APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCES. No. Item Details

1.

Whether it is a violation case and application is being submittedunder Notification No. S.O.804(E) dated 14.03.2017 ? No

Details of Project:

(a)Name of the project(s) Expansion from 0.135 MTPA steel to 0.33 MTPA cold drawn and long products by M/sMaithan Steel & Power Ltd

(b)Name of the Company / Organisation MAITHAN STEEL AND POWER LTD(c)Registered Address 9, AJC Bose Road, Ideal Centre, 6th floor, Kolkata,Barddhaman,West Bengal-700017(d)Legal Status of the Company Private(e)Joint Venture No

2.

Address for the correspondence:(a)Name of the Applicant Madhur Agarwalla(b)Designation (Owner/ Partner/ CEO) Director

(c)Address 9, AJC Bose Road, Ideal Centre, 6th Floor, Kolkata,,Kanksa,Barddhaman,West Bengal-700017

(d)Pin code 700017(e)E-mail [email protected](f)Telephone No. 39877233(g)Fax No.(h)Copy of documents in support of the competence/authority ofthe person making this application to make application on behalfof the User Agency .

Annexure-Uploaded Copy of documents in support of the competence/authority

3.

Category of the Project/Activity as per Schedule of EIA Notification,2006:(a)Project/Activity 3(a) Metallurgical industries (ferrous & non ferrous)

(b)Category A(c)Proposal Number IA/WB/IND/88715/2017(d)Master Proposal Number(Single Window) SW/88709/2018(e)EAC concerned (for category A Projects only) Industrial Projects - 1(f)Project Type Expansion

4. Location of the Project:(a)Plot/Survey/Khasra No. 1016,1010,1011,1018,1019,1024,1041

12/17/2018 Report Part 1

http://environmentclearance.nic.in/auth/ECgeneral_report.aspx?pid=13696 2/13

(b)Pincode 713357(c)Bounded Latitudes (North) FROM 234626.30 To 234639.90(d)Bounded Longitudes (East) FROM 865200.12 To 865200.26(e)Survey of India Topo Sheet No. F45C14(f)Uploaded Topo Sheet File Copy of Topo Sheet File(g)Maximum Elevation Above Means Sea Level(AMSL) 255(h)Uploaded (kml) File Copy of Kml File(i)Distance of Nearest HFL from the project boundary within thestudy area 3.8

(j)Seismic Zone 3

5.(a)Number of States in which Project will be Executed 1(b)Main State of the project West Bengal

Details of State(s) of the project

S.No. State Name District Name Tehsil Name Village Name

(1.) West Bengal Burdwan Kanksa Nakrajoria

6.

Details of Terms of Reference (ToR)/EC:(a)MoEF&CC / SEIAA File Number J-11011/679/2008-IA II(I)(b)Date of Apply of TOR 08 Dec 2017(c)Date of Issue of TOR / Standard ToR 16 Jan 2018(d)Date of Apply of EC 24 Sep 2009(e)Date of Issue of EC 27 Aug 2010(f)Previous TOR Letter Copy of Previous TOR letter(g)Previous EC Letter Copy of Previous EC letter

7.

Details of Public Consultation:(a)Whether the Project Exempted from Public Hearing? No(b)Whether details of Public Hearing available? Yes(c)Whether Public hearing was presided over by an officer of therank of Additional District Magistrate or above Yes

7.1. Details of Public Hearing

S.No.

Details of Advertisement Details of PublicHearing

Venue Location Details No. ofPeople

Attended

IssuesRaised

Designationof Presiding

Officer

OtherDesignation

12/17/2018 Report Part 1

http://environmentclearance.nic.in/auth/ECgeneral_report.aspx?pid=13696 3/13

of PresidingOfficer

(1.)

Date ofAdvertisement:

12 Jul 2018

Copy ofadvertisement:

Copy ofAdvertisement

Copy of PublicHearing :

Copy ofPublicHearing

Date : 17 Aug2018

Distance ofPublic HearingVenue from theProposedProject :

2.5

Conferencehall ofPanormaCountryClub andresorts nearChowingheeMore

State : WestBengal

District: Burdwan

Tehsil : Kanksa

Village: Nakrajoria

88

Concernaboutpollution load,scarcity ofelectricity forgeneralpublic, healthdeterioration,solid wastegeneration,source ofwater forexpansionand its impacton waterregime,peripheraldevelop

Others DM&DC

8.Details of Project Configuration/Product:

Details Not Applicable

9.

In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisationunder Clause 7(ii) / Change of Product Mix under Clause 7(ii):(a)Details of certified report on compliance of earlier environmental clearance condition(i)Certified Compliance By Regional(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB /SPCB / UTPCC from which certified report on Bhubneshwar

(iii)Letter No. 102-309/08/EPE/3618(iv)Status of Compliance Compiled(v)Certified report on compliance of earlier environmentalclearance conditions (Including Monitoring Report) Copy of Certified Compliance Report

(vi)Date of site visit N/A(b)Details of Capacity Expansion

S.No.

Product/Activity(Capacity/Area) Quantity From Quantity To Total Unit Other Unit

Mode ofTransport /

Transmission ofProduct

Other Modeof Transport

/Transmission

of Product

12/17/2018 Report Part 1

http://environmentclearance.nic.in/auth/ECgeneral_report.aspx?pid=13696 4/13

(1.) Steel 135000 195000 330000 Tons perAnnum(TPA)

Road,Rail

(c)Details of Configuration

S. No. Plant / Equipment / Facility Existing Configuration Proposed Configuration Final configuration afterexpansion Remarks

(1.) Induction Furnace 3 X 15 T 5 X 15 T 8 X 15 T

(2.) Rolling Mill 90,000 TPA 2,07,000 TPA 2,97,000 TPA

(3.) Cold drawn wires 0 33,000 TPA 33,000 TPA

9.1.

Details of Consent to Operate(i)Whether Consent to operate obtained ? NA(ii)Copies of all Consent to operate obtained since inception NA(iii)Date of Issue 30 Jul 2018(iv)Valid Upto 30 Jun 2023(v)File No. CO110133(vi)Application No. CO110133(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate

10.

Project Cost:(a)Total Cost of the Project at current price level (in Crores) 136.50(b) Funds Allocated for Environment Management (Capital) (inCrores) 5.5

(c) Funds Allocated Towards CER (Corporate EnvironmentResponsibility) (in Crores) 1.30

(d) Funds Allocated for Environment Management Plan (EMP)(Recurring per Annum) (in Crores) 0.6

11. Whether project attracts the General Condition specifiedin the Schedule of EIA Notification ? No

12. Whether project attract the Specific Condition specified inthe Schedule of EIA Notification ? No

13.

Raw Material / Fuel Requirement:(a)Proposed quantity of raw material/fuel 435000(b)Existing quantity of raw material/fuel 0(c)Total quantity of raw material/fuel 435000

12/17/2018 Report Part 1

http://environmentclearance.nic.in/auth/ECgeneral_report.aspx?pid=13696 5/13

13.1. Raw Material / Fuel Profile

S. No.Raw

Material /Fuel

Quantity Unit OtherUnit

Source(incase ofImport.pleasespecifycountry

and Nameof the

port fromwhichRaw

Material /Fuel is

received )

Mode ofTransport

Other Modeof

Transport

Distance ofSourcefrom

Project Site(in

Kilometres)(In case of

import,distancefrom theport fromwhich the

rawmaterial /

fuel isreceived)

Type ofLinkage

Other Typeof Linkage

UploadedCopy ofLinkage

(1.) SpongeIron 370000 Tons per

Annum Purulia Road 40 Others Tax invoice Copy ofLinkage

(2.) Pig Iron 45000 Tons perAnnum Durgapur Road 58 Others invoice Copy of

Linkage

14.Baseline Data :(a)Period of Base Line Data Collection FROM 01 Dec 2017 To 28 Feb 2018(b)Season Winter

14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8

S. No. Criteria Pollutants Other Criteria Pollutants Unit MaximumValue

MinimumValue

98 PercentileValue

PrescribedStandard

(1.) PM10 Micro Gram perMeter Cube 93.6 66.6 92.1 100

(2.) NOx Micro Gram perMeter Cube 27.6 14.4 26 80

(3.) Others CO Micro Gram perMeter Cube 470 323 441.5 2000

(4.) PM2.5 Micro Gram perMeter Cube 56.4 31.3 53.1 60

(5.) SO2 Micro Gram perMeter Cube

22.8 12.1 21.5 80

12/17/2018 Report Part 1

http://environmentclearance.nic.in/auth/ECgeneral_report.aspx?pid=13696 6/13

14.2. No. of Ground Water monitoring locations : 8

S. No. CriteriaPollutants

OtherCriteria

PollutantsHeavy Metal Unit Other Unit Maximum

ValueMinimum

ValueDesirable

Limit

MaximumPermissible

Limit

(1.) pH NA 7.5 7.1 6.5 8.5

(2.) TSS mg/l 0 0 0 0

(3.) Total Hardness mg/l 156 116 200 600

(4.) Chlorides mg/l 51.6 46.4 250 1000

(5.) Heavy Metals Fe mg/l 0.11 0.05 1 1

(6.) Fluoride mg/l 0.48 0.35 1 1.5

(7.) TDS mg/l 364 304 500 2000

14.3. No. of Surface Water monitoring locations : 8

S. No. Criteria Pollutants Other Criteria Pollutants Unit Other Unit MaximumValue

MinimumValue

Classificationof inland

water body

(1.) pH NA 7.8 7.2 C

(2.) Others TDS mg/l 262 214.02 C

(3.) DO mg/l 6.6 5.2 C

(4.) BOD mg/l 7.2 4.8 C

(5.) COD mg/l 40.3 26.9 C

14.4. No. of Ambient Noise monitoring locations : 8

S. No. Parameter Unit Maximum Value Minimum Value Prescribed Standard

(1.) Leq(Night) A-weighted decibels(dB(A)) 50.2 42.3 45

(2.) Leq(Day) A-weighted decibels(dB(A)) 62.8 49.5 55

14.5. No. of Soil Sample Monitored locations : 8

S. No. Parameter Unit Other Unit Maximum Value Minimum Value

(1.) P(Phosphorus) Percent 0.18 0.013

(2.) pH Others NA 7.9 7.2

12/17/2018 Report Part 1

http://environmentclearance.nic.in/auth/ECgeneral_report.aspx?pid=13696 7/13

(3.) N(Nitrogen) Percent 0.025 0.016

(4.) K(Potassium) Percent 0.021 0.012

(5.) Electric Conductivity Millisiemens per Centimetre 330 294

14.6.

Details of Ground Water Table:(a)Range of Water Table Pre-Monsoon Season (Meters BelowGround Level (m bgl)) From 10 To 17

(b)Range of Water Table Post-Monsoon Season (Meters BelowGround Level (m bgl)) From 2 To 5

(c)Whether Ground Water Intersection will be there ? No

15. Details of Water Requirement (During Operation)

S.No. Source Source

OtherRequiredQuantity

Distancefrom

Source

Copy ofPermission

fromCompetentAuthority

Mode ofTransport

OtherMode of

Transport

Method ofWater

Withdrawal

OtherMethod of

WaterWithdrawal

Letter No. Date ofIssue

PermittedQuantity

(1.) Surface 1250 0Copy ofPermissionLetter

Pipeline Intake WellMSPL-U2/SMS/17-18/290

03 Apr2018 1250

15.1. (a)Whether Desalination is proposed No

16. Waste Water Management(During Operation)

S. No. Type/Source

Quantity ofWaste Water

Generated(Kilolitre per

Day)

TreatmentCapacity

(Kilolitre perDay)

TreatmentMethod

Mode ofDisposal

Other Mode ofDisposal

Quantity of TreatedWater Used in

Recycling/Reuse(Kilolitre per Day)

Quantity ofDischarged Water

(Kilolitre perDay)

(1.) Domestic 72 80 STP Green BeltRenewal Plant 72

16.1.(a)Total Waste Water Generation 72(b)Total Discharged Water 0(c)Total Reused Water 72

17. Solid Waste Generation/Management

S. No. Name of Item Other Quantity Unit Distance Mode of Other Mode Mode of Other Mode of

12/17/2018 Report Part 1

http://environmentclearance.nic.in/auth/ECgeneral_report.aspx?pid=13696 8/13

Waste Item perAnnum

fromSite(KM)

Transport of Transport Disposal Disposal

(1.) IF slag IndustrialWaste 45500 Tons 6 Road Authorized

Recyclers

(2.) IF dust IndustrialWaste 5000 Tons 1500 Rail Authorized

Recyclers

18.

18.1. Air Quality Impact Prediction

S. No. CriteriaPollutants

OtherCriteria

PollutantsUnit Baseline

Concentration Distance GLC IncrementalConcentration Total GLC Prescribed

Standard

(1.) PM2.5 Microgram per Meter Cube 53.1 6.15 0.41 53.5 60

(2.) NOx Microgram per Meter Cube 0 0 0 0 0

(3.) PM10 Microgram per Meter Cube 92.1 3.66 0.54 92.6 100

(4.) SO2 Microgram per Meter Cube 0 0 0 0 0

18.2. Stack Details

S. No. Source Fuel Stack Height(m) Stack Diameter(m) Pollutants Other Pollutants Emission (GLS)

(1.) IF Electricity 30 1.4 PM10 1.15

(2.) IF Electricity 30 1.4 PM10 1.15

(3.) IF Electricity 30 1.4 PM10 1.15

(4.) IF Electricity 30 1.4 PM10 1.15

19.

Power Requirement:(a)Quantity (Kilo Volt Amps (kVA)) 35(b)Source DVC(c)Uploaded Copy of Agreement Copy of Agreement(d)Standby Arrangement (Details of DG Sets) 2 x 500 KVA(e)Stack Height (in m) 8

20. Land Ownership Pattern:(a)Forest Land 0

12/17/2018 Report Part 1

http://environmentclearance.nic.in/auth/ECgeneral_report.aspx?pid=13696 9/13

(b)Private Land 10.27(c)Government Land 0(d)Revenue Land 0(e)Other Land 0 Total Land 10.27

21.

Present Land Use Breakup of the Study Area in Ha:(a)Agriculture Area 14190(b)Waste/Barren Land 2300(c)Grazing/ Community Land 0(d)Surface Water Bodies 4710(e)Settlements 7060(f)Industrial 2640(g)Forest 1000(h)Mangroves 0(i)Marine Area 0(j)Others : Road, railway 930 Total 32830

22. Land requirement for various activities

S. No. Description of Activity /Facility / Plant / Others Others Land Requirement Remarks

(1.) Green belt 3.43

(2.) Water Reservoir 0.61

(3.) Main Plant 5.1

(4.) Others Vacant space 1.13

Total 10.27

23. Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas;ESZs-Eco Sensitive Zones :

23.1. Details of Ecological Sensitivity :

S. No. Details of EcologicalSensitivity Name Distance from the Project (Km) Remarks

(1.) Critically Polluted Area NA 0 Not found

12/17/2018 Report Part 1

http://environmentclearance.nic.in/auth/ECgeneral_report.aspx?pid=13696 10/13

(2.) WLS NA 0 Not found

(3.) NPA NA 0 Not found

(4.) Corridors NA 0 Not found

(5.) ESAs NA 0 Not found

(6.) ESZs NA 0 Not found

(7.) Wildlife Corridors NA 0 Not found

23.2. Details of Environmental Sensitivity :

S. No. Details of EnvironmentalSensitivity

Other Details ofEnvironmental Sensitivity Name Distance from the Project (Km) Remarks

(1.) Defence Installations NA 0 Not Found

(2.) Forest NA 0 Not Found

(3.) Archaeological Sites NA 0 Not Found

23.3.(a)Whether Noc / Permission from the competent authority isrequired? No

(b)Whether NBWL recommendation is required? No

24.Forest Land:Whether any Forest Land involved? No

25.Tree Cutting:(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0(b)Details of Tree Cutting and Planting of Trees Not Applicable

26.

Land Acquisition Status:(a)Acquired Land(Ha) 10.27(b)Land yet to be acquired(Ha) 0(c)Status of Land acquisition if not acquired 0

27. Rehabilitation and Resettlement (R&R):(a)No. of Villages 0(b)No. of Households 0(c)No. of PDFs (Project Displaced Families) 0(d)No. of PAFs (Project Affected Families) 0

12/17/2018 Report Part 1

http://environmentclearance.nic.in/auth/ECgeneral_report.aspx?pid=13696 11/13

(e)Funds Allocated for R&R(in Rs) 0(f)Status of R&R Yet To Start

28.

Details of Presence of Schedule-I Species:(a)Whether there is Presence of Schedule-I Species ? No(b)Whether conservation plan for Schedule-I Species has beenprepared ? No

(c)Whether conservation plan for Schedule-I Species has beenapproved by competent authority ? No

29.

Details of Presence of Water Bodies in Core Area:(a)Whether there is Presence of Water Bodies in Core Area ? No(b)Whether there is Diversion Required ? No(c)Whether permission has been obtained from competentauthority ? No

30.

Details of Presence of Water Bodies in Buffer Area:(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes(i)Details of Water Bodies in Buffer Area Barakar river(ii)Direction of Water Bodies in Buffer Area North(iii)Distance of Water Bodies in Buffer Area 4.13

31.

Manpower Requirement:(a)Permanent Employment-During Construction 120(b)Permanent Employment-During Operation 80(c)Temporary Employment- During Construction 170(d)Temporary Employment- During Operation 180(e)No. of working days 330(f)Total Manpower 550

32.Green Belt in Ha:(a)Uploaded Green Belt plan Copy of Green Belt Plan

S. No. Description Existing Proposed Total

(1.) Total Area of Green Belt 2.86 0.55 3.41

(2.) Percentage of Total ProjectArea 0.28 0.053 0.333

(3.) No. of Plants 4305 825 5130

12/17/2018 Report Part 1

http://environmentclearance.nic.in/auth/ECgeneral_report.aspx?pid=13696 12/13

(4.) Funds Allocated 286000 126000 412000

33. Project Benefits

S. No. Type of Project Benefits Details of Project Benefits

(1.) Financial Revenue generation

(2.) Environmental Green belt plantation

(3.) Social Peripheral development, Employment opportunities

34. CRZ Specific Details : Not Applicable

35. Sector Specific Details : NOT APPLICABLE

35. Sector Specific Details For Industrial Projects - 1

S. No. Item Details

Additional Detail Sought: NIL ,w ,3.NIL

S. No. Item Details

36.Details of Court Cases:(a)Whether there is any Court Cases pending against the projectand/or land in which the project is proposed to be set up ? No

37.

Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Controlof Pollution) Act:(a)Whether any Direction issued under EPA Act/Air Act/Water Act? No

38. Details of EIA Consultant:(a)Have you hired Consultant for preparing document? Yes(i)Accreditation No. 77(ii)Name of the EIA Consultant Global Tech Enviro Experts Pvt Ltd(iii)Address C-23, BJB Nagar Bhubaneswar(iv)Mobile No. 9437033487(v)Landline No. 0674233685

12/17/2018 Report Part 1

http://environmentclearance.nic.in/auth/ECgeneral_report.aspx?pid=13696 13/13

(vi)Email Id [email protected](vii)Category of Accreditation A(viii)Sector of Accreditation Industrial Projects - 1(ix)Validity of Accreditation 23 Nov 2020(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation

39.

Documents to be Attached:(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment(c)Uploaded Copy of Feasibility Report/ Detailed ProjectReport(DPR) /Detailed Engineering Report /Detailed ConceptualPlan /Approved Mining Plan

Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report/Detailed Conceptual Plan /Approved Mining Plan

(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan(e)Uploaded Cover Letter Copy of Cover Letter(f)Uploaded Copy of documents in support of thecompetence/authority of the person making this application tomake application on behalf of the User Agency

Copy of documents in support of the competence/authority of the person making thisapplication to make application on behalf of the User Agency

(g)Uploaded Additional File NA

UndertakingI hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge andbelief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejectedand clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/construction/ expansion has since been taken up.

Name of Applicant Madhur AgarwallaDesignation DirectorName of Company (Applicant Name should not be givenhere) MAITHAN STEEL AND POWER LTD

Address 9, AJC Bose Road, Ideal Centre, 6th floor, Kolkata