folha de horas de pilotagem 06-20 mar 2012

20
6:25 0:50 7:15 150 25 7:15 0:34 7:49 7:49 0:22 8:11 8:11 1:32 9:43 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00

Upload: alenorato1985

Post on 15-Jan-2016

215 views

Category:

Documents


0 download

DESCRIPTION

Piloting

TRANSCRIPT

Page 1: Folha de Horas de Pilotagem 06-20 Mar 2012

6:25 0:50 7:15 150 257:15 0:34 7:497:49 0:22 8:118:11 1:32 9:43

0:000:000:000:000:000:000:000:000:000:000:000:000:000:000:000:000:000:000:000:00

Page 2: Folha de Horas de Pilotagem 06-20 Mar 2012

9000 0.416667 9000.417 150.0069

Page 3: Folha de Horas de Pilotagem 06-20 Mar 2012

ROV PERSONNEL LOG BOOK ROV PERSONNEL LOG BOOKPart 5 - Record of Work Experience Part 5 - Record of Work Experience

Note: Use one page per tour of duty unless a separete dive record is required Note: Use one page per tour of duty unless a separete dive record is required

Tour Date/Date of dive: 8-mar-12 Tour Date/Date of dive: 10-mar-12

Name of Contractor: DOF SUBSEA BRASIL Name of Contractor: DOF SUBSEA BRASIL

Client Name(s): AKER / PETROBRAS Client Name(s): AKER / PETROBRAS

Dive Number(s): 765 Dive Number(s): 767

Dive Location: Marlim Sul Dive Location: Marlin Sul

Support Vessel/Installation: SKANDI SANTOS Support Vessel/Installation: SKANDI SANTOS

Position During Tour(s): PILOTO Position During Tour(s): PILOTO

Type of Rovs: Manufacturer: Perry Type of Rovs: Manufacturer: Perry

Model: XLX Model: XLX

Unit Number: 23 Unit Number: 23

Total Time (this tour): HRS MINS Total Time (this tour): HRS MINS06 00 6 0

HRS MINS HRS MINSCumulative Pilot hours (total): Cumulative Pilot hours (total):

Type of Operation: Type of Operation:Instalação da Tree Cap no poço 8-MLS-183HP-RJS

Instalação de ANM no poço 8-MLS-183HP-RJS

Sensors/Manipulators Used: Sensors/Manipulators Used:Rigmaster, T4, sonar, navipac Rigmaster, T4, sonar, navipac

Name of Supervisor in Charger (and Company): Name of Supervisor in Charger (and Company):José Luis José Luis

Signature Verifier: Date: Signature Verifier: Date:

Signature Project Manager: Date: Signature Project Manager: Date:

Page 4: Folha de Horas de Pilotagem 06-20 Mar 2012

ROV PERSONNEL LOG BOOK ROV PERSONNEL LOG BOOKPart 5 - Record of Work Experience Part 5 - Record of Work Experience

Note: Use one page per tour of duty unless a separete dive record is required Note: Use one page per tour of duty unless a separete dive record is required

Tour Date/Date of dive: 10-mar-12 Tour Date/Date of dive: 11-mar-12

Name of Contractor: DOF SUBSEA BRASIL Name of Contractor: DOF SUBSEA BRASIL

Client Name(s): AKER / PETROBRAS Client Name(s): AKER / PETROBRAS

Dive Number(s): 768 Dive Number(s): 769

Dive Location: RONCADOR Dive Location: Roncador

Support Vessel/Installation: SKANDI SANTOS Support Vessel/Installation: SKANDI SANTOS

Position During Tour(s): PILOTO Position During Tour(s): PILOTO

Type of Rovs: Manufacturer: Perry Type of Rovs: Manufacturer: Perry

Model: XLX Model: XLX

Unit Number: 23 Unit Number: 23

Total Time (this tour): HRS MINS Total Time (this tour): HRS MINS01 58 00 57

HRS MINS HRS MINSCumulative Pilot hours (total): Cumulative Pilot hours (total):

Type of Operation: Type of Operation:

INSTALAÇÃO DO TAMPÃO SUIÇO NA BAP 7-RO RJS Instalação do array do poço 7-RO-107HP-RJS para SS-49

Sensors/Manipulators Used: Sensors/Manipulators Used:Rigmaster, T4, sonar, navipac Rigmaster, T4, sonar, navipac

Name of Supervisor in Charger (and Company): Name of Supervisor in Charger (and Company):José Luis José Luis

Signature Verifier: Date: Signature Verifier: Date:

Page 5: Folha de Horas de Pilotagem 06-20 Mar 2012

Signature Project Manager: Date: Signature Project Manager: Date:

ROV PERSONNEL LOG BOOK ROV PERSONNEL LOG BOOKPart 5 - Record of Work Experience Part 5 - Record of Work Experience

Note: Use one page per tour of duty unless a separete dive record is required Note: Use one page per tour of duty unless a separete dive record is required

Tour Date/Date of dive: 11-mar-12 Tour Date/Date of dive:

Name of Contractor: DOF SUBSEA BRASIL Name of Contractor: DOF SUBSEA BRASIL

Client Name(s): AKER / PETROBRAS Client Name(s): AKER / PETROBRAS

Dive Number(s): 770 Dive Number(s):

Dive Location: BARRACUDA Dive Location:

Support Vessel/Installation: SKANDI SANTOS Support Vessel/Installation: SKANDI SANTOS

Position During Tour(s): PILOTO Position During Tour(s): PILOTO

Type of Rovs: Manufacturer: Perry Type of Rovs: Manufacturer: Perry

Model: XLX Model: XLX

Unit Number: 23 Unit Number:

Total Time (this tour): HRS MINS Total Time (this tour): HRS MINS03 35

HRS MINS HRS MINSCumulative Pilot hours (total): Cumulative Pilot hours (total):

Type of Operation: Type of Operation:

Retira da capa de corrosão e Limpeza do poço 6-BR-063A-RJS

Sensors/Manipulators Used: Sensors/Manipulators Used:Rigmaster, T4, sonar, navipac. Rigmaster, T4, sonar, navipac

Name of Supervisor in Charger (and Company): Name of Supervisor in Charger (and Company):José Luis

Page 6: Folha de Horas de Pilotagem 06-20 Mar 2012

Signature Verifier: Date: Signature Verifier: Date:

Signature Project Manager: Date: Signature Project Manager: Date:

ROV PERSONNEL LOG BOOK ROV PERSONNEL LOG BOOKPart 5 - Record of Work Experience Part 5 - Record of Work Experience

Note: Use one page per tour of duty unless a separete dive record is required Note: Use one page per tour of duty unless a separete dive record is required

Tour Date/Date of dive: Tour Date/Date of dive:

Name of Contractor: DOF SUBSEA BRASIL Name of Contractor: DOF SUBSEA BRASIL

Client Name(s): AKER / PETROBRAS Client Name(s): AKER / PETROBRAS

Dive Number(s): Dive Number(s):

Dive Location: Dive Location:

Support Vessel/Installation: SKANDI SANTOS Support Vessel/Installation: SKANDI SANTOS

Position During Tour(s): PILOTO Position During Tour(s): PILOTO

Type of Rovs: Manufacturer: Perry Type of Rovs: Manufacturer: Perry

Model: XLX Model: XLX

Unit Number: Unit Number:

Total Time (this tour): HRS MINS Total Time (this tour): HRS MINS

HRS MINS HRS MINSCumulative Pilot hours (total): Cumulative Pilot hours (total):

Type of Operation: Type of Operation:

Sensors/Manipulators Used: Sensors/Manipulators Used:

Name of Supervisor in Charger (and Company): Name of Supervisor in Charger (and Company):Rigmaster, T4, sonar, navipac Rigmaster, T4, sonar, navipac

Page 7: Folha de Horas de Pilotagem 06-20 Mar 2012

Signature Verifier: Date: Signature Verifier: Date:

Signature Project Manager: Date: Signature Project Manager: Date:

ROV PERSONNEL LOG BOOK ROV PERSONNEL LOG BOOKPart 5 - Record of Work Experience Part 5 - Record of Work Experience

Note: Use one page per tour of duty unless a separete dive record is required Note: Use one page per tour of duty unless a separete dive record is required

Tour Date/Date of dive: Tour Date/Date of dive:

Name of Contractor: DOF SUBSEA BRASIL Name of Contractor: DOF SUBSEA BRASIL

Client Name(s): AKER / PETROBRAS Client Name(s): AKER / PETROBRAS

Dive Number(s): Dive Number(s):

Dive Location: Dive Location:

Support Vessel/Installation: SKANDI SANTOS Support Vessel/Installation: SKANDI SANTOS

Position During Tour(s): PILOTO Position During Tour(s): PILOTO

Type of Rovs: Manufacturer: Perry Type of Rovs: Manufacturer: Perry Model: XLX Model: XLX Unit Number: Unit Number:

Total Time (this tour): HRS MINS Total Time (this tour): HRS MINS

HRS MINS HRS MINSCumulative Pilot hours (total): Cumulative Pilot hours (total):

Type of Operation: Type of Operation:

Page 8: Folha de Horas de Pilotagem 06-20 Mar 2012

Sensors/Manipulators Used: Sensors/Manipulators Used:Rigmaster, T4, sonar, navipac. Rigmaster, T4, sonar, navipac

Name of Supervisor in Charger (and Company): Name of Supervisor in Charger (and Company):

Signature Verifier: Date: Signature Verifier: Date:Signature Project Manager: Date: Signature Project Manager: Date:

ROV PERSONNEL LOG BOOK ROV PERSONNEL LOG BOOKPart 5 - Record of Work Experience Part 5 - Record of Work Experience

Note: Use one page per tour of duty unless a separete dive record is required Note: Use one page per tour of duty unless a separete dive record is required

Tour Date/Date of dive: Tour Date/Date of dive:

Name of Contractor: DOF SUBSEA BRASIL Name of Contractor: DOF SUBSEA BRASIL

Client Name(s): AKER / PETROBRAS Client Name(s): AKER / PETROBRAS

Dive Number(s): Dive Number(s):

Dive Location: Dive Location:

Support Vessel/Installation: SKANDI SANTOS Support Vessel/Installation: SKANDI SANTOS

Position During Tour(s): PILOTO Position During Tour(s): PILOTO

Type of Rovs: Manufacturer: Perry Type of Rovs: Manufacturer: Perry Model: XLX Model: XLX Unit Number: Unit Number:

Total Time (this tour): HRS MINS Total Time (this tour): HRS MINS

HRS MINS HRS MINSCumulative Pilot hours (total): Cumulative Pilot hours (total):

Page 9: Folha de Horas de Pilotagem 06-20 Mar 2012

Type of Operation: Type of Operation:

Sensors/Manipulators Used: Sensors/Manipulators Used:

Name of Supervisor in Charger (and Company): Name of Supervisor in Charger (and Company):Rigmaster, T4, sonar, navipac Rigmaster, T4, sonar, navipac

Signature Verifier: Date: Signature Verifier: Date:Signature Project Manager: Date: Signature Project Manager: Date:

ROV PERSONNEL LOG BOOK ROV PERSONNEL LOG BOOKPart 5 - Record of Work Experience Part 5 - Record of Work Experience

Note: Use one page per tour of duty unless a separete dive record is required Note: Use one page per tour of duty unless a separete dive record is required

Tour Date/Date of dive: Tour Date/Date of dive:

Name of Contractor: DOF SUBSEA BRASIL Name of Contractor: DOF SUBSEA BRASIL

Client Name(s): AKER / PETROBRAS Client Name(s): AKER / PETROBRAS

Dive Number(s): Dive Number(s):

Dive Location: Dive Location:

Support Vessel/Installation: SKANDI SANTOS Support Vessel/Installation: SKANDI SANTOS

Position During Tour(s): PILOTO Position During Tour(s): PILOTO

Type of Rovs: Manufacturer: Perry Type of Rovs: Manufacturer: Perry Model: XLX Model: XLX Unit Number: Unit Number:

Page 10: Folha de Horas de Pilotagem 06-20 Mar 2012

Total Time (this tour): HRS MINS Total Time (this tour): HRS MINS

HRS MINS HRS MINSCumulative Pilot hours (total): Cumulative Pilot hours (total):

Type of Operation: Type of Operation:

Sensors/Manipulators Used: Sensors/Manipulators Used:Rigmaster, T4, sonar, navipac. Rigmaster, T4, sonar, navipac

Name of Supervisor in Charger (and Company): Name of Supervisor in Charger (and Company):

Signature Verifier: Date: Signature Verifier: Date:Signature Project Manager: Date: Signature Project Manager: Date:

ROV PERSONNEL LOG BOOK ROV PERSONNEL LOG BOOKPart 5 - Record of Work Experience Part 5 - Record of Work Experience

Note: Use one page per tour of duty unless a separete dive record is required Note: Use one page per tour of duty unless a separete dive record is required

Tour Date/Date of dive: Tour Date/Date of dive:

Name of Contractor: DOF SUBSEA BRASIL Name of Contractor: DOF SUBSEA BRASIL

Client Name(s): AKER / PETROBRAS Client Name(s): AKER / PETROBRAS

Dive Number(s): Dive Number(s):

Dive Location: Dive Location:

Support Vessel/Installation: SKANDI SANTOS Support Vessel/Installation: SKANDI SANTOS

Position During Tour(s): PILOTO Position During Tour(s): PILOTO

Page 11: Folha de Horas de Pilotagem 06-20 Mar 2012

Type of Rovs: Manufacturer: Perry Type of Rovs: Manufacturer: Perry Model: XLX Model: XLX Unit Number: Unit Number:

Total Time (this tour): HRS MINS Total Time (this tour): HRS MINS

HRS MINS HRS MINSCumulative Pilot hours (total): Cumulative Pilot hours (total):

Type of Operation: Type of Operation:

Sensors/Manipulators Used: Sensors/Manipulators Used:

Name of Supervisor in Charger (and Company): Name of Supervisor in Charger (and Company):Rigmaster, T4, sonar, navipac Rigmaster, T4, sonar, navipac

Signature Verifier: Date: Signature Verifier: Date:Signature Project Manager: Date: Signature Project Manager: Date: