florida department of transportation florida’s … virtual... · florida’s turnpike enterprise...
TRANSCRIPT
FLORIDA’S TURNPIKE ENTERPRISECONSULTANT ACQUISITION PLAN (CAP) FY 2019
VIRTUAL FORUM 11/30/2017
Florida Department ofTRANSPORTATION
1
Opening Remarks
2
Agenda
Opening Remarks – Mike Shannon, P.E.
Continuing Services Contracts – Kathy Alexander
Phase 22 (PD&E) – Rax Jung, P.E.
Phase 32 (DESIGN) – Kathy Alexander
Design Build Projects – Kathy Alexander
Phase 62 (CEI) – Karen Akers, P.E.
FY 20 Tentative Summary – Kathy Alexander
Top 10 Design Tips – Pat Muench, P.E.
Additional Resources – Kathy Alexander
Forum Q&A Review – Brianna Myers
3
Continuing Services/Miscellaneous Design Services Contracts
ESTIMATED TOTAL CONTINUING/MISCELLANEOUS SERVICES CONTRACTS $8M
AD NO19801 19809
CONTRACT TYPED/W – MISC DESIGN SERVICES CONTRACT CONT SERVICES DESIGN BUILD RFP
DEVELOPMENT
TYPE OF SERVICE MISCELLANEOUS DESIGN DESIGN BUILD RFP
CONTRACT AMOUNT & LENGTH
$1.5M / 3 YEARS(2 CONTRACTS WILL BE AWARDED) $5M / 5 YEARS
BDI? YES NO
FORMAL AD DATE 12/18/2017 1/2/2018
4
Phase 22 (PD&E)
ESTIMATED TOTAL PHASE 22 CONTRACTS $4.50M
AD NUMBER19804
(CURRENTLY UNDER ACQUISITION) 19803
PROJECT
WIDEN TPK FROM KISSIMMEE PARK RD TO US 192 (MP 238.5‐
242.5) (4 TO 8 LANES)PD&E WIDENING TPK FROM I‐595 TO ATLANTIC (8 TO 10 LANES)
FPID 441224‐1 442212‐1
BDI? NO NO
EST CONTRACT AMOUNT $1.5M (WITH OPTION FOR DESIGN $) $3.0M
COUNTY OSCEOLA BROWARD
PMBRIAN RIBARIC (PD&E)STEVE SOLDATI (DESIGN) BECKY BOLAN
FORMAL AD DATE 10/23/2017 2/19/2018
5
PM BRIAN RIBARIC / 407.264.3095STEVE SOLDATI / 407.264‐3967
AD NO / FPID(S) AD NO 19804 / FPID 441224‐1
County/Counties OSCEOLA
Estimated Contract Amount $1.5M (WITH OPTION FOR DESIGN)
Estimated Contract Execution AUGUST 2018
Estimated Length of Contract 48 MONTHS
BDI NO
Project Description:
WIDEN TPK FROM KISSIMMEE PARK RD TO US 192 (MP 238.5 ‐ 242.5) (4 TO 8 LANES)
Major/Minor Work Types Anticipated
Major – 2.0, 3.3Minor – 3.1, 3.2, 4.1.1, 4.1.2, 6.1, 6.2, 6.3.1, 6.3.2, 6.3.3, 7.1, 7.2, 7.3, 8.1, 8.2, 8.3, 8.4, 9.1, 9.2, 9.4.1, 14.0, 15.0
PHASE 22
6
PM BECKY BOLAN / 407.264.3416
AD NO / FPID(S) AD NO 19803 / FPID 442212‐1
County/Counties BROWARD
Estimated Contract Amount $3.0M
Estimated Contract Execution MARCH 2019
Estimated Length of Contract 24 MONTHS
BDI NO
Project Description:
PD&E WIDENING TPK FROM I‐595 TO ATLANTIC (8 TO 10 LANES)
Major/Minor Work Types Anticipated
Major – 2.0, 3.3Minor – 4.1.1, 4.1.2, 4.2.1, 4.2.2, 4.2.3, 6.1, 6.2, 6.3.1, 6.3.2, 6.3.3, 7.1, 7.2, 7.3, 8.1, 8.2, 8.3, 8.4, 9.1, 9.2, 9.4.1, 14.0, 15.0
PHASE 22
7
Phase 32 (DESIGN)
ESTIMATED TOTAL PHASE 32 CONTRACTS $35.1M
8
AD NO FPID DESCRIPTION ESTIMATED CONTRACT AMT
19802 435786‐1 / 440294‐1
WIDEN TPK‐ MINNEOLA INTCHG TO US27 (MP279‐289.3) (4TO8 W/EXP) &RESURFACE TURNPIKE MAINLINE LAKE COUNTY MP 279.0 TO MP 287.7
$24.4M
19805 405270‐5 SUNCOAST PARKWAY 2 ‐ SR 44 TO US19(PD&E RE EVAL)
$3.7M
19806 440291‐1 RESURFACE SEMINOLE EXPRESSWAY MP 38 TO MP 44.5 $1.3M (BDI)
19807 440293‐1 RESURFACE TURNPIKE MAINLINE ORANGE COUNTY MP 259.9 TO MP 266.8 $2.2M
19808(UNDER
ACQUISITION)
436516‐1 RESURFACING TURNPIKE MAINLINE MP 234.95 TO 238.76 $0.6M (BDI)
19810 440423‐1 RESURFACE HEFT IN MIAMI‐DADE FROM MP 0.0‐5.1, & RAMPS FROM MP 5.1‐9.2
$1.3M
19811 440700‐1 RESURFACING ‐ TURNPIKE OSCEOLA COUNTY MP 190.5 TO 198.3 $1.6M
PM ANIL SHARMA / 407.264.3041
AD NO / FPID(S) AD NO 19802 / FPID(S) 435786‐1 & 440294‐1
County/Counties LAKE
Estimated Contract Amount $24.4M
Estimated Contract Execution MARCH 2019
Estimated Length of Contract 30 MONTHS
BDI NO
Project Description:WIDEN TPK‐ MINNEOLA INTCHG TO US27 (MP279 ‐ 289.3) (4 TO 8 LANES W/EXP LANES) &RESURFACE TURNPIKE MAINLINE LAKE COUNTY MP 279.0 TO MP 287.7
Major/Minor Work Types Anticipated
Major – 3.3, 4.1.1, 4.1.2Minor – 3.1, 3.2, 6.2, 6.3.1, 7.1, 7.2, 7.3, 8.1, 8.2, 8.4, 9.1, 9.2, 9.3, 9.4.1, 14.0, 15.0
PHASE 32 (DESIGN)
9
PM TOM NEYER / 407.264.3424
AD NO / FPID(S) AD NO 19805 / FPID 405270‐5
County/Counties CITRUS
Estimated Contract Amount $3.7M
Estimated Contract Execution JANUARY 2019
Estimated Length of Contract 60 MONTHS
BDI NO
Project Description:
SUNCOAST 2 FROM SR 44 TO US 19 (INCLUDES PD&E RE EVAL)
Major/Minor Work Types Anticipated
Major – 3.3, 4.1.1, 4.1.2Minor – 2.0, 3.2, 4.2.1, 5.4, 6.1, 6.3.1, 6.3.2, 6.3.3, 7.1, 7.2, 7.3, 8.1, 8.2, 8.3, 8.4, 9.1, 9.2, 9.4.1, 14.0, 15.0
PHASE 32 (DESIGN)
10
PM SNEHAL AMBARE / 407.264.3414
AD NO / FPID(S) AD NO 19806 / FPID 440291‐1
County/Counties SEMINOLE
Estimated Contract Amount $1.3M
Estimated Contract Execution JANUARY 2019
Estimated Length of Contract 18 MONTHS
BDI YES
Project Description:
RESURFACE SEMINOLE EXPRESSWAY MP 38 TO MP 44.5
Major/Minor Work Types Anticipated
Major – 3.3Minor – 3.1, 4.1.4, 4.1.2, 7.1, 7.2, 7.3, 8.1, 8.2, 9.1, 9.2
PHASE 32 (DESIGN)
11
PM BRANDON BOBO / 407.264.3113
AD NO / FPID(S) AD NO 19807 / FPID 440293‐1
County/Counties ORANGE
Estimated Contract Amount $2.2M
Estimated Contract Execution JANUARY 2019
Estimated Length of Contract 12 MONTHS
BDI NO
Project Description:
RESURFACE TURNPIKE MAINLINE ORANGE COUNTY MP 259.9 TO MP 266.8
Major/Minor Work Types Anticipated
Major – 3.3Minor – 4.1.1; 4.1.2; 6.3.1; 6.3.2; 6.3.3; 7.1; 7.2; 8.1; 8.2; 8.3; 8.4; 9.1; 9.2
PHASE 32 (DESIGN)
12
PM FRANCISCO CARDONA / 407.264.3029
AD NO / FPID(S) AD NO 19808 / FPID 436516‐1
County/Counties OSCEOLA
Estimated Contract Amount $0.63M
Estimated Contract Execution SEPTEMBER 2018
Estimated Length of Contract 10 MONTHS
BDI YES
Project Description:
RESURFACING TURNPIKE MAINLINE MP 234.95 TO MP 238.76
Major/Minor Work Types Anticipated
Major – 3.3Minor – 4.1.1; 4.1.2; 7.1; 8.1; 8.2; 9.1; 9.2
PHASE 32 (DESIGN)
13
PM ANTHONY WASHINGTON / 407.264.3199
AD NO / FPID(S) AD NO 19810 / FPID 440423‐1
County/Counties MIAMI – DADE
Estimated Contract Amount $1.3M
Estimated Contract Execution JANUARY 2019
Estimated Length of Contract 18 MONTHS
BDI NO
Project Description:
RESURFACE HEFT IN MIAMI‐DADE FROM MP 0.0 TO MP 5.1, & RAMPS FROM MP 5.1 TO MP 9.2
Major/Minor Work Types Anticipated
Major – 3.3Minor – 4.1.1; 4.1.2; 6.2; 7.1; 7.2; 7.3; 8.2; 9.1; 9.2
PHASE 32 (DESIGN)
14
PM STEVE SOLDATI / 407.264.3967
AD NO / FPID(S) AD NO 19811 / FPID 440700‐1
County/Counties OSCEOLA
Estimated Contract Amount $1.5M
Estimated Contract Execution JANUARY 2019
Estimated Length of Contract 14 MONTHS
BDI NO
Project Description:
RESURFACING ‐ TURNPIKE OSCEOLA COUNTY MP 190.5 TO MP 198.3
Major/Minor Work Types Anticipated
Major – 3.3Minor – 4.1.1; 4.1.2; 7.1; 8.1; 8.2; 9.1; 9.2
PHASE 32 (DESIGN)
15
Design Build Projects
ESTIMATED DESIGN BUILD CONTRACTS $3.0M
16
FPID 442552‐1
PROJECT DESCRIPTION VETERAN’S EXPRESSWAY – SR 60 OPERATIONAL IMPROVEMENTS
ESTIMATED CONTRACT AMT $3.0M
ANTICIPATED LETTING JULY 2018
COUNTY HILLSBOROUGH
FORMAL AD 5/7/2018
PM TOM NEYER / (407) 264‐3424
FPID(S) 442552‐1
County/Counties HILLSBOROUGH
Estimated Contract Amount $3.0M
Letting JULY 2018
BDI NO
Project Description:
VETERAN'S EXPRESSWAY‐SR 60 OPERATIONAL IMPROVEMENT
Major/Minor Work Types Anticipated
Major – 3.3Minor – 4.1.1, 6.1.7, 8.1, 8.2, 8.3
DESIGN BUILD
17
ESTIMATED TOTAL CEI CONTRACTS AMOUNT $62M
PHASE 62 (CEI)
18
AD NO FPID DESCRIPTIONEST. CONTRACT AMOUNT
19818 435543‐1 WIDEN HEFT FROM SR 836 TO NW 106TH ST (MP26‐34)(6/8 LNS TO 10 LNS INC EXP) $17.4M
19820 435542‐1 WIDEN HEFT NW 106TH ST TO I‐75 (MP 34‐MP39) (6 LNS TO 10 LNS INC EXP) $13.7M
19814 441067‐2 DOLPHIN STADIUM INTERCHG (SR 91 MP 2X) ULTIMATE AET INSTALLATION $0.7M (BDI)
19815 428154‐4 SAWGRASS CANAL REVETMENT PHASE 4 $0.8M (BDI)
19821 429339‐1 AET 5C, TPK FROM SAWGRASS XWAY TO S OF LANTANA TOLL PLAZA (MP71‐88) $1.2M
19822 431737‐1 ALL ELECTRONIC TOLLING (AET) PHASE 8 TICKET SYSTEM (MP 88‐236) $6.5M
19823 437991‐1/3 MILL AND RESURFACE FROM MP 81.4‐83.822 AND MP 86.5‐90.183 $2.6M
19812 437992‐1/3 RESURFACE TPK MAINLINE IN MARTIN COUNTY, MP 117.843‐138.037 $4.8M
19817 437986‐1/3 RESURFACING MAINLINE ST. LUCIE COUNTY MP 138.130‐153.230 $6.5M
19816 441322‐1 /440859‐1
AET NORTHERN COIN CONVERSION (MP 236‐309) AND KISSIMMEE PARK ROAD TOLL GANTRY REPLACEMENT
$1.8M
19819 439457‐1 RESURFACE TPK MAINLINE IN ORANGE COUNTY, MP 269.4‐273.3 $1.4M (BDI)
19813 437300‐4 SUNTRAX INFIELD $4.0M
19824 435605‐6 CENTRAL FLORIDA DMS IMPROVEMENTS AND REPLACEMENTS $0.6M
PM PACIFICO CASTILLO / 954.934.1118
AD NO / FPID(S) AD NO 19818 / FPID(S) 435543‐1
County/Counties MIAMI – DADE
Estimated Contract Amount $17.4M
Estimated CEI Contract Execution MAY 2019
BDI NO
Project Description:
WIDEN HEFT FROM SR836 TO NW 106TH ST (MP 26 TO MP 34) (6/8 LANES TO 10 INC EXP LANES)
Major/Minor Work Types Anticipated
Major – 10.1Minor – 8.2
PHASE 62 (CEI)
19
PM PACIFICO CASTILLO / 954.934.1118
AD NO / FPID(S AD NO 19820 / FPID(S) 435542‐1
County/Counties MIAMI ‐ DADE
Estimated Contract Amount $13.7M
Estimated CEI Contract Execution AUGUST 2018
BDI NO
Project Description:
WIDEN HEFT‐ NW 106TH ST TO I‐75 (MP34 TO MP39) 6 TO 10 LANES W/EXP LANES
Major/Minor Work Types Anticipated
Major – 10.1Minor – 8.2
PHASE 62 (CEI)
20
PM JAIME GOMEZ / 954.934.1131
AD NO / FPID(S) AD NO 19814 / FPID 441067‐2
County/Counties MIAMI – DADE
Estimated Contract Amount $0.7M
Estimated CEI Contract Execution JANUARY 2019
BDI YES
Project Description:
DOLPHIN STADIUM INTCHG (SR 91 MP 2X) ULTIMATE AET INSTALLATION
Major/Minor Work Types Anticipated
Major – 10.1Minor – 8.2
PHASE 62 (CEI)
21
PM JAIME GOMEZ / 954.934.1131
AD NO / FPID(S) AD NO 19815 / FPID(S) 428154‐4
County/Counties BROWARD
Estimated Contract Amount $0.8M
Estimated CEI Contract Execution FEBRUARY 2019
BDI YES
Project Description:
SAWGRASS CANAL REVETMENT PHASE 4
Major/Minor Work Types Anticipated
Major – 10.1Minor – 8.2
PHASE 62 (CEI)
22
PM JAIME GOMEZ / 954.934.1131
AD NO / FPID(S) AD NO 19821 / FPID(S) 429339‐4
County/Counties DISTRICT WIDE
Estimated Contract Amount $1.2M
Estimated CEI Contract Execution JUNE 2019
BDI YES
Project Description:
AET 5C, TPK FROM SAWGRASS XWAY TO S OF LANTANA TOLL PLAZA (MP 71 TO MP 88)
Major/Minor Work Types Anticipated
Major – 10.1Minor – 8.2
PHASE 62 (CEI)
23
PM KEN HUDSON / 954.934.1134
AD NO / FPID(S) AD NO 19822 / FPID 431737‐1
County/Counties DISTRIC WIDE
Estimated Contract Amount $6.5M
Estimated CEI Contract Execution JUNE 2019
BDI NO
Project Description:
ALL ELECTRONIC TOLLING (AET) PHASE 8 TICKET SYSTEM (MP 88 TO MP 236)
Major/Minor Work Types Anticipated
Major – 10.1Minor – 8.2
PHASE 62 (CEI)
24
PM ROXANNE RIGGS / 954‐934‐1296
AD NO / FPID(S) AD NO 19823 / FPID 437991‐1
County/Counties PALM BEACH
Estimated Contract Amount $2.6M
Letting JUNE 2019
BDI NO
Project Description:
RESURFACE TPK MAINLINE IN PALM BEACH CNTY, MP 81.4 TO MP 87.3
Major/Minor Work Types Anticipated
Major – 10.1Minor – 8.2
PHASE 62 (CEI)
25
PM ROXANNE RIGGS / 954‐934‐1296
AD NO / FPID(S) AD NO 19812 / FPID(S) 437992‐1
County/Counties MARTIN
Estimated Contract Amount $4.8M
Estimated CEI Contract Execution SEPTEMBER 2018
BDI NO
Project Description:
RESURFACE TPK MAINLINE IN MARTIN CNTY, MP 117.843 TO MP 138.037
Major/Minor Work Types Anticipated
Major – 10.1Minor – 8.2
PHASE 62 (CEI)
26
PM ROXANNE RIGGS / 954.934.1296
AD NO / FPID(S) AD NO 19817 / FPID(S) 437986‐1
County/Counties ST. LUCIE
Estimated Contract Amount $6.5M
Estimated CEI Contract Execution MAY 2019
BDI NO
Project Description:
RESURFACING MAINLINE ST. LUCIE COUNTY MP 138.130 TO MP 153.230
Major/Minor Work Types Anticipated
Major – 10.1Minor – 8.2
PHASE 62 (CEI)
27
PM JON FORD / 407.264.3020
AD NO / FPID(S) 19816 / FPID(S) 441322‐1 & 440859‐1
County/Counties OSCEOLA / DISTRICT WIDE
Estimated Contract Amount $1.8M
Estimated CEI Contract Execution MARCH 2019
BDI NO
Project Description:
ALL ELECTRONIC TOLLING (AET) NORTHERN COIN CONVERSION (MP 236 TO MP 309) &KISSIMMEE PARK ROAD TOLL GANTRY REPLACEMENT
Major/Minor Work Types Anticipated
Major – 10.1Minor – 8.2
PHASE 62 (CEI)
28
PM CHRISTOPHER NESMITH / 407.264.3482
AD NO / FPID(S) AD NO 19819 / FPID(S) 439457‐1
County/Counties ORANGE
Estimated Contract Amount $1.4M
Estimated CEI Contract Execution MAY 2019
BDI YES
Project Description:
RESURFACE TPK MAINLINE IN ORANGE COUNTY, MP 269.4 TO MP 273.3 (PAVEMENT ONLY PROJECT)
Major/Minor Work Types Anticipated
Major – 10.1Minor – 8.2
PHASE 62 (CEI)
29
PM TODD KELLY / 407.264.3370
AD NO / FPID(S) AD NO 19813 / FPID(S) 437300‐4
County/Counties POLK
Estimated Contract Amount $4.0M
Estimated CEI Contract Execution NOVEMBER 2018
BDI NO
Project Description:
SUNTRAX INFIELD
Major/Minor Work Types Anticipated
Major – 10.1Minor – 8.2
PHASE 62 (CEI)
30
PM TODD KELLY / 407.264.3370
AD NO / FPID(S) AD NO 19824 / FPID 435605‐6
County/Counties DISTRICT WIDE
Estimated Contract Amount $0.6M
Estimated CEI Contract Execution JUNE 2019
BDI YES
Project Description:
CENTRAL FLORIDA DMS IMPROVEMENTS AND REPLACEMENTS
Major/Minor Work Types Anticipated
Major – 10.1Minor – 8.2
PHASE 62 (CEI)
31
TENTATIVE CONSULTANT ACQUISITIONS FY 20
FY 20 ‐ TENTATIVE ACQUISITIONS(# OF PROJECTS / $ AMT)
PH 22 2 $4.5M
PH 32 10 $41.8M
PH 62 29 $50.2M
32
DESIGN ‐ TOP 10 TIPS
2. Turnpike Reviewers Are on Your Side…Be on Theirs
3. Quality…Improvements From Start to Finish
4. Turnpike Specific Criteria (TPPPH, GTR, etc.)...Learn It, Know It, Live It
5. It's Not Just About Getting it Done…When It Gets Done is Just As Important
6. Statutes and Policies…Not Just for the Lawyers
7. Coordinate...Early, Often and with Everybody
8. FGT Gas Lines...If They're There, Be Aware
9. Turnpike Project Acquisitions...Proper Planning Prevents Poor Performance
10. Turnpike Design Website...A Wealth of Valuable Resources ‐
http://www.floridasturnpike.com/design
33
DESIGN ‐ TOP 10 TIPS
1. Engineers Should Engineer…Identify, Evaluate, Recommend
34
Public Records Requests for ALL Procurements
PRIOR Formal AdvertisementStephanie Hall (407) 264‐[email protected]
POST Formal AdvertisementProfessional Services Unit (PSU)[email protected]
* Assigned Contract Analyst information will be on the advertisement
Requests for Information
35
FTE’s Marketing Websitehttp://www.dot.state.fl.us/procurement/marketingTP/
FDOT: Procurement ‐ Marketing – CAPhttp://www.dot.state.fl.us/procurement/CAP.shtm
FDOT: Procurement – Advertisements http://www.dot.state.fl.us/procurement/Advertisements.shtm
GIS ‐ Geographic Information Systems ‐ Work Program Mapshttp://fdot.maps.arcgis.com/apps/OnePane/basicviewer/index.html?appid=
71d5dbe101874d8ebef391a1cf94d962
FTE’s Design Websitehttp://design.floridasturnpike.com/index.html
WEB LINKS
Presentation Presentation
will belocated here
36
Florida Department ofTRANSPORTATION
Turnpike Program Management Staff
Mike Shannon, P.E. – Director of Transportation Development Paul Satchfield – District Program Management Administrator Kathy Alexander – District Program Administration Manager
[email protected] Karen Akers, P.E. – CEI Manager Brianna Myers – Production Manager
Special Presenter – Top 10 Design Tips
Pat Muench – District Design Engineer
37
Florida Department ofTRANSPORTATION
38
FINAL THOUGHTS…
39