kV 15 24.12.88 Yes

1053 Wankaner Mahika line AC S/C 66kV 16.6 03.05.82 Yes

1054 Mahika- Bamanbore chotila AC S/C 66kV 34.4 21.08.84 Yes

123

Page 24: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

1055 Wankaner Dhuva AC S/C 66kV 12 01.06.77 Yes

1056 Dhuva Lilapar AC S/C 66kV 13.5 01.06.77 Yes

1057 Tankara-Hadala LILO at Kagdadi AC S/C 66kV 27 05.03.05 Yes

1058 Pipli-Khareda AC S/C 66kV 15 13.06.06 Yes

1059 Pipli-Mahendranagar AC S/C 66kV 5 29.06.06 Yes

1060 66 KV Motadadva - Ramod AC S/C H frame 66 KV 14.20 8/26/2009 Yes

1061 66 KV Vasavad - Motadevaliya AC

S/C H frame

+ Tower66 KV 11.50 8/29/2010 Yes

1062 66 KV Motadevaliya - Derdi (K) AC

S/C H frame

+ Tower66 KV 16.50 8/29/2010 Yes

1063 66 KV Metoda-Rotari AC D/C 66 KV 1.00 2/5/2009 Yes

1064 66 KV Morbi-Bharatnagar AC

S/C on D/C

Tower66 KV 1.00 8/26/2009 Yes

1065 66 KV LILO-Limbada from

Wankaner-Mahika LineAC S/C 66 KV 0.80 8/27/2009 Yes

1066 66 KV Gondal-Jamvadi-(3 KM) AC S/C 66 KV 3.00 3/8/2010 Yes

1067 66 KV Jamvadi-Umrali-(22KM) AC S/C 66 KV 22.00 2/24/2010 Yes

1068 66 KV Umrali-Jetpur-(30KM) AC S/C 66 KV 30.00 2/24/2010 Yes

1069 66 KV Jamwadi -Umrali AC D/C 66 KV 22.00 24.02.10 Yes

1070 66 KV Umrali -Jetpur AC D/C 66 KV 30.00 24.02.10 Yes

1071 66 KV Gondal-Jamwadi AC D/C 66 KV 8.00 08.03.10 Yes

1072 66 KV Devaliya - Wejalpar AC S/C 66 KV 25.59 25 Yes

1073 66 KV Balambha Latipar D/C

Tower Line AC D/C 66 KV 19.05 26 Yes

1074 Chchchapar - Lajai AC S/C 66 KV 12 5/10/2010 Yes

1075 66 kv Lalpar - Sartanpar AC D/C 66 KV 8.963 10/10/2010 Yes

1076 66KV Sardhar-Faddang AC S/C 66 KV 21.00 29.03.10 Yes

1077 66KV Faddang-Tramba AC S/C 66 KV 16.00 29.03.10 Yes

1078 66 KV Kamlapur-Lakhanka line AC S/C 66 KV 14.00 25.08.2009 Yes

1079 66KV Chhaya - Odadar W/F-1 AC D/C 66 KV 13.20 Jul-10 6/30/2010

1080 66KV Chhaya - Odadar W/F-2 AC D/C 66 KV 13.20 Jul-10 6/30/2010

1081 Junagadh-Bilkha-I AC D/C 66kV 14 7/5/1993 Yes

1082 Junagadh-Bilkha-II AC D/C 66kV 14 7/5/1993 Yes

1083 Bilkha-Bhesan AC S/C 66kV 18.9 6/20/1984 Yes1083 Bilkha-Bhesan AC S/C 66kV 18.9 6/20/1984 Yes

1084 Devkigalol-Bhesan AC S/C 66kV 8.39 1/10/1984 Yes

1085 Visavadar-Motimonpari AC S/C 66kV 24.4 9/9/1994 Yes

1086 Visavadar-Visavadar - I AC D/C 66kV 5.6 9/11/1988 Yes

1087 Visavadar-Visavadar - II AC D/C 66kV 10.5 3/28/1998 Yes

1088 Vadia-Kunkavav AC S/C 66kV 20 9/9/1992 Yes

1089 Shapur-Kanza AC D/C 66kV 11.4 8/1/1978 Yes

1090 Sardargadh-Shapur AC D/C 66kV 7 5/15/2007 Yes

1091 Visavadar-Dhebar-I AC D/C 66kV 6.45 10/6/1995 Yes

1092 Visavadar-Bilkha AC S/C 66kV 20 9/11/1988 Yes

1093 Visavadar-Bhader AC S/C 66kV 26.5 2/24/1996 Yes

1094 Shapur-Zanzarda-I AC D/C 66kV 9.5 4/15/1965 Yes

1095 Junagadh-Zanzarda AC S/C 66kV 12.05 4/15/1965 Yes

1096 Shapur-Zanzarda-II AC D/C 66kV 9.5 4/15/1965 Yes

1097 Tap to Prabhatpur AC S/C 66kV 4.46 3/28/1998 Yes

1098 Motakotda-Chuda AC S/C 66kV 17.43 6/15/1999 Yes

1099 Majewadi-Junagadh AC S/C 66kV 8 6/2/2000 Yes

1100 Choki-Junagadh AC S/C 66kV 15.15 4/15/1965 Yes

1101 Visavadar-Kotda AC S/C 66kV 13 3/19/1997 Yes

1102 Majevadi-Zanzarda AC S/C 66kV 13.9 1/16/2000 Yes

1103 Dhebar-Bhalgam AC S/C 66kV 8.67 3/27/2004 Yes

1104 Jetpur-Junagadh AC S/C 66kV 36.7 4/15/1965 Yes

1105 Jetpur-Choki AC S/C 66kV 21.5 4/15/1965 Yes

1106 Jetpur-Vadia AC S/C 66kV 24.5 12/3/1986 Yes

1107 Visavadar-Baradiya(Tap) AC S/C 66kV 25 4/26/2006 Yes

1108 Visavadar-Dhebar-II AC D/C 66kV 5.43 11/24/2005 Yes

1109 Kutiyana-Ranakandorna AC S/C 66kV 11.6 5/24/1965 Yes

1110 Kutiyana-Khageshri AC S/C 66kV 17 7/30/2007 Yes

1111 Ranakandorna-Ranavav AC S/C 66kV 14 5/24/1965 Yes

1112 Manavadar-Pajod AC S/C 66kV 12.67 1968 Yes

1113 Pajod-Kutiyana AC S/C 66kV 17 1968 Yes

1114 Kutiyana-Ranavav AC S/C 66kV 27 5/24/1965 Yes

1115 Ranavav-Porbandar GIDC AC S/C 66kV 9.5 5/12/1992 Yes

1116 Ranavav-Porbandar-I AC D/C 66kV 17.1 4/27/1974 Yes

1117 Ranavav-Porbandar-II AC D/C 66kV 16.5 4/27/1974 Yes

1118 Ranakandorna-Vansjalia AC S/C 66kV 21 10/28/1993 Yes

1119 Ranavav-Bagvadar AC S/C 66kV 22 11/25/1993 Yes

1120 Bagvadar-Visavada AC S/C 66kV 18 6/12/1994 Yes

1121 Ranavav-Bokhira AC S/C 66kV 15 9/16/1996 Yes1121 Ranavav-Bokhira AC S/C 66kV 15 9/16/1996 Yes

1122 Tap to Gosa AC S/C 66kV 18.9 11/14/1996 Yes

1123 Bokhira-GIDC AC S/C 66kV 9.5 9/16/1996 Yes

1124 Bokhira-Kuchadi AC D/C 66kV 8.12 9/16/1996 Yes

1125 Bagvadar-Advana AC S/C 66kV 15 12/21/2001 Yes

1126 Bagvadar-Gunda AC S/C 66kV 33.5 2/10/2005 Yes

1127 Bhanvad-Gunda AC S/C 66kV 16.5 12/10/2004 Yes

124

Page 25: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

1128 Sardargadh-Sardargadh I AC D/C 66kV 0.5 5/4/1998 Yes

1129 Sardargadh-Sardargadh II AC D/C 66kV 0.5 5/4/1998 Yes

1130 Sardargadh-Manavadar AC S/C 66kV 12.78 5/24/2000 Yes

1131 Sardargadh-Mervadar AC S/C 66kV 23 10/14/1999 Yes

1132 Sardargadh-Pajod AC S/C 66kV 14 11/23/1999 Yes

1133 Jamjodhpur-Bhanvad AC S/C 66kV 30 7/29/2000 Yes

1134 Jetpur-Jamkandorna AC S/C 66kV 28 1/12/1984 Yes

1135 Jetpur-Jetpur A AC S/C 66kV 7 11/6/1981 Yes

1136 Jetpur-Jetpur B AC S/C 66kV 7.5 9/3/1998 Yes

1137 Jetpur-Supedi AC S/C 66kV 29 11/12/1998 Yes

1138 Supedi-Upleta AC S/C 66kV 10 11/12/1998 Yes

1139 Upleta-Kharachia AC S/C 66kV 20 7/7/1979 Yes

1140 Paneli-Kharachia AC S/C 66kV 13 4/18/1998 Yes

1141 Paneli-Bhanvad (Lilo Jamjodhpur)AC S/C 66kV 21.9 5/17/1980 Yes

1142 Bhayavadar-Supedi AC S/C 66kV 18 3/6/1997 Yes

1143 Paneli-Samana AC S/C 66kV 30 1/23/1998 Yes

1144 Motipaneli - Sadodar AC D/C 66kV 26.82 10/25/2008 Yes

1145 Samana-Navagam AC S/C 66kV 16 7/13/2007 Yes

1146 Paneli-Sonvadia AC S/C 66kV 32 4/21/1998 Yes

1147 Bhayavadar-Kharachia AC S/C 66kV 25 4/18/1999 Yes

1148 Sardargadh-Tansava AC S/C 66kV 17.5 12/20/1997 Yes

1149 Tansava-Dhank AC S/C 66kV 14 8/7/1995 Yes

1150 Sardargadh-Patanvav AC S/C 66kV 11 9/7/1999 Yes

1151 Jamkandorna-Motimarad AC S/C 66kV 30 6/30/1989 Yes

1152 Jamkandorna-Chitravad AC S/C 66kV 25 3/24/1994 Yes

1153 Patanvav-Motimarad AC S/C 66kV 12 6/18/1999 Yes

1154 Sardargadh-Shapur AC S/C 66kV 22.77 6/4/1992 Yes

1155 Sardargadh-Kutiyana AC S/C 66kV 25 3/2/2000 Yes

1156 Sardargadh-Dhank AC S/C 66kV 31.5 8/10/2001 Yes

1157 Sardargadh-Mandodara AC S/C 66kV 21.68 6/5/1998 Yes

1158 Jetpur "B" Devkigalol AC S/C 66kV 11 1/10/1984 Yes

1159 Keshod-Keshod AC S/C 66kV 5 1/9/1989 Yes

1160 Keshod-Kanza AC S/C 66kV 19 2/6/1989 Yes

1161 Keshod-Khirasara AC S/C 66kV 12.05 11/17/1994 Yes1161 Keshod-Khirasara AC S/C 66kV 12.05 11/17/1994 Yes

1162 Keshod-Madhavpur AC S/C 66kV 25 1/30/1989 Yes

1163 Keshod-Malia AC S/C 66kV 13 12/18/1989 Yes

1164 Malia-Chorvad AC S/C 66kV 11 4/8/1996 Yes

1165 Keshod-Mendarda AC S/C 66kV 28 9/30/1989 Yes

1166 Keshod-Chorvad AC S/C 66kV 24 2/9/1995 Yes

1167 Keshod-Mangrol-1 AC D/C 66kV 23.5 12/30/1988 Yes

1168 Keshod-Mangrol-2 AC D/C 66kV 22.5 5/26/2002 Yes

1169 Mendarda-Khodiyar AC S/C 66kV 14 3/8/2004 Yes

1170 Khodiyar-Ajab AC S/C 66kV 14 3/8/2004 Yes

1171 Keshod-Ajab AC S/C 66kV 14.5 8/14/2003 Yes

1172 Madhvpur-Shil AC S/C 66kV 9.05 10/21/1993 Yes

1173 Keshod-Shapur AC S/C 66kV 25.07 7/3/1981 Yes

1174 Moraj-Veraval AC S/C 66kV 12 7/3/2003 Yes

1175 Malia-Chuldi AC S/C 66kV 16 10/18/2000 Yes

1176 Keshod-Koylana AC S/C 66kV 8.3 12/21/2004 Yes

1177 Koylana - Amrapur AC S/C 66kV 18.4 6/16/2008 Yes

1178 LILO to 66kv S/S Vekariya from

66kv Visavadar- Bhader lineAC S/C 66 KV 0.34 25.06.09 Yes

1179 66 KV LILO to Agatra from

Keshod-Kanza lineAC S/C 66 KV 0.72 04.08.09 Yes

1180 66 KV LILO to Chhaya from

Ranavav-PBR-1 lineAC S/C 66 KV 0.04 10.08.09 Yes

1181 66KV P.Patan (U/G cable) AC S/C 66 KV 1.60 29.09.09 Yes

1182 66KV Bagvadar Gunda line LILO

to 66KV Bhomiyavadar S/S AC S/C 66 KV 13.07 5.10.09 Yes

1183 66 KM Bhesan-Chuda AC S/C 66 KV 13.04 20.03.10 Yes

1184 66kv LILO to Kolki AC S/C 66 KV 4.89 31.05.10 Yes

1185 66KV LILO to Shethvadala AC S/C 66 KV 3.80 16.06.10 Yes

1186 66 KV LILO to Raydi AC S/C 66 KV 3.50 5.07.10 Yes

1187 66 KV Timbadi to Sindhaj AC S/C 66 KV 13.20 5.08.10 Yes

1188 Anjar - Banian & Berry AC S/C 66kV 6 17/01/75 Yes

1189 G'dham 'B' - Mithi Rohar AC S/C 66kV 2.3 3/30/1998 Yes

1190 Anjar - KPT - 1 AC D/C 66kV 27 6/28/2000 Yes

1191 Anjar - KPT - 2 AC S/C 66kV 27 6/28/2000 Yes

1192 Tappar - Amardi AC S/C 66kV 16.1 3/8/2008 Yes

1193 Anjar - Amardi - Chirai AC S/C 66kV 30 2/25/2000 Yes

1194 Anjar - Khedoi AC S/C 66kV 13 6/30/1980 Yes1194 Anjar - Khedoi AC S/C 66kV 13 6/30/1980 Yes

1195 Anjar - FTZ (H-frame

Gandhidham)

AC S/C 66kV 19 7/30/1975 Yes

1196 Khedoi -Nilkanth- Mundra AC S/C 66kV 31 10/12/2004 Yes

1197 Khedoi - Mann Ind AC S/C 66kV 2.52 11/1/2007 Yes

1198 Khodoi - Suzlon Ltd AC S/C 66kV 7.4 Jan-09 Yes

1199 Samkhiyali - Vajepar AC S/C 66kV 40 10/30/1995 Yes

125

Page 26: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

1200 Samkhiyali - Adhoi AC S/C 66kV 12 9/30/1995 Yes

1201 Vajepar - Chobari AC S/C 66kV 25 1/9/1996 Yes

1202 Tappar - Ratnamani AC S/C 66kV 5.6 9/22/2008 Yes

1203 Tappar - Dudhai AC S/C 66kV 3.95 5/10/2008 Yes

1204 Dudhai - Dhaneti (Lilo Kaniyabe) AC S/C 66kV 13.14 3/5/1997 Yes

1205 Bhachau - Samkhiyali AC S/C 66kV 17 10/30/1991 Yes

1206 Vajepar - Balasar AC S/C 66kV 38 11/26/1999 Yes

1207 Samkhiyali - Shivlakha AC S/C 66kV 15.5 5/15/2004 Yes

1208 Shivlakha - Rapar AC S/C 66kV 27 10/23/1991 Yes

1209 Shivlakha - Pragpar AC S/C 66kV 26.5 5/13/2004 Yes

1210 Shivlakha - Gail AC S/C 66kV 1.5 5/12/2004 Yes

1211 Shivlakha- RRB Vestas-2 AC S/C 66kV 12.49 10/9/2007 Yes

1212 Shivlakha- Adhoi AC S/C 66kV 13.19 11/5/2007 Yes

1213 Shivlakha- Veer AC S/C 66kV 8.83 11/7/2007 Yes

1214 Anjar - Dudhai AC S/C 66kV 29 3/4/1989 Yes

1215 Anjar - FTZ (T) AC D/C 66kV 27 1/17/1975 Yes

1216 FTZ - Kandla (T) AC S/C 66kV 16 1/17/1975 Yes

1217 Anjar - Ratnal AC S/C 66kV 13 10/9/2002 Yes

1218 Kandla - IFFCO (T) AC S/C 66kV 1 1/17/1975 Yes

1219 Mithirohar- IFFCO line AC S/C 66kV 5 17/01/75 Yes

1220 Pragpar - Bhimasar AC S/C 66kV 13 5/2/1994 Yes

1221 Chirai - Bhachau AC S/C 66kV 10 8/6/1975 Yes

1222 Rapar - Pragpar AC S/C 66kV 12 5/2/1994 Yes

1223 Anjar - Varsana AC S/C 66kV 15 8/21/2004 Yes

1224 Varsana- PSL AC S/C 66kV 4 4/21/2005 Yes

1225 Varsana - ISL AC S/C 66kV 3.5 4/8/2005 Yes

1226 Samakhayali-Electrotherm AC S/C 66kV 2.5 3/24/2005 Yes

1227 B&B - Gandhidham B AC S/C 66kV 6 3/30/1998 Yes

1228 Samakhyali - ASR AC S/C 66kV 2.5 10/8/2005 Yes

1229 Samakhyali -Shivlkha AC D/C 66kV 35.91 10/3/2007 Yes

1230 Mithirohar-MID- India AC S/C 66kV 5.5 4/18/2005 Yes

1231 Ratnal-Dhaneti Line AC S/C 66kV 8 6/7/2005 Yes

1232 Samakhiyali-Chirai-Anjar AC S/C 66kV 60 10/28/2005 Yes

1233 Samakhayali-NewTech AC S/C 66kV 6.2 12/28/2005 Yes

1234 Samakhayali-Gallant AC S/C 66kV 2.1 12/20/2005 Yes1234 Samakhayali-Gallant AC S/C 66kV 2.1 12/20/2005 Yes

1235 Varsna -Varsana Ispat AC S/C 66kV 5.5 12/28/2005 Yes

1236 Mithirohar- GPT AC S/C 66kV 1.4 12/12/2005 Yes

1237 FTZ- Shefali AC S/C 66kV 8.7 12/30/2005 Yes

1238 FTZ - SAL AC S/C 66kV 12 6/18/2006 Yes

1239 Amardi -Hans Ispat AC S/C 66kV 2.9 12/18/2005 Yes

1240 Bhuj - Mankuva AC S/C 66kV 18 11/5/1976 Yes

1241 Dhaneti- Global AC S/C 66kV 7.5 5/3/2005 Yes

1242 Bhuj - Deshalpar AC S/C 66kV 25.65 7/5/1982 Yes

1243 Loriya - Khavada AC S/C 66kV 48 12/25/1999 Yes

1244 Bidada - Dahisara-1 AC S/C 66kV 32 4/4/1998 Yes

1245 Bidada - Dahisara-2 AC S/C 66kV 32 11/27/1998 Yes

1246 Bidada - Mundra Industrial AC S/C 66kV 32.04 10/12/2007 Yes

1247 Nanikhakhar (Bidada) -

Nanikhakhar

AC S/C 66kV 6 4/4/1998 Yes

1248 Bhuj - Dahisara to Kotda(Ch) AC S/C 66kV 50 5/25/1976 Yes

1249 Bhuj 'B'-Loriya-Lakhond AC S/C 66kV 31 9/30/1998 Yes

1250 Nanikhakhar (Bidada) -Mandvi'B'

(Koday)

AC S/C 66kV 27 5/3/1999 Yes

1251 Mandvi 'B' (Koday) - Mandvi AC S/C 66kV 12 5/3/1999 Yes

1252 Mundra - Adani Port AC D/C + S/C 66kV 14.38 9/5/2002 Yes

1253 Mundra - Nanikhakhar AC S/C 66kV 1.50 February-09 Yes

1254 Mundra - Willmar AC S/C 66kV 6 5/1/2001 Yes

1255 Dahinsara - Baladia AC S/C 66kV 10 3/15/2000 Yes

1256 Bhuj - Madhapar-Bhuj'B' AC S/C 66kV 22 4/16/1987 Yes

1257 Madhapar - Kotda (C) AC S/C 66kV 13 2/28/1997 Yes

1258 Nanikhakhar (Bidada) -Bhujpar AC S/C 66kV 16.5 5/3/1999 Yes

1259 Mundra - Bhujpur AC S/C 66kV 22 5/3/1999 Yes

1260 Bidada - Darshadi AC S/C 66kV 23 9/28/2003 Yes

1261 Bidada - Sherdi Tap AC S/C 66kV 24 9/30/2003 Yes

1262 Dhaneti - Lakhond AC S/C 66kV 17 10/13/2004 Yes

1263 Kotda (C) - Tharavda AC S/C 66kV 7.2 10/29/2004 Yes

1264 Gadhsisa - Don AC S/C 66kV 18 3/6/1989 Yes

1265 Kothara - Khirsara AC S/C 66kV 45 3/19/1997 Yes

1266 Nakhatrana(Angia)-Nakhatrana AC S/C 66kV 5 9/20/1995 Yes

1267 Nakhatrana (Angia) - Mankuva AC S/C 66kV 35 12/25/1999 Yes

1268 Nakhatrana(Angia)-Kotda (Ja) AC S/C 66kV 19 3/19/1978 Yes

1269 Kotda(J)- Netra AC S/C 66kV 13 3/28/1995 Yes

1270 Netra - Ravapar AC S/C 66kV 23 3/25/1995 Yes1270 Netra - Ravapar AC S/C 66kV 23 3/25/1995 Yes

1271 Ravapar - Dayapar AC S/C 66kV 28 3/30/1985 Yes

1272 Dayapar - Dipak cement AC S/C 66kV 27.34 Jan-09 Yes

1273 Kothara - Nalia AC S/C 66kV 17 3/30/1992 Yes

1274 Nakhatrana (Angia) - Vithon AC S/C 66kV 5 1/24/2002 Yes

1275 Deshalpar - Gadhsisa AC S/C 66kV 22 7/21/1985 Yes

1276 Dayapar - Panandhro AC S/C 66kV 15 3/18/1997 Yes

126

Page 27: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.

No.

Name of line Type of line

AC/ HVDC

S/C or D/C Voltage

level kV

Line length

Ckt.km.

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

1277 Angia - Deshalpar AC S/C 66kV 25 5/10/2003 Yes

1278 Deshalpar - Khirsara AC S/C 66kV 13 3/30/1992 Yes

1279 Pandhro - GMDC - I AC S/C 66kV 4 9/22/1987 Yes

1280 Pandhro - GMDC - II AC S/C 66kV 4 5/7/1995 Yes

1281 Don- Bayath AC S/C 66kV 17 3/6/1989 Yes

1282 Don - Motaliaza (windfarm) AC S/C 66kV 14.01 Jan-08 Yes

1283 Don -Mandvi AC S/C 66kV 12 10/11/2004 Yes

1284 Bayath-Suzlon(Windmill) AC S/C 66kV 6 12/10/2005 Yes

1285 66 kv Kothara-Wanku(Windmill) AC S/C 66kV 11.7 3/1/2006 Yes

1286 Khavda-Vighakot AC S/C 66kV 52.77 8/2/2007 Yes

1287 Khavda-Bhediabet AC S/C 66kV 89.7 8/25/2007 Yes

1288 Shivlakha - Shikarpur (Suzlon) AC S/C 66kV 18.23 9/29/2008 Yes

1289 66 KV Mothala-Dumra Line AC S/C 66 KV 19.27 19.08.2009 Yes

1290 66 KV LILO Sukhpar Line AC S/C 66 KV 0.66 13.08.2009 Yes

1291 LILO Line to 66KV Siracha S/S AC S/C 66 KV 0.86 01.09.2009 Yes

1292 LILO to 66KV Nani-Mau from

66KV Gadhsisa-DonAC S/C 66 KV 3.80 26.02.2010 Yes

1293 66KV Loriya - Nirona Line AC S/C 66 KV 19.58 05.04.2010 Yes

1294 66KV Bidada-Koday- LILO

Talwana LineAC S/C 66 KV 3.61 04.05.2010 Yes

1295 66KV Gadhsisa-Don-LILO

NaniMau LineAC S/C 66 KV 3.80 16.04.2010 Yes

1296 66KV S/C Khavda-Solaris AC S/C 66 KV 3.92 17.06.2010 Yes

1297 66KV S/C Varsana -Everest

kantoAC S/C 66 KV 3.42 05.06.2010 Yes

1298 66 KV Tappar-Varsana S/C Line

on D/C Tower AC S/C 66 KV 8.53 04.08.2010 Yes

1299 66 KV Samakhayali -Ajanta line AC S/C 66 KV 15.73 14.08.2010 Yes

^ updated KM in Old Lines

127

Page 28: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Form 2

DETAILS OF TRANSMISSION LINES & SUBSTATIONS

Name of Transmission Licensee : Gujarat Energy Transmission Corporation

Name of the Transmission System

Name of Region : Gujarat

Substation

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

1 DAHEJ Conventional 220 220 11.06.1998 Yes

2 BHARUCH Conventional 132 132/66 3x20 132 19.05.1973 Yes

66/22 2x15+1x10

3 ANKLESHWAR Conventional 132 132/66 3x50 132 12.10.1976 Yes

66/22 4x15

4 ANKLESHWAR GIDC-A Conventional 66 66/22 1x15+1x10 66 18.8.1994 Yes

5 ANKLESHWAR GIDC-B Conventional 66 66/22 2X15 66 13.02.2000 Yes

6 ANKLESHWAR (Urban) Conventional 66 66/22 1X10+1X5 66 26.3.2000 Yes

7 DAHEJ Conventional 66 66/11 10x1+1x5 66 14.09.81 Yes

8 PANOLI GIDC Conventional 66 66/221x15+1x10+

1x7.566

27.02.86

Yes

9 HANSOT Conventional 66 66/11 2x5 66 31.05.86 Yes

10 BHARUCH B Conventional 66 66/22 3x10 66 23.08.93 Yes

11 JHAGADIA Conventional 220 220/66 2x50 220 06.06.95 Yes

12 ACHHALIA Conventional 220 220/132 2x100+1x50 220 17.03.79 Yes

220/66 1x25

132/66 1x40

13 VALIA Conventional 132 132/66 2x50 132 22.05.72 Yes

66/11 2x10

14 JHAGADIA Conventional 66 66/11 1x10+1x5 66 28.03.95 Yes

15 RAJPIPLA Conventional 66 66/22/11 2x10 66 15.12.69 Yes

16 RAJPARDI Conventional 66 66/11 2x10 66 12.10.96 Yes

17 DEDIYAPADA Conventional 66 66/11 2x5 66 28.02.89

NO X'MER PROVIDED.

17 DEDIYAPADA Conventional 66 66/11 2x5 66 28.02.89 Yes

18 SAGBARA Conventional 66 66/11 1x5+1x3 66 20.08.76 Yes

19 NETRANG Conventional 66 66/11 1X5+1X10 66 28.11.85 Yes

20 PRATAPNAGAR Conventional 66 66/11 2X10 66 16.01.96 Yes

21 RANDERI Conventional 66 66/11 2X5 66 13.12.96 Yes

22 PANETHA Conventional 66 66/11 1X10 66 20.04.06 Yes

23 HALDARVA Conventional 220 220/132 2x100 220 10.9.92 Yes

220/66 1X50+1X100 13.03.76 Yes

24 PALEJ Conventional 66 66/11 3x10 66 13.03.76 Yes

25 ZANOR(NABIPUR) Conventional 66 66/11 1x10+1x5 66 27.02.92 Yes

26 SARBHAN Conventional 66 66/11 1x10+1x5 66 19.10.82 Yes

27 WAGRA Conventional 66 66/11 10x1+1x5 66 28.08.86 Yes

28 JAMBUSAR Conventional 66 66/11 2x10 66 24.04.79 Yes

29 RAROD Conventional 66 66/11 2X5 66 16.05.92 Yes

30 CHHIDRA Conventional 66 66/11 2X5 66 11.08.01 Yes

31 AMOD Conventional 66 66/11 1X10 66 17.01.05 Yes

32 MULLER Conventional 66 66/11 1X10 66 24-1-06 Yes

33 KIM (LINDIAT) Conventional 220 220/66 100x2 220 19.08.93 Yes

34 PALOD(KIM) Conventional 66 66/11 15x 2 66 6.09.89 Yes

35 MOSALI (MANGROL) Conventional 66 66/11 5 x 2 66 12.07.95 Yes

36 KARANJ Conventional 66 66/11 10x 2 66 14.02.97 Yes

37 VELANJA Conventional 66 66/22 15x1+10x2 66 25.10.96 Yes

38 PIPODARA Conventional 66 66/11 10x 3 66 11.03.93 Yes

39 MOTA BORSARA Conventional 66 66/11 15x2 66 20.03.93. Yes

40 MANDVI Conventional 66 66/11 15x1+10x1 66 31.03.84 Yes

41 ZANKHVAV Conventional 66 66/11 5 x 2 66 17.09.90 Yes

42 KOSAMBA Conventional 66 66/22 10 x 2 66 17.01.65 Yes

43 KHARACH (TARSALI) Conventional 66 66/22 10 x 1+7.5 x1 66 5/3/1994 Yes

44 ARETH Conventional 66 66/11 10 x 1 66 08.02.07 Yes

45 BHENSALI Conventional 66 66/11 10 x 1 66 08.06.07 Yes

46 SADARPANI Conventional 66 66/11 10 x 1 66 06.06.07 Yes

47 DEHELI Conventional 66 66/11 10 x 1 66 13.06.07 Yes

48 CHIKDA Conventional 66 66/11 1x5 66 22.03.07 Yes

49 BHACHARWADA Conventional 66 66/11 1x10 66 21.03.07 Yes

50 VAPI Conventional 220 220/66 3x100+1X50 220 29.04.80 Yes

66/11 2X15 +1x10 12.05.80

51 BHILAD Conventional 220 220/66 2x100+50 26 29.01.94 Yes

52 ATUL Conventional 132 132/66 1X50+1X20 132 20.03.73 Yes

132/11 2X12.5 10.02.76132/11 2X12.5 10.02.76

53 VAPI GIDC Conventional 66 66/11 2x15+2x10 66 10.02.76 Yes

54 UMERGAM Conventional 66 66/11 2x15+ 20 66 23.04.69 Yes

55 ATAKPARDI VALSAD Conventional 66 66/11 3x10 66 23.11.58 Yes

56 VAPI GIDC III Conventional 66 66/11 1x15+2x10 66 10.03.84 Yes

57 SARIGAM Conventional 66 66/11 2x10 +20 66 23.05.84 Yes

58 DHARAMPUR Conventional 66 66/11 2x10 6626.03.83

15.03.93 Yes

59 DAMANGANGA Conventional 66 66/11 2x10 66 25.1093 Yes

60 MOTAPONDA(KAKAD KOPAR) Conventional 66 66/11 1X10 66 28.11.99 Yes

61 VALSAD CITY Conventional 66 66/11 1X15+1X10 66 04.06.97 Yes

128

Page 29: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

62 VAPI GIDC IV Conventional 66 66/11 1X15+1X10 66 28.03.00 Yes

63 DUNGRI Conventional 66 66/11 2X10 66 26.05.00 Yes

64 KAPARADA Conventional 66 66/11 1X10+1x5 66 16.06.00 Yes

65 DUNGARKHADKI(PARDI) Conventional 66 66/11 1X10+1x5 66 23.07.00 Yes

66 SANJAN Conventional 66 66/11 1x10 66 15.06.04 Yes

67 NAVSARI Conventional 220 220/132 3x100 220 Yes

220/66 1X100+2X50

66/11 2x15+1x10

68 AMBHETA(CHIKHLI) Conventional 220 220/66 1X100+1X50 220 27.03.99 Yes

69 EROO Conventional 66 66/11 3x10 66 15.08.72 Yes

70 GANDEVI Conventional 66 66/11 2x10 66 28.03.71 Yes

71 BILIMORA Conventional 66 66/11 2x10 66 15.08.54 Yes

72 WAGHAI Conventional 66 66/11 2x5 66 19.02.66 Yes

73 ANAVAL Conventional 66 66/11 2x10 66 06.08.87 Yes

74 CHIKHALI Conventional 66 66/11 2X10 66 07.11.88 Yes

75 CHHAPRA Conventional 66 66/11 3X10 66 12.04.89 Yes

76 MAROLI Conventional 66 66/11 2x10 66 31.03.90 Yes

77 DOLVAN Conventional 66 66/11 1x10+1x5 66 16.01.90 Yes

78 VANSDA Conventional 66 66/11 2X5 66 02.03.90 Yes

79 KHERGAM Conventional 66 66/11 2X10 66 14.03.94 Yes

80 AHWA Conventional 66 66/11 2X5 66 27.02.99 Yes

81 AMALSAD Conventional 66 66/11 1X10 66 02.09.02 Yes

82 ICHHAPORE Conventional 220 220/66 2X100+1X50 220 23.03.92 Yes

83 TALANGPUR(SACHIN) Conventional 220 220/66 3X100 220 22.01.00 Yes

84 BHESTAN Conventional 132 132/66 4x50 132 03.01.66 Yes

66/22 4X20+2x15

85 ICHHAPORE Conventional 66 66/11 1x15+10 66 23.04.89 Yes

86 TAPI Conventional 66 66/22 4x20 66 11.04.50 Yes

87 UDHANA Conventional 66 66/22 2x15+ 1x 20 66 29.07.81 Yes

88 OLPAD Conventional 66 66/11 2x10+1X5 66 11.05.82 Yes

89 GODADARA Conventional 66 66/22 4x15 66 31.01.94 Yes

90 VARIAV Conventional 66 66/11 3x15 66

04.04.67

90 VARIAV Conventional 66 66/11 3x15 66 29.11.95 Yes

91 VESU Conventional 66 66/22 1x15+1x10 66 31.12.96 Yes

92 GOVALAK(UDHANA'B') Conventional 66 66/22 3X15 66 27.07.98 Yes

93 SARTHANA Conventional 66 66/22 2X15+1x10 66 18.05.99 Yes

94 SACHIN GIDC - A Conventional 66 66/111x20+1x15+

2x1066

31.03.85 Yes

95 SACHIN B Conventional 66 66/11 3X15 66 06.02.95 Yes

96 PANDESARA Conventional 66 66/11 4x15 66 31.01.92 Yes

97 PAL Conventional 66 66/11 2X15 66 31.05.03 Yes

98 PUNA Conventional 66 66/22 3x15 66 01.05.04 Yes

99 VANZ Conventional 66 66/11 1X10+1x15 66 29.04.04 Yes

100 PANDESARA-II Conventional 66 66/22 4X15 66 14.06.04 Yes

101 VAV (VALTHAN) Conventional 220 220/66 6X100 220 15.01.80 Yes

102 MOTA(BARDOLI) Conventional 220 220/66 2X50 220 03.07.03 Yes

103 VYARA Conventional 66 66/11 3x10 66 12.06.73 Yes

104 UKAI Conventional 66 66/11 2X5 66 29.03.64 Yes

105 NIZAR Conventional 66 66/11 2x10 66 30.11.75 Yes

106 SONGADH Conventional 66 66/11 1X5+1x10 66 31.05.86 Yes

107 MAHUVA Conventional 66 66/11 2x10 66 21.05.85 Yes

108 UCHHAL Conventional 66 66/11 2X5 66 30.12.87 Yes

109 VALOD Conventional 66 66/11 2x10 66 05.11.92 Yes

110 BARDOLI Conventional 66 66/22 2x15+1X10 66 14.02.65 Yes

111 PALSANA Conventional 66 66/22 2x15 66 27.12.95 Yes

112 KAMREJ Conventional 66 66/11 3x10 66 04.07.91 Yes

113 KADODARA Conventional 66 66/22 4X15 66 01.09.75 Yes

114 LASKANA Conventional 66 66/11 2X15 66 09.08.03 Yes

115 JOLWA Conventional 66 66/11 1x10 + 1X15 66 20.10.05 Yes

116 KADOD Conventional 66 66/11 1X10 66 22.05.2006 Yes

117 MADHI Conventional 66 66/11 1X10 66 15.06.2006 Yes

118 TANKAL Conventional 66 66/11 1X10 66 20.08.2006 Yes

119 FADVAL Conventional 66 66/11 1X10 66 15.03.07 Yes

120 BAMANI Conventional 66 66/11 1X10 66 27.12.06 Yes

121 JAMBUVA Conventional 220 220/132 2X100 220 1966 Yes

132/66 1x50+1x40

66/11 2X5

122 WAGHODIA Conventional 220 220/66 2X50 220 03.01.85 Yes

66/11 2X10

123 KHATAMBA Conventional 66 66/11 2X5 66 20.03.86 Yes

124 KARVAN Conventional 66 66/11 2X10 66 29.10.86 Yes124 KARVAN Conventional 66 66/11 2X10 66 29.10.86 Yes

125 MAKARPURA Conventional 66 66/11 2X15 66 10.04.89 Yes

126 TARSALI Conventional 66 66/11 2X15 66 Nov-69 Yes

127 INDRAPURI Conventional 66 66/11 2X10+1X15 66 24.04.89 Yes

128 HARNI Conventional 66 66/11 2X15 66 27.03.93 Yes

129

Page 30: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

129 DABHOI Conventional 66 66/22 2X10 66 02.11.72 Yes

130 MOTIBAUG Conventional 66 66/11 2x15 66 29.12.97 Yes

131 GAJRAWADI Conventional 66 66/11 2X10 66 15.12.97 Yes

132 GAVASAD(MOBHA) Conventional 220 220/66 2X50 220 03.09.00 Yes

133 GOTRI Conventional 132 132/66 3X40+1X50 132 19.06.64 Yes

132/11 2X12.5

134 KARJAN Conventional 132 132/66 3X50 132 15.06.89 Yes

66/11 1X15+1X10

135 VIDYUTNAGAR Conventional 66 66/11 4X15 66 22.03.64 Yes

136 SUBHANPURA 'B' Conventional 66 66/11 4X10 66 10.06.88 Yes

137 CHHANI 'A' Conventional 66 66/11 2x10 66 19.11.74 Yes

138 CHHANI 'B' Conventional 66 66/11 3X10 66 29.11.86 Yes

139 PADRA Conventional 66 66/11 3X10 66 10.09.72 Yes

140 MOBHA ROAD Conventional 66 66/11 1X15+1X10 66 03.11.82 Yes

141 KASHIPURA Conventional 66 66/11 2X10 66 24.09.87 Yes

142 MASAR ROAD Conventional 66 66/11 1X10 66 28.03.94 Yes

143 ATLADARA Conventional 66 66/11 1X15+1X10 66 05.04.91 Yes

144 KARAKHADI Conventional 66 66/11 1X15+1X10 5 22.03.99 Yes

145 GORWA Conventional 66 66/11 1X15 66 21.03.03 Yes

146 SAMIYALA Conventional 66 66/11 1X10 66 23.02.06 Yes

147 HANDOD Conventional 66 66/11 1X10 66 03.10.06 Yes

148 JAWAHAR NAGAR Conventional 132 132/33 3X50 132 23.01.73 Yes

149 FERTILIZERNAGAR Conventional 132 132/66 1x50+2x40 132 10.12.68 Yes

150 NANDESARI(DHANORA) Conventional 132 132/66 2X50 132 24.07.84 Yes

132/33 2X50

151 MANJUSAR Conventional 132 132/11 1X12.5 6 12.11.97 Yes

152 KOYALI Conventional 66 66/11 2X10 66 10.08.66 Yes

153 SAVLI Conventional 66 66/11 2X10 66 21.01.81 Yes

154 NANDESARI Conventional 66 66/11 3X10 66 12.06.74 Yes

155 RANIA Conventional 66 66/11 2X10 66 14.03.89 Yes

156 DESAR Conventional 66 66/11 1X10 66 10.08.91 Yes

157 RANOLI Conventional 66 66/11 2X10 66157 RANOLI Conventional 66 66/11 2X10 66 17.03.92 Yes

158 TUNDAV Conventional 66 66/11 1X10 66 29.06.95 Yes

159 JAROD Conventional 66 66/11 1X10+1x5 66 25.12.93 Yes

160 BASKA Conventional 66 66/11 2X10 66 25.10.85 Yes

161 GODHRA Conventional 220 220/132 3X50 220 15.01.79 Yes

220/66 1X50+1x100

66/11 1x15+1X10

162 CHANDRAPURA Conventional 220 220/66 2X50 17 26.01.89 Yes

163 DAHOD Conventional 132 132/33 2X20 132 17.12.83 Yes

132/66 1x40

33/11 2X5+1x4+10

164 SANTROAD Conventional 66 66/11 2x5 66 Apr-84 Yes

165 LUNAWADA Conventional 66 66/33 1X10+1X5 66 18.12.76 Yes

66/11 2x10

166 LIMKHEDA Conventional 66 66/11 1X5 + 1x3 66 18.12.86 Yes

167 MOTAKHANPUR Conventional 66 66/11 2X5 66 23.04.87 Yes

168 SANTRAMPUR Conventional 66 66/11 2x10 66 07.04.84 Yes

169 DEVGADHBARIA Conventional 66 66/11 2X5 66 08.03.93 Yes

170 KADANA Conventional 33 33/11 2X2 33 20.04.75 Yes

171 ZALOD Conventional 66 66/11 1x10 66 18.05.02 Yes

172 SHEHRA Conventional 66 66/11 2X5 66 08.09.90 Yes

173 TIMBA Conventional 66 66/11 2X5 66 21.03.91 Yes

174 JAFRABAD(GOVINDI) Conventional 66 66/11 2X10 66 26.03.99 Yes

175 VEJALPUR Conventional 66 66/11 1X10 66 25.03.00 Yes

176 KALOL(PMS) Conventional 66 66/11 2x10 66 05.11.79 Yes

177 HALOL GIDC Conventional 66 66/11 2X10 66 16.03.89 Yes

178 KHAKHARIA Conventional 66 66/11 1X5 + 1x15 66 15.01.79 Yes

179 KOTHAMBA Conventional 66 66/11 1X10 66 01.02.04 Yes

180 KHAREDI Conventional 66 66/11 1X10 66 05.10.05 Yes

181 TILAKWADA Conventional 132 132/66 1X50+1X40 132 11.12.73 Yes

66/22 2X5

182 CHHOTAUDEPUR VASEDI Conventional 132 132/66 1X50 132 27.03.98 Yes

66/11 1x10+1x5

183 KAWANT Conventional 66 66/11 2X5 66 10.12.68 Yes

184 NAVAGAM Conventional 66 66/11 2X10 66 13.08.90 Yes

185 CHANDOD Conventional 66 66/11 2X10 66 20.05.68 Yes

186 SADHLI Conventional 66 66/11 2X10 66 16.09.80 Yes

187 BODELI Conventional 66 66/11 2X10 66 09.02.84 Yes

188 SANKHEDA Conventional 66 66/11 1x10+1x5 66 12.04.84 Yes188 SANKHEDA Conventional 66 66/11 1x10+1x5 66 12.04.84 Yes

189 PAVIJETPUR Conventional 66 66/11 2X5 66 26.03.91 Yes

190 NASVADI Conventional 66 66/11 1x10+1x5 66 18.03.86 Yes

191 SINOR Conventional 66 66/11 2X5 66 09.04.93 Yes

192 SHIVRAJPUR Conventional 66 66/11 1X4+1x3 66 25.09.81 Yes

130

Page 31: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

193 GHOGHAMBA Conventional 66 66/11 2X5 66 28.03.92 Yes

194 KOSHINDRA Conventional 66 66/11 1X10 66 01.04.05 Yes

195 KARAMSAD Conventional 220 220/132 2x100+1x50 220 30.03.70 Yes

132/66 3X50

196 ODE Conventional 132 132/66 3X20 132 10.02.84 Yes

132/11 2x12.5

197 UNDEL Conventional 132 132/66 2x50 132 26.03.95 Yes

66/11 1X10+1x5

198 VALLABH VIDYANAGAR Conventional 66 66/11 2X15 66 19.12.73 Yes

199 ANAND Conventional 66 66/11 2X15 66 06.01.74 Yes

200 MOGAR Conventional 66 66/11 2X10 66 28.01.72 Yes

201 ANKLAV Conventional 66 66/11 1X15+1X10 66 21.11.73 Yes

202 BORSAD Conventional 66 66/11 1X15+1X10 66 20.12.73 Yes

203 PETLAD Conventional 66 66/11 3X10 66 05.04.70 Yes

204 NAR Conventional 66 66/11 2X5 66 19.02.72 Yes

205 VASAD Conventional 66 66/11 1X10+1X5 66 09.09.85 Yes

206 RAS Conventional 66 66/11 1X10+1x5 66 28.03.91 Yes

207 CAMBAY Conventional 66 66/11 2X10 66 22.03.90 Yes

208 VIRSAD Conventional 66 66/11 2X10 66 28.03.91 Yes

209 VITHAL UDYOGNAGAR Conventional 66 66/11 2X10 66 29.03.96 Yes

210 GOPALPURA Conventional 66 66/11 1X10 66 11.06.98 Yes

211 NEJA Conventional 66 66/11 1X10 66 27.05.05 Yes

212 JOL Conventional 66 66/11 1X10 66 05.03.07 Yes

213 KAPADVANJ Conventional 220 220/66 2x50 220 18.09.1993 Yes

214 NADIAD(DABHAN) Conventional 132 132/66 2X50 132 2.10.1974 Yes

66/11 3x10

215 MEHMDABAD Conventional 132 132/66 2X50 132 6.6.1969 Yes

66/11 2x10

216 KAPADVANJ Conventional 66 66/11 2x10+1x5 66 8.6.1969 Yes

217 MAHUDHA Conventional 66 66/11 2x10 66 16.1.1976 Yes

218 CHAKLASHI Conventional 66 66/11 1x15+1x10 66 4.12.1976 Yes

219 UMRETH Conventional 66 66/11 1x15+1x10 66219 UMRETH Conventional 66 66/11 1x15+1x10 66 8.5.1968 Yes

220 SEVALIA Conventional 66 66/11 1x10+1X5 66 19.1.1974 Yes

221 CHANGA Conventional 66 66/11 1x10+1X5 66 25.11.1976 Yes

222 VASO Conventional 66 66/11 2X5 66 24.7.1977 Yes

223 LIMBASI Conventional 66 66/11 2x10 66 2.8.1973 Yes

224 UTTARSANDA Conventional 66 66/11 2X5 66 23.3.1994 Yes

225 KAMLA(NADIADCITY) Conventional 66 66/11 2X10 66 11.10.1991 Yes

226 THASRA Conventional 66 66/11 1X7.5+1X5 66 1.2.1990 Yes

227 NIRMALI Conventional 66 66/11 2x10 66 31.12.1991 Yes

228 ATTARSUMBA Conventional 66 66/11 2x10 66 11.12.1992 Yes

229 KATHLAL Conventional 66 66/11 2x10 66 12.8.1989 Yes

230 BALASINOR Conventional 66 66/11 2x10 66 3.12.1987 Yes

231 TORNA Conventional 66 66/11 1X10 66 30.9.1999 Yes

232 KHEDA Conventional 66 66/11 2X10 66 16.5.1989 Yes

233 DEMAI Conventional 66 66/11 1X10 66 28.1.2003 Yes

234 SALEJADA Conventional 220 220/66 1x100+1x50 220 5.11.1999 Yes

235 VATVA (NAROL) Conventional 132 132/66 3X40+1X50 132 16.1.1964 Yes

236 BAREJADI Conventional 66 66/22 2X10 66 20.9.1977 Yes

66/11 2X10

237 NAVAGAM Conventional 66 66/11 2x10 66 31.8.1981 Yes

238 HALDARVAS Conventional 66 66/11 2x15 66 25.4.1995 Yes

239 KERALA Conventional 66 66/11 2X10 66 10.11.1987 Yes

240 KOTH Conventional 66 66/11 2X10 66 12.5.1987 Yes

241 CHANGODAR Conventional 66 66/11 3x15 66 23.7.1993 Yes

242 SANAND Conventional 66 66/11 2X15 66 29.1.1983 Yes

243 BAVLA Conventional 66 66/11 3x10 66 2.12.1983 Yes

244 DHOLKA Conventional 66 66/11 2x15 66 25.8.1980 Yes

245 JUVALRUPVATI Conventional 66 66/11 1X10+1X5 66 8.10.1979 Yes

246 DHOLKA GIDC Conventional 66 66/11 2x10 66 27.8.1991 Yes

247 SAMADARA Conventional 66 66/11 1x10+1x10 66 12.10.1992 Yes

248 JETALPUR Conventional 66 66/11 2X10 66 6.10.1999 Yes

249 MORAIYA Conventional 66 66/11 2X15 66 13.12.2002 Yes

250 SIMEJ Conventional 66 66/11 1X15 66 27.3.2003 Yes

251 ZAMP Conventional 66 66/11 1x10 66 20.12.2004 Yes

252 RANASAN Conventional 220 220/132 2X150+2X100 220 30.10.1969 Yes

132/66 1x50

253 KHANPUR (DEHGAM) Conventional 220 220/66 2x100 220 16.12.1994 Yes

254 SABARMATI Conventional 132 132/66 1x40+1x20 132 29.12.1969 Yes

66/11 1X566/11 1X5

255 CHILODA Conventional 132 132/66 1x50 132 24.8.1991 Yes

132/11 1X25+2X12.5

256 DEHGAM Conventional 66 66/22 2X15+1x10 66 18.2.1966 Yes

257 RAKHIAL Conventional 66 66/11 2x10 66 15.2.1985 Yes

131

Page 32: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

258 CHHALA Conventional 66 66/11 3x10 66 8.7.1986 Yes

259 NARODA Conventional 66 66/11 3X15 66 31.7.1966 Yes

260 VEHLAL Conventional 66 66/11 3x10 66 26.2.1988 Yes

261 KANBHA Conventional 66 66/11 3x15 66 23.11.1990 Yes

262 BAHIAL Conventional 66 66/11 2x10 66 14.12.1995 Yes

263 HALISA Conventional 66 66/11 2x10 66 28.2.1994 Yes

264 SADRA Conventional 66 66/11 2x10 66 30.4.1994 Yes

265 BOPAL Conventional 66 66/11 2X10 66 13.12.1998 Yes

266 MUTHIA(NANA-CHILODA) Conventional 66 66/11 1X15 66 10.2.1999 Yes

267 KADJODARA Conventional 66 66/11 1X15 66 9.9.2000 Yes

268 BHAT Conventional 66 66/11 1X15+1x10 66 10.7.2003 Yes

269 BHADAJ Conventional 66 66/11 2X10 66 20.6.2004 Yes

270 KUHA Conventional 66 66/11 1X10 66 27.11.2005 Yes

271 LIMBDI Conventional 220 220/132 2X100+1X50 220 25.6.1971 Yes

132/66 3X50

66/11 2x10

272 DHANDHUKA Conventional 132 132/11 2x12.5 132 20.1.1973 Yes

273 SITAGADH Conventional 132 132/11 1x25+1x12.5 132 30.10.1992 Yes

274 SURENDRANAGAR Conventional 66 66/22 2x10 66 25.6.1960 Yes

66/11 1x10

275 SAYLA Conventional 66 66/11 2x10 66 17.11.1984 Yes

276 DUDHREJ Conventional 66 66/11 2x10 66 30.3.1992 Yes

277 KHODU Conventional 66 66/11 3x10 66 16.7.1992 Yes

278 SADLA Conventional 66 66/11 3x10 66 8.10.1994 Yes

279 CHUDA Conventional 66 66/11 1x10+1X5 66 23.8.1991 Yes

280 RANPUR Conventional 66 66/11 2X10 66 15.4.1991 Yes

281 RAJSITAPUR Conventional 66 66/11 3X10 66 16.9.1987 Yes

282 MULI Conventional 66 66/11 2x10 66 24.3.1999 Yes

283 SUDAMADA Conventional 66 66/11 1x10+1X5 66 19.12.2002 Yes

284 WADHWAN Conventional 66 66/11 1X15 66 22.12.2005 Yes

285 DHRANGADHRA Conventional 220 220/66 3 x 100 220 26.2.1991 Yes

66/22 1x15+1x566/22 1x15+1x5

286 HALVAD Conventional 220 220/66 2 x 100 220 22.5.2004 Yes

287 KONDH Conventional 66 66/11 1x15+2x10 66 21.12.1989 Yes

288 SARA Conventional 66 66/11 1X15+2X10 66 28.3.1988 Yes

289 DHRANGADHRA Conventional 66 66/22 1x20+1x15+1x10 66 30.1.1990 Yes

290 KANKAVATI Conventional 66 66/11 3X10 66 30.1.1974 Yes

291 VAVDI(HARIPUR) Conventional 66 66/22 1X15+1x10 66 28.3.1995 Yes

292 HALVAD Conventional 66 66/11 2X15 66 9.12.1977 Yes

293 GHANSHYAMGADH Conventional 66 66/11 2X10 66 9.3.1993 Yes

294 BHALGAMDA Conventional 66 66/11 3x10 66 1.3.1995 Yes

295 MALANIYAD Conventional 66 66/11 2X10 66 28.3.1999 Yes

296 NARICHANA Conventional 66 66/11 3X10 66 23.11.1999 Yes

297 CHULI Conventional 66 66/11 3X10 66 20.12.1999 Yes

298 SARAMBHDA Conventional 66 66/11 2X10 66 10.7.2001 Yes

299 METHAN Conventional 66 66/11 1X10 66 5.12.2003 Yes

300 66 KV CHUPANI Conventional 66 66/11 1X10+2X15 66 28.01.93 Yes

301 RANAKPUR Conventional 66 66/11 2X10 66 24.7.2004 Yes

302 TARNETAR Conventional 66 66/11 1x10 66 30.8.2005 Yes

303 RAIGADH Conventional 66 66/11 1X10 66 25.5.2006 Yes

304 VIRAMGAM Conventional 220 220/66 1X100+2X50 220 27.1.1985 Yes

305 VIRAMGAM(FULWADI) Conventional 66 66/11 2x15+1x10 66 1.1.1976 Yes

306 MANDAL Conventional 66 66/11 2X10 66 25.7.1983 Yes

307 KHAVAD Conventional 66 66/11 2x10 66 15.12.1983 Yes

308 CHHARODI Conventional 66 66/11 2x10 66 6.10.1994 Yes

309 PATDI Conventional 66 66/11 2X10 66 31.3.1986 Yes

310 KANZ Conventional 66 66/11 1X10+1X5 66 29.11.1992 Yes

311 LAKHTAR Conventional 66 66/11 1x10+1x5 66 25.3.1985 Yes

312 VANOD Conventional 66 66/11 1X10 66 28.7.2000 Yes

313 VADGAM Conventional 66 66/11 1X10+1X5 66 23.11.2000 Yes

314 KAMALPUR Conventional 66 66/11 1X10 66 27.11.2003 Yes

315 JAKHWADA Conventional 66 66/11 1X10 66 6.12.2004 Yes

316 HIRAPUR Conventional 66 66/11 1X10 66 4.1.07 No

317 DIGSAR Conventional 66 66/11 1X10 66 17.01.07 No

318 DHOLIYA Conventional 66 66/11 1X10 66 31.05.07 No

319 ISHWARNAGAR Conventional 66 66/11 1X10 66 5.01.07 No

320 MEHSANA Conventional 220 220/132 4X100 220 28-11-75 Yes

220/66 1x100

132/66 1X50

66/11 2X1566/11 2X15

321 MITHA Conventional 220 220/66 2X100 220 27-07-01 Yes

322 BASNA Conventional 66 66/11 2X15 66 15-1-79 Yes

323 BHANDU Conventional 66 66/11 2X10 66 20-12-82 Yes

324 LINCH Conventional 66 66/11 2X15 66 18-10-77 Yes

132

Page 33: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

325 BALOL Conventional 66 66/11 2X10 66 21-11-81 Yes

326 BECHRAJI Conventional 66 66/11 3X10 66 22-08-72 Yes

327 DHINOJ Conventional 66 66/11 2X10 66 23-08-82 Yes

328 MODHERA Conventional 66 66/11 2X10 66 11-11-83 Yes

329 PALAVASANA Conventional 66 66/11 2x10 66 15-1-90 Yes

330 KHERVA Conventional 66 66/11 2X10 66 16-6-92 Yes

331 MOTAP Conventional 66 66/11 2X10 66 29-12-92 Yes

332 KASALPUR (JOTANA) Conventional 66 66/11 2x10 66 28-03-94 Yes

333 NAGALPUR Conventional 66 66/11 2x10 66 10/8/2001 Yes

334 UDALPUR Conventional 66 66/11 1X10 66 17-12-03 Yes

335 VALAM Conventional 66 66/11 1x10 66 8/7/04 Yes

336 CHHATRAL Conventional 220 220/66 3X100+1X50 220 23-5-77 Yes

66/11 1x10+1X10

337 KALOL(NG) Conventional 66 66/11 2X15 66 1-3-66 Yes

338 NARADIPUR Conventional 66 66/11 3X10 66 27-9-93 Yes

339 KADI Conventional 66 66/11 3X15 66 23-11-77 Yes

340 VADSAR Conventional 66 66/11 2X15 66 13-10-77 Yes

341 NANDASAN Conventional 66 66/11 3X10 66 17-1-89 Yes

342 KATOSAN ROAD Conventional 66 66/11 1x15+1x10 66 1-7-80 Yes

343 LANGHNEJ Conventional 66 66/11 2X10 66 15-10-93 Yes

344 RANDHEJA Conventional 66 66/11 3X10 66 21-8-84 Yes

345 CHHATRAL GIDC Conventional 66 66/11 3X10 66 16-5-89 Yes

346 ADALAJ Conventional 66 66/11 3x10 66 1-3-88 Yes

347 BORISANA Conventional 66 66/11 2X10 66 27-4-89 Yes

348 SOJA II Conventional 66 66/11 2X10 66 26-11-91 Yes

349 KARAN NAGAR Conventional 66 66/11 2X10 66 23-1-92 Yes

350 RAJPUR Conventional 66 66/11 2x10 66 2-11-93 Yes

351 MEDA ADRAJ Conventional 66 66/11 2X10 66 5-5-94 Yes

352 SANTEJ Conventional 66 66/11 2X15 66 19-1-95 Yes

353 PANSAR Conventional 66 66/11 2x10 66 6-1-95 Yes

354 MEDHA Conventional 66 66/11 2X10 66 27-2-95 Yes

355 MANDALI Conventional 66 66/11 1X10+1X5 66355 MANDALI Conventional 66 66/11 1X10+1X5 66 31-10-99 Yes

356 SURAJ Conventional 66 66/11 2X10 66 3-8-99 Yes

357 MOTI ADARAJ Conventional 66 66/11 1x10 66 31-1-05 Yes

358 RANGPURDA Conventional 66 66/11 1x10 66 25-2-05 Yes

359 VEDA Conventional 66 66/11 1x10 66 22-2-05 Yes

360 VIJAPUR Conventional 220 220/66 2x100 220 23-3-87 Yes

66/11 3X15

361 JAMLA Conventional 220 220/66 2X100 220 30-3-95 Yes

362 VISNAGAR Conventional 132 132/66 2X50 132 5-6-92 Yes

66/11 2X15+1X10

363 MANSA Conventional 66 66/11 2X15+1X10 66 26-2-69 Yes

364 LODRA Conventional 66 66/11 3X10 66 7/5/1973 Yes

365 TATOSAN Conventional 66 66/11 3X10 66 22-1-77 Yes

366 SUNDERPUR Conventional 66 66/11 3X10 66 14-2-80 Yes

367 GOZARIA Conventional 66 66/11 3X10 66 7-5-73 Yes

368 VASAI Conventional 66 66/11 3X10 66 3-9-80 Yes

369 JANTRAL Conventional 66 66/11 1x10+1X5 66 25-6-92 Yes

370 VIHAR(KUKARWADA) Conventional 66 66/11 2X10 66 23-3-93 Yes

371 GRAMBHARTI(M'PUR) Conventional 66 66/11 2X10 66 22-1-99 Yes

372 KADA Conventional 66 66/11 1X15+1X10 66 28-9-99 Yes

373 LADOL Conventional 66 66/11 1X10 66 8/4/2003 Yes

374 RANASAN(GIDC) Conventional 66 66/11 1X10+1X15 66 23-4-03 Yes

375 CHARADA Conventional 66 66/11 1x10 66 20-12-04 Yes

376 HIRPURA Conventional 66 66/11 1x10 66 19-6-07 Yes

377 BHALAK Conventional 66 66/11 1x10 66 18-3-05 Yes

378 DHANSURA Conventional 220 220/66 3X50 220 21-11-84 Yes

66/11 2x10

379 TALOD Conventional 132 132/66 2X50+1X40 132 3-1-74 Yes

66/11 2x15

380 PRANTIJ Conventional 66 66/11 2X15 66 9-12-72 Yes

381 TAJPUR Conventional 66 66/11 1x10+1x15 66 29-5-90 Yes

382 RANASAN(SK) Conventional 66 66/11 3X10 66 1-4-79 Yes

383 GAMBHOI Conventional 66 66/11 3X10 66 7-9-81 Yes

384 MODASA Conventional 66 66/11 1X15+1x10 66 19-7-77 Yes

385 MALPUR Conventional 66 66/11 1x10+1X5 66 26-3-85 Yes

386 MEGHRAJ Conventional 66 66/11 2X7.5 66 6-7-89 Yes

387 TINTOI Conventional 66 66/11 1x10+1X5 66 14-6-84 Yes

388 BAYAD Conventional 66 66/11 2x15 66 29-3-77 Yes

389 SATHAMBA Conventional 66 66/11 1X10+1X5 66 19-7-83 Yes389 SATHAMBA Conventional 66 66/11 1X10+1X5 66 19-7-83 Yes

390 AMBALIYARA Conventional 66 66/11 2x10 66 20-3-90 Yes

391 AMODARA Conventional 66 66/11 2X10 66 15-2-91 Yes

392 ROZAD Conventional 66 66/11 2X10 66 26-3-91 Yes

393 GABAT Conventional 66 66/11 2X5 66 8-3-93 Yes

133

Page 34: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

394 MEDHASAN Conventional 66 66/11 1x10+1x5 66 10-6-93 Yes

395 DALANI-MUVADI Conventional 66 66/11 1x10+1X5 66 10-4-94 Yes

396 BAYAL(DHANAKROL) Conventional 66 66/11 1X10 66 27-3-01 Yes

397 RELLAWADA Conventional 66 66/11 2x10 66 31-3-00 Yes

398 VIRPUR Conventional 66 66/11 1X10 66 4/9/2002 Yes

399 SHINAWAD Conventional 66 66/11 1x10 66 7/3/2005 Yes

400 AGIOL (HIMATNAGAR) Conventional 220 220/132 1x100+2X50 220 26-11-90 Yes

220/66 1x100+2X50 Yes

401 IDAR Conventional 132 132/66 2X50 132 25-1-71 Yes

66/11 3X10 Yes

402 BHUTIYA Conventional 220 220/66 100X1 220 28-1-06 Yes

403 VADALI Conventional 66 66/11 2X10 66 18-1-89 Yes

404 BADOLI Conventional 66 66/11 3X10 66 28-5-89 Yes

405 VIJAYNAGAR Conventional 66 66/11 1x10 66 21-3-05 Yes

406 HIMATNAGAR-I Conventional 66 66/11 2X15 66 19-10-69 Yes

407 HIMATNAGAR-II Conventional 66 66/11 2X10 66 26-2-00 Yes

408 BHILODA Conventional 66 66/11 2X10 66 13-10-78 Yes

409 KHEDBRAHMA Conventional 66 66/11 2X10 66 3-7-72 Yes

410 MAKADCHAMPA(Hadad) Conventional 66 66/11 2X5 66 6-9-89 Yes

411 JADAR Conventional 66 66/11 2x10 66 22-8-82 Yes

412 LAI-RANASAN Conventional 66 66/11 1x10+1X5 66 6-10-89 Yes

413 CHORIVAD Conventional 66 66/11 2X10 66 5-5-84 Yes

414 DEDHROTA Conventional 66 66/11 2x10 66 5-2-90 Yes

415 VASAI (M) Conventional 66 66/11 1X15 66 31-3-95 Yes

416 KANIYOL Conventional 66 66/11 1X10+1X7.5 66 28-10-95 Yes

417 KUNDLA Conventional 66 66/11 1X10 66 4-10-99 Yes

418 SUNDARPUR(Chhapi) Conventional 66 66/11 1x10 66 17-3-01 Yes

419 HAJIPUR Conventional 66 66/11 3X10 66 7-3-02 Yes

420 DANTOD (CHITHODA) Conventional 66 66/11 2X10 66 31-3-03 Yes

421 HANSALPUR Conventional 66 66/11 1x10 66 28-10-04 Yes

422 PANOL Conventional 66 66/11 1x10 66 10/11/2004 Yes

423 NIKODA Conventional 66 66/11 1x10 66423 NIKODA Conventional 66 66/11 1x10 66 28-2-05 Yes

424 SHAMLAJI (Palla) Conventional 66 66/11 1x10 2 31-3-06 Yes

425 MOTIBHOYAN Conventional 66 66/11 1X10 3 3/14/2007 Yes

426 PALANPUR Conventional 220 220/66 2X100 220 26.12.88 Yes

427 PALANPUR-I Conventional 66 66/11 3X10 66 10.3.75 Yes

428 GADH Conventional 66 66/11 3X10 66 23.1.80 Yes

429 VADGAM Conventional 66 66/11 1x15+2x10 66 14.2.80 Yes

430 DANTA Conventional 66 66/11 2X10 66 12.8.91 Yes

431 DANTIWADA Conventional 66 66/11 1X15+1X10 66 30.9.87 Yes

432 IQBALGADH Conventional 66 66/11 1x10 66 18.8.88 Yes

433 JALOTRA Conventional 66 66/11 1x15+1X10 66 6.3.90 Yes

434 CHANDISAR GIDC Conventional 66 66/11 1X15+1X10 66 6.2.91 Yes

435 AMBAJI Conventional 66 66/11 1x10+1X5 66 15.1.93 Yes

436 PALANPUR-II Conventional 66 66/11 2X10 66 27.4.93 Yes

437 KANODAR Conventional 66 66/11 2X10 66 22.12.94 Yes

438 MALAN Conventional 66 66/11 1X10 66 4.2.97 Yes

439 HEBATPUR(CHITRASANI) Conventional 66 66/11 1X10 66 11.3.96 Yes

440 LALAWADA Conventional 66 66/11 1X10 66 14.5.01 Yes

441 BASU Conventional 66 66/11 1X10 66 29.3.03 Yes

442 PANCHADA Conventional 66 66/11 1X10 66 20.8.04 Yes

443 AMIRGADH Conventional 66 66/11 1X10 66 4.12.04 Yes

444 JEGOL Conventional 66 66/11 1X10 66 21.3.05 Yes

445 SANKHARI Conventional 220 220/66 1X100+2x50 220 14.8.95 Yes

446 PATAN Conventional 132 132/66 1X50+2X40 132 11.8.85 Yes

66/11 4X10

447 BALISANA Conventional 66 66/11 3X10 66 1.12.81 Yes

448 CHANASMA Conventional 66 66/11 3X10 66 29.12.75 Yes

449 HARIJ Conventional 66 66/11 3X10 66 4.5.81 Yes

450 KANSA Conventional 66 66/11 1X15+1X10 66 12.8.91 Yes

451 MANUD Conventional 66 66/11 2X10 66 31.3.92 Yes

452 KAMBOI(CHANASMA) Conventional 66 66/11 1x10 66 30.12.92 Yes

453 ADIA Conventional 66 66/11 2X10 66 5.2.90 Yes

454 SAMI Conventional 66 66/11 1X10 66 17.5.94 Yes

455 SANKHESHWAR Conventional 66 66/11 2x10 66 1.5.95 Yes

456 ANAWADA(PATAN) Conventional 66 66/11 2x10 66 18.10.97 Yes

457 DUNAWADA Conventional 66 66/11 1X10 66 31.1.98 Yes

458 ANGANWADA Conventional 66 66/11 2X10 66 12.4.97 Yes

459 KIMBUVA Conventional 66 66/11 1X15 66 1.1.2001 Yes

460 BHADRADA Conventional 66 66/11 1X10 66 12.11.01 Yes460 BHADRADA Conventional 66 66/11 1X10 66 12.11.01 Yes

461 KAMLIWADA Conventional 66 66/11 1X10 66 18.4.03 Yes

462 MUJPUR Conventional 66 66/11 1X10 66 17.10.03 Yes

463 KESHANI Conventional 66 66/11 1X10 66 18.3.05 Yes

464 RAJPUR(P) Conventional 66 66/11 1X10 66 8.8.05 Yes

134

Page 35: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

465 KANSARI Conventional 400 400/220 3X315 400 8.2.2000 Yes

Conventional 220 220/66 3X100 220 16-8-91 Yes

66/11

466 JANGRAL Conventional 220 220/66 1X100 220 12/11/2003 Yes

467 DEESA Conventional 132 132/66 2X50+1X40 132 1.9.80 Yes

66/11 2x20=40

468 JANGRAL Conventional 66 66/11 2x10 66 14.6.80 Yes

469 SAMAU Conventional 66 66/11 2x10+1X15 66 21-5-88 Yes

470 ZERDA Conventional 66 66/11 2x15+1x10 66 27.2.87 Yes

471 KHIMAT Conventional 66 66/11 1x15+1x10 66 15-1-91 Yes

472 MOTAKAPRA Conventional 66 66/11 3x10 66 29-10-92 Yes

473 NANAMEDA(RAVIA) Conventional 66 66/11 1x15+1x10 66 27-5-93 Yes

474 PANTHWADA Conventional 66 66/11 2x10 66 11/7/1996 Yes

475 LORWADA Conventional 66 66/11 2X10 66 6/11/1996 Yes

476 BAIWADA(MALGADH) Conventional 66 66/11 2X10 66 9/12/1996 Yes

477 SHAMSHERPURA Conventional 66 66/11 2x15 66 18-5-92 Yes

478 SHERGADH Conventional 66 66/11 1X15 66 20-4-00 Yes

479 BHILDI Conventional 66 66/11 2x15+1x10 66 27.9.86 Yes

480 VITHODAR Conventional 66 66/11 2X10 66 29-6-02 Yes

481 RAMUN Conventional 66 66/11 1x10+1x15 66 29-9-02 Yes

482 MANEKPUR Conventional 66 66/11 2X10 66 4/3/2004 Yes

483 RANPUR Conventional 66 66/11 1X10 66 7/5/2004 Yes

484 DEVSARI Conventional 66 66/11 1X10 66 12.5.05 Yes

485 VAKTAPURA Conventional 66 66/11 1X10 66 22-5-06 Yes

486 SAMDHI Conventional 66 66/11 1X10 66 30.3.06 Yes

487 DEODAR Conventional 220 220/66 2X100+1x50 220 31.1.89 Yes

488 RADHANPUR Conventional 220 220/66 2X50 220 31.12.04 Yes

489 DEODAR Conventional 66 66/11 2X15+1x10 66 1.1.69 Yes

490 SHIHORI Conventional 66 66/11 3X10 66 30.11.77 Yes

491 DUNGRASAN Conventional 66 66/11 1X10 66 16.12.99 Yes

492 THARA Conventional 66 66/11 1x15+2x10 66 27.9.86 Yes

493 KHODA Conventional 66 66/11 3X10 66493 KHODA Conventional 66 66/11 3X10 66 25.7.90 Yes

494 VARAHI Conventional 66 66/11 1x10 66 26.11.91 Yes

495 KOTDA(F) Conventional 66 66/11 3x10 66 25.7.90 Yes

496 RADHANPUR Conventional 66 66/11 2X10 66 21.2.91 Yes

497 PADARDI Conventional 66 66/11 2X10 66 22.3.94 Yes

498 TERWADA Conventional 66 66/11 2x10 66 25.2.95 Yes

499 SANTALPUR Conventional 66 66/11 1X5 66 31.3.96 Yes

500 DAHISAR Conventional 66 66/11 1X10 66 31.3.96 Yes

501 KAMBOI[F] Conventional 66 66/11 1X10 66 11.5.99 Yes

502 UN Conventional 66 66/11 1X10+1x5 66 28.12.99 Yes

503 ARNIWADA Conventional 66 66/11 2X10 66 2.7.01 Yes

504 RAIYA Conventional 66 66/11 1X10 66 28.2.05 Yes

505 VADIYA Conventional 66 66/11 1X10 66 27.2.06 Yes

506 KHERALU Conventional 220 220/66 2X100 220 28.3.96 Yes

507 SIDHPUR Conventional 132 132/66 2X50+1X40 132 29.12.75 Yes

66/11 2x15

508 CHHAPI Conventional 66 66/11 2X15 66 14.1.80 Yes

509 GIDASAN Conventional 66 66/11 2X10 66 13.4.92 Yes

510 KAKOSI Conventional 66 66/11 3X10 66 15.2.90 Yes

511 KAHODA Conventional 66 66/11 3x10 66 16.3.90 Yes

512 KARLI Conventional 66 66/11 2X10 66 17-1-86 Yes

513 KHALI Conventional 66 66/11 2X10 66 10/12/1999 Yes

514 KODRAM Conventional 66 66/11 2X10 66 31.3.92 Yes

515 SATLASANA Conventional 66 66/11 2X10+1X5 66 2.2.87 Yes

516 UNJHA Conventional 66 66/11 2X10+1X5 66 8.9.72 Yes

517 VADNAGAR Conventional 66 66/11 2X10 66 15.2.84 Yes

518 KHERALU Conventional 66 66/11 1X15+1X10 66 2.6.72 Yes

519 UMTA Conventional 66 66/11 1X10 66 13.7.01 Yes

520 KHANPUR Conventional 66 66/11 1X10 66 9.9.02 Yes

521 VARETHA Conventional 66 66/11 1X10 66 30.1.04 Yes

522 MANDALI Conventional 66 66/11 1X10 66 29.11.04 Yes

523 DASAJ Conventional 66 66/11 1X10 66 5.8.05 Yes

524 UNAVA Conventional 66 66/11 1X10 66 24-2-06 Yes

525 THAVAR Conventional 220 220/66 2X100 220 27.2.98 Yes

526 ASODAR Conventional 66 66/11 2X10 66 30.3.96 Yes

527 BHABHAR Conventional 66 66/11 2X15 66 5.3.88 Yes

528 MITHI PALDI Conventional 66 66/11 2X15 66 13.12.91 Yes

529 TITHGAM Conventional 66 66/11 2x10 66 19.2.92 Yes

530 DHANERA Conventional 66 66/11 1x15+2x10 66 1.9.80 Yes530 DHANERA Conventional 66 66/11 1x15+2x10 66 1.9.80 Yes

531 LAKHANI Conventional 66 66/11 1x15+2x10 66 26.11.89 Yes

532 JADIA Conventional 66 66/11 3X10 66 27.3.89 Yes

533 RAH Conventional 66 66/11 1X15+1x10 66 26.2.92 Yes

534 KOTDA(DHUNSOL) Conventional 66 66/11 3x10 66 22.9.94 Yes

135

Page 36: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

535 PILUDA Conventional 66 66/11 2X10 66 16.2.94 Yes

536 TADAV Conventional 66 66/11 1X5 66 29.3.94 Yes

537 KUVANA Conventional 66 66/11 2X10 66 30.1.2000 Yes

538 MERA Conventional 66 66/11 1X15+1X10 66 17.11.94 Yes

539 THARAD Conventional 66 66/11 2X15 66 16.11.89 Yes

540 LAVARA Conventional 66 66/11 2X10 66 17.4.01 Yes

541 JALOYA Conventional 66 66/11 2X5 66 30.1.01 Yes

542 AGTHALA Conventional 66 66/11 1X10 66 30.3.04 Yes

543 MAKHANU Conventional 66 66/11 1X10 66 25.8.04 Yes

544 JADIYALI Conventional 66 66/11 1X10 66 30.3.05 Yes

545 DIDARDA Conventional 66 66/11 1X10 66 6.1.06 Yes

546 RUNI Conventional 66 66/11 1X10 66 27.1.06 Yes

547 PATHAMADA Conventional 66 66/11 1X10 66 23-7-2007 Yes

548 KALANA Conventional 66 66/11 1X10 66 31.01.07 Yes

549 BHUTADI Conventional 66 66/11 1X10 66 29.03.07 Yes

550 VIRAMPUR Conventional 66 66/11 1X10 3 30.12.06 Yes

551 ASOJ Conventional 400 400/220 2X500 400 15-8-86 Yes

220/132 2X150

552 KASOR Conventional 400 400/220 2X315 400 31-1-96 Yes

553 SOJA Conventional 400 400/220 2X500 400 16-1-87 Yes

554 KANSARI Conventional 400 400/220 2X315 400 8/2/2000 Yes

220/66 3X100

555 VADAVI Conventional 400 400/220 2x315 400 02.01.07 Yes

556 CHORNIA Conventional 400 440/220 2X500 400 18-10-94 Yes

557 AMRELI Conventional 400 440/220 2X315 400 2/8/2002 Yes

220/66 1X100

558 JETPUR Conventional 400 400/220 3X315 400 31-12-87 Yes

220/66 2X100

559 HADALA Conventional 400 400/220 2X315 400 27-05-07 YES

220/66 0

66/11 1x5

560 220KV GONDAL Conventional 220 220/132 2X100+1X50 220 15.04.65560 220KV GONDAL Conventional 220 220/132 2X100+1X50 220 15.04.65 Yes

132/66 1X50

132/66 2X30

66/11 1X5

561 66KV KASHIVISHVANATH Conventional 66 66/11 2x15+1x10 66 15.04.65 Yes

562 132KV JASDAN Conventional 132 132/66 2x50 132 14.04.99 Yes

66/11 2x15+1x10

563 66KV VIRPUR Conventional 66 66/11 1x10+1x5 66 13.12.89 Yes

564 66KV LODHIKA Conventional 66 66/11 2x10 66 30.12.89 Yes

565 66KV VASAVAD Conventional 66 66/11 2X10 66 30.07.90 Yes

566 66KV SARDHAR Conventional 66 66/11 1x15+1x10 66 18.06.91 Yes

567 66KV KOTDA SANGANI Conventional 66 66/11 1X10+1X5 66 08.06.91 Yes

568 66KV MOVIYA Conventional 66 66/11 1x10+1x5 66 24.06.93 Yes

569 66KV KOLITHAD Conventional 66 66/11 1x10+1x5 66 07.05.94 Yes

570 66KV LILAKHA Conventional 66 66/11 1X10+1X5 66 26.09.94 Yes

571 66KV DERDI Conventional 66 66/11 1X10+1X7.5 66 20.03.96 Yes

572 66KV KAMLAPUR Conventional 66 66/11 2X10 66 31.03.01 Yes

573 66KV TRAMBA Conventional 66 66/11 1X10 66 01.09.03 Yes

574 66KV Hadamtala Conventional 66 66/11 1X10 66 07.07.07 Yes

575 66KV Motadadva Conventional 66 66/11 1X5 66 27.06.07 Yes

576 66KV Mevasa Conventional 66 66/11 1x10 66 16.07.07 Yes

577 220KV RAJKOT (NYARA) Conventional 220 220/132 1X100 220 24.11.96 Yes

220/66 2X100

66/11 1X5

578 132KV RAJKOT (VIKRAM) Conventional 132 132/66 3X50 132 14.06.88 Yes

579 132KV VAJADI Conventional 132 132/66 2X20 132 13.04.93 Yes

132/11 1X12.5

66/11 2X10

580 66KV PUNITNAGAR Conventional 66 66/11 1x15+3x10 66 01.02.78 Yes

581 66KV LIARA Conventional 66 66/11 2X5 66 07.08.68 Yes

582 66KV PADADHARI Conventional 66 66/11 1X10+1X5 66 14.04.76 Yes

583 66KV DUDHSAGAR Conventional 66 66/11 4x15 66 1963 Yes

584 66KV SHAPAR Conventional 66 66/11 2x15 66 01.02.95 Yes

585 66KV AJI GIDC Conventional 66 66/11 3X15 66 21.05.92 Yes

586 66KV GHANTESHWAR Conventional 66 66/11 1X15+2X10 66 19.12.86 Yes

587 66KV NAVAGAM Conventional 66 66/11 2 X 15 66 25.10.96 Yes

588 66KV LAXMINAGAR Conventional 66 66/11 3x15 66 10.11.98 Yes

589 66KV SIDDHESWAR Conventional 66 66/11 1X15+1X10 66 29.09.99 Yes

590 66KV KOTHARIA Conventional 66 66/11 2x10 66 21.09.02 Yes590 66KV KOTHARIA Conventional 66 66/11 2x10 66 21.09.02 Yes

591 66KV TARAGHADI Conventional 66 66/11 1X10+1X5 66 07.10.02 Yes

592 66KV POPATPARA Conventional 66 66/11 1X10 66 20.07.04 Yes

593 66KV NIKAWA Conventional 66 66/11 1X10 66 09.06.05 Yes

594 66KV METODA Conventional 66 66/11 1X10 66 21.07.06 Yes

136

Page 37: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

595 66KV KAGDADI Conventional 66 66/11 1X10 66 08.06.06 Yes

596 66KV Raiyadhar Conventional 66 66/11 1X10 66 12.10.06 Yes

597 220KV JAMNAGAR Conventional 220 220/132 2X100 220 28.03.95 Yes

220/66 2X100

598 132KV NAGHEDI Conventional 132 132/66 2X50 132 31.01.71 Yes

132/11 1x25+1x12.5

66/11 1X10

599 132KV DHROL Conventional 132 132/66 1X50+1X40 132 31.05.03 Yes

600 66KV SAT RASTA Conventional 66 66/11 4X10 66 11.07.80 Yes

601 66KV BEDESHWAR Conventional 66 66/11 1X15+2X10 66 29.05.86 Yes

602 66KV SIKKA Conventional 66 66/11 2x10 66 17.04.75 Yes

603 66KV DHROL Conventional 66 66/11 1x15+1X10 66 03.07.81 Yes

604 66KV KALAVAD Conventional 66 66/11 1X15+2X10 66 11.08.72 Yes

605 66KV LALPUR Conventional 66 66/11 1x15+1X10 66 29.03.84 Yes

606 66KV JAMNAGAR-B Conventional 66 66/11 1x15+2x10 66 19.12.90 Yes

607 66KV JAMDHUDHAI Conventional 66 66/11 1x10+1x5 66 07.05.93 Yes

608 66KV KHAREDI Conventional 66 66/11 1x10+1x5 66 26.05.93 Yes

609 66KV JAMVANTHALI Conventional 66 66/11 1X10+1X5 66 16.02.98 Yes

610 66KV HAPA Conventional 66 66/11 2x10 66 16.03.99 Yes

611 66KV MODPAR Conventional 66 66/11 1X10 66 20.03.00 Yes

612 66KV KESHIYA (JODIA) Conventional 66 66/11 1X10+1X5 66 25.01.00 Yes

613 66KV JAMNAGAR-C Conventional 66 66/11 2X10 66 22.09.02 Yes

614 66KV BANUGAR Conventional 66 66/11 1X10 66 10.02.05 Yes

615 66KV LATIPUR Conventional 66 66/11 1X10 66 28.08.04 Yes

616 66KV PIPALI Conventional 66 66/11 1X10 66 06.07.05 Yes

617 66KV PIPARTODA Conventional 66 66/11 1X10 66 20.08.06 Yes

618 66KV NAVAGAM Conventional 66 66/11 1X10 66 17.07.07 Yes

619 132KV KHAMBHALIA Conventional 132 132/66 1x20 132 11.03.92 Yes

132/11 1x20

132/11 1X12.5

66/11 2X5

620 132KV BHATIA Conventional 132 132/66 1X50+1X20 132 07.04.93620 132KV BHATIA Conventional 132 132/66 1X50+1X20 132 07.04.93 Yes

132/66 1X50

66/11 1X10+1X5

621 66KV VADINAR Conventional 66 66/11 2X5 66 28.11.78 Yes

622 66KV VARVALA Conventional 66 66/11 1X10+1X5 66 30.05.81 Yes

623 66KV ARAMBHADA Conventional 66 66/11 2X5 66 28.04.94 Yes

624 66KV KALYANPUR Conventional 66 66/11 1X10+1X5 66 07.05.95 Yes

625 66KV MEGHPAR Conventional 66 66/11 1X15 66 28.05.99 Yes

626 66KV VADATARA Conventional 66 66/11 1X10 66 19.01.02 Yes

627 66KV BHADTHAR Conventional 66 66/11 1X10 66 09.04.05 Yes

628 220 KV MORBI Conventional 220 220/66 2X100 220 30.05.97 Yes

66/11 1X5

629 132KV WANKANER Conventional 132 132/66 3X50 132 01.02.65 Yes

66/11 1X20+2X15

630 132KV LALPAR Conventional 132 132/11 2x12.5 132 21.09.95 Yes

631 66 KV MORBI ‘A’ Conventional 66 66/11 2X15+1X10 66 18.09.66 Yes

632 66 KV MORBI’B’ Conventional 66 66/11 3X10 66 15.07.88 Yes

633 66 KV CHARAVDA Conventional 66 66/11 1X10+2X15 66 21.03.87 Yes

634 66 KV TANKARA Conventional 66 66/11 2X10 66 01.01.78 Yes

635 DUNGARPUR Conventional 66 66/11 2X10 66 18.4.2004 Yes

636 66 KV DEVALIYA Conventional 66 66/11 1X10+1X15 66 23.01.95 Yes

637 66 KV JETPAR Conventional 66 66/11 2X5 66 31.05.96 Yes

638 66 KV PIPALIYA Conventional 66 66/11 1X5 66 03.11.96 Yes

639 66 KV JEDESHWAR Conventional 66 66/11 2X10 66 24.01.98 Yes

640 66 KV CHOTILA Conventional 66 66/11 2X10 66 28.08.84 Yes

641 66 KV THAN Conventional 66 66/11 2X15 66 14.12.91 Yes

642 66 KV BAMANBORE Conventional 66 66/11 1X5+1X10 66 28.08.90 Yes

643 66 KV LUNSAR Conventional 66 66/11 2X10 66 01.08.00 Yes

644 66KV MORBI-C- LILAPAR Conventional 66 66/11 1X10 66 21.08.02 Yes

645 66KV DHUVA Conventional 66 66/11 2X10 66 07.05.04 Yes

646 66 KV MAHIKA Conventional 66 66/11 2X10 66 30.03.04 Yes

647 66 KV KHAREDA Conventional 66 66/11 1X10 66 03.07.06. Yes

648 66 KV PIPLI (M) Conventional 66 66/11 1X10 66 14.07.06 Yes

649 66 KV BANGAWADI (OTAVA) Conventional 66 66/11 1X10 66 7/1/2007 Yes

650 66 KV BANDHANI Conventional 66 66/11 1X10 66 22.03.07 Yes

651 66 KV LAMBA Conventional 66 66/11 1X10 4 30.03.07 Yes

652 66 KV OTALA Conventional 66 66/11 1X10 4 24.03.07 Yes

653 VARTEJ Conventional 220 220/66 3X100 220 6/12/1996 Yes

66/11 2X1566/11 2X15

654 SAGAPARA Conventional 220 220/66 1X100+1X50 220 6/8/1999 Yes

655 VALLABHIPUR Conventional 132 132/11 2X12.5 132 5/12/1994 Yes

132/66 1X20

656 BHAVNAGAR CITY Conventional 66 66/11 3X15 66 6/26/1978 Yes

137

Page 38: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

657 NARIROAD Conventional 66 66/11 2X10 66 6/13/1975 Yes

658 BUNDER ROAD Conventional 66 66/11 2X15 66 7/21/1971 Yes

659 SONGADH Conventional 66 66/11 2X10 66 1/11/1977 Yes

660 PALITANA Conventional 66 66/11 3X10 66 8/9/1977 Yes

661 TALAJA Conventional 66 66/11 3x10 66 12/4/1981 Yes

662 SHIHOR Conventional 66 66/11 2X10+1X15 66 9/24/1987 Yes

663 DHOLA Conventional 66 66/11 2X10 66 8/21/1989 Yes

664 NAVAGAM Conventional 66 66/11 2X10 66 10/3/1991 Yes

665 SIDSAR Conventional 66 66/11 2x10 66 9/14/1992 Yes

666 TANSA Conventional 66 66/11 2x10 66 10/7/1993 Yes

667 BAGDANA(RAJPURA) Conventional 66 66/11 2x10 66 12/23/1995 Yes

668 TANA Conventional 66 66/11 2x7.5 66 7/31/1997 Yes

669 MAMSA Conventional 66 66/11 2x10 66 10/27/1997 Yes

670 GHANGHALI Conventional 66 66/11 1x10 66 2/21/1999 Yes

671 GHOGHA(BHUMLI) Conventional 66 66/11 1x10 66 2/21/1999 Yes

672 MANAR(ALANG) Conventional 66 66/11 2x10 66 2/28/1999 Yes

673 VARTEJ-II(CHITRA) Conventional 66 66/11 2x10 66 4/21/2000 Yes

674 PITHALPUR Conventional 66 66/11 1X10 66 6/21/2004 Yes

675 THADACH Conventional 66 66/11 1*10 66 8/24/2006 Yes

676 Timbdi Conventional 220 220/66 1X50+1X100 220 31/12/89 Yes

220/132 3X50

677 Kansari Conventional 220 220/66 1X100+1X50 220 18/1/97 Yes

678 Talala Conventional 132 132/66 4X20 132 16/2/70 Yes

66/11 2X15

679 Haripur Conventional 132 132/11 1X12.5 132 26/3/03 Yes

680 Advi Conventional 66 66/11 1X10+1X5 66 20/7/90 Yes

681 Una Conventional 66 66/11 2X15 66 1970 Yes

682 Dhokadava Conventional 66 66/11 3X5 66 25/8/88 Yes

683 Pranchi Conventional 66 66/11 2X10+1X15 66 14/12/76 Yes

684 Kodinar Conventional 66 66/11 1X15+2X10 66 1/3/1970 Yes

685 Girgadhada Conventional 66 66/11 3X5 66 27/12/91 Yes

686 Ankolwadi Conventional 66 66/11 66686 Ankolwadi Conventional 66 66/11 1X10+1X5 66 19/12/97 Yes

687 Ghatwad Conventional 66 66/11 1X10+1X5 66 30/9/99 Yes

688 Samter Conventional 66 66/11 1X10 66 26/2/2000 Yes

689 Devli Conventional 66 66/11 1X10 66 17/4/02 Yes

690 Keshriya Conventional 66 66/11 1X10 66 29/7/05 Yes

691 Bhetali Conventional 66 66/11 1x15 66 17/4/06 Yes

692 Alidar Conventional 66 66/11 1x10 66 4/6/2006 Yes

693 220kv Otha Conventional 220 220/66 1X100 220 31/3/00 Yes

694 220kv Savarkundla Conventional 220 220/66 2X100+1X50 220 7/7/1981 Yes

695 66kv Amreli Conventional 66 66/11 3X10 66 16/11/78 Yes

696 66kv Amreli-'B' Conventional 66 66/11 10X1+1x7.5 66 11/20/2000 Yes

697 66kv Bagasara Conventional 66 66/11 3X10 66 11/11/1990 Yes

698 66kv Bhader Conventional 66 66/11 2X10 66 20/3/99 Yes

699 66kv Chalala Conventional 66 66/11 2x10 66 11/4/1993 Yes

700 66kv Dhari Conventional 66 66/11 2X10 + 1x15 66 30/9/90 Yes

701 66kv Dudhala Conventional 66 66/11 1X5+1X10 66 23/11/97 Yes

702 66kv Dunger Conventional 66 66/11 1X10 66 31/10/91 Yes

703 66kv Jafrabad Conventional 66 66/11 2X5 66 13/3/86 Yes

704 66kv Jesar Conventional 66 66/11 1X10 + 1X5 66 5/7/1990 Yes

705 66kv Khambha Conventional 66 66/11 1X5 + 1X10 66 3/9/2004 Yes

706 66kv Khuntawada Conventional 66 66/11 1x10 66 31/3/91 Yes

707 66kv Kukavav Conventional 66 66/11 2X10 66 30/5/92 Yes

708 66kv Liliya Conventional 66 66/11 1X5+1X10 66 16/11/78 Yes

709 66kv Mahuwa Conventional 66 66/11 3X10 66 2/8/1995 Yes

710 66kv Mota-Barman Conventional 66 66/11 1X10 66 23/3/66 Yes

711 66kv Rajula Conventional 66 66/11 2X10 66 26/3/99 Yes

712 66kv Sarambhada Conventional 66 66/11 1X10 66 15/7/73 Yes

713 66kv Savarkundla Conventional 66 66/11 2X15 66 15/7/73 Yes

714 66kv Vadli Conventional 66 66/11 1X10+1X5 66 30/12/99 Yes

715 66kv Vanda Conventional 66 66/11 1X10 66 8/10/1994 Yes

716 66kv Vijapadi Conventional 66 66/11 1X10 66 3/8/2005 Yes

717 66kv Ambardi Conventional 66 66/11 1X10 66 13/6/05 Yes

718 66kv Dalkhaniya Conventional 66 66/11 1X10 66 13/6/05 Yes

719 66kv Mota Samadhiyala Conventional 66 66/11 1X10 66 30/11/05 Yes

720 DHASA Conventional 220 220/66 1x100+1x50 220 7/11/1995 Yes

66/11 10+15 7/5/1965

721 PALIYAD Conventional 132 132/66 2x50 132 11/12/1991 Yes

132/11 1X12.5

66/11 1X1066/11 1X10

722 BARVALA Conventional 132 132/11 2X12.5 132 30/12/1988 Yes

723 LATHI Conventional 66 66/11 1X10+2X5 66 29/11/1991 Yes

724 BOTAD Conventional 66 66/11 1X15+2X10 66 29/3/1991 Yes

725 GADHADA Conventional 66 66/11 3x10 66 25/1/1990 Yes

138

Page 39: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

726 BABRA Conventional 66 66/11 1x10+1X15 66 8/8/1994 Yes

727 GARIYADHAR Conventional 66 66/11 3X10 66 21/12/1992 Yes

728 SARANGPUR Conventional 66 66/11 1x10+1X5 66 5/12/1991 Yes

729 LAKHENI Conventional 66 66/11 1x10+1X5 66 10/3/1993 Yes

730 VINCHIYA Conventional 66 66/11 1X10+1X5 66 19/10/1993 Yes

731 CHITAL Conventional 66 66/11 2x10 66 14/07/1993 Yes

732 DAMNAGAR Conventional 66 66/11 1X10+1X5 66 26/06/1996 Yes

733 SANOSARA Conventional 66 66/11 10+5 66 10/10/1998 Yes

734 TURKHA Conventional 66 66/11 1X10+1x5 66 6/7/2000 Yes

735 NONGHANVADAR Conventional 66 66/11 1X10+1x5 66 24/12/2001 Yes

736 LATHIDAD Conventional 66 66/11 1X10+1X5 5 21/6/2005 Yes

737 KOTADA PITHA Conventional 66 66/11 10 66 24/8/2005 Yes

738 KALATALAV Conventional 66 66/11 1X10 66 8/5/2006 Yes

739 TATAM Conventional 66 66/11 1X10 66 9/4/2007 Yes

740 HADDAD Conventional 66 66/11 1X10 66 15/2/2007 Yes

741 220 KV ANJAR Conventional 220 220/132 3x100 220 15/07/1988 Yes

132/66 2X50+2X40

66/11 2X15

220/66 1x100

742 220 KV SHIVLAKHA Conventional 220 220/66 1X100 220 08/05/2004 Yes

66 1X5

743 SAMAKHIYALI Conventional 132 132/66 1X50+2x20 132 13/01/1995 Yes

66/11 2X5

744 66 KV GANDHIDHAM [FTZ]

Conventional66 66/11 1x20+1x15+

1x1066 01/05/1980

Yes

745 66 KV BHACHAU Conventional 66 66/11 1X15+1X10 66 01/08/1980 Yes

746 66 KV KHEDOI Conventional 66 66/11 3X10 66 01/08/1983 Yes

747 66 KV KANDLA Conventional 66 66/11 2X5 66 01/01/1971 Yes

748 66 KV DUDHAI Conventional 66 66/11 1X15+1X10 66 01/05/1989 Yes

749 66 KV BHIMASAR Conventional 66 66/11 2X10 66 02/05/1994 Yes

750 66 KV CHIRAI Conventional 66 66/11 1X10 66 31/12/2002 Yes

751 66 KV RAPAR Conventional 66 66/11 2X15 66 01/01/1980 Yes751 66 KV RAPAR Conventional 66 66/11 2X15 66 01/01/1980 Yes

752 66 KV VAJEPAR Conventional 66 66/11 1X10 66 28/02/1990 Yes

753 66 KV CHOBARI Conventional 66 66/11 1X10+1X5 66 16/01/1996 Yes

754 66 KV ADHOI Conventional 66 66/11 2x5 66 30/03/1995 Yes

755 66 KV GANDHIDHAM `B' Conventional 66 66/11 2x10 66 30/03/1998 Yes

756 66 KV BALASAR Conventional 66 66/11 1X10 66 26/11/1999 Yes

757 66 KV AMARDI Conventional 66 66/11 1X15+1X10 66 25/02/2000 Yes

758 66 KV RATNAL Conventional 66 66/11 1X15 66 10/10/2002 Yes

759 66 KV PRAGPAR Conventional 66 66/11 1X10 66 13/03/2003 Yes

760 66 KV MITHIROHAR Conventional 66 66/11 1X10 66 11/02/2005 Yes

761 66 KV VARSANA Conventional 66 66/11 1X15 66 21/08/2004 Yes

762 66 KV MOKHA Conventional 66 66/11 1X10 66 28/03/2006 Yes

763 66 KV SHIKARA Conventional 66 66/11 1X10 66 28/03/2007 Yes

764 22O KV NAKHATRANA Conventional 220 220/66 2X50 220 26/09/1995 Yes

66/11 1X5

765 66 KV DESHALPAR Conventional 66 66/11 2X10 66 20/05/1982 Yes

766 66 KV GADHSISA Conventional 66 66/11 1x15+1x10 66 06/07/1986 Yes

767 66 KV KHIRSARA Conventional 66 66/11 1X10+1X5 66 27/03/1997 Yes

768 66 KV NALIA Conventional 66 66/11 2X5 66 30/09/1992 Yes

769 66 KV KOTHARA Conventional 66 66/11 1X15 + 1X10 66 06/05/1971 Yes

770 66 KV NAKHATRANA Conventional 66 66/11 2X15+1X10 66 05/11/1976 Yes

771 66 KV RAVAPAR Conventional 66 66/11 1X10+1X5 66 19/03/1978 Yes

772 66 KV NETRA Conventional 66 66/11 1X10+1X5 66 25/03/1995 Yes

773 66 KV KOTDA [J] Conventional 66 66/11 1X10+1X5 66 30/03/1996 Yes

774 66 KV DAYAPAR Conventional 66 66/11 2x5 66 31/03/1997 Yes

775 66 KV BAYATH Conventional 66 66/11 1X10 66 20/06/2000 Yes

776 66 KV VITHON Conventional 66 66/11 1X10 66 24/01/2002 Yes

777 66 KV DON Conventional 66 66/11 1X10 66 12/02/2005 Yes

778 66 KV MOTHALA Conventional 66 66/11 1X10 66 28/03/2006 Yes

779 220KV NANIKHAKHAR Conventional 220 220/66 2X100 220 31/12/1997 Yes

66/11 1X5

780 BHUJ Conventional 132 132/66 3X50 132 06/05/1971 Yes

66/11 1X15+2X10

781 66 KV DAHINSARA Conventional 66 66/11 1X15+1X10 66 12/04/1995 Yes

782 66 KV MANDVI Conventional 66 66/11 2X15+1X10 66 01/06/1976 Yes

783 66 KV NANIKHAKHAR Conventional 66 66/11 2X10+1X5 66 23/01/1991 Yes

784 66 KV LORIA Conventional 66 66/11 1X10+1X5 66 28/04/1987 Yes

785 66 KV KOTDA[CHAKAR] Conventional 66 66/11 2X15 66 28/03/1994 Yes

786 66 KV MADHAPAR Conventional 66 66/11 3X10 66 31/03/1990 Yes786 66 KV MADHAPAR Conventional 66 66/11 3X10 66 31/03/1990 Yes

787 66 KV BHUJ `B' Conventional 66 66/11 2X10 66 15/02/1994 Yes

788 66 KV MANKUVA Conventional 66 66/11 1X10+1X5 66 26/01/1994 Yes

789 66 KV KHAVDA Conventional 66 66/11 1X5 66 28/12/1999 Yes

790 66 KV BALADIYA Conventional 66 66/11 1X10+1X5 66 31/03/2000 Yes

139

Page 40: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

791 66 KV KODAY Conventional 66 66/11 2X10 66 01/01/2000 Yes

792 66 KV LAKHOND Conventional 66 66/11 2X15 66 07/03/1997 Yes

793 66 KV MUNDRA Conventional 66 66/11 2X10 66 01/06/1980 Yes

794 66 KV BHUJPAR Conventional 66 66/11 2x10 66 31/03/2001 Yes

795 66 KV DARSADI Conventional 66 66/11 1X10 66 20/11/2003 Yes

796 66 KV DHANETI Conventional 66 66/11 1X15 66 04/11/2004 Yes

797 66 KV THARAWADA Conventional 66 66/11 1X10 66 02/02/2005 Yes

798 66 KV MUNDRA IND. Conventional 66 66/11 1X10 66 28/03/2006 Yes

799 66 KV VIGHAKOT Conventional 66 66/11 1x5+1x5 66 23.03.07 Yes

800 66 KV BEDIABET Conventional 66 66/11 1x5+1x5 66 30.03.07 Yes

801 VISAVADAR Conventional 220 220/66 1x100+1x50 220 3/5/1995 Yes

802 JUNAGADH Conventional 132 132/66 1x50+1x20 132 10/17/1987 Yes

132/11 2x12.5

803 JUNAGADH(GIDC) Conventional 66 66/11 3x10 66 9/1/1975 Yes

804 BHESAN Conventional 66 66/11 1x10+1x15 66 1/10/1984 Yes

805 SHAPUR Conventional 66 66/11 1x10+1x15 66 3/20/1962 Yes

806 MOTI MONPARI Conventional 66 66/11 1x10+1x15 66 3/22/1994 Yes

807 KANZA Conventional 66 66/11 1x10+1x5 66 9/16/1994 Yes

808 VADIA Conventional 66 66/11 2x10 66 3/26/1987 Yes

809 CHOKI Conventional 66 66/11 2x10 66 10/20/1995 Yes

810 DHEBAR Conventional 66 66/11 2x10 66 10/5/1995 Yes

811 ZANZARDA Conventional 66 66/11 2x10 66 3/31/1997 Yes

812 DEVKIGALOL Conventional 66 66/11 2x5 66 10/16/1996 Yes

813 MOTAKOTDA Conventional 66 66/11 2x10 66 6/25/1997 Yes

814 PRABHATPUR Conventional 66 66/11 1x10+1x5 66 3/28/1998 Yes

815 VISAVADAR Conventional 66 66/11 3x10 66 9/11/1988 Yes

816 CHUDA Conventional 66 66/11 1x10+1x5 66 6/15/1999 Yes

817 MAJEVADI Conventional 66 66/11 1x10 66 1/25/2000 Yes

818 BHALGAM Conventional 66 66/11 1x10+1x5 66 7/29/2004 Yes

819 BILKHA Conventional 66 66/11 1x10+1x5 66 6/20/1984 Yes

820 BARADIYA Conventional 66 66/11.55 1x10 66 9/13/2005 Yes

821 KESHOD Conventional 220 220/66 1x100+2X50 220 12/27/1988821 KESHOD Conventional 220 220/66 1x100+2X50 220 12/27/1988 Yes

822 VERAVAL Conventional 66 66/11 4X10 66 10/16/1970 Yes

823 CHORVAD Conventional 66 66/11 2X15 66 12/17/1972 Yes

824 MALIA-HATINA Conventional 66 66/11 3X10 66 1/29/1988 Yes

825 KESHOD Conventional 66 66/11 1X15+2X10 66 1/1/1970 Yes

826 MANGROL Conventional 66 66/11 1X15+2X10 66 1/1/1972 Yes

827 MADHAVPUR Conventional 66 66/11 1X10+1X5 66 9/5/1981 Yes

828 MENDARDA Conventional 66 66/11 1X15+2X10 66 9/30/1989 Yes

829 PRABHAS PATAN Conventional 66 66/11 3X10 66 3/23/1992 Yes

830 SHIL Conventional 66 66/11 1x10 66 10/21/1993 Yes

831 KHIRASARA Conventional 66 66/11 1x10 66 11/16/1994 Yes

832 AJAB Conventional 66 66/11 2X10 66 9/26/1995 Yes

833 SUTRAPADA Conventional 66 66/11 1X10+1X5 66 4/1/1999 Yes

834 CHULDI Conventional 66 66/11 2X10 66 12/11/2000 Yes

835 MORAJ Conventional 66 66/11 1X10+1X5 66 7/3/2003 Yes

836 KOYLANA Conventional 66 66/11 1X10 66 5/21/2004 Yes

837 NANI KHODIYAR Conventional 66 66/11 1X10 66 7/6/2004 Yes

838 SARDARGADH Conventional 220 220/66 1X100+1X50 220 12/18/1997 Yes

839 MOTI PANELI Conventional 220 220/66 1X100+1X50 220 1/23/1998 Yes

840 BHAYAVADAR Conventional 132 132/66 2X20 132 3/6/1997 Yes

66/11 2X10

841 DHORAJI Conventional 132 132/11 2X12.5 132 1/4/1971 Yes

842 PATANVAV Conventional 66 66/11 1x10+1x5 66 11/24/1996 Yes

843 SARDARGADH Conventional 66 66/11 1X10+1X5 66 4/6/1992 Yes

844 KHARCHIYA Conventional 66 66/11 2X10 66 9/11/1979 Yes

845 JAM JODHPUR Conventional 66 66/11 1X15+1X10 66 8/4/1980 Yes

846 SAMANA Conventional 66 66/11 1X10+1X5 66 1/23/1998 Yes

847 CHITRAVAD Conventional 66 66/11 1X10+1X05 66 3/24/1994 Yes

848 UPLETA Conventional 66 66/11 1X15+1X10 66 5/7/1979 Yes

849 TANSAVA Conventional 66 66/11 1X10+1X5 66 8/7/1995 Yes

850 JAM KANDORNA Conventional 66 66/11 1X15+1X10 66 1/12/1984 Yes

851 MOTI MARAD Conventional 66 66/11 1X10+1X5 66 6/30/1989 Yes

852 SUPEDI Conventional 66 66/11 1X10+1X5 66 6/26/1997 Yes

853 JETPUR `B` Conventional 66 66/11 1X10 +1X05 66 9/3/1998 Yes

854 JETPUR `A` Conventional 66 66/11 3X10 66 11/6/1981 Yes

855 RANAVAV Conventional 220 220/132 2X100 220 6/5/1980 Yes

132/66 3X50

66/11 2X10

856 PORBANDAR COLONY Conventional 66 66/11 2X10 66 4/27/1974 Yes856 PORBANDAR COLONY Conventional 66 66/11 2X10 66 4/27/1974 Yes

857 BHANVAD Conventional 66 66/11 1X10+1X5 66 9/12/1991 Yes

858 VANSJALIA Conventional 66 66/11 1X10+1x15 66 10/18/1993 Yes

859 GOSA Conventional 66 66/11 1X5 66 11/14/1996 Yes

860 PORBANDAR (GIDC) Conventional 66 66/11 2X10 66 4/25/1974 Yes

140

Page 41: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

861 BOKHIRA Conventional 66 66/11 1X10+1X5 66 9/16/1996 Yes

862 BAGVADAR Conventional 66 66/11 2X10 66 2/8/1984 Yes

863 VISAVADA Conventional 66 66/11 1X10 66 6/12/1994 Yes

864 ADVANA Conventional 66 66/11 1X10+1x5 66 12/21/2001 Yes

865 MANAVADAR Conventional 66 66/11 1X15+1X10 66 12/19/1971 Yes

866 PAJOD Conventional 66 66/11 1X5+1x10 66 1/8/1987 Yes

867 MANDODARA Conventional 66 66/11 1X10+1x5=15 66 9/20/1994 Yes

868 KUTIYANA Conventional 66 66/11 1X10+1X10 66 3/1/1973 Yes

869 RANA KANDORNA Conventional 66 66/11 1x5+1x10 66 9/28/1991 Yes

870 SONVADIA Conventional 66 66/11 1X10 66 3/7/1998 Yes

871 GUNDA Conventional 66 66/11 1X10 66 12/10/2004 Yes

872 BANTIYA Conventional 66 66/11 1X10 66 3/12/2007 Yes

873 BHAT SIMROLI Conventional 66 66/11 1X10 66 4/24/2006 Yes

874 BUDHECHA Conventional 66 66/11 1X10 66 3/5/2007 Yes

875 MANDLIKPUR Conventional 66 66/11 1X10 66 2/23/2007 Yes

876 NAVI HADIYAD Conventional 66 66/11 1X10 66 2/20/2007 Yes

877 KHAMBHALIYA Conventional 66 66/11 1X10 66 3/17/2007 Yes

878 KHAGESHRI Conventional 66 66/11 1X10 66 3/29/2007 Yes

879 BAMANIA Conventional 66 66/11 1X10 2 7/13/2007 Yes

880 KOSAMADA (SIMADA) Conventional 66 66/11 1X10 2 7/7/2008 Yes

881 NAVSARI CITY Conventional 66 66/11 1X10 2 8/9/2008 Yes

882 SAMPURA (VIHAN) Conventional 66 66/11 1X10 3 9/5/2008 Yes

883 HIRAPARA Conventional 66 66/11 1X10 3 1/4/2007 Yes

884 SCIENCE CITY Conventional 66 66/11 1X20 2 2/12/2008 Yes

885 JORAPARA Conventional 66 66/11 1X10 2 5/1/2008 Yes

886 ODHAV Conventional 66 66/11 1X10 4 6/23/2008 Yes

1X15

887 PALAIYA (MOHOREL) Conventional 66 66/11 1X10 3 11/3/2008 Yes

888 SANTHAL Conventional 66 66/11 1X10 4 6/26/2008 Yes

1X10

889 ADRI Conventional 66 66/11 1X10 2 2/15/2008 Yes

890 AMRAPUR Conventional 66 66/11 1X10 2 8/1/2008 Yes890 AMRAPUR Conventional 66 66/11 1X10 2 8/1/2008 Yes

891 KUNTALPUR Conventional 66 66/11 1X10 2 7/25/2008 Yes

892 LAKHDHIRPUR Conventional 66 66/11 1X10 4 2/8/2008 Yes

1X10

893 GADHDIYA (JASADAN-II) Conventional 66 66/11 1X10 2 12/20/2007 Yes

894 BABAZAR Conventional 66 66/11 1X10 3 6/5/2008 Yes

895 SULTANPUR Conventional 66 66/11 1X10 3 3/31/2008 Yes

896 KUVADA Conventional 66 66/11 1X10 2 4/9/2008 Yes

897 MORVADI Conventional 66 66/11 1X10 2 5/5/2008 Yes

898 RAFELESHWAR Conventional 66 66/11 1X10 3 7/31/2008 Yes

899 MORKANDA Conventional 66 66/11 1X10 2 8/5/2008 Yes

900 LAJAI Conventional 66 66/11 1X10 3 4/29/2009 Yes

901 VODA Conventional 66 66/11 1X10 3 5/8/2008 Yes

902 VATAM Conventional 66 66/11 1X10 3 5/30/2008 Yes

903 KALYANA Conventional 66 66/11 1X10 2 9/20/2007 Yes

904 GORAD Conventional 66 66/11 1X10 2 1/2/2008 Yes

905 BHUTEDI Conventional 66 66/11 1X10 2 2/27/2008 Yes

906 KHIMANA Conventional 66 66/11 1X10 3 4/1/2008 Yes

66 66/11 1X10

907 BANDHANI Conventional 66 66/11 1X10 2 7/13/2007 Yes

908 GUNDRAN Conventional 66 66/11 1X10 2 9/24/2008 Yes

909 RATANPAR Conventional 66 66/11 1X10 3 5/30/2008 Yes

910 DATHA Conventional 66 66/11 1X10 2 10/1/2008 Yes

911 SIMRAN Conventional 66 66/11 1X10 3 10/14/2008 Yes

912 VANGAR Conventional 66 66/11 1X10 3 1/30/2009 Yes

913 GAVADAKA Conventional 66 66/11 1X10 3 11/18/2008 Yes

914 GADHAKADA Conventional 66 66/11 1X10 3 11/7/2008 Yes

915 DHARWALA Conventional 66 66/11 1X10 3 4/7/2009 Yes

916 JASADHAR Conventional 66 66/11 1X10 4 2/26/2008 Yes

917 SIKARA Conventional 66 66/11 1X10 3 8/13/2007 Yes

918 KHAMBRA Conventional 66 66/11 1X10 2 6/24/2008 Yes

919 KANIYABE Conventional 66 66/11 1X10 3 6/26/2008 Yes

920 KIDANA Conventional 66 66/11 1X10 3 7/15/2008 Yes

921 TAPPAR Conventional 220 66/11 1X100 5 12/10/2008 Yes

922 KUKMA Conventional 220 66/11 1X100 3 12/15/2009 Yes

923 POINCHA Conventional 66 66/11 1X10 2/15/2008 Yes

924 SAMA Conventional 66 66/11 1X10 2 3/29/2008 Yes

925 MAHUVAD Conventional 66 66/11 1X10 3 5/26/2008 Yes

926 SARASWAPURVA Conventional 66 66/11 1X10 3 5/26/2008 Yes926 SARASWAPURVA Conventional 66 66/11 1X10 3 5/26/2008 Yes

927 CHALAMALI (VANDHA) Conventional 66 66/11 1X10 2 10/12/2008 Yes

928 KARATH Conventional 66 66/11 1X10 3 6/26/2008 Yes

929 KHANPUR Conventional 66 66/11 1X10 2 1/1/2009 Yes

930 NAPA (SHINGLAV) Conventional 66 66/11 1X10 3 9/25/2008 Yes

931 LAXMIPURA Conventional 66 66/11 1X10 3 1/7/2008 Yes

932 DALPUR Conventional 66 66/11 1X10 3 5/17/2008 Yes

1X15

933 ITLA Conventional 66 66/11 1X10 2 4/24/2008 Yes

934 KASANA Conventional 66 66/11 1X10 2 7/17/2008 Yes

935 UMRADA Conventional 66 66/11 1X10 2 9/11/2008 Yes

936 220 KV WAGRA Conventional 220 220/66 1X50 3 1/28/2009 Yes

937 66KV Borda Conventional 66 66/11 1x10 4 01.05.10 Yes

938 66KV Sivan Conventional 66 66/11 1x10 3 14.10.09 Yes

939 66KV Niyol Conventional 66 66/11 1x10 4 16.07.09 Yes

141

Page 42: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

940 66KV Rumkitalav Conventional 66 66/11 1x10 4 03.07.10 Yes

941 66kV Khajod Conventional 66 66/11 1 x 10 4 30.10.09 Yes

942 66kV Pala Conventional 66 66/11 1 x 10 4 01.01.10 Yes

943 66kV Jiyav Conventional 66 66/11 1 x 10 4 01.05.10 Yes

944 66kV Kosad Conventional 66 66/11 1 x 10 4 01.05.10 Yes

945 66kV Sachin C Conventional 66 66/11 2 x 15 7 16.09.10 Yes

946 66KV Singod Conventional 66 66/11 1x10 3 23.09.09 Yes

947 66KV Movasa Conventional 66 66/11 1x10 5 15.02.10 Yes

948 66KV Nalvai Conventional 66 66/11 1x10 3 15.10.09 Yes

949 66KV Panwad Conventional 66 66/11 1X10 4 22.01.10 Yes

950 66KV Dharwala Conventional 66 66/11 1x10=10 4 04.04.2009 Yes

951 66KV Ghodidhal SS Conventional 66 66/11 1x10=10 4 20.05.2009 Yes

952 66KV Pasvi SS Conventional 66 66/11 1x10=10 4 02.05.2009 Yes

953 66 Malaviya Pipariya Conventional 66 66/11 1x10=10 4 02.05.2009 Yes

954 66KV Sardar Nagar S/S Conventional 66 66/11 1x10=10 4 20.06.2009 Yes

955 66KV Malapara S/S Conventional 66 66/11 1x10=10 4 16.07.2009 Yes

956 66KV Moti Dharai S/S Conventional 66 66/11 1x10=10 3 21.07.2009 Yes

957 66KV Kadamgiri Conventional 66 66/11 1x10=10 3 30.11.2009 Yes

958 66KV Devla Conventional 66 66/11 1x10=10 3 20.11.2009 Yes

959 66KV Khambhala S/S Conventional 66 66/11 1x10=10 3 01.02.2010 Yes

960 66KVRabariak S/S Conventional 66 66/11 1x10=10 4 04.03.2010 Yes

961 66 KV Panvi s/s Conventional 66 66/11 1x10=10 3 26.05.2010 Yes

962

220KV Botad S/S

Conventional

66 220/66 1x100=100

5 nos (220KV

)+06 nos

(66KV)=11 11.06.2010 Yes

963 66KV Sar Conventional 66 66/11 1x10=10 4 03.07.2010 Yes

964 66KV Kadiyali ss Conventional 66 66/11 1x10=10 4 28.07.2010 Yes

965 66kv Sukhpar Conventional 66 66/11 1x10=10 3 13.8.2009 Yes

966 66kv Siracha Conventional 66 66/11 1x10=10 5 1.9.2009 Yes

967 66kv Dumra Conventional 66 66/11 1x10=10 2 19.8.2009 Yes

968 66kv Nirona Conventional 66 66/11 1x10=10 2 6.4.10 Yes

969 66kv Nanimau Conventional 66 66/11 1x10=10 3 16.4.10 Yes969 66kv Nanimau Conventional 66 66/11 1x10=10 3 16.4.10 Yes

970 66kv Talwana Conventional 66 66/11 1x10=10 3 29.4.10 Yes

971 66 KV Akhaj Conventional 66 66/11 1x10=10 3 5/1/2010 Yes

972 66 KV Chandarni SS Conventional 66 66/11 1x10=10 4 8/3/2009 Yes

973 66KV Munpur Conventional 66 66/11 1x10=10 3 29.2.10 Yes

974 66KV Kalidungri Conventional 66 66/11 1x10=10 3 3/24/2009 Yes

975 66KV Gadhi Conventional 66 66/11 1x10=10 3 2/6/2010 Yes

976 66 KV Hinagatiya Conventional 66 66/11 1x10=10 4 3/25/2009 Yes

977 66KV Unava Conventional 66 66/11 1x10=10 3 8/7/2009 Yes

978 66KV Mota Bhadukiya Conventional 66KV 66/11 1x10=10 3 01.05.10 Yes

979 66KV Bed Conventional 66KV 66/11 1x10=10 4 01.05.10 Yes

980 66KV Kanchanpur Conventional 66KV 66/11 1x10=10 4 01.05.10 Yes

981 666KV Khengarka Conventional 66KV 66/11 1x10=10 3 12.07.10 Yes

982 66kv Vekariya Conventional 66 66/11 1X10 4 25.06.09 Yes

983 66kv Agatray Conventional 66 66/11 1X10 4 6.08.09 Yes

984 66kv GIDC Veraval Conventional 66 66/11 1X10 3 2.10.09 Yes

985 66kv Lodhava Conventional 66 66/11 1X10 3 20.06.09 Yes

986 66 Kv Mendapara Conventional 66 66/11 1X10 4 21.7.2010 Yes

987 66KV Kolki Conventional 66 66/11 1X10 4 31.05.10 Yes

988 66KV Shethvadala Conventional 66 66/11 1X10 4 6.06.10 Yes

989 66KV Raydi Conventional 66 66/11 1X10 4 5.07.10 Yes

990 66KV Motipaneli Conventional 66 66/11 1X10 3 6.10.10 Yes

991 66kv Sindhaj Conventional 66 66/11 1X10 3 5.08.10 Yes

992

66Kv SadraConventional 66 66/11 10x1 2 14.04.10

Yes

993

66Kv Umari(Navasudasana)Conventional 66 66/11 10x1 2 23.03.10

Yes

994

66KV GadhiConventional 66 66/11 10x1 2 27.03.10

Yes

995

66KV AkhajConventional 66 66/11 10x1 2 01.05.10

Yes

996

66Kv MunpurConventional 66 66/11 10x1 2 20.01.10

Yes

997

66KV Khatraj S/SConventional 66 66/11 10x1 2 23.08.10

Yes

998

66KV DhanotConventional 66 66/11 10x1 3 22.07.10

Yes

999

66KV Pahada(Torda)Conventional 66 66/11 10x1 3 15.07.10

Yes

1000 66KV NAVAKHAL Conventional 66 66/11 1x10 2 28.9.09 Yes1000 66 66/11 2 Yes

1001 220KV BHAT Conventional 220 220/66 2X100 13 1.6.10 Yes

66 11 Yes

1002 220KV BHAT Conventional 66 66/11 2X10 2 8.11.09 Yes

1003 66KV RAJODA Conventional 66 66/11 1X10 5 19.6.10 Yes

1004 66KV NANI DEVTI Conventional 66 66/11 1X10 4 12.7.10 Yes

1005 66KV INGOLI ROAD Conventional 66 66/11 1X10 4 8.5.10 Yes

1006 66KV SOLANKIPURA Conventional 66 66/11 1x10 4 8.5.10 Yes

1007 66KV DABHODA Conventional 66 66/11 1X10 4 12.2.09 Yes

1008 220KV Agathala Conventional 220 220/66 1X100 12 10/4/2010 Yes

1009 66 15

1010 66KV Malotra Conventional 66 66/11 1X10 4 5/3/2010 Yes

1011 66KV Asheda Conventional 66 66/11 1X10 4 5/28/2010 Yes

1012 66KV Sherpura Conventional 66 66/11 1X10 4 6/15/2010 Yes

1013 66KV Balodhan Conventional 66 66/11 1X10 4 7/7/2010 Yes

1014 66KV Talepura Conventional 66 66/11 1x10 4 7/7/2010 Yes

142

Page 43: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Sr.N

OName of Substaions

Type of

Substation

Voltage

level KVRatio IN KV

No. of

transformer

s/Reactors/s

vc etc. with

capacity

No. of Bays

Date of

Commercial

operation

Covered in this

petition

(Yes/No)

1015 66KV Taruva Conventional 66 66/11 1X10 4 7/13/2010 Yes

1016 66KV Pechhadal Conventional 66 66/11 1x10 4 9/1/2010 Yes

1017 66KV Mitha Conventional 66 66/11 1X10 5 8/16/2010 Yes

1018 66 Kv Lakhanka Conventional 66 66/11 1x10 2 21.08.2009 Yes

1019 66 KV Panshina Conventional 66 66/11 1x10 2 31.03.2010 Yes

1020 66 KV Moti Vavdi Conventional 66 66/11 1x10 2 31.03.2010 Yes

1021 66 kv Vendar Park ( Neno) Conventional 66 66/11 1 x15 5 30.09.2009 Yes

1022 66KV Bavli Conventional 66 66/11 1x10 3 18.08.2009 Yes

1023 66KV Narali Conventional 66 66/11 1x10 2 8.09.2009 Yes

1024 66KV Chandragadh Conventional 66 66/11 1x10 3 1.10.2010 Yes

1025 66KV Baisabgadh Conventional 66 66/11 1x10 3 21.06.2010 Yes

1026

66 KV Mavdi Road ( Rajkot ) Conventional

66 66/11 1x10 2 7/10/2009 Yes

1027 66 KV Jamvadi ( Gondal ) Conventional 66 66/11 1x10 3 8/3/2010 Yes

1028 66 KV Umrali ( Gondal ) Conventional 66 66/11 1x10 3 2/3/2010 Yes

1029 66 KV Faddang ( Gondal ) Conventional 66 66/11 1x10 3 5/4/2010 Yes

1030

66 KV Sindhavadar ( Wankaner) Conventional

66 66/11 1x10 3 6/5/2010 Yes

1031

66 KV Ghantila (Vejalpar) ( Morbi) Conventional

66 66/11 1x10 2 25-06-2010 Yes

1032 66 KV Chachapar ( Morbi ) Conventional 66 66/11 1x10 2 6/5/2010 Yes

1033

66 KV Thikariyala ( Wankaner) Conventional

66 66/11 1x10 4 27-05-2010 Yes

143

Page 44: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Normative Parameters considered for tariff calculations

Name of theTransmission Licensee :

Name of the Transmission System:

Name of Region: Gujarat

Particulars Unit 2009-10

(Actual)

2010-11(Revised

Estimates)

2011-12(Projected)

2012-13(Projected)

2013-14(Projected)

2014-15(Projected)

2015-16(Projected)

1 2 3 4 5 6 7 8 9

Target Availability %400Kv 99.46 99.55 99.56 99.56 99.57 99.58 99.58220Kv 99.16 99.20 99.21 99.22 99.22 99.24 99.25132KV 99.48 99.47 99.48 99.48 99.49 99.49 99.5066KV 99.72 99.71 99.72 99.72 99.73 99.74 99.74S/S 99.87 99.83 99.83 99.83 99.83 99.83 99.83

Normative O&M per ckt.km Rs. lacsNormative O&M per bay Rs. lacsSpares for WC as % of O&M % 1% of historical cost with 6% escalationRecievables in Months for WC months 2 Months of total transmission chargesRate of Return on Equity (%) % 14% 14% 14% 14% 14% 14% 14%

** actuals are lower than Commission's norms

Petitioner

Projected based on actuals of 2009-10**

FORM-3

Gujarat Energy Transmission Corporation Limited

144

Page 45: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Name of the Transmission Licensee Gujarat Energy Transmission Corporation Limited

Name of the Transmission System: ____________________________________

Name of Region Gujarat

Exchange Rate at COD ____________________________________

Exchange Rate as on 31.03.2004 ____________________________________

(Amount in Crs)

Financial Year (Starting from COD)

1 2 3 4 5 6 7 8 9 10 11 12 13

Date Amount

(Foreign

Currency)

Exchange

Rate

Amount

(Rs.)

Date Amount

(Foreign

Currency)

Exchange

Rate

Amount

(Rs.)

Date Amount

(Foreign

Currency)

Exchang

e Rate

Amount

(Rs.)

Currency11

At the date of Drawl2

Scheduled repayment date of principal

Scheduled payment date of interest

At the end of Financial year

Currency21

At the date of Drawl2

Scheduled repayment date of principal

Scheduled payment date of interest

At the end of Financial year

Currency31 & so on

At the date of Drawl2

Scheduled repayment date of principal

Scheduled payment date of interest

At the end of Financial year

1 Name of the currency to be mentioned e.g. US $, DM, etc. etc.2 In case of more than one drawl during the year, Exchange rate at the date of each drawl to be given.

* NOTE : GETCO has not taken any foreign currency loans for any of its ongoing projects

Petitioner

FORM- 4

Details of Foreign loans (Details only in respect of loans applicable to the project under petition)

Not Applicable*

Year 1 Year 2 Year 3 and so on

145

Page 46: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Form 5

Name of the Transmission Licensee :

Name of the Transmission System:

Name of Region: Gujarat

Capital as admitted by GERC

Capital cost admitted as on ___________

(Give reference of the GERC relevant Order with Petition

No. & Date)

Foreign Component, if any (In Million US $ or the relevant

Currency):

Domestic Component (Rs. Cr.):

Foreign Exchange rate considered for the admitted cost:

Total Project cost admitted (Rs. Cr):

* Note : Details of admitted capital cost for the lines/ substatons are not available.

Petitioner

Abstract of Admitted Capital Cost for the existing Projects

Not Applicable*

Gujarat Energy Transmission

Corporation Limited

146

Page 47: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

FORM-5A

Name of the Transmission Licensee : Gujarat Energy Transmission Corporation Limited

Name of the Transmission System:

Name of Region: GujaratCapital Cost Estimates

Board of Director/ Agency approving the

Capital cost estimates:

Date of approval of the Capital cost

estimates:

Price level of approved estimates

Foreign Exchange rate considered for the

Capital cost estimates

Capital Cost excluding IDC & FC

Foreign Component, if any (In Million US $

or the relevant Currency)

Domestic Component (Rs. Cr.)

Capital cost excluding IDC & FC (Rs.

Cr)

IDC & FC

Foreign Component, if any (In Million US $

or the relevant Currency)

Domestic Component (Rs. Cr.)

Total IDC & FC (Rs.Cr.)

Rate of taxes & duties considered

Capital cost Including IDC & FC

Foreign Component, if any (In Million US $

or the relevant Currency)

Domestic Component (Rs. Cr.)

Total Capital cost Including IDC & FC

(Rs. Cr)

Schedule of Commissioning

(Scheduled DOCO elementwise)

Note: 1. Copy of approval letter should be enclosed.2. Details of Capital cost are to be furnished as per FORM-5B or 5C as applicable.3. Details of IDC & Financing Charges are to be furnished as per FORM-16.

PETITIONER

Details are give in the APR / Tariff Petition

Abstract of Capital Cost Estimates and Schedule of Commissioning for the New projects

Present Day Cost Completed Cost

As of End of ______Qtr. Of As on Scheduled COD of

147

Page 48: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Form 5B

Name of theTransmission Licensee : Gujarat Energy Transmission Corporation Limited

Name of the Transmission System:

Name of Region: Gujarat

As per

original

Estimates

As on

COD

1 2 3 4 5 6 7

A TRANSMISSION LINE

1.0 Preliminary works

1.1 Design & Engineering

1.2 Priliminary investigation,Right of way, forest clearance,

PTCC , general civil works etc.1.3 Total Preliminary works

2.0 Transmission Lines material

2.1 Towers Steel

2.2 Conductor

2.3 Earth Wire

2.4 Insulators

2.5 Hardware Fittings

2.6 Conductor & Earthwire accessoriesTotal Transmission Lines material

2.8 Spares

2.9 Erection, Stringing & Civil works including foundation

3.0 Taxes and Duties

3.1 Custom Duty

3.2 Other Taxes & Duties

Total Taxes & Duties

Total -Transmission lines

B. SUBSTATIONS

4.0 Preliminary works & land4.1 Design & Engineering4.2 Land

4.3 Site preparation

Total Preliminary works & land

5.0 Civil Works

5.1 Control Room & Office Building including HVAC

5.2 Township & Colony

5.3 Roads and Drainage

5.4 Foundation for structures

5.5 Misc. civil works

Total Civil Works

6.0 Substation Equipments6.1 Switchgear (CT,PT, Circuit Breaker, Isolator etc)

6.2 Transformers

6.3 Compensating Equipment( Reactor, SVCs etc)

6.4 Control , Relay & Protection Panel

6.5 PLCC

6.6 HVDC package

6.7 Bus Bars/ conductors/Insulators

6.8 Outdoor lighting

6.9 Emergency D.G. Set

6.10 Grounding System

6.11 Structure for switchyard

Total Substation Equipments

7.00 Spares

8.0 Taxes and Duties

8.1 Custom Duty

8.2 Other Taxes & Duties

8.3 Total Taxes & Duties

Total (Sub-station)

9.0 Construction and pre-commissioning expenses9.1 Site supervision & site admn.etc.

9.2 Tools and Plants

9.3 construction Insurance

Total Construction and pre commissioning expenses

10.0 Overheads

10.1 Establishment

10.2 Audit & Accounts

10.3 Contingency

Total Overheads

11.0 Project cost without IDC & FC

12.0 IDC & FC

13.0 Project cost including IDC & FC

Petitioner

Not Applicable*

* Note : Details o Project specific breakup of expenses is not available. Company has not availed any foreign

currency loans.

Break-up of Project Cost for Transmission System

Sl.No. Break Down Cost in Rs. Crores Variation Reasons for

Variation

Admitted

Cost

148

Page 49: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Form 5C

Name of theTransmission Licensee : Gujarat Energy Transmission Corporation Limited

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

S.No. Name/No. of

Construction/supply/s

ervice package

Scope of works1

(in line with head

of cost break-ups

as applicable)

Whether awarded

through ICB/DCB/

Depatmentally/

Deposit Work etc &

No. of bids received

No. of bids

received

Date of

Award

Date of

Start of

work

Date of

Comple-

tion of

Work

Value of

Award2 in

(Rs. Cr.)

Firm or With

Escalation in

prices

Actual expenditure

till the completion

or up to COD

whichever is

earlier

* Note - Deails of breakup of constructin /supply / service packages are not available.

Petitioner

1 The scope of work in any package should be indicated in conformity of cost break-up in form-5B to the extent possible.

Break-up of Construction/Supply/Sevice packages

Not applicable*

2 If there is any package, which need to be shown in Indian Rupee and foreign currency(ies), the same should be shown separatly alongwith the currency, the exchange rate and the date

e.g. Rs.80 Cr+US$50m=Rs.280Cr at US$=Rs40 as on say 4.1.1999.

149

Page 50: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Form 5D

Name of theTransmission Licensee :

Gujarat Energy

Transmission Corporation

Ltd.

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

S.NO. Name of line Apportioned approved Cost

(Rs. Crs)

Completed Cost (Rs. Crs)

1

2

3

4

-

-

-

Substations

S.NO. Name of Substation Apportioned approved Cost

(Rs. Crs)

Completed Cost (Rs. Crs)

1

2

3

4

-

-

Petitioner

DETAILS OF ELEMENTWISE COST

Details of the Items have been enclosed in the MYT Petition

Details of the Items have been enclosed in the MYT Petition

150

Page 51: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

FORM- 6

Name of theTransmission Licensee :

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

Project Cost as on COD1

_________________________________

Date of Commercial Operation of the Transmission element2

_________________________________

(Amount in Crs)

1 2 3 4 5 6 7

Loan-I

Loan-II

Loan-III

and so on

Equity-

Foreign

Domestic

Total Equity

Debt : Equity Ratio

2 Date of Commercial Operation means Commercial Operation of the transmission element

3 For example : US $, 200M etc.etc

Petitioner

As Admitted on COD

Currency and Amount3

Gujarat Energy Transmission Corporation Limited

* Note: The company is still in proceess of finalising the details of the sources of finance for the cpaital

expenditure

Currency and Amount3

Currency and Amount3

Not available / applicable*

Not available / applicable.*

Financial Package upto COD

1 Say US $ 200m + Rs.400 Cr or Rs.1200 Cr including US $200m at an exchange rate of 1US $=Rs.40/-

Financial Package as Approved Financial Package as on COD

151

Page 52: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

FORM- 7

Name of theTransmission Licensee : Gujarat Energy Transmission Corporation Ltd.

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

(Amount in Crs)Particulars Package1 Package2 Package3 Package4 Package5 Package6

1 2 3 4 5 6 7

Source of Loan1

Currency2

Amount of Loan sanctionedAmount of Gross Loan drawn upto

31.03.2004/COD 3,4,5,13,15

Interest Type6

Fixed Interest Rate, if applicable

Base Rate, if Floating Interest7

Margin, if Floating Interest8

Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No

Are there any Caps/Floor9

If above is yes,specify caps/floor

Moratorium Period10

Moratorium effective from

Repayment Period11

Repayment effective from

Repayment Frequency12

Repayment Instalment13,14

Base Exchange Rate16

* Note : Details of project specific allocation of loans is not available.

Petitioner

Details of Project Specific Loans

16 Base exchange rate means the exchange rate prevailing as on 31.03.2004 for existing assets and as on COD for the

remaining assets.

15 In case of Foreign loan,date of each drawal & repayment alongwith exchange rate at that date may be given.

3 Details are to be submitted as on 31.03.2004 for existing assets and as on COD for the remaining assets.

4 Where the loan has been refinanced, details in the Form is to be given for the loan refinaced. However, the details of

the original loan is to be given seperately in the same form.

6 Interest type means whether the interest is fixed or floating.

5 If the Tariff in the petition is claimed seperately for various transmission elements, details in the Form is to be given

seperately for all the transmission elements in the same form.

7 Base rate means the base as PLR, LIBOR etc. over which the margin is to be added. Applicable base rate on different

dates from the date of drawl may also be enclosed.8 Margin means the points over and above the floating rate.

9 At times caps/floor are put at which the floating rates are frozen. If such a condition exists, specify the limits.

1 Source of loan means the agency from whom the loan has been taken such as WB, ADB, WMB, PNB, SBI, ICICI, IFC,

PFC etc.

14 If the repayment instalment amount and repayment date can not be worked out from the data furnished above, the

repayment schedule to be furnished seperately.

12 Repayment frequency means the interval at which the debt servicing is to be done such as monthly, quarterly, half

yearly, annual, etc.

11 Repayment period means the repayment of loan such as 7 years, 10 years, 25 years etc.

2 Currency refers to currency of loan such as US$, DM, Yen,Indian Rupee etc.

10 Moratorium period refers to the period during which loan servicing liability is not required.

13 Where there is more than one drawal/repayment for a loan, the date & amount of each drawal/repayement may also

be given seperately

Not Available*

152

Page 53: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Name of theTransmission Licensee : Gujarat Energy Transmission Corporation Limited

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

(Amount in Crs)

Particulars Package1 Package2 Package3 Package4 Package5 Remarks

1 2 3 4 5 6 7

Source of Loan1

Currency2

Amount of Loan sanctioned

Amount of Gross Loan drawn upto 31.03.2004/COD 3,4,5,13,15

Interest Type6

Fixed Interest Rate, if applicable

Base Rate, if Floating Interest7

Margin, if Floating Interest8

Are there any Caps/Floor9

Yes/No Yes/No Yes/No Yes/No Yes/No

If above is yes,specify caps/floor

Moratorium Period10

Moratorium effective from

Repayment Period11

Repayment effective from

Repayment Frequency12

Repayment Instalment13,14

Base Exchange Rate16

Eastern Region

Transmission element 1

Transmission element 2 and so on

Total

Western Region

Transmission element 1

Transmission element 2 and so on

Total

Northern Region

Transmission element 1

Transmission element 2 and so on

Total

Southern Region

Transmission element 1

Transmission element 2 and so on

Total

North-Eastern Region

Transmission element 1

Transmission element 2 and so on

Total

RLDC

Total

Petitioner

FORM- 8

Details of Allocation of corporate loans to various transmission elements

Distribution of loan packages to various transmission elements

1 Source of loan means the agency from whom the loan has been taken such as WB, ADB, WMB, PNB, SBI, ICICI, IFC, PFC etc.

Note : Details of Project Specific allocation of

loans is not available.

5 If the Tariff in the petition is claimed seperately for various transmission elements, details in the Form is to be given seperately for all the transmission

elements in the same form.6 Interest type means whether the interest is fixed or floating.

2 Currency refers to currency of loan such as US$, DM, Yen,Indian Rupee etc.

3 Details are to be submitted as on 31.03.2004 for existing assets and as on COD for the remaining assets.

4 Where the loan has been refinanced, details in the Form is to be given for the loan refinaced. However, the details of the original loan is to be given

seperately in the same form.

7 Base rate means the base as PLR, LIBOR etc. over which the margin is to be added. Applicable base rate on different dates from the date of drawl may

also be enclosed.

9 At times caps/floor are put at which the floating rates are frozen. If such a condition exists, specify the limits.

10 Moratorium period refers to the period during which loan servicing liability is not required.

11 Repayment period means the repayment of loan such as 7 years, 10 years, 25 years etc.

13 Where there is more than one drawal/repayment for a loan, the date & amount of each drawal/repayement and its allocation may also be given

seperately14 If the repayment instalment amount and repayment date can not be worked out from the data furnished above, the repayment schedule to be

furnished seperately.

8 Margin means the points over and above the floating rate.

15 In case of Foreign loan,date of each drawal & repayment alongwith exchange rate at that date may be given.

16 Base exchange rate means the exchange rate prevailing as on 31.03.2004 for existing assets and as on COD for the remaining assets.

12 Repayment frequency means the interval at which the debt servicing is to be done such as monthly, quarterly, half yearly, annual, etc.

153

Page 54: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Statement of Additional Capitalisation after COD

Name of theTransmission Licensee : Gujarat Energy Transmission Corporation Ltd.

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

COD _________________________________

Sl.No. Year Work/Equipment

added after COD

up to Cut off Date /

Beyond Cut off

Date

Amount

Capitalised /

Proposed to be

capitalised

Justification Admitted CostI

(1) (2) (3) (4) (5) (6)

Total

Note:

Petitioner

Note: The detailed list of the expenditure incurred on repair and maintenance and on

spares has been enclosed in the ARR petition.

FORM-9

1In case the project has been completed and any tariff notification(s) has already been issued in the

past by GOI, fill column 6 giving the cost as admitted for the purpose of tariff notification already

issued by (Name of the authority) (Enclose copy of the tariff Order)

1 Fill the form in chronological order year wise along with detailed justification clearly bring out the 2 In case initial spares are purchased alongwith any equipment, then the cost of such spares should

be indicated separately.

Not applicable*

154

Page 55: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

FORM-10

Name of theTransmission Licensee : Gujarat Energy Transmission Corporation Limited

Name of the Transmission System: ____________________________________

Name of Region: GujaratDate of Commercial Operation ____________

(Amount in Crs)

Financial Year

(Starting from COD)

Year1 Year2 Year3 Year4 Year 5

& So on

Year1 Year2 Year3 Year4 Year 5

& So

on1 2 3 4 5 6 7 8 9 10 11

Amount capitalised in

Work/Equipment

Financing Details

Loan-1Loan-2

Loan-3 and so on

Total Loan2

EquityInternal ResourcesOthers

Total

1 Year 1 refers to Financial Year of COD and Year 2, Year 3 etc. are the subsequent financial years respectively.

2 Loan details for meeting the additional capitalisation requirement should be given as per FORM-7 or 8 whichever is relevent.

* Note - The company is still in the process of finalising the details of sources of finance for the capital expenditure.

Petitioner

Financing of Additional Capitalisation

Actual Admitted

Not Applicable*

155

Page 56: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

FORM- 11

Name of theTransmission Licensee :

Name of the Transmission System: __________________________________Name of Region: Gujarat

(Amount in Crs)Financial Year

2009-10

(Actual)

2010-11(Revised

Estimates)

2011-12(Projected)

2012-13(Projected)

2013-14(Projected)

2014-15(Projected)

2015-16(Projected)

1 2 3 4 5 6 7 8

Depreciation on Capital Cost (Opening)Amount of Capital Cost (Opening) 6066 6762 8757 10971 13371 15708 18114Depreciation Amount 304 342 443 555 676 794 916

Depreciation on Additional CapitalisationAmount of Additional Capitalisation 696 1995 2214 2399 2337 2406 1889Depreciation Amount 17 50 56 61 59 61 48

Detail of FERV

Amount of FERV on which depreciation charged

Depreciation amount

Depreciation recovered during the Year 322 392 499 615 735 855 964Advance against Depreciation recovered during

the Year- - - - - - -

Depreciation & Advance against Depreciation

recovered during the year322 392 499 615 735 855 964

Petitioner

Not applicalbe as no foreign currency loans have been availed

Gujarat Energy Transmission Corporation Ltd.

Statement of Depreciation

156

Page 57: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

FORM- 12

Name of theTransmission Licensee : Gujarat Energy Transmission Company LimitedName of the Transmission System: ____________________________________Name of Region: Gujarat

(Amount in Crs)

Sl.

no.Name of the Assets

1

Gross Block as on

31.03.2010

Depreciation

Rates as per

CERC's

Depreciation

Rate Schedule

Depreciation

Amount for

2009-10*

2 3 4= Col.2 X

Calculation of Depreciation Rate

12 3 4= Col.2 X

Col.3

1 Land and Land Rights2 Building3 Hydraulic works4 Other Civil Work5 Plant & Machinery6 Lines & Cable Networks7 Vehicles8 Furniture & Fixture9 Office Equipments

10 Others

TOTAL 6769 5.06% 393Weighted Average Depreciation Rate

(%)5.06%

1 Name of the Assets should conform to the description of the assets mentioned in Depreciation Schedule

*Capital Additions during the year have been consideredPetitioner

157

Page 58: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

FORM- 13

Name of theTransmission Licensee :

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

(Amount in Crs)

Sl.

no.Particulars

2009-10

(Actual)

2010-11(Revised

Estimates)

2011-12(Projected)

2012-13(Projected)

2013-14(Projected)

2014-15(Projected)

2015-16(Projected)

1 2 3 4 5 6 7 8 9

Loan-1

Gross loan - Opening

Cumulative repayments of Loans upto previous year

Net loan - Opening 2271 2930 3837 5003 6183 7200 8164

Add: Drawal(s) during the Year 1398 1200 1550 1680 1636 1684 1322

Less: Repayment (s) of Loans during the year 739 293 384 500 618 720 816

Net loan - Closing 2930 3837 5003 6183 7200 8164 8670

Average Net Loan 2600 3383 4420 5593 6692 7682 8417

Rate of Interest on Loan 8.44% 8.80% 9.31% 9.62% 9.81% 9.95% 10.03%

Interest on loan 219 298 412 538 657 764 844

Guarantee Charges 3 3 3 2 2 2 2

Total Interest on Loan & Financing charges 223 301 414 541 659 766 846

Loan-2 and so on

Gross loan - Opening

Cumulative repayments of Loans upto previous year

Net loan - Opening

Add: Drawal(s) during the Year

Less: Repayment (s) of Loans during the year

Net loan - Closing

Average Net Loan

Rate of Interest on Loan

Interest on loan

Total Loan

Gross loan - Opening

Cumulative repayments of Loans upto previous year

Net loan - Opening

Add: Drawal(s) during the Year

Less: Repayment (s) of Loans during the year

Net loan - Closing

Average Net Loan

Interest on loan

Weighted average Rate of Interest on Loans

Petitioner

Calculation of Weighted Average Rate of Interest on Actual Loans1

Gujarat Energy Transmission Corporation Limited

1 In case of Foreign Loans, the calculations in Indian Rupees is to be furnished. However,

the calculations in Orginal currency is also to be furnished seperately in the same form.

158

Page 59: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

Calculation of Advance Against Depreciation (AAD)

Name of theTransmission Licensee :

Name of the Transmission System: ____________________________________Name of Region: Gujarat

(Amount in Crs)

Particulars2009-10

(Actual)

2010-11(Revised

Estimates)

2011-12(Projected)

2012-13(Projected)

2013-14(Projected)

2014-15(Projected)

2015-16(Projected)

1 2 3 4

1/10th of the Loan(s)Repayment of the Loan(s) as considered for working out

Interest on LoanMinimum of the AboveLess:Depreciation during the year

(A1)

Cumulative Repayment of the Loan(s) as considered for

working out Interest on LoanLess: Cumulative Depreciation

(B1)

Advance Against Depreciation (Minimum of A & B) 0 0 0 0 0 0 0

1 If the amount is negative, it will be shown as zero.

Petitioner

FORM- 14

Not available

Gujarat Energy Transmission Corporation Limited

159

Page 60: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

FORM- 15

Name of theTransmission Licensee :

Name of the Transmission System: ____________________________________Name of Region: Gujarat

(Amount in Crs)

Sl.

No.Particulars

2009-10

(Actual)

2010-11(Revised

Estimates)

2011-12(Projected)

2012-13(Projected)

2013-14(Projected)

2014-15(Projected)

2015-16(Projected)

1 2 3 4 5 6 7 8 9

1 O & M expenses 50 51 59 66 74 82 912 Maintenance Spares 78 102 131 163 196 231 2643 Recievables 209 251 320 396 471 546 614Total Working Capital 337 405 510 625 741 860 969Rate of Interest 10.25% 10.25% 10.25% 10.25% 10.25% 10.25% 10.25%

Interest on Working Capital 35 42 52 64 76 88 99

Petitioner

Calculation of Interest on Working Capital

Gujarat Energy Transmission Corporation Ltd.

160

Page 61: Formats for Petition - GETCOgetco.co.in/getco_new/pages/files/formats.pdf · Form No. Tariff Filing Formats ... 10 PGCIL-Wanakbori AC S/C 400kV 65.27 29-3-05 Yes ... 3 Ambheta- Vapi

FORM-16

Name of theTransmission Licensee : Gujarat Energy Transmission Corporation Ltd.

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

(Amount in Lacs)

Draw Down

Particulars Quantu

m in

Foreign

currency

Exchange

Rate on

draw

down

date

Amount

in

Indian

Rupee

Quantum

in

Foreign

currency

Exchange

Rate on

draw

down

date

Amount

in

Indian

Rupee

Quantu

m in

Foreign

currency

Exchange

Rate on

draw

down

date

Amount

in

Indian

Rupee

1 Loans

1.1 Foreign Loans

1.1.1 Foreign Loan 1

Draw down Amount

IDC

Financing charges

1.1.2 Foreign Loan 2

Draw down Amount

IDC

Financing charges

1.1.3 Foreign Loan 3

Draw down Amount

IDC

Financing charges

1.1.4 - -

- -

- -

1.1 Total Foreign Loans

Draw down Amount

IDC

Financing charges

1.2 Indian Loans

1.2.1 Indian Loan 1

Draw down Amount -- -- -- -- -- --

IDC -- -- -- -- -- --

Financing charges -- -- -- -- -- --

1.2.2 Indian Loan 2

Draw down Amount -- -- -- -- -- --

IDC -- -- -- -- -- --

Financing charges -- -- -- -- -- --

1.2.3 Indian Loan 3

Draw down Amount -- -- -- -- -- --

IDC -- -- -- -- -- --

Financing charges -- -- -- -- -- --

1.2.4 - - -- -- -- -- -- --

- - -- -- -- -- -- --

- - -- -- -- -- -- --

1.2 Total Indian Loans

Draw down Amount -- -- -- -- -- --

IDC -- -- -- -- -- --

Financing charges -- -- -- -- -- --

1 Total of Loans drawn

IDC

Financing charges

2 Equity

2.1 Foreign equity drawn

2.2 Indian equity drawn -- -- -- -- -- --

Total equity deployed

Petitioner

Note: Drawal of debt and equity shall be on paripassu basis to meet the commissioning schedule. Drawal of higher equity in the

beginning is permissible.

Draw Down Schedule for Calculation of IDC & Financing Charges

Quarter 1 Quarter 2 Quarter n (COD)Sl.

No.

Not Applicable

161