Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: PERDIDO LANDFILL On-site Inspection Start Date: 03/08/2021 On-site Inspection End Date: 03/08/2021 WACS No.: 1688 Facility Street Address: 13009 BEULAH RD City: CANTONMENT County Name: ESCAMBIA Zip: 32533 INSPECTION PARTICIPANTS: (Include ALL Landfill and Department Personnel with Corresponding Titles) Principal Inspector: Dawn Templin, P.E., Inspector Other Participants: Nic Howard, Engineering & Environmental Quality Manager; INSPECTION TYPE: Construction Completion Certification Inspection for Landfill - Class I COMMENTS: On March 8, 2021, a construction completion inspection for the Section 5, Cell 1A repairs was conducted at the Perdido Landfill. Nic Howard from Escambia County was present at the inspection. The purpose of the inspection was to verify that the repairs to the Section 5, Cell 1A liner was conducted in accordance with Rule 62-701.400, F.A.C., the facility permit, and standard engineering practices. The original certification of construction completion inspection for Section 5, Cell 1A was completed on June 4, 2019. The current inspection focused only on the repaired area. The construction completion report was provided to the Department via email on March 2, 2021. The report was signed and sealed by the Engineer of Record, George Reinhart, III, P.E. The report contained the construction quality assurance (CQA) for the repair area. The report also included the manufacturer’s quality control (MQC) documentation for the geomembrane. The repaired area consisted of installing eight single liner 60-mil HDPE panels over the existing subgrade and a granular drainage layer. Two deviations were noted in the report. The first was constructing a low permeability clay berm on the south side of the cell to promote drainage away from the southern edge. The second deviation (which was approved in the original Section 5, Cell 1A construction) was the use of protective soil with a slightly higher percent passing of the No. 200 sieve (15.4% versus the required 12%). Based on the construction completion report and the site inspection, it appears construction was completed accordingly. The photos below show the repair area with the protective soil layer installed. ATTACHMENTS:

Upload: others

Post on 20-Nov-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Florida Department of

Environmental Protection

Inspection Checklist

FACILITY INFORMATION:Facility Name: PERDIDO LANDFILL

On-site Inspection Start Date: 03/08/2021

On-site Inspection End Date: 03/08/2021

WACS No.: 1688

Facility Street Address: 13009 BEULAH RD

City: CANTONMENT

County Name: ESCAMBIA

Zip: 32533 

INSPECTION PARTICIPANTS:(Include ALL Landfill and Department Personnel with Corresponding Titles)

Principal Inspector: Dawn Templin, P.E., Inspector

Other Participants: Nic Howard, Engineering & Environmental Quality Manager; 

INSPECTION TYPE:Construction Completion Certification Inspection for Landfill - Class I 

 

COMMENTS: 

On March 8, 2021, a construction completion inspection for the Section 5, Cell 1A repairs was conducted at the Perdido Landfill. Nic Howard from Escambia County was present at the inspection. The purpose of the inspection was to verify that the repairs to the Section 5, Cell 1A liner was conducted in accordance with Rule 62-701.400, F.A.C., the facility permit, and standard engineering practices. The original certification of construction completion inspection for Section 5, Cell 1A was completed on June 4, 2019. The current inspection focused only on the repaired area. The construction completion report was provided to the Department via email on March 2, 2021. The report was signed and sealed by the Engineer of Record, George Reinhart, III, P.E. The report contained the construction quality assurance (CQA) for the repair area. The report also included the manufacturer’s quality control (MQC) documentation for the geomembrane. The repaired area consisted of installing eight single liner 60-mil HDPE panels over the existing subgrade and a granular drainage layer. Two deviations were noted in the report. The first was constructing a low permeability clay berm on the south side of the cell to promote drainage away from the southern edge. The second deviation (which was approved in the original Section 5, Cell 1A construction) was the use of protective soil with a slightly higher percent passing of the No. 200 sieve (15.4% versus the required 12%). Based on the construction completion report and the site inspection, it appears construction was completed accordingly. The photos below show the repair area with the protective soil layer installed.

ATTACHMENTS: 

Photo 1 

Photo 2 

 

Photo 3 

PERDIDO LANDFILL

Inspection Date: 03/08/2021

Page 2 of 3

Signed: 

Dawn Templin, P.E.

PRINCIPAL INSPECTOR NAME

Inspector

PRINCIPAL INSPECTOR TITLE

PRINCIPAL INSPECTOR SIGNATURE

DEP

ORGANIZATION

03/17/2021

DATE

 

Nic Howard

REPRESENTATIVE NAME

Engineering & Environmental Quality Manager

REPRESENTATIVE TITLE 

NO SIGNATURE REQUIRED

REPRESENTATIVE SIGNATURE

Escambia County Waste Services

ORGANIZATION

NOTE: By signing this document, the Site Representative only acknowledges receipt of this Inspection Report and is not admitting to the accuracy of any of the items identified by the Department as "Not Ok" or areas of concern. 

Report Approvers: 

Approver: Dawn Templin Inspection Approval Date: 03/17/2021

PERDIDO LANDFILL

Inspection Date: 03/08/2021

Page 3 of 3