for office use only date received: 2010 application for

4
2010 Application for Multimodal Transportation Concurrency* *All Applicants Please Note: 1.) Projects affecting arterials or intersections with low level of service (LOS) or that produce 50+ peak hour trips will also be required to complete a full traffic study as per Section 11, Public Works Development Guidelines, available on the Public Works web site. 2.) Projects abutting public right-of-way will be required to construct standard street improvements. 3.) Projects will be required to pay Transportation Impact Fees (TIF) at building permit issuance. PROJECT INFORMATION Project Name: _________________________________________________________________________ Project Address: _______________________________________________________________________ Assessor’s Parcel Number(s): ____________________________________________________________ Concurrency Service Area (CSA) Number (See Map on page 3): ____________ PROPOSED PROJECT DESCRIPTION Office___ Retail___ Industrial/Manufacturing___ Institutional ___ Mixed Use___ Other___ Gross square footage of non-residential building _____________ Single family residential _______ Multi-family residential _______ Total number of units_______ Expected Date of Completion/Occupancy: _________________ APPLICANT INFORMATION Name___________________________________ Company________________________________ Mailing Address____________________________________________________________________ Phone___________________ Fax___________________ Email_____________________________ PROPERTY OWNER INFORMATION (If different from above) Name___________________________________ Company________________________________ Mailing Address____________________________________________________________________ Phone___________________ Fax___________________ Email_____________________________ As the project applicant listed below, I hereby acknowledge I have read this permit application and state that the information is correct, and agree to comply with all City ordinances and State laws regulating activities covered by this permit application. Applicant Name: ______________________________ Signature: ______________________________ Date: ____________ FOR OFFICE USE ONLY Date Received: ___________________________ Tidemark Case Number: CON________________

Upload: others

Post on 29-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FOR OFFICE USE ONLY Date Received: 2010 Application for

2010 Application for Multimodal Transportation Concurrency*

*All Applicants Please Note:

1.) Projects affecting arterials or intersections with low level of service (LOS) or that produce 50+ peak hour trips will also be required to complete a full traffic study as per Section 11, Public Works Development Guidelines, available on the Public Works web site.

2.) Projects abutting public right-of-way will be required to construct standard street improvements. 3.) Projects will be required to pay Transportation Impact Fees (TIF) at building permit issuance.

PROJECT INFORMATION

Project Name: _____________________________________ ____________________________________

Project Address: __________________________________ _____________________________________

Assessor’s Parcel Number(s): ______________________ ______________________________________

Concurrency Service Area (CSA) Number (See Map on p age 3): ____________

PROPOSED PROJECT DESCRIPTION Office ___ Retail ___ Industrial/Manufacturing ___ Institutional ___ Mixed Use ___ Other ___

Gross square footage of non-residential building _____________

Single family residential _______ Multi-family residential _______ Total number of units _______

Expected Date of Completion/Occupancy: ____________ _____

APPLICANT INFORMATION Name___________________________________ Company ________________________________

Mailing Address ____________________________________________________________________

Phone ___________________ Fax___________________ Email _____________________________

PROPERTY OWNER INFORMATION (If different from above)

Name___________________________________ Company ________________________________

Mailing Address ____________________________________________________________________

Phone ___________________ Fax___________________ Email _____________________________

As the project applicant listed below, I hereby ack nowledge I have read this permit application and st ate that the information is correct, and agree to comply with all City ordinanc es and State laws regulating activities covered by this permit application.

Applicant Name: ______________________________ Sig nature: ______________________________ Date: ____________

FOR OFFICE USE ONLY

Date Received: ___________________________

Tidemark Case Number: CON________________

Page 2: FOR OFFICE USE ONLY Date Received: 2010 Application for

Land Use(s) and Trip Generation

Land Use Description

ITE

Land

Use

Code 1

ITE

Trip

Generation

Rate1

Residential

Units

Commercial or Industrial

Gross Square Feet

Total New Trips

(PW Staff Only)

Prop osed Land Uses

Existing Land Uses

Net New Vehicle Trips

(PW Staff Only)

1Note: According to most current edition of Institute of Transportation Engineers (ITE) Trip Generation Manual

ADDITIONAL MULTIMODAL INFORMATION

Distance from project to nearest existing WTA transit route:

_____ abutting project _____ < ¼ mile _____ ¼ mile to ½ mile _____ > ½ mile

Distance from project to nearest existing bicy cle lanes:

_____ abutting project _____ < ¼ mile _____ ¼ mile to ½ mile _____ > ½ mile

Distance from project to nearest existing ADA- compatible sidewalk:

_____ abutting project _____ < ¼ mile _____ ¼ mile to ½ mile _____ > ½ mile

PROPOSED TRIP GENERATION REDUCTIONS FOR PROJECT

_____ locate in mixed use/multimodal-orie nted area, such as an Urban Village

_____ contract with WTA to fund and provi de annual bus passes to residents and/or employees

_____ reduce on-site parking spaces and/o r _____ shared parking spaces

_____ fund and install bicycle parking ra ck(s) for residents and/or employees

_____ fund and install transit shelter in WTA-approved location

_____ contract with car-share agency to p rovide annual membership to residents and/or employ ees

_____ car-share vehicle available on-site to residents and/or employees

Page 3: FOR OFFICE USE ONLY Date Received: 2010 Application for

G4

CSA Deecripton

1. Edgemooo-S<luth

2. SannhHnl

'3. Fairhaven Vilage

4. South-lfil~Val.,,

s. WWU - SehOMe Arboretum.

8. -rfr-Diatricl 7. Dowo1town-Sarie.~ountam

8. Pugo~-Fallo

9. Bin:h~Cohnbia

10.

11. Baddey Vil._ 12.. Rooaevea-Cha.nder

13. Atabema-SiW..-Beac:h

14. Gordata f'UD.Guido Mericf'on

16- King Moootain

16. 1 ..... p. lnduotrial

Legend Transportation Concurrency

SH~=:~::) Type •

Type II

1.JG.a. H:-at. ..

..__ City of Bellinghan1 G.· ~ _ Transportation Concurrency

~

~ ~

1

Roadway Functional Classificat.ion ,..,, Frindpal Rou:e

~ s.coooa<y """'' /".,/ CO:iett.of Root:

~ lr!3'S!ate S

Service Areas (CSA)

...... Prclp06ed R'lrx:!p.3"

.;•,,,.# R'Op06eC Sieooodary

, .... ,, ?rop06Ed COl:Jecl«

2010

Page 4: FOR OFFICE USE ONLY Date Received: 2010 Application for

Development Review Elements

Transportation Concurrency is only one piece of the development review puzzle

City of Bellingham Resources

The transportation planning documents listed below are available on the City of Bellingham web site:

www.cob.org/services/neighborhoods/community-planning/transportation/index.aspx

Transportation Report on Annual Concurrency (TRAC)

Multimodal Transportation Concurrency Management Or dinance (BMC 13.70)

Transportation Impact Fee Ordinance (BMC 19.06)

Public Works Development Guidelines and Improvement Standards

Bellingham Comprehensive Plan, Transportation Eleme nt

Public Works Transportation Planning Staff

In addition to the transportation planning documents listed above, specific Public Works administrative staff are responsible for the implementation of the Transportation Concurrency Management Program and can be reached by telephone at (360) 778-7900 between 8:00am and 5:00pm, Monday through Friday, or by email, listed below. Chris Comeau, AICP, Transportation Planner [email protected]

Brent Baldwin, AICP, Development Review Manager [email protected]