for the development of detailed design, drawings and …
TRANSCRIPT
Annex B - Terms of Reference
Page 1 of 12
FOR THE DEVELOPMENT OF DETAILED DESIGN, DRAWINGS AND BILL OF QUANTITIES
FOR UNHCR DSU CABIN IN KUALA LUMPUR, MALAYSIA
INTRODUCTION:
The Office of the UNHCR was established on December 14, 1950 by the United Nations General
Assembly. The agency is mandated to lead and co-ordinate international action to protect
refugees and resolve refugee problems worldwide
BACKGROUND:
DSU (Durable Solutions Unit (DSU) Cabin which is located near the newly renovated UNHCR
Reception Centre at 570 Jalan Bukit Petaling, needs structural remodeling and new design to
cater more interview rooms. Due to COVID-19 pandemic, there is a need to increase office space
to accommodate all staff safely and create more interview rooms, keeping in mind physical
distancing requirements. At the same time, the conditions of the current buildings housing DSU
are often in need of repair and maintenance. In their current state, the buildings routinely
encounter issues with leaking, partition walls unstable, electrical wiring, floor uneven, gutter
systems need to repair etc. The current cabin is s single storey consisting of interview rooms, the
proposed plan is to construct a two storey cabin with 28 rooms.
Architectural firms should have mandatory registration with “Lembaga Arkitek Malaysia” and
designers especially engineers should be registered under BEM as the services also involve
development of BOQs, the firm should have a registered Quantity Surveyor.
This term of References outlines the key deliverables required by UNHCR.
Objectives.
The objectives are as follows:
1) to create a design, layout and BOQ to have a welcoming and comfortable environment for
the safety and dignity of both staff and visitors at the new DSU Refurbishment/remodeling
into two-storey.
2) The design should ensure a safe and comfortable work environment to staff of UNHCR in
line with COVID-19 prevention requirements at the proposed new refurbishment building.
3) To provide design and BOQs interview rooms equipped with safety precautions such as
panic button, fire alarm, smoke detector, access card (preferably entry-pass which is the
current service provider, CCTV in the meeting rooms for two storey building, walkway,
Annex B - Terms of Reference
Page 2 of 12
lobby area, to be more ventilated area (windows). CCTV system and Panic button should
be salvaged which was recently installed at the said building.
4) To include furniture such as Workstations/Desks, Ergonomic Chairs, Visitor Chairs,
windows for paired interview rooms etc. as a whole package.
5) During Tendering & Construction period visit bi-weekly or have monthly meeting with the
client and contractor and provide feedback on the on-going construction.
Main Deliverables.
The independent consultant is expected to provide technical architectural drawings and prepare BOQs for UNHCR on the refurbishment/remodeling of the new DSU Cabin for tendering purposes, keeping in mind the objectives as outlined above and the specific requirements for the new building listed below. The layout and design should be based on the following:
Ground floor
• The existing DSU cabins to be removed and remodeled into a two-storey building erected on the maximum space available (as per building regulations).
• The broad idea for the ground floor is to have 14 meeting rooms equipped with LAN sockets, power sockets, CCTV in each room, fire alarm detector, panic buttons and access card accessing in and out. CCTV, Alarm and Panic button system are installed which should be salvaged and re-used along with new additional equipment compatible with the current system.
• The interview rooms to be made into pairs which could also be used as individual rooms for future, each room to have two doors and a window with blind in the middle.
• Walkway around the building with CCTV coverage
• The ground floor needs to be wheelchair accessible, connecting to UNHCR Reception Centre, canteen, and proper EXIT in case of emergency.
• All interview rooms have adequate numbers of windows to facilitate good ventilation.
• The foundation works (existing building underneath sloppy and need to backfill to flat surface included foundation works especially pad footings including all the necessary foundation works to cater the load of the building.
First floor.
• To have another 14 rooms rooms equipped with LAN sockets, power sockets, CCTV in each room, fire alarm detector, panic buttons and access card accessing in and out. CCTV Panic button and Alarm system should be compatible to the current setup.
• All offices shall have adequate numbers of windows to facilitate good ventilation.
• Access to go up first floor. (outside staircase)
• Walkway terrace around the building having railing with CCTV coverage.
External building.
Annex B - Terms of Reference
Page 3 of 12
• Proper drainage to connect existing drainage system
• Proper roofing with good quality gutters with mesh grill
• CCTV camera outside of the building for full coverage and compatibility with current
system.
• Good quality metal decking of the exterior walls
Statement of Works:
I. Prepare Architectural design which includes - Design Development, Tender
Documentation, Drawings, BOQs and Construction Documentation.
II. Prepare Bill of quantities for - general building works, structural & civil works,
architectural works, interior finishing and furnishing, air conditioning, CCTV points,
lighting, fire alarm systems, telecommunication (LAN), electrical sockets & door access.
(M&E and C&W works to be embedded in BOQs).
III. Provide Build monitoring and coordination with awarded contractors and reporting to
UNHCR.
IV. Ensure that the contract is implemented in the best possible way and that other contract
management issues related to schedules, variations, disputes etc. are managed without
any impact on the quality and timeframe of works.
Timeline of Works:
• Selection of Architectural Firm for Design and BOQ Development – 15th September 2021
• Submission of Drawings and BOQs for approval - 30th September 2021
• Tender for Selection of Contractor – 1st October 2021
• Approval of Construction Contract – 1st December 2021.
Pictures of current DSU Cabin:
Annex B - Terms of Reference
Page 4 of 12
Annex B - Terms of Reference
Page 5 of 12
Annex B - Terms of Reference
Page 6 of 12
Annex B - Terms of Reference
Page 7 of 12
Annex B - Terms of Reference
Page 8 of 12
Proposed mockup design:
Dimensions are given for estimation only*
Annex B - Terms of Reference
Page 9 of 12
Annex B - Terms of Reference
Page 10 of 12
Annex B - Terms of Reference
Page 11 of 12
Annex B - Terms of Reference
Page 12 of 12
Company Name: ______________________________________
Authorized Person & Title: _______________________________
Signature & stamp: __________________________________
Date: ______________________________________