force projection symposium v building capabilities -...
TRANSCRIPT
Force Projection Symposium VForce Projection Symposium VBuilding CapabilitiesBuilding Capabilities
Dr V. GarberDr V. GarberDirector, Systems and Mission IntegrationDirector, Systems and Mission Integration
OUSD (AT&L)/Defense SystemsOUSD (AT&L)/Defense [email protected]@osd.mil
(703) 695(703) 695‐‐97139713
OutlineOutline
Building Capabilities (Building Capabilities (JCIDsJCIDs, Roadmaps, , Roadmaps, Capability Area Capability Area DABsDABs))
Joint Battle Management Command and Joint Battle Management Command and Control Control Air & Missile DefenseAir & Missile DefenseSea BasingSea BasingJoint Forcible Entry OperationsJoint Forcible Entry Operations
SummarySummary
OutlineOutline
Building Capabilities (Building Capabilities (JCIDsJCIDs, Roadmaps, , Roadmaps, Capability Area Capability Area DABsDABs))
Joint Battle Management Command and Joint Battle Management Command and Control Control Air & Missile DefenseAir & Missile DefenseSea BasingSea BasingJoint Forcible Entry OperationsJoint Forcible Entry Operations
SummarySummary
Revised Capabilities PlanningRevised Capabilities PlanningProcess Simplified End State ProcessProcess Simplified End State Process
- SECDEF decision points
Execution andFeedback
EXECUTION & EXECUTION & ACCOUNTABILITYACCOUNTABILITY
ENHANCEDENHANCEDPLANNING PLANNING
OperationalPlanning
Enterprise(Non -warfighting )
Planning
DefenseResourcing
Process
Feedback during next cycleFeedback during next cycle
CapabilitiesPlanning
Resources
SECDEFJoint
ProgrammingGuidance
- Iterative SECDEF engagement
-
STRATEGYSTRATEGY
Execution andFeedback
EXECUTION & EXECUTION & ACCOUNTABILITYACCOUNTABILITY
OperationalPlanning
Enterprise(Non -warfighting )
Planning
DefenseResourcing
Process
RESOURCINGRESOURCING
CapabilitiesPlanning
Resources
SECDEFJoint
ProgrammingGuidance
-
SECDEFStrategicPlanningGuidance
What to What to do?do? How to do it?How to do it?
How well did we How well did we do ?do ?
CJCSI 3170 :CJCSI 3170 :“Concept” Driven Process With Architectures as Integration Tool“Concept” Driven Process With Architectures as Integration Tool
TaskTaskAnalysesAnalysesMilitary tasksMilitary tasksderived from derived from JOCsJOCs, Plans, , Plans, DPG ScenariosDPG Scenarios
Joint Functional Joint Functional ConceptsConcepts((JFCsJFCs))
•• Battlespace Battlespace AwarenessAwareness
•• C2C2•• ProtectionProtection•• Force ApplicationForce Application•• Focused LogisticsFocused Logistics
Capability Capability AssessmentsAssessmentsare done for each are done for each of the JFC areasof the JFC areas
Joint Capabilities Integration and Development System (JCIDS) Joint Capabilities Integration and Development System (JCIDS) analysis addresses:analysis addresses:
Ability of current capabilitiesAbility of current capabilities ((JFCsJFCs) ) to meet joint user needsto meet joint user needsas reflected inas reflected in integrated architecturesintegrated architectures
to support user needs viato support user needs via task analyses task analyses oror capability assessmentscapability assessments
Integrated Integrated ArchitecturesArchitectures
Joint Joint Operating Operating ConceptsConcepts
•• Major Combat Major Combat Operations Operations (JFCOM)(JFCOM)
•• Homeland Homeland Security Security (NORTHCOM)(NORTHCOM)
•• Stability Stability Operations Operations (JFCOM)(JFCOM)
•• Strategic Strategic Deterrence Deterrence (STRATCOM)(STRATCOM)
Capabilities- based identificationof needs combines joint concepts
and integrated architectures with analysis
JCIDSRecommendationCapability Needs
DOTMLPF Changes
JointFunctionalConcepts
Joint OperatingConcepts
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitectureIntegrated
ArchitectureIntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegratedArchitecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
DefensePlanningScenarios
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
DefensePlanningScenarios
Strategy & Overarching
Concepts
Joint OperationsConceptsGuidance NSS
Assessmentand Analysis
Reconciliation and Recommendation
Decision andAction
Capabilities- based identificationof needs combines joint concepts
and integrated architectures with analysis
JCIDSRecommendationCapability Needs
DOTMLPF Changes
JointFunctionalConcepts
Joint OperatingConcepts
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitectureIntegrated
ArchitectureIntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegratedArchitecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
DefensePlanningScenarios
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
DefensePlanningScenarios
Strategy & Overarching
Concepts
Joint OperationsConceptsGuidance NSS
Assessmentand Analysis
Reconciliation and Recommendation
Decision andAction
JCIDSRecommendationCapability Needs
DOTMLPF Changes
JointFunctionalConcepts
Joint OperatingConcepts
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitectureIntegrated
ArchitectureIntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegratedArchitecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
DefensePlanningScenarios
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
DefensePlanningScenarios
Strategy & Overarching
Concepts
Joint OperationsConceptsGuidance NSS
Assessmentand Analysis
Reconciliation and Recommendation
Decision andAction
JCIDSRecommendationCapability Needs
DOTMLPF Changes
JointFunctionalConcepts
Joint OperatingConcepts
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitectureIntegrated
ArchitectureIntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegratedArchitecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
DefensePlanningScenarios
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
DefensePlanningScenarios
Strategy & Overarching
Concepts
Joint OperationsConcepts
JCIDSRecommendationCapability Needs
DOTMLPF Changes
JointFunctionalConcepts
Joint OperatingConcepts
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitectureIntegrated
ArchitectureIntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegratedArchitecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
DefensePlanningScenarios
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
DefensePlanningScenarios
Strategy & Overarching
Concepts
Joint OperationsConceptsGuidance NSS
Assessmentand Analysis
Reconciliation and Recommendation
Decision andAction
Guidance NSS
Assessmentand Analysis
Reconciliation and Recommendation
Decision andAction
Guidance NSS
Assessmentand Analysis
Reconciliation and Recommendation
Decision andAction
Task Analysis Capability Assessments
Science &Technology
Planning, Programming, andBudgeting System
Acquisition Experimentation
USD(AT&L), ASD(C3I)USD(AT&L), ASD(C3I), , thethe Joint StaffJoint Staff,, thetheMilitary DepartmentsMilitary Departments, , thethe Defense AgenciesDefense Agencies, , Combatant Commanders shall work Combatant Commanders shall work collaboratively to develop joint integrated collaboratively to develop joint integrated architectures for capability areas as agreed architectures for capability areas as agreed to by the Joint Staff…..to by the Joint Staff…..
TheThe Joint StaffJoint Staff (or Principal Staff (or Principal Staff Assistant (PSA) for business areas) Assistant (PSA) for business areas) shall lead development of the shall lead development of the operational view, to describe the joint operational view, to describe the joint capabilities that the user seeks and how capabilities that the user seeks and how to employ themto employ them. .
The USD(AT&L)The USD(AT&L) (or PSA (or PSA for business areas) for business areas) shall lead development shall lead development of the systems viewof the systems view, , The systems view shall The systems view shall identify the kinds of identify the kinds of systems and systems and integration needed to integration needed to achieve the desired achieve the desired operational capabilityoperational capability. .
TheThe DoD Chief Information DoD Chief Information Officer (CIOOfficer (CIO) ) shall lead the shall lead the development and facilitate the development and facilitate the implementation of the Global implementation of the Global Information Grid Integrated Information Grid Integrated ArchitectureArchitecture
The Department of Defense shall The Department of Defense shall use these roadmaps touse these roadmaps to conduct conduct capability assessments, guide capability assessments, guide systems development, define the systems development, define the associated investment plansassociated investment plans as as the basis for aligning resources the basis for aligning resources and as an input to the Defense and as an input to the Defense Planning Guidance, Program Planning Guidance, Program Objective Memorandum Objective Memorandum development, and Program and development, and Program and Budget Reviews.Budget Reviews.
USD(AT&L)USD(AT&L) shall lead shall lead the development of the development of integrated plans or integrated plans or roadmaps. roadmaps.
StrategicStrategicGuidanceGuidance
JointJointOperationalOperationalConceptsConcepts
Tasks/Tasks/Functional Functional CapabilitiesCapabilities
IntegratedIntegratedPlans orPlans or
RoadmapRoadmap
Integrated ArchitectureIntegrated Architecture
CapabilityCapabilityAssessmentAssessment
FunctionalFunctionalNeeds AnalysisNeeds Analysis
FunctionalFunctionalSolution AnalysisSolution Analysis
Operational ViewOperational View
Systems ViewSystems ViewTechnical ViewTechnical View[Standards from JTA][Standards from JTA]
++++
GIG ArchitectureGIG Architecture
StrategicStrategicGuidanceGuidance
JointJointOperationalOperationalConceptsConcepts
Tasks/Tasks/Functional Functional CapabilitiesCapabilities
StrategicStrategicGuidanceGuidance
JointJointOperationalOperationalConceptsConcepts
Tasks/Tasks/Functional Functional CapabilitiesCapabilities
IntegratedIntegratedPlans orPlans or
RoadmapRoadmap
CapabilityCapabilityAssessmentAssessment
FunctionalFunctionalNeeds AnalysisNeeds Analysis
FunctionalFunctionalSolution AnalysisSolution Analysis
Operational ViewOperational View
Systems ViewSystems ViewTechnical ViewTechnical View[Standards from JTA][Standards from JTA]
++++
GIG ArchitectureGIG Architecture
IntegratedIntegratedPlans orPlans or
RoadmapRoadmap
Architecture Architecture SI LedSI LedAssessmentAssessment
RoadmapRoadmap
Integrated ArchitectureIntegrated Architecture
CapabilityCapabilityAssessmentAssessment
FunctionalFunctionalNeeds AnalysisNeeds Analysis
FunctionalFunctionalSolution AnalysisSolution Analysis
++++
Operational ViewOperational View
Systems ViewSystems View
Technical ViewTechnical View[Standards from JTA][Standards from JTA]
++
++GIG ArchitectureGIG Architecture
Investment Strategy Planning Guidance Investment Strategy Planning Guidance Program Changes New Start/UpgradesProgram Changes New Start/Upgrades
Responsibilities Spelled Out in DODI 5000.2Responsibilities Spelled Out in DODI 5000.2
Side by SideSide by Side
StrategicGuidance
JointOperationalConcepts
Tasks/Functional Capabilities
IntegratedPlans or
Roadmap
Integrated Architecture
CapabilityAssessment
FunctionalNeeds Analysis
FunctionalSolution Analysis
Operational View
Systems ViewTechnical View[Standards from JTA]
++
GIG Architecture
StrategicGuidance
JointOperationalConcepts
Tasks/Functional Capabilities
StrategicGuidance
JointOperationalConcepts
Tasks/Functional Capabilities
IntegratedPlans or
Roadmap
CapabilityAssessment
FunctionalNeeds Analysis
FunctionalSolution Analysis
Operational View
Systems ViewTechnical View[Standards from JTA]
++
GIG Architecture
IntegratedPlans or
Roadmap
Architecture SI LedAssessment
Roadmap
Integrated Architecture
CapabilityAssessment
FunctionalNeeds Analysis
FunctionalSolution Analysis
++
Operational View
Systems View
Technical View[Standards from JTA]
+
+GIG Architecture
Capabilities- based identificationof needs combines joint concepts
and integrated architectures with analysis
JCIDSRecommendationCapability Needs
DOTMLPF Changes
JointFunctionalConcepts
Joint OperatingConcepts
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitectureIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
DefensePlanningScenarios
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
DefensePlanningScenarios
Strategy & Overarching
ConceptsJoint Operations
ConceptsGuidance NSS
Assessmentand Analysis
Reconciliation and Recommendation
Decision andAction
Capabilities- based identificationof needs combines joint concepts
and integrated architectures with analysis
JCIDSRecommendationCapability Needs
DOTMLPF Changes
JointFunctionalConcepts
Joint OperatingConcepts
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitectureIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
DefensePlanningScenarios
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
DefensePlanningScenarios
Strategy & Overarching
ConceptsJoint Operations
ConceptsGuidance NSS
Assessmentand Analysis
Reconciliation and Recommendation
Decision andAction
JCIDSRecommendationCapability Needs
DOTMLPF Changes
JointFunctionalConcepts
Joint OperatingConcepts
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitectureIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
DefensePlanningScenarios
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
DefensePlanningScenarios
Strategy & Overarching
ConceptsJoint Operations
ConceptsGuidance NSS
Assessmentand Analysis
Reconciliation and Recommendation
Decision andAction
JCIDSRecommendationCapability Needs
DOTMLPF Changes
JointFunctionalConcepts
Joint OperatingConcepts
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitectureIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
DefensePlanningScenarios
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
DefensePlanningScenarios
Strategy & Overarching
ConceptsJoint Operations
Concepts
Science &Technology
Planning, Programming, andBudgeting System
Acquisition Experimentation
JCIDSRecommendationCapability Needs
DOTMLPF Changes
JointFunctionalConcepts
Joint OperatingConcepts
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitectureIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
OPLANSAnd
CONPLANSIntegrated
ArchitectureIntegrated
ArchitectureIntegrated
Architecture
DefensePlanningScenarios
IntegratedArchitecture
IntegratedArchitecture
IntegratedArchitecture
DefensePlanningScenarios
Strategy & Overarching
ConceptsJoint Operations
ConceptsGuidance NSS
Assessmentand Analysis
Reconciliation and Recommendation
Decision andAction
Guidance NSS
Assessmentand Analysis
Reconciliation and Recommendation
Decision andAction
Guidance NSS
Assessmentand Analysis
Reconciliation and Recommendation
Decision andAction
Task AnalysisCapability
Assessments
Investment Strategy Planning Guidance Program Changes New Start/Upgrades
CJCSI 3170.01CCJCSI 3170.01CJoint Capabilities Integration and Joint Capabilities Integration and
Development SystemDevelopment System
DODI 5000.2DODI 5000.2Operation of Defense Operation of Defense Acquisition SystemAcquisition System
Capability Area ReviewsCapability Area Reviews
Implements capabilityImplements capability--based methodology on provider sidebased methodology on provider sideProvides mission area contextProvides mission area contextRelates acquisition process to capability and programming procesRelates acquisition process to capability and programming processessesIdentifies Joint solutions and additional work to be done (acrosIdentifies Joint solutions and additional work to be done (across s DOTMLPF)DOTMLPF)Reveals need for management, engineering, and testing across a Reveals need for management, engineering, and testing across a capability areacapability areaHelps align individual program expectations for capability and Helps align individual program expectations for capability and schedule (including collective capability)schedule (including collective capability)Provides basis to set metrics and gauge progress in developing Provides basis to set metrics and gauge progress in developing capability over timecapability over time
RoadmapsRoadmapsNature of Roadmap will vary by topicNature of Roadmap will vary by topicMust start with view of where we want to go Must start with view of where we want to go Assessment of where we areAssessment of where we areLay down of strategic plan considering:Lay down of strategic plan considering:•• Management, engineering, and testing activities that Management, engineering, and testing activities that
cut across a capability areacut across a capability area•• Capability that only exists at FamilyCapability that only exists at Family--ofof--
Systems/SystemSystems/System--ofof--Systems levelSystems level•• Network enablersNetwork enablers•• Material and nonMaterial and non--material solutionsmaterial solutions•• What to expect from each systemWhat to expect from each system•• AffordabilityAffordability•• Other considerationsOther considerations
OutlineOutline
Building Capabilities (Building Capabilities (JCIDsJCIDs, Roadmaps, , Roadmaps, Capability Area Capability Area DABsDABs))
Joint Battle Management Command and Joint Battle Management Command and ControlControlAir & Missile DefenseAir & Missile DefenseSea BasingSea BasingJoint Forcible Entry OperationsJoint Forcible Entry Operations
SummarySummary
JBMC2 Roadmap Chapter Outline:JBMC2 Roadmap Chapter Outline:1.1. IntroductionIntroduction2.2. JBMC2 Operational Concepts, Architectures, and CapabilitiesJBMC2 Operational Concepts, Architectures, and Capabilities3.3. Plans to make JBMC2 Programs Interoperable, Convergent, or Plans to make JBMC2 Programs Interoperable, Convergent, or
Phased Out by 2008Phased Out by 20084.4. Milestones for Key JBMC2 InitiativesMilestones for Key JBMC2 Initiatives5.5. JBMC2 Capability Development and Integration ManagementJBMC2 Capability Development and Integration Management6.6. JBMC2 Data StrategyJBMC2 Data Strategy7.7. NetNet‐‐Centric Underpinnings of JBMC2Centric Underpinnings of JBMC28.8. DOTMLPF Strategy for JBMC2DOTMLPF Strategy for JBMC29.9. Experimentation and Technology for JBMC2Experimentation and Technology for JBMC210.10. Joint SystemsJoint Systems‐‐ofof‐‐Systems Development Testing and Systems Development Testing and
Operational Testing and EvaluationOperational Testing and Evaluation11.11. Summary and ConclusionsSummary and Conclusions
Achieving Functional Capability of Achieving Functional Capability of NetNet‐‐Centric “Operations”Centric “Operations”
(Total Mission Critical to phase out or make interoperable(Total Mission Critical to phase out or make interoperable––360)360)
Mission
Criti
cal IS
R +87
Mission
Criti
cal IS
R +87
Mission Critical Support Communications +132Mission Critical Support Communications +132
130130Core BMC2Core BMC2
TotalTotal
FIOPFIOP
SIAP
SISP
SOFP
FnMPFnMPSIGP
DOTMLPFDOTMLPFJI&IJI&I (~ (~ 30)30)GCCS
Logistics +11
Logistics +11
Context of JBMC2 RoadmapContext of JBMC2 Roadmap“Making JBMC2 Interoperable by 2008”
JBMC2 Pathfinders, V 2.1JBMC2 Pathfinders, V 2.1
Major C2 Systems
Major ISR Platforms
Air Force
Major C2 Platforms
• GCCS-AF • TBMCS• AOC-WS
Army• FAADC2I• FBCB2• GCCS-A• MCS• FCS
Navy• GCCS-M• DCGS-N• FORCEnet
Joint• GCCS-J• JC2
Air Force•AWACS•JSTARS•MC2A
Navy•AEGIS•E-2C
USMC• C2PC• TCO
Joint• DJC2• JSF
Air Force• Global
Hawk• MP-RTIP
Army• ACS
Navy• AESA• Navy
ACS
Air Force• DCGS-AF• DIB• JSTARS• MC2A
Army• ABCS /
ASAS• DCGS-A
Navy• DCGS-N
USMC• DCGS-
MC
Air Force
Major ISR Systems
• AEHF• TSAT
Army• WIN-T
Navy• ATDLS• CEC• JTIDS• MIDS• MUOS
Joint• GIG-BE• JTRS• NCES• Teleport
Joint Force NetworkingGIG Infrastructure, Tactical Data Links, Core Enterprise Services
USJFCOM USJFCOM “Top“Top--Level” Systems Level” Systems
Engineering Tradeoffs & Engineering Tradeoffs & LeadershipLeadership
Service Lead FIOP (USAF)Service Lead FIOP (USAF)“Day“Day--toto--Day” Systems EngineeringDay” Systems Engineering
ArmyArmy USMCUSMC NavyNavy Air ForceAir Force
OSDOSD(AT&L, NII & JS)(AT&L, NII & JS)
Strategy & Strategy & OversightOversight
Service Implementation of JBMC2Service Implementation of JBMC2
Joint Battle Management Command and Control (JBMC2)Joint Battle Management Command and Control (JBMC2)Management StructureManagement Structure
JBMC2
JBMC2
(FIOP (FIOP ––
SIAP, SIGP, FORCEnet, SISP…)
SIAP, SIGP, FORCEnet, SISP…)
OutlineOutline
Building Capabilities (Building Capabilities (JCIDsJCIDs, Roadmaps, , Roadmaps, Capability Area Capability Area DABsDABs))
Joint Battle Management Command and Joint Battle Management Command and Control Control Air & Missile DefenseAir & Missile DefenseSea BasingSea BasingJoint Forcible Entry OperationsJoint Forcible Entry Operations
SummarySummary
JO TNI
S TA FFCH IE FS OF
AMD Operational View (OVAMD Operational View (OV--1)1)
Key Joint Capability Improvements • Single Integrated Air Picture (SIAP)• Combat ID (CID)
• Integrated Fire Control (IFC)• Automated Battle Management Aids (ABMA)
• Attack Operations• Passive Defense /
Early Warning
AMD Roadmap Document OutlineAMD Roadmap Document Outline
1.1. Executive SummaryExecutive Summary2.2. Purpose and ScopePurpose and Scope3.3. Operational ConceptOperational Concept4.4. AMD Capability AssessmentAMD Capability Assessment5.5. Integrated AMD Program Integrated AMD Program
Schedule and CapabilitiesSchedule and Capabilities6.6. DOTMLPF Alternatives for AMD DOTMLPF Alternatives for AMD 7.7. Experimentation and Emerging Experimentation and Emerging
TechnologyTechnology8.8. NetNet--Centric UnderCentric Under--PinningPinning9.9. AMD Test and Evaluation AMD Test and Evaluation 10.10. Conclusions and Conclusions and
Recommendations Recommendations 11.11. Appendices Appendices
Air and Missile Defense
Roadmap
JO TNI
S TA FFCH IE FS OF
Key Joint Capability Enablers*Key Joint Capability Enablers*
Common and Complete PicturesCommon and Complete PicturesOne Track Per Air ObjectOne Track Per Air ObjectContinuous TrackContinuous Track
• Employ independently of organic radar• Overcome Radar Horizon Limitation
Automated Battle Management Aids (ABMA)
Inte
rope
rabi
lity
• Long Range• Wide Area• Increase Shooter Confidence
Confidence to Engage Throughout the Battlespace
Extended Battlespace, Multiple Engagements, Stressing Threat
Efficient Engagements
SIAP - CID
IFC
ABMA
Single Integrated Air Picture (SIAP)
Combat ID (CID)
Integrated Fire Control (IFC)
Optimal Use ofJoint Forces
• Determine Optimum Weapon and Sensors• Efficient Weapon and Sensor Management
* TAMD CRD dtd
OutlineOutline
Building Capabilities (Building Capabilities (JCIDsJCIDs, Roadmaps, , Roadmaps, Capability Area Capability Area DABsDABs))
Joint Battle Management Command and Joint Battle Management Command and Control Control Air & Missile DefenseAir & Missile DefenseSea BasingSea BasingJoint Forcible Entry OperationsJoint Forcible Entry Operations
SummarySummary
Joint Sea Basing/Expeditionary Joint Sea Basing/Expeditionary Force ProjectionForce Projection
Where and how do Joint Forces fit?
These are not Sea Bases …
Current MPS• Port to Port Function
• Sustainment flows through ports and airfields
• Becomes part of Common User Pool
Sea Bases are maneuverable, scalable, distributed, and project combat power
Sea Base Overview Sea Base Overview ---- Process, Components, & EnablersProcess, Components, & Enablers
PrepoLinkages
Joint Sea Base leverages forward deployed, pre-positioned, and surge force posture. Arrive ready with scalable air, maritime, and ground forces on accelerated timelines.
Joint Sea Basing/Expeditionary Force ProjectionJoint Sea Basing/Expeditionary Force ProjectionJoint CapabilityJoint Capability
Joint Sea Basing/Expeditionary Force Projection has Joint Sea Basing/Expeditionary Force Projection has the potential to be a significant US capabilitythe potential to be a significant US capability
CNO and Commandant have made major progress, CNO and Commandant have made major progress, but require but require fullfull joint participation joint participation andand resourcingresourcing to to ensure successensure success
Joint Sea Basing/Expeditionary Force ProjectionJoint Sea Basing/Expeditionary Force ProjectionJoint CapabilityJoint Capability
What is needed?
The establishment of a US seaThe establishment of a US sea--basing capability basing capability requires an requires an integratedintegrated spiral approach, involving spiral approach, involving requirementsrequirements andand acquisitionacquisition decisions and actionsdecisions and actions
Capability enhancement or “drops” would be Capability enhancement or “drops” would be introduced introduced nearnear--termterm, , midmid--termterm, and build toward a , and build toward a revolutionary future capabilityrevolutionary future capability
Joint Sea Basing/Expeditionary Force ProjectionJoint Sea Basing/Expeditionary Force ProjectionJoint CapabilityJoint Capability
JCS Tank Recommended: JCS Tank Recommended:
Joint Sea Basing be designated a primary candidate Joint Sea Basing be designated a primary candidate for a for a Joint Integrating ConceptJoint Integrating Concept
Start by utilizing existing (new) processStart by utilizing existing (new) process
JIC Role in JCIDS JIC Role in JCIDS JCIDS Chart—CJCSI 3170D
040325 J7/JTD/040325 Concepts to Capabilities Brief to NWC v32
DOD Strategic Guidance
Joint OperationsConcepts
Guidance
OPLANSand
CONPLANS
DefensePlanningScenarios
IntegratedArchitectures
Overlaywhat we have with what we need to do
• COCOM IPLs• Gap Analysis
• Risk Assessment
TaskAnalyses
CapabilityAssessments
AssessmentandAnalysis
Reconciliation& Recommendations
DecisionandAction
AcquisitionPlanning,
Programming, and Budgeting System
Science &Technology
Experimentation
NationalSecurityStrategy
JCIDS Recommendations
Capability NeedsDOTMLPF Changes
JCIDS AnalysisJCIDS Analysis
JointOperatingConcepts
JointFunctionalConcepts
JOCs were intended to lead to a Task Analysis needed for capability assessments
In practice, JOCsappear to be written at too high a level to lead to needed task analysis and JICs are filling that role
JointIntegratingConcepts
(FAA)(FNA)
(FSA)
Prioritized tasks from JICs are then used by FCBs to assess capabilities
OutlineOutline
Building Capabilities (Building Capabilities (JCIDsJCIDs, Roadmaps, , Roadmaps, Capability Area Capability Area DABsDABs))
Joint Battle Management Command and Joint Battle Management Command and Control Control Air & Missile DefenseAir & Missile DefenseSea BasingSea BasingJoint Forcible Entry OperationsJoint Forcible Entry Operations
SummarySummary
JFEO TasksJFEO Tasks
Per JROCM:Per JROCM: Perform a capabilitiesPerform a capabilities--based based assessment (CBA) of undersea superiority & assessment (CBA) of undersea superiority & JFEO NLT 30 Sep 04 using the tasks JFEO NLT 30 Sep 04 using the tasks identified by the PACOM / JFCOMidentified by the PACOM / JFCOM--developed developed enabling concept.enabling concept.
Per OSD direction:Per OSD direction: Support the EPP NLT 15 Support the EPP NLT 15 May 04 with emerging results of the CBA. May 04 with emerging results of the CBA.
JFEO CBA DefinitionJFEO CBA Definition
Joint Forcible Entry OperationsJoint Forcible Entry Operations
“A Joint military operation conducted in the “A Joint military operation conducted in the face of expected armed opposition to gain face of expected armed opposition to gain entry of ground forces into a JOA in order entry of ground forces into a JOA in order to enable the conduct of followto enable the conduct of follow--on on operations or as a decisive operation.”operations or as a decisive operation.”
A32
Analyze COAs' Operational Effectiveness and Risk
A2
Develop, Validate Nominate, and
Prioritize Operational Engagements
A33
Prioritize COAs
A1
Establish Commander's Objectives,
Guidance and Intent
A4
Decide and Assign Forces
A31
Develop COAs to
MatchPotential Targets/Eff
ects/ Appropriate Resource Application
A3
Perform Capabilities Analys
is A6
Perform Combat Assessment
A5
Perform Mission Planning and Force Execution
A12
Understand Enemy Situation Capabiliti
es Vulnerabilities and Intent (IPB)
A14
Determine Operational Strategy Resources,
and Operational Objectives
A13
Understand Friendly Force Situation Capabiliti
es and Vulnerabili
ties A15
Formulate and Conv
ey Commander's Guidance to Staff and Subordin
ate Commanders
A11
Understand Higher
Mission and Intent
A22
Recommend Targets &
Target Systems to Achieve
Desired Effects
A
Conduct Precision Engagement
A21
Develop Operatio
nal Targets
A62
Determine Reattack
and Future Targeti
ng Requirements
A611
Determine Effects on Targets
A61
Assess Impact of Attack on Over
all Campaign Prosecution
A24
Produce and Approve Prioritized Target List A5
2
Conduct Employm
ent Plan Rehearsal and Preparation
A23
Deconflict and Nomin
ate Specific Targets
A612
Analyze Mission Effectiven
ess
A51
Coordinate Employment Plan with Compon
ent Commanders
A312
Match Effects wit
h Employment Options
A311
Determine Effects
Criteria
A512
Deconflict Actions/Effects/T
argets
A53
Employ Resourc
es Based on Tasking
A6112
Conduct Munitions Effectiven
ess Assessment
A6111
Conduct Battle Dama
ge Assessment
A122
Determine Potential Enemy
COA A121
Determine Enemy Centers
of Gravity
A511
Conduct Mission Planni
ng
A42
Finalize and Approve Plan
A43
Issue Order
A41
Select COA
A212
Develop ISR Pla
n
A222
Recommend Targets
A223
Sequence Effects on Targets
A531
React to Unplanned Events A53
2 Engage Targets
A221
Assess Located Targets
A213
Execute Initial ISR
Plan A211
Determine Prospective Targets
FSAFNA
1 Oct 1 Jan
Complete Assessment/ICD
Start IntegratingConcept
Complete IntegratingConcept
Begin CapabilitiesBased assessment
FAA
15 May1 Apr 1 Jul 15 Sep
1 Jan
EPP - FORSAT
Complete EPP
Functional Area AnalysisTasksCritical CapabilitiesMetrics
Functional Needs AnalysisGapsShortfallsRedundancies
Functional Solution AnalysisS+T TTPAcq to Fill GapsJt Experimentation
PRODUCTS:
Task/Capability identificationCrit Capability identification (Table Top)
M+S force on force equivalencies
M+S force movement
M+S force sustainment(Asslt and follow-on forces)
(Table Top)Gap/redundancy analysis
M&S Solutions analysis (to fill gaps*)
Integrating Concept Coord
JFEOforces
Assault CapabilitiesCritical Capabilities-Enablers (ISR, Air, Undersea sup, etc)-Assault (movement, insertion, attack)-Follow on Force (movement, inserrtion)-Sustainment
Agility (strategic)
Agility(tactical)
Networked
SustainableTailorable
Tactical Dominance
Assault ImprovementsArea Assessment Needs Assessment Solution Assessment
JFEO CBA Timeline
Possible use of MCO-3 with excursions for FNA M&S effort.
* Currently considering - JHUAPL - FIRESIM- WAD - TACWAR
JHUAPL - FIRESIM
NEED FSA M & S EXCURSIONS
Current Status
DefinitionDefinition of “Critical Capability”of “Critical Capability”Significant likelihood of needing capability to conduct JFEOMajor negative consequence to JFEO if capability not available
(Chairman's Risk Assessment)(Chairman's Risk Assessment)
Prioritized Capabilities ListPrioritized Capabilities List(hundreds) CBA(hundreds) CBA--derived capabilitiesderived capabilities
24 critical capabilities with 24 critical capabilities with MOE’sMOE’s identifiedidentified
Attribute and MOE under development for critical Attribute and MOE under development for critical
capabilitiescapabilities
Capabilities assigned to Capabilities assigned to FCB’sFCB’s
Operationalizing JICs
Joint ForcibleJoint ForcibleEntry OpsEntry Ops
Sea BasingSea Basing
Blue Force Tracking/CIDBlue Force Tracking/CID
Force Projection OpsForce Projection Ops
CounterinsurgencyCounterinsurgency
Integrated Air & Missile DefenseIntegrated Air & Missile Defense
Undersea Undersea SuperioritySuperiority
Persistent/Global StrikePersistent/Global StrikeIGPBS
BRAC
Warfighter Driven
OutlineOutline
Building Capabilities (Building Capabilities (JCIDsJCIDs, Roadmaps, , Roadmaps, Capability Area Capability Area DABsDABs))
Joint Battle Management Command and Joint Battle Management Command and Control Control Air & Missile DefenseAir & Missile DefenseSea BasingSea BasingJoint Forcible Entry OperationsJoint Forcible Entry Operations
SummarySummary
Capabilities for the WarfightersProgression
Integrated DoD Strategic Plan
“as is”
Version 0
Time
Version X
Capab
ility
Capability Drop A
Version 1
Capability Drop B
Version 2
Cap
abili
ty
All Stakeholders Must Work Together
5/25/2004
Defense SystemsDirector Dr. LamartinPrincipal Deputy Mr. Schaeffer
Enterprise Development
Plans andOperations
Development Test &
Evaluation
Assessments & Support
Air WarfareLand Warfare & Munitions
Naval Warfare Missile Warfare Treaty Compliance
Joint Force Integration
Joint Force Applications
Joint Force Operations
Systems and Mission IntegrationDr GarberDirector
System AcquisitionDr LarmartinDirector
System EngineeringMr SchaefferDirector
Organization of the Organization of the Defense Systems DirectorateDefense Systems Directorate
OUSD(AT&L)OUSD(AT&L)
Integrated Fire ControlForward Pass Concept
USMC Section Leader
SINCGARSSINCGARSUSA
HUMRAAM/USMC CLAWS
EPLRSEPLRSEPLRSEPLRS
JLENS Ground Processing
Station
JTIDS
ABMOC
SINCGARS
SINCGARS
15 Mar USMC Target Kill
4 Apr USA Direct Hit
Forward Pass Data Link
Beyond Line of Sight Engagement with Organic LinksBeyond Line of Sight Engagement with Organic Links
Engage-On-Remote Concept
Patriot AdvancedCapability-3
Successful Engagement of Simulated Cruise Missile Based on Fire-Control
Data from External Radar
Demonstrated Capability to Increase Defended Footprint Against Low Flying Cruise Missile Threats
Demonstrated Capability to Increase Defended Footprint Against Low Flying Cruise Missile Threats
IFC Coverage vs Stressing Threat
PAC 3
AEGIS
CoverageWithout IFC
Expands the Battlespace toKinematic Range of Weapons
Greater Defensive Coverage With Existing ForcesGreater Defensive Coverage With Existing Forces
Cruise Missile DefenseToday
2010 Cruise Missile
Defense
Airborne Platform
Representative Coverage of Low Altitude Cruise Missile Threat
IFC Coverage vs Stressing Threat
PAC 3
AEGIS
CoverageWithout IFC
Representative Coverage of Low Altitude Cruise Missile Threat
Cruise Missile DefenseToday
JO TNI
S TA FFCH IE FS OF
FY 04 05 06 07 08 09 10 11 12 13 14 15 16Sensors:
JLENSE-2AEGISMRRSE-3E-8E-10MP-RTIP
Weapons:PAC-3 (PATRIOT)MEADSSLAMRAAMF/A-18F-35ERAM/SM6CLAWSF-15F-16F/A-22AIM-120
Battle Management:AMDC2CAC2SAOC
Networks/C2:CECJTRSMIDST-SATGIG-BEDoD TeleportNCES
(AWACS 30/35 - 40/45)
(JSTARS)
(MIDS)
(Suite 5M)
(C-7)
(F/A-18)
(Block 1)
(40/42)
(GATORS Inc 1)
AMD Roadmap: Selected Systems
Critical Capabilities Cross Walk
Establish/maintain communications for JFEO Force, Coalition and Enablers
PDM IIJF
COM JIC
DSB SEA BASIN
G
USMC 2015
MEB
AABCT AFLOAT
ENSB --USN/U
SMC
Transport to and unload / receive assets in JFEO AOR
Transport and unload / receive assets within JFEO AOR
Protect forces throughout JFEO AOR
Control LOCs in JOA as required
Maneuver within the JFEO AOR
Detect and identify enemy anti-access capabilities
Find, fix and track targets
Target and engage targets
Sustain the JFEO force in austere environment
Provide fire support to maneuver forces
VIGNETTE
UC-04
JOIN
T FIRES 20
15
JFEO
2015
EXPED WAR FP
Track and defeat enemy anti-access capabilities
DOD EndDOD End--toto--EndEndRequirements, Acquisition and Test ProcessRequirements, Acquisition and Test Process
JO TNI
S TA FFCH IE FS OF
• Capabilities• Tasks• Attributes• Metrics
• Gaps• Shortfalls• Redundancies• Risk areas
• Non-materiel solutions• Materiel solutions• S+T initiatives• Experimentation
SecDef Joint Staff (OSD)
Functional Area Analysis
Functional Needs Analysis
Functional Solutions Analysis
Select a JointIntegrating
Concept
• Strategic Planning Guidance
• Defense Planning Scenarios
• Family of Concepts• Transformation
oversight
activity
Capability Based Assessment
Policy Requirements
Develop Concept
COCOM
JO TNI
STAFF
CHIEFSOF
ICD
Joint Chiefs of Staff & Joint Requirements Oversight Council
OSD (AT&L)
COCOMs
USMCArmy
Navy
Air Force
DIA
OSD (NII)
OSD (PA&E)
FCBJoint Staff / OSD
Capabilities Based AssessmentCapabilities Based AssessmentJCIDS Process JCIDS Process
• Capabilities• Tasks• Attributes• Metrics
• Gaps• Shortfalls• Redundancies• Risk areas
• Non-materiel solutions• Materiel solutions• S+T initiatives• Experimentation
SecDef Joint Staff (OSD)
Functional Area Analysis
Functional Needs Analysis
Functional Solutions Analysis
Select a JointIntegrating
Concept
• Strategic Planning Guidance
• Defense Planning Scenarios
• Family of Concepts• Transformation
oversight
activity
Capability Based Assessment
Policy Requirements
Develop Concept
COCOM
JO TNI
STAFF
CHIEFSOF
ICD
Joint Chiefs of Staff & Joint Requirements Oversight Council
OSD (AT&L)
COCOMs
USMCArmy
Navy
Air Force
DIA
OSD (NII)
OSD (PA&E)
FCBJoint Staff / OSD
Capabilities Based AssessmentCapabilities Based AssessmentJCIDS Process JCIDS Process
• LRIP• FOT&E
• Refined concept• Analysis of
Alternatives• Technology
Development Strategy
• Affordable military-useful increment
• Technology demonstrated
• Initial KPPs
MS “B”
• Revise KPPs• Detailed design• System integration• IOT&E
MS “C”
Acquisition and TestOSD (AT&L, PA&E), Services and OSD (DOT&E) -- Joint Staff (JROC)
MS “A”
Evolutionary or SpiralDevelopment
activity
Concept Refinement
Technology Development
System Development ProductionCDD CPDTechnology
DevelopmentSystem
Development ProductionCDD CPDMS “A”
Analysis of Alternatives
Technology Development
System Development ProductionCDD CPD
• LRIP• FOT&E
• Refined concept• Analysis of
Alternatives• Technology
Development Strategy
• Affordable military-useful increment
• Technology demonstrated
• Initial KPPs
MS “B”
• Revise KPPs• Detailed design• System integration• IOT&E
MS “C”
Acquisition and TestOSD (AT&L, PA&E), Services and OSD (DOT&E) -- Joint Staff (JROC)
MS “A”
Evolutionary or SpiralDevelopment
activity
Concept Refinement
Technology Development
System Development ProductionCDD CPDTechnology
DevelopmentSystem
Development ProductionCDD CPDTechnology Development
System Development ProductionCDD CPDTechnology
DevelopmentSystem
Development ProductionCDD CPDMS “A”
Analysis of Alternatives
Technology Development
System Development ProductionCDD CPDMS “A”
Analysis of Alternatives
Technology Development
System Development ProductionCDD CPD
20162004 2006 2008 2010 2012 2014
OSD (AT&L)-Led Roadmaps(DOD 5000)
• DT&E