DMRC – Case Study

GROUP : II

Page 2: Fmg 18 A Dmrc Group 2

Mr. E Sreedharan- railway man

Graduated as engineer from Jawahar Lal Nehru technological university.

1954, first assignment at Southern Railway 1963, task of restoring Pamban Bridge 1970, as deputy chief engineer for Calcutta metro 1990, took Konkan Railway project 1997,took up DMRC project as a MD Very professional approach of work, worked on his own

terms, disciplined,

Page 3: Fmg 18 A Dmrc Group 2

About DMRC

A Government Company jointly promoted by Government of India and Government of Delhi.

Incorporated in May 1995, under the name Delhi Metro Rail Corporation Ltd. (DMRC).The two Governments have 50% shares each in this

Corporation Has the responsibility for construction and operation of

Delhi Metro• ISO 14001 & OSHSAS 18001 certified.

Page 4: Fmg 18 A Dmrc Group 2

The Delhi Metro Rail Corporation…

Meeting Time deadlines Low political interference Ensures no disruption in civic amenities. 45 persons per kilometer (1/3rd of other organisations

in world) Environment conscious-installation of storm water

drains, monitors air and noise pollution

Page 5: Fmg 18 A Dmrc Group 2

Contd…

Anticipated the steel price hike and made provisions.Financial management is efficientAutonomy to contractorsPenalty clauses to ensure timely completion and counter

guarantee against late payments.

Page 6: Fmg 18 A Dmrc Group 2

Problems faced

Failure of Rock Tunnel Boring Machine◦Austrian tunneling method helped and earth press

balance machines saved it◦Fixed term contracts ensured accountability of

contractorsThe ITO problemThermal power station problem

Page 7: Fmg 18 A Dmrc Group 2

Contd..

Tried to blindly follow the international practice of public toilets

Indian partners necessary for suppliers Process management done by 4 global members and

RITES(Indian)

Page 8: Fmg 18 A Dmrc Group 2

Question 1 How according to you the crisis of the Metro tracks going over the Indian Railway's overhead

lines near ITO should have been avoided by DMRC?

Page 9: Fmg 18 A Dmrc Group 2

Basic Problems

Indian railway tracks. Problem of red tapeMetro tracks should go over the Indian Railway’s

overhead lines near ITOUnderground track to an elevated trackThe planning engineers either miscalculated the

magnitude of the problem involved or gave insufficient time for the execution of the tasks.

Required modern construction technology.Alteration of signaling system was a possible solution

Page 10: Fmg 18 A Dmrc Group 2

Possible solutions to avoid crisis

Could have opted for faster and more convenient fabrication methods

DMRC had encountered oversight in design capabilities. So a possible solution could have been to do detailed analysis before planning the routing work.

Opted for a more convenient track profile rather than the one executed given the hindrances in the current track.

Giving a more realistic estimate for the execution of the project.

Page 11: Fmg 18 A Dmrc Group 2

Question 2In Your view is it a right decision on part of DMRC

to now provide public toilets at all its stations by violating the international norm of not providing

toilets at all stations?

Page 12: Fmg 18 A Dmrc Group 2

Provision Of Public Toilets

Delhi Metro is a public transport mode meant to provide convenient and hassle free transport taking minimum time.

Thus basic objective is to reduce the traffic congestion on the roads and provide the people with air-conditioned, modern transport at cheap prices.

International norms do not provide public toilets on all metro stations as they lead to cleanliness problems.

Page 13: Fmg 18 A Dmrc Group 2

• More staff have to be deployed on the cleaning side.• Lead to a dirty overall environment.

• Probability of increasing long queues for the use of public conveniences thus increasing the traffic in metro premises.

• An average metro traveller probably travels in Metro on a one way for about 15 mins between the start and destination station and thus leaving no urgent need to provide public toilets.

• More services could lead to increase in costs.• Space constraint• Thus providing toilets at the main junctions the most

suitable option.

Page 14: Fmg 18 A Dmrc Group 2

Provision Of Public Toilets

DMRC was questioned by the Honourable Delhi High Court on a PIL filed to provide basic amenities to the public.

DMRC then provided toilets at 48 out of 58 stations. Absence of space was there at 4 stations. DMRC also voiced a protest stating absence of toilets in

short duration train system was the practice across the world.

Page 15: Fmg 18 A Dmrc Group 2

DMRC says if people start respecting the system then they don’t dirty it. So they can provide toilets.

50 stations have toilets (Sulabh complexes or MCD urinals) near or inside Metro premises

48 stations have toilets within 50 metre from the station.

2 stations (Pragati Maidan and Netaji Subhash Place) have toilet facilities within 50-100 metre from station premises

9 stations do not have public toilets but staff toilets are available

Page 16: Fmg 18 A Dmrc Group 2

Question 3It is always beneficial for a public sector enterprise

to deal with public sector suppliers and contractors. Otherwise, it would have been

impossible for a private enterprise to tackle the escalating steel prices problem, the way DMRC handled it by convincing its PSU supplier SAIL.

Page 17: Fmg 18 A Dmrc Group 2

Objective of Delhi Metro is development with convenience and not profits.

Social well being precedes profits.Project of the size and type such as that of DMRC

requires Iron & Steel, Cement etc. in huge quantity

Page 18: Fmg 18 A Dmrc Group 2

DMRC Project spans over more than 7 years and thus price fluctuations in cost of raw materials is always a risk

Thus, hedging is essentialAgain this project involved national and international

contractors.

Page 19: Fmg 18 A Dmrc Group 2

SAIL

SAIL is a Navratna Company. It has the independence and the financial muscle to

partner such a projectThe Management of DMRC had a vision and thus

they got into minimum guarantee contracts with SAIL.

This helped them counter escalating prices

Page 20: Fmg 18 A Dmrc Group 2

SAIL, being a PSU, the Govt. could provide it with subsidies and tax benefits.

With Private participants, this may be a problem and also there is a risk of bureaucracy and red-tapism with private units.

Page 21: Fmg 18 A Dmrc Group 2

WHY NOT PRIVATE UNITS

Private Companies cannot solely work on social obligations.

Moreover they may not be in a position to be in-terms with increasing costs.

Private firms could have been considered if DMRC could have entered into a contract with them before hand

Page 22: Fmg 18 A Dmrc Group 2

Question 4Would DMRC be able to meet the target it had set

for the commonwealth Games in 2010?Comment on the current status

Page 23: Fmg 18 A Dmrc Group 2

In October 2010, New Delhi will play host to the third largest multi-sporting event in the world, the Commonwealth Games.

Delhi will see over one lakh people, including athletes and officials from 72 participating countries, visiting the city.

To prepare itself for this, the city is planning a major overhaul of its urban infrastructure as well as its sporting facilities.

The emphasis of the present Rapid Transport system is now on the Metro.

Page 24: Fmg 18 A Dmrc Group 2

Phase I of Delhi Metro Rail project is over

Page 25: Fmg 18 A Dmrc Group 2

Phase II, aimed at extending the network much further in the city, is already under construction, and is set to be ready before 2010.

This phase is going to require massive investment, over Rs 8000 Crores. The second phase is going to provide a vital transport link to East Delhi, with a dedicated Games Village station.

Page 26: Fmg 18 A Dmrc Group 2

Corridors Length Target Date Revised Target

Compl. Date

1. Vishwa Vidayalaya–Jahangir Puri 6.36 Km Oct., 08 Oct., 09 03.02.09

2. CentralSecretariat-QutabMinar 10.87 Km Dec., 09 Jun,10

3. Indraprastha–New Ashok Nagar 8.07 Km June, 08 Jun,9

4. Shahdara-Dilshad Garden 3.09 Km Dec., 07 Dec., 08 04.06.08

5. Yamuna Bank – Anand Vihar 6.16 Km Sept., 08 Dec., 096. Mundka – Inderlok 18.47 Km Jan, o9 Mar., 10 Total 53.02 KmFollowing corridors have also been included in MRTS, Phase-II:-

7. Qutab Minar-Sushant Lok 15.93 Km Jan., 10

8. Central Secretariat-Badar Pur 19.55 Km Sep., 10

9. New Ashok Nagar-Noida Sector-32 7.05 Km Jan., 1010. Airport Express Link 9.20 Km Aug., 10(New Delhi-IGI)

11. Extension of Airport Express 3.50 Km Sept., 10Total 64.23 Km

Page 27: Fmg 18 A Dmrc Group 2

String of accidents last one year dented Delhi Metro’s image.

Senior Metro officials accepted : accidents gave them a setback of at least three months.

Three new Metro lines — Yamuna Bank to Noida, Yamuna Bank to Anand Vihar and Inderlok to Mundka — that were to be opened in 2009 have got delayed.

Present Status

Page 28: Fmg 18 A Dmrc Group 2

The Metro network will also provide easy access to 10 of 11 sporting venues across the city.These include the Games Village, Jawaharlal Nehru Stadium, Delhi University, Thyagaraj Complex, Siri Fort Sports Complex, National Stadium, Indira Gandhi Sports Complex, Talkatora Indoor Stadium, Yamuna Sports Complex and R. K. Tennis Complex.

Three Commonwealth Games venues -- the Games Village, the Jawaharlal Nehru Stadium and Delhi University -- will have direct access to metro stations. The Games Village, where most athletes will reside, is adjacent to the Akshardham metro station on the Indraprastha-Noida line.

Page 29: Fmg 18 A Dmrc Group 2

Delhi Metro has decided to procure 300 air-conditioned feeder buses in its effort to provide hassle-free and comfortable ride to spectators on their way to Commonwealth Games (CWG) venues.

Metro Citizens’ Forum

DMRC is also putting its Customer Relations Assistants (CRAs) through lesson in the Queen’s language.

The staff will also be equipped to handle queries from passengers about the metro, the stations and the immediate surroundings. “