s `` MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance with: Individual Permit for Discharges of Stormwater from MS4 (VA0092975) Coverage from July 1, 2017 to June 30, 2022 Prepared By: Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219 December 15, 2019

Upload: others

Post on 13-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

s

``

MS4 PROGRAM PLAN

FOR

URBANIZED AREAS OF VIRGINIA

Virginia Department of Transportation Small

Municipal Separate Storm Sewer System (MS4)

In Compliance with:

Individual Permit for Discharges of Stormwater from MS4 (VA0092975)

Coverage from July 1, 2017 to June 30, 2022

Prepared By:

Virginia Department of Transportation

1401 East Broad Street

Richmond, Virginia 23219

December 15, 2019

Page 2: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance
Page 3: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

Page 4: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

Page 5: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

TABLE OF CONTENTS

VDOT MS4 PROGRAM PLAN BACKGROUND .......................................................................................... 1

VDOT RESPONSiBILITIES ......................................................................................................................... 2

MS4 INDIVIDUAL PERMIT CROSS REFERENCE TABLE ............................................................................. 3

MCM#1: PUBLIC EDUCATION AND OUTREACH ON STORMWATER IMPACTS ....................................... 5

BMP 1(A) – Maintain and Update Stormwater Webpage ................................................................. 6

BMP 1(B) – Signage at Rest Areas and Welcome Centers ................................................................. 7

BMP 1(C) – Annual Reporting and Effectiveness Review .................................................................. 8

MCM#2: PUBLIC INVOLVEMENT/PARTICIPATION ................................................................................. 9

BMP 2(A) – BMPs for Public Involvement Activities: Adopt a Highway .......................................... 10

BMP 2(B) – BMPs for Public Involvement Activities: Storm Drain Stenciling .................................. 11

BMP 2(C) – Participation in Development of Local TMDLs .............................................................. 12

BMP 2(D) – BMPs for Public Involvement Activities: Stream Cleanups ........................................... 13

BMP 2(E) – Annual Reporting and Effectiveness Review ................................................................. 14

MCM#3: ILLICIT DISCHARGE DETECTION AND ELIMINATION .............................................................. 15

BMP 3(A) – Storm Sewer Map ......................................................................................................... 16

BMP 3(B)1 - Prohibition of Non-Stormwater Discharge .................................................................. 17

BMP 3(B)2 - Prohibition of Non-Stormwater Discharge .................................................................. 18

BMP 3(B)3 – Prohibition of Non-Stormwater Discharge ................................................................. 19

BMP 3(C) – Illicit Discharge Detection and Elimination Program .................................................... 20

BMP 3(D) – Annual Reporting and Effectiveness Review ................................................................ 21

MCM#4: CONSTRUCTION SITE STORMWATER RUNOFF CONTROL ..................................................... 22

BMP 4(A) – Annual Standards and Specifications ............................................................................ 23

BMP 4(B) – Annual Reporting and Effectiveness Review ................................................................ 24

MCM#5: POST-CONSTRUCTION STORMWATER MANAGEMENT ........................................................ 26

BMP 5(A) – Standards and Specifications ........................................................................................ 27

BMP 5(B) – Long-Term Care and Maintenance of SWM Facilities ................................................... 29

BMP 5(C) – Annual Reporting and Effectiveness Review ................................................................ 30

MCM#6: POLLUTION PREVENTION/GOOD HOUSEKEEPING FOR VDOT OPERATIONS ........................ 31

BMP 6(A)1 – Procedures for Operation and Maintenance Activities .............................................. 32

BMP 6(A)2 – Procedures for Operation and Maintenance Activities .............................................. 33

BMP 6(B) – Turf and Landscape Management ................................................................................ 35

BMP 6(C)1 – Training of VDOT Forces .............................................................................................. 36

BMP 6(C)2 – Training of VDOT Forces .............................................................................................. 37

BMP 6(C)3 – Training of VDOT Forces .............................................................................................. 38

BMP 6(C)4 – Training of VDOT Forces .............................................................................................. 39

BMP 6(D) – Oversight of VDOT Maintenance Contractors .............................................................. 40

BMP 6(E) – Annual Reporting and Effectiveness Review ................................................................. 40

MCM#7: Infrastructure Coordination .................................................................................................. 41

BMP 7(A) – Infrastructure Coordination .......................................................................................... 42

SC#1: SPECIAL CONDITIONS FOR CHESAPEAKE BAY TMDL .................................................................. 43

BMP SC1(A) – Action Plan for Chesapeake Bay Watershed TMDL .................................................. 44

SC#2: SPECIAL CONDITIONS FOR APPROVED LOCAL TMDLS ............................................................... 45

BMP SC2(A) – Action Plans for Approved Local TMDLs ................................................................... 46

PROGRAM EVALUATION, MODIFICATION, AND REPORTING .............................................................. 47

Page 6: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

LIST OF ATTACHMENTS

High Priority Facilities

Support Facilities with Nutrient Management Plans

Revisions to Program Plan and Reference Materials

Reference Material

Page 7: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

ACRONYMS

AASHTO American Association of State Highway and Transportation Officials

BMP Best Management Practice

CGP Construction General Permit

CRCIF Construction Runoff Control Inspection Form

CWA Clean Water Act

DCR Virginia Department of Conservation and Recreation

DEQ Virginia Department of Environmental Quality

DOD Department of Defense

EPA Environmental Protection Agency

ERAC Environmental Research Advisory Committee

ESC Erosion and Sediment Control

ESCCC Erosion and Sediment Control Contractor Certification

HUC Hydrologic Unit Code

IDDE Illicit Discharge Detection and Elimination

IP Implementation Plan

L&D Location & Design

LDA Land-Disturbing Activity

LUP Land Use Permit

MCM Minimum Control Measure

MEP Maximum Extent Practicable

MS4 Municipal Separate Storm Sewer System

NMP Nutrient Management Plan

O&M Operations & Maintenance

ORI Outfall Reconnaissance and Inventory

P2 Pollution Prevention

POD Point of Discharge

PSA Public Service Announcement

RLD Responsible Land Disturber

RLDA Regulated Land Disturbance Activity

SWM Stormwater Management

SWPPP Stormwater Pollution Prevention Plan

TMDL Total Maximum Daily Load

TRB Transportation Research Board

VAC Virginia Administrative Code

VDOT Virginia Department of Transportation

VESCLR Virginia Erosion and Sediment Control Law and Regulations

VSMP Virginia Stormwater Management Program

VPDES Virginia Pollutant Discharge Elimination System

WIP Watershed Implementation Plan

WLA Wasteload Allocation

Page 8: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 1

VDOT MS4 PROGRAM PLAN BACKGROUND

The Virginia Department of Transportation (VDOT) is authorized to discharge stormwater from its

municipal separate storm sewer system (MS4) by coverage under the Virginia Pollutant Discharge

Elimination System (VPDES) Individual Permit for the VDOT Municipal Separate Storm Sewer System

(MS4) (the Permit) within the urbanized areas of Virginia. As part of the original permit authorization

(originally under a general permit), VDOT developed and implemented an MS4 Program Plan (the

Plan) with best management practices (BMPs) to address the six minimum control measures (MCMs)

and the special conditions for applicable total maximum daily loads (TMDLs) outlined in the Permit.

The program plan has been refined and updated throughout the life of the program and permit(s).

In accordance with, VDOT’s coverage under the 2017 Permit, VDOT has updated this MS4 Program

Plan to address new permit requirements (including the addition of MCM7 – Infrastructure

Coordination) as well as enhance BMPs through the adaptive management process. Implementation

of these BMPs is consistent with the provisions of an iterative MS4 Program. Consistent with EPA

interpretation, the Virginia Department of Environmental Quality (DEQ) has determined that

implementation of the MS4 Program Plan, provided that the plan meets the requirements of the

Permit, will reduce the discharge of pollutants to the Maximum Extent Practicable (MEP).

BMPs that are included in this Plan follow a prescribed alpha-numeric nomenclature that is based on

the respective MCMs, the numbers of BMPs for each MCM, and the responsible Division. For

example, BMP 3(B)(2) refers to the following:

BMP 3 MCM 3: Illicit Discharge Detection and Elimination

(B) The second BMP to address the requirements of MCM 3

2 The second VDOT Division to be assigned responsibility under the BMP

Note: BMPs associated with the special conditions for approved TMDLs are assigned a BMP of SC1

(Chesapeake Bay TMDL) or SC2 (Local TMDLs), as appropriate.

The area regulated by the MS4 Permit (herein referred to as the regulated area) covers areas

discharging to an MS4 that is owned and/or operated by VDOT and located within one of the

urbanized areas of Virginia. Urbanized areas as identified by the 2010 Decennial Census are listed

below.

• Blacksburg • Richmond

• Bristol • Roanoke

• Charlottesville • Virginia Beach

• Fredericksburg • Washington, DC

• Harrisonburg • Winchester

• Kingsport • Staunton-Waynesboro

• Lynchburg • Williamsburg

Page 9: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 2

VDOT RESPONSIBILITIES

The Virginia Department of Transportation, under the leadership of the VDOT Commissioner, is

organized into several divisions within the Central Office, each serving under a designated Program

Chief. The nine VDOT Construction Districts are each managed by a District Administrator or District

Engineer who operates under the direct authority of the Deputy Commissioner/Chief Engineer. In

general, VDOT employs a decentralized implementation strategy; overall program policy and

guidance is provided by the appropriate Program Chiefs, while the day to day operation and

implementation of VDOT's road construction and maintenance programs fall under the authority of

the District Administrators/Engineers.

Division Responsibilities

General oversight of the MS4 Program is assigned to the Location & Design (L&D) Division. The

Stormwater Policy Committee Chairman and MS4 Steering Committee Chairman are represented by

L&D staff. However, individual VDOT Central Office Divisions are responsible for the continued

development and/or implementation of specific BMPs identified in this MS4 Program Plan as follows:

Lead Division Associated BMPs

Construction 4(B), 6(C)3

Environmental 2(C), 3(B)2, 3(C), 6(A)2, 6(C)1, SC1(A), SC2(A)

Land Use 2(B)

Location & Design 1(A), 1(C), 2(D), 2(E), 3(A), 3(B)3, 3(D), 4(A), 5(A), 5(C), 6(E), 7(A)

Maintenance 1(B), 2(A), 3(B)1, 5(B), 6(A)1, 6(B), 6(C)2, 6(D)

Workforce Development 6(C)4

District Responsibilities

Each District will generally be responsible for program implementation within the specific Urbanized

Areas. VDOT Central Office staff will provide ongoing support to the Districts and will also develop

the required annual reports with data provided by the Districts.

Stormwater Policy Committee Responsibilities

The Stormwater Policy Committee generally meets on an annual basis to discuss the status of Program

Implementation and address other administration concerns. The Policy Committee is largely

comprised of Division and District Administrators.

MS4 Steering Committee Responsibilities

The MS4 Steering Committee generally meets on a quarterly basis to discuss and develop program-

wide policies and procedures, including implementation, reporting, and assessment tools.

Responsibilities of Sub-Committees

The Stormwater Policy Committee and/or MS4 Steering Committee may establish other standing or

special committees, as they deem advisable, to address specific elements or components of the MS4

Program Plan.

Page 10: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 3

MS4 INDIVIDUAL PERMIT CROSS REFERENCE TABLE

Permit Reference Permit Description MS4 Program Plan BMP

Section I.B.2.c List of documents incorporated by reference Reference Document List

MCM1

Section I.C.1.a.i-iv Maintain a webpage BMP 1(A)

Section I.C.1.b.i Maintain a webpage BMP 1(A)

Section I.C.1.b.ii Program for illicit discharges, trash, debris and litter BMP 1(A,B)

Section I.C.1.b.iii Signage for pet waste, etc. BMP 1(B)

Section I.C.1.c Allowance for regional partnering N/A

Section I.C.1.d Include written procedures for Implementation BMP 1(A-C)

Section I.C.1.e Annual report requirements BMP 1 (C )

MCM2

Section I.C.2.a.i Adopt-A Highway BMP 2(A)

Section I.C.2.a.ii Stenciling Program BMP 2(B)

Section I.C.2.a.iii Development of local TMDLs BMP 2(C)

Section I.C.2.a.iv Promote four stream cleanups BMP 2(D)

Section I.C.2.b Include written procedures BMP 2(A-D)

Section I.C.2.c Annual report requirements BMP 2(E)

MCM3

Section I.C.3.a Prohibit non-stormwater discharges BMP 3(B), 6(E)

Section I.C.3.b Maintain IDDE manual BMP 3(C)

Section I.C.3.c Training program BMP 3(C)

Section I.C.3.d Spills BMP 3(B)2

Section I.C.3.e GIS System Map BMP 3(A)

Section I.C.3.f.i Program Plan requirements MCM2 (footnote)

Section I.C.3.f.ii Program Plan requirements BMP 3(C)

Section I.C.3.f.iii Program Plan requirements MCM2 (footnote), 3(B)2

Section I.C.3.f.iv Program Plan requirements BMP 3(A)

Section I.C.3.g Annual Report BMP 3(D)

MCM4

Section I.C.4.a Standards and Specs BMP 4(A)

Section I.C.4.b Procedures for Compliance Inspections BMP 4(B)

Section I.C.4.c Track compliance BMP 4(B)

Section I.C.4.d Program Plan requirements BMP 4(A), 4(B)

Section I.C.4.e Annual Report requirements BMP 4(B)

MCM5

Section I.C.5.a Standards and Specs BMP 5(A)

Section I.C.5.b Standards and Specs BMP 5(A)

Section I.C.5.c Inspection BMPs BMP 5(B)

Page 11: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 4

Permit Reference Permit Description MS4 Program Plan BMP

Section I.C.5.d Documentation of BMPs BMP 5(B)

Section I.C.5.e Definition of Maintenance N/A

Section I.C.5.f Database of BMPs BMP 5(A)

Section I.C.5.g Report installation for post construction BMP 5(A)

Section I.C.5.h Report installation not reported in 5.g BMP 5(B)

Section I.C.5.i Annual Reporting Requirements BMP 5(C )

MCM6

Section I.C.6.a.i-v Written maintenance procedures BMP 6(A)1, 6(A)2

Section I.C.6.b Dumping yard waste BMP 6(A)

Section I.C.6.c Management of leaked fluids BMP 6(B)

Section I.C.6.d Vehicle wash pad BMP 6(A)

Section I.C.6.e HPF SWPPPs BMP 6(A)

Section I.C.6.f Management of roadways and parking lots. BMP 6(A)

Section I.C.6.g Turf and Pesticide Management BMP 6(A), 6(B)

Section I.C.6.h Training BMP 6(C)

Section I.C.6.i Program Plan Requirements N/A

Section I.C.6.j Annual Report Requirements BMP 6(E)

MCM7

Section I.C.7.a Annual coordination meeting BMP 7(A)

Section I.C.6.b Mapping BMP 7(A)

Section I.C.6.c Chesapeake Bay TMDL Action Plans BMP 7(A)

Section I.C.6.d Other TMDL Action Plans BMP 7(A)

Section I.C.6.e Credit for TMDL Implementation BMP 7(A)

Section I.C.6.f IDDE BMP 7(A)

Section I.C.6.g Small MS4 Coordination BMP 7(A)

Section I.C.6.h Annual Report BMP 7(A)

TMDL SC Requirements Affecting other MCMs Section I.E.3b Septic Requirements BMP 6(A)2

Section I.E.4.b Excessive sediment loading Annual S&S

Section I.E.4.c Excessive sediment loading BMP 3(C)

Section I.E.5.b PCB reporting BMP 3(C)

Page 12: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 5

MCM#1:

PUBLIC EDUCATION AND OUTREACH ON

STORMWATER IMPACTS1

1 VDOT’s Permit does not define the term “public”. However, VDOT is required to provide outreach to the public

including its employees and contractors regarding proper disposal of pet waste and trash and identification and

reporting of illicit discharges. VDOT is also required to implement the use of signage at its safety/rest areas to promote

proper trash disposal. Therefore, the public, for the purposes of this permit condition, is considered to be VDOT’s

employees, hired contractors, and travelers using VDOT’s fixed facilities such as rest areas. VDOT does not consider

travelers along the roadway system as part of the “public” for the purpose of developing targeted public outreach

strategies. However, VDOT has developed education material that may incidentally reach these travelers, which will

have a positive benefit outside of VDOT’s right-of-way.

Page 13: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 6

BMP 1(A) – Maintain and Update Stormwater Webpage

Description and

Measurable Goal:

Maintain and update a webpage dedicated to MS4 and stormwater, as it

pertains to roads, highways, and permittee owned or operated facilities on the

VDOT website (referred to herein as the “VDOT Stormwater Webpage”).

Lead Division: Location & Design

Reference Materials: VDOT Stormwater Webpage

Efforts and Expected

Results in Meeting

Measurable Goal

Implementation

Schedule Annual Report Documentation

Maintain and update

VDOT Stormwater

Webpage to communicate

MS4 program elements.

Webpage was

previously developed.

VDOT will update

webpage with necessary

information as discussed

in other parts of this

Program Plan.

Link to dedicated VDOT stormwater webpage.

Ensure that current MS4 permit is provided on

webpage.

Ensure that links are provided to the MS4 Program

Plan and Annual Reports.

Provide instructions for

the public on how to

report illicit discharges,

improper disposal, or spills

to the MS4 or other

potential stormwater

pollution concerns

Webpage was

previously developed.

VDOT will update

webpage with necessary

information as discussed

in other parts of this

Program Plan.

Verify that links and contact information for

reporting are valid and updated.

Page 14: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 7

BMP 1(B) – Signage at Rest Areas and Welcome Centers

Description and

Measurable Goal:

Provide informational signage at rest areas identified in permit.

Lead Division: Maintenance

Reference Materials: Templates for Pet Waste and Litter Signage

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule Annual Report Documentation

Continue to install and

maintain informational

signage for disposal of pet

waste, litter, debris and

trash at rest areas and

welcome centers within

urbanized areas*.

Message signs were

previously developed

and reported to DEQ.

Facility signage was

installed during first six

months of permit term.

VDOT will continue to

maintain signage.

The number, type and location of informational

signs posted.

Verification that signage is in place and functional

will be conducted during year 5 of the permit and

reported in the last annual report.

Note: * Informational signage is required at 1) Dale City; 2) Fredericksburg; 3) New Kent*; 4) Manassas;

5) Bristol; 6) Abingdon; 7) Troutville*; and 8) Winchester. Those rest areas above denoted with an

“*” are not physically located within a CUA; therefore, the municipal stormwater discharges from

these rest areas are not regulated by this permit.

Page 15: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 8

BMP 1(C) – Annual Reporting and Effectiveness Review

Description and

Measurable Goal:

Provide annual reports and assess effectiveness of outreach efforts.

Lead Division: Location & Design

Reference Materials: VDOT Stormwater Webpage*

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Continue to post Program

Plans and Annual

Reports.

The Program Plan will be

posted on the VDOT

webpage within 30 days

after submittal to DEQ.

Within 30 days of any

modification to the

Program Plan, the latest

version will be posted.

Annual reports will be

posted on the web page

within 30 days of

submittal to DEQ, or by

November 1st of each

year.

Confirm that Program Plan updates and annual

reports have been posted. Also, provide a weblink

to the VDOT stormwater webpage where the MS4

Program Plan and annual reports are posted.

Assessment of the

effectiveness of the

outreach program

Annually Estimated number of individuals reached through

outreach including 1) illicit discharge program, 2)

disposal of trash, debris, and litter program; and 3)

informational signage at rest areas.

Identify any entities with which VDOT partnered

with to achieve this MCM.

Provide list of education and outreach programs

other than those listed and discuss whether these

additional activities are anticipated to continue in

subsequent permit years.

Summary assessment of the effectiveness based

on measurable goals above.

Page 16: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 9

MCM#2:

PUBLIC INVOLVEMENT/PARTICIPATION

Page 17: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 10

BMP 2(A) – BMPs for Public Involvement Activities: Adopt a Highway

Description and

Measurable Goal:

Promote, support, and maintain public involvement activities that encourage

public awareness of stormwater pollution

Lead Division: Maintenance

Reference materials: Adopt-A-Highway Documentation

VDOT’s Stormwater Webpage

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Continue to promote the

Adopt-A-Highway

program.

Annually promote

Adopt-A-Highway

through use of VDOT’s

stormwater webpage*.

The number of miles adopted statewide in the

Adopt-A-Highway program for the reporting

period, including a description of where, and an

analysis of whether public participation has

increased or decreased in the previous 5 years.

Page 18: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 11

BMP 2(B) – BMPs for Public Involvement Activities: Storm Drain Stenciling

Description and

Measurable Goal:

Promote, support, and maintain public involvement activities that encourage

public awareness of stormwater pollution

Lead Division: Office of Land Use

Reference materials: VDOT’s Stormwater Webpage

LUP-SDS

The number and location of LUPs that were issued for stenciling activities.

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Promote and support a

public storm drain

stenciling program

through the Land Use

Permit Program

to promote public

awareness of stormwater

pollution

Annually promote storm

sewer stenciling through

use of VDOT’s

stormwater webpage.

The number and location of Land Use Permits that

were issued for stenciling activities.

Page 19: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 12

BMP 2(C) – Participation in Development of Local TMDLs

Description and

Measurable Goal:

Track activities in which VDOT participated related to development of Local

TMDLs.

Lead Division: Environmental

Reference Materials:

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Continue to participate in

the development of local

TMDLs in watersheds

located within the CUA

and in which the VDOT

MS4 discharges.

Annually participate in

TMDL and IP

development meetings,

when applicable.

Identify the name of TMDL and IP meetings that

were attended.

Page 20: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 13

BMP 2(D) – BMPs for Public Involvement Activities: Stream Cleanups

Description and

Measurable Goal:

Promote, support, and maintain public involvement activities that encourage

public awareness of stormwater pollution

Lead Division: Location & Design

Reference materials:

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Promote four local area

stream clean-ups

sponsored by VDOT or

other organizations.

Annually promote Local

Stream Clean-Ups

through use of VDOT’s

stormwater webpage.

The local area stream cleanups promoted,

including date of the event, and how they were

promoted.

Page 21: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 14

BMP 2(E) – Annual Reporting and Effectiveness Review

Description and

Measurable Goal:

Report efforts and results of Public Involvement/Participation BMPs in the

Annual Report and Monitor Effectiveness

Lead Division: Location & Design

Reference Materials:

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Summarize Activities in

BMP 2A-2D as required

by permit.

Annually. Specific reporting items listed under BMP 2A-2D.

Summarize other public

involvement activities.

Annually. A summary of any other activities (other than

those listed in BMP 2A-2D) in which VDOT

participated (e.g. workshops, meetings) or which

the permittee sponsored with the goal of reducing

stormwater pollutant loads; improving water

quality; and supporting local water quality

restoration. The summary should include a

discussion if these additional activities are

anticipated to continue in subsequent permit

years.

Identify Partners Annually. Identify entities with which VDOT partnered to

fulfill the requirements.

Evaluate and describe

effectiveness of each

strategy and practice.

Annually. Summary of effectiveness based on measurable

goals.

Page 22: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 15

MCM#3:

ILLICIT DISCHARGE DETECTION AND

ELIMINATION2

2 BMP 3(C) – Illicit Discharge Detection and Elimination Program Note: VDOT has developed an Illicit Discharge Detection

and Elimination (IDDE) Program to address illicit discharges that originate within VDOT’s property and right-of-way as well

those that originate outside of VDOT’s right-of-way, but enter VDOT’s MS4. VDOT actively screens, investigates, and

eliminates illicit discharges that originate within its right-of-way to the MEP. VDOT actively screens and investigates illicit

discharges that enter its MS4 from an external source. However, VDOT does not have direct legal authority to prohibit or

eliminate these sources, as VDOT has limited enforcement authority outside its right of way or property boundaries. As

such, VDOT refers discovered illicit dischargers to the regulatory agencies and other MS4s as described in VDOT’s IDDE

manual.

In addition to any regulatory requirements, VDOT, DEQ, and VDEM have established guidelines regarding coordination of

transportation-related pollution incidents. The guidelines were outlined in the April 5, 2005 version of the DEQ Pollution

Response Manual and provide a framework whereby DEQ, VDEM, and VDOT work with first responders (e.g. local fire

departments, state and local police) to ensure these incidents are handled appropriately and in an efficient manner. The

spill response program may include a combination of response actions by the permittee, and/or another public or private

entity. For purposes of this permit:

• Fluids from vehicular accidents are not handled through the IDDE program;

• For Section I.C.3.g.ii-“Significant spills” is defined as those that require formal regulatory reporting or pose an

imminent threat to human health or the environment.

Page 23: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 16

BMP 3(A) – Storm Sewer Map

Description and

Measurable Goal:

Develop and maintain a storm sewer map that supports a successful Illicit

Discharge Detection and Elimination (IDDE) Program. The map, at a minimum,

will include:

• The permittee’s MS4 service area based on the CUA as determined by

the U.S. Census Bureau’s 2010 census;

• Location of all outfalls owned or operated by the permittee

discharging to state waters;

• Known points of discharge to downstream, directly adjacent MS4s;

• A unique identifier for each outfall and point of discharge;

• Names of receiving waters to which the outfalls discharge; and

• Stormwater management facilities owned or operated by the

permittee.

Lead Division: Location & Design

Reference materials: Storm Sewer Map

VDOT Right of Way Determination and Mapping Protocols

VDOT Outfall Inventory Manual

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Complete storm sewer

system map.

Storm sewer map was

previously developed.

VDOT will update with

necessary information

as needed.

A statement that the GIS map of the storm sewer

system is being updated in accordance with the

written procedures.

Page 24: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 17

BMP 3(B)1 - Prohibition of Non-Stormwater Discharge

Description and

Measurable Goal:

Prohibit non-stormwater discharges into the storm sewer system through

updated manuals of practice.

Lead Division: Maintenance

Reference materials: Maintenance Best Practices Manual*

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Continue to develop and

refine appropriate

practices in the

Maintenance Best

Practices Manuals to

prohibit non-stormwater

discharges from VDOT

operations.

This BMP is currently

implemented and is

continuously updated.

Revisions will be made

as appropriate to

update this Manual.

Summarize changes to guides as they apply to

prohibition of non-stormwater discharges

Page 25: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 18

BMP 3(B)2 - Prohibition of Non-Stormwater Discharge

Description and

Measurable Goal:

Prohibit non-stormwater discharges into the storm sewer system

Lead Division: Environmental

Reference Materials: Waste Management and Pollution Prevention Guides

Transportation-related Incident Procedures

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Continue to develop and

refine appropriate

practices in the Waste

Management & Pollution

Prevention Guides to

prohibit non-stormwater

discharges from VDOT

operations.

This aspect of the BMP

is currently

implemented and is an

ongoing effort. The

WM/PP Guide will be

reviewed each year.

Summarize changes to guides as they apply to

prohibition of non-stormwater discharges.

Continue to support

VDOT’s role consistent

with the guidelines

detailed in the DEQ,

VDOT, and VDEM

Coordination of

Transportation-Related

Incidents, or subsequent

agreement, in response

to spills that may

discharge into the MS4

via roadside ditches.

This aspect of the BMP

is currently

implemented and is an

ongoing effort.

Summarize any changes to the multi-agency

guidelines/agreement.

Page 26: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 19

BMP 3(B)3 – Prohibition of Non-Stormwater Discharge

Description and

Measurable Goal:

Review of legal authorities to continue providing adequate legal authority.

Lead Division: Location & Design

Reference Materials: Law, Regulations, permit(s), Program Plan and related VDOT Governance

Documents.

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Review and update legal

authorities, if necessary,

such as permits, orders,

contracts, and inter-

jurisdictional

agreements.

24 months from permit

effective date

(6/30/2019).

VDOT has conducted a review of legal authorities

and did not note any necessary changes in the

annual report due October 2019. Any associated

change(s) that may be identified as necessary in

the future will be documented in subsequent

Annual Report(s).

Page 27: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 20

BMP 3(C) – Illicit Discharge Detection and Elimination Program

Description and

Measurable Goal:

Utilize written procedures to detect, identify, and address unauthorized non-

stormwater discharges, including illegal dumping, to VDOT’s MS4.

Lead Division: Environmental

Reference Materials: VDOT IDDE Program Manual

VDOT IDDE Field Guide

IDDE Geodatabase

Storm Sewer Map

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Ensure that proper

notifications are made if

certain pollutants are

identified as entering

VDOT’s system from

non-VDOT sources.

Incorporate notification

provisions into VDOT

IDDE Field Guide during

PY19. Update IDDE

Program Manual as

appropriate.

Document that proper notification (for excessive

sediment or PCB sources in Local TMDL

watersheds) requirements have been

incorporated into the IDDE Field Guide and/or

Program Manual, as appropriate. Document

updates to the IDDE Manual and reporting

procedures and date of published revision.

Maintain, modify and

update the IDDE

Program Manual and

Field Guide, as

warranted.

This aspect of the BMP is

currently implemented

and is an ongoing effort.

Summarize any modifications or updates to the

IDDE Program Manual and Field Guide.

Develop, update, offer

and deliver IDDE Training

Materials for appropriate

VDOT staff, maintenance

operators, and

contractors in how to

identify and report illicit

discharges.

This aspect of the BMP is

currently implemented

and is an ongoing effort.

Appropriate VDOT

maintenance operators

and contractors will be

offered IDDE training

once every five years.

Summarize any updates to the IDDE Training

Materials and Program delivery.

Document the number of staff and contractors

trained in IDDE during the reporting year.

Continue to perform

investigations associated

with potential illicit

discharges as appropriate

using VDOT’s IDDE

Program Manual

procedures. Effort is to

be coordinated with

Maintenance Division

and other VDOT

Divisions, as appropriate.

This aspect of the BMP is

currently implemented

and is an ongoing effort –

follow-up investigations

will be performed in

accordance with the

VDOT IDDE Program

Manual.

Document a summary of IDDE investigations

conducted for potential illicit discharges

consistent with Section I.C.3.g. of the Permit.

Summarize significant spills to the MS4s where

VDOT was the responsible party, including the

sources of the spill, description of follow-up

activities, and the resolution of the incident.

Page 28: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 21

BMP 3(D) – Annual Reporting and Effectiveness Review

Description and

Measurable Goal:

Report efforts and results of IDDE Efforts in the Annual Report and Monitor

Effectiveness

Lead Division: Location & Design

Reference Materials:

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Annual Report

containing permit

required elements.

Annually. Itemized in BMP 3A-3C above.

Evaluate and describe

effectiveness of each

strategy and practice.

Annually. Summarize BMP effectiveness based on

measurable goals.

Page 29: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 22

MCM#4:

CONSTRUCTION SITE STORMWATER RUNOFF

CONTROL

Page 30: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 23

BMP 4(A) – Annual Standards and Specifications

Description and

Measurable Goal:

VDOT will utilize its annual ESC and SWM Standards & Specifications to

address discharges entering the MS4 from VDOT land-disturbing activities

regulated by the VPDES and VSMP.

Lead Division: Location & Design

Reference Materials: VDOT’s Annual ESC and SWM Standards & Specifications

Database to track land-disturbing activities regulated under CGP

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Continue to obtain

annual approval of

VDOT’s ESC and SWM

Standards &

Specifications from DEQ.

Update components of

the Standards &

Specifications as

regulations and

operations warrant.

Statement that ESC and SWM Standards &

Specifications were updated and the annual

approval was received.

Update DEQ approval date of Annual Standards

and Specifications within 30 days of approval.

Continue to require the

ESC plan to be developed

in accordance with

VDOT’s annual ESC

Standards &

Specifications prior to

commencing land

disturbing activities.

This aspect of the BMP

is currently

implemented and is an

ongoing annual effort.

Statement that required ESC Plans were developed

in accordance with VDOT’s annual ESC Standards &

Specifications.

Continue to require

applicable RLDA to

secure the necessary

state permit

authorizations from DEQ

to discharge stormwater

from construction sites.

This aspect of the BMP

is currently

implemented and is an

ongoing annual effort.

Document the required info from the MS4 Permit,

including:

(1) Total number of regulated land-disturbing

activities**; and

(2) Total number of acres disturbed**.

Page 31: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 24

BMP 4(B) – Annual Reporting and Effectiveness Review

Description and

Measurable Goal:

Inspect and enforce compliance with the VPDES

Construction General Permit and attending regulations on applicable projects.

Lead Division: Construction

Reference Materials: VDOT’s Annual ESC and SWM Standards & Specifications

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Perform construction

inspections for compliance

with VESCLR, CGP and

Annual ESC and SWM

Standards & Specifications.

This aspect of the BMP is

currently implemented

and is an ongoing effort –

VDOT will inspect

regulated land-disturbing

activities in accordance

with the Annual ESC and

SWM Standards &

Specifications.

Until VDOT can develop and implement its

central electronic database (see below), VDOT

will estimate the number of inspections

performed based on the number of existing

construction projects, the duration of each

project for the permit year, and the prescribed

inspection schedule. The enhanced inspection

schedule required by the CGP is applied

statewide of whether or not an Impaired, TMDL,

or Exceptional water is present.

Provide a statement that land disturbing

projects that occurred during the reporting

period have been conducted in accordance with

the current DEQ approved Standards and

Specifications for Erosion and Sedimentation

Control.

Require compliance with

SWPPP plans including the

ESC Plan, and require

changes/ modifications to

SWPPPs, as necessary, to

maintain compliance with

applicable regulations.

Also, utilize enforcement

authority if necessary.

This aspect of the BMP is

currently implemented

and is an ongoing effort.

VDOT will report a summary of the enforcement

actions carried out, including the total number

and type of enforcement actions taken during

the reporting period. [After tracking mechanism

below is completed and implemented, VDOT

will report number of inspections, number of

inspections with deficiencies noted, number of

corrective actions performed, and a summary of

the type of corrective actions.]

Develop procedures to

perform periodic

compliance inspections.

This aspect of the BMP is

currently implemented

and is an ongoing effort.

Periodic compliance

inspections are

conducted quarterly.

Document periodic BMP Inspections.

Document the total number of third-party QA

inspections conducted.

Page 32: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 25

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Develop a mechanism to

track compliance

inspections and associated

deficiencies.

No later than June 30,

2019, VDOT must

develop a mechanism for

tracking of compliance

inspections, deficiencies

noted, corrective actions

and nature of corrective

actions.

Report on progress of development of

compliance inspection tracking mechanism.

Upon completion and implementation of

tracking mechanism, report annually on number

of compliance inspections where deficiencies

were discovered, the number of corrective

actions completed and a summary of the type of

corrective actions.

Evaluate and describe

effectiveness of each

strategy and practice.

Annually. Summarize BMP effectiveness based on

measurable goals.

Page 33: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 26

MCM#5:

POST-CONSTRUCTION STORMWATER

MANAGEMENT

Page 34: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 27

BMP 5(A) – Standards and Specifications

Description and

Measurable Goal:

VDOT will utilize its annual ESC and SWM Standards & Specifications to

address post-construction stormwater runoff that enters the MS4 from

regulated land-disturbing activities.

Lead Division: Location & Design

Reference Materials: VDOT’s Annual ESC and SWM Standards & Specifications

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Continue to obtain

annual approval of

VDOT’s ESC and SWM

Standards &

Specifications.

Update components of

the Standards &

Specifications as

regulations and

operations warrant.

Incorporate most

current DEQ approved

standards and

specifications for post-

construction SWM.

Update the approval

dates for standards and

specifications within the

program plan within 30

days of DEQ approval

for any changes.

Confirmation that the annual approval has been

secured from DEQ.

Listing of changes to annual standards and

specifications.

Verification that program plan has been updated

with new approval dates within 30 days of DEQ

approval of any changes.

Continue to specify

design criteria for post-

construction stormwater

runoff controls.

This aspect of the BMP

is currently

implemented and is an

ongoing annual effort.

Statement that VDOT’s annual ESC and SWM

Standards & Specifications include current design

criteria for post-construction stormwater runoff

controls

Continue to develop

stormwater management

plans that are in

accordance with VDOT’s

annual ESC and SWM

Standards &

Specifications

This aspect of the BMP

is currently

implemented and is an

ongoing annual effort.

Statement that post-construction stormwater

management plans were developed in accordance

with VDOT’s annual ESC and SWM Standards &

Specifications.

Page 35: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 28

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Continue to inventory

post-construction SWM

facilities and related

hydraulic and design

information.

VDOT has previously

implemented this

requirement and will

continue to inventory

new BMPs as they are

brought online.

For new SWM facilities brought online during the

reporting year, the following information will be

included*:

i. The SWM facility type;

ii. Location including latitude, and

longitude (in decimal degrees);

iii. The total pervious and impervious acres

treated by the SWM (to the nearest one-

tenth of an acre); iv. The date brought

online (MMYYYY). If the date is unknown,

the permittee shall use June 1, 2005 as the

date brought online for all previously

existing SWM facilities;

v. The hydrologic unit code (HUC 6) in

which the SWM facility is located; and

vi. The date of last inspection of the SWM

facility by the permittee.

Land Disturbing Projects

and SWM facilities follow

appropriate

requirements and are

reported properly to

DEQ.

VDOT will adjust queries

and reports from

current databases to

develop such that BMPs

can be reported in the

next reporting period in

a format compatible

with the Virginia

Construction

Stormwater Database.

A statement that the permittee submitted

information for SWM facilities implemented in

accordance with the Standards and Specifications

for the control of post construction stormwater

runoff from areas of new development and

development on prior developed lands through the

Virginia Construction Stormwater General Permit

database in accordance with Part I.C.5.g.

Track and report total number of LD-445D forms

completed and submitted for permit termination.

Note: * Permit requires reporting of this information using the DEQ Construction Stormwater Database or other

application as specified by DEQ. For any post-construction stormwater BMPs that are brought online

but not reported through the Construction Stormwater Database (i.e. CBPA Land Disturbing Activities

with less than 1 ac of disturbance), they must be reported using the DEQ BMP Warehouse. VDOT

submits this information in a specific tabular format that is acceptable to DEQ.

Page 36: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 29

BMP 5(B) – Long-Term Care and Maintenance of SWM Facilities

Description and

Measurable Goal:

Provide adequate long-term operation and maintenance of its SWM facilities

in accordance with the VDOT BMP Inspection and Maintenance Manuals.

Lead Division: Maintenance

Reference Materials: VDOT’s Annual ESC and SWM Standards and Specifications, including:

VDOT BMP Inspection Manual

VDOT BMP Maintenance Manual

DEQ Construction Stormwater Database

DEQ BMP Database

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Continue to annually

inspect VDOT post-

construction SWM

facilities in accordance

with VDOT BMP

Inspection Manual, and

record inspections in

SWM facility database.

This aspect of the BMP

is currently

implemented and is an

ongoing effort.

Track and report the total number of inspections

completed. In addition, VDOT will report the date

of the most recent inspection for each SWM

facility.

Continue maintenance

on its post-construction

SWM facilities in

accordance with the

VDOT BMP Maintenance

Manual

This aspect of the BMP

is currently

implemented and is an

ongoing effort.

Confirmation that SWM facilities are being

maintained in accordance with the VDOT BMP

Maintenance Manual.

Provide a summary of SWM facility maintenance

activities performed when necessary to address

structural deficiencies or other significant

maintenance activities.

Report BMP Data in a

format acceptable to

DEQ

VDOT will modify

database reports and

queries as needed to

adapt to reporting

format required by DEQ

for the next reporting

period.

For BMPs not reported through the Virginia DEQ

Construction Stormwater Database, provide a

confirmation statement that the permittee

electronically reported BMPs using the DEQ BMP

Warehouse in accordance with the permit, and the

date on which the information was submitted.

Page 37: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 30

BMP 5(C) – Annual Reporting and Effectiveness Review

Description and

Measurable Goal:

Report efforts and results of Post-Construction Stormwater BMPs in the

Annual Report and Monitor Effectiveness

Lead Division: Location & Design

Reference Materials:

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Summarize Activities in

BMP 5A-5B as required

by permit.

Annually. Specific reporting items listed under BMP 5A-5B.

Evaluate and describe

effectiveness of each

strategy and practice.

Annually. Summary of effectiveness based on measurable

goals.

Page 38: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 31

MCM#6:

POLLUTION PREVENTION/GOOD HOUSEKEEPING

FOR VDOT OPERATIONS

Page 39: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 32

BMP 6(A)1 – Procedures for Operation and Maintenance Activities

Description and

Measurable Goal:

Develop and refine written procedures designed to minimize or prevent

pollutant discharge from support facilities, daily operations, equipment

maintenance, and the application, storage, transport, and disposal of

pesticides, herbicides, and fertilizers.

Lead Division: Maintenance

Reference Materials: Maintenance Best Practices Manual

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Continue to develop

and refine applicable

sections of the

Maintenance Best

Practices Manual for

MS4 regulated

activities

This BMP is currently

implemented and is

continuously updated.

Revisions will be made

as appropriate to

update this Manual.

A confirmation statement that the

Maintenance Best Practices Manual continues

to be implemented and a list of any new

protocols that were developed to reduce

pollutants including those to reduce the

discharge of pollutants associated with roads,

streets and parking lot maintenance; as well as

those associated with pesticide, herbicide, and

fertilizer application.

Prohibit the dumping

of yard waste and grass

clippings into the MS4.

This aspect of the

BMP is currently

implemented through

Chapter 7 of the

Maintenance Best

Practices Manual.

Provide a statement that the guidance related

to mowing, tree removal, pruning and

trimming are followed.

Page 40: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 33

BMP 6(A)2 – Procedures for Operation and Maintenance Activities

Description and

Measurable Goal:

Develop and refine, as appropriate, written procedures designed to

minimize or prevent pollutant discharge from high-priority support

facilities, daily operations, equipment maintenance, and the

application, storage, and disposal of pesticides, herbicides, and

fertilizers.

Lead Division: Environmental

Reference Materials: Waste Management and Pollution Prevention Guide

List of High Priority Facilities

Applicable Stormwater Pollution Prevention Plans

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Continue to develop and

refine applicable sections

of Waste Management

and Pollution Prevention

Guide that apply to MS4

regulated activities

This aspect of the BMP

is currently

implemented and is an

ongoing effort. The

WM/PP Guide will be

reviewed each year.

A summary of modifications/refinements to the

Waste Management and Pollution Prevention

Guide, as appropriate and a list of any new

protocols that were developed to reduce

pollutants.

Prohibit vehicle washing

except on approved wash

pads.

This aspect of the BMP

is currently

implemented and is an

ongoing effort.

Identify High Priority

Facilities as defined by

the Individual Permit

The effort has been

completed. The list will

be annually evaluated to

determine if additional

facilities are determined

to be high priority.

List any additions and deletions to the High Priority

Facilities list, including the Facility name, location,

date the SWPPP was or will be developed, and

whether it is unmanned. An update was made to

the High Priority Facility list in PY20 which is

included in an attachment of this Program Plan.

Continue to develop and

refine SWPPPs for High

Priority Facilities

This aspect of the BMP

is currently

implemented and is an

ongoing effort. Each

SWPPP is reviewed

annually.

Provide a summary report confirming the

implementation of the required SWPPPs for the

reporting year.

Continue to perform

annual MS4 compliance

assessments at VDOT

High Priority Facilities

within the MS4 Areas

This aspect of the BMP

is currently

implemented and is an

ongoing effort.

Provide a confirmation statement that assessments

were performed at all High Priority Facilities, that

SWPPPs have been developed and are up to date.

Page 41: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 34

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Develop a list of facilities

with onsite septic in local

watersheds with a

bacteria TMDL that

allocates a WLA to

VDOT’s MS4.

Maintain list and

guidance and

communicate

requirements to District

Maintenance and/or

Facilities to inspect

and/or pump out septic

tanks once every 5

years.

Summary report of facility list and date of

inspections and pump-outs conducted during the

reporting year.

Page 42: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 35

BMP 6(B) – Turf and Landscape Management

Description and

Measurable Goal:

Develop and refine turf and landscape nutrient management plans (NMPs)

that have been developed by a certified turf and landscape nutrient

management planner to minimize or prevent pollutant discharge from turf

and landscape management

Lead Division: Maintenance

Reference Materials: List of Applicable Lands that Require NMPs

Applicable Nutrient Management Plans (once developed)

Roadside Development Standards and Specifications

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Identify all applicable

lands where nutrients are

applied to a contiguous

area of more than one

acre.

This effort has been

completed. The list will

be evaluated annually to

determine if updates are

required.

List any additions and deletions to the list of

applicable lands, including location and total

acreages.

Continue to develop and

refine NMPs on all lands

where nutrients are

applied to a contiguous

area of more than one

acre.

This aspect of the BMP

is currently

implemented and is an

ongoing effort.

The acreage of lands upon which turf and

landscape nutrient management plans have been

developed. Document updates as applicable to

VDOT’s two current DCR-approved Nutrient

Managements (1) one plan applicable to all new

construction; (2) one plan applicable to all roadside

management activities.

Continue to develop and

refine Nutrient

Management Standards

& Specifications as

approved by DCR for

roadside development

during construction and

maintenance activities.

This aspect of the BMP

is currently

implemented with

approved district

specific NMPs and is an

ongoing effort.

A confirmation statement that the approved

Nutrient Management Standards & Specifications

continue to be implemented.

Continue to specify

criteria for managing

yard waste and grass

clippings in VDOT’s

Roadside Development

Standards and

Specifications.

This aspect of the BMP

is currently

implemented and is an

ongoing annual effort.

Confirmation that VDOT’s Roadside Development

Standards and Specifications include management

specifications for handling of yard waste and grass

clippings.

Page 43: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 36

BMP 6(C)1 – Training of VDOT Forces

Description and

Measurable Goal:

Continue to implement VDOT’s efforts to prevent and reduce stormwater

pollution from VDOT-related activities through development, deployment, and

delivery of training courses and events.

Lead Division: Environmental

(for division specific elements of VDOT’s Employee Training Program for MS4

and Stormwater)

Reference Materials: VDOT Employee Training Program for MS4 and Stormwater

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Deliver a training plan to

include, but not limited

to, training on the IDDE

program, Good

Housekeeping/Pollution

Prevention, SWPPP and

appropriate spill

prevention and

responses.

This aspect of the BMP

is currently

implemented and is an

ongoing effort.

A summary report on the training obtained,

including a list of training events, the training date,

the objective of the training, and the number of

employees attending the training events.

Page 44: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 37

BMP 6(C)2 – Training of VDOT Forces

Description and

Measurable Goal:

Continue to develop and refine VDOT’s efforts to prevent and reduce

stormwater pollution from VDOT-related activities.

Lead Division: Maintenance

(for division specific elements of VDOT’s Employee Training Program for MS4

and Stormwater)

Reference materials: VDOT Employee Training Program for MS4 and Stormwater

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Ensure that VDOT

employees and

contractors who apply

pesticides and herbicides

are properly trained or

certified in accordance

with the Virginia

Pesticide Control Act.

This aspect of the BMP

is currently

implemented and is an

ongoing effort.

A summary report on the training obtained,

including a list of training events, the training date,

the objective of the training, and the number of

employees attending the training events.

Ensure that VDOT

employees and

contractors are trained in

good housekeeping and

pollution prevention

practices and the IDDE

Program.

This aspect of the BMP

is currently

implemented and is an

ongoing effort

A summary report on the training obtained,

including a list of training events, the training date,

the objective of the training, and the number of

employees attending the training events.

Page 45: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 38

BMP 6(C)3 – Training of VDOT Forces

Description and

Measurable Goal:

Continue to train VDOT forces to prevent and reduce stormwater pollution

from VDOT-related activities.

Lead Division: Construction

(for division specific elements of VDOT’s Employee Training Program for MS4

and Stormwater)

Reference Documents: VDOT Employee Training Program for MS4 and Stormwater

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Ensure applicable

construction personnel

receive training on the

IDDE program and

appropriate spill

responses.

Starting in the second

year of permit coverage,

provide training to

applicable field

personnel.

A summary report on the required training,

including a list of training events, the training date,

the objective of the training and the number of

employees attending training.

Page 46: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 39

BMP 6(C)4 – Training of VDOT Forces

Description and

Measurable Goal:

Continue to implement VDOT’s efforts to prevent and reduce stormwater

pollution from VDOT-related activities.

Lead Division: Workforce Development

(for division specific elements of VDOT’s Employee Training Program for MS4

and Stormwater)

Reference materials: VDOT Employee Training Program for MS4 and Stormwater*

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Ensure that VDOT

employees and

consultants serving as

plan reviewers and

inspectors obtain the

appropriate certifications

as specified in VDOT’s

annual ESC and SWM

standards and

specifications.

This aspect of the BMP

is currently

implemented and is an

ongoing effort.

A summary report on the total number of

personnel that are certified, including those newly

certified and re-certified during the reporting year.

Provide training

opportunities through

the Erosion and Sediment

Control Contractor

Certification (ESCCC)

Program.

This aspect of the BMP

is currently

implemented and is an

ongoing effort.

A summary of the number of personnel trained

through each training program and date of

training.

Page 47: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 40

BMP 6(D) – Oversight of VDOT Maintenance Contractors

Description and

Measurable Goal:

Contractual oversight procedures for VDOT contractors for maintenance of

roadway or operation and use of VDOT facilities.

Lead Division: Maintenance

Reference materials: Maintenance contracts

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Continue to require that

contractors use

appropriate control

measures and procedures

for stormwater

discharges to the VDOT’s

MS4 System.

This aspect of the BMP

is currently

implemented and is an

ongoing effort

A confirmation statement that contractors are

complying with the contract language.

BMP 6(E) – Annual Reporting and Effectiveness Review

Description and

Measurable Goal:

Report efforts and results of Pollution Prevention/Good Housekeeping BMPs

in the Annual Report and Monitor Effectiveness

Lead Division: Location & Design

Reference Materials:

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Summarize Activities in

BMP 6A-6D as required

by permit.

Annually. Specific reporting items listed under BMP 6A-6D.

Assure that protocols are

followed

Annually. Provide a statement that the written protocols

developed above were followed to reduce the

discharge of pollutants associated with VDOT

owned or operated facilities and road, street and

parking lot maintenance.

Provide a statement that turf and landscape

management BMPs were followed.

Evaluate and describe

effectiveness of each

strategy and practice.

Annually. Summary of effectiveness based on measurable

goals.

Page 48: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 41

MCM#7:

INFRASTRUCTURE COORDINATION

Page 49: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 42

BMP 7(A) – Infrastructure Coordination

Description and

Measurable Goal:

Coordinate with other large MS4s regarding physical interconnection of

systems.

Lead Division: Location & Design

Reference materials:

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Meet* annually with

each Phase 1 MS4

permittee for the

purpose of coordination

on priority issues for the

Program Plan and TMDL

Action Planning relevant

to interconnectivity.

This aspect of the BMP

is currently being

implemented and is an

ongoing effort.

A summary report on the meeting dates and

primary issues discussed during meetings with

each Phase 1 permittee.

Document coordination with physically-

interconnected MS4s related to high-risk facilities.

Participate in

coordination efforts

initiated by Phase 1 MS4

and Small MS4 operators

when the VDOT MS4 is

physically-

interconnected.

Engage and participate

with Phase 1 and Small

MS4s as requested.

Annually document meetings* with Phase 1 and

Small MS4s related to physical interconnection

issues addressed in the permit.

Note: * Meetings may be conducted individually with permittees or in a group meeting and face to face

meetings, conference calls, or using electronic meeting technology may constitute a meeting.

Page 50: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 43

SC#1:

SPECIAL CONDITIONS FOR CHESAPEAKE BAY

TMDL3

3 Special condition for the Chesapeake Bay TMDL. The Commonwealth in its Phase I and Phase II Chesapeake Bay TMDL

Watershed Implementation Plans (WIP) committed to a phased approach for MS4s, affording MS4 operators up to three

full five-year permit cycles to implement necessary reductions. This permit is consistent with the Chesapeake Bay TMDL

and the Virginia Phase I and II WIPs to meet the Level 2 (L2) scoping run for existing developed lands as it represents an

implementation of a cumulative 36.0% of L2 as specified in the 2010 Phase I WIP. Conditions of future permits will be

consistent with the TMDL or WIP conditions in place at the time of permit issuance.

(1) In accordance with Part I, Section D.3 of the permit, the operator has developed and submitted to the DEQ for its

review an amended Chesapeake Bay TMDL Action Plan that addresses a cumulative reduction of at least 36% of

the total Level 2 Scoping Run reductions.

Page 51: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 44

BMP SC1(A) – Action Plan for Chesapeake Bay Watershed TMDL

Description and

Measurable Goal:

Develop and implement 2nd Phase TMDL Action Plan for the Chesapeake Bay

Watershed TMDL

Lead Division: Environmental

Reference materials: Chesapeake Bay 2nd Phase TMDL Action Plan

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Develop 2nd Phase

Chesapeake Bay TMDL

Action Plan for the four

river basins.

Develop 2nd Phase

Action Plan within 12

months of receiving

permit coverage

6/30/18.

The 2nd Phase Chesapeake Bay TMDL Action Plan

has been developed and submitted to DEQ. Any

future updates made during the reporting year if

any, will be submitted and documented.

Implementation of 2nd

Phase Chesapeake Bay

Watershed TMDL Action

Plan.

No later than the

expiration date of this

permit.

Submit report on progress in implementing the

Action Plan including BMPs and/or strategies

implemented, the estimated reduction of

Pollutants, progress toward meeting the required

cumulative reductions, and control measures that

are planned to be implemented during the next

reporting period.

Page 52: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 45

SC#2:

SPECIAL CONDITIONS FOR APPROVED LOCAL

TMDLS4

4 Special conditions for approved total maximum daily loads (TMDL) other than the Chesapeake Bay TMDL. An approved

TMDL may allocate an applicable wasteload to a small MS4 that identifies a pollutant or pollutants for which additional

stormwater controls are necessary for the surface waters to meet water quality standards. The permittee shall develop

and implement a local TMDL action plan for each pollutant for which wasteloads have been allocated to the permittee’s

MS4 in TMDLs approved by the Environmental Protection Agency (EPA) and listed in Attachment A of the permit as

described below:

a. For TMDLs approved by the EPA prior to July 1, 2013, the permittee has updated the previously approved local

TMDL action plans in order to meet the conditions of Part I.E.2, 3, 4, and 5, as applicable.

b. For TMDLs approved by EPA on or after July 1, 2013 and prior to April 1, 2017, the permittee has developed

and initiated implementation of action plans for each pollutant for which wasteloads have been allocated to the

permittee’s MS4 in order to meet the conditions of Part I.E.2, 3, 4, and 5. Copies of the Local TMDL Action Plans

for Bacteria, PCBs and Sediment are available at Environmental Division’s Central Office location.

Page 53: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 46

BMP SC2(A) – Action Plans for Approved Local TMDLs

Description and

Measurable Goal:

Develop and implement applicable TMDL Action Plans for approved TMDLs

that have assigned VDOT’s MS4 a wasteload allocation.

Lead Division: Environmental

Reference materials: List of approved local TMDLs that have assigned VDOT’s MS4 a WLA

Local TMDL Action Plans (once developed)

Expected Efforts and

Results in Meeting

Measurable Goal

Implementation

Schedule

Annual Report Documentation

Update Existing Local

TMDL Action Plans

(TMDLs approved before

July 2013)* in accordance

with Local TMDL Special

Condition

Update Existing Local

TMDL Action Plans

within 12 months of

receiving permit

coverage.

Applicable existing TMDL Action Plans were

updated within 12 months of receiving permit

coverage. Any future updates made during the

reporting year if any, will be submitted.

Develop New Local TMDL

Action Plans (TMDLs

approved between July

2013 and

June 2017)* in

accordance with Local

TMDL Special Conditions

of Permit.

Develop Local TMDL

Action Plans within 24

months of receiving

permit coverage.

Applicable TMDL Action Plans were developed

within 24 months of receiving permit coverage.

Any future updates made during the reporting year

if any, will be submitted.

Implement Local TMDL

Action Plans.

Schedule to be

identified during the

development of the

Local TMDL Action

Plans.

Submit report on progress of implementing each

Action Plan and the associated pollutant load

reductions.

Evaluate effectiveness of

applicable local TMDL

Action Plans.

No later than 48 months

from permit effective

date (6/30/2021).

Submit effectiveness assessment to DEQ.

Page 54: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

December 2019 Page 47

PROGRAM EVALUATION, MODIFICATION, AND REPORTING

Through the MS4 Steering Committee meetings, VDOT will annually evaluate the effectiveness of

each strategy or practice. VDOT routinely evaluates specific standards and specifications, schedules,

manuals, checklists, and other documents. Revisions to the MS4 Program Plan are expected

throughout the life of this permit as part of the iterative process to reduce pollutant loading and

protect water quality. As such, revisions made in accordance with this permit as a result of the

iterative process do not require modification of this permit. VDOT will document revisions to the MS4

Program Plan as part of the Annual Report, including an explanation as to why a specific BMP was

replaced or eliminated. A list of plan revisions is included in the attachments.

Documents, policies, and procedures listed in the Program Plan are updated internally at VDOT as

needed (to comport with changes to laws, regulations, implementation approach or other factors not

related to MS4/Stormwater). These items are listed under “Reference materials” within each BMP

section. A detailed table, included in the attachments, lists the reference material name, status, date

modified (if modified). Any changes to a reference material will be tracked in the list of plan revisions.

Location & Design Division will document revisions based on the table below. In the event L&D is not

the owner of a revised reference material, the owning division should provide L&D with the

information needed to complete the revisions to the table.

The reference table is updated periodically for internal distribution and can be provided to DEQ upon

request. A copy of this table will be provided with the annual report.

Page 55: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

HIGH PRIORITY FACILITIES

Page 56: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

High Priority Facilities with SWPPPs (with Date of Revision)

High Priority Facility VDOT District SWPPP Date

Bristol District Complex Bristol Sep-16

Gate City AHQ Bristol Sep-16

Chancellor AHQ Fredericksburg Sep-16

Falmouth AHQ Fredericksburg Sep-16

Fredericksburg District Complex Fredericksburg Sep-16

Massaponnax AHQ Fredericksburg Sep-16

Stafford AHQ Fredericksburg Sep-16

Bartlett AHQ Hampton Roads Sep-16

Downtown Tunnel State Street

Facility Hampton Roads Feb-17

Expressway AHQ Hampton Roads Sep-16

Frederick AHQ Hampton Roads Sep-16

Hampton Roads District Complex Hampton Roads Sep-16

Hampton Roads TMS Operations Hampton Roads Sep-16

Midtown Tunnel Pinners Point

Facility Hampton Roads Dec-16

Norfolk Residency Complex Hampton Roads Sep-16

Pine Chapel AHQ Hampton Roads Sep-16

Seaford AHQ Hampton Roads Sep-16

Skiffs Creek AHQ Hampton Roads Sep-16

Wards Corner AHQ Hampton Roads Sep-16

Wayside AHQ Hampton Roads Sep-16

Williamsburg Residency Complex Hampton Roads Sep-16

Lynchburg District Complex Lynchburg Sep-16

Timberlake AHQ Lynchburg Sep-16

Arcola AHQ Northern Virginia Sep-16

Chantilly AHQ Northern Virginia Sep-16

Columbia Pike

Maintenance/Operations Complex Northern Virginia Sep-16

Dale City AHQ Northern Virginia Sep-16

Dumfries AHQ Northern Virginia Sep-16

Camp 30 Shop Northern Virginia Sep-16

Gainesville AHQ Northern Virginia Sep-16

Lake Ridge AHQ Northern Virginia Sep-16

Leesburg Residency Northern Virginia Sep-16

Manassas AHQ Storage Area Northern Virginia Sep-16

Manassas Residency Complex Northern Virginia Sep-16

Merrifield AHQ Northern Virginia Sep-16

Page 57: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

High Priority Facility VDOT District SWPPP Date

Newington AHQ Northern Virginia Sep-16

NOVA Maintenance Facility Northern Virginia Sep-16

Reston AHQ Northern Virginia Sep-16

Van Dorn Maintenance Complex Northern Virginia Sep-16

West Parcel AHQ Northern Virginia Sep-16

Westmoreland AHQ Northern Virginia Sep-16

Ashland Residency Complex Richmond Sep-16

Atlee AHQ Richmond Feb-17

Basie Road AHQ Richmond Sep-16

Bethia AHQ Richmond Sep-16

Bon Air AHQ Richmond Sep-16

Chester AHQ Richmond Sep-16

Crater Sub AHQ Richmond Sep-16

I-295/Rt 10 Storage Area Richmond Sep-16

I-95/Rt 1 (Brook Rd) Storage Lot Richmond Sep-16

Mechanicsville AHQ Richmond Sep-16

Petersburg Residency Complex Richmond Sep-16

Pocahontas Parkway Storage Lot Richmond Sep-16

Richmond District Complex Richmond Sep-16

Airport AHQ Salem Sep-16

Christiansburg Residency Complex Salem Sep-16

Hanging Rock AHQ Salem Sep-16

Mason Creek Storage Lot Salem Sep-16

New London AHQ Salem Sep-16

Old Cave Spring Road Storage Lot Salem Sep-16

Route 11 Storage Area Salem Sep-16

Salem District Complex Salem Sep-16

Salem Residency/Southwest AHQ Salem Sep-16

Texas St Storage Lot Salem Sep-16

Harrisonburg Residency Complex Staunton Sep-16

Stephens City AHQ Staunton Sep-16

Verona AHQ Staunton Sep-16

Winchester AHQ Staunton Sep-16

A copy of the respective SWPPP is available Environmental Division’s Central Office

Page 58: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

REVISIONS TO PROGRAM PLAN AND REFERENCE

MATERIAL

Page 59: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

List or Revisions to Program Plan or Supporting Documents in Materials Guide

Document Name Revision Date Section Revised Summary of Revision

Annual Standards &

Specifications for ESC and

SWM*

6/26/2019 Select IIMs, 445 forms, and

text

Changes specific to program documents that reference regulatory

requirements and finalized certain IIMs that were previously draft.

IDDE Field Guide June 2019 All Sections Major revision of entire guide to streamline and convert to a more

handheld format for maintenance and field crews.

Facility Waste Management

and Pollution Prevention

Guide

June 2019 Sections 3.24 & 3.26 New sections added on proper operation and maintenance of

portable toilets, septic tanks and vegetation waste management

MS4 Program Plan 01/15/2020 BMP 3, 6, SWPPP List Updates to reflect Program Manual revisions and removal of two

(2) sites from High Priority Facilities with SWPPP list.

Facility Stormwater Pollution

Prevention Plan (SWPPP)

Training Video

2017 New Video VDOT training video on requirements for implementing a SWPPP

at a high-priority facility (pollution prevention, inspections, etc.)

VDOT Salt Infrastructure Good

Housekeeping and Pollution

Prevention Training Video

2017 New Video VDOT training video on salt loading/storage good housekeeping

and pollution prevention at a VDOT facility.

VDOT Facility Leak and Spill

Control Awareness Training

Video

2018 New Video VDOT training video on pollution prevention for controlling leaks

and spills at a VDOT facility.

VDOT Facility Erodible

Stockpile Management Video 2018 New Video

VDOT training video on pollution prevention for storing erodible

piles at a VDOT facility.

Good Housekeeping and

Pollution Prevention for

Contractors Video

2019 New Video VDOT training video on good housekeeping and pollution

prevention awareness for VDOT contractors.

Illicit Discharge Detection and

Elimination (IDDE) Training

Video

2019 Revised 2019 VDOT training video on IDDE program (detecting, reporting,

eliminating, documenting).

*Pending review and approval by DEQ

Page 60: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

SUPPORT FACILITIES WITH NUTRIENT

MANAGEMENT PLANS*

*Presently, no VDOT support facilities have been identified which apply nutrient fertilizers. The list will

be updated and amended as needed if VDOT facilities requiring NMPs are identified.

Page 61: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

REFERENCE MATERIAL

Page 62: FOR URBANIZED AREAS OF VIRGINIA · MS4 PROGRAM PLAN FOR URBANIZED AREAS OF VIRGINIA Virginia Department of Transportation Small Municipal Separate Storm Sewer System (MS4) In Compliance

VDOT MS4 Program Plan

VPDES #: VA0092975

List of Reference Material

Document Name Document Location Document Date

VDOT Outfall Inventory Manual Location and Design Division’s Central Office 11/2011

VDOT Right of Way Determination and Mapping Protocols Location and Design Division’s Central Office 12/2017

VDOT IDDE Manual Environmental Division’s Central Office 12/2014

VDOT IDDE Field Guide Environmental Division’s Central Office 06/2019

VDOT Annual ESC and SWM Standards and Specifications* Location & Design Division’s Central Office 06/26/2019

VDOT Roadside Development Standards & Specifications Maintenance Division’s Central Office 01/2016

Maintenance Best Practices Manual Maintenance Division’s Central Office 12/16/2016

Facility Waste Management and Pollution Prevention Guide Environmental Division’s Central Office 06/2019

VDOT BMP Inspection Manual Maintenance Division’s Central Office 09/2016

BMP Maintenance Manual Maintenance Division’s Central Office 09/2016

VDOT Employee Training Program for MS4 and Stormwater Location and Design Division’s Central Office 10/2014

Chesapeake Bay TMDL Action Plan for the James, Potomac,

Rappahannock, and York River Basins

(Amended for the Second Permit Cycle)

Environmental Division’s Central Office 06/2018

VDOT Action Plan for Local Bacteria TMDLs Environmental Division’s Central Office 06/2018

VDOT Action Plan for Local PCB TMDLs Environmental Division’s Central Office 06/2018

VDOT Action Plan for Local Sediment TMDLs Environmental Division’s Central Office 06/2018

*Submittal on 6/26/2019 pending review and approval following previous approved submittal on 6/21/2018