for ceramic/tiled floor - purus...

20
1 Purus Line - installation instructions for ceramic/tiled floor For concrete floor, placed as a door channel For concrete floor, placed against wall. For wooden beam floor constructions with tiles, as a door channel For wooden beam floor constructions with tiles, placed against wall. 1 2 3 4 Page 2-4 Page 5-7 Page 8-11 Page 12-15 Tile Page 18 Dimensions table, Cleaning and maintenance Page 20 5 6 Purus AB, Södergatan 7, SE 275 31 Sjöbo – Tel +46 416 25 700, Fax +46 416 25 720 [email protected], www.purus.se - www.purusgroup.se - www.purusline.com This product is adapted to trade regulations for Säker Vatteninstallation (secure water installation). The supplier guarantees the function of the product when Trade regulations are followed and in accordance with installation instructions. Vers. 06.2009

Upload: others

Post on 22-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

1

Purus Line - installation instructions for ceramic/tiled floor

For concrete floor, placed as a doorchannel

For concrete floor, placed against wall.

For wooden beam floor constructionswith tiles, as a door channel

For wooden beam floor constructionswith tiles, placed against wall.

1

2

3

4

Page 2-4

Page 5-7

Page 8-11

Page 12-15

Tile Page 18

Dimensions table, Cleaning and maintenance Page 20

5

6

Purus AB, Södergatan 7, SE 275 31 Sjöbo – Tel +46 416 25 700, Fax +46 416 25 [email protected], www.purus.se - www.purusgroup.se - www.purusline.com

This product is adapted to trade regulations for Säker Vatteninstallation (securewater installation). The supplier guarantees the function of the product when Trade regulations are followed and in accordance with installation instructions.

Vers. 06.2009

Page 2: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

2

Installation instructions no 1

For concrete floor, placed as adoor channel

Installation kit for concrete:

Art. no. 711 41 51 - 300 mm

Art. no. 711 41 81 - 600 mm

Art. no. 711 42 10 - 700 mm

Art. no. 711 42 39 - 800 mm

Art. no. 711 42 68 - 900 mm

Art. no. 711 42 96 - 1000 mm

Our ongoing product development may cause

changes in the specifications. We reserve these rights.

When choosing Purus Line,please note:● The upper part is made of stainless steel● The gully part is made of Polypropylene (PP).● When PP is burning, it forms only carbon

dioxide and water.● PURUS LINE has a clamping frame for

membrane / sealing-vinyl floor.● Spare parts for PURUS LINE are always

available● PURUS LINE is self-cleaning and seldom

demands cleaning or maintenance.● PURUS LINE fulfills the European Standards

EN 1253-1● For installation of ceramic floor tiles refer to

national standards.● For installation of vinyl floors refer to

national standards.● Purus Line must be installed flat - i.e. not on falls● Please note that Polypropylene outlets cannot

be solvent welded”. There are Solvent Weldand Mechanical Fix adapters/connectors

available. Please consult your distributor for details.

Maximum height with one distance casing. Further casings can be mounted, if necessary.

88

202*Distancecasing

PURUS SupportThe grip claw fits the brackets of the lower part ofthe channel. It is easy to adjust so that the upperedge of the tile frame is in line with the ready-made floor

Min.height = 88 mmMax height = 202 mmDistance case = 50 mm.

Necessarytools:- Wrench 8 mm. dimension- Torx bits dim T25- Phillips screwdriver

Page 3: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

3

PURUS Line is placed on thesurface and the height is adju-sted by PURUS support.

Connect to the drain. The instal-lation is attached to the reinfor-cement with steel wire.

The PURUSsupport maybe nailed or screwed to the surface.

IMPORTANT:Leave the protection plastic onduring cementing!

3

B

1

2

Enclosed brackets for PURUS support are mounted on thechannel, with one bracket on each side of the channel.

For a channel length of 1000 mm, an extra bracket is

fastened in the middle.

On rough concrete bed, the mounting can be fixed with cementunder the gully (fig. B).

(1)

The floor is cementedand the membrane

(1) is mounted to theupper part of the

channel.

Alt. 2. Cut in portionWhen the drain pipe is moulded, make a cut-in portion in the mould form, which is approximately 5 cm longer and wider than Purus Line.

When the concrete isset, Purus Line isplaced in the holeand connected to thedrain pipe. Fill thehole with concrete.

PURUS LINE is installed on the samelevel as sealing/tanking layer.

The membrane is trimmed with a sharp knife.Use the inner edge of the channel as a ruler and cut offsurplus cloth around the entireopening.

3B

Installing the gully part

The gully is fixed with six nutsand washers.

A separate mounting spanner isenclosed, attached on the bottom of the channel.

Ensure that the gasket between gully and channel

is in place before assembling!

It must beinstalled flat

One bracket at each end ofthe channel.

Gasket

Page 4: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

4

Tighten all screws except thefour long ones. They are adjust-ment screws for the tile frame.

Adjust the height of the fourscrews (6 on length 1000 mm). Range: 11-16 mm.

No power tools!

4SURFACE LAYERS MUST BE CONNECTED TO PURUS LINE ACCORDING TO GUIDELINESOF THE SUPPLIER.

The sealing/clamping layer (1) is mounted according to thesupplier’s directions. The clamping frame is mountedafter the sealing/tanking layer.Position the clamping frame andpierce holes for the screws withan awl.

The sealing layer can be a flexible foil or a liquid-basedmaterial. Check with the selected manufacturer.

5

Membrane

Adjustment screws

(1)

NO POWER TOOLS!

6

Tile adhesive

After adjusting the height, turn the frame upside-down and fill the frame-edge with tile adhesive to get it extra stabilized.

Then turn the frame back andinstall it.

NOTE: When installing, the wholeframe around shall be filled withadhesive.

Gasket

Page 5: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

5

7

flexible grout. Tile adhesive

Tiles

Tiles are installed. Join the tileframe with flexible grout.

Check list● When choosing the position

for mounting, remember theneed for easy access for cleaning of the channel andwater trap.

● Purus Line must be installed horizontally.

● Purus Line’s surface must be on the same level as the finished floor, i.e. flat and in level with flooring material/ tiles and not on falls.

● Tiles must be connected to Purus Line according tonational standards.

● Surface layers must be connected to Purus Line according to guidelines of the supplier.Follow national standards.

● Do not solvent weld waste connections.

Page 6: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

6

F1

When choosing Purus Line,please note:● The upper part is made of stainless steel● The gully part is made of Polypropylene (PP).● When PP is burning, it forms only carbon dioxide

and water.● PURUS LINE has a clamping frame for

membrane / sealing-vinyl floor.● Spare parts for PURUS LINE are always

available● PURUS LINE is self-cleaning and seldom

demands cleaning or maintenance.● PURUS LINE fulfills the European Standards

EN 1253-1● For installation of ceramic floor tiles refer to

national standards.● For installation of vinyl floors refer to

national standards.● Purus Line must be installed flat - i.e. not on falls● Please note that Polypropylene outlets cannot be

solvent welded”. There are Solvent Weld andMechanical Fix adapters/connectors available. Please consult your distributor for details.

Installation instructions no. 2

For concrete floor, placedagainst wall.

Installation kit for concrete:

711 41 59 wallbracket 300 mm711 41 88 wallbracket 600 mm711 42 17 wallbracket 700 mm711 42 46 wallbracket 800 mm711 42 75 wallbracket 900 mm711 43 04 wallbracket 1000 mm

Necessary tools:- Wrench 8 mm. dimension- Torx bits 6 mm. dimension- Phillips screwdriver

Our ongoing product development may cause

changes in the specifications. We reserve these rights.

Page 7: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

7

The wall rail is placed on the thewall and fastened with screws inlevel with the ready-casted floor.

NOTE! The upper edge of thechannel will be 1,5 mm over theedge of the rail.

The gully is connected to theoutlet pipe.

Installing the gully part

The gully is fixed with six nutsand washers.

A separate mounting spanner isenclosed, attached on the bottom of the channel.

1

Ensure that the gasket between gully and channel

is in place before assembling!

2 It must beinstalled flat

The brackets are mounted on the channel.

Oval holes in the bracket allows adjustment.

The channel is installed by pres-sing the brackets down in thetracks in the wall rail.

The big holes together with theslideable brackets gives goodadjustment possiblities.

Re-adjustment is also possibleas the angle-brackets can slidein the track of the rail.

IMPORTANT:Leave the protection plastic onduring cementing!

Lay the concrete.

3

Page 8: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

8

SURFACE LAYERS MUST BE CONNECTED TO PURUS LINE ACCORDING TO GUIDELINESOF THE SUPPLIER.

The sealing/tanking layer/ (1) ismounted according to the sup-plier’s directions.

The clamping frame is mountedafter the sealing/tanking layer.

Place the clamping frame andpierce holes for the screws withan awl.

Tighten all screws except thefour long ones. They are adjust-ment screws for the tile frame.

Adjust the height for the fourscrews (6 on length 1000 mm). Range: 11-16 mm.

5

6

Membrane

(1)

Adjustment screw

4

(1)

Remove the clamping frame.

Mount the membrane(1) in accordance to the supplier’s

instructions .

The membrane is trimmed with asharp knife. Use the inner edgeof the channel as a ruler and cutoff surplus cloth around theentire opening.

4B

Gasket

Gasket

Page 9: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

9

8

Flexible grout

Tile adhesive

Tiles

Tiles

Tiles are installed. Join the tileframe with grouting cement.

7

Tile adhesive

After adjusting the height, turn the frame upside-down and fill the frame-edge with tile adhesive to get it extra stabilized.

Then turn the frame back andinstall it.

NOTE: When installing, the wholeframe around shall be filled withadhesive.

Check list● When choosing the position

for mounting, remember theneed for easy access for cleaning of the channel andwater trap.

● Purus Line must be installed horizontally.

● Purus Line’s surface must be on the same level as the finished floor, i.e. flat and in level with flooring material/ tiles and not on falls.

● Tiles must be connected to Purus Line according tonational standards.

● Surface layers must be connected to Purus Line according to guidelines of the supplier.Follow national standards.

● Do not solvent weld waste connections.

Page 10: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

10

When choosing Purus Line,please note:● The upper part is made of stainless steel● The gully part is made of Polypropylene (PP).● When PP is burning, it forms only carbon dioxide

and water.● PURUS LINE has a clamping frame for

membrane / sealing-vinyl floor.● Spare parts for PURUS LINE are always

available● PURUS LINE is self-cleaning and seldom

demands cleaning or maintenance.● PURUS LINE fulfills the European Standards

EN 1253-1● For installation of ceramic floor tiles refer to

national standards.● For installation of vinyl floors refer to

national standards.● Purus Line must be installed flat - i.e. not on falls● Please note that Polypropylene outlets cannot

be solvent welded”. There are Solvent Weld and Mechanical Fix adapters/connectors available. Please consult your distributor for details.

For wooden beam floorconstructions with tiles, as a door channel

Installation kit:Length Height 35 mm Mounting rail

(22+13 mm concrete)

300 Art. no. 711 41 52 2 pc.600 Art. no. 711 41 82 2 pc.700 Art. no. 711 42 11 2 pc.800 Art. no. 711 42 40 2 pc.900 Art. no. 711 42 69 2 pc.

1000 Art. no. 711 42 98 2 pc

Necessary tools:- Wrench 11 mm. dimension- Torx bits 6 mm. dimension- Phillips screwdriver

Installation instructions no. 3

Our ongoing product development may cause

changes in the specifications. We reserve these rights.

Page 11: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

11

Attach the mounting rail for thewooden beams (A) and the end-cover (B) to the channel.

2

Installing the gully part

The gully is fixed with six nutsand washers.

A separate mounting spanner isenclosed, attached on the bottom of the channel.

(A)

(A)

(B)

3NB! strengthen the beams with

extra cross-beams.

Fasten the mounting rails direct to the wooden beamswith wood screws.

1

Ensure that the gasket between gully and channel

is in place before assembling!

Check list● When choosing the position

for mounting, remember theneed for easy access for cleaning of the channel andwater trap.

● Purus Line must be installed horizontally.

● Purus Line’s surface must be on the same level as the finished floor, i.e. flat and in level with flooring material/ tiles and not on falls.

● Tiles must be connected to Purus Line according tonational standards.

● Surface layers must be connected to Purus Line according to guidelines of the supplier.Follow national standards.

● Do not solvent weld waste connections.

It must beinstalled flat

Page 12: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

12

(1)

(1)

(2) Sealing layer

IMPORTANT:Leave the protection plastic onduring cementing!Lay the concrete.

6

Concrete

5

The mounting rails are fastenedto the floor beamsMount the chip-boards.The opening between theboards must be 120 mm wide.

4

witdh120 mm

The membraneis trimmed with a sharp knife.Use the inner edge of thechannel as a ruler and cut off surplus cloth around theentire opening.

SURFACE LAYERS MUST BE CONNECTED TO PURUS LINE ACCORDING TO GUIDELINESOF THE SUPPLIER.

The membrane (1) is mounted in the channel

Sealing layer (2) is attachedaccording to the supplier’sinstructions

Gasket

Page 13: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

13

7

Tighten all screws except the four long ones.They are height adjustment screws for the tile frame. Range: 11-16 mm.Adjust the height of the four screws (6 on length 1000 mm).

NO POWER TOOLS

9

Tile adhesive

Flexible grout

Tiles

8

Tile adhesive

After adjusting the height, turn the frame upside-down and fill the frame-edge with tile adhesive to get it extra stabilized.

Then turn the frame back andinstall it.

Once the tiles are installed, jointhe tile frame with Flexible grout.

Check list● When choosing the position

for mounting, remember theneed for easy access for cleaning of the channel andwater trap.

● Purus Line must be installed horizontally.

● Purus Line’s surface must be on the same level as the finished floor, i.e. flat and in level with flooring material/ tiles and not on falls.

● Tiles must be connected to Purus Line according tonational standards.

● Surface layers must be connected to Purus Line according to guidelines of the supplier.Follow national standards.

● Do not solvent weld waste connections.

NOTE: When installing, the whole framearound shall be filled with adhesive.

Page 14: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

14

When choosing Purus Line,please note:● The upper part is made of stainless steel● The gully part is made of Polypropylene (PP).● When PP is burning, it forms only carbon dioxide

and water.● PURUS LINE has a clamping frame for

membrane / sealing-vinyl floor.● Spare parts for PURUS LINE are always

available● PURUS LINE is self-cleaning and seldom

demands cleaning or maintenance.● PURUS LINE fulfills the European Standards

EN 1253-1● For installation of ceramic floor tiles refer to

national standards.● For installation of vinyl floors refer to

national standards.● Purus Line must be installed flat - i.e. not on falls● Please note that Polypropylene outlets cannot

be solvent welded”. There are Solvent Weld and Mechanical Fix adapters/connectors available. Please consult your distributor for details.

For wooden beam floorconstructions with tiles, placed against wall.Installation kit:Length: Height 35 mm Mounting rails.

(22+13 mm concrete)

300 At. no 711 41 55 2 pc.600 At. no 711 41 85 2 pc.700 At. no 711 42 43 2 pc.800 At. no711 42 13 2 pc.900 At. no 711 42 72 2 pc

1000 At. no 711 43 01 2 pc.

Necessary tools:- Wrench 11 mm. dimension- Torx bits 6 mm. dimension- Phillips screwdriver.

Installation instructions no. 4

Our ongoing product development may cause

changes in the specifications. We reserve these rights.

Page 15: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

15

Attachment bricks for wallrail(A), mounting brackets for floorbeams (B) and endcovers (C)are attached to the channels underside.

2

Installing the gully part

The gully is fixed with six nutsand washers.

A separate mounting spanner isenclosed, attached on the bottom of the channel.

(B)

(C)

(A)

3NB! Strengthen the beams with

extra cross-beams.

1

Ensure that the gasket between gully and channel

is in place before assembling!

Check list● When choosing the position

for mounting, remember theneed for easy access for cleaning of the channel andwater trap.

● Purus Line must be installed horizontally.

● Purus Line’s surface must be on the same level as the finished floor, i.e. flat and in level with flooring material/ tiles and not on falls.

● Tiles must be connected to Purus Line according tonational standards.

● Surface layers must be connected to Purus Line according to guidelines of the supplier.Follow national standards.

● Do not solvent weld waste connections.

It must beinstalled flat

Page 16: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

16

(1)

(1)

(2)

(2)

6

Concrete

5

Mount the wall rail to the floorbeam.NB! Do not mount on to wall!

4

witdh120 mm

The channel is placed against thewall rail, then the outside rail is pla-ced and screwed to the floorbeams.

Position the chip board.The opening between the boardsmust be 120 mm wide.

IMPORTANT:Leave the protection plastic onduring cementing!

The membraneis trimmed with a sharp knife..Use the inner edge of thechannel as a ruler and cut offsurplus cloth around theentire opening.

SURFACE LAYERS MUST BE CONNECTED TO PURUS LINE ACCORDING TO GUIDELINESOF THE SUPPLIER.

The membrane (1) is mounted in the channel

Sealing layer (2) are attachedaccording to the supplier’sinstructions

Gasket

Page 17: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

17

7The clamping frame is mountedafter the sealing/tanking layer.

Position the clamping frame andpierce holes for the screws withan awl.

NO POWER TOOLS

Tighten all screws except the four long ones. They are adjustment screws for the tile frame. Adjust to the right height with the four screws. (6 screws on length 1000 mm).Range: 11-16 mm.

Flexible grout

Tile adhesive

Tiles

Tiles are installed. Join the tileframe with grouting cement.9

8B8

Tile adhesive

After adjusting the height, turn the frame upside-down and fill the frame-edge with tile adhesive to get it extra stabilized.

Then turn the frame back andinstall it.

NOTE: When installing, the wholeframe around shall be filled withadhesive.

Page 18: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

18

Installation of TILE

IMPORTANT: The height of the frame is adjustablefrom:* 15-23 mm with the screws M5x20* 15-29 mm with the screws M5x25

Installation of the channel part isdescribed in the earlier chapters for every type of flooring.

This chapter describes only what isspecial for the tile-frame TILE.

TILE differs from the other frames as follows:

● The tiles shall be put in the lowered area in the frame.

● The TILE frame is more narrow and shorter compared with the channel and the other models of frames.

Installation instructions No. 5

● The TILE is most suitable for installing as a door channel.

See measure table!

Additional instructions for installing the frame TILE

The TILE frame is most suitable for

installing as a door channel. See instructions no. 1 and 3.

15-23 mm*15-29 mm*

1 The adjustmentscrew liftsthe frame

Page 19: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

19

The TILE frame is installed likethe other frames i.e. after moun-ting the membrane according tothe guideline from the supplier.

2

3The inner part of the frame isloose and can be lifted out tosimplify the work with laying thetiles.

Membrane

Rollable or folio-coveredwater tight membrane

LAY THE TILES

Fix the tiles with adhesive that fastens to stainless steel.

4 Flexible grout

Page 20: for ceramic/tiled floor - Purus Sverigeqbankfrontend.purus.se/deployedFiles/23c00603aba5c59174... · 2014. 9. 30. · EN 1253-1 For installation of ceramic floor tiles refer to national

1. Lift out the water trap, shown by picture (1).2. If necessary, rinse the water trap under water

see picture (2).3. Replace the water trap.

Hold the water trap with the spring loaded bodyopen whilst rinsed clean. Alternatively use a brush.

Make sure the gaskets are completely clean for awatertight fitting as possible!

1 2

ww

w.ultra-d

esign.no-2270-06.2009

Cleaning and maintenance

Purus AB, Södergatan 7, SE 275 31 Sjöbo – Tel +46 416 25 700, Fax +46 416 25 [email protected], www.purus.se - www.purusgroup.se - www.purusline.com

Channel length mm:Gully type Dim 300 600 700 800 900 1000

Side-/Side&Side outletØ50 og Ø75 H: 132 132 134 136 137 139

Ø50 A: 107 107 109 111 112 114Ø75 A: 95 95 97 99 100 102

Bottom outletØ50 H: 187 187 188 190 192 193Ø75 H: 212 212 213 215 217 219

Low gullyØ50 H: 79 79 81 83 84 86Ø50 A: 54 54 56 58 59 61

Purus LINE, dimensions

Type W: 300 600 700 800 900 1000

Door channel 92 273 573 673 773 873 973

Tile frame 52 234 534 634 734 834 934

H A

H

Purus LINE, Frame/grating dimensions

Tile frame/grating

AH