fm 917 steps for project...

1
FM 917 Steps for Project Development Feasibility Study 2015 Route Study 2016 Environmental Study & Schematic Design Detailed Design & ROW Acquisition Utility Adjustments Construction We Are Here

Upload: others

Post on 27-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FM 917 Steps for Project Developmentftp.dot.state.tx.us/pub/txdot-info/ftw/notices/111516-project-steps.pdf · Title: Project Steps Author: TxDOT Subject: FM 917 from West of BNSF

FM 917 Steps for Project Development

Feasibility Study 2015

Route Study 2016

Environmental Study & Schematic

Design

Detailed Design & ROW Acquisition

Utility Adjustments

Construction

We Are Here