for personal use only - home - australian securities ... — that is what the growth rate is going...
TRANSCRIPT
Gujarat NRE Minerals Limited
CORPORATE ADDRESS: CNR BELLAMBI LANE & PRINCESS HIGHWAY, RUSSELL VALE, NSW 2517ACN 111 244 896
PHONE NO: +61 (02) 4223 6800 FAX: +61 (02) 4283 7368 E-MAIL: [email protected]
Dated: 9 May 2008 To, The Company Announcement Office Australian Securities Exchange 20, Bridge Street, Sydney NSW 2000 ASX Code: GNM Mode of Announcement: Via electronic lodgment
Ref: Presentation Released on 7 May 2008 Dear Share and Option Holders, Please find attached an updated copy of “Presentation for Investors”. Kindly disregard presentation that was released on 7 May 2008. The presentation lodged was not in accordance with the reporting requirements of the JORC Code. We regret for any inconvenience caused. Should you need more information or have any doubt, please feel free to contact us. Thank you Yours truly, For and on behalf of Gujarat NRE Minerals Limited
___________________________ Sanjay Sharma Company Secretary Ph: 02 4223 6836 Fx: 02 4283 7449
REGISTERED OFFICE: 96, CAHORS ROAD, PADSTOW NSW 2211 PHONE NO: +61 (02) 9792 1422 FAX: +61 (02) 9774 3779
For
per
sona
l use
onl
y
Arun Kumar JagatramkaChairman
Gujarat NRE Minerals Limited(ASX: GNM)
Developments in the IndianCoke and Steel Marketplace
- Australian Hard Coking Coal from an Indian Perspective
For
per
sona
l use
onl
y
The views expressed here contain information derived from publicly available sources that have not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. Any forward looking information in this presentation has been prepared on the basis of a number of assumptions which may prove to be incorrect. This presentation should not be relied upon as a recommendation or forecast by Gujarat NRE
Disclaimer
For
per
sona
l use
onl
y
Vision 2020India on Steroids
100 million tons of steel(since scaled up to 200 million tons)and already talking about 300 million tons
“How do you project your steel production – you are already in
2010 according to earlier estimates !”
For
per
sona
l use
onl
y
An important point to note
“In order to produce 100 million tons of steel, India will need to consume 100 million tons of steel – which will come first is the million
tons question”
For
per
sona
l use
onl
y
“Though India is a low-cost producer, it is going to have a problem because of the fact that when you want to graduate from 35-40 million tons to 150-250 million tons — that is what the growth rate is going to take us to another 10-15 years — you require lot of new
innovations, lot of new thinking, you require a vision.”- B. Muthuraman, MD, TATA STEELFor
per
sona
l use
onl
y
The New Era of steel making dawned in
1947India had three units
Two of them in the Private Sector (TISCO & IISCO)
Total Capacity 1 million tons
For
per
sona
l use
onl
y
China too had almost similar capacities …(one million ton in 1949)
For
per
sona
l use
onl
y
It took China 47 years
to commission its first 100 million tons of steel
capacity5 years to commission the
next 100 million tonsAnd
A mere two years to score its triple hundred.
The rest is history!
For
per
sona
l use
onl
y
India• Today, India is the 5 th.
largest crude steel producer in the world.
• In 2007-08 (Apri-Feb''08), production of Finished Steel was 46.9 million (annualised 51.1 million tons) as against 44.4 million tons in 2005/06
• Steel Production target revised to 110 mt by 2011-12, to 300 mt by 2020
For
per
sona
l use
onl
y
Year 2020
300 million tons of steel
For
per
sona
l use
onl
y
SAIL 12.0TATA STEEL 30.0VIZAG 6.5MITTAL 12.0POSCO 12.0ESSAR 11.0JINDAL 20.6BHUSHAN 3.1OTHER (MISC) 7.0
Total 114.2
million tons
Additional Crude Steel Capacity being planned in India
For
per
sona
l use
onl
y
The world’s who’s who of steel making are waiting :• Arcelor Mittal, the world's largest steelmaker, plans to set up two greenfield
steel projects in India each with a capacity of 12 million tonne per annum (mtpa).
• Acerinox SA, the world's second-biggest stainless steelmaker, is joining hands with Japan's Nisshin Steel to build a steel plant in India.
• Tata Steel, the world's fifth largest steel maker, plans to double its capacity by 2015, by adding another 35 mt capacity.
• India's largest steel manufacturer SAIL is planning to increase its annual production of 12 mtpa to 24.98 mtpa by 2011-12.
• Sinosteel Corp, China's second- biggest iron ore trader, plans to invest US$ 4 billion to build a 5 mt greenfield steel plant
• Posco which has already started work in Orissa.
For
per
sona
l use
onl
y
PortsVesselsMaterial handling facilitiesRoads
RailwaysRoad – rail
linkagesAncillaries
Trained manpower,
including skilled labour
All resources can be mobilised in the medium termF
or p
erso
nal u
se o
nly
Except Coking Coal
For
per
sona
l use
onl
y
1 MT of steel will require 0.6 MT of met coke60 MT of coke requirement for 100 MT
Or 100 MT Coking Coal required
For
per
sona
l use
onl
y
Demand from Foundries,Soda Ash plants,Chemical Units
Other Sectors not considered.
For
per
sona
l use
onl
y
Potential sources :
Established : AustraliaCanadaUSAChina
Emerging : MozambiqueIndonesiaSouth African NationsF
or p
erso
nal u
se o
nly
But Except AustraliaNeed to consider
*ash content,*calorific values,*land locked mines,*transport bottle necks,*freight costs,*law & order problems
For
per
sona
l use
onl
y
India centric issuesPeculiarities of Indian
psycheTendency to buy in the
spot marketDependence on China
Herd mentalityLack of foresight
leading to Inability of ensuring
supply security
For
per
sona
l use
onl
y
In 2004 among the Indian Secondary Steel Producers only Sesa Goa had captive coke
plant (0.28mtpa)
By 2007 more than 10 producers have gone in for captive plants ( 4 mtpa)
For
per
sona
l use
onl
y
(million TPA)2003/04 2006/07
Sesa Kembla Coke 0.28 0.28Sathvahana Ispat 0.12Jindal Vijaynagar 0.80
Lanco Ferro 0.12Electrosteel Castings 0.12Jindal Saw 0.15JSPL 0.80VISA 0.40Neelachal 0.80Jayaswal Neco 0.20
Total 0.28 3.79
JV tie ups:Kalyani Steel with Gujarat NRE 0.32
Captive Coke Plants in Secondary Steel Sector
For
per
sona
l use
onl
y
Which meansDistinct move away from
Chinese dependence : (Coking coal import
preferred over coke import as Chinese prices move
defying logic)
India to emerge as the second largest coke producer after
China
Coking Coal criticality to continue
For
per
sona
l use
onl
y
Expected Indian Coke Consumption & Coking Coal Demand Projections
(Conservatively based on additional 50 million tons of steel by 2012 and further 100 million tons by 2020)
year 2005 2007 2012 2020CokeConsumption
21 25 60 120
Coking coal reqd. 28 35 84 170
Indian coal 8 8 9 12
Nett import demand (equivalent coal)
21 27 75 158
(million tons)
For
per
sona
l use
onl
y
Australia :Quality mines ready and rolling are hard to come by
Ports are already congestedStiff Mining / Environmental legislation
For
per
sona
l use
onl
y
Mainly in the prospecting license stage
Reserves have to identified and established
Huge investment in infrastructure required
Before mining can actually commence
Mozambique, Botswana, other African sources
Note as opposed to a steel plant being set up in 2-4 years time, setting up a mine will require 6 – 8 years
which means, 10 years to get the coal flow)
For
per
sona
l use
onl
y
Coal Criticality
For
per
sona
l use
onl
y
Coal Videsh(scouting for the last decade)
Gujarat NRE Coke(2 mines in Australia, stake in
NZ mine, other prospecting Co’s)
Tata Steel(Mozambique)
OthersFor
per
sona
l use
onl
y
Gujarat NRE Coke Limited
India’s largest independent coke producer(Current capacity – 1 MTPA
By Dec’08 - 1.25 MTPA)
For
per
sona
l use
onl
y
Growth @ speed of thoughtGUJARAT NRE COKE LIMITED
GNCL is the largest independent producer of Metallurgical Coke in India and the
only listed company in this sector with more than 60,000 shareholders
Apr’08 Market Cap US$ 1 billion plus
Profit earning and dividend paying company with strong financials and credit rating
Met Coke capacity 1 million tons & being increased to 1.25 Million MTPA
The only Indian company to have acquired captive coking coal mines outside India –
NRE No. 1 Colliery and NRE Wongawilli Colliery near Wollongong, NSW, (combined
resources more than 550 million tonnes of Hard Coking Coal)
NRE NO 1 IPO for AU $15 million oversubscribed. Currently listed with a market cap
of AU $1 billion – (Gujarat NRE Minerals Ltd – ASX Code:GNM)
Recently acquired Elouera Colliery from BHP Billiton and consolidated with NRE
Avondale. Since renamed as NRE Wongawilli Colliery
A Snapshot
For
per
sona
l use
onl
y
Growth @ speed of thoughtGUJARAT NRE COKE LIMITED
NZ $20 Million invested in Pike River for 400 KTPA of Ultra Low Ash Coal (a much
sought after sweetener for blending with NSW Coal)
Environment friendly Non – recovery Coke batteries with heat recovery and Stamp
Charging facility having ISO 9001:2000 certification
Group has the potential to generate power from waste heat at Re. 0.50 / Unit
Setting up waste heat recovery power plants of 30 MW Capacity by 2009 and further
30MW by 2010.
Setting up Captive Jetty at Bellikeri, Karnataka and Railway Siding at Dharwad which
would improve logistics and reduce cost
Acquiring Six new dry bulk carriers on long term time charters with an option to buy.
To be put in service progressively from 2010 onwards.
Bagged several awards as Super performer, Highest wealth creator, Best Performing
Mid sized company, environment & safety awards by various media houses
A Snapshot Contd…F
or p
erso
nal u
se o
nly
GUJARAT NRE COKE LIMITEDGrowth @ speed of thought
Shareholding Pattern Jagatramka Family 41%
Mutual Funds & FIIs 32%Indian Public (60,000) 27%
----------100%
Returns to ShareholdersInvestment of Rs. 1 million 1994 equals Rs 0.3 billion in March, 2008Which translates to more than49% YOY growth
• Listed on BSE & NSE• Ticker Code: GUJNRECOKE BSE: 512579• Face Value : Rs. 10 per share
• Shares on Issue- As on 31/3/2007 244 million- On Conversion of warrants 14 million- On Conversion of 1st FCCB issue 48 million- On Conversion of 2nd FCCB issue 25 million
Total as on 31/3/1008 331 million
• Current Market Price Rs. 153 • Fully diluted Market Cap US $1 Billion +
For
per
sona
l use
onl
y
Growth @ speed of thoughtGUJARAT NRE COKE LIMITED
GUJARAT NRE COKE LTDOperations…
Gujarat NRE MineralsASX Code - GNM
LOW ASH METALLURGICAL COKE
1.25 MMTPA
COAL WASHERYAT KHAMBALIA
& Bachau* (0.75 MTPA each)
NRE No.1 Colliery~1.5 Mt Measured~135.08 Mt Indicated~186 Mt Inferred
~323 Million MT Total Coal Resources#
NRE Wongawilli Colliery~21 Mt Measured~24 Mt Indicated~76 Mt Inferred
~121 Million MT Total Coal Resources %
NRE Avondale Colliery~0.00 Mt Measured~0.00 Mt Indicated~137 Mt Inferred
~137 Million MT Total Coal Resources%
STEEL UNITTMT BARS : 0.311 MMTPA
*DHARWAD UNIT0. 25 MILLION MTPA
BHACHAU UNIT0.324 MILLION MTPA
KHAMBALIA UNIT0.358 MILLION MTPA
BNCL (60%)DHARWAD UNIT
0. 324 MILLION MTPA
*Proposed Facilities
Waste Heat Recovery Power Plants
Khambhalia* 15 MWBachau* 15 MWDharwad* 30 MW
Total 60 MW
Wind Power 27.5 MWBeing Commissioned 30 MW
Total 57.5 MW
In Australia In India# Gujarat NRE No.1 Mine estimation of coal Resources, B. Agrali, Feb 18 2007
% Statement of the Coal Resources of Gujarat NRE Wongawilli and Avondale Colliery Holdings as at end of Feb 2008. B. Clark, Feb 2008
For
per
sona
l use
onl
y
15%
85%
GUJARAT NRE COKE LIMITEDListed on NSE & BSE in India
Pluton Resources LtdGujarat NRE Limited
Pike River Coal Ltd Rey Resources LtdWonga Coal Pty Ltd
Gujarat NRE FCGL Pty Ltd
Gujarat NRE Minerals Ltd
Listed on ASX:GNM
100%
NRE Wongawilli Colliery ~21 Mt Measured~24 Mt Indicated~76 Mt Inferred~121 Million MT
Total Coal Resources NRE Avondale Colliery
~0.00 Mt Measured~0.00 Mt Indicated~137 Mt Inferred~137 Million MT
Total Coal Resources%
NRE No.1 Colliery~1.5 Mt Measured~135.08 Mt Indicated~186 Mt Inferred~323 Million MT
Total Coal Resources#
International Operations
Gujarat NRE Resources NL
Coal mine in New Zealand.
Coal off-take For 400,000MT pa
Exploration tenements
In Australia, Chile & Peru
Exploration tenementsIn Australia
13%
10%
100%
100%
100%
# Gujarat NRE No.1 Mine estimation of coal Resources, B. Agrali, Feb 18 2007
% Statement of the Coal Resources of Gujarat NRE Wongawilli and Avondale Colliery Holdings as at end of Feb 2008. B. Clark, Feb 2008
For
per
sona
l use
onl
y
GUJARAT NRE MINERALS LIMITED
Listed on ASXTicker Code: GNMIssue Price $0.50 per share (In July’07)Shares on Issue 801 million
Pre takeover 494 millionIssued against GUJ 188 millionOptions against GUJO 119 million
Current Market Price $1.70Fully diluted Market Cap AUS $1 Billion +
13 million INR unquoted options (50-75 cents and various expiry dates) are not shown above
For
per
sona
l use
onl
y
GUJARAT NRE MINERALS LIMITED
Resources– HOLDING / LEASES
Resources (In million tonnes)
Measured 21
Indicated 24
Inferred 76
NRE Wongawilli Colliery
For
per
sona
l use
onl
y
GUJARAT NRE MINERALS LIMITED
Shareholding Pattern:
Holding Co. 85%Institutions 08%Corporate Bodies 05%Individuals 02%
For
per
sona
l use
onl
y
GUJARAT NRE MINERALS LIMITED
Acquired NRE No.1 Colliery in Dec’04
Production re-started in late 2005 using board & pillar mining
Produced more than 0.8 million tons of coal and exported to India
Four panels in operation in Bulli Seam
One pillar extraction and three development
units – approx 0.6 million tons p.a.Acquired Gujarat NRE Resources, which owns NRE Wongawilli Colliery
Wonga Mains project commenced to access Wongawilli Seam
Working towards producing 4 Mt per annum by 2012
NRE No. 1 Colliery
For
per
sona
l use
onl
y
Location gives access to un congested Port Kembla currently operating at < 50% capacity
NRE No.1 CollieryLocation & Logistics of Mine
For
per
sona
l use
onl
y
310/311 Panels
S Mains
P, O & H Panels
Current Working Panels in Bulli Seam
NRE No.1 CollieryF
or p
erso
nal u
se o
nly
Wonga Mains – roadway layoutF
or p
erso
nal u
se o
nly
Wonga Mains Project
• Underground operations commenced 7th January 2008
• RTV is currently being mined – drift of 1 in 10 gradient down to Wongawilli seam
• Belt road portal is currently being mining
• Excavation for Track Road portal commenced
NRE No.1 CollieryF
or p
erso
nal u
se o
nly
OLD BULLI WORKINGS
BAR RIER
BARRIER
Bulli Seam Longwalls:Size of Longwall blocks still to be
determined,dependant on Geotech advice
regarding Wallandoola creek area
5m Staple Shafts
Pillar Extension 200,000t
P ill ar Extensi on 200,000t
Pi llar Ex tension 400,000t
S Main 2 Panel
1000t Bin
Conveyor & Transport DriftsBulli seam S Main 2 to Wongawilli seam
V Mains Panel
Drift down from wongawilli for Bin
No1 Shaft
Wongawilli Longwalls:Length of Longwall blocks still to be
determined, dependant on Geotech advice and the DSC regarding Cataract/Dam wall
Wongawilli Seam Longwall Development
Wongawilli Seam Mains Development
Wongawilli Seam Partial Extraction Panels
800 AREA
600 AREA
700 AREA
No3 Shaft
No4 Shaft
No5 Shaft
No6 Shaft
Planned Wongawilli Development & Proposed Longwall Extraction
NRE No.1 CollieryF
or p
erso
nal u
se o
nly
NRE No.1 Colliery – Wonga Mains ProjectF
or p
erso
nal u
se o
nly
Mining Schedule
COMPLETED• Mid 2007 – Finalise 20 year mine plan• Mid 2007 – Commence work on Wonga Mains• End 2007 Commence Environmental Studies • 2008 – Place orders for new Miners
BEING PLANNED• 2009 – Commence work on ventilation Shaft• 2010 – Lodge Part 3A Application• 2010 – Place order for Washery & Longwall• 2011 – Commence Longwall Development• 2012 – Commence Longwall production
- Total mine production up from 1Mt pa to > 4 Mt pa
NRE No.1 CollieryF
or p
erso
nal u
se o
nly
• Acquired Elouera from BHP Billiton in December 2007
• Consolidated with NRE Avondale
• Consolidated Colliery re-named as NRE Wongawilli Colliery
• Development commenced in Feb 2008
• Longwall operations to commence in April 2009
• Mine is currently in production
GUJARAT NRE MINERALS LIMITED
NRE Wongawilli Colliery
For
per
sona
l use
onl
y
SurfaceCoal Handling Facilities - Railway, Bins, Stockpile, Decline Conveyor ,
Bathhouse, offices and car parking
UndergroundLongwall, coal clearance, development equipment, transport fleet
Infrastructure
NRE Wongawilli CollieryF
or p
erso
nal u
se o
nly
Location & Logistics of Mine
NRE AVONDALE
Huntley
Colliery
NRE WongawilliColliery
NRE Wongawilli Colliery
(Old Avondale)
(Old Elouera)
For
per
sona
l use
onl
y
Mine Plan• Form and extract two
longwall blocks - February 2008
• Evaluate existing workings for Pillar Extraction -potential to increase mine life
• Develop new access roadways towards and into adjoining Avondale lease -start late 2008
• Develop longwall blocks and commence extraction – start longwall operations 2013
NRE Wongawilli CollieryF
or p
erso
nal u
se o
nly
LW EXTRACTION PLANNNED (2007-2010)
NRE Wongawilli CollieryF
or p
erso
nal u
se o
nly
Project Timing Project Timing –– NRE Avondale accessed NRE Avondale accessed through NRE Wongawillithrough NRE Wongawilli
Q1Q1-- 2008 Restart operations at Wongawilli2008 Restart operations at WongawilliElouera Elouera –– area Aarea A
---- area Barea B---- access roadways into NRE Avondaleaccess roadways into NRE Avondale---- develop mine plan for NRE Wongawilli & NRE Avondaledevelop mine plan for NRE Wongawilli & NRE Avondale
Production profile:Production profile:2008 2008 –– 350,000T350,000T2009 2009 –– 1,150,000T1,150,000T2010 2010 –– 1,300,000T1,300,000T
Long term production target 2.5 to 3 MTPALong term production target 2.5 to 3 MTPA
NRE Wongawilli CollieryF
or p
erso
nal u
se o
nly
Production commencementProduction commencement
First production planned for March 2008, First production planned for March 2008, (commenced since end Feb 2008) (commenced since end Feb 2008) Development for longwall extraction will be Development for longwall extraction will be the initial focusthe initial focusMachinery to be moved to new mining Machinery to be moved to new mining area area -- Jan 2008Jan 2008Longwall production to commence April, Longwall production to commence April, 20092009
NRE Wongawilli CollieryF
or p
erso
nal u
se o
nly
Gujarat NRE Minerals LtdGujarat NRE Minerals LtdRaw Coal Production Profile Raw Coal Production Profile
0
1
2
3
4
5
6
7
Mar'09 Mar'11 Mar'13
No. 1WongawilliTotal
For
per
sona
l use
onl
y
CORE STRENGTHS & OPPORTUNITIESStrength
Only ASX Listed Stock with pure Hard coking coal minesSubstantial resource base in both mines of Pure Hard Coking CoalSpread out risk with 2 mines in the same areaIntegrated from mine to marketStrong backward and forward linkages between India & AustraliaIndependent Board of DirectorsProactive ManagementStrong employee participation & community profileMajority of employees are shareholders with investment in the company
Opportunities
Australia is the largest producer of coking coal in the WorldAll major steel producing countries including China, India, Japan and Brazil are dependant on the Australian Coking Coal, which is of high qualityIndia expected to emerge as second largest coke producer next only to China over the next decadeImport of additional 50 million tons of coking coal required in India based on expected coke consumption & coking coal demand by 2011/12
Gujarat NRE Minerals LimitedF
or p
erso
nal u
se o
nly
Thank You
For
per
sona
l use
onl
y
COMPETENT PERSON STATEMENT
• "The information in this report that relates to Mineral Resources is based on information complied by Dr. Bülent Agrali and Mr. Barry Clark who are Members of the Australasian Institute of Mining and Metallurgy.
• Dr. Agrali is employed by BullAnt Associates P/L-Mining Geological Services. Mr. Clark is employed by Bureau Veritas, International Trade Australia Pty. Ltd
• Dr. Bülent and Mr. Clark have sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which they are undertaking to qualify as Competent Persons as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr. Agrali and Mr Clark consent to the inclusion in the report of the matters based on their information in the form and context in which it appears."F
or p
erso
nal u
se o
nly