flight plan - nasaviii flt pln/114/bas a introduction the sts-114 flight plan is the flight data...

227
JSC-48000-114 Flight Plan STS-114 / LF-1 (STS-114 OCFR2_RevD Cycle Trajectory) Mission Operations Directorate Operations Division Basic, Rev A November 19, 2004 EVENT MET CENTRAL GMT Launch 0/00:00 Sun 9/12/04 18:22 256/23:22 OBSS Survey 0/17:15 Mon 9/13/04 11:37 257/16:37 Docking 1/19:58 Tue 9/14/04 14:20 258/19:20 OBSS Handoff 1/23:00 Tue 9/14/04 17:22 258/22:22 MPLM Install 2/14:00 Wed 9/15/04 08:22 259/13:22 OBSS Survey 2/19:45 Wed 9/15/04 14:07 259/19:07 EVA 1 3/18:00 Thu 9/16/04 12:22 260/17:22 EVA 2 5/18:00 Sat 9/18/04 12:22 262/17:22 EVA 3 7/18:00 Mon 9/20/04 12:22 264/17:22 MPLM Uninstall 8/20:30 Tue 9/21/04 14:52 265/19:52 OBSS Handoff 8/23:00 Tue 9/21/04 17:22 265/22:22 Undocking 9/17:15 Wed 9/22/04 11:37 266/16:37 Deorbit Burn 11/17:53 Fri 9/24/04 12:15 268/17:15 Landing 11/18:56 Fri 9/24/04 13:18 268/18:18 National Aeronautics and Space Administration Lyndon B. Johnson Space Center Houston, Texas Verify this is the correct version for the pending operation (training, simulation or flight). Electronic copies of FDF books are available. URL: http://mod.jsc.nasa.gov/do3/FDF/index.html For the latest working copy of the Flight Plan, visit http://mod.jsc.nasa.gov/do4/flightplan/main/fp.cfm?id=114

Upload: others

Post on 24-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

JSC-48000-114

Flight Plan

STS-114 / LF-1 (STS-114 OCFR2_RevD Cycle Trajectory)

Mission Operations Directorate Operations Division

Basic, Rev A November 19, 2004

EVENT MET CENTRAL GMT Launch 0/00:00 Sun 9/12/04 18:22 256/23:22 OBSS Survey 0/17:15 Mon 9/13/04 11:37 257/16:37 Docking 1/19:58 Tue 9/14/04 14:20 258/19:20 OBSS Handoff 1/23:00 Tue 9/14/04 17:22 258/22:22 MPLM Install 2/14:00 Wed 9/15/04 08:22 259/13:22 OBSS Survey 2/19:45 Wed 9/15/04 14:07 259/19:07 EVA 1 3/18:00 Thu 9/16/04 12:22 260/17:22 EVA 2 5/18:00 Sat 9/18/04 12:22 262/17:22 EVA 3 7/18:00 Mon 9/20/04 12:22 264/17:22 MPLM Uninstall 8/20:30 Tue 9/21/04 14:52 265/19:52 OBSS Handoff 8/23:00 Tue 9/21/04 17:22 265/22:22 Undocking 9/17:15 Wed 9/22/04 11:37 266/16:37 Deorbit Burn 11/17:53 Fri 9/24/04 12:15 268/17:15 Landing 11/18:56 Fri 9/24/04 13:18 268/18:18

National Aeronautics and Space Administration

Lyndon B. Johnson Space Center Houston, Texas

Verify this is the correct version for the pending operation (training, simulation or flight). Electronic copies of FDF books are available. URL: http://mod.jsc.nasa.gov/do3/FDF/index.html

For the latest working copy of the Flight Plan, visit http://mod.jsc.nasa.gov/do4/flightplan/main/fp.cfm?id=114

Page 2: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed
Page 3: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed
Page 4: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

ii FLT PLN/114/BAS A

Incorporates the following: 482#: FLT PLN-2022

AREAS OF TECHNICAL RESPONSIBILITY

Book Manager/Lead FAO DO4/D. Hord 281-244-0294

Lead Timeliner DO4/J. Keeton 281-483-6882

Lead Pointer DO4/N. Dworak 281-244-0955

Lead Ops Planner DO4/J. Dunning 281-483-4360

Lead RPE DO4/K. Peters 281-483-5735

Page 5: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

iii FLT PLN/114/BAS A

FLIGHT PLAN STS-114

LIST OF EFFECTIVE PAGES

BASIC 10/07/02 FINAL 01/28/03 BAS A 11/19/04

Sign Off ........................... * 114/BAS A ii ...................................... * 114/BAS A iii...................................... * 114/BAS A iv ..................................... * 114/BAS A v ...................................... * 114/BAS A vi ..................................... * 114/BAS A vii..................................... * 114/BAS A viii .................................... * 114/BAS A 1-1................................... 114/BAS A 1-2................................... 114/BAS A 1-3................................... 114/BAS A 1-4................................... 114/BAS A 2-1................................... 114/BAS A 2-2................................... 114/BAS A 2-3................................... 114/BAS A 2-4................................... 114/BAS A 2-5................................... 114/BAS A 2-6A ................................ 114/BAS A 2-6B ................................ 114/BAS A 2-7A ................................ 114/BAS A 2-7B ................................ 114/BAS A 2-8A ................................ 114/BAS A 2-8B ................................ 114/BAS A 2-9A ................................ 114/BAS A 2-9B ................................ 114/BAS A 2-10A .............................. 114/BAS A 2-10B .............................. 114/BAS A 2-11A .............................. 114/BAS A 2-11B .............................. 114/BAS A 2-12A .............................. 114/BAS A 2-12B .............................. 114/BAS A 2-13A .............................. 114/BAS A 2-13B .............................. 114/BAS A 2-14A .............................. 114/BAS A 2-14B .............................. 114/BAS A 2-15A .............................. 114/BAS A 2-15B .............................. 114/BAS A 2-16A .............................. 114/BAS A 2-16B .............................. 114/BAS A 2-17A .............................. 114/BAS A 2-17B .............................. 114/BAS A 2-18A .............................. 114/BAS A 2-18B .............................. 114/BAS A 2-19A .............................. 114/BAS A 2-19B .............................. 114/BAS A 2-20A .............................. 114/BAS A

2-20B............................... 114/BAS A 2-21A............................... 114/BAS A 2-21B............................... 114/BAS A 2-22A............................... 114/BAS A 2-22B............................... 114/BAS A 2-23 ................................. 114/BAS A 2-24 ................................. 114/BAS A 2-25 ................................. 114/BAS A 2-26 ................................. 114/BAS A 2-27 ................................. 114/BAS A 3-1 ................................... 114/BAS A 3-2 ................................... 114/BAS A 3-3 ................................... 114/BAS A 3-4 ................................... 114/BAS A 3-5 ................................... 114/BAS A 3-6 ................................... 114/BAS A 3-7 ................................... 114/BAS A 3-8 ................................... 114/BAS A 3-9 ................................... 114/BAS A 3-10 ................................. 114/BAS A 3-11 ................................. 114/BAS A 3-12 ................................. 114/BAS A 3-13 ................................. 114/BAS A 3-14 ................................. 114/BAS A 3-15 ................................. 114/BAS A 3-16 ................................. 114/BAS A 3-17 ................................. 114/BAS A 3-18 ................................. 114/BAS A 3-19 ................................. 114/BAS A 3-20 ................................. 114/BAS A 3-21 ................................. 114/BAS A 3-22 ................................. 114/BAS A 3-23 ................................. 114/BAS A 3-24 ................................. 114/BAS A 3-25 ................................. 114/BAS A 3-26 ................................. 114/BAS A 3-27 ................................. 114/BAS A 3-28 ................................. 114/BAS A 3-29 ................................. 114/BAS A 3-30 ................................. 114/BAS A 3-31 ................................. 114/BAS A 3-32 ................................. 114/BAS A 3-33 ................................. 114/BAS A 3-34 ................................. 114/BAS A 3-35 ................................. 114/BAS A 3-36 ................................. 114/BAS A

* – Omit from flight book

Page 6: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

iv FLT PLN/114/BAS A

3-37................................. 114/BAS A 3-38................................. 114/BAS A 3-39................................. 114/BAS A 3-40................................. 114/BAS A 3-41................................. 114/BAS A 3-42................................. 114/BAS A 3-43................................. 114/BAS A 3-44................................. 114/BAS A 3-45................................. 114/BAS A 3-46................................. 114/BAS A 3-47................................. 114/BAS A 3-48................................. 114/BAS A 3-49................................. 114/BAS A 3-50................................. 114/BAS A 3-51................................. 114/BAS A 3-52................................. 114/BAS A 3-53................................. 114/BAS A 3-54................................. 114/BAS A 3-55................................. 114/BAS A 3-56................................. 114/BAS A 3-57................................. 114/BAS A 3-58................................. 114/BAS A 3-59................................. 114/BAS A 3-60................................. 114/BAS A 3-61................................. 114/BAS A 3-62................................. 114/BAS A 3-63................................. 114/BAS A 3-64................................. 114/BAS A 3-65................................. 114/BAS A 3-66................................. 114/BAS A 3-67................................. 114/BAS A 3-68................................. 114/BAS A 3-69................................. 114/BAS A 3-70................................. 114/BAS A 3-71................................. 114/BAS A 3-72................................. 114/BAS A 3-73................................. 114/BAS A 3-74................................. 114/BAS A 3-75................................. 114/BAS A 3-76................................. 114/BAS A 3-77................................. 114/BAS A 3-78................................. 114/BAS A 3-79................................. 114/BAS A 3-80................................. 114/BAS A 3-81................................. 114/BAS A 3-82................................. 114/BAS A 3-83................................. 114/BAS A 3-84................................. 114/BAS A 3-85................................. 114/BAS A 3-86................................. 114/BAS A 3-87................................. 114/BAS A 3-88................................. 114/BAS A 3-89................................. 114/BAS A 3-90................................. 114/BAS A

3-91 ................................. 114/BAS A 3-92 ................................. 114/BAS A 3-93 ................................. 114/BAS A 3-94 ................................. 114/BAS A 3-95 ................................. 114/BAS A 3-96 ................................. 114/BAS A 3-97 ................................. 114/BAS A 3-98 ................................. 114/BAS A 3-99 ................................. 114/BAS A 3-100 ............................... 114/BAS A 3-101 ............................... 114/BAS A 3-102 ............................... 114/BAS A 3-103 ............................... 114/BAS A 3-104 ............................... 114/BAS A 3-105 ............................... 114/BAS A 3-106 ............................... 114/BAS A 3-107 ............................... 114/BAS A 3-108 ............................... 114/BAS A 3-109 ............................... 114/BAS A 3-110 ............................... 114/BAS A 3-111 ............................... 114/BAS A 3-112 ............................... 114/BAS A 3-113 ............................... 114/BAS A 3-114 ............................... 114/BAS A 3-115 ............................... 114/BAS A 3-116 ............................... 114/BAS A 3-117 ............................... 114/BAS A 3-118 ............................... 114/BAS A 3-119 ............................... 114/BAS A 3-120 ............................... 114/BAS A 3-121 ............................... 114/BAS A 3-122 ............................... 114/BAS A 3-123 ............................... 114/BAS A 3-124 ............................... 114/BAS A 3-125 ............................... 114/BAS A 3-126 ............................... 114/BAS A 3-127 ............................... 114/BAS A 3-128 ............................... 114/BAS A 3-129 ............................... 114/BAS A 3-130 ............................... 114/BAS A 3-131 ............................... 114/BAS A 3-132 ............................... 114/BAS A 3-133 ............................... 114/BAS A 3-134 ............................... 114/BAS A 3-135 ............................... 114/BAS A 3-136 ............................... 114/BAS A 3-137 ............................... 114/BAS A 3-138 ............................... 114/BAS A 3-139 ............................... 114/BAS A 3-140 ............................... 114/BAS A 3-141 ............................... 114/BAS A 3-142 ............................... 114/BAS A 4-i ....................................* 114/BAS A 4-ii....................................* 114/BAS A

* – Omit from flight book

Page 7: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

v FLT PLN/114/BAS A

4-1................................... * 114/BAS A 4-2................................... * 114/BAS A 4-3................................... * 114/BAS A 4-4................................... * 114/BAS A 4-5................................... * 114/BAS A 4-6................................... * 114/BAS A 4-7................................... * 114/BAS A 4-8................................... * 114/BAS A 5-1................................... * 114/BAS A 5-2................................... * 114/BAS A 5-3................................... * 114/BAS A 5-4................................... * 114/BAS A 5-5................................... * 114/BAS A 5-6................................... * 114/BAS A 6-1................................... * 114/BAS A 6-2................................... * 114/BAS A 6-3................................... * 114/BAS A 6-4................................... * 114/BAS A 6-5................................... * 114/BAS A 6-6................................... * 114/BAS A 6-7................................... * 114/BAS A 6-8................................... * 114/BAS A 6-9................................... * 114/BAS A 6-10................................. * 114/BAS A

* – Omit from flight book

Page 8: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

vi FLT PLN/114/BAS A

This Page Intentionally Blank

Page 9: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

vii FLT PLN/114/BAS A

CONTENTS PAGE

INTRODUCTION ............................................................................................................. viii

OVERVIEW TIMELINE.................................................................................................... 1-1

SUMMARY TIMELINE AND ISS SHORT TERM PLAN .................................................. 2-1

DETAILED TIMELINE...................................................................................................... 3-1

ATTITUDE TIMELINE...................................................................................................... 4-1

FLIGHT PLAN NOTES .................................................................................................... 5-1

FLIGHT PLAN WALKTHROUGH .................................................................................... 6-1

Page 10: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

viii FLT PLN/114/BAS A

INTRODUCTION

The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines that are covered in the Ascent, Post Insertion, Deorbit Prep, and Entry Checklists. The detailed rendezvous and undocking timelines and procedures are contained in the Rendezvous Checklist. The detailed EVA task timelines and procedures are contained in the EVA Checklist. This Flight Plan satisfies the mission requirements specified in the following documents:

NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-114, STS-114 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

The STS-114 Basic A Flight Plan is based on a launch date of September 12, 2004 at 18:22 CDT (23:22 GMT). Orbiter inertial attitudes are expressed relative to a mean of 1950 (M50) reference frame. The Flight Plan and other related mission information are available on the following Space Shuttle Flight Planning web site:

http://mod.jsc.nasa.gov/do4/flightplan/main/fp.cfm?id=114

Page 11: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

1-1 FLT PLN/114/BAS A

OV

ER

VIE

W

TIM

EL

INE

OVERVIEW TIMELINE

Page 12: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

1-2 FLT PLN/114/BAS A

OV

ER

VIE

W

TIM

EL

INE

This Page Intentionally Blank

Page 13: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

1-3 FLT PLN/114/BAS A

STS-114 (LF1) OVERVIEW TIMELINE

Page 14: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

1-4 FLT PLN/114/BAS A

STS-114 (LF1) OVERVIEW TIMELINE (Concluded)

Page 15: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

2-1 FLT PLN/114/BAS A

SU

MM

AR

Y

TIM

EL

INE

SUMMARY TIMELINE AND ISS SHORT TERM PLAN

Page 16: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

2-2 FLT PLN/114/BAS A

SU

MM

AR

Y

TIM

EL

INE

This Page Intentionally Blank

Page 17: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-3

LAUNCH

OMS-2

FD1

COLLINS

KELLY

NOGUCHI

ROBINSON

∧NC1

MPLM ENV CK

THOMAS

LAWRENCE

CAMARDA

MNVR

STS-114

09/13 01 02 03 04 05 06 07 08 09 10 11GMT 09/12/04 (256) 000/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 000

CDR

APCU 1*

APCU*

ASCENT

GRP B

PWRDN

IMU

MNVR

-ZLV

OIU

OMSBURNPMC

A/GPOST INSERTION PRE SLEEP

PRE

SLEEP

SLEEP

WSBDTO/ELEVPK

PRE

SLEEP

PLT

APU HTR

ASCENT

GRP B

PWRDN

OMSBURNPOST INSERTION PRE

SLEEP SLEEPRMSINIT

PRE

SLEEP

WSBDTO/ELEVPK

RMS

PWRUP

PRESLEEP

MS1 ASCENT P/TV01 SETUPPOST INSERTION PRE SLEEP - GIRA SLEEP

HHVIDEO

D/L

MS2 ASCENT PGSC S/U PT1POST INSERTION PRE SLEEP SLEEP

MS3 ASCENT GIRAINSTALLPOST INSERTION PRE SLEEP SLEEPRMS C/O

RMS

PWRDN

MS4 ASCENTOCAC

S/UPOST INSERTION PRE SLEEPSEE

S/U SLEEP

TEPC

SETUP

P/TV01 SETUP

WATCH

RENAL

MS5 ASCENT POST INSERTION SLEEPPRE SLEEPPGSCS/U PT1

WATCH

RMS C/O

RMS

PWRDN

DAY/NIGHTORBIT 2 3 4 5 6 7 8 9

TDRSE -47.0W -171.0Z -275.0

ORB ATT -ZLV +YVV BIASED NC-1 -ZLV -XVV BIASED INTRL -ZLV -XVV

NOTES

*ACT *DEACT * HTR DECONFIG

2-3

LAUNCH

OMS-2

FD1

COLLINS

KELLY

NOGUCHI

ROBINSON

∧NC1

MPLM ENV CK

THOMAS

LAWRENCE

CAMARDA

MNVR

STS-114

09/13 01 02 03 04 05 06 07 08 09 10 11GMT 09/12/04 (256) 000/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 000

CDR

APCU 1*

APCU*

ASCENT

GRP B

PWRDN

IMU

MNVR

-ZLV

OIU

OMSBURNPMC

A/GPOST INSERTION PRE SLEEP

PRE

SLEEP

SLEEP

WSBDTO/ELEVPK

PRE

SLEEP

PLT

APU HTR

ASCENT

GRP B

PWRDN

OMSBURNPOST INSERTION PRE

SLEEP SLEEPRMSINIT

PRE

SLEEP

WSBDTO/ELEVPK

RMS

PWRUP

PRESLEEP

MS1 ASCENT P/TV01 SETUPPOST INSERTION PRE SLEEP - GIRA SLEEP

HHVIDEO

D/L

MS2 ASCENT PGSC S/U PT1POST INSERTION PRE SLEEP SLEEP

MS3 ASCENT GIRAINSTALLPOST INSERTION PRE SLEEP SLEEPRMS C/O

RMS

PWRDN

MS4 ASCENTOCAC

S/UPOST INSERTION PRE SLEEPSEE

S/U SLEEP

TEPC

SETUP

P/TV01 SETUP

WATCH

RENAL

MS5 ASCENT POST INSERTION SLEEPPRE SLEEPPGSCS/U PT1

WATCH

RMS C/O

RMS

PWRDN

DAY/NIGHTORBIT 2 3 4 5 6 7 8 9

TDRSE -47.0W -171.0Z -275.0

ORB ATT -ZLV +YVV BIASED NC-1 -ZLV -XVV BIASED INTRL -ZLV -XVV

NOTES

*ACT *DEACT * HTR DECONFIG

Page 18: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-4

COLLINS

KELLY

NOGUCHI

ROBINSON

FD02 ∧NC2

MPLM PRESSURE CK

THOMAS

LAWRENCE

CAMARDA

STBD WING NOSE CAP PORT WINGLDRI SURVEY:

STS-114

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/13/04 (257) 12 13 14 15 16 17 18 19 20 21 22 23 001/00

MET Day 000

CDR

AFT C/O

APCU 1*

APCU*

CRYO02SNSRCK

DOCKRINGEXT

FC*

FILTERCLEANING

H2O CWCSETUP

LOAD

DAP MEALOMS

BURNPOST SLEEPSLEEPWSB

POST SLEEP EXERCISE PRE SLEEPMNVR

-ZLV

MNVR

-ZLV

PLT MEALOMSBURNPOST SLEEPSLEEP POST SLEEP OBSS SURVEYOBSS SURVEYOBSS

UNBERTH OBSS SURVEY

SALIVA

MS1 EMU C/OEMUC/OPREP

ERGOS/U MEALP/TV01 SETUP

C/LCMRINSTL

POST SLEEP - GIRASLEEP PGTC/O

CIPAAC/O

EMIT

WSH APP

A/L*

MS2 EMU C/OEMUC/OPREP

ERGOS/U MEALPOST SLEEP RNDZ TOOLS

C/O PT1SLEEP PGTC/OPGSC S/U PT2

EMIT

WSH APP

CIPAAC/O

MS3 MEALPOST SLEEPSLEEP RMS C/O OBSS SURVEYOBSSUNBERTH OBSS SURVEY OBSS SURVEY

MS4DOCKRINGEXT

EMUC/OMEALP/TV01 SETUP

C/LCMRINSTL

POST SLEEP RNDZ TOOLSC/O PT1SLEEP

MDDKXFERPREP

SALIVA

LOG

SSVS/U MDDK XFER PREP

MS5 POST SLEEPSLEEP RMS C/O MEALOBSS SURVEYOBSSUNBERTH OBSS SURVEYOBSS SURVEY

LOG

SALIVA

DAY/NIGHTORBIT 9 10 11 12 13 14 15 16 17

TDRSE -47.0W -171.0Z -275.0

ORB ATT -ZLV -XVV NC-2 -ZLV -YVV BIASED

NOTES

*ACT *DEACT*PURGE-MANUAL

*FAN ACT

2-4

COLLINS

KELLY

NOGUCHI

ROBINSON

FD02 ∧NC2

MPLM PRESSURE CK

THOMAS

LAWRENCE

CAMARDA

STBD WING NOSE CAP PORT WINGLDRI SURVEY:

STS-114

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/13/04 (257) 12 13 14 15 16 17 18 19 20 21 22 23 001/00

MET Day 000

CDR

AFT C/O

APCU 1*

APCU*

CRYO02SNSRCK

DOCKRINGEXT

FC*

FILTERCLEANING

H2O CWCSETUP

LOAD

DAP MEALOMS

BURNPOST SLEEPSLEEPWSB

POST SLEEP EXERCISE PRE SLEEPMNVR

-ZLV

MNVR

-ZLV

PLT MEALOMSBURNPOST SLEEPSLEEP POST SLEEP OBSS SURVEYOBSS SURVEYOBSS

UNBERTH OBSS SURVEY

SALIVA

MS1 EMU C/OEMUC/OPREP

ERGOS/U MEALP/TV01 SETUP

C/LCMRINSTL

POST SLEEP - GIRASLEEP PGTC/O

CIPAAC/O

EMIT

WSH APP

A/L*

MS2 EMU C/OEMUC/OPREP

ERGOS/U MEALPOST SLEEP RNDZ TOOLS

C/O PT1SLEEP PGTC/OPGSC S/U PT2

EMIT

WSH APP

CIPAAC/O

MS3 MEALPOST SLEEPSLEEP RMS C/O OBSS SURVEYOBSSUNBERTH OBSS SURVEY OBSS SURVEY

MS4DOCKRINGEXT

EMUC/OMEALP/TV01 SETUP

C/LCMRINSTL

POST SLEEP RNDZ TOOLSC/O PT1SLEEP

MDDKXFERPREP

SALIVA

LOG

SSVS/U MDDK XFER PREP

MS5 POST SLEEPSLEEP RMS C/O MEALOBSS SURVEYOBSSUNBERTH OBSS SURVEYOBSS SURVEY

LOG

SALIVA

DAY/NIGHTORBIT 9 10 11 12 13 14 15 16 17

TDRSE -47.0W -171.0Z -275.0

ORB ATT -ZLV -XVV NC-2 -ZLV -YVV BIASED

NOTES

*ACT *DEACT*PURGE-MANUAL

*FAN ACT

Page 19: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-5

FD2

∧NC3

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

∧NPC MNVR

STS-114

09/14 01 02 03 04 05 06 07 08 09 10 11GMT 09/13/04 (257) 001/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 001

CDR

CMGHTR

MNVR

-ZLV

PMCOCA

PRE SLEEP SLEEP

PRE

SLEEP

PRE

SLEEP

PRESLEEP

RCSBURN

MNVR

-ZLV

PAOA/G

RCSBURN

PLT FCMSC/O PRE SLEEP SLEEPPRE SLEEPPAO

A/G

RCSBURN

RCSBURN

MS1 EVA PREP FORXFER PRE SLEEP - GIRA SLEEP

A/L*

MS2 EVA PREP FORXFER PRE SLEEP SLEEP

MS3 PRE SLEEP SLEEPOBSSBERTH

OBSS

SURVEY

MS4 SLEEPVTR PB PRE SLEEP

RENAL

PRE SLEEPVTRPB

MS5 PRE SLEEP SLEEPOBSSBERTH

OBSS

SURVEY

DAY/NIGHTORBIT 17 18 19 20 21 22 23 24 25

TDRSE -47.0W -171.0Z -275.0

ORB ATT -ZLV +YVV BIASED NC-3 -ZLV -XVV INTRL -ZLV -XVV

NOTES

*FAN BYPASS

2-5

FD2

∧NC3

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

∧NPC MNVR

STS-114

09/14 01 02 03 04 05 06 07 08 09 10 11GMT 09/13/04 (257) 001/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 001

CDR

CMGHTR

MNVR

-ZLV

PMCOCA

PRE SLEEP SLEEP

PRE

SLEEP

PRE

SLEEP

PRESLEEP

RCSBURN

MNVR

-ZLV

PAOA/G

RCSBURN

PLT FCMSC/O PRE SLEEP SLEEPPRE SLEEPPAO

A/G

RCSBURN

RCSBURN

MS1 EVA PREP FORXFER PRE SLEEP - GIRA SLEEP

A/L*

MS2 EVA PREP FORXFER PRE SLEEP SLEEP

MS3 PRE SLEEP SLEEPOBSSBERTH

OBSS

SURVEY

MS4 SLEEPVTR PB PRE SLEEP

RENAL

PRE SLEEPVTRPB

MS5 PRE SLEEP SLEEPOBSSBERTH

OBSS

SURVEY

DAY/NIGHTORBIT 17 18 19 20 21 22 23 24 25

TDRSE -47.0W -171.0Z -275.0

ORB ATT -ZLV +YVV BIASED NC-3 -ZLV -XVV INTRL -ZLV -XVV

NOTES

*FAN BYPASS

Page 20: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-6A

FD03

COLLINS

KELLY

NOGUCHI

ROBINSON

D

O

C

K

∧∧NC4 TI

∧NH

H

A

N

D

S

H

A

K

E

∧+YVV

THOMAS

LAWRENCE

CAMARDA

*DOCK 1/19:58

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/14/04 (258) 12 13 14 15 16 17 18 19 20 21 22 23 002/00

MET Day 001

CDR

APCU1*

APPROACH W/RPM

GRP B

PWRDN

GRP B

PWRUP

CWC

INIT

MNVR-XLVISS RNDZ SFTY

BRIEFSIMOINIT

SIMOTERM

HATCHOPEN

POSTSLEEP

POSTSLEEP

POST

EXERCISE

ATTHO*

IMU

PLT APPROACH W/RPM

GRP B

PWRDN

GRP B

PWRUP

POST SLEEP ISS RNDZ SFTYBRIEF

HATCHOPEN

MNVR-XLV

OBSSGRPL

OBSSUNBRTH

SALIVA

EXERCISE

MS1 EMURMVLEXERCISE

POSTRNDZPGSCCNFG

POST SLEEP - GIRA ISS RNDZ SFTYBRIEF

EVA TOOLXFER

P/TV04

S/U

P/TV04

OPSPTV02 OPSP/TV02

S/U

P/TV05

S/U

MS2 APPROACH W/RPMEMURMVLEXERCISE

POSTRNDZPGSCCNFG

POST SLEEP SFTYBRIEF

PCSS/U

HATCHOPENISS RNDZ EVA TOOL

XFERISSRNDZ

RNDZTOOLSC/OPT2

MS3 APPROACH W/RPMISS RNDZPOST SLEEP LEAKCHECK

HATCHOPEN

SFTYBRIEFTILE INSPECT EXERCISEPOST SLEEP ⊕ OBSS

UNBTH CAMR

A/L

PREP

INGRS

ISS RNDZ

MS4

COND

SETUP

LEAKCHECKPOST SLEEP APPROACH W/RPMISS RNDZ HATCH

OPENSFTYBRIEF

OBSSGRPL

OBSSUNBRTH

♦LOG

SALIVA

EXERCISEPOST SLEEP

A/L

PREP

INGRS

TILE INSPECT

MS5

AUDIO

ISSPOST SLEEP APPROACH W/RPMISS RNDZ HATCH

OPENSFTYBRIEF

PCSS/UTILE INSPECT POST SLEEP OBSS

UNBTH CAMR

LOG

SALIVA

EXERCISE

ISS CDR SLEEP POSTSLEEP-ISS DPC PREPWORK AIR SMPL EXERCISE TVIS VRFY СОЖ

MNT ISS MEALDOCFILM DOCK-FILM ♥ LEAK

CHECK∆ ♠АК 1М

SMPL

HATCHOPEN

SFTYBRIEF MDDK XFER

FE-1 SLEEP POSTSLEEP-ISS DPCCOMM

PREPWORK

RWS

EXERCISE RED

CDRA*

VRFYCNFGWDWCL

ISS MEALDOC

TIMER

RBAR-FILM PMA2ARVL

D/L

LEAKCHECK

HATCHOPEN

SFTYBRIEF SSRMS SUPPORT

DAY/NIGHTORBIT 25 26 27 28 29 30 31 32 33

TDRSE -47.0W -171.0Z -275.0

ORB ATT +ZLV +YVV BIASED RNDZ DOCK FREE BIAS -XLV +ZVV

NOTES

♣OBSS MNVR T⊕OBSS H/O FROM SSRMS

♦OBSS MNVR TOBSS H/O FROM SSRMS

♥C&T-DAIU-VOICE-CK∆A/L CCAA ACT

♠A/L CCAA A

*ACT

*STS TO RS

*ACT

2-6A

FD03

COLLINS

KELLY

NOGUCHI

ROBINSON

D

O

C

K

∧∧NC4 TI

∧NH

H

A

N

D

S

H

A

K

E

∧+YVV

THOMAS

LAWRENCE

CAMARDA

*DOCK 1/19:58

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/14/04 (258) 12 13 14 15 16 17 18 19 20 21 22 23 002/00

MET Day 001

CDR

APCU1*

APPROACH W/RPM

GRP B

PWRDN

GRP B

PWRUP

CWC

INIT

MNVR-XLVISS RNDZ SFTY

BRIEFSIMOINIT

SIMOTERM

HATCHOPEN

POSTSLEEP

POSTSLEEP

POST

EXERCISE

ATTHO*

IMU

PLT APPROACH W/RPM

GRP B

PWRDN

GRP B

PWRUP

POST SLEEP ISS RNDZ SFTYBRIEF

HATCHOPEN

MNVR-XLV

OBSSGRPL

OBSSUNBRTH

SALIVA

EXERCISE

MS1 EMURMVLEXERCISE

POSTRNDZPGSCCNFG

POST SLEEP - GIRA ISS RNDZ SFTYBRIEF

EVA TOOLXFER

P/TV04

S/U

P/TV04

OPSPTV02 OPSP/TV02

S/U

P/TV05

S/U

MS2 APPROACH W/RPMEMURMVLEXERCISE

POSTRNDZPGSCCNFG

POST SLEEP SFTYBRIEF

PCSS/U

HATCHOPENISS RNDZ EVA TOOL

XFERISSRNDZ

RNDZTOOLSC/OPT2

MS3 APPROACH W/RPMISS RNDZPOST SLEEP LEAKCHECK

HATCHOPEN

SFTYBRIEFTILE INSPECT EXERCISEPOST SLEEP ⊕ OBSS

UNBTH CAMR

A/L

PREP

INGRS

ISS RNDZ

MS4

COND

SETUP

LEAKCHECKPOST SLEEP APPROACH W/RPMISS RNDZ HATCH

OPENSFTYBRIEF

OBSSGRPL

OBSSUNBRTH

♦LOG

SALIVA

EXERCISEPOST SLEEP

A/L

PREP

INGRS

TILE INSPECT

MS5

AUDIO

ISSPOST SLEEP APPROACH W/RPMISS RNDZ HATCH

OPENSFTYBRIEF

PCSS/UTILE INSPECT POST SLEEP OBSS

UNBTH CAMR

LOG

SALIVA

EXERCISE

ISS CDR SLEEP POSTSLEEP-ISS DPC PREPWORK AIR SMPL EXERCISE TVIS VRFY СОЖ

MNT ISS MEALDOCFILM DOCK-FILM ♥ LEAK

CHECK∆ ♠АК 1М

SMPL

HATCHOPEN

SFTYBRIEF MDDK XFER

FE-1 SLEEP POSTSLEEP-ISS DPCCOMM

PREPWORK

RWS

EXERCISE RED

CDRA*

VRFYCNFGWDWCL

ISS MEALDOC

TIMER

RBAR-FILM PMA2ARVL

D/L

LEAKCHECK

HATCHOPEN

SFTYBRIEF SSRMS SUPPORT

DAY/NIGHTORBIT 25 26 27 28 29 30 31 32 33

TDRSE -47.0W -171.0Z -275.0

ORB ATT +ZLV +YVV BIASED RNDZ DOCK FREE BIAS -XLV +ZVV

NOTES

♣OBSS MNVR T⊕OBSS H/O FROM SSRMS

♦OBSS MNVR TOBSS H/O FROM SSRMS

♥C&T-DAIU-VOICE-CK∆A/L CCAA ACT

♠A/L CCAA A

*ACT

*STS TO RS

*ACT

Page 21: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-6B

D

O

C

K

ISS

12 13 14 15 16 17 18 19 20 21 22 23 002/00MET Day 001 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/14/04 (258)DAY/NIGHTORBIT 25 26 27 28 29 30 31 32 33

DAILY ORBIT 14 15 16 1 2 3 4 5 6RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEAMNVR DOCK ATT

+XVV +ZLVFREE DRIFT +XVV +ZLV TEA

OCA-MAIL-SYNCLOCK-OPS-RECORDEROCA-RPM-IMAGE-D/L

KU

OCA-MAIL-SYNCLOCK-OPS-RECORDER

OCA-RPM-IMAGE-D/LФ-СОСБ-СБ-FEATHERС-СОСБ-СБ-FEATHERС-СОГБ-COMB MODEФ-СОСБ-СOMB MODE

SY

Ф-СОСБ-СБ-FEATHERС-СОСБ-СБ-FEATHER

С-СОГБ-COMB MODEФ-СОСБ-СOMB MODE

UHF-1-ACTAUDIO-UHF OPS-CNFGC&T-COMM-CNFG-VRFYDPCKUBD-ORB MASK-ENAMSS-POWERUPC&DH-INH VALIDITY-CKACS-CMG-DATA-DUMPC&T-VIDEO CNFGACS-H/O-USOS-TO-RSLOCK-OPS-RECORDERC&T-UHF-CONFIGISS-PWR-DWNACS-ATT-CCDB-UPDATEACS-PRE-ARVL-THRSTRSDMS-DOCKINGPPS-P6 SA-FTHRACS-PMA2-ARVL-THRSTRPPS-P6-SA-AUTOACS-POST-ARVL-THRSTRKUBD-ORB MASK-INHACS-H/O-RS-TO-US-MMC&T-AUDIO-HRDLN-CNFGACS-STS/RS-ATT-H/OC&DH-POST DOCK-CNFGACS-GPS-RCNFISS-PWR-UPIATCS-LTL-STPT-CHGA/L CCAA ACTUHF-1-DEACTCDRA ACT

SBD

UHF-1-ACTAUDIO-UHF OPS-CNFG

C&T-COMM-CNFG-VRFYDPC

KUBD-ORB MASK-ENAMSS-POWERUP

C&DH-INH VALIDITY-CK C&DH-INH VALIDITY-CKACS-CMG-DATA-DUMP

C&T-VIDEO CNFGACS-H/O-USOS-TO-RS

LOCK-OPS-RECORDERC&T-UHF-CONFIG

ISS-PWR-DWNACS-ATT-CCDB-UPDATE ACS-ATT-CCDB-UPDATEACS-PRE-ARVL-THRSTR

SDMS-DOCKINGPPS-P6 SA-FTHR

ACS-PMA2-ARVL-THRSTRPPS-P6-SA-AUTO

ACS-POST-ARVL-THRSTRKUBD-ORB MASK-INH

ACS-H/O-RS-TO-US-MMC&T-AUDIO-HRDLN-CNFGACS-STS/RS-ATT-H/O

C&DH-POST DOCK-CNFGACS-GPS-RCNF

ISS-PWR-UPIATCS-LTL-STPT-CHG

A/L CCAA ACTUHF-1-DEACT

CDRA ACTGTS-OFF-ПРД400СЭП-АБ-FULL CHRGСУДН-ОГНИ-LIGHTS ONФ-СОСБ-СБ-FEATHERС-СОСБ-СБ-FEATHERСУДН-ОГНИ-LIGHTS OFFACS-PMA2-ARVL-THRSTRACS-STS/RS-ATT-H/OСЭП-АБ-PART CHRGGTS-ON-ПРД400

RS

GTS-OFF-ПРД400СЭП-АБ-FULL CHRG

СУДН-ОГНИ-LIGHTS ONФ-СОСБ-СБ-FEATHERС-СОСБ-СБ-FEATHER

СУДН-ОГНИ-LIGHTS OFFACS-PMA2-ARVL-THRSTR

ACS-STS/RS-ATT-H/OСЭП-АБ-PART CHRG

GTS-ON-ПРД400CHANGE-ELEKTRON-MODEACS-CMG-DATA-DUMPMCC-M GO FOR TIISS GO FOR TISTS GO FOR TIACS-H/O-USOS-TO-RSISS MODE-PROX-XTIONISS GO FOR RPMACS-PRE-ARVL-THRSTRISS GO FOR DOCKISS/STS DOCKING SCRPDOCKACS-POST-ARVL-THRSTRACS-H/O-RS-TO-US-MMACS-STS/RS-ATT-H/OISS MODE-STND-XTIONMPLM-PRES-CK

MCC

CHANGE-ELEKTRON-MODEACS-CMG-DATA-DUMP

MCC-M GO FOR TIISS GO FOR TISTS GO FOR TI

ACS-H/O-USOS-TO-RSISS MODE-PROX-XTION

ISS GO FOR RPMACS-PRE-ARVL-THRSTR

ISS GO FOR DOCKISS/STS DOCKING SCRPDOCK

ACS-POST-ARVL-THRSTRACS-H/O-RS-TO-US-MMACS-STS/RS-ATT-H/OISS MODE-STND-XTION

MPLM-PRES-CK

2-6B

D

O

C

K

ISS

12 13 14 15 16 17 18 19 20 21 22 23 002/00MET Day 001 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/14/04 (258)DAY/NIGHTORBIT 25 26 27 28 29 30 31 32 33

DAILY ORBIT 14 15 16 1 2 3 4 5 6RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEAMNVR DOCK ATT

+XVV +ZLVFREE DRIFT +XVV +ZLV TEA

OCA-MAIL-SYNCLOCK-OPS-RECORDEROCA-RPM-IMAGE-D/L

KU

OCA-MAIL-SYNCLOCK-OPS-RECORDER

OCA-RPM-IMAGE-D/LФ-СОСБ-СБ-FEATHERС-СОСБ-СБ-FEATHERС-СОГБ-COMB MODEФ-СОСБ-СOMB MODE

SY

Ф-СОСБ-СБ-FEATHERС-СОСБ-СБ-FEATHER

С-СОГБ-COMB MODEФ-СОСБ-СOMB MODE

UHF-1-ACTAUDIO-UHF OPS-CNFGC&T-COMM-CNFG-VRFYDPCKUBD-ORB MASK-ENAMSS-POWERUPC&DH-INH VALIDITY-CKACS-CMG-DATA-DUMPC&T-VIDEO CNFGACS-H/O-USOS-TO-RSLOCK-OPS-RECORDERC&T-UHF-CONFIGISS-PWR-DWNACS-ATT-CCDB-UPDATEACS-PRE-ARVL-THRSTRSDMS-DOCKINGPPS-P6 SA-FTHRACS-PMA2-ARVL-THRSTRPPS-P6-SA-AUTOACS-POST-ARVL-THRSTRKUBD-ORB MASK-INHACS-H/O-RS-TO-US-MMC&T-AUDIO-HRDLN-CNFGACS-STS/RS-ATT-H/OC&DH-POST DOCK-CNFGACS-GPS-RCNFISS-PWR-UPIATCS-LTL-STPT-CHGA/L CCAA ACTUHF-1-DEACTCDRA ACT

SBD

UHF-1-ACTAUDIO-UHF OPS-CNFG

C&T-COMM-CNFG-VRFYDPC

KUBD-ORB MASK-ENAMSS-POWERUP

C&DH-INH VALIDITY-CK C&DH-INH VALIDITY-CKACS-CMG-DATA-DUMP

C&T-VIDEO CNFGACS-H/O-USOS-TO-RS

LOCK-OPS-RECORDERC&T-UHF-CONFIG

ISS-PWR-DWNACS-ATT-CCDB-UPDATE ACS-ATT-CCDB-UPDATEACS-PRE-ARVL-THRSTR

SDMS-DOCKINGPPS-P6 SA-FTHR

ACS-PMA2-ARVL-THRSTRPPS-P6-SA-AUTO

ACS-POST-ARVL-THRSTRKUBD-ORB MASK-INH

ACS-H/O-RS-TO-US-MMC&T-AUDIO-HRDLN-CNFGACS-STS/RS-ATT-H/O

C&DH-POST DOCK-CNFGACS-GPS-RCNF

ISS-PWR-UPIATCS-LTL-STPT-CHG

A/L CCAA ACTUHF-1-DEACT

CDRA ACTGTS-OFF-ПРД400СЭП-АБ-FULL CHRGСУДН-ОГНИ-LIGHTS ONФ-СОСБ-СБ-FEATHERС-СОСБ-СБ-FEATHERСУДН-ОГНИ-LIGHTS OFFACS-PMA2-ARVL-THRSTRACS-STS/RS-ATT-H/OСЭП-АБ-PART CHRGGTS-ON-ПРД400

RS

GTS-OFF-ПРД400СЭП-АБ-FULL CHRG

СУДН-ОГНИ-LIGHTS ONФ-СОСБ-СБ-FEATHERС-СОСБ-СБ-FEATHER

СУДН-ОГНИ-LIGHTS OFFACS-PMA2-ARVL-THRSTR

ACS-STS/RS-ATT-H/OСЭП-АБ-PART CHRG

GTS-ON-ПРД400CHANGE-ELEKTRON-MODEACS-CMG-DATA-DUMPMCC-M GO FOR TIISS GO FOR TISTS GO FOR TIACS-H/O-USOS-TO-RSISS MODE-PROX-XTIONISS GO FOR RPMACS-PRE-ARVL-THRSTRISS GO FOR DOCKISS/STS DOCKING SCRPDOCKACS-POST-ARVL-THRSTRACS-H/O-RS-TO-US-MMACS-STS/RS-ATT-H/OISS MODE-STND-XTIONMPLM-PRES-CK

MCC

CHANGE-ELEKTRON-MODEACS-CMG-DATA-DUMP

MCC-M GO FOR TIISS GO FOR TISTS GO FOR TI

ACS-H/O-USOS-TO-RSISS MODE-PROX-XTION

ISS GO FOR RPMACS-PRE-ARVL-THRSTR

ISS GO FOR DOCKISS/STS DOCKING SCRPDOCK

ACS-POST-ARVL-THRSTRACS-H/O-RS-TO-US-MMACS-STS/RS-ATT-H/OISS MODE-STND-XTION

MPLM-PRES-CK

Page 22: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-7A

FD3

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

09/15 01 02 03 04 05 06 07 08 09 10 11GMT 09/14/04 (258) 002/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 002

CDR

APCU1*

CWC

TERM

PMCOCA

PRE SLEEPPRE SLEEP SLEEPXFER

CWC

VTRPB

VTRS/U

PLT SLEEP⊕OBSS

H/O

MNVRTO

ACBMINSPT

PRESLEEP PRE SLEEP

MS1PTV06S/UMPLM

PRE SLEEP - GIRA SLEEPEVA TOOLXFER

MS2 PRE SLEEP SLEEPEVA TOOLXFER

MS3 SLEEPPRE SLEEP

OBSS

UNBTH

CAMR

OBSSH/OFROMSSRMS

MS4 PRE SLEEP SLEEPOBSS

H/O

MNVRTO

ACBMINSPT

RENAL

PRESLEEP

MS5 SLEEPPRE SLEEP

OBSS

UNBTH

CAMR

OBSSH/OFROMSSRMS

ISS CDR VELO + HC DPC AIR SMPL PRE SLEEP SLEEP

FE-1 SSRMSSUPPORT DPC ∆ PREP

WORK PRE SLEEP SLEEP

DAY/NIGHTORBIT 33 34 35 36 37 38 39 40

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣EXERCISE⊕OBSS MNVR TO HANDOFF

♦OBSS H/O FROM SSRMSOBSS MNVR TO HANDOFF

♥OBSS H/O FROM SSRMS

∆DAILY PLN RVW

*DEACT

2-7A

FD3

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

09/15 01 02 03 04 05 06 07 08 09 10 11GMT 09/14/04 (258) 002/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 002

CDR

APCU1*

CWC

TERM

PMCOCA

PRE SLEEPPRE SLEEP SLEEPXFER

CWC

VTRPB

VTRS/U

PLT SLEEP⊕OBSS

H/O

MNVRTO

ACBMINSPT

PRESLEEP PRE SLEEP

MS1PTV06S/UMPLM

PRE SLEEP - GIRA SLEEPEVA TOOLXFER

MS2 PRE SLEEP SLEEPEVA TOOLXFER

MS3 SLEEPPRE SLEEP

OBSS

UNBTH

CAMR

OBSSH/OFROMSSRMS

MS4 PRE SLEEP SLEEPOBSS

H/O

MNVRTO

ACBMINSPT

RENAL

PRESLEEP

MS5 SLEEPPRE SLEEP

OBSS

UNBTH

CAMR

OBSSH/OFROMSSRMS

ISS CDR VELO + HC DPC AIR SMPL PRE SLEEP SLEEP

FE-1 SSRMSSUPPORT DPC ∆ PREP

WORK PRE SLEEP SLEEP

DAY/NIGHTORBIT 33 34 35 36 37 38 39 40

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣EXERCISE⊕OBSS MNVR TO HANDOFF

♦OBSS H/O FROM SSRMSOBSS MNVR TO HANDOFF

♥OBSS H/O FROM SSRMS

∆DAILY PLN RVW

*DEACT

Page 23: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-7B

ISS

002/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 002 09/15 01 02 03 04 05 06 07 08 09 10 11

GMT 09/14/04 (258)DAY/NIGHTORBIT 33 34 35 36 37 38 39 40

DAILY ORBIT 6 7 8 9 10 11 12 13RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

N1-NAD-ACBM-SURVEYOCA-MAIL-SYNC

KU

N1-NAD-ACBM-SURVEYOCA-MAIL-SYNC

SY

CDRA ACTACS-GNC-PPL-UPDATEDPCSDMS-DOCKING-DUMPN1 CBM PREP FOR MATEN1-NAD-ACBM-SURVEYSBD-KEY-CHG

SBD

CDRA ACTACS-GNC-PPL-UPDATE

DPCSDMS-DOCKING-DUMP

N1 CBM PREP FOR MATEN1-NAD-ACBM-SURVEY

SBD-KEY-CHGPCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

RS

N1 CBM PREP FOR MATEN1-NAD-ACBM-SURVEYM

CC

N1 CBM PREP FOR MATEN1-NAD-ACBM-SURVEY

NOTES

2-7B

ISS

002/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 002 09/15 01 02 03 04 05 06 07 08 09 10 11

GMT 09/14/04 (258)DAY/NIGHTORBIT 33 34 35 36 37 38 39 40

DAILY ORBIT 6 7 8 9 10 11 12 13RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

N1-NAD-ACBM-SURVEYOCA-MAIL-SYNC

KU

N1-NAD-ACBM-SURVEYOCA-MAIL-SYNC

SY

CDRA ACTACS-GNC-PPL-UPDATEDPCSDMS-DOCKING-DUMPN1 CBM PREP FOR MATEN1-NAD-ACBM-SURVEYSBD-KEY-CHG

SBD

CDRA ACTACS-GNC-PPL-UPDATE

DPCSDMS-DOCKING-DUMP

N1 CBM PREP FOR MATEN1-NAD-ACBM-SURVEY

SBD-KEY-CHGPCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

RS

N1 CBM PREP FOR MATEN1-NAD-ACBM-SURVEYM

CC

N1 CBM PREP FOR MATEN1-NAD-ACBM-SURVEY

NOTES

Page 24: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-8A

FD04

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/15/04 (259) 12 13 14 15 16 17 18 19 20 21 22 23 003/00

MET Day 002

CDR

APCU1*

APCU1*

CWC

INIT 3

CWC

INIT 2

CWC

TERM

CWC

TERM

MEAL

PCBM*

POST SLEEPPOST SLEEP

POST

SLEEP

XFER2 CWCPAO

A/G

EVAPROCREVW

OBSS SURVEY

PLT MEALPOST SLEEP OBSS SURVEYMPLM UNBTH MPLMINSTL

MPLMINSTL

LIMP

BRAKE

UNGRP

MPLMINSTLGRPL

SALIVA

MEAL

MBSGRAPPLE

LABUNGRPL

MNVRTOSRVYSPT

EVAPROCREVW

MS1

CEVIS

EMU XFER& RCFG

EMUTOA/L

I/F CK

REBA

H/WE LK PREPMEALCBM

1STSTG

CBM 2NDSTG/ABOLTS

VERIF

POST SLEEP - GIRA EVA TOOLCONFG

XFER

SAFER

CIPAAPRE\HEAT

MDDK XFEREVA

CAMR

EXERCISEEVAPROCREVW

MS2

CEVIS

EMU XFER& RCFG

EMUTOA/L

I/F CK

REBA

H/WE LK PREPMEALCBM

1STSTG

CBM 2NDSTG/ABOLTS

POST SLEEP

VERIF

EVA TOOLCONFG

XFER

SAFER

PAOA/G

CIPAAPRE\HEAT

EVA

CAMR

EXERCISE MDDK XFEREVAPROCREVW

MS3 POST SLEEP MEALSTS O2 P/BCONFIGN2 XFER

EMUTOA/L

I/F CK

E LK PREP EVA TOOLCONFG

PRLA

EMU XFER& RCFG EXERCISE

EVAPROCREVW

DOUGRVW OBSS SURVEY

MS4 MPLMINSTL

MPLMINSTL

BRAKE

MPLMINSTLGRPL

LIMP

MPLM UNBTHMPLM

S/UMPLM VEST

MPLM

INGR

VEST PRESSPOST SLEEP

SALIVA

LOG

UNGRP

MEAL

MEALEVAPROCREVW

MDDKXFER

MS5N1NDRCBCSRMV

POST SLEEP MEALEXERCISE MDDKXFERN2 XFER OBSS SURVEY

SALIVA

LOG

POST SLEEPPRLA

EVAPROCREVW

DOUGRVW

ISS CDR SLEEP POST SLEEPPREP

WORK

PREP

WORK

DPCMPLMEQUIPS/U

VELO + HC СОЖMNT MEAL VEST PRESS MPLM VEST

MPLM

INGR

MPLM

S/UEVAREVW

FE-1 SLEEP POST SLEEP

POST

SLEEP

DWPNT

♣ DPC

CEVIS

EMU XFER& RCFG

EMUTOA/L

I/F CK

N2 XFER STS O2 P/BCONFIG

MBSGRAPPLE

LABUNGRPL

MNVRTOSRVYSPT

MEAL E LK PREP EVA TOOLCONFG

EXERCISETVIS

EVAREVW

DAY/NIGHTORBIT 41 42 43 44 45 46 47 48

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣CBCS P/U*ACT*DEACT

*INSPECT

2-8A

FD04

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/15/04 (259) 12 13 14 15 16 17 18 19 20 21 22 23 003/00

MET Day 002

CDR

APCU1*

APCU1*

CWC

INIT 3

CWC

INIT 2

CWC

TERM

CWC

TERM

MEAL

PCBM*

POST SLEEPPOST SLEEP

POST

SLEEP

XFER2 CWCPAO

A/G

EVAPROCREVW

OBSS SURVEY

PLT MEALPOST SLEEP OBSS SURVEYMPLM UNBTH MPLMINSTL

MPLMINSTL

LIMP

BRAKE

UNGRP

MPLMINSTLGRPL

SALIVA

MEAL

MBSGRAPPLE

LABUNGRPL

MNVRTOSRVYSPT

EVAPROCREVW

MS1

CEVIS

EMU XFER& RCFG

EMUTOA/L

I/F CK

REBA

H/WE LK PREPMEALCBM

1STSTG

CBM 2NDSTG/ABOLTS

VERIF

POST SLEEP - GIRA EVA TOOLCONFG

XFER

SAFER

CIPAAPRE\HEAT

MDDK XFEREVA

CAMR

EXERCISEEVAPROCREVW

MS2

CEVIS

EMU XFER& RCFG

EMUTOA/L

I/F CK

REBA

H/WE LK PREPMEALCBM

1STSTG

CBM 2NDSTG/ABOLTS

POST SLEEP

VERIF

EVA TOOLCONFG

XFER

SAFER

PAOA/G

CIPAAPRE\HEAT

EVA

CAMR

EXERCISE MDDK XFEREVAPROCREVW

MS3 POST SLEEP MEALSTS O2 P/BCONFIGN2 XFER

EMUTOA/L

I/F CK

E LK PREP EVA TOOLCONFG

PRLA

EMU XFER& RCFG EXERCISE

EVAPROCREVW

DOUGRVW OBSS SURVEY

MS4 MPLMINSTL

MPLMINSTL

BRAKE

MPLMINSTLGRPL

LIMP

MPLM UNBTHMPLM

S/UMPLM VEST

MPLM

INGR

VEST PRESSPOST SLEEP

SALIVA

LOG

UNGRP

MEAL

MEALEVAPROCREVW

MDDKXFER

MS5N1NDRCBCSRMV

POST SLEEP MEALEXERCISE MDDKXFERN2 XFER OBSS SURVEY

SALIVA

LOG

POST SLEEPPRLA

EVAPROCREVW

DOUGRVW

ISS CDR SLEEP POST SLEEPPREP

WORK

PREP

WORK

DPCMPLMEQUIPS/U

VELO + HC СОЖMNT MEAL VEST PRESS MPLM VEST

MPLM

INGR

MPLM

S/UEVAREVW

FE-1 SLEEP POST SLEEP

POST

SLEEP

DWPNT

♣ DPC

CEVIS

EMU XFER& RCFG

EMUTOA/L

I/F CK

N2 XFER STS O2 P/BCONFIG

MBSGRAPPLE

LABUNGRPL

MNVRTOSRVYSPT

MEAL E LK PREP EVA TOOLCONFG

EXERCISETVIS

EVAREVW

DAY/NIGHTORBIT 41 42 43 44 45 46 47 48

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣CBCS P/U*ACT*DEACT

*INSPECT

Page 25: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-8B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 003/00MET Day 002 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/15/04 (259)DAY/NIGHTORBIT 41 42 43 44 45 46 47 48

DAILY ORBIT 14 15 1 2 3 4 5 6RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

FMS-CALIBRATIONFMS-DATA-DUMPUHF-1-ACTAUDIO-UHF OPS-CNFGUHF-1-DEACTCBM BOLT LOADINGGNC-PPL-INCORPMPLM ACT PART IMPLM ACT PART 2C&T-VIDEO-DECONFGMSS-POWERDOWN

SBD

FMS-CALIBRATIONFMS-DATA-DUMP

UHF-1-ACTAUDIO-UHF OPS-CNFG

UHF-1-DEACTCBM BOLT LOADING

GNC-PPL-INCORPMPLM ACT PART I

MPLM ACT PART 2C&T-VIDEO-D

MSS-POWERPCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPSCPO/PRO-PCG-CMD

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

CPO/PRO-PCG-CMDGTS-OFF-ПРД400GTS-ON-ПРД400

RS

GTS-OFF-ПРД400GTS-ON-ПРД400

MPLM-PRES-CKCBM BOLT LOADINGM

CC

MPLM-PRES-CKCBM BOLT LOADING

NOTES

2-8B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 003/00MET Day 002 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/15/04 (259)DAY/NIGHTORBIT 41 42 43 44 45 46 47 48

DAILY ORBIT 14 15 1 2 3 4 5 6RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

FMS-CALIBRATIONFMS-DATA-DUMPUHF-1-ACTAUDIO-UHF OPS-CNFGUHF-1-DEACTCBM BOLT LOADINGGNC-PPL-INCORPMPLM ACT PART IMPLM ACT PART 2C&T-VIDEO-DECONFGMSS-POWERDOWN

SBD

FMS-CALIBRATIONFMS-DATA-DUMP

UHF-1-ACTAUDIO-UHF OPS-CNFG

UHF-1-DEACTCBM BOLT LOADING

GNC-PPL-INCORPMPLM ACT PART I

MPLM ACT PART 2C&T-VIDEO-D

MSS-POWERPCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPSCPO/PRO-PCG-CMD

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

CPO/PRO-PCG-CMDGTS-OFF-ПРД400GTS-ON-ПРД400

RS

GTS-OFF-ПРД400GTS-ON-ПРД400

MPLM-PRES-CKCBM BOLT LOADINGM

CC

MPLM-PRES-CKCBM BOLT LOADING

NOTES

Page 26: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-9A

FD4

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

09/16 01 02 03 04 05 06 07 08 09 10 11GMT 09/15/04 (259) 003/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 003

CDR EXERCISE PMCOCA

PRE SLEEPPRESLEEP SLEEPPRE

SLEEPEVA PROCREVW

PLT SLEEPEVA PROCREVW PRE SLEEP

MS1 PRE SLEEP - GIRA SLEEPSAFERC/O

EVA PROCREVW

MS2 SLEEPPRE SLEEPSAFERC/O

EVA PROCREVW

MS3 PRE SLEEP SLEEPEVA PROCREVW

MS4 PRE SLEEP SLEEP

RENAL

EVA PROCREVW

MS5 SLEEPPRE SLEEP

XFER

TAGUP

XFER

CALL

PRE SLEEPEVA PROCREVW

ISS CDR EVA REVW PREPWORK

PRE

SLEEP

PRE SLEEPDPC

XFER

TAGUP

SLEEP

FE-1 EVA REVW DPC PRE SLEEP SLEEP

DAY/NIGHTORBIT 49 50 51 52 53 54 55 56

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES 2-9A

FD4

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

09/16 01 02 03 04 05 06 07 08 09 10 11GMT 09/15/04 (259) 003/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 003

CDR EXERCISE PMCOCA

PRE SLEEPPRESLEEP SLEEPPRE

SLEEPEVA PROCREVW

PLT SLEEPEVA PROCREVW PRE SLEEP

MS1 PRE SLEEP - GIRA SLEEPSAFERC/O

EVA PROCREVW

MS2 SLEEPPRE SLEEPSAFERC/O

EVA PROCREVW

MS3 PRE SLEEP SLEEPEVA PROCREVW

MS4 PRE SLEEP SLEEP

RENAL

EVA PROCREVW

MS5 SLEEPPRE SLEEP

XFER

TAGUP

XFER

CALL

PRE SLEEPEVA PROCREVW

ISS CDR EVA REVW PREPWORK

PRE

SLEEP

PRE SLEEPDPC

XFER

TAGUP

SLEEP

FE-1 EVA REVW DPC PRE SLEEP SLEEP

DAY/NIGHTORBIT 49 50 51 52 53 54 55 56

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

Page 27: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-9B

ISS

003/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 003 09/16 01 02 03 04 05 06 07 08 09 10 11

GMT 09/15/04 (259)DAY/NIGHTORBIT 49 50 51 52 53 54 55 56

DAILY ORBIT 6 7 8 9 10 11 12 13 14RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

MSS-POWERDOWNAR-MCA MPLM-PPLDPCSBD-KEY-CHGPPS-PCU-DISCHARGE

SBD

MSS-POWERDOWNAR-MCA MPLM-PPL

DPCSBD-KEY-CHG

PPS-PCU-DISCHARGEPCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

GTS-OFF-ПРД400RS

GTS-OFF-П

MCC

NOTES

2-9B

ISS

003/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 003 09/16 01 02 03 04 05 06 07 08 09 10 11

GMT 09/15/04 (259)DAY/NIGHTORBIT 49 50 51 52 53 54 55 56

DAILY ORBIT 6 7 8 9 10 11 12 13 14RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

MSS-POWERDOWNAR-MCA MPLM-PPLDPCSBD-KEY-CHGPPS-PCU-DISCHARGE

SBD

MSS-POWERDOWNAR-MCA MPLM-PPL

DPCSBD-KEY-CHG

PPS-PCU-DISCHARGEPCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

GTS-OFF-ПРД400RS

GTS-OFF-П

MCC

NOTES

Page 28: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-10A

FD05

COLLINS

KELLY

NOGUCHI

ROBINSON

EVA 1 (06:30)CEVIS

CEVIS

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/16/04 (260) 12 13 14 15 16 17 18 19 20 21 22 23 004/00

MET Day 003

CDR

EVA1

INHBT

FILTERCLEANINSPECT

CWC

INIT 5

CWC

INIT 4

CWC

TERM

CWC

TERM

MEALPMCA/G

POSTSLEEP

XFER2 CWCPOST SLEEP EXERCISE

IMU

PLT EXERCISEPOST SLEEP

SALIVA

DTO

EVA

SETUP

MBSUNGRPL

LABGRAPPLE

COMM*

POST SLEEP SSMRS SUPPORT

MS1 EMU P/B

EMU

PURGE

C/L DPRS EGRS /SETUP C/U&INGRSTS P/B O2 EVA PREPPOST SLEEP -

GIRA TPS SAMPLE REPAIRPAYLOADBAY SETUP

PAYLOADBAY

CLEANUP

CIPAA*

MS2 EMU P/B

EMU

PURGE

C/L DPRS EGRS /SETUP C/U&INGRSTS P/B O2 EVA PREPPOST SLEEP TPS SAMPLE REPAIRPAYLOAD

BAY SETUP

PAYLOADBAY

CLEANUP

CIPAA*

MS3 EMU P/B

EMU

PURGE

IVA SUPPORTC/L DPRSSTS P/B O2 EVA PREPLEH

POST SLEEP

MS4 XFERREVIEWPOST SLEEP EXERCISE P/TV07

EVAS/U

SALIVA

LOG

DTO

EVA

SETUP

MBSUNGRPL

LABGRAPPLE SSMRS SUPPORT

MS5 POST SLEEP EXERCISE TRANSFER MEALXFERREVIEW TRANSFERTRANSFER

SALIVA

LOG

ISS CDR SLEEP POST SLEEP DPC PREPWORK

XFERREVIEW VELO + HC СОЖ

MNT TRANSFER TRANSFERMEAL ♣ ⊕

FE-1 SLEEP POSTSLEEP POST SLEEP

LEH

STS P/B O2 EVA PREP

EMU

PURGE

EMU P/B C/L DPRS EXERCISETVIS MEAL ♦ EXERCISE RED

DAY/NIGHTORBIT 56 57 58 59 60 61 62 63 64

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣СГО-АСУ-МП-Ф-В-R&R⊕EXERCISE TV

♦C&T-CMM-CNFG-VRFY-2B

*CONFIG*TERM*TERM

2-10A

FD05

COLLINS

KELLY

NOGUCHI

ROBINSON

EVA 1 (06:30)CEVIS

CEVIS

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/16/04 (260) 12 13 14 15 16 17 18 19 20 21 22 23 004/00

MET Day 003

CDR

EVA1

INHBT

FILTERCLEANINSPECT

CWC

INIT 5

CWC

INIT 4

CWC

TERM

CWC

TERM

MEALPMCA/G

POSTSLEEP

XFER2 CWCPOST SLEEP EXERCISE

IMU

PLT EXERCISEPOST SLEEP

SALIVA

DTO

EVA

SETUP

MBSUNGRPL

LABGRAPPLE

COMM*

POST SLEEP SSMRS SUPPORT

MS1 EMU P/B

EMU

PURGE

C/L DPRS EGRS /SETUP C/U&INGRSTS P/B O2 EVA PREPPOST SLEEP -

GIRA TPS SAMPLE REPAIRPAYLOADBAY SETUP

PAYLOADBAY

CLEANUP

CIPAA*

MS2 EMU P/B

EMU

PURGE

C/L DPRS EGRS /SETUP C/U&INGRSTS P/B O2 EVA PREPPOST SLEEP TPS SAMPLE REPAIRPAYLOAD

BAY SETUP

PAYLOADBAY

CLEANUP

CIPAA*

MS3 EMU P/B

EMU

PURGE

IVA SUPPORTC/L DPRSSTS P/B O2 EVA PREPLEH

POST SLEEP

MS4 XFERREVIEWPOST SLEEP EXERCISE P/TV07

EVAS/U

SALIVA

LOG

DTO

EVA

SETUP

MBSUNGRPL

LABGRAPPLE SSMRS SUPPORT

MS5 POST SLEEP EXERCISE TRANSFER MEALXFERREVIEW TRANSFERTRANSFER

SALIVA

LOG

ISS CDR SLEEP POST SLEEP DPC PREPWORK

XFERREVIEW VELO + HC СОЖ

MNT TRANSFER TRANSFERMEAL ♣ ⊕

FE-1 SLEEP POSTSLEEP POST SLEEP

LEH

STS P/B O2 EVA PREP

EMU

PURGE

EMU P/B C/L DPRS EXERCISETVIS MEAL ♦ EXERCISE RED

DAY/NIGHTORBIT 56 57 58 59 60 61 62 63 64

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣СГО-АСУ-МП-Ф-В-R&R⊕EXERCISE TV

♦C&T-CMM-CNFG-VRFY-2B

*CONFIG*TERM*TERM

Page 29: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-10B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 004/00MET Day 003 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/16/04 (260)DAY/NIGHTORBIT 56 57 58 59 60 61 62 63 64

DAILY ORBIT 14 15 16 1 2 3 4 5 6RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

KUSY

UHF-1-ACTAUDIO-UHF OPS-CNFG10.2 PSI OPS INIT

MSS-POWERUPIATCS-N1-LTL-INITIATCS-N1-MTL-CHGC&T-VIDEO CNFGDPCPCU-C&W-ENAISS-DPRS-INH/ENAEVA1 INHIBIT PAD10.2 PSI OPS TERM

ISS-PWR-DWNFMS-DATA-DUMPFMS-CALIBRATIONC&T-CMM-CNFG-VRFY-2BLTL/CCAA-METOX-CNFG

SBD

UHF-1-ACTAUDIO-UHF OPS-CNFG

10.2 PSI OPS INIT10.2 PSI OPS INIT

MSS-POWERUPIATCS-N1-LTL-INIT

IATCS-N1-MTL-CHGC&T-VIDEO CNFGDPC

PCU-C&W-ENAISS-DPRS-INH/ENA

EVA1 INHIBIT PAD10.2 PSI OPS TERM

10.2 PSI OPS TERMISS-PWR-DWN

FMS-DATA-FMS-CALIBRATION

C&T-CMM-CNFG-VRFY-2BLTL/CCAA-

PCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

RS

EVA1 INHIBIT PAD

MCC-M EVA1 INH COMPLMCC

EVA1 INHIBIT PADEVA1 INHIBIT PAD

MCC-M EVA1 INH COMPL

NOTES

2-10B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 004/00MET Day 003 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/16/04 (260)DAY/NIGHTORBIT 56 57 58 59 60 61 62 63 64

DAILY ORBIT 14 15 16 1 2 3 4 5 6RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

KUSY

UHF-1-ACTAUDIO-UHF OPS-CNFG10.2 PSI OPS INIT

MSS-POWERUPIATCS-N1-LTL-INITIATCS-N1-MTL-CHGC&T-VIDEO CNFGDPCPCU-C&W-ENAISS-DPRS-INH/ENAEVA1 INHIBIT PAD10.2 PSI OPS TERM

ISS-PWR-DWNFMS-DATA-DUMPFMS-CALIBRATIONC&T-CMM-CNFG-VRFY-2BLTL/CCAA-METOX-CNFG

SBD

UHF-1-ACTAUDIO-UHF OPS-CNFG

10.2 PSI OPS INIT10.2 PSI OPS INIT

MSS-POWERUPIATCS-N1-LTL-INIT

IATCS-N1-MTL-CHGC&T-VIDEO CNFGDPC

PCU-C&W-ENAISS-DPRS-INH/ENA

EVA1 INHIBIT PAD10.2 PSI OPS TERM

10.2 PSI OPS TERMISS-PWR-DWN

FMS-DATA-FMS-CALIBRATION

C&T-CMM-CNFG-VRFY-2BLTL/CCAA-

PCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

RS

EVA1 INHIBIT PAD

MCC-M EVA1 INH COMPLMCC

EVA1 INHIBIT PADEVA1 INHIBIT PAD

MCC-M EVA1 INH COMPL

NOTES

Page 30: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-11A

FD5

COLLINS

KELLY

NOGUCHI

ROBINSON

& W/MTX

& W/MTX

& W/MTXTHOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

09/17 01 02 03 04 05 06 07 08 09 10 11GMT 09/16/04 (260) 004/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 004

CDR PMCOCA

PRE SLEEPPRE SLEEP SLEEPPWRFILL

PLT

COMM*

SLEEP

CMGR&REVAS/U

PRE SLEEP

MS1 C/U&INGR

C/L

RPRS

POST EVA W/OH20 PRE SLEEP - GIRA SLEEP

MS2 C/U&INGR

C/L

RPRS

POST EVA W/OH20 PRE SLEEP SLEEP

MS3

BSA-I

IVASUPPORT

C/L

RPRS

POST EVAW/O H20 PRE SLEEP SLEEPL/M/

EMUBATT

MS4 PRE SLEEPPRE SLEEPXFER

CALL

XFER

TAGUP

SLEEP

RENAL

CMGR&REVAS/U

MS5 SLEEPPRE SLEEP

XFER

TAGUP

XFER

CALL

PRE SLEEP♣

ISS CDR EXERCISETVIS

PREPWORK DPC

PRE

SLEEP

PRE SLEEP

XFER

TAGUP

SLEEP

FE-1C/L

RPRS

POST EVAW/O H20

L/M/EMUBATT

BSA-I

PRE SLEEP SLEEP

DAY/NIGHTORBIT 64 65 66 67 68 69 70 71 72

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣TRANSFER*DECONFIG

2-11A

FD5

COLLINS

KELLY

NOGUCHI

ROBINSON

& W/MTX

& W/MTX

& W/MTXTHOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

09/17 01 02 03 04 05 06 07 08 09 10 11GMT 09/16/04 (260) 004/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 004

CDR PMCOCA

PRE SLEEPPRE SLEEP SLEEPPWRFILL

PLT

COMM*

SLEEP

CMGR&REVAS/U

PRE SLEEP

MS1 C/U&INGR

C/L

RPRS

POST EVA W/OH20 PRE SLEEP - GIRA SLEEP

MS2 C/U&INGR

C/L

RPRS

POST EVA W/OH20 PRE SLEEP SLEEP

MS3

BSA-I

IVASUPPORT

C/L

RPRS

POST EVAW/O H20 PRE SLEEP SLEEPL/M/

EMUBATT

MS4 PRE SLEEPPRE SLEEPXFER

CALL

XFER

TAGUP

SLEEP

RENAL

CMGR&REVAS/U

MS5 SLEEPPRE SLEEP

XFER

TAGUP

XFER

CALL

PRE SLEEP♣

ISS CDR EXERCISETVIS

PREPWORK DPC

PRE

SLEEP

PRE SLEEP

XFER

TAGUP

SLEEP

FE-1C/L

RPRS

POST EVAW/O H20

L/M/EMUBATT

BSA-I

PRE SLEEP SLEEP

DAY/NIGHTORBIT 64 65 66 67 68 69 70 71 72

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣TRANSFER*DECONFIG

Page 31: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-11B

ISS

004/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 004 09/17 01 02 03 04 05 06 07 08 09 10 11

GMT 09/16/04 (260)DAY/NIGHTORBIT 64 65 66 67 68 69 70 71 72

DAILY ORBIT 6 7 8 9 10 11 12 13 14RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

FMS-DATA-DUMPLTL/CCAA-METOX-CNFGPCU-C&W-INHISS-PWR-UPUHF-1-DEACTDPCC&T-VIDEO-DECONFGMSS-POWERDOWNSSRMS-VIDEO-DEROUTESBD-KEY-CHG

SBD

FMS-DATA-DUMPLTL/CCAA-METOX-CNFG

PCU-C&W-INHISS-PWR-UP

UHF-1-DEACTDPC

C&T-VIDEO-DECONFGMSS-POWERDOWN

SSRMS-VIDEO-DEROUTESBD-KEY-CHG

PCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

GTS-ON-ПРД400RS

GTS-ON-ПРД400

C&T-CMM-CNFG-VRFY-3BMCC

C&T-CMM-CNFG-VRFY-3B

NOTES

2-11B

ISS

004/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 004 09/17 01 02 03 04 05 06 07 08 09 10 11

GMT 09/16/04 (260)DAY/NIGHTORBIT 64 65 66 67 68 69 70 71 72

DAILY ORBIT 6 7 8 9 10 11 12 13 14RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

FMS-DATA-DUMPLTL/CCAA-METOX-CNFGPCU-C&W-INHISS-PWR-UPUHF-1-DEACTDPCC&T-VIDEO-DECONFGMSS-POWERDOWNSSRMS-VIDEO-DEROUTESBD-KEY-CHG

SBD

FMS-DATA-DUMPLTL/CCAA-METOX-CNFG

PCU-C&W-INHISS-PWR-UP

UHF-1-DEACTDPC

C&T-VIDEO-DECONFGMSS-POWERDOWN

SSRMS-VIDEO-DEROUTESBD-KEY-CHG

PCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

GTS-ON-ПРД400RS

GTS-ON-ПРД400

C&T-CMM-CNFG-VRFY-3BMCC

C&T-CMM-CNFG-VRFY-3B

NOTES

Page 32: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-12A

FD06

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/17/04 (261) 12 13 14 15 16 17 18 19 20 21 22 23 005/00

MET Day 004

CDR

CABIN

COND

C/O

CWCVENT/PWR

DUMPEXERCISE

CWC

INIT 7

CWC

INIT 6

CWC

TERM

CWC

TERM

HTR

PAO

EVENT

POST SLEEPRCS*

XFER2 CWC

WCS CK

MEAL PWRFILL

ATTHO*

PAO

EVENT

ATTHO*

EVA

REVW

IMU

POST SLEEP

PLT EXERCISEPOST SLEEP MEALCWC VENT/PWR DUMP TRANSFERTRANSFER

PAO

EVENT

SALIVA

POSTSLEEP TRANSFER

EVA

REVW

MS1

ASPRN

EMUH20RCHG

METOX

EVA TOOL CONFGE LK PREP MEALPOST SLEEP - GIRA

PAO

EVENT

TPS EVA TOOL/XFER TRANSFEREVA

CAMR

EVA

REVW

MS2

ASPRN

EMUH20RCHG

EVA TOOL CONFGE LK PREP MEALPOST SLEEP TRANSFEREXERCISE

PAO

EVENT

TPS EVA TOOL/XFEREVA

CAMR

EVA

REVW

MS3 MEALPOST SLEEP TRANSFERTRANSFER E LK PREP EVA TOOL CONFGEVA

REVW

MS4 XFERREVIEW TRANSFERPOST SLEEP MEALEXERCISETRANSFER

SALIVA

LOG

PAOS/U TRANSFER

EVA

REVW

MS5 EXERCISEPOST SLEEP MEALXFERREVIEW TRANSFERTRANSFER TRANSFER

PAO

EVENT

SALIVA

LOG

WLES

BATT

EVA

REVW

ISS CDR SLEEP POST SLEEP DPCPREP

WORK

XFERREVIEW TRANSFER TRANSFEREXERCISE TVIS MEAL VELO + HC

PAO

EVENT

EVA

REVW

FE-1 SLEEP POST SLEEP DPC PREPWORK

♣ TRANSFER TRANSFEREXERCISE RED MEAL ⊕ EXERCISETVIS

EVA

REVW

DAY/NIGHTORBIT 72 73 74 75 76 77 78 79 80

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣LAB CWC FILL ⊕СОЖ-MNT*REG RCNFG*CMG TO STS *STS TO RS

*TERM2-12A

FD06

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/17/04 (261) 12 13 14 15 16 17 18 19 20 21 22 23 005/00

MET Day 004

CDR

CABIN

COND

C/O

CWCVENT/PWR

DUMPEXERCISE

CWC

INIT 7

CWC

INIT 6

CWC

TERM

CWC

TERM

HTR

PAO

EVENT

POST SLEEPRCS*

XFER2 CWC

WCS CK

MEAL PWRFILL

ATTHO*

PAO

EVENT

ATTHO*

EVA

REVW

IMU

POST SLEEP

PLT EXERCISEPOST SLEEP MEALCWC VENT/PWR DUMP TRANSFERTRANSFER

PAO

EVENT

SALIVA

POSTSLEEP TRANSFER

EVA

REVW

MS1

ASPRN

EMUH20RCHG

METOX

EVA TOOL CONFGE LK PREP MEALPOST SLEEP - GIRA

PAO

EVENT

TPS EVA TOOL/XFER TRANSFEREVA

CAMR

EVA

REVW

MS2

ASPRN

EMUH20RCHG

EVA TOOL CONFGE LK PREP MEALPOST SLEEP TRANSFEREXERCISE

PAO

EVENT

TPS EVA TOOL/XFEREVA

CAMR

EVA

REVW

MS3 MEALPOST SLEEP TRANSFERTRANSFER E LK PREP EVA TOOL CONFGEVA

REVW

MS4 XFERREVIEW TRANSFERPOST SLEEP MEALEXERCISETRANSFER

SALIVA

LOG

PAOS/U TRANSFER

EVA

REVW

MS5 EXERCISEPOST SLEEP MEALXFERREVIEW TRANSFERTRANSFER TRANSFER

PAO

EVENT

SALIVA

LOG

WLES

BATT

EVA

REVW

ISS CDR SLEEP POST SLEEP DPCPREP

WORK

XFERREVIEW TRANSFER TRANSFEREXERCISE TVIS MEAL VELO + HC

PAO

EVENT

EVA

REVW

FE-1 SLEEP POST SLEEP DPC PREPWORK

♣ TRANSFER TRANSFEREXERCISE RED MEAL ⊕ EXERCISETVIS

EVA

REVW

DAY/NIGHTORBIT 72 73 74 75 76 77 78 79 80

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣LAB CWC FILL ⊕СОЖ-MNT*REG RCNFG*CMG TO STS *STS TO RS

*TERM

Page 33: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-12B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 005/00MET Day 004 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/17/04 (261)DAY/NIGHTORBIT 72 73 74 75 76 77 78 79 80

DAILY ORBIT 14 15 1 2 3 4 5 6 7RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

KUSY

A/L CCAA CONFIGDPCACS-CMG/STS ATT-H/OLTL/CCAA-METOX-CNFG

SBD

A/L CCAA CONFIGDPC

ACS-CMG/STS ATT-H/OLTL/CCAA-METOX-CNFG

PCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

ACS-STS/RS-ATT-H/ORS

ACS-STS/RS-ATT-H/O

ACS-CMG/STS ATT-H/OACS-STS/RS-ATT-H/OM

CC

ACS-CMG/STS ATT-H/OACS-STS/RS-ATT-H/O

NOTES

*CMG TO STS *STS TO RS*CMG TO STS *STS TO RS

2-12B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 005/00MET Day 004 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/17/04 (261)DAY/NIGHTORBIT 72 73 74 75 76 77 78 79 80

DAILY ORBIT 14 15 1 2 3 4 5 6 7RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

KUSY

A/L CCAA CONFIGDPCACS-CMG/STS ATT-H/OLTL/CCAA-METOX-CNFG

SBD

A/L CCAA CONFIGDPC

ACS-CMG/STS ATT-H/OLTL/CCAA-METOX-CNFG

PCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

ACS-STS/RS-ATT-H/ORS

ACS-STS/RS-ATT-H/O

ACS-CMG/STS ATT-H/OACS-STS/RS-ATT-H/OM

CC

ACS-CMG/STS ATT-H/OACS-STS/RS-ATT-H/O

NOTES

*CMG TO STS *STS TO RS*CMG TO STS *STS TO RS

Page 34: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-13A

COLLINS

KELLY

NOGUCHI

ROBINSON

FD6

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

09/18 01 02 03 04 05 06 07 08 09 10 11GMT 09/17/04 (261) 005/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 005

CDR PMCOCA

PRE SLEEP PRE SLEEP SLEEPEVA REVW

PLT SLEEPEVA REVW PRE SLEEP

MS1 PRE SLEEP - GIRA SLEEPEXERCISEEVA REVW

MS2 PRE SLEEP SLEEPEVA REVW

MS3 SLEEPPRE SLEEPEXERCISEPRESLEEPEVA REVW

MS4 PRE SLEEPPRE SLEEPXFER

CALL

XFER

TAGUP

SLEEP

RENAL

EVA REVW

MS5 SLEEPPRE SLEEP

XFER

TAGUP

XFER

CALL

PRE SLEEPEVA REVW

ISS CDR EVA REVW PREPWORK

PRE

SLEEP

PRE SLEEPDPC

XFER

TAGUP

SLEEP

FE-1 EVA REVW PREPWORK DPC PRE SLEEP SLEEP

DAY/NIGHTORBIT 80 81 82 83 84 85 86 87 88

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES 2-13A

COLLINS

KELLY

NOGUCHI

ROBINSON

FD6

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

09/18 01 02 03 04 05 06 07 08 09 10 11GMT 09/17/04 (261) 005/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 005

CDR PMCOCA

PRE SLEEP PRE SLEEP SLEEPEVA REVW

PLT SLEEPEVA REVW PRE SLEEP

MS1 PRE SLEEP - GIRA SLEEPEXERCISEEVA REVW

MS2 PRE SLEEP SLEEPEVA REVW

MS3 SLEEPPRE SLEEPEXERCISEPRESLEEPEVA REVW

MS4 PRE SLEEPPRE SLEEPXFER

CALL

XFER

TAGUP

SLEEP

RENAL

EVA REVW

MS5 SLEEPPRE SLEEP

XFER

TAGUP

XFER

CALL

PRE SLEEPEVA REVW

ISS CDR EVA REVW PREPWORK

PRE

SLEEP

PRE SLEEPDPC

XFER

TAGUP

SLEEP

FE-1 EVA REVW PREPWORK DPC PRE SLEEP SLEEP

DAY/NIGHTORBIT 80 81 82 83 84 85 86 87 88

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

Page 35: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-13B

ISS

005/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 005 09/18 01 02 03 04 05 06 07 08 09 10 11

GMT 09/17/04 (261)DAY/NIGHTORBIT 80 81 82 83 84 85 86 87 88

DAILY ORBIT 7 8 9 10 11 12 13 14 15RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

A/L CCAA CONFIGDPCSBD-KEY-CHGSPS-DDCU-BDTMSS-POWERUP

SBD

A/L CCAA CONFIGDPC

SBD-KEY-CHGSPS-DDCU-BDT

MSS-POWERPCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

GTS-OFF-ПРД400RS

GTS-OFF-П

MCC

NOTES

2-13B

ISS

005/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 005 09/18 01 02 03 04 05 06 07 08 09 10 11

GMT 09/17/04 (261)DAY/NIGHTORBIT 80 81 82 83 84 85 86 87 88

DAILY ORBIT 7 8 9 10 11 12 13 14 15RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

A/L CCAA CONFIGDPCSBD-KEY-CHGSPS-DDCU-BDTMSS-POWERUP

SBD

A/L CCAA CONFIGDPC

SBD-KEY-CHGSPS-DDCU-BDT

MSS-POWERPCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

GTS-OFF-ПРД400RS

GTS-OFF-П

MCC

NOTES

Page 36: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-14A

FD07

COLLINS

KELLY

NOGUCHI

ROBINSON

EVA 2 (6:30)

CEVIS

CEVIS

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/18/04 (262) 12 13 14 15 16 17 18 19 20 21 22 23 006/00

MET Day 005

CDR

CMGCK

EVA2

INHBT

CWC

INIT 8

CWC

INIT 9

CWC

TERM

PMCA/G

POSTSLEEP

WASTE

INIT

WASTE

TERM

POST SLEEP EXERCISE MEAL

ATTHO*

ATTHO*

IMU

PLT EXERCISEPOST SLEEP

WASTE

INIT

WASTE

TERM

ESP2EVASETUP

EVA SSRMS SUPPORT

SALIVA

TRANSFER

COMM*

MS1 EMU P/B

EMU

PURGE

C/L DPRS EGRS /SETUP C/U&INGRSTS P/B O2 EVA PREPPOST SLEEP -

GIRA

BSA-T

EVA2 CMG R&R

MS2 EMU P/B

EMU

PURGE

C/L DPRS EGRS /SETUP C/U&INGRSTS P/B O2 EVA PREPPOST SLEEP

BSA-T

EVA2 CMG R&R

MS3 EMU P/B

EMU

PURGE

IVA SUPPORTC/L DPRSSTS P/B O2 EVA PREPLEH

POST SLEEP

MS4 POST SLEEP XFERREVIEW EXERCISE P/TV07

EVAS/U

ESP2EVASETUP

SALIVA

LOG

TRANSFER EVA SSRMS SUPPORT

MS5 EXERCISEPOST SLEEP MEAL TRANSFERTRANSFERXFERREVIEW

SALIVA

LOG

ISS CDR SLEEP POSTSLEEP-ISS PREPWORK

XFERREVIEWDPC TRANSFER TRANSFERСОЖ

MNT VELO + HC MEAL EXERCISETVIS

FE-1 SLEEP ♣ ⊕♦LEH

STS P/B O2 EVA PREP

EMU

PURGE

EMU P/B C/L DPRS EXERCISETVIS MEAL EXERCISE RED

DAY/NIGHTORBIT 88 89 90 91 92 93 94 95 96

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣POSTSLEEP-ISS ⊕POSTSLEEP-ISS♦C&T-CMM-CNFG-VRFY-2B

*CMG TO STS *STS TO RS*CONFIG

2-14A

FD07

COLLINS

KELLY

NOGUCHI

ROBINSON

EVA 2 (6:30)

CEVIS

CEVIS

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/18/04 (262) 12 13 14 15 16 17 18 19 20 21 22 23 006/00

MET Day 005

CDR

CMGCK

EVA2

INHBT

CWC

INIT 8

CWC

INIT 9

CWC

TERM

PMCA/G

POSTSLEEP

WASTE

INIT

WASTE

TERM

POST SLEEP EXERCISE MEAL

ATTHO*

ATTHO*

IMU

PLT EXERCISEPOST SLEEP

WASTE

INIT

WASTE

TERM

ESP2EVASETUP

EVA SSRMS SUPPORT

SALIVA

TRANSFER

COMM*

MS1 EMU P/B

EMU

PURGE

C/L DPRS EGRS /SETUP C/U&INGRSTS P/B O2 EVA PREPPOST SLEEP -

GIRA

BSA-T

EVA2 CMG R&R

MS2 EMU P/B

EMU

PURGE

C/L DPRS EGRS /SETUP C/U&INGRSTS P/B O2 EVA PREPPOST SLEEP

BSA-T

EVA2 CMG R&R

MS3 EMU P/B

EMU

PURGE

IVA SUPPORTC/L DPRSSTS P/B O2 EVA PREPLEH

POST SLEEP

MS4 POST SLEEP XFERREVIEW EXERCISE P/TV07

EVAS/U

ESP2EVASETUP

SALIVA

LOG

TRANSFER EVA SSRMS SUPPORT

MS5 EXERCISEPOST SLEEP MEAL TRANSFERTRANSFERXFERREVIEW

SALIVA

LOG

ISS CDR SLEEP POSTSLEEP-ISS PREPWORK

XFERREVIEWDPC TRANSFER TRANSFERСОЖ

MNT VELO + HC MEAL EXERCISETVIS

FE-1 SLEEP ♣ ⊕♦LEH

STS P/B O2 EVA PREP

EMU

PURGE

EMU P/B C/L DPRS EXERCISETVIS MEAL EXERCISE RED

DAY/NIGHTORBIT 88 89 90 91 92 93 94 95 96

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣POSTSLEEP-ISS ⊕POSTSLEEP-ISS♦C&T-CMM-CNFG-VRFY-2B

*CMG TO STS *STS TO RS*CONFIG

Page 37: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-14B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 006/00MET Day 005 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/18/04 (262)DAY/NIGHTORBIT 88 89 90 91 92 93 94 95 96

DAILY ORBIT 15 16 1 2 3 4 5 6 7RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

KUSY

MSS-POWERUPC&T-VIDEO CNFGUHF-1-ACTAUDIO-UHF OPS-CNFG10.2 PSI OPS INIT

C&T-CMM-CNFG-VRFY-2BEVA2 INHIBIT PADISS-PWR-DWNPPS-SA 4B-FTHRACS-CMG/STS ATT-H/ODPCISS-DPRS-INH/ENA10.2 PSI OPS TERM

PCU-C&W-ENAFMS-CALIBRATIONACS-CMG1-SHUTDOWNISS-RAP DPRS-INHFMS-DATA-DUMPPPS-P6-SA-4B-AUTOCMG1-ON-ORBIT-C/O CMG C/OACS-CMG1 STARTUP

SBD

MSS-POWERUPC&T-VIDEO CNFG

UHF-1-ACTAUDIO-UHF OPS-CNFG

10.2 PSI OPS INIT10.2 PSI OPS INIT

C&T-CMM-CNFG-VRFY-2BEVA2 INHIBIT PAD

ISS-PWR-DWNPPS-SA 4B-FTHR

ACS-CMG/STS ATT-H/ODPC

ISS-DPRS-INH/ENA10.2 PSI OPS TERM

10.2 PSI OPS TERMPCU-C&W-ENA

FMS-CALIBRATIONACS-CMG1-SHUTDOWN

ISS-RAP DPRS-INHFMS-DATA-DUMP

PPS-P6-SA-4B-AUTOCMG1-ON-ORBIT-C/O

CMG C/OACS-CMG1

PCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

ACS-STS/RS-ATT-H/ORS

ACS-STS/RS-ATT-H/O

EVA2 INHIBIT PAD

PPS-SA 4B-FTHRACS-CMG/STS ATT-H/OMCC-M EVA2 INH COMPLACS-STS/RS-ATT-H/OCMG1-ON-ORBIT-C/O

MCC

EVA2 INHIBIT PADEVA2 INHIBIT PAD

EVA2 INHIBIT PAD

PPS-SA 4B-FTHRACS-CMG/STS ATT-H/O

MCC-M EVA2 INH COMPLACS-STS/RS-ATT-H/O

CMG1-ON-ORBIT-C/O

NOTES

*CMG TO STS *STS TO RS*CMG TO STS *STS TO RS

2-14B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 006/00MET Day 005 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/18/04 (262)DAY/NIGHTORBIT 88 89 90 91 92 93 94 95 96

DAILY ORBIT 15 16 1 2 3 4 5 6 7RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

KUSY

MSS-POWERUPC&T-VIDEO CNFGUHF-1-ACTAUDIO-UHF OPS-CNFG10.2 PSI OPS INIT

C&T-CMM-CNFG-VRFY-2BEVA2 INHIBIT PADISS-PWR-DWNPPS-SA 4B-FTHRACS-CMG/STS ATT-H/ODPCISS-DPRS-INH/ENA10.2 PSI OPS TERM

PCU-C&W-ENAFMS-CALIBRATIONACS-CMG1-SHUTDOWNISS-RAP DPRS-INHFMS-DATA-DUMPPPS-P6-SA-4B-AUTOCMG1-ON-ORBIT-C/O CMG C/OACS-CMG1 STARTUP

SBD

MSS-POWERUPC&T-VIDEO CNFG

UHF-1-ACTAUDIO-UHF OPS-CNFG

10.2 PSI OPS INIT10.2 PSI OPS INIT

C&T-CMM-CNFG-VRFY-2BEVA2 INHIBIT PAD

ISS-PWR-DWNPPS-SA 4B-FTHR

ACS-CMG/STS ATT-H/ODPC

ISS-DPRS-INH/ENA10.2 PSI OPS TERM

10.2 PSI OPS TERMPCU-C&W-ENA

FMS-CALIBRATIONACS-CMG1-SHUTDOWN

ISS-RAP DPRS-INHFMS-DATA-DUMP

PPS-P6-SA-4B-AUTOCMG1-ON-ORBIT-C/O

CMG C/OACS-CMG1

PCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

ACS-STS/RS-ATT-H/ORS

ACS-STS/RS-ATT-H/O

EVA2 INHIBIT PAD

PPS-SA 4B-FTHRACS-CMG/STS ATT-H/OMCC-M EVA2 INH COMPLACS-STS/RS-ATT-H/OCMG1-ON-ORBIT-C/O

MCC

EVA2 INHIBIT PADEVA2 INHIBIT PAD

EVA2 INHIBIT PAD

PPS-SA 4B-FTHRACS-CMG/STS ATT-H/O

MCC-M EVA2 INH COMPLACS-STS/RS-ATT-H/O

CMG1-ON-ORBIT-C/O

NOTES

*CMG TO STS *STS TO RS*CMG TO STS *STS TO RS

Page 38: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-15A

FD7

COLLINS

KELLY

NOGUCHI

ROBINSON

EVA

W/METOX

THOMAS

LAWRENCE

CAMARDA

W/METOX

W/METOX

KRIKALEV

PHILLIPS

STS-114

ISS

09/19 01 02 03 04 05 06 07 08 09 10 11GMT 09/18/04 (262) 006/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 006

CDRCWC

TERM

PMCOCA

PRE SLEEP PRE SLEEP SLEEPXFER2 CWC

PLT

CMGHTR

COMM*

SLEEPPRE SLEEP

MS1 C/U&INGR

C/L

RPRS

POST EVA W/OH20 PRE SLEEP - GIRA SLEEP

MS2 C/U&INGR

C/L

RPRS

POST EVA W/OH20 PRE SLEEP SLEEP

MS3 ♣C/L

RPRS

POST EVA W/OH20 SLEEPPRE SLEEP

MS4XFER

CALL

XFER

TAGUP

SLEEPPRE SLEEPPRE SLEEP

RENAL

MS5 SLEEP⊕ PRE SLEEP

XFER

TAGUP

XFER

CALL

PRE SLEEP

ISS CDR ♦DAILYPLNRVW

PREPWORK

XFER

TAGUP

DPC PRESLEEP-ISS SLEEP

FE-1 C/L

RPRS

POST EVA W/OH20

♥ PRESLEEP-ISS SLEEP

DAY/NIGHTORBIT 96 97 98 99 100 101 102 103

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣IVA SUPPORT⊕TRANSFER♦EXERCISE TVIS

EXERCISE RED

♥C&T-CMM-CNFG-VRFY-3B

*OFF*DECONFIG

2-15A

FD7

COLLINS

KELLY

NOGUCHI

ROBINSON

EVA

W/METOX

THOMAS

LAWRENCE

CAMARDA

W/METOX

W/METOX

KRIKALEV

PHILLIPS

STS-114

ISS

09/19 01 02 03 04 05 06 07 08 09 10 11GMT 09/18/04 (262) 006/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 006

CDRCWC

TERM

PMCOCA

PRE SLEEP PRE SLEEP SLEEPXFER2 CWC

PLT

CMGHTR

COMM*

SLEEPPRE SLEEP

MS1 C/U&INGR

C/L

RPRS

POST EVA W/OH20 PRE SLEEP - GIRA SLEEP

MS2 C/U&INGR

C/L

RPRS

POST EVA W/OH20 PRE SLEEP SLEEP

MS3 ♣C/L

RPRS

POST EVA W/OH20 SLEEPPRE SLEEP

MS4XFER

CALL

XFER

TAGUP

SLEEPPRE SLEEPPRE SLEEP

RENAL

MS5 SLEEP⊕ PRE SLEEP

XFER

TAGUP

XFER

CALL

PRE SLEEP

ISS CDR ♦DAILYPLNRVW

PREPWORK

XFER

TAGUP

DPC PRESLEEP-ISS SLEEP

FE-1 C/L

RPRS

POST EVA W/OH20

♥ PRESLEEP-ISS SLEEP

DAY/NIGHTORBIT 96 97 98 99 100 101 102 103

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣IVA SUPPORT⊕TRANSFER♦EXERCISE TVIS

EXERCISE RED

♥C&T-CMM-CNFG-VRFY-3B

*OFF*DECONFIG

Page 39: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-15B

ISS

006/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 006 09/19 01 02 03 04 05 06 07 08 09 10 11

GMT 09/18/04 (262)DAY/NIGHTORBIT 96 97 98 99 100 101 102 103

DAILY ORBIT 7 8 9 10 11 12 13 14RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

ACS-CMG1 STARTUPLTL/CCAA-METOX-CNFGISS-PWR-UPPCU-C&W-INHUHF-1-DEACTC&T-VIDEO-DECONFGMSS-POWERDOWNDPC

SBD

ACS-CMG1 STARTUPLTL/CCAA-METOX-CNFG

ISS-PWR-UPPCU-C&W-INH

UHF-1-DEACTC&T-VIDEO-DECONFG

MSS-POWERDOWNDPC

PCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

GTS-ON-ПРД400RS

GTS-ON-ПРД400

C&T-CMM-CNFG-VRFY-3BMCC

C&T-CMM-CNFG-VRFY-3B

NOTES

2-15B

ISS

006/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 006 09/19 01 02 03 04 05 06 07 08 09 10 11

GMT 09/18/04 (262)DAY/NIGHTORBIT 96 97 98 99 100 101 102 103

DAILY ORBIT 7 8 9 10 11 12 13 14RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

ACS-CMG1 STARTUPLTL/CCAA-METOX-CNFGISS-PWR-UPPCU-C&W-INHUHF-1-DEACTC&T-VIDEO-DECONFGMSS-POWERDOWNDPC

SBD

ACS-CMG1 STARTUPLTL/CCAA-METOX-CNFG

ISS-PWR-UPPCU-C&W-INH

UHF-1-DEACTC&T-VIDEO-DECONFG

MSS-POWERDOWNDPC

PCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

GTS-ON-ПРД400RS

GTS-ON-ПРД400

C&T-CMM-CNFG-VRFY-3BMCC

C&T-CMM-CNFG-VRFY-3B

NOTES

Page 40: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-16A

FD08

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/19/04 (263) 12 13 14 15 16 17 18 19 20 21 22 23 007/00

MET Day 006

CDR CREWCONF

CREW

PHOTO

EXERCISE FILTERCLEANING

CWC

INIT10

CWC

TERM

JOINT MEAL OFF DUTYPOST SLEEPXFER

CWC

PWRFILL

PWRFILL

PWRFILL JAXA

PAO

IMU

POST SLEEP

PLT CREWCONF

CREW

PHOTO

JOINT MEALPOST SLEEP OFF DUTY

SALIVA

EXERCISE TRANSFERPOSTSLEEP

MS1

ASPRN

CREWCONF

CREW

PHOTO

EMUH20RCHG

METOX

EVA TOOL CONFGE LK PREP JOINT MEAL OFF DUTYPOST SLEEP - GIRA PAOS/U

EVA

CAMR

XFER JAXAPAO

MS2

ASPRN

CREWCONF

CREW

PHOTO

EMUH20RCHG

EVA TOOL CONFGEXERCISE E LK PREP JOINT MEAL OFF DUTYPOST SLEEPEVA

CAMR

TRANSFER

MS3 EVA TOOL CONFGE LK PREPL/M/EMUBATT

POST SLEEP OFF DUTYCREWCONF

CREW

PHOTO

JOINT MEALTRANSFER

MS4 OFF DUTYXFERREVIEWPOST SLEEP CREW

CONF

CREW

PHOTO

JOINT MEALEXERCISE TRANSFER

SALIVA

LOG

MS5 POST SLEEP OFF DUTYCREWCONF

CREW

PHOTO

JOINT MEALEXERCISEXFERREVIEW TRANSFER

SALIVA

LOG

ISS CDR SLEEP POSTSLEEP-ISS DPCPREP

WORK

XFERREVIEW EXERCISE TVIS TRANSFER

CREW

PHOTO

CREWCONF JOINT MEAL ♣ СОЖ

MNTFILEDWNLD

RSPAO

EVENT

VELO + HC

FE-1 SLEEP POSTSLEEP-ISS DPC PREPWORK

♦ L/M/EMUBATT

EXERCISE RED TRANSFER

CREW

PHOTO

CREWCONF JOINT MEAL ECLSS DTO EXERCISE

TVIS

DAY/NIGHTORBIT 104 105 106 107 108 109 110 111

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣СВО-СРВК-БРПК-INSPCT⊕PAO S/U

♦HRF1-PC HD-INSTL *TERM

2-16A

FD08

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/19/04 (263) 12 13 14 15 16 17 18 19 20 21 22 23 007/00

MET Day 006

CDR CREWCONF

CREW

PHOTO

EXERCISE FILTERCLEANING

CWC

INIT10

CWC

TERM

JOINT MEAL OFF DUTYPOST SLEEPXFER

CWC

PWRFILL

PWRFILL

PWRFILL JAXA

PAO

IMU

POST SLEEP

PLT CREWCONF

CREW

PHOTO

JOINT MEALPOST SLEEP OFF DUTY

SALIVA

EXERCISE TRANSFERPOSTSLEEP

MS1

ASPRN

CREWCONF

CREW

PHOTO

EMUH20RCHG

METOX

EVA TOOL CONFGE LK PREP JOINT MEAL OFF DUTYPOST SLEEP - GIRA PAOS/U

EVA

CAMR

XFER JAXAPAO

MS2

ASPRN

CREWCONF

CREW

PHOTO

EMUH20RCHG

EVA TOOL CONFGEXERCISE E LK PREP JOINT MEAL OFF DUTYPOST SLEEPEVA

CAMR

TRANSFER

MS3 EVA TOOL CONFGE LK PREPL/M/EMUBATT

POST SLEEP OFF DUTYCREWCONF

CREW

PHOTO

JOINT MEALTRANSFER

MS4 OFF DUTYXFERREVIEWPOST SLEEP CREW

CONF

CREW

PHOTO

JOINT MEALEXERCISE TRANSFER

SALIVA

LOG

MS5 POST SLEEP OFF DUTYCREWCONF

CREW

PHOTO

JOINT MEALEXERCISEXFERREVIEW TRANSFER

SALIVA

LOG

ISS CDR SLEEP POSTSLEEP-ISS DPCPREP

WORK

XFERREVIEW EXERCISE TVIS TRANSFER

CREW

PHOTO

CREWCONF JOINT MEAL ♣ СОЖ

MNTFILEDWNLD

RSPAO

EVENT

VELO + HC

FE-1 SLEEP POSTSLEEP-ISS DPC PREPWORK

♦ L/M/EMUBATT

EXERCISE RED TRANSFER

CREW

PHOTO

CREWCONF JOINT MEAL ECLSS DTO EXERCISE

TVIS

DAY/NIGHTORBIT 104 105 106 107 108 109 110 111

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣СВО-СРВК-БРПК-INSPCT⊕PAO S/U

♦HRF1-PC HD-INSTL *TERM

Page 41: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-16B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 007/00MET Day 006 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/19/04 (263)DAY/NIGHTORBIT 104 105 106 107 108 109 110 111

DAILY ORBIT 15 1 2 3 4 5 6 7RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEAMNVR REBOOST 3

REBOOST MNVR TEA

+XVV +ZLV TEA

KUSY

DPCACS-GNC-PPL-UPDATEISS-PWR-DWNLTL/CCAA-METOX-CNFGISS-PWR-UPCREW CONFERENCE

SBD

DPCACS-GNC-PPL-UPDATE

ISS-PWR-DWNLTL/CCAA-METOX-CNFG

ISS-PWR-UPCREW CONFERENCE

PCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

RSMCC

NOTES

2-16B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 007/00MET Day 006 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/19/04 (263)DAY/NIGHTORBIT 104 105 106 107 108 109 110 111

DAILY ORBIT 15 1 2 3 4 5 6 7RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEAMNVR REBOOST 3

REBOOST MNVR TEA

+XVV +ZLV TEA

KUSY

DPCACS-GNC-PPL-UPDATEISS-PWR-DWNLTL/CCAA-METOX-CNFGISS-PWR-UPCREW CONFERENCE

SBD

DPCACS-GNC-PPL-UPDATE

ISS-PWR-DWNLTL/CCAA-METOX-CNFG

ISS-PWR-UPCREW CONFERENCE

PCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

RSMCC

NOTES

Page 42: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-17A

FD8

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

ISS EXTERNAL SURVEY

KRIKALEV

PHILLIPS

STS-114

ISS

09/20 01 02 03 04 05 06 07 08 09 10 11GMT 09/19/04 (263) 007/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 007

CDR PMCOCA

PRESLEEPPRE SLEEP SLEEPEVA REVW

ILLUM

ON

PLT SLEEPEVA REVW PRE SLEEP

MS1 EVA REVW PRE SLEEP - GIRA SLEEPEXERCISE

MS2 EVA REVW PRE SLEEP SLEEP

MS3 EVA REVW EXERCISE PRE SLEEP SLEEPPRESLEEP

MS4 EVA REVW PRE SLEEPPRE SLEEPXFER

CALL

XFER

TAGUP

SLEEP

RENAL

MS5 EVA REVW SLEEPPRE SLEEP

XFER

TAGUP

XFER

CALL

PRE SLEEP

ISS CDR EVA REVW ♣ PRESLEEP-ISSDAILYPLNRVW

DPC

XFER

TAGUP

SLEEP

FE-1 EVA REVWPREP

WORK

DAILYPLNRVW

DPC PRESLEEP-ISS SLEEP

DAY/NIGHTORBIT 112 113 114 115 116 117 118 119

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣PRESLEEP-ISS

2-17A

FD8

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

ISS EXTERNAL SURVEY

KRIKALEV

PHILLIPS

STS-114

ISS

09/20 01 02 03 04 05 06 07 08 09 10 11GMT 09/19/04 (263) 007/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 007

CDR PMCOCA

PRESLEEPPRE SLEEP SLEEPEVA REVW

ILLUM

ON

PLT SLEEPEVA REVW PRE SLEEP

MS1 EVA REVW PRE SLEEP - GIRA SLEEPEXERCISE

MS2 EVA REVW PRE SLEEP SLEEP

MS3 EVA REVW EXERCISE PRE SLEEP SLEEPPRESLEEP

MS4 EVA REVW PRE SLEEPPRE SLEEPXFER

CALL

XFER

TAGUP

SLEEP

RENAL

MS5 EVA REVW SLEEPPRE SLEEP

XFER

TAGUP

XFER

CALL

PRE SLEEP

ISS CDR EVA REVW ♣ PRESLEEP-ISSDAILYPLNRVW

DPC

XFER

TAGUP

SLEEP

FE-1 EVA REVWPREP

WORK

DAILYPLNRVW

DPC PRESLEEP-ISS SLEEP

DAY/NIGHTORBIT 112 113 114 115 116 117 118 119

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣PRESLEEP-ISS

Page 43: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-17B

ISS

007/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 007 09/20 01 02 03 04 05 06 07 08 09 10 11

GMT 09/19/04 (263)DAY/NIGHTORBIT 112 113 114 115 116 117 118 119

DAILY ORBIT 7 8 9 10 11 12 13 14 15RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

DPCC&DH-PPL-LWR-U/L

SBD

DPCC&DH-PPL-LWR-U/L

PCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

GTS-OFF-ПРД400RS

GTS-OFF-П

MCC

NOTES

2-17B

ISS

007/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 007 09/20 01 02 03 04 05 06 07 08 09 10 11

GMT 09/19/04 (263)DAY/NIGHTORBIT 112 113 114 115 116 117 118 119

DAILY ORBIT 7 8 9 10 11 12 13 14 15RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

DPCC&DH-PPL-LWR-U/L

SBD

DPCC&DH-PPL-LWR-U/L

PCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

GTS-OFF-ПРД400RS

GTS-OFF-П

MCC

NOTES

Page 44: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-18A

FD09

COLLINS

KELLY

NOGUCHI

ROBINSON

EVA 3 (6:30)CEVIS

CEVIS

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/20/04 (264) 12 13 14 15 16 17 18 19 20 21 22 23 008/00

MET Day 007

CDRCOND

INIT

COND

TERM

PRLA

EVA3

INHBT

EXERCISE

CWC

INIT12

CWC

INIT11

CWC

TERM

CWC

TERM

MEALPMCA/G

POSTSLEEP

XFER2 CWCPOST SLEEP

ATTHO*

ILLUM

OFF

ATTHO*

IMU

PLT POST SLEEP EXERCISE

MPLM

GRAPL

TRANSFERCOND

INIT

COND

TERM

EVA ESPAD INSTALL

MNVRTO

MATEDMPLM

ESP2UNBRTH

SSRMSESP2 GRPL SSRMS ESP2 INSTALL

ESP2

UNGRPL

SALIVA

COMM*

POST SLEEP

MS1 EMU P/B

EMU

PURGE

C/L DPRS EGRS/SETUPSTS P/B O2 EVA PREPPOST SLEEP -

GIRA

PRIMARYCABLEROUTNG

ESP2INSTALL

MISSE 1&2RETRIEVAL

MISSE 5INSTALL

SECONDARYCABLE ROUT

ESP2FRGF RMV

MS2 EMU P/B

EMU

PURGE

C/L DPRS EGRS/SETUPSTS P/B O2 EVA PREPPOST SLEEP ESPAD INSTALL MISSE 5

INSTALLSECONDARYCABLE ROUT ESP2 INSTALL

MS3 IVA SUPPORTLEH

STS P/B O2 EVA PREP

EMU

PURGE

EMU P/B C/L DPRSPOST SLEEP

MS4

MPLM

GRAPL

XFERREVIEWPOST SLEEP EXERCISE P/TV07

EVAS/U

EVA ESPAD INSTALL

MNVRTO

MATEDMPLM

ESP2UNBRTH

SSRMSESP2 GRPL SSRMS ESP2 INSTALL

ESP2

UNGRPL

SALIVA

LOG

XFER

MS5 CPAINSTALLPOST SLEEP EXERCISETRANSFER TRANSFERXFER

REVIEW MEALPRLA

SALIVA

LOG

CPA INSTALL TRANSFER

ISS CDR SLEEP POSTSLEEP-ISS PREPWORK DPC XFER

REVIEW♣ EXERCISE TVIS TRANSFER TRANSFERMEAL СОЖ

MNT CPA INSTALL

FE-1 SLEEP POSTSLEEP POST SLEEP

LEH

STS P/B O2 EVA PREP

EMU

PURGE

EMU P/B C/L DPRS MEAL EXERCISETVIS

DAY/NIGHTORBIT 119 120 121 122 123 124 125 126 127

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣C&T-CMM-CNFG-VRFY-2B*STS TO RS*CMG TO STS

*CONFIG

2-18A

FD09

COLLINS

KELLY

NOGUCHI

ROBINSON

EVA 3 (6:30)CEVIS

CEVIS

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/20/04 (264) 12 13 14 15 16 17 18 19 20 21 22 23 008/00

MET Day 007

CDRCOND

INIT

COND

TERM

PRLA

EVA3

INHBT

EXERCISE

CWC

INIT12

CWC

INIT11

CWC

TERM

CWC

TERM

MEALPMCA/G

POSTSLEEP

XFER2 CWCPOST SLEEP

ATTHO*

ILLUM

OFF

ATTHO*

IMU

PLT POST SLEEP EXERCISE

MPLM

GRAPL

TRANSFERCOND

INIT

COND

TERM

EVA ESPAD INSTALL

MNVRTO

MATEDMPLM

ESP2UNBRTH

SSRMSESP2 GRPL SSRMS ESP2 INSTALL

ESP2

UNGRPL

SALIVA

COMM*

POST SLEEP

MS1 EMU P/B

EMU

PURGE

C/L DPRS EGRS/SETUPSTS P/B O2 EVA PREPPOST SLEEP -

GIRA

PRIMARYCABLEROUTNG

ESP2INSTALL

MISSE 1&2RETRIEVAL

MISSE 5INSTALL

SECONDARYCABLE ROUT

ESP2FRGF RMV

MS2 EMU P/B

EMU

PURGE

C/L DPRS EGRS/SETUPSTS P/B O2 EVA PREPPOST SLEEP ESPAD INSTALL MISSE 5

INSTALLSECONDARYCABLE ROUT ESP2 INSTALL

MS3 IVA SUPPORTLEH

STS P/B O2 EVA PREP

EMU

PURGE

EMU P/B C/L DPRSPOST SLEEP

MS4

MPLM

GRAPL

XFERREVIEWPOST SLEEP EXERCISE P/TV07

EVAS/U

EVA ESPAD INSTALL

MNVRTO

MATEDMPLM

ESP2UNBRTH

SSRMSESP2 GRPL SSRMS ESP2 INSTALL

ESP2

UNGRPL

SALIVA

LOG

XFER

MS5 CPAINSTALLPOST SLEEP EXERCISETRANSFER TRANSFERXFER

REVIEW MEALPRLA

SALIVA

LOG

CPA INSTALL TRANSFER

ISS CDR SLEEP POSTSLEEP-ISS PREPWORK DPC XFER

REVIEW♣ EXERCISE TVIS TRANSFER TRANSFERMEAL СОЖ

MNT CPA INSTALL

FE-1 SLEEP POSTSLEEP POST SLEEP

LEH

STS P/B O2 EVA PREP

EMU

PURGE

EMU P/B C/L DPRS MEAL EXERCISETVIS

DAY/NIGHTORBIT 119 120 121 122 123 124 125 126 127

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣C&T-CMM-CNFG-VRFY-2B*STS TO RS*CMG TO STS

*CONFIG

Page 45: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-18B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 008/00MET Day 007 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/20/04 (264)DAY/NIGHTORBIT 119 120 121 122 123 124 125 126 127

DAILY ORBIT 15 16 1 2 3 4 5 6 7RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

KUSY

10.2 PSI OPS INIT

AUDIO-DOCK OPS-DCNFGUHF-1-ACTAUDIO-UHF OPS-CNFGACS-CMG/STS ATT-H/OMSS-POWERUPPPS-PCU-CW-ENAC&T-CMM-CNFG-VRFY-2BCAM-COLOR-BALANCEC&T-VIDEO CNFGISS-DPRS-INH/ENA10.2 PSI OPS TERMFMS-CALIBRATIONISS-PWR-DWNFMS-DATA-DUMP

SBD

10.2 PSI OPS INIT10.2 PSI OPS INIT

AUDIO-DOCK OPS-DCNFGUHF-1-ACTAUDIO-UHF OPS-CNFG

ACS-CMG/STS ATT-H/OMSS-POWERUP

PPS-PCU-CW-ENAC&T-CMM-CNFG-VRFY-2BCAM-COLOR-BALANCE

C&T-VIDEO CNFGISS-DPRS-INH/ENA

10.2 PSI OPS TERMFMS-CALIBRATION

ISS-PWR-DWNFMS-DATA-

FMS-DATA-DUMPPCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

ACS-STS/RS-ATT-H/ORS

ACS-STS/RS-ATT-H/O

ACS-CMG/STS ATT-H/OMCC-M EVA3 INH COMPLEVA3 INHIBIT PADACS-STS/RS-ATT-H/O

MCC

ACS-CMG/STS ATT-H/OMCC-M EVA3 INH COMPL

EVA3 INHIBIT PADACS-STS/RS-ATT-H/O

NOTES

*CMG TO STS *STS TO RS*CMG TO STS *STS TO RS

2-18B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 008/00MET Day 007 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/20/04 (264)DAY/NIGHTORBIT 119 120 121 122 123 124 125 126 127

DAILY ORBIT 15 16 1 2 3 4 5 6 7RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

KUSY

10.2 PSI OPS INIT

AUDIO-DOCK OPS-DCNFGUHF-1-ACTAUDIO-UHF OPS-CNFGACS-CMG/STS ATT-H/OMSS-POWERUPPPS-PCU-CW-ENAC&T-CMM-CNFG-VRFY-2BCAM-COLOR-BALANCEC&T-VIDEO CNFGISS-DPRS-INH/ENA10.2 PSI OPS TERMFMS-CALIBRATIONISS-PWR-DWNFMS-DATA-DUMP

SBD

10.2 PSI OPS INIT10.2 PSI OPS INIT

AUDIO-DOCK OPS-DCNFGUHF-1-ACTAUDIO-UHF OPS-CNFG

ACS-CMG/STS ATT-H/OMSS-POWERUP

PPS-PCU-CW-ENAC&T-CMM-CNFG-VRFY-2BCAM-COLOR-BALANCE

C&T-VIDEO CNFGISS-DPRS-INH/ENA

10.2 PSI OPS TERMFMS-CALIBRATION

ISS-PWR-DWNFMS-DATA-

FMS-DATA-DUMPPCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

ACS-STS/RS-ATT-H/ORS

ACS-STS/RS-ATT-H/O

ACS-CMG/STS ATT-H/OMCC-M EVA3 INH COMPLEVA3 INHIBIT PADACS-STS/RS-ATT-H/O

MCC

ACS-CMG/STS ATT-H/OMCC-M EVA3 INH COMPL

EVA3 INHIBIT PADACS-STS/RS-ATT-H/O

NOTES

*CMG TO STS *STS TO RS*CMG TO STS *STS TO RS

Page 46: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-19A

FD9

COLLINS

KELLY

NOGUCHI

ROBINSON

ISS EXTERNAL SURVEY

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

09/21 01 02 03 04 05 06 07 08 09 10 11GMT 09/20/04 (264) 008/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 008

CDR

ILLUM

ON PCS*

PMCOCA

PRE SLEEPPRE SLEEP SLEEP

PLT

COMM*

SLEEPWCS

CNFG MPLMRACKS XFER PRE SLEEP

MS1 C/U&INGR

C/L

RPRS

POST EVA W/H2O &MTX PRE SLEEP - GIRA SLEEP

MS2 C/U&INGR

C/L

RPRS

POST EVA W/H2O &MTX PRE SLEEP SLEEP

MS3 ♣C/L

RPRS

POST EVA W/H2O &MTX PRE SLEEP SLEEP

MS4 PRE SLEEPXFER

CALL

XFER

TAGUP

PRESLEEP SLEEPCNFG MPLM

RACKS

RENAL

POSTEVAXFER

MS5 SLEEPPRESLEEP

XFER

TAGUP

XFER

CALL

PRE SLEEPTRANSFER

ISS CDR ⊕ VELO + HC PREPWORK DPC

PRE

XFER

TAGUP

PRESLEEP-ISS SLEEP

FE-1C/L

RPRS

POST EVA W/H2O &MTX

♦ PRESLEEP-ISS SLEEP

DAY/NIGHTORBIT 127 128 129 130 131 132 133 134 135

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣IVA SUPPORT⊕TRANSFER

♦C&T-CMM-CNFG-VRFY-3B*CNFG *DECONFIG

2-19A

FD9

COLLINS

KELLY

NOGUCHI

ROBINSON

ISS EXTERNAL SURVEY

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

09/21 01 02 03 04 05 06 07 08 09 10 11GMT 09/20/04 (264) 008/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 008

CDR

ILLUM

ON PCS*

PMCOCA

PRE SLEEPPRE SLEEP SLEEP

PLT

COMM*

SLEEPWCS

CNFG MPLMRACKS XFER PRE SLEEP

MS1 C/U&INGR

C/L

RPRS

POST EVA W/H2O &MTX PRE SLEEP - GIRA SLEEP

MS2 C/U&INGR

C/L

RPRS

POST EVA W/H2O &MTX PRE SLEEP SLEEP

MS3 ♣C/L

RPRS

POST EVA W/H2O &MTX PRE SLEEP SLEEP

MS4 PRE SLEEPXFER

CALL

XFER

TAGUP

PRESLEEP SLEEPCNFG MPLM

RACKS

RENAL

POSTEVAXFER

MS5 SLEEPPRESLEEP

XFER

TAGUP

XFER

CALL

PRE SLEEPTRANSFER

ISS CDR ⊕ VELO + HC PREPWORK DPC

PRE

XFER

TAGUP

PRESLEEP-ISS SLEEP

FE-1C/L

RPRS

POST EVA W/H2O &MTX

♦ PRESLEEP-ISS SLEEP

DAY/NIGHTORBIT 127 128 129 130 131 132 133 134 135

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣IVA SUPPORT⊕TRANSFER

♦C&T-CMM-CNFG-VRFY-3B*CNFG *DECONFIG

Page 47: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-19B

ISS

008/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 008 09/21 01 02 03 04 05 06 07 08 09 10 11

GMT 09/20/04 (264)DAY/NIGHTORBIT 127 128 129 130 131 132 133 134 135

DAILY ORBIT 7 8 9 10 11 12 13 14 15RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

LTL/CCAA-METOX-CNFGPPS-PCU-CW-INHC&T-VIDEO-DECONFGMSS-POWERDOWNC&DH-PPL-NOM-U/LISS-PWR-UPAUDIO-UHF OPS-DCNFGPPS-PCU-STANDBYUHF-1-DEACTDPCC&T-CMM-CNFG-VRFY-3BIATCS-N1-MTL-CHGPPS-2B-BATT-DUMPN1 CBM PREP DEMATESBD-KEY-CHG

SBD

LTL/CCAA-METOX-CNFGPPS-PCU-CW-INH

C&T-VIDEO-DECONFGMSS-POWERDOWNC&DH-PPL-NOM-U/LISS-PWR-UP

AUDIO-UHF OPS-DCNFGPPS-PCU-STANDBY

UHF-1-DEACTDPC

C&T-CMM-CNFG-VRFY-3BIATCS-N1-MTL-CHG

PPS-2B-BATT-DUMPN1 CBM PREP DEMATE

SBD-KEY-CHGPCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

GTS-ON-ПРД400RS

GTS-ON-ПРД400

MCC

NOTES

2-19B

ISS

008/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 008 09/21 01 02 03 04 05 06 07 08 09 10 11

GMT 09/20/04 (264)DAY/NIGHTORBIT 127 128 129 130 131 132 133 134 135

DAILY ORBIT 7 8 9 10 11 12 13 14 15RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

LTL/CCAA-METOX-CNFGPPS-PCU-CW-INHC&T-VIDEO-DECONFGMSS-POWERDOWNC&DH-PPL-NOM-U/LISS-PWR-UPAUDIO-UHF OPS-DCNFGPPS-PCU-STANDBYUHF-1-DEACTDPCC&T-CMM-CNFG-VRFY-3BIATCS-N1-MTL-CHGPPS-2B-BATT-DUMPN1 CBM PREP DEMATESBD-KEY-CHG

SBD

LTL/CCAA-METOX-CNFGPPS-PCU-CW-INH

C&T-VIDEO-DECONFGMSS-POWERDOWNC&DH-PPL-NOM-U/LISS-PWR-UP

AUDIO-UHF OPS-DCNFGPPS-PCU-STANDBY

UHF-1-DEACTDPC

C&T-CMM-CNFG-VRFY-3BIATCS-N1-MTL-CHG

PPS-2B-BATT-DUMPN1 CBM PREP DEMATE

SBD-KEY-CHGPCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

PCG STES-EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

GTS-ON-ПРД400RS

GTS-ON-ПРД400

MCC

NOTES

Page 48: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-20A

FD10

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

PHILLIPS

KRIKALEV

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/21/04 (265) 12 13 14 15 16 17 18 19 20 21 22 23 009/00

MET Day 008

CDR

APCU1*

EXERCISE

CWC

INIT13

CWC

TERM

MEALH20

CNFG

POST SLEEP PWRFILL

PWRFILL

XFER2 CWC

PAO

EVENT

APCU1*

CWC

INIT14

CWC

TERM

PWRFILL

PAOS/U

IMU

POST SLEEP

PLT EXERCISE

ILLUM

OFF MEALPOST SLEEP MDDK

XFER

PAO

EVENT

MPLMUNINSTL MPLM BERTH

MPLM^

MPLMUNGRPLPOST SLEEP MDDK XFERMPLM CLEANUP

MNVROBSSGRPLH/0

OBSS

GRPL

SALIVA

OBSSMNVRTOCLRUHF

MS1

ASPRN

METOX

EVA TOOLSTOW EXERCISEMEALNODE 1

CBM DEMATEPOST EVA EMU XFERPOST SLEEP - GIRA EMU C/OEMU

XFER

MDDK XFER

MS2

ASPRN

POST EVA EMU XFERPOST SLEEP RNDZ TOOLSC/O PT1

NODE 1CBM DEMATE

EVA TOOLSTOWEMU C/O

EMU

XFER

MDDK XFERMEAL

MS3 EVA TOOLSTOWPOST EVA EMU XFERPOST SLEEP EXERCISE MEAL N2 TERMO2 TRDWN OBSS H/O

FROM SRMS

OBSSBERTHCAMR

PRLA

MS4 MPLMUNGRPLMPLM CLEANUP MPLM BERTHMPLM

UNINSTL

PTV06S/UMPLM

POST SLEEP MEALEXERCISEXFER

CALL

PCG-STES 10TRANSFERPOST SLEEP MDDK

XFER

MNVROBSSGRPLH/0

OBSS

GRPL

SALIVA

LOG

OBSSMNVRTOCLRUHF

MS5

MPLM

DEACT

DWPNT

VESTIBULE CONFIG VEST DEPRESS RNDZ TOOLSC/O PT1POST SLEEP ♣ MEAL MDDK XFER OBSS H/O

FROM SRMS

OBSSBERTHCAMR

SALIVA

LOG

PRLA

ISS CDR SLEEP POST SLEEP-ISS PREPWORK DPC

MPLM

EGRS

MPLM

DEACT

VESTIBULE CONFIG VEST DEPRESS MEAL СОЖMNT MDDK XFER EXERCISE TVIS VELO

+ HC

FE-1 SLEEP POST SLEEP-ISS PREPWORK DPC EXERCISE

TVISPCG-STES 10TRANSFER

PAO

EVENT

POST EVAEMU XFER

EVA TOOLSTOW MEAL O2 TRDWN

LABCWCFILL

N2 TERM EXERCISE RED ⊕

DAY/NIGHTORBIT 135 136 137 138 139 140 141 142 143

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣MPLM EGRS ⊕DAILY PLN*DEACT*ACT^HTR ON*TERM

2-20A

FD10

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

PHILLIPS

KRIKALEV

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/21/04 (265) 12 13 14 15 16 17 18 19 20 21 22 23 009/00

MET Day 008

CDR

APCU1*

EXERCISE

CWC

INIT13

CWC

TERM

MEALH20

CNFG

POST SLEEP PWRFILL

PWRFILL

XFER2 CWC

PAO

EVENT

APCU1*

CWC

INIT14

CWC

TERM

PWRFILL

PAOS/U

IMU

POST SLEEP

PLT EXERCISE

ILLUM

OFF MEALPOST SLEEP MDDK

XFER

PAO

EVENT

MPLMUNINSTL MPLM BERTH

MPLM^

MPLMUNGRPLPOST SLEEP MDDK XFERMPLM CLEANUP

MNVROBSSGRPLH/0

OBSS

GRPL

SALIVA

OBSSMNVRTOCLRUHF

MS1

ASPRN

METOX

EVA TOOLSTOW EXERCISEMEALNODE 1

CBM DEMATEPOST EVA EMU XFERPOST SLEEP - GIRA EMU C/OEMU

XFER

MDDK XFER

MS2

ASPRN

POST EVA EMU XFERPOST SLEEP RNDZ TOOLSC/O PT1

NODE 1CBM DEMATE

EVA TOOLSTOWEMU C/O

EMU

XFER

MDDK XFERMEAL

MS3 EVA TOOLSTOWPOST EVA EMU XFERPOST SLEEP EXERCISE MEAL N2 TERMO2 TRDWN OBSS H/O

FROM SRMS

OBSSBERTHCAMR

PRLA

MS4 MPLMUNGRPLMPLM CLEANUP MPLM BERTHMPLM

UNINSTL

PTV06S/UMPLM

POST SLEEP MEALEXERCISEXFER

CALL

PCG-STES 10TRANSFERPOST SLEEP MDDK

XFER

MNVROBSSGRPLH/0

OBSS

GRPL

SALIVA

LOG

OBSSMNVRTOCLRUHF

MS5

MPLM

DEACT

DWPNT

VESTIBULE CONFIG VEST DEPRESS RNDZ TOOLSC/O PT1POST SLEEP ♣ MEAL MDDK XFER OBSS H/O

FROM SRMS

OBSSBERTHCAMR

SALIVA

LOG

PRLA

ISS CDR SLEEP POST SLEEP-ISS PREPWORK DPC

MPLM

EGRS

MPLM

DEACT

VESTIBULE CONFIG VEST DEPRESS MEAL СОЖMNT MDDK XFER EXERCISE TVIS VELO

+ HC

FE-1 SLEEP POST SLEEP-ISS PREPWORK DPC EXERCISE

TVISPCG-STES 10TRANSFER

PAO

EVENT

POST EVAEMU XFER

EVA TOOLSTOW MEAL O2 TRDWN

LABCWCFILL

N2 TERM EXERCISE RED ⊕

DAY/NIGHTORBIT 135 136 137 138 139 140 141 142 143

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣MPLM EGRS ⊕DAILY PLN*DEACT*ACT^HTR ON*TERM

Page 49: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-20B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 009/00MET Day 008 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/21/04 (265)DAY/NIGHTORBIT 135 136 137 138 139 140 141 142 143

DAILY ORBIT 15 1 2 3 4 5 6 7 8RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

KUSY

UHF-1-ACTA/L CCAA CONFIGDPCLTL/CCAA-METOX-CNFGAR-MCA-PPLMSS-POWERUPFMS-CALIBRATIONC&T-VIDEO CNFGNODE 1 CBM PWRDNMPLM-ENV-CHECKACS-GNC-PPL-UPDATE

SBD

UHF-1-ACTA/L CCAA CONFIG

DPCLTL/CCAA-METOX-CNFG

AR-MCA-PPLMSS-POWERUP

FMS-CALIBRATIONC&T-VIDEO CNFG

NODE 1 CBM PWRDNMPLM-ENV-CHECK

ACS-GNC-PPL-UPDATPCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPSCPO/PRO-PCG-CMD

UNTEND PL

PCG STES-010-GROWTHEXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

CPO/PRO-PCG-CMDGTS-OFF-ПРД400R

SGTS-OFF-ПРД400

NODE 1 CBM PWRDNMPLM-ENV-CHECKM

CC

NODE 1 CBM PWRDNMPLM-ENV-CHECK

NOTES

2-20B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 009/00MET Day 008 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/21/04 (265)DAY/NIGHTORBIT 135 136 137 138 139 140 141 142 143

DAILY ORBIT 15 1 2 3 4 5 6 7 8RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

KUSY

UHF-1-ACTA/L CCAA CONFIGDPCLTL/CCAA-METOX-CNFGAR-MCA-PPLMSS-POWERUPFMS-CALIBRATIONC&T-VIDEO CNFGNODE 1 CBM PWRDNMPLM-ENV-CHECKACS-GNC-PPL-UPDATE

SBD

UHF-1-ACTA/L CCAA CONFIG

DPCLTL/CCAA-METOX-CNFG

AR-MCA-PPLMSS-POWERUP

FMS-CALIBRATIONC&T-VIDEO CNFG

NODE 1 CBM PWRDNMPLM-ENV-CHECK

ACS-GNC-PPL-UPDATPCG STES-010-GROWTHEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPSCPO/PRO-PCG-CMD

UNTEND PL

PCG STES-010-GROWTHEXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

CPO/PRO-PCG-CMDGTS-OFF-ПРД400R

SGTS-OFF-ПРД400

NODE 1 CBM PWRDNMPLM-ENV-CHECKM

CC

NODE 1 CBM PWRDNMPLM-ENV-CHECK

NOTES

Page 50: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-21A

COLLINS

KELLY

NOGUCHI

ROBINSON

FD10

ISS EXTERNAL SURVEY

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

09/22 01 02 03 04 05 06 07 08 09 10 11GMT 09/21/04 (265) 009/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 009

CDR

ILLUM

ON

MPLM^

PMCOCA

PRE SLEEP PRE SLEEP SLEEPPRESLEEP

PLT SLEEPOBSSBERTH

OBSSUNGRPL

♣ PRE SLEEP

MS1 P/TV08OPS

P/TV08

S/U PRE SLEEP - GIRA SLEEP

P/TV04

S/U

MS2 EXERCISE PRE SLEEP SLEEP

MS3 PRE SLEEP SLEEP

RMS

PWRDN

OBSS BERTHCAMR

MS4 SLEEP

XFER

TAGUP

XFER

CALL

PRE SLEEP

OBSS

UNGRPL

OBSSBERTH PRE SLEEP

RENAL

MS5 SLEEPPRE SLEEPMDDK

OBSS BERTHCAMR

ISS CDR VELO+ HC

DAILYPLNRVW

PREPWORK DPC ♦ PRE SLEEP

XFER

TAGUP

SLEEP

FE-1 DAILYPLNRVW

PREPWORK

OBSSUNGRPL DPC PRESLEEP-ISS SLEEP

DAY/NIGHTORBIT 143 144 145 146 147 148 149 150 151

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣OBSS MNVR TO CLR UHF⊕OBSS MNVR TO CLR UHF

♦PRE SLEEP^HTR OFF

2-21A

COLLINS

KELLY

NOGUCHI

ROBINSON

FD10

ISS EXTERNAL SURVEY

THOMAS

LAWRENCE

CAMARDA

KRIKALEV

PHILLIPS

STS-114

ISS

09/22 01 02 03 04 05 06 07 08 09 10 11GMT 09/21/04 (265) 009/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 009

CDR

ILLUM

ON

MPLM^

PMCOCA

PRE SLEEP PRE SLEEP SLEEPPRESLEEP

PLT SLEEPOBSSBERTH

OBSSUNGRPL

♣ PRE SLEEP

MS1 P/TV08OPS

P/TV08

S/U PRE SLEEP - GIRA SLEEP

P/TV04

S/U

MS2 EXERCISE PRE SLEEP SLEEP

MS3 PRE SLEEP SLEEP

RMS

PWRDN

OBSS BERTHCAMR

MS4 SLEEP

XFER

TAGUP

XFER

CALL

PRE SLEEP

OBSS

UNGRPL

OBSSBERTH PRE SLEEP

RENAL

MS5 SLEEPPRE SLEEPMDDK

OBSS BERTHCAMR

ISS CDR VELO+ HC

DAILYPLNRVW

PREPWORK DPC ♦ PRE SLEEP

XFER

TAGUP

SLEEP

FE-1 DAILYPLNRVW

PREPWORK

OBSSUNGRPL DPC PRESLEEP-ISS SLEEP

DAY/NIGHTORBIT 143 144 145 146 147 148 149 150 151

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV

NOTES

♣OBSS MNVR TO CLR UHF⊕OBSS MNVR TO CLR UHF

♦PRE SLEEP^HTR OFF

Page 51: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-21B

ISS

009/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 009 09/22 01 02 03 04 05 06 07 08 09 10 11

GMT 09/21/04 (265)DAY/NIGHTORBIT 143 144 145 146 147 148 149 150 151

DAILY ORBIT 8 9 10 11 12 13 14 15 16RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

A/L CCAA CONFIGIATCS-N1-LTL-TERMDPCC&T-VIDEO-DECONFGMSS-POWERDOWNSBD-KEY-CHGSDMS-PPL-U/LACS-CCDB PARAM-U/DACS-GNC-PPL-UPDATE

SBD

A/L CCAA CONFIGIATCS-N1-LTL-TERM

DPCC&T-VIDEO-DECONFG

MSS-POWERDOWNSBD-KEY-CHG

SDMS-PPL-U/LACS-CCDB PARAM

ACS-GNC-PPLEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

RSMCC

NOTES

2-21B

ISS

009/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 009 09/22 01 02 03 04 05 06 07 08 09 10 11

GMT 09/21/04 (265)DAY/NIGHTORBIT 143 144 145 146 147 148 149 150 151

DAILY ORBIT 8 9 10 11 12 13 14 15 16RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEA

OCA-MAIL-SYNCKU

OCA-MAIL-SYNC

SY

A/L CCAA CONFIGIATCS-N1-LTL-TERMDPCC&T-VIDEO-DECONFGMSS-POWERDOWNSBD-KEY-CHGSDMS-PPL-U/LACS-CCDB PARAM-U/DACS-GNC-PPL-UPDATE

SBD

A/L CCAA CONFIGIATCS-N1-LTL-TERM

DPCC&T-VIDEO-DECONFG

MSS-POWERDOWNSBD-KEY-CHG

SDMS-PPL-U/LACS-CCDB PARAM

ACS-GNC-PPLEXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

RSMCC

NOTES

Page 52: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-22A

FD11

COLLINS

KELLY

NOGUCHI

ROBINSON

UNDOCK*

* UNDOCK 9/17:15

^SEP-2

THOMAS

LAWRENCE

CAMARDA

^SEP-1

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/22/04 (266) 12 13 14 15 16 17 18 19 20 21 22 23 010/00

MET Day 009

CDR

APCU1*

COND

TERM

EXERCISEFARE

WELL

GRP B

PWRDN

MEALMNVR

DUMP

MNVR

UNDCK

MPLM^

OFF DUTYPOST SLEEPEGRSHATCHCLS

UNDOCK OPS

GRP B

PWRUP

ATTHO*

OFFDUTY

IMU

POST SLEEPIMU

PLT

APCU1*

SMPL

COND

TERM

COND

INIT

EXERCISEFARE

WELL

GRP B

PWRDN

ILLUM

OFF MEAL OFF DUTYOFF

DUTYPOST SLEEPSIMO

INIT

SIMOTERM

EGRSHATCHCLS

UNDOCK OPS

GRP B

PWRUP

SALIVA

OFFDUTY

MS1 EXERCISEFARE

WELL

MEAL OFF DUTYC/LCMRINSTL

POST SLEEP - GIRA

SSVR3

SSVR3

P/TV04EGRSOPS

P/TV03 OPSP/TV03S/U

RMVC/LCMR

OFF DUTY

MS2 EXERCISEFARE

WELL

MEAL OFF DUTYPOST SLEEP UNDOCK OPS

RNDZTOOLSC/OPT2

MS3

COMM*

MEALODS VESTLK CK OFF DUTY PFC

MPM

STOW

FARE

WELL

UNDOCK OPSPOST SLEEP OFF DUTYFMK*

MS4 EXERCISEMEALODS VESTLK CK OFF DUTY

C/LCMRINSTL

PFCVTRPB

VTRS/U

FARE

WELL

UNDOCK OPSPOST SLEEP OFF DUTY♣LOG

MS5HLAUDB/O

MEAL OFF DUTY

SSOR

DEACT

UNDOCK OPSFARE

WELL

POST SLEEPMDDK

⊕LOG

OFFDUTY PFC

A/L*

EXERCISE

RNDZTOOLSC/OPT2

ISS CDR SLEEP POSTSLEEPPREP

WORKDPC

FARE

WELL

MEAL

FE-1 SLEEP POSTSLEEPPREP

WORKDPC

FARE

WELL

EGRSHATCHCLS

♦ MEAL PMA2-DEPRESSCDRA

♥ EXERCISETVIS

DAY/NIGHTORBIT 151 152 153 154 155 156 157 158

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV UNDOCK -ZLV +YVV BIASED

NOTES

♣SALIVA⊕SALIVA

♦ACS-PMA2-DEP-THRSTRACS-POST-DEP-THRSTR

♥C&T-CMM-CNFG-VRFY-1A∆MSS-RWS CABLE-DSCN

*ACT

^HTR ON*RS TO STS

*DEACT*COMM 1 STRING C/O

*DEPLOY

*FAN BYPASS

2-22A

FD11

COLLINS

KELLY

NOGUCHI

ROBINSON

UNDOCK*

* UNDOCK 9/17:15

^SEP-2

THOMAS

LAWRENCE

CAMARDA

^SEP-1

KRIKALEV

PHILLIPS

STS-114

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/22/04 (266) 12 13 14 15 16 17 18 19 20 21 22 23 010/00

MET Day 009

CDR

APCU1*

COND

TERM

EXERCISEFARE

WELL

GRP B

PWRDN

MEALMNVR

DUMP

MNVR

UNDCK

MPLM^

OFF DUTYPOST SLEEPEGRSHATCHCLS

UNDOCK OPS

GRP B

PWRUP

ATTHO*

OFFDUTY

IMU

POST SLEEPIMU

PLT

APCU1*

SMPL

COND

TERM

COND

INIT

EXERCISEFARE

WELL

GRP B

PWRDN

ILLUM

OFF MEAL OFF DUTYOFF

DUTYPOST SLEEPSIMO

INIT

SIMOTERM

EGRSHATCHCLS

UNDOCK OPS

GRP B

PWRUP

SALIVA

OFFDUTY

MS1 EXERCISEFARE

WELL

MEAL OFF DUTYC/LCMRINSTL

POST SLEEP - GIRA

SSVR3

SSVR3

P/TV04EGRSOPS

P/TV03 OPSP/TV03S/U

RMVC/LCMR

OFF DUTY

MS2 EXERCISEFARE

WELL

MEAL OFF DUTYPOST SLEEP UNDOCK OPS

RNDZTOOLSC/OPT2

MS3

COMM*

MEALODS VESTLK CK OFF DUTY PFC

MPM

STOW

FARE

WELL

UNDOCK OPSPOST SLEEP OFF DUTYFMK*

MS4 EXERCISEMEALODS VESTLK CK OFF DUTY

C/LCMRINSTL

PFCVTRPB

VTRS/U

FARE

WELL

UNDOCK OPSPOST SLEEP OFF DUTY♣LOG

MS5HLAUDB/O

MEAL OFF DUTY

SSOR

DEACT

UNDOCK OPSFARE

WELL

POST SLEEPMDDK

⊕LOG

OFFDUTY PFC

A/L*

EXERCISE

RNDZTOOLSC/OPT2

ISS CDR SLEEP POSTSLEEPPREP

WORKDPC

FARE

WELL

MEAL

FE-1 SLEEP POSTSLEEPPREP

WORKDPC

FARE

WELL

EGRSHATCHCLS

♦ MEAL PMA2-DEPRESSCDRA

♥ EXERCISETVIS

DAY/NIGHTORBIT 151 152 153 154 155 156 157 158

TDRSE -47.0W -171.0Z -275.0

ORB ATT BIAS -XLV +ZVV UNDOCK -ZLV +YVV BIASED

NOTES

♣SALIVA⊕SALIVA

♦ACS-PMA2-DEP-THRSTRACS-POST-DEP-THRSTR

♥C&T-CMM-CNFG-VRFY-1A∆MSS-RWS CABLE-DSCN

*ACT

^HTR ON*RS TO STS

*DEACT*COMM 1 STRING C/O

*DEPLOY

*FAN BYPASS

Page 53: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-22B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 010/00MET Day 009 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/22/04 (266)DAY/NIGHTORBIT 151 152 153 154 155 156 157 158

DAILY ORBIT 16 1 2 3 4 5 6 7 8RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEAMNVR UNDOCKING

FREE DRIFTREDOCKING +XVV +ZLV TEA

LOCK-OPS-RECORDERKU

LOCK-OPS-

С-СОГБ-COMB MODEФ-СОГБ-JOINT OPS

SY

С-СОГБ-COMB MODEФ-СОГБ-JOINT OPS

IATCS-LTL-STPT-CHGCDRA DEACTC&DH-INH VALIDITY-CKDPCMSS-POWERUPC&T-AUDIO-HRDLN-CNFGACS-CMG-DATA-DUMPC&T-UHF-CONFIGACS-PRE-DEP-THRSTRC&T-VIDEO CNFGACS-H/O-USOS-TO-RSLOCK-OPS-RECORDERISS-PWR-DWNACS-RS/STS ATT-H/OPPS-SA-FTHRSDMS-UNDOCKINGPPS-SA-AUTOTRACKVDS-VIDEO-CNFGISS-PWR UPACS-GPS-RCNFC&T-VIDEO-DECONFGMSS-POWERDOWNC&T-UHF1-DEACTC&T-CMM-CNFG-VRFY-1APMA2-HTR-RECONFIGVDS-VIDEO-DCNFG

SBD

IATCS-LTL-STPT-CHG IATCS-LTL-STPT-CHGCDRA DEACT

C&DH-INH VALIDITY-CK C&DH-INH VALIDITY-CKDPC

MSS-POWERUPC&T-AUDIO-HRDLN-CNFG

ACS-CMG-DC&T-UHF-CONFIG

ACS-PRE-DEP-THRSTRC&T-VIDEO CNFG

ACS-H/O-USOS-TO-RSLOCK-OPS-

ISS-PWR-DWNACS-RS/STS ATT-H/O

PPS-SA-FTHRSDMS-UNDOCKING

PPS-SA-AUTOTRACKVDS-VIDEO-CNFG

ISS-PWR UPACS-GPS-RCNF

C&T-VIDEO-DECONFGMSS-POWERDOWN

C&T-UHF1-DEACTC&T-CMM-CNFG-VRFY-1A

PMA2-HTR-RECONFIGVDS-VIDEO-DCNFG

EXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

СУДН-ОГНИ-LIGHTS ON

Ф-СОСБ-СБ-FEATHERС-СОСБ-СБ-FEATHER

RS

СУДН-ОГНИ-LIGHTS ONСУДН-ОГНИ-LIGHTS ON

Ф-СОСБ-СБ-FEATHERС-СОСБ-СБ-FEATHER

ISS MODE-PROX-XTIONACS-CMG-DATA-DUMPACS-PRE-DEP-THRSTRACS-H/O-USOS-TO-RSACS-RS/STS ATT-H/OPPS-SA-FTHRUNDOCKPPS-SA-AUTOTRACKISS MODE-STND-XTIONACS-PMA2-DEP-THRSTRACS-POST-DEP-THRSTRMPLM-PRES-CK

MCC

ISS MODE-PROX-XTIONACS-CMG-D

ACS-PRE-DEP-THRSTRACS-H/O-USOS-TO-RS

ACS-RS/STS ATT-H/OPPS-SA-FTHR

UNDOCKPPS-SA-AUTOTRACK

ISS MODE-STND-XTIONACS-PMA2-DEP-THRSTR

ACS-POST-DEP-THRSTRMPLM-PRES-CK

NOTES

*RS TO STS*RS TO STS

2-22B

ISS

12 13 14 15 16 17 18 19 20 21 22 23 010/00MET Day 009 12 13 14 15 16 17 18 19 20 21 22 23

GMT 09/22/04 (266)DAY/NIGHTORBIT 151 152 153 154 155 156 157 158

DAILY ORBIT 16 1 2 3 4 5 6 7 8RS GND

TDRS ALL

ISS ATT +XVV +ZLV TEAMNVR UNDOCKING

FREE DRIFTREDOCKING +XVV +ZLV TEA

LOCK-OPS-RECORDERKU

LOCK-OPS-

С-СОГБ-COMB MODEФ-СОГБ-JOINT OPS

SY

С-СОГБ-COMB MODEФ-СОГБ-JOINT OPS

IATCS-LTL-STPT-CHGCDRA DEACTC&DH-INH VALIDITY-CKDPCMSS-POWERUPC&T-AUDIO-HRDLN-CNFGACS-CMG-DATA-DUMPC&T-UHF-CONFIGACS-PRE-DEP-THRSTRC&T-VIDEO CNFGACS-H/O-USOS-TO-RSLOCK-OPS-RECORDERISS-PWR-DWNACS-RS/STS ATT-H/OPPS-SA-FTHRSDMS-UNDOCKINGPPS-SA-AUTOTRACKVDS-VIDEO-CNFGISS-PWR UPACS-GPS-RCNFC&T-VIDEO-DECONFGMSS-POWERDOWNC&T-UHF1-DEACTC&T-CMM-CNFG-VRFY-1APMA2-HTR-RECONFIGVDS-VIDEO-DCNFG

SBD

IATCS-LTL-STPT-CHG IATCS-LTL-STPT-CHGCDRA DEACT

C&DH-INH VALIDITY-CK C&DH-INH VALIDITY-CKDPC

MSS-POWERUPC&T-AUDIO-HRDLN-CNFG

ACS-CMG-DC&T-UHF-CONFIG

ACS-PRE-DEP-THRSTRC&T-VIDEO CNFG

ACS-H/O-USOS-TO-RSLOCK-OPS-

ISS-PWR-DWNACS-RS/STS ATT-H/O

PPS-SA-FTHRSDMS-UNDOCKING

PPS-SA-AUTOTRACKVDS-VIDEO-CNFG

ISS-PWR UPACS-GPS-RCNF

C&T-VIDEO-DECONFGMSS-POWERDOWN

C&T-UHF1-DEACTC&T-CMM-CNFG-VRFY-1A

PMA2-HTR-RECONFIGVDS-VIDEO-DCNFG

EXPRS1-SYS-PWR/THERMEXPRS4-SYS-PWR/THERMMAMS-P/L-NOM OPSSAMS-ICU/D1-OPSSAMS-RTS/D1-OPSSAMS-RTS/D2-OPS

UNTEND PL

EXPRS1-SYEXPRS4-SYMAMS-P/L-SAMS-ICU/SAMS-RTS/SAMS-RTS/

СУДН-ОГНИ-LIGHTS ON

Ф-СОСБ-СБ-FEATHERС-СОСБ-СБ-FEATHER

RS

СУДН-ОГНИ-LIGHTS ONСУДН-ОГНИ-LIGHTS ON

Ф-СОСБ-СБ-FEATHERС-СОСБ-СБ-FEATHER

ISS MODE-PROX-XTIONACS-CMG-DATA-DUMPACS-PRE-DEP-THRSTRACS-H/O-USOS-TO-RSACS-RS/STS ATT-H/OPPS-SA-FTHRUNDOCKPPS-SA-AUTOTRACKISS MODE-STND-XTIONACS-PMA2-DEP-THRSTRACS-POST-DEP-THRSTRMPLM-PRES-CK

MCC

ISS MODE-PROX-XTIONACS-CMG-D

ACS-PRE-DEP-THRSTRACS-H/O-USOS-TO-RS

ACS-RS/STS ATT-H/OPPS-SA-FTHR

UNDOCKPPS-SA-AUTOTRACK

ISS MODE-STND-XTIONACS-PMA2-DEP-THRSTR

ACS-POST-DEP-THRSTRMPLM-PRES-CK

NOTES

*RS TO STS*RS TO STS

Page 54: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-23

FD11

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

STS-114

09/23 01 02 03 04 05 06 07 08 09 10 11GMT 09/22/04 (266) 010/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 010

CDRMNVR

-ZLV

OFFDUTYPFC PMC

OCAPRE SLEEP PRE

SLEEP SLEEPOFFDUTY

PLT

MPLM^

OFF DUTY PFC PRE SLEEPPRE SLEEP SLEEP

MS1 OFF DUTY PFC PRE SLEEP - GIRA SLEEP

MS2 OFF DUTY♣PFC PRE SLEEP SLEEP

MS3 PRE SLEEP SLEEPEXERCISEOFF

DUTY

MS4 PRE SLEEP SLEEPOFF DUTY

RENAL

MS5 OFF DUTY PRE SLEEP SLEEPMDDK

DAY/NIGHTORBIT 159 160 161 162 163 164 165 166

TDRSE -47.0W -171.0Z -275.0

MILDFR

ORB ATT -ZLV -XVV

NOTES

♣OFF DUTY ^HTR OFF

2-23

FD11

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

STS-114

09/23 01 02 03 04 05 06 07 08 09 10 11GMT 09/22/04 (266) 010/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 010

CDRMNVR

-ZLV

OFFDUTYPFC PMC

OCAPRE SLEEP PRE

SLEEP SLEEPOFFDUTY

PLT

MPLM^

OFF DUTY PFC PRE SLEEPPRE SLEEP SLEEP

MS1 OFF DUTY PFC PRE SLEEP - GIRA SLEEP

MS2 OFF DUTY♣PFC PRE SLEEP SLEEP

MS3 PRE SLEEP SLEEPEXERCISEOFF

DUTY

MS4 PRE SLEEP SLEEPOFF DUTY

RENAL

MS5 OFF DUTY PRE SLEEP SLEEPMDDK

DAY/NIGHTORBIT 159 160 161 162 163 164 165 166

TDRSE -47.0W -171.0Z -275.0

MILDFR

ORB ATT -ZLV -XVV

NOTES

♣OFF DUTY ^HTR OFF

Page 55: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-24

COLLINS

KELLY

NOGUCHI

ROBINSON

FD12

FD12

MPLM PRESSURE CK

THOMAS

LAWRENCE

CAMARDA

STS-114

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/23/04 (267) 12 13 14 15 16 17 18 19 20 21 22 23 011/00

MET Day 010

CDR CABINSTOW

CABINSTOW

D/OBRIEFEXERCISEFCS C/O

FES*

FES*

L-1COMMCHK

MEAL

MPLM^

PAO

EVENT

PILOT OPSPOST SLEEP POST SLEEP RCSH/F

CABIN

STOW

HUDCAL

MNVR

-ZLV

ELEVONPSN

FTR

LOAD

WSSHCOMMCK

MNVR

-ZLV

PLT

APCU 1*

APCU*

APU HTR

CABIN STOWD/OBRIEFEXERCISEFCS C/O MEALPILOT OPSPOST SLEEP RCS

H/F

PAO

EVENT

CABIN STOWPOSTSLEEP

SALIVA

HUDCAL

HUD

MNVR

MNVR

IMU

MNVR

-ZLV

ELEVONPSN

IMU

MS1 D/OBRIEF

ERGOSTOWEVA H/W STOWEXERCISEFILTER

CLEANING MEAL

ENTRY

VIDEO

S/UPOST EVA

ENT PREPPOST SLEEP - GIRA CABIN STOW

PAO

EVENT

CABIN STOWPAOS/U

MS2 CABIN STOWD/OBRIEFEVA H/W STOW EXERCISEFCS C/O MEAL

PGSCSTOWPART I

PILOT OPSPILOTSETUP

POST EVAENT PREPPOST SLEEP RCS

H/F

PAO

EVENT

MS3 CABINSTOW CABIN STOW CABIN STOW

COMM*

D/OBRIEF

ERGOSTOWEXERCISE MEAL

OIU*

PAO

EVENT

POST SLEEP

PRLACL

MS4 CABIN STOW CABIN STOWCABIN STOW D/OBRIEFEXERCISE MEAL

PAO

EVENT

POST SLEEP

SALIVA

LOG

MS5 CABIN STOW CABIN STOWD/OBRIEFEXERCISE MEAL

PAO

EVENT

POST SLEEPMDDK

SALIVA

LOG

PRLACL

DAY/NIGHTORBIT 167 168 169 170 171 172 173 174

TDRSE -47.0W -171.0Z -275.0

MILDFR

ORB ATT -ZLV -XVV +ZLV -ZLV -XVV HUD

NOTES

*INIT *TERM^HTR ON*ACT

*DEACT*COMM STRING 2 C/O*DEACT

2-24

COLLINS

KELLY

NOGUCHI

ROBINSON

FD12

FD12

MPLM PRESSURE CK

THOMAS

LAWRENCE

CAMARDA

STS-114

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/23/04 (267) 12 13 14 15 16 17 18 19 20 21 22 23 011/00

MET Day 010

CDR CABINSTOW

CABINSTOW

D/OBRIEFEXERCISEFCS C/O

FES*

FES*

L-1COMMCHK

MEAL

MPLM^

PAO

EVENT

PILOT OPSPOST SLEEP POST SLEEP RCSH/F

CABIN

STOW

HUDCAL

MNVR

-ZLV

ELEVONPSN

FTR

LOAD

WSSHCOMMCK

MNVR

-ZLV

PLT

APCU 1*

APCU*

APU HTR

CABIN STOWD/OBRIEFEXERCISEFCS C/O MEALPILOT OPSPOST SLEEP RCS

H/F

PAO

EVENT

CABIN STOWPOSTSLEEP

SALIVA

HUDCAL

HUD

MNVR

MNVR

IMU

MNVR

-ZLV

ELEVONPSN

IMU

MS1 D/OBRIEF

ERGOSTOWEVA H/W STOWEXERCISEFILTER

CLEANING MEAL

ENTRY

VIDEO

S/UPOST EVA

ENT PREPPOST SLEEP - GIRA CABIN STOW

PAO

EVENT

CABIN STOWPAOS/U

MS2 CABIN STOWD/OBRIEFEVA H/W STOW EXERCISEFCS C/O MEAL

PGSCSTOWPART I

PILOT OPSPILOTSETUP

POST EVAENT PREPPOST SLEEP RCS

H/F

PAO

EVENT

MS3 CABINSTOW CABIN STOW CABIN STOW

COMM*

D/OBRIEF

ERGOSTOWEXERCISE MEAL

OIU*

PAO

EVENT

POST SLEEP

PRLACL

MS4 CABIN STOW CABIN STOWCABIN STOW D/OBRIEFEXERCISE MEAL

PAO

EVENT

POST SLEEP

SALIVA

LOG

MS5 CABIN STOW CABIN STOWD/OBRIEFEXERCISE MEAL

PAO

EVENT

POST SLEEPMDDK

SALIVA

LOG

PRLACL

DAY/NIGHTORBIT 167 168 169 170 171 172 173 174

TDRSE -47.0W -171.0Z -275.0

MILDFR

ORB ATT -ZLV -XVV +ZLV -ZLV -XVV HUD

NOTES

*INIT *TERM^HTR ON*ACT

*DEACT*COMM STRING 2 C/O*DEACT

Page 56: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-25

FD12

FD13

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

STS-114

09/24 01 02 03 04 05 06 07 08 09 10 11GMT 09/23/04 (267) 011/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 011

CDRL-1COMMCHK

PMCA/G

POST SLEEPPRE SLEEPPRE SLEEP SLEEPPRESLEEP

PLT

ENTRY*

KUSTOW

MPLM^

POST SLEEPPRE SLEEP SLEEP

SALIVA

MS1 POST SLEEP- GIRAPRE SLEEP - GIRA SLEEP

SSV

DEACT

MS2OCAS-BDS/U

POST SLEEPPRE SLEEP SLEEP

MS3 POST SLEEPPRE SLEEP SLEEP

MS4 CABINSTOW POST SLEEPPRE SLEEP SLEEP

SALIVA

LOG

RENAL

MS5 POST SLEEPPRE SLEEP SLEEPMDDK

WLESSTW

SALIVA

LOG

DAY/NIGHTORBIT 174 175 176 177 178 179 180 181 182

TDRSE -47.0W -171.0Z -275.0

MILDFR

ORB ATT -ZLV -XVV

NOTES

*CONFIG ^HTR OFF

2-25

FD12

FD13

COLLINS

KELLY

NOGUCHI

ROBINSON

THOMAS

LAWRENCE

CAMARDA

STS-114

09/24 01 02 03 04 05 06 07 08 09 10 11GMT 09/23/04 (267) 011/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 011

CDRL-1COMMCHK

PMCA/G

POST SLEEPPRE SLEEPPRE SLEEP SLEEPPRESLEEP

PLT

ENTRY*

KUSTOW

MPLM^

POST SLEEPPRE SLEEP SLEEP

SALIVA

MS1 POST SLEEP- GIRAPRE SLEEP - GIRA SLEEP

SSV

DEACT

MS2OCAS-BDS/U

POST SLEEPPRE SLEEP SLEEP

MS3 POST SLEEPPRE SLEEP SLEEP

MS4 CABINSTOW POST SLEEPPRE SLEEP SLEEP

SALIVA

LOG

RENAL

MS5 POST SLEEPPRE SLEEP SLEEPMDDK

WLESSTW

SALIVA

LOG

DAY/NIGHTORBIT 174 175 176 177 178 179 180 181 182

TDRSE -47.0W -171.0Z -275.0

MILDFR

ORB ATT -ZLV -XVV

NOTES

*CONFIG ^HTR OFF

Page 57: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 2-26

FD13

COLLINS

KELLY

NOGUCHI

ROBINSON

D/O

BURN

KSC LNDG*

D/O TIG 11/17:53 *KSC LNDG 11/18:56

THOMAS

LAWRENCE

CAMARDA

STS-114

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/24/04 (268) 12 13 14 15 16 17 18 19 20 21 22 23 012/00

MET Day 011

CDR DEORBIT PREP

GRP B

PWRUP

IMUALIGN/VERIF

MNVR

-XSI

MPLM^

PMCA/G

POSTSLEEP

PLT DEORBIT PREP

GRP B

PWRUP

POST SLEEP POSTSLEEP

MS1 DEORBIT PREPGIRA

STOW

POST SLEEP - GIRA

MS2 CLRPRTSTW

DEORBIT PREP

PGSCSTOWPARTII

POST SLEEP

MS3 DEORBIT PREPOCAC

STOW

POST SLEEP

FMKSTW

MS4 DEORBIT PREPPOST SLEEPTEPC

OFF

WATCH

MS5

AIRSAMP

DEORBIT PREPPOST SLEEPMDDK

WATCH

DAY/NIGHTORBIT 182 183 184 185 186 187 188 189 190

TDRSE -47.0W -171.0Z -275.0

MILDFR

ORB ATT -ZLV -XVV VERIF -XSI COMM D/O BURN

NOTES

^HTR ON

2-26

FD13

COLLINS

KELLY

NOGUCHI

ROBINSON

D/O

BURN

KSC LNDG*

D/O TIG 11/17:53 *KSC LNDG 11/18:56

THOMAS

LAWRENCE

CAMARDA

STS-114

12 13 14 15 16 17 18 19 20 21 22 23GMT 09/24/04 (268) 12 13 14 15 16 17 18 19 20 21 22 23 012/00

MET Day 011

CDR DEORBIT PREP

GRP B

PWRUP

IMUALIGN/VERIF

MNVR

-XSI

MPLM^

PMCA/G

POSTSLEEP

PLT DEORBIT PREP

GRP B

PWRUP

POST SLEEP POSTSLEEP

MS1 DEORBIT PREPGIRA

STOW

POST SLEEP - GIRA

MS2 CLRPRTSTW

DEORBIT PREP

PGSCSTOWPARTII

POST SLEEP

MS3 DEORBIT PREPOCAC

STOW

POST SLEEP

FMKSTW

MS4 DEORBIT PREPPOST SLEEPTEPC

OFF

WATCH

MS5

AIRSAMP

DEORBIT PREPPOST SLEEPMDDK

WATCH

DAY/NIGHTORBIT 182 183 184 185 186 187 188 189 190

TDRSE -47.0W -171.0Z -275.0

MILDFR

ORB ATT -ZLV -XVV VERIF -XSI COMM D/O BURN

NOTES

^HTR ON

Page 58: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

2-27 FLT PLN/114/BAS A

This Page Intentionally Blank

Page 59: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

3-1 FLT PLN/114/BAS A

DE

TA

ILE

D

TIM

EL

INE

DETAILED TIMELINE

Page 60: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-2

FD01 EZ ACTIVITIESPerform at earliest convenience,LAMP TEST (ORB OPS, EPS)CSA-CP CHECKOUT OPS (ORB OPS, CSA-CP)DATE/TIME SET (PHOTO/TV, DCS 760)VTR CLOCK SET (PHOTO/TV, DTV) If not performed for PLBD rec.PCS 1(2) CONFIG (ORB OPS, ECLS) Config to PCS 1MS4: If PMZ Req'd, PMZ PROTOCOL (ORB OPS, DSO)Unstow Latent Virus Kit & place near sleep area

< PLBD OPENING

< KU BAND DEPLOY

Activities prior to MET 0/02:30 are in the ASCENT &POST INSERTION C/L. The Orbiter will be in a -ZLV +YVV attitude upon entering the Flight Plan.

TFL 184

01

β +21 MASKUPLINK

PRE SLEEP ACTIVITY (ORB OPS, CREW SYS)

MET 000/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/12(256)

00:00

01:00

02:00

03:00

04:00

MET

Day 000E W Z

TDRS

~~

ORB

2

3

STS ATT

ASCENT

OMS-2

~

-ZLV +YVV BIASED

COLLINS

APCU 1 ACT (ASSY OPS, APCU)

On MCC GO:APCU 1 DEACT (ASSY OPS)

IMU STAR OF OPTY ALIGN (ORB OPS)

OIU ACTIVATION (ORB OPS, OIU)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

WSB COOLING VERIF(ORB OPS, TBD)

~

KELLY

ON-ORBIT INITIALIZATION (PDRS, ON-ORBIT INIT)

WSB COOLING VERIF(ORB OPS, TBD)

~

RMS PWRUP (PDRS, RMS PWRUP)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOGUCHI

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

~

OPERATIONS (DIGITAL) (CUE CARD, PLAYBACK) ET PHOTO DNLK

ROBINSON

PGSC SETUP (PART 1) At mininum, Setup the following:PGSC NETWORK (ORB OPS, PGSC) FLT DK: Setup 2 A31PsACTIVATION AND CHECKOUT (ORB OPS, WLE SENSORS)UMBILICAL WELL TPS CMR IMGRY D/L (ORB OPS, PGSC)DCS FILE DNLK-FROM MICRO DRIVE (PHOTO/TV, DCS 760) ET PHOTO DNLK

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MCC

3-2

FD01 EZ ACTIVITIESPerform at earliest convenience,LAMP TEST (ORB OPS, EPS)CSA-CP CHECKOUT OPS (ORB OPS, CSA-CP)DATE/TIME SET (PHOTO/TV, DCS 760)VTR CLOCK SET (PHOTO/TV, DTV) If not performed for PLBD rec.PCS 1(2) CONFIG (ORB OPS, ECLS) Config to PCS 1MS4: If PMZ Req'd, PMZ PROTOCOL (ORB OPS, DSO)Unstow Latent Virus Kit & place near sleep area

< PLBD OPENING

< KU BAND DEPLOY

Activities prior to MET 0/02:30 are in the ASCENT &POST INSERTION C/L. The Orbiter will be in a -ZLV +YVV attitude upon entering the Flight Plan.

TFL 184

01

β +21 MASKUPLINK

PRE SLEEP ACTIVITY (ORB OPS, CREW SYS)

MET 000/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/12(256)

00:00

01:00

02:00

03:00

04:00

MET

Day 000E W Z

TDRS

ORB

2

3

STS ATT

ASCENT

OMS-2

~

-ZLV +YVV BIASED

COLLINS

APCU 1 ACT (ASSY OPS, APCU)

On MCC GO:APCU 1 DEACT (ASSY OPS)

IMU STAR OF OPTY ALIGN (ORB OPS)

OIU ACTIVATION (ORB OPS, OIU)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

WSB COOLING VERIF(ORB OPS, TBD)

~

KELLY

ON-ORBIT INITIALIZATION (PDRS, ON-ORBIT INIT)

WSB COOLING VERIF(ORB OPS, TBD)

~

RMS PWRUP (PDRS, RMS PWRUP)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOGUCHI

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

~

OPERATIONS (DIGITAL) (CUE CARD, PLAYBACK) ET PHOTO DNLK

ROBINSON

PGSC SETUP (PART 1) At mininum, Setup the following:PGSC NETWORK (ORB OPS, PGSC) FLT DK: Setup 2 A31PsACTIVATION AND CHECKOUT (ORB OPS, WLE SENSORS)UMBILICAL WELL TPS CMR IMGRY D/L (ORB OPS, PGSC)DCS FILE DNLK-FROM MICRO DRIVE (PHOTO/TV, DCS 760) ET PHOTO DNLK

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MCC

Page 61: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-3

01MET 000/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/12(256)

00:00

01:00

02:00

03:00

04:00

MET

Day 000E W Z

TDRS

~ ~

ORB

2

3

STS ATT

ASCENT

OMS-2

~

-ZLV +YVV BIASED

THOMAS

GIRA INSTALLATION (ORB OPS, ECLS)

RMS CHECKOUT (PDRS, RMS C/O)

RMS PWRDN (PDRS, RMS PWRDN) Step 1 ONLY

LAWRENCE

OCAC SETUP (ORB OPS, CREW SYS)

TISSUE EQUIV PROP COUNTER (ORB OPS, CREW SYS) POWER ON & STATUS CK

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

CAMARDA

PGSC SETUP (PART 1) At mininum, Setup the following:PGSC NETWORK (ORB OPS, PGSC)MDDK: Setup KFX & OCA RouterCOLOR PRNTR UNSTOW & ASSEMBLE (ORB OPS, PGSC) NOTE: PGSC Late Update scheduled FD2

RMS CHECKOUT (PDRS, RMS C/O)

RMS PWRDN (PDRS, RMS PWRDN) Step 1 ONLY

MCC

MPLM ENVIRONMENT CHECK (MPLM, NOMINAL)

3-3

01MET 000/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/12(256)

00:00

01:00

02:00

03:00

04:00

MET

Day 000E W Z

TDRS

ORB

2

3

STS ATT

ASCENT

OMS-2

~

-ZLV +YVV BIASED

THOMAS

GIRA INSTALLATION (ORB OPS, ECLS)

RMS CHECKOUT (PDRS, RMS C/O)

RMS PWRDN (PDRS, RMS PWRDN) Step 1 ONLY

LAWRENCE

OCAC SETUP (ORB OPS, CREW SYS)

TISSUE EQUIV PROP COUNTER (ORB OPS, CREW SYS) POWER ON & STATUS CK

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

CAMARDA

PGSC SETUP (PART 1) At mininum, Setup the following:PGSC NETWORK (ORB OPS, PGSC)MDDK: Setup KFX & OCA RouterCOLOR PRNTR UNSTOW & ASSEMBLE (ORB OPS, PGSC) NOTE: PGSC Late Update scheduled FD2

RMS CHECKOUT (PDRS, RMS C/O)

RMS PWRDN (PDRS, RMS PWRDN) Step 1 ONLY

MCC

MPLM ENVIRONMENT CHECK (MPLM, NOMINAL)

Page 62: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-4

01

WSB COOLING VERIF(ORB OPS, TBD)

WSB COOLING VERIF(ORB OPS, TBD)

MET 000/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/13(257)

04:00

05:00

06:00

07:00

08:00

MET

Day 000E W Z

TDRS

~

~~

ORB

3

4

5

6

STS ATT~

NC-1

~

-ZLV -XVV BIASED

COLLINS

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) OMIT Steps 2,7 & 13 Single G2

MNVR (TRK) -ZLV -XVV (BIASED) TG=2 BV=3 OM=350 A1/AUTO/VERN Init TRK

ON-ORBIT OMS BURN (ORB OPS, OMS)

<NC1 TIG (05:05)

06 UHF MODE - OFF A/G PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

APU HEATER RECONFIGR2 BLR PWR (three)-OFFA12 APU HTR GG/FU PMP (three)-A AUTOPRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) OMIT Steps 2,7 & 13 Single G2

ON-ORBIT OMS BURN (ORB OPS, OMS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

NOGUCHI

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

~

SLEEP

~

ROBINSON

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MCC

UPDATEORBITALMNVR PAD

3-4

01

WSB COOLING VERIF(ORB OPS, TBD)

WSB COOLING VERIF(ORB OPS, TBD)

MET 000/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/13(257)

04:00

05:00

06:00

07:00

08:00

MET

Day 000E W Z

TDRS

ORB

3

4

5

6

STS ATT~

NC-1

~

-ZLV -XVV BIASED

COLLINS

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) OMIT Steps 2,7 & 13 Single G2

MNVR (TRK) -ZLV -XVV (BIASED) TG=2 BV=3 OM=350 A1/AUTO/VERN Init TRK

ON-ORBIT OMS BURN (ORB OPS, OMS)

<NC1 TIG (05:05)

06 UHF MODE - OFF A/G PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

APU HEATER RECONFIGR2 BLR PWR (three)-OFFA12 APU HTR GG/FU PMP (three)-A AUTOPRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) OMIT Steps 2,7 & 13 Single G2

ON-ORBIT OMS BURN (ORB OPS, OMS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

NOGUCHI

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

~

SLEEP

~

ROBINSON

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MCC

UPDATEORBITALMNVR PAD

Page 63: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-5

SHUTTLE EMER EYEWASH (SEE) Unstow, attach or near container(s) and attach near appropriate experiment location

01MET 000/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/13(257)

04:00

05:00

06:00

07:00

08:00

MET

Day 000E W Z

TDRS

~

~ ~

ORB

3

4

5

6

STS ATT~

NC-1

~

-ZLV -XVV BIASED

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

RMS PWRDN (PDRS, RMS PWRDN) Step 1 ONLY

LAWRENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

DON ACT WATCH (ORB OPS, DSO)WITH MEAL: RENAL STONE (ORB OPS)

CAMARDA

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DON ACT WATCH (ORB OPS, DSO)

RMS PWRDN (PDRS, RMS PWRDN) Step 1 ONLY

MCC

3-5

SHUTTLE EMER EYEWASH (SEE) Unstow, attach or near container(s) and attach near appropriate experiment location

01MET 000/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/13(257)

04:00

05:00

06:00

07:00

08:00

MET

Day 000E W Z

TDRS

ORB

3

4

5

6

STS ATT~

NC-1

~

-ZLV -XVV BIASED

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

RMS PWRDN (PDRS, RMS PWRDN) Step 1 ONLY

LAWRENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

DON ACT WATCH (ORB OPS, DSO)WITH MEAL: RENAL STONE (ORB OPS)

CAMARDA

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DON ACT WATCH (ORB OPS, DSO)

RMS PWRDN (PDRS, RMS PWRDN) Step 1 ONLY

MCC

Page 64: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-6

UPLINKDEU INRTLMNVR INIT

UPLINKDEU -ZLVINIT

01MET 000/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/13(257)

08:00

09:00

10:00

11:00

12:00

MET

Day 000E W Z

TDRS

~

~~

ORB

6

7

8

9

STS ATT~

INTRL

~

-ZLV -XVV

COLLINS

SLEEP

~

~

KELLY

SLEEP

~

~

NOGUCHI

SLEEP

~

~

ROBINSON

SLEEP

~

~

MCC

3-6

UPLINKDEU INRTLMNVR INIT

UPLINKDEU -ZLVINIT

01MET 000/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/13(257)

08:00

09:00

10:00

11:00

12:00

MET

Day 000E W Z

TDRS

ORB

6

7

8

9

STS ATT~

INTRL

~

-ZLV -XVV

COLLINS

SLEEP

~

~

KELLY

SLEEP

~

~

NOGUCHI

SLEEP

~

~

ROBINSON

SLEEP

~

~

MCC

Page 65: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-7

01MET 000/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/13(257)

08:00

09:00

10:00

11:00

12:00

MET

Day 000E W Z

TDRS

~

~ ~

ORB

6

7

8

9

STS ATT~

INTRL

~

-ZLV -XVV

THOMAS

SLEEP

~

~

LAWRENCE

SLEEP

~

~

CAMARDA

SLEEP

~

~

MCC

3-7

01MET 000/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/13(257)

08:00

09:00

10:00

11:00

12:00

MET

Day 000E W Z

TDRS

ORB

6

7

8

9

STS ATT~

INTRL

~

-ZLV -XVV

THOMAS

SLEEP

~

~

LAWRENCE

SLEEP

~

~

CAMARDA

SLEEP

~

~

MCC

Page 66: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-8

02

FD02

FD02 EZ ACTIVITIESHARD REBOOT PGSCsSMK DETN CK TEST (ORB OPS, ECLS)TEPC (STATUS CK)(ORB OPS, CREW SYS)OCAC FILTER INSPECTMS4: If PMZ Req'd, PMZ PROTOCOL (ORB OPS, DSO)

√ HUM SEP FOR H20 ACCUMULATION

MET 000/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/13(257)

12:00

13:00

14:00

15:00

16:00

MET

Day 000E W Z

TDRS

~

~~

ORB

9

10

11

STS ATT~

-ZLV -XVV

NC-2

~

COLLINS

ON-ORBIT OMS BURN (ORB OPS, OMS)

<NC2 TIG (15:29)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MNVR (TRK) -ZLV -YVV (BIASED) TG=2 BV=3 OM=140 A1/AUTO/VERN Init TRK

KELLY

ON-ORBIT OMS BURN (ORB OPS, OMS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SALIVA COLLECT (ORB OPS, DSO)

NOGUCHI

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

~

SLEEP

~

ROBINSON

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MCC

UPDATEORBITAL MNVR PADUPDATEORBITAL MNVR PAD

3-8

02

FD02

FD02 EZ ACTIVITIESHARD REBOOT PGSCsSMK DETN CK TEST (ORB OPS, ECLS)TEPC (STATUS CK)(ORB OPS, CREW SYS)OCAC FILTER INSPECTMS4: If PMZ Req'd, PMZ PROTOCOL (ORB OPS, DSO)

√ HUM SEP FOR H20 ACCUMULATION

MET 000/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/13(257)

12:00

13:00

14:00

15:00

16:00

MET

Day 000E W Z

TDRS

ORB

9

10

11

STS ATT~

-ZLV -XVV

NC-2

~

COLLINS

ON-ORBIT OMS BURN (ORB OPS, OMS)

<NC2 TIG (15:29)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MNVR (TRK) -ZLV -YVV (BIASED) TG=2 BV=3 OM=140 A1/AUTO/VERN Init TRK

KELLY

ON-ORBIT OMS BURN (ORB OPS, OMS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SALIVA COLLECT (ORB OPS, DSO)

NOGUCHI

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

~

SLEEP

~

ROBINSON

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MCC

UPDATEORBITAL MNVR PADUPDATEORBITAL MNVR PAD

Page 67: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-9

02

FD02

MET 000/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/13(257)

12:00

13:00

14:00

15:00

16:00

MET

Day 000E W Z

TDRS

~

~ ~

ORB

9

10

11

STS ATT~

-ZLV -XVV

NC-2

~

THOMAS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

LAWRENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

FLIGHT SLEEP LOG (ORB OPS, DSO)SALIVA COLLECT (ORB OPS, DSO)

MCC

3-9

02

FD02

MET 000/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/13(257)

12:00

13:00

14:00

15:00

16:00

MET

Day 000E W Z

TDRS

ORB

9

10

11

STS ATT~

-ZLV -XVV

NC-2

~

THOMAS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

LAWRENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

FLIGHT SLEEP LOG (ORB OPS, DSO)SALIVA COLLECT (ORB OPS, DSO)

MCC

Page 68: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-10

UPLINKTGT SV

02

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS LDRI RCC SURV - STBD (PDRS, TPS SURVEYS)

TFL 184

MET 000/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/13(257)

16:00

17:00

18:00

19:00

20:00

MET

Day 000E W Z

TDRS

~

~~

ORB

11

12

13

14

STS ATT~

~

-ZLV -YVV BIASED

COLLINS

AFT CONTROLER C/O (ORB OPS, GNC)

APCU 1 ACT (ASSY OPS, APCU)

On MCC GO:APCU 1 DEACT (ASSY OPS)

CRYO O2 TK HTR SNSR CK (ORB OPS. EPS)

~

FC PURGE - MANUAL (ORB OPS, EPS)FILTER CLEANING (IFM, SCHED MAINT) Inspect filters and clean as necessary Do NOT perform for MCIU filter.

LOAD FLT SPEC DAPS (ORB OPS, DAP TABLES)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

KELLY

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS UNBERTH (PDRS, OBSS NOMINAL)

OBSS LDRI RCC SURV - NOSE CAP (PDRS, TPS SURVEYS)~

NOGUCHI

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) ERGOMETER SETUP

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR)

~

PGT CHECKOUT (EVA, TOOLS & STOWAGE)

~

ROBINSON

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) ERGOMETER SETUP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) PART 1 Checkout RNDZ tools with RPOP2

PGT CHECKOUT (EVA, TOOLS & STOWAGE)

~

PGSC SETUP (PART 2) Setup the following:PGSC NETWORK (ORB OPS, PGSC) Setup remaining PGSCsPGSC HARD DISK LATE UPDATE Update PGSCs with late update disk

MCC

TFL 192

3-10

UPLINKTGT SV

02

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS LDRI RCC SURV - STBD (PDRS, TPS SURVEYS)

TFL 184

MET 000/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/13(257)

16:00

17:00

18:00

19:00

20:00

MET

Day 000E W Z

TDRS

ORB

11

12

13

14

STS ATT~

~

-ZLV -YVV BIASED

COLLINS

AFT CONTROLER C/O (ORB OPS, GNC)

APCU 1 ACT (ASSY OPS, APCU)

On MCC GO:APCU 1 DEACT (ASSY OPS)

CRYO O2 TK HTR SNSR CK (ORB OPS. EPS)

~

FC PURGE - MANUAL (ORB OPS, EPS)FILTER CLEANING (IFM, SCHED MAINT) Inspect filters and clean as necessary Do NOT perform for MCIU filter.

LOAD FLT SPEC DAPS (ORB OPS, DAP TABLES)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

KELLY

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS UNBERTH (PDRS, OBSS NOMINAL)

OBSS LDRI RCC SURV - NOSE CAP (PDRS, TPS SURVEYS)~

NOGUCHI

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) ERGOMETER SETUP

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR)

~

PGT CHECKOUT (EVA, TOOLS & STOWAGE)

~

ROBINSON

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) ERGOMETER SETUP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) PART 1 Checkout RNDZ tools with RPOP2

PGT CHECKOUT (EVA, TOOLS & STOWAGE)

~

PGSC SETUP (PART 2) Setup the following:PGSC NETWORK (ORB OPS, PGSC) Setup remaining PGSCsPGSC HARD DISK LATE UPDATE Update PGSCs with late update disk

MCC

TFL 192

Page 69: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-11

02

OBSS LDRI RCC SURV - STBD (PDRS, TPS SURVEYS)

OBSS LDRI RCC SURV - STBD (PDRS, TPS SURVEYS)

CONFIGURE DTV FOR DOWNLINKL10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MET 000/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/13(257)

16:00

17:00

18:00

19:00

20:00

MET

Day 000E W Z

TDRS

~

~ ~

ORB

11

12

13

14

STS ATT~

~

-ZLV -YVV BIASED

THOMAS

MEAL~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RMS CHECKOUT (PDRS, RMS C/O)

OBSS UNBERTH (PDRS, OBSS NOMINAL)

LAWRENCE

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR)

~

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) PART 1 Checkout RNDZ tools with RPOP2

SSV NOMINAL SETUP (PHOTO/TV, SSV) OUTRATE = 3

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RMS CHECKOUT (PDRS, RMS C/O)

OBSS UNBERTH (PDRS, OBSS NOMINAL)

OBSS LDRI RCC SURV - NOSE CAP (PDRS, TPS SURVEYS)~

MCC

MPLM ENVIRONMENT CHECK (MPLM, NOMINAL) Steps 1 & 4 Note: Pressure Check (NO fan)

3-11

02

OBSS LDRI RCC SURV - STBD (PDRS, TPS SURVEYS)

OBSS LDRI RCC SURV - STBD (PDRS, TPS SURVEYS)

CONFIGURE DTV FOR DOWNLINKL10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MET 000/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/13(257)

16:00

17:00

18:00

19:00

20:00

MET

Day 000E W Z

TDRS

ORB

11

12

13

14

STS ATT~

~

-ZLV -YVV BIASED

THOMAS

MEAL~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RMS CHECKOUT (PDRS, RMS C/O)

OBSS UNBERTH (PDRS, OBSS NOMINAL)

LAWRENCE

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR)

~

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) PART 1 Checkout RNDZ tools with RPOP2

SSV NOMINAL SETUP (PHOTO/TV, SSV) OUTRATE = 3

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RMS CHECKOUT (PDRS, RMS C/O)

OBSS UNBERTH (PDRS, OBSS NOMINAL)

OBSS LDRI RCC SURV - NOSE CAP (PDRS, TPS SURVEYS)~

MCC

MPLM ENVIRONMENT CHECK (MPLM, NOMINAL) Steps 1 & 4 Note: Pressure Check (NO fan)

Page 70: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-12

02

PGT CHECKOUT (EVA, TOOLS & STOWAGE)

PGT CHECKOUT (EVA, TOOLS & STOWAGE)

MET 000/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/13(257)

20:00

21:00

22:00

23:00

00:00

MET

Day 000E W Z

TDRS

~

~~

ORB

14

15

16

17

STS ATT~

~

-ZLV -YVV BIASED

COLLINS

CRYO O2 TK HTR SNSR CK (ORB OPS. EPS)

~

DOCKING MECH INITDOCKING MECH PWRUPAfter STBD SURV complete:DOCKING RING EXTENSIONDOCKING MECH PWRDN (RNDZ, APDS-NOMINAL)

SHUTTLE/ISS H20 CONT FILL (ORB OPS, ECLS) Perform EQUIP PREP and WATER TRANSFER HOSE PURGE

MEAL

R2 BLR CNTLR/HTR (three) - B

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MNVR (TRK) -ZLV -YVV (BIASED) TG=2 BV=3 OM=110 A1/AUTO/VERN Init TRK on MCC GO

KELLY

MEAL

OBSS LDRI RCC SURV - PORT (PDRS, TPS SURVEYS)

OBSS LDRI RCC SURV - NOSE CAP (PDRS, TPS SURVEYS)

~

NOGUCHI

EMU CHECKOUT (EVA, CHECKOUTS)

EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

MEAL

~

CIPAA CHECKOUT (EVA, TPS REPAIR PREP)

EMITTANCE WASH APPLICATOR PREP (EVA, TPS REPAIR PREP)

A/L FAN ACT & ODS VOL PREP (RNDZ, APDS-NOMINAL) Steps 1-5

ROBINSON

EMU CHECKOUT (EVA, CHECKOUTS)

EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

MEAL

~

EMITTANCE WASH APPLICATOR PREP (EVA, TPS REPAIR PREP)

CIPAA CHECKOUT (EVA, TPS REPAIR PREP)

MCC

3-12

02

PGT CHECKOUT (EVA, TOOLS & STOWAGE)

PGT CHECKOUT (EVA, TOOLS & STOWAGE)

MET 000/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/13(257)

20:00

21:00

22:00

23:00

00:00

MET

Day 000E W Z

TDRS

ORB

14

15

16

17

STS ATT~

~

-ZLV -YVV BIASED

COLLINS

CRYO O2 TK HTR SNSR CK (ORB OPS. EPS)

~

DOCKING MECH INITDOCKING MECH PWRUPAfter STBD SURV complete:DOCKING RING EXTENSIONDOCKING MECH PWRDN (RNDZ, APDS-NOMINAL)

SHUTTLE/ISS H20 CONT FILL (ORB OPS, ECLS) Perform EQUIP PREP and WATER TRANSFER HOSE PURGE

MEAL

R2 BLR CNTLR/HTR (three) - B

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MNVR (TRK) -ZLV -YVV (BIASED) TG=2 BV=3 OM=110 A1/AUTO/VERN Init TRK on MCC GO

KELLY

MEAL

OBSS LDRI RCC SURV - PORT (PDRS, TPS SURVEYS)

OBSS LDRI RCC SURV - NOSE CAP (PDRS, TPS SURVEYS)

~

NOGUCHI

EMU CHECKOUT (EVA, CHECKOUTS)

EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

MEAL

~

CIPAA CHECKOUT (EVA, TPS REPAIR PREP)

EMITTANCE WASH APPLICATOR PREP (EVA, TPS REPAIR PREP)

A/L FAN ACT & ODS VOL PREP (RNDZ, APDS-NOMINAL) Steps 1-5

ROBINSON

EMU CHECKOUT (EVA, CHECKOUTS)

EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

MEAL

~

EMITTANCE WASH APPLICATOR PREP (EVA, TPS REPAIR PREP)

CIPAA CHECKOUT (EVA, TPS REPAIR PREP)

MCC

Page 71: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-13

02

OBSS LDRI RCC SURV - NOSE CAP (PDRS, TPS SURVEYS)

OBSS LDRI RCC SURV - PORT (PDRS, TPS SURVEYS)

MET 000/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/13(257)

20:00

21:00

22:00

23:00

00:00

MET

Day 000E W Z

TDRS

~

~ ~

ORB

14

15

16

17

STS ATT~

~

-ZLV -YVV BIASED

THOMAS

MEAL

~

~

LAWRENCE

DOCKING MECH INITDOCKING MECH PWRUPAfter STBD SURV complete:DOCKING RING EXTENSIONDOCKING MECH PWRDN (RNDZ, APDS-NOMINAL)

EMU CHECKOUT (EVA, CHECKOUTS) COMM CK

MEAL

MIDDECK TRANSFER PREP

MIDDECK TRANSFER PREP

CAMARDA

MEAL

OBSS LDRI RCC SURV - PORT (PDRS, TPS SURVEYS)

~

OBSS LDRI RCC SURV - NOSE CAP (PDRS, TPS SURVEYS)

~

MCC

3-13

02

OBSS LDRI RCC SURV - NOSE CAP (PDRS, TPS SURVEYS)

OBSS LDRI RCC SURV - PORT (PDRS, TPS SURVEYS)

MET 000/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/13(257)

20:00

21:00

22:00

23:00

00:00

MET

Day 000E W Z

TDRS

ORB

14

15

16

17

STS ATT~

~

-ZLV -YVV BIASED

THOMAS

MEAL

~

~

LAWRENCE

DOCKING MECH INITDOCKING MECH PWRUPAfter STBD SURV complete:DOCKING RING EXTENSIONDOCKING MECH PWRDN (RNDZ, APDS-NOMINAL)

EMU CHECKOUT (EVA, CHECKOUTS) COMM CK

MEAL

MIDDECK TRANSFER PREP

MIDDECK TRANSFER PREP

CAMARDA

MEAL

OBSS LDRI RCC SURV - PORT (PDRS, TPS SURVEYS)

~

OBSS LDRI RCC SURV - NOSE CAP (PDRS, TPS SURVEYS)

~

MCC

Page 72: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-14

02

√ HUM SEP FOR H20 ACCUMULATION

MET 001/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/13(257)

00:00

01:00

02:00

03:00

04:00

MET

Day 001E W Z

TDRS

~

~~

ORB

17

18

19

STS ATT~

-ZLV +YVV BIASED

NC-3

~

-ZLV -XVV

COLLINS

CMG HTR: R1 PL AFT MNC - ON

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A1/AUTO/VERN Init TRK

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ON-ORBIT MULTI-AXIS RCS BURN (ORB OPS, RCS)

< NPC TIG (01:08)

MNVR (TRK) -ZLV +YVV (BIASED) TG=2 BV=3 OM=295 A1/AUTO/VERN Init TRK on MCC GO

PAO VOICE CHECK/EVENT (A/G) REF MSG ###

ON-ORBIT +X RCS BURN (ORB OPS, RCS)

< NC-3 TIG (02:40)

KELLY

FC MONITORING SYS (FCMS) OPS (ORB OPS, EPS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PAO VOICE CHECK/EVENT (A/G) REF MSG ###

ON-ORBIT MULTI-AXIS RCS BURN (ORB OPS, RCS)

ON-ORBIT +X RCS BURN (ORB OPS, RCS)

< NC-3 TIG (02:40)

NOGUCHI

EVA PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

AIRLOCK FAN BYPASS (RNDZ, APDS-NOMINAL)

ROBINSON

EVA PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

OCA-PMC

3-14

02

√ HUM SEP FOR H20 ACCUMULATION

MET 001/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/13(257)

00:00

01:00

02:00

03:00

04:00

MET

Day 001E W Z

TDRS

ORB

17

18

19

STS ATT~

-ZLV +YVV BIASED

NC-3

~

-ZLV -XVV

COLLINS

CMG HTR: R1 PL AFT MNC - ON

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A1/AUTO/VERN Init TRK

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ON-ORBIT MULTI-AXIS RCS BURN (ORB OPS, RCS)

< NPC TIG (01:08)

MNVR (TRK) -ZLV +YVV (BIASED) TG=2 BV=3 OM=295 A1/AUTO/VERN Init TRK on MCC GO

PAO VOICE CHECK/EVENT (A/G) REF MSG ###

ON-ORBIT +X RCS BURN (ORB OPS, RCS)

< NC-3 TIG (02:40)

KELLY

FC MONITORING SYS (FCMS) OPS (ORB OPS, EPS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PAO VOICE CHECK/EVENT (A/G) REF MSG ###

ON-ORBIT MULTI-AXIS RCS BURN (ORB OPS, RCS)

ON-ORBIT +X RCS BURN (ORB OPS, RCS)

< NC-3 TIG (02:40)

NOGUCHI

EVA PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

AIRLOCK FAN BYPASS (RNDZ, APDS-NOMINAL)

ROBINSON

EVA PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

OCA-PMC

Page 73: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-15

02MET 001/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/13(257)

00:00

01:00

02:00

03:00

04:00

MET

Day 001E W Z

TDRS

~

~ ~

ORB

17

18

19

STS ATT~

-ZLV +YVV BIASED

NC-3

~

-ZLV -XVV

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS BERTH (ROBOTICS, OBSS OPS)

OBSS LDRI RCC SURV - PORT (PDRS, TPS SURVEYS)

~

LAWRENCE

OPERATIONS (DIGITAL) (CUE CARD, PLAYBACK) KU TDRX (XX:XX - XX:XX)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

WITH MEAL: RENAL STONE (ORB OPS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OPERATIONS (DIGITAL) (CUE CARD, PLAYBACK) KU TDRX (XX:XX - XX:XX)

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS BERTH (ROBOTICS, OBSS OPS)

OBSS LDRI RCC SURV - PORT (PDRS, TPS SURVEYS)

~

MCC

3-15

02MET 001/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/13(257)

00:00

01:00

02:00

03:00

04:00

MET

Day 001E W Z

TDRS

ORB

17

18

19

STS ATT~

-ZLV +YVV BIASED

NC-3

~

-ZLV -XVV

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS BERTH (ROBOTICS, OBSS OPS)

OBSS LDRI RCC SURV - PORT (PDRS, TPS SURVEYS)

~

LAWRENCE

OPERATIONS (DIGITAL) (CUE CARD, PLAYBACK) KU TDRX (XX:XX - XX:XX)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

WITH MEAL: RENAL STONE (ORB OPS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OPERATIONS (DIGITAL) (CUE CARD, PLAYBACK) KU TDRX (XX:XX - XX:XX)

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS BERTH (ROBOTICS, OBSS OPS)

OBSS LDRI RCC SURV - PORT (PDRS, TPS SURVEYS)

~

MCC

Page 74: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-16

02

UPLINKDEU INRTLMNVR INIT

MET 001/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/14(258)

04:00

05:00

06:00

07:00

08:00

MET

Day 001E W Z

TDRS

~

~~

ORB

19

20

21

22

STS ATT~

-ZLV -XVV

~

INTRL

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-16

02

UPLINKDEU INRTLMNVR INIT

MET 001/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/14(258)

04:00

05:00

06:00

07:00

08:00

MET

Day 001E W Z

TDRS

ORB

19

20

21

22

STS ATT~

-ZLV -XVV

~

INTRL

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 75: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-17

02MET 001/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/14(258)

04:00

05:00

06:00

07:00

08:00

MET

Day 001E W Z

TDRS

~

~ ~

ORB

19

20

21

22

STS ATT~

-ZLV -XVV

~

INTRL

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-17

02MET 001/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/14(258)

04:00

05:00

06:00

07:00

08:00

MET

Day 001E W Z

TDRS

ORB

19

20

21

22

STS ATT~

-ZLV -XVV

~

INTRL

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 76: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-18

02

UPLINKDEU -ZLVINIT

MET 001/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/14(258)

08:00

09:00

10:00

11:00

12:00

MET

Day 001E W Z

TDRS

~

~~

ORB

22

23

24

25

STS ATT~

INTRL

~

-ZLV -XVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-18

02

UPLINKDEU -ZLVINIT

MET 001/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/14(258)

08:00

09:00

10:00

11:00

12:00

MET

Day 001E W Z

TDRS

ORB

22

23

24

25

STS ATT~

INTRL

~

-ZLV -XVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 77: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-19

02MET 001/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/14(258)

08:00

09:00

10:00

11:00

12:00

MET

Day 001E W Z

TDRS

~

~ ~

ORB

22

23

24

25

STS ATT~

INTRL

~

-ZLV -XVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-19

02MET 001/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/14(258)

08:00

09:00

10:00

11:00

12:00

MET

Day 001E W Z

TDRS

ORB

22

23

24

25

STS ATT~

INTRL

~

-ZLV -XVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 78: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-20

TRANSITION TO RNDZ C/L @ MET 1/14:19

RNDZ PET 00:00 (TI) @ MET 1/17:19

03

FD03

DEU BIASED +ZLV +YVV

< NH

< NC4

SSV OUT RATE = 3 TFL 192

FD03 EZ ACTIVITIESHARD REBOOT PGSCsTEPC (STATUS CK)(ORB OPS, CREW SYS)OCAC FILTER INSPECTL17 Check MCIU Filter ScreenMS4: If PMZ Req'd, PMZ PROTOCOL (ORB OPS, DSO)

A Steps 12,10,& 5 After crew cabin survey, Steps 9 & 6 Triple G2, NBAT 1233

UPLINKDEU:BIASED +YVVINIT

<

MET 001/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/14(258)

12:00

13:00

14:00

15:00

16:00

MET

Day 001E W Z

TDRS

~

~ ~

~

ORB

25

26

27

STS ATT~

+ZLV +YVV BIASED

~

RNDZ

COLLINS

PRIORITY PWRUP GRP B A (ORB PKT, PRIOR PWRDN)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

~

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate SIMO Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate SIMO Dump

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

IMU STAR OF OPTY ALIGN (ORB OPS)

KELLY

PRIORITY PWRUP GRP B A (ORB PKT, PRIOR PWRDN)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

~

SALIVA COLLECT (ORB OPS, DSO)

EXERCISE

NOGUCHI

EXERCISE

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

ROBINSON

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) PART 2 Checkout RNDZ tools with RPOP1 OMIT Step 8

MCC

UPDATEH20 WASTEDUMP QTY

3-20

TRANSITION TO RNDZ C/L @ MET 1/14:19

RNDZ PET 00:00 (TI) @ MET 1/17:19

03

FD03

DEU BIASED +ZLV +YVV

< NH

< NC4

SSV OUT RATE = 3 TFL 192

FD03 EZ ACTIVITIESHARD REBOOT PGSCsTEPC (STATUS CK)(ORB OPS, CREW SYS)OCAC FILTER INSPECTL17 Check MCIU Filter ScreenMS4: If PMZ Req'd, PMZ PROTOCOL (ORB OPS, DSO)

A Steps 12,10,& 5 After crew cabin survey, Steps 9 & 6 Triple G2, NBAT 1233

UPLINKDEU:BIASED +YVVINIT

<

MET 001/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/14(258)

12:00

13:00

14:00

15:00

16:00

MET

Day 001E W Z

TDRS

ORB

25

26

27

STS ATT~

+ZLV +YVV BIASED

~

RNDZ

COLLINS

PRIORITY PWRUP GRP B A (ORB PKT, PRIOR PWRDN)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

~

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate SIMO Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate SIMO Dump

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

IMU STAR OF OPTY ALIGN (ORB OPS)

KELLY

PRIORITY PWRUP GRP B A (ORB PKT, PRIOR PWRDN)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

~

SALIVA COLLECT (ORB OPS, DSO)

EXERCISE

NOGUCHI

EXERCISE

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

ROBINSON

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) PART 2 Checkout RNDZ tools with RPOP1 OMIT Step 8

MCC

UPDATEH20 WASTEDUMP QTY

Page 79: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-21

03

FD03CONFIG DTV FOR DNLKL10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

MET 001/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/14(258)

12:00

13:00

14:00

15:00

16:00

MET

Day 001E W Z

TDRS

~

~ ~

~

ORB

25

26

27

STS ATT~

+ZLV +YVV BIASED

~

RNDZ

THOMAS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SRMS EE CAM UPPER SURFACE SRVY (PDRS, TPS SURVEYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, DSO)SALIVA COLLECT (ORB OPS, DSO)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SRMS EE CAM UPPER SURFACE SRVY (PDRS, TPS SURVEYS) CAMR OPS

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SRMS EE CAM UPPER SURFACE SRVY (PDRS, TPS SURVEYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, DSO)SALIVA COLLECT (ORB OPS, DSO)

EXERCISE

~

MCC

3-21

03

FD03CONFIG DTV FOR DNLKL10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

MET 001/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/14(258)

12:00

13:00

14:00

15:00

16:00

MET

Day 001E W Z

TDRS

ORB

25

26

27

STS ATT~

+ZLV +YVV BIASED

~

RNDZ

THOMAS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SRMS EE CAM UPPER SURFACE SRVY (PDRS, TPS SURVEYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, DSO)SALIVA COLLECT (ORB OPS, DSO)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SRMS EE CAM UPPER SURFACE SRVY (PDRS, TPS SURVEYS) CAMR OPS

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SRMS EE CAM UPPER SURFACE SRVY (PDRS, TPS SURVEYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, DSO)SALIVA COLLECT (ORB OPS, DSO)

EXERCISE

~

MCC

Page 80: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-22

UPLINKβ 21° + B1

03

TI 1/17:19

BOX B1-35<AZ<45-35<EL<40UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33

C1,C2,C3

<

< CAPTURE 1/19:58SSV OUT RATE = 2 TFL 199

MET 001/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/14(258)

16:00

17:00

18:00

19:00

20:00

MET

Day 001E W Z

TDRS

~

~

~

~

ORB

28

29

30

STS ATT~

RNDZ

DOCK

~

COLLINS

APPROACH WITH RPM (CUE CARD)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

~

KELLY

APPROACH WITH RPM (CUE CARD)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

~

NOGUCHI

EMU REMOVAL (EVA, AIRLOCK CONFIG)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

P/TV02 DOCK (OPS) (PHOTO/TV, SCENES)

P/TV02 DOCK (SETUP) (PHOTO/TV, SCENES)

ROBINSON

APPROACH WITH RPM (CUE CARD)

EMU REMOVAL (EVA, AIRLOCK CONFIG)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

MCC

3-22

UPLINKβ 21° + B1

03

TI 1/17:19

BOX B1-35<AZ<45-35<EL<40UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33

C1,C2,C3

<

< CAPTURE 1/19:58SSV OUT RATE = 2 TFL 199

MET 001/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/14(258)

16:00

17:00

18:00

19:00

20:00

MET

Day 001E W Z

TDRS

ORB

28

29

30

STS ATT~

RNDZ

DOCK

~

COLLINS

APPROACH WITH RPM (CUE CARD)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

~

KELLY

APPROACH WITH RPM (CUE CARD)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

~

NOGUCHI

EMU REMOVAL (EVA, AIRLOCK CONFIG)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

P/TV02 DOCK (OPS) (PHOTO/TV, SCENES)

P/TV02 DOCK (SETUP) (PHOTO/TV, SCENES)

ROBINSON

APPROACH WITH RPM (CUE CARD)

EMU REMOVAL (EVA, AIRLOCK CONFIG)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

MCC

Page 81: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-23

03MET 001/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/14(258)

16:00

17:00

18:00

19:00

20:00

MET

Day 001E W Z

TDRS

~

~

~

~

ORB

28

29

30

STS ATT~

RNDZ

DOCK

~

THOMAS

APPROACH WITH RPM (CUE CARD)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

EXERCISE

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

LAWRENCE

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform SETUP

APPROACH WITH RPM (CUE CARD)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

EXERCISE

CAMARDA

APPROACH WITH RPM (CUE CARD)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

EXERCISE

~

MCC

3-23

03MET 001/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/14(258)

16:00

17:00

18:00

19:00

20:00

MET

Day 001E W Z

TDRS

ORB

28

29

30

STS ATT~

RNDZ

DOCK

~

THOMAS

APPROACH WITH RPM (CUE CARD)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

EXERCISE

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

LAWRENCE

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform SETUP

APPROACH WITH RPM (CUE CARD)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

EXERCISE

CAMARDA

APPROACH WITH RPM (CUE CARD)

RENDEZVOUS TIMELINE (RNDZ, RNDZ TIMELINE)

EXERCISE

~

MCC

Page 82: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-24

03

RETURN TO FLIGHT PLAN @ MET~1/20:35

ASteps 6 & 12, Steps 5,9 &10SINGLE G2O6 S TRK PWR -Z -OFF

UPLINKβ 21° +C1,C2,C3+X1BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX X1-65<AZ<8-88<EL<-52

MET 001/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/14(258)

20:00

21:00

22:00

23:00

00:00

MET

Day 001E W Z

TDRS

~

~ ~

ORB

30

31

32

33

STS ATT~

FREE

~

BIAS -XLV +ZVV

COLLINS

APCU 1 ACT (ASSY OPS, APCU)

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) A

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #1 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

WELCOME CEREMONY

MNVR (TRK) BIAS -XLV +ZVV TG=2 BV=5 P=157 Y=0 OM=0 Init TRK, When rates damped: DAP: FREE > 2 seconds, Then: DAP: A12/AUTO/VERN

SAFETY BRIEFING

HATCH OPEN AND DUCT INSTALL (BYPASS CONFIG) (JOINT OPS, INGRESS STATION)

EXERCISE

~

H/O ATT CONTROL ORB to RS (JOINT OPS, CONTINGENCY)

KELLY

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) A

WELCOME CEREMONY

SAFETY BRIEFING

HATCH OPEN AND DUCT INSTALL (BYPASS CONFIG) (JOINT OPS, INGRESS STATION)

MNVR (TRK) BIAS -XLV +ZVV TG=2 BV=5 P=157 Y=0 OM=0 Init TRK, When rates damped: DAP: FREE > 2 seconds, Then: DAP: A12/AUTO/VERN

BERTHED OBSS GRAPPLE (ROBOTICS, OBSS OPS)

OBSS UNBERTH (ROBOTICS, OBSS OPS)

OBSS MNVR TO HANDOFF (ROBOTICS, OBSS OPS)

~

NOGUCHI

WELCOME CEREMONY

POST RNDZ PGSC CONFIG (REF DATA, UTIL PWR) Use PGSC Usage chart and Plug-In-Plan

SAFETY BRIEFING

EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

P/TV04 INGRESS/EGRESS (S/U) (PHOTO/TV, SCENES)

P/TV04 INGRESS/EGRESS (OPS) (PHOTO/TV, SCENES)

P/TV05 ISS INTERNAL OPS (S/U) (PHOTO/TV, SCENES)

ROBINSON

WELCOME CEREMONY

POST RNDZ PGSC CONFIG (REF DATA, UTIL PWR) Use PGSC Usage chart and Plug-In-Plan

SAFETY BRIEFING

PCS SETUP - SHUTTLE (JOINT OPS, COMM/DATA)

HATCH OPEN AND DUCT INSTALL (BYPASS CONFIG) (JOINT OPS, INGRESS STATION)

EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

MCC

TFL 184

3-24

03

RETURN TO FLIGHT PLAN @ MET~1/20:35

ASteps 6 & 12, Steps 5,9 &10SINGLE G2O6 S TRK PWR -Z -OFF

UPLINKβ 21° +C1,C2,C3+X1BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX X1-65<AZ<8-88<EL<-52

MET 001/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/14(258)

20:00

21:00

22:00

23:00

00:00

MET

Day 001E W Z

TDRS

ORB

30

31

32

33

STS ATT~

FREE

~

BIAS -XLV +ZVV

COLLINS

APCU 1 ACT (ASSY OPS, APCU)

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) A

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #1 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

WELCOME CEREMONY

MNVR (TRK) BIAS -XLV +ZVV TG=2 BV=5 P=157 Y=0 OM=0 Init TRK, When rates damped: DAP: FREE > 2 seconds, Then: DAP: A12/AUTO/VERN

SAFETY BRIEFING

HATCH OPEN AND DUCT INSTALL (BYPASS CONFIG) (JOINT OPS, INGRESS STATION)

EXERCISE

~

H/O ATT CONTROL ORB to RS (JOINT OPS, CONTINGENCY)

KELLY

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) A

WELCOME CEREMONY

SAFETY BRIEFING

HATCH OPEN AND DUCT INSTALL (BYPASS CONFIG) (JOINT OPS, INGRESS STATION)

MNVR (TRK) BIAS -XLV +ZVV TG=2 BV=5 P=157 Y=0 OM=0 Init TRK, When rates damped: DAP: FREE > 2 seconds, Then: DAP: A12/AUTO/VERN

BERTHED OBSS GRAPPLE (ROBOTICS, OBSS OPS)

OBSS UNBERTH (ROBOTICS, OBSS OPS)

OBSS MNVR TO HANDOFF (ROBOTICS, OBSS OPS)

~

NOGUCHI

WELCOME CEREMONY

POST RNDZ PGSC CONFIG (REF DATA, UTIL PWR) Use PGSC Usage chart and Plug-In-Plan

SAFETY BRIEFING

EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

P/TV04 INGRESS/EGRESS (S/U) (PHOTO/TV, SCENES)

P/TV04 INGRESS/EGRESS (OPS) (PHOTO/TV, SCENES)

P/TV05 ISS INTERNAL OPS (S/U) (PHOTO/TV, SCENES)

ROBINSON

WELCOME CEREMONY

POST RNDZ PGSC CONFIG (REF DATA, UTIL PWR) Use PGSC Usage chart and Plug-In-Plan

SAFETY BRIEFING

PCS SETUP - SHUTTLE (JOINT OPS, COMM/DATA)

HATCH OPEN AND DUCT INSTALL (BYPASS CONFIG) (JOINT OPS, INGRESS STATION)

EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

MCC

TFL 184

Page 83: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-25

03

RETURN TO FLIGHT PLAN @ MET~1/20:35

MET 001/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/14(258)

20:00

21:00

22:00

23:00

00:00

MET

Day 001E W Z

TDRS

~

~ ~

ORB

30

31

32

33

STS ATT~

FREE

~

BIAS -XLV +ZVV

THOMAS

POST DOCKING HATCH LEAK CK (RNDZ, APDS-NOMINAL)

HATCH OPEN AND DUCT INSTALL (BYPASS CONFIG) (JOINT OPS, INGRESS STATION)

SAFETY BRIEFING

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL) Steps 1-2

OBSS UNBERTH CAMERA SUPPORT

~

AIRLOCK PREP FOR INGRESS-BYPASS CONFIG (RNDZ, APDS-NOMINAL)

WELCOME CEREMONY

LAWRENCE

POST DOCKING HATCH LEAK CK (RNDZ, APDS-NOMINAL)

HATCH OPEN AND DUCT INSTALL (BYPASS CONFIG) (JOINT OPS, INGRESS STATION)

SAFETY BRIEFING

BERTHED OBSS GRAPPLE (ROBOTICS, OBSS OPS)

OBSS UNBERTH (ROBOTICS, OBSS OPS)

OBSS MNVR TO HANDOFF (ROBOTICS, OBSS OPS)

~

AIRLOCK PREP FOR INGRESS-BYPASS CONFIG (RNDZ, APDS-NOMINAL)

WELCOME CEREMONY

CAMARDA

HARDLINE AUDIO CONFIG (ISS) (JOINT OPS, COMM/DATA) STEPS 1,2,6,7

HATCH OPEN AND DUCT INSTALL (BYPASS CONFIG) (JOINT OPS, INGRESS STATION)

SAFETY BRIEFING

PCS SETUP - SHUTTLE (JOINT OPS, COMM/DATA)

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL) Steps 1-2

OBSS UNBERTH CAMERA SUPPORT

~

WELCOME CEREMONY

MCC

MPLM ENVIRONMENT CHECK (MPLM, NOMINAL) Steps 1 & 4 Note: Pressure Check (NO fan)

3-25

03

RETURN TO FLIGHT PLAN @ MET~1/20:35

MET 001/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/14(258)

20:00

21:00

22:00

23:00

00:00

MET

Day 001E W Z

TDRS

ORB

30

31

32

33

STS ATT~

FREE

~

BIAS -XLV +ZVV

THOMAS

POST DOCKING HATCH LEAK CK (RNDZ, APDS-NOMINAL)

HATCH OPEN AND DUCT INSTALL (BYPASS CONFIG) (JOINT OPS, INGRESS STATION)

SAFETY BRIEFING

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL) Steps 1-2

OBSS UNBERTH CAMERA SUPPORT

~

AIRLOCK PREP FOR INGRESS-BYPASS CONFIG (RNDZ, APDS-NOMINAL)

WELCOME CEREMONY

LAWRENCE

POST DOCKING HATCH LEAK CK (RNDZ, APDS-NOMINAL)

HATCH OPEN AND DUCT INSTALL (BYPASS CONFIG) (JOINT OPS, INGRESS STATION)

SAFETY BRIEFING

BERTHED OBSS GRAPPLE (ROBOTICS, OBSS OPS)

OBSS UNBERTH (ROBOTICS, OBSS OPS)

OBSS MNVR TO HANDOFF (ROBOTICS, OBSS OPS)

~

AIRLOCK PREP FOR INGRESS-BYPASS CONFIG (RNDZ, APDS-NOMINAL)

WELCOME CEREMONY

CAMARDA

HARDLINE AUDIO CONFIG (ISS) (JOINT OPS, COMM/DATA) STEPS 1,2,6,7

HATCH OPEN AND DUCT INSTALL (BYPASS CONFIG) (JOINT OPS, INGRESS STATION)

SAFETY BRIEFING

PCS SETUP - SHUTTLE (JOINT OPS, COMM/DATA)

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL) Steps 1-2

OBSS UNBERTH CAMERA SUPPORT

~

WELCOME CEREMONY

MCC

MPLM ENVIRONMENT CHECK (MPLM, NOMINAL) Steps 1 & 4 Note: Pressure Check (NO fan)

Page 84: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-26

03

UPLINKβ 21° +C1,C2,C3BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33

OBSS MNVR TO HANDOFF (ROBOTICS, OBSS OPS)

TFL 199

MET 002/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/14(258)

00:00

01:00

02:00

03:00

04:00

MET

Day 002E W Z

TDRS

~

~ ~

ORB

33

34

35

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

On MCC GO:APCU 1 DEACT (ASSY OPS)

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CWC TRANSFER Xfer 1 CWC bag to ISS

OPERATIONS (DIGITAL) (CUE CARD, PLAYBACK) KU TDRX (XX:XX - XX:XX)

ACTIVATION (DIGITAL) (CUE CARD, PLAYBACK) Docking

EXERCISE~

KELLY

~

OBSS UNGRAPPLE AT HANDOFF (ROBOTICS, OBSS OPS)

MNVR TO ACBM INSPECT POSN (ROBOTICS, OBSS OPS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

P/TV06 MPLM ASSEMBLY OPS (S/U) (PHOTO/TV, SCENES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

ROBINSON

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

MCC

OCA-PMC

3-26

03

UPLINKβ 21° +C1,C2,C3BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33

OBSS MNVR TO HANDOFF (ROBOTICS, OBSS OPS)

TFL 199

MET 002/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/14(258)

00:00

01:00

02:00

03:00

04:00

MET

Day 002E W Z

TDRS

ORB

33

34

35

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

On MCC GO:APCU 1 DEACT (ASSY OPS)

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CWC TRANSFER Xfer 1 CWC bag to ISS

OPERATIONS (DIGITAL) (CUE CARD, PLAYBACK) KU TDRX (XX:XX - XX:XX)

ACTIVATION (DIGITAL) (CUE CARD, PLAYBACK) Docking

EXERCISE~

KELLY

~

OBSS UNGRAPPLE AT HANDOFF (ROBOTICS, OBSS OPS)

MNVR TO ACBM INSPECT POSN (ROBOTICS, OBSS OPS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

P/TV06 MPLM ASSEMBLY OPS (S/U) (PHOTO/TV, SCENES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

ROBINSON

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

MCC

OCA-PMC

Page 85: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-27

03

√ HUM SEP FOR H20 ACCUMULATION

MET 002/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/14(258)

00:00

01:00

02:00

03:00

04:00

MET

Day 002E W Z

TDRS

~

~ ~

ORB

33

34

35

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS UNBERTH CAMERA SUPPORT

~

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL) Steps 3-4

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL) Steps 5-6

LAWRENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS MNVR TO HANDOFF (ROBOTICS, OBSS OPS)

~

OBSS UNGRAPPLE AT HANDOFF (ROBOTICS, OBSS OPS)

MNVR TO ACBM INSPECT POSN (ROBOTICS, OBSS OPS)

WITH MEAL: RENAL STONE (ORB OPS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS UNBERTH CAMERA SUPPORT

~

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL) Steps 3-4

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL) Steps 5-6

MCC

3-27

03

√ HUM SEP FOR H20 ACCUMULATION

MET 002/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/14(258)

00:00

01:00

02:00

03:00

04:00

MET

Day 002E W Z

TDRS

ORB

33

34

35

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS UNBERTH CAMERA SUPPORT

~

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL) Steps 3-4

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL) Steps 5-6

LAWRENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS MNVR TO HANDOFF (ROBOTICS, OBSS OPS)

~

OBSS UNGRAPPLE AT HANDOFF (ROBOTICS, OBSS OPS)

MNVR TO ACBM INSPECT POSN (ROBOTICS, OBSS OPS)

WITH MEAL: RENAL STONE (ORB OPS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS UNBERTH CAMERA SUPPORT

~

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL) Steps 3-4

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL) Steps 5-6

MCC

Page 86: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-28

03MET 002/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/15(259)

04:00

05:00

06:00

07:00

08:00

MET

Day 002E W Z

TDRS

~

~

~

~

ORB

35

36

37

38

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-28

03MET 002/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/15(259)

04:00

05:00

06:00

07:00

08:00

MET

Day 002E W Z

TDRS

ORB

35

36

37

38

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 87: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-29

03MET 002/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/15(259)

04:00

05:00

06:00

07:00

08:00

MET

Day 002E W Z

TDRS

~

~

~

~

ORB

35

36

37

38

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

NODE 1 CBM PREP FOR MATE (S&M, NOMINAL) Step 20-22

NODE 1 NAD ACBM SURVEY (S&M, NOMINAL)

~3-29

03MET 002/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/15(259)

04:00

05:00

06:00

07:00

08:00

MET

Day 002E W Z

TDRS

ORB

35

36

37

38

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

NODE 1 CBM PREP FOR MATE (S&M, NOMINAL) Step 20-22

NODE 1 NAD ACBM SURVEY (S&M, NOMINAL)

~

Page 88: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-30

03MET 002/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/15(259)

08:00

09:00

10:00

11:00

12:00

MET

Day 002E W Z

TDRS

~ ~

~

ORB

38

39

40

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-30

03MET 002/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/15(259)

08:00

09:00

10:00

11:00

12:00

MET

Day 002E W Z

TDRS

ORB

38

39

40

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 89: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-31

03MET 002/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/15(259)

08:00

09:00

10:00

11:00

12:00

MET

Day 002E W Z

TDRS

~ ~

~

ORB

38

39

40

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

NODE 1 NAD ACBM SURVEY (S&M, NOMINAL)

~

3-31

03MET 002/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/15(259)

08:00

09:00

10:00

11:00

12:00

MET

Day 002E W Z

TDRS

ORB

38

39

40

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

NODE 1 NAD ACBM SURVEY (S&M, NOMINAL)

~

Page 90: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-32

FD04 EZ ACTIVITIESHARD REBOOT PGSCsOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)L17 Check MCIU Filter Screen

04

FD04

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX D1-41<AZ<8-88<EL<-9

C1,C2,C3+D1

TFL 199

R1 PRI PL MNC -OFF(tb-OFF)

Minerals and/or Ag Biocide are req'd.Samples are/are not req'd.Fill duration: 56 minutes

A

MET 002/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/15(259)

12:00

13:00

14:00

15:00

16:00

MET

Day 002E W Z

TDRS

~ ~

~

ORB

41

42

43

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

APCU 1 ACT (ASSY OPS, APCU)

On MCC GO:APCU 1 DEACT (ASSY OPS)

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #2 A

ACTIVE AND PASSIVE CBM INSPECTION CRITERIA (JOINT OPS, MATED OPS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MPLM UNBERTH (ROBOTICS, MPLM OPS)

MPLM INSTALL (ROBOTICS, MPLM OPS) Steps 1-2

BERTHED MPLM GRAPPLE (ROBOTICS, MPLM OPS)

SALIVA COLLECT (ORB OPS, DSO)

NOGUCHI

CEVIS C/O FOR EVA

PRE EVA1 EMU XFER & RECONFIG (EVA, AIRLOCK CONFIG)

EMU TO AIRLOCK INTERFACE CHECK (ISS EVA SYS, CHECKOUTS)

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

ROBINSON

CEVIS C/O FOR EVA

PRE EVA1 EMU XFER & RECONFIG (EVA, AIRLOCK CONFIG)

EMU TO AIRLOCK INTERFACE CHECK (ISS EVA SYS, CHECKOUTS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

TFL 184

3-32

FD04 EZ ACTIVITIESHARD REBOOT PGSCsOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)L17 Check MCIU Filter Screen

04

FD04

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX D1-41<AZ<8-88<EL<-9

C1,C2,C3+D1

TFL 199

R1 PRI PL MNC -OFF(tb-OFF)

Minerals and/or Ag Biocide are req'd.Samples are/are not req'd.Fill duration: 56 minutes

A

MET 002/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/15(259)

12:00

13:00

14:00

15:00

16:00

MET

Day 002E W Z

TDRS

ORB

41

42

43

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

APCU 1 ACT (ASSY OPS, APCU)

On MCC GO:APCU 1 DEACT (ASSY OPS)

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #2 A

ACTIVE AND PASSIVE CBM INSPECTION CRITERIA (JOINT OPS, MATED OPS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MPLM UNBERTH (ROBOTICS, MPLM OPS)

MPLM INSTALL (ROBOTICS, MPLM OPS) Steps 1-2

BERTHED MPLM GRAPPLE (ROBOTICS, MPLM OPS)

SALIVA COLLECT (ORB OPS, DSO)

NOGUCHI

CEVIS C/O FOR EVA

PRE EVA1 EMU XFER & RECONFIG (EVA, AIRLOCK CONFIG)

EMU TO AIRLOCK INTERFACE CHECK (ISS EVA SYS, CHECKOUTS)

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

ROBINSON

CEVIS C/O FOR EVA

PRE EVA1 EMU XFER & RECONFIG (EVA, AIRLOCK CONFIG)

EMU TO AIRLOCK INTERFACE CHECK (ISS EVA SYS, CHECKOUTS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

TFL 184

Page 91: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-33

04

FD04

CONFIG DTV FOR DNLKL10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

MET 002/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/15(259)

12:00

13:00

14:00

15:00

16:00

MET

Day 002E W Z

TDRS

~ ~

~

ORB

41

42

43

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NITROGEN TRANSFER INIT (JOINT OPS, MATED OPS)~

EMU TO AIRLOCK INTERFACE CHECK (ISS EVA SYS, CHECKOUTS)

MPLM UNBERTH Steps 1,4-8 (ROBOTICS, MPLM OPS)PRE EVA1 EMU XFER & RECONFIG (EVA, AIRLOCK CONFIG)

LAWRENCE

MPLM INSTALL (ROBOTICS, MPLM OPS) Steps 1-2

BERTHED MPLM GRAPPLE (ROBOTICS, MPLM OPS)

MPLM UNBERTH (ROBOTICS, MPLM OPS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

NITROGEN TRANSFER INIT (JOINT OPS, MATED OPS)~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MPLM UNBERTH Steps 1,4-8 (ROBOTICS, MPLM OPS)

MCC

MPLM ENVIRONMENT CHECK (MPLM, NOMINAL) Steps 1 & 4 Note: Pressure Check (NO fan)

3-33

04

FD04

CONFIG DTV FOR DNLKL10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

MET 002/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/15(259)

12:00

13:00

14:00

15:00

16:00

MET

Day 002E W Z

TDRS

ORB

41

42

43

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NITROGEN TRANSFER INIT (JOINT OPS, MATED OPS)~

EMU TO AIRLOCK INTERFACE CHECK (ISS EVA SYS, CHECKOUTS)

MPLM UNBERTH Steps 1,4-8 (ROBOTICS, MPLM OPS)PRE EVA1 EMU XFER & RECONFIG (EVA, AIRLOCK CONFIG)

LAWRENCE

MPLM INSTALL (ROBOTICS, MPLM OPS) Steps 1-2

BERTHED MPLM GRAPPLE (ROBOTICS, MPLM OPS)

MPLM UNBERTH (ROBOTICS, MPLM OPS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

NITROGEN TRANSFER INIT (JOINT OPS, MATED OPS)~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MPLM UNBERTH Steps 1,4-8 (ROBOTICS, MPLM OPS)

MCC

MPLM ENVIRONMENT CHECK (MPLM, NOMINAL) Steps 1 & 4 Note: Pressure Check (NO fan)

Page 92: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-34

04

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX S1-135<AZ<5-90<EL<45

C1,C2,C3+S1

OBSS SURVEY VIEWING

MPLM INSTALL Step 7 (ROBOTICS, MPLM OPS)

MET 002/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/15(259)

16:00

17:00

18:00

19:00

20:00

MET

Day 002E W Z

TDRS

~ ~

~

ORB

43

44

45

46

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #3 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

MEAL

CWC TRANSFER Xfer 2 CWC bags to ISS

PAO VOICE CHECK/EVENT (A/G) REF MSG ###

~

KELLY

MEAL

OBSS SURVEY

~

MPLM INSTALL (ROBOTICS, MPLM OPS) Steps 3-5 NOTE: NO Exercise

MPLM INSTALL Step 6 (ROBOTICS, MPLM OPS)

MATED MPLM UNGRAPPLE (ROBOTICS, MPLM OPS)

MEAL

WS4 MBS PDGF 1 GRAPPLE (ROBOTICS, SRMS SURVEY SPT)

LAB PDGF UNGRAPPLE (ROBOTICS, SRMS SURVEY SPT)

MNVR TO SURVEY SUPPORT VIEW POSN (ROBOTICS, SRMS SURVEY SPT)

NOGUCHI

MEAL

N1 CBM CAPTURE/ABLT SSRMS (S&M, NOMINAL) Steps 1-3 NOTE: No Exercise

N1 CBM CAPTURE/ABLT SSRMS (S&M, NOMINAL) Steps 4-6 NOTE: No Exercise

N1 CBM VERIFY PREMATE STATUS (S&M, NOMINAL)

TRANSFER Ref. MDDK TRANSFER LIST

~

760 EVA CAMR (PHOTO/TV, DCS 760)

EXERCISE

ROBINSON

MEAL

N1 CBM CAPTURE/ABLT SSRMS (S&M, NOMINAL) Steps 1-3 NOTE: No Exercise

N1 CBM CAPTURE/ABLT SSRMS (S&M, NOMINAL) Steps 4-6 NOTE: No Exercise

N1 CBM VERIFY PREMATE STATUS (S&M, NOMINAL)

PAO VOICE CHECK/EVENT (A/G) REF MSG ###

760 EVA CAMR (PHOTO/TV, DCS 760)

EXERCISE

~

MCC

3-34

04

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX S1-135<AZ<5-90<EL<45

C1,C2,C3+S1

OBSS SURVEY VIEWING

MPLM INSTALL Step 7 (ROBOTICS, MPLM OPS)

MET 002/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/15(259)

16:00

17:00

18:00

19:00

20:00

MET

Day 002E W Z

TDRS

ORB

43

44

45

46

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #3 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

MEAL

CWC TRANSFER Xfer 2 CWC bags to ISS

PAO VOICE CHECK/EVENT (A/G) REF MSG ###

~

KELLY

MEAL

OBSS SURVEY

~

MPLM INSTALL (ROBOTICS, MPLM OPS) Steps 3-5 NOTE: NO Exercise

MPLM INSTALL Step 6 (ROBOTICS, MPLM OPS)

MATED MPLM UNGRAPPLE (ROBOTICS, MPLM OPS)

MEAL

WS4 MBS PDGF 1 GRAPPLE (ROBOTICS, SRMS SURVEY SPT)

LAB PDGF UNGRAPPLE (ROBOTICS, SRMS SURVEY SPT)

MNVR TO SURVEY SUPPORT VIEW POSN (ROBOTICS, SRMS SURVEY SPT)

NOGUCHI

MEAL

N1 CBM CAPTURE/ABLT SSRMS (S&M, NOMINAL) Steps 1-3 NOTE: No Exercise

N1 CBM CAPTURE/ABLT SSRMS (S&M, NOMINAL) Steps 4-6 NOTE: No Exercise

N1 CBM VERIFY PREMATE STATUS (S&M, NOMINAL)

TRANSFER Ref. MDDK TRANSFER LIST

~

760 EVA CAMR (PHOTO/TV, DCS 760)

EXERCISE

ROBINSON

MEAL

N1 CBM CAPTURE/ABLT SSRMS (S&M, NOMINAL) Steps 1-3 NOTE: No Exercise

N1 CBM CAPTURE/ABLT SSRMS (S&M, NOMINAL) Steps 4-6 NOTE: No Exercise

N1 CBM VERIFY PREMATE STATUS (S&M, NOMINAL)

PAO VOICE CHECK/EVENT (A/G) REF MSG ###

760 EVA CAMR (PHOTO/TV, DCS 760)

EXERCISE

~

MCC

Page 93: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-35

04

OBSS SURVEY

MPLM INSTALL Step 7 (ROBOTICS, MPLM OPS)

MET 002/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/15(259)

16:00

17:00

18:00

19:00

20:00

MET

Day 002E W Z

TDRS

~ ~

~

ORB

43

44

45

46

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

MEAL

PREBREATHE USING SHUTTLE O2 S/U (JOINT OPS, MATED OPS)

NITROGEN TRANSFER INIT (JOINT OPS, MATED OPS)

~

DOUG REVIEW

OBSS SURVEY

~

LAWRENCE

MPLM INSTALL (ROBOTICS, MPLM OPS) Steps 3-5 NOTE: NO Exercise

MPLM INSTALL Step 6 (ROBOTICS, MPLM OPS)

MPLM VESTIBULE-CONFIG FOR INGRESS (S&M, NOMINAL)

~

N1 TO MPLM VEST PRESS AND LK CK (MPLM, NOMINAL)

MATED MPLM UNGRAPPLE (ROBOTICS, MPLM OPS)

MEAL

MEAL

TRANSFER Ref. MDDK TRANSFER LIST

CAMARDA

N1 NADIR CBCS REMOVAL (S&M, NOMINAL)

MEAL

TRANSFER Ref. MDDK TRANSFER LIST

NITROGEN TRANSFER INIT (JOINT OPS, MATED OPS)

~

~

DOUG REVIEW

MCC

NODE 1 CBM BOLT LOADING (S&M, NOMINAL)

3-35

04

OBSS SURVEY

MPLM INSTALL Step 7 (ROBOTICS, MPLM OPS)

MET 002/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/15(259)

16:00

17:00

18:00

19:00

20:00

MET

Day 002E W Z

TDRS

ORB

43

44

45

46

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

MEAL

PREBREATHE USING SHUTTLE O2 S/U (JOINT OPS, MATED OPS)

NITROGEN TRANSFER INIT (JOINT OPS, MATED OPS)

~

DOUG REVIEW

OBSS SURVEY

~

LAWRENCE

MPLM INSTALL (ROBOTICS, MPLM OPS) Steps 3-5 NOTE: NO Exercise

MPLM INSTALL Step 6 (ROBOTICS, MPLM OPS)

MPLM VESTIBULE-CONFIG FOR INGRESS (S&M, NOMINAL)

~

N1 TO MPLM VEST PRESS AND LK CK (MPLM, NOMINAL)

MATED MPLM UNGRAPPLE (ROBOTICS, MPLM OPS)

MEAL

MEAL

TRANSFER Ref. MDDK TRANSFER LIST

CAMARDA

N1 NADIR CBCS REMOVAL (S&M, NOMINAL)

MEAL

TRANSFER Ref. MDDK TRANSFER LIST

NITROGEN TRANSFER INIT (JOINT OPS, MATED OPS)

~

~

DOUG REVIEW

MCC

NODE 1 CBM BOLT LOADING (S&M, NOMINAL)

Page 94: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-36

04MET 002/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/15(259)

20:00

21:00

22:00

23:00

00:00

MET

Day 002E W Z

TDRS

~ ~

~

ORB

46

47

48

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

OBSS SURVEY VIEWING~

KELLY

OBSS SURVEY~

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

NOGUCHI

REBA POWERED H/W CHECKOUT (ISS EVA SYS, CHECKOUTS)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

EVA 1 TOOL CONFIG (EVA, EVA 1)

TRANSFER SAFER

CIPAA PRE-HEAT (INIT) (EVA, TPS REPAIR PREP) Perform for 2 CIPAAs

TRANSFER Ref. MDDK TRANSFER LIST

~

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

ROBINSON

REBA POWERED H/W CHECKOUT (ISS EVA SYS, CHECKOUTS)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

EVA 1 TOOL CONFIG (EVA, EVA 1)

TRANSFER SAFER

CIPAA PRE-HEAT (INIT) (EVA, TPS REPAIR PREP) Perform for 2 CIPAAs

EXERCISE

~

TRANSFER Ref. MDDK TRANSFER LIST

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

MCC

3-36

04MET 002/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/15(259)

20:00

21:00

22:00

23:00

00:00

MET

Day 002E W Z

TDRS

ORB

46

47

48

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

OBSS SURVEY VIEWING~

KELLY

OBSS SURVEY~

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

NOGUCHI

REBA POWERED H/W CHECKOUT (ISS EVA SYS, CHECKOUTS)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

EVA 1 TOOL CONFIG (EVA, EVA 1)

TRANSFER SAFER

CIPAA PRE-HEAT (INIT) (EVA, TPS REPAIR PREP) Perform for 2 CIPAAs

TRANSFER Ref. MDDK TRANSFER LIST

~

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

ROBINSON

REBA POWERED H/W CHECKOUT (ISS EVA SYS, CHECKOUTS)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

EVA 1 TOOL CONFIG (EVA, EVA 1)

TRANSFER SAFER

CIPAA PRE-HEAT (INIT) (EVA, TPS REPAIR PREP) Perform for 2 CIPAAs

EXERCISE

~

TRANSFER Ref. MDDK TRANSFER LIST

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

MCC

Page 95: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-37

04MET 002/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/15(259)

20:00

21:00

22:00

23:00

00:00

MET

Day 002E W Z

TDRS

~ ~

~

ORB

46

47

48

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

EVA 1 TOOL CONFIG (EVA, EVA 1)

EXERCISE

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

OBSS SURVEY~

LAWRENCE

MPLM S/U FOR TRANSFER Ref. MPLM RESUPPLY XFER LIST

MPLM VESTIBULE-CONFIG FOR INGRESS (S&M, NOMINAL)

~

MPLM INGRESS (MPLM, NOMINAL)

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

CAMARDA

OBSS SURVEY~

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

MCC

MPLM ACTIVATION (MPLM, NOMINAL) STEPS 1-2, 4-8

MPLM ACTIVATION (MPLM, NOMIMAL) STEP 9

3-37

04MET 002/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/15(259)

20:00

21:00

22:00

23:00

00:00

MET

Day 002E W Z

TDRS

ORB

46

47

48

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

EVA 1 TOOL CONFIG (EVA, EVA 1)

EXERCISE

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

OBSS SURVEY~

LAWRENCE

MPLM S/U FOR TRANSFER Ref. MPLM RESUPPLY XFER LIST

MPLM VESTIBULE-CONFIG FOR INGRESS (S&M, NOMINAL)

~

MPLM INGRESS (MPLM, NOMINAL)

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

CAMARDA

OBSS SURVEY~

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

MCC

MPLM ACTIVATION (MPLM, NOMINAL) STEPS 1-2, 4-8

MPLM ACTIVATION (MPLM, NOMIMAL) STEP 9

Page 96: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-38

04MET 003/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/15(259)

00:00

01:00

02:00

03:00

04:00

MET

Day 003E W Z

TDRS

~

~

~

~

ORB

49

50

51

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

EXERCISE

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

KELLY

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

SAFER CHECKOUT (ISS EVA SYS, CHECKOUTS)

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

ROBINSON

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SAFER CHECKOUT (ISS EVA SYS, CHECKOUTS)

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

MCC

OCA-PMC

3-38

04MET 003/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/15(259)

00:00

01:00

02:00

03:00

04:00

MET

Day 003E W Z

TDRS

ORB

49

50

51

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

EXERCISE

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

KELLY

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

SAFER CHECKOUT (ISS EVA SYS, CHECKOUTS)

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

ROBINSON

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SAFER CHECKOUT (ISS EVA SYS, CHECKOUTS)

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

MCC

OCA-PMC

Page 97: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-39

04

√ HUM SEP FOR H20 ACCUMULATION

MET 003/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/15(259)

00:00

01:00

02:00

03:00

04:00

MET

Day 003E W Z

TDRS

~

~

~

~

ORB

49

50

51

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

LAWRENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

WITH MEAL: RENAL STONE (ORB OPS)

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY STS/ISS CREW TRANSFER TAGUP

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

MCC

3-39

04

√ HUM SEP FOR H20 ACCUMULATION

MET 003/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/15(259)

00:00

01:00

02:00

03:00

04:00

MET

Day 003E W Z

TDRS

ORB

49

50

51

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

LAWRENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

WITH MEAL: RENAL STONE (ORB OPS)

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY STS/ISS CREW TRANSFER TAGUP

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 1 BRIEFING CARD (EVA, EVA 1)

~

MCC

Page 98: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-40

04MET 003/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/16(260)

04:00

05:00

06:00

07:00

08:00

MET

Day 003E W Z

TDRS

~

~

~

~

ORB

51

52

53

54

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-40

04MET 003/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/16(260)

04:00

05:00

06:00

07:00

08:00

MET

Day 003E W Z

TDRS

ORB

51

52

53

54

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 99: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-41

04MET 003/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/16(260)

04:00

05:00

06:00

07:00

08:00

MET

Day 003E W Z

TDRS

~

~

~

~

ORB

51

52

53

54

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-41

04MET 003/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/16(260)

04:00

05:00

06:00

07:00

08:00

MET

Day 003E W Z

TDRS

ORB

51

52

53

54

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 100: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-42

04MET 003/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/16(260)

08:00

09:00

10:00

11:00

12:00

MET

Day 003E W Z

TDRS

~

~ ~

~

ORB

54

55

56

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-42

04MET 003/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/16(260)

08:00

09:00

10:00

11:00

12:00

MET

Day 003E W Z

TDRS

ORB

54

55

56

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 101: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-43

04MET 003/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/16(260)

08:00

09:00

10:00

11:00

12:00

MET

Day 003E W Z

TDRS

~

~ ~

~

ORB

54

55

56

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-43

04MET 003/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/16(260)

08:00

09:00

10:00

11:00

12:00

MET

Day 003E W Z

TDRS

ORB

54

55

56

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 102: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-44

FD05 EZ ACTIVITIES

05

FD05HARD REBOOT PGSCsOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)

CIPAA PRE-HEAT (TERM) (EVA, TPS REPAIR PREP)

CIPAA PRE-HEAT (TERM) (EVA, TPS REPAIR PREP)

MET 003/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/16(260)

12:00

13:00

14:00

15:00

16:00

MET

Day 003E W Z

TDRS

~

~

~

~

ORB

56

57

58

59

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

06 UHF MODE - OFF A/G PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

IMU STAR OF OPTY ALIGN (ORB OPS)

KELLY

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SALIVA COLLECT (ORB OPS, DSO)

EVA COMM CONFIG (ISS EVA SYS, EVA PREP/POST)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOGUCHI

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

ROBINSON

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

3-44

FD05 EZ ACTIVITIES

05

FD05HARD REBOOT PGSCsOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)

CIPAA PRE-HEAT (TERM) (EVA, TPS REPAIR PREP)

CIPAA PRE-HEAT (TERM) (EVA, TPS REPAIR PREP)

MET 003/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/16(260)

12:00

13:00

14:00

15:00

16:00

MET

Day 003E W Z

TDRS

ORB

56

57

58

59

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

06 UHF MODE - OFF A/G PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

IMU STAR OF OPTY ALIGN (ORB OPS)

KELLY

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SALIVA COLLECT (ORB OPS, DSO)

EVA COMM CONFIG (ISS EVA SYS, EVA PREP/POST)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOGUCHI

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

ROBINSON

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

Page 103: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-45

FD05

05

MET 003/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/16(260)

12:00

13:00

14:00

15:00

16:00

MET

Day 003E W Z

TDRS

~

~

~

~

ORB

56

57

58

59

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

SHUTTLE LEH CONFIG FOR EVA P/B ON ISS (ISS EVA SYS, EVA PREP/POST)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

TRANSFER REVIEW Update MASTER Xfer list

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

P/TV07 EVA (SETUP) (PHOTO/TV, SCENES)CONFIG DTV FOR DNLKL10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER REVIEW Update MASTER Xfer list

TRANSFER Ref. MPLM TRANSFER LIST

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

MCC

3-45

FD05

05

MET 003/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/16(260)

12:00

13:00

14:00

15:00

16:00

MET

Day 003E W Z

TDRS

ORB

56

57

58

59

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

SHUTTLE LEH CONFIG FOR EVA P/B ON ISS (ISS EVA SYS, EVA PREP/POST)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

TRANSFER REVIEW Update MASTER Xfer list

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

P/TV07 EVA (SETUP) (PHOTO/TV, SCENES)CONFIG DTV FOR DNLKL10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER REVIEW Update MASTER Xfer list

TRANSFER Ref. MPLM TRANSFER LIST

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

MCC

Page 104: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-46

05

UPLINKβ 0° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX E1-52<AZ<-10-65<EL<1

C1,C2,C3+E1

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

MET 003/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/16(260)

16:00

17:00

18:00

19:00

20:00

MET

Day 003E W Z

TDRS

~

~ ~

ORB

59

60

61

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

EVA 1 INHIBIT PAD (EVA, EVA 1)

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #4 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

EXERCISE

KELLY

DTO EVA SETUP (ROBOTICS, TILE RPR DTO EVA SPT)

WS4 MBS PDGF 1 UNGRAPPLE (ROBOTICS, TILE RPR DTO EVA SPT)

LAB PDGF GRAPPLE (ROBOTICS, TILE RPR DTO EVA SPT)

EVA - TILE REPAIR DTO (ROBOTICS, TILE RPR DTO EVA SPT)

~

NOGUCHI

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

EVA 1 EGRESS/SETUP (EVA, EVA 1)

~

PAYLOAD BAY SETUP (EVA, EVA 1)

~

ROBINSON

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

EVA 1 EGRESS/SETUP (EVA, EVA 1)

~

PAYLOAD BAY SETUP (EVA, EVA 1)

~

MCC

3-46

05

UPLINKβ 0° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX E1-52<AZ<-10-65<EL<1

C1,C2,C3+E1

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

MET 003/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/16(260)

16:00

17:00

18:00

19:00

20:00

MET

Day 003E W Z

TDRS

ORB

59

60

61

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

EVA 1 INHIBIT PAD (EVA, EVA 1)

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #4 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

EXERCISE

KELLY

DTO EVA SETUP (ROBOTICS, TILE RPR DTO EVA SPT)

WS4 MBS PDGF 1 UNGRAPPLE (ROBOTICS, TILE RPR DTO EVA SPT)

LAB PDGF GRAPPLE (ROBOTICS, TILE RPR DTO EVA SPT)

EVA - TILE REPAIR DTO (ROBOTICS, TILE RPR DTO EVA SPT)

~

NOGUCHI

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

EVA 1 EGRESS/SETUP (EVA, EVA 1)

~

PAYLOAD BAY SETUP (EVA, EVA 1)

~

ROBINSON

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

EVA 1 EGRESS/SETUP (EVA, EVA 1)

~

PAYLOAD BAY SETUP (EVA, EVA 1)

~

MCC

Page 105: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-47

05

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

MET 003/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/16(260)

16:00

17:00

18:00

19:00

20:00

MET

Day 003E W Z

TDRS

~

~ ~

ORB

59

60

61

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

IVA SUPPORT FOR EVA

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

~

LAWRENCE

DTO EVA SETUP (ROBOTICS, TILE RPR DTO EVA SPT)

WS4 MBS PDGF 1 UNGRAPPLE (ROBOTICS, TILE RPR DTO EVA SPT)

LAB PDGF GRAPPLE (ROBOTICS, TILE RPR DTO EVA SPT)

EVA - TILE REPAIR DTO (ROBOTICS, TILE RPR DTO EVA SPT)

~

CAMARDA

EXERCISE

TRANSFER Ref. MPLM TRANSFER LIST

TRANSFER Ref. MPLM TRANSFER LIST

~

MCC

EVA 1 INHIBIT PAD (EVA, EVA 1)

3-47

05

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

MET 003/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/16(260)

16:00

17:00

18:00

19:00

20:00

MET

Day 003E W Z

TDRS

ORB

59

60

61

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

IVA SUPPORT FOR EVA

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

~

LAWRENCE

DTO EVA SETUP (ROBOTICS, TILE RPR DTO EVA SPT)

WS4 MBS PDGF 1 UNGRAPPLE (ROBOTICS, TILE RPR DTO EVA SPT)

LAB PDGF GRAPPLE (ROBOTICS, TILE RPR DTO EVA SPT)

EVA - TILE REPAIR DTO (ROBOTICS, TILE RPR DTO EVA SPT)

~

CAMARDA

EXERCISE

TRANSFER Ref. MPLM TRANSFER LIST

TRANSFER Ref. MPLM TRANSFER LIST

~

MCC

EVA 1 INHIBIT PAD (EVA, EVA 1)

Page 106: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-48

05

PAYLOAD BAY SETUP (EVA, EVA 1)

PAYLOAD BAY SETUP (EVA, EVA 1)

MET 003/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/16(260)

20:00

21:00

22:00

23:00

00:00

MET

Day 003E W Z

TDRS

~

~ ~

ORB

62

63

64

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters and clean as necessary

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #5 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

MEAL

CWC TRANSFER Xfer 2 CWC bags to ISS

KELLY

EVA - TILE REPAIR DTO (ROBOTICS, TILE RPR DTO EVA SPT)

~

NOGUCHI

CLEANUP/INGRESS (EVA, EVA 1)

~

REPAIR SAMPLES (EVA, EVA 1)

~

PAYLOAD BAY CLEANUP (EVA, EVA 1)

ROBINSON

CLEANUP/INGRESS (EVA, EVA 1)

~

REPAIR SAMPLES (EVA, EVA 1)

~

PAYLOAD BAY CLEANUP (EVA, EVA 1)

MCC

3-48

05

PAYLOAD BAY SETUP (EVA, EVA 1)

PAYLOAD BAY SETUP (EVA, EVA 1)

MET 003/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/16(260)

20:00

21:00

22:00

23:00

00:00

MET

Day 003E W Z

TDRS

ORB

62

63

64

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters and clean as necessary

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #5 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

MEAL

CWC TRANSFER Xfer 2 CWC bags to ISS

KELLY

EVA - TILE REPAIR DTO (ROBOTICS, TILE RPR DTO EVA SPT)

~

NOGUCHI

CLEANUP/INGRESS (EVA, EVA 1)

~

REPAIR SAMPLES (EVA, EVA 1)

~

PAYLOAD BAY CLEANUP (EVA, EVA 1)

ROBINSON

CLEANUP/INGRESS (EVA, EVA 1)

~

REPAIR SAMPLES (EVA, EVA 1)

~

PAYLOAD BAY CLEANUP (EVA, EVA 1)

MCC

Page 107: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-49

05MET 003/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/16(260)

20:00

21:00

22:00

23:00

00:00

MET

Day 003E W Z

TDRS

~

~ ~

ORB

62

63

64

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

IVA SUPPORT FOR EVA

~

~

LAWRENCE

EVA - TILE REPAIR DTO (ROBOTICS, TILE RPR DTO EVA SPT)

~

CAMARDA

MEAL

TRANSFER Ref. MPLM TRANSFER LIST

~

MCC

3-49

05MET 003/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/16(260)

20:00

21:00

22:00

23:00

00:00

MET

Day 003E W Z

TDRS

ORB

62

63

64

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

IVA SUPPORT FOR EVA

~

~

LAWRENCE

EVA - TILE REPAIR DTO (ROBOTICS, TILE RPR DTO EVA SPT)

~

CAMARDA

MEAL

TRANSFER Ref. MPLM TRANSFER LIST

~

MCC

Page 108: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-50

05

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX O1-35<AZ<-10-45<EL<-18

C1,C2,C3+O1

MET 004/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/16(260)

00:00

01:00

02:00

03:00

04:00

MET

Day 004E W Z

TDRS

~

~

~

~

ORB

64

65

66

67

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PWR FILL (ORB OPS, ECLS)

KELLY

EVA COMM DECONFIG (ISS EVA SYS, CHECKOUTS)

CMG R&R EVA SETUP (ROBOTICS, CMG R&R EVA SPT)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

CLEANUP/INGRESS (EVA, EVA 1)

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Do not perform: EMU WATER RECHARGE Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

ROBINSON

CLEANUP/INGRESS (EVA, EVA 1)

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Do not perform: EMU WATER RECHARGE Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

OCA-PMC

3-50

05

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX O1-35<AZ<-10-45<EL<-18

C1,C2,C3+O1

MET 004/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/16(260)

00:00

01:00

02:00

03:00

04:00

MET

Day 004E W Z

TDRS

ORB

64

65

66

67

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PWR FILL (ORB OPS, ECLS)

KELLY

EVA COMM DECONFIG (ISS EVA SYS, CHECKOUTS)

CMG R&R EVA SETUP (ROBOTICS, CMG R&R EVA SPT)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

CLEANUP/INGRESS (EVA, EVA 1)

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Do not perform: EMU WATER RECHARGE Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

ROBINSON

CLEANUP/INGRESS (EVA, EVA 1)

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Do not perform: EMU WATER RECHARGE Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

OCA-PMC

Page 109: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-51

05MET 004/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/16(260)

00:00

01:00

02:00

03:00

04:00

MET

Day 004E W Z

TDRS

~

~

~

~

ORB

64

65

66

67

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

BSA BATTERY RECHARGE INIT (ISS EVA SYS, BATTERY OPS)

IVA SUPPORT FOR EVA

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Do not perform: EMU WATER RECHARGE Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EMU METOX/LIOH/BATTERY REPLACE (ISS EVA SYS, EMU MAINT)

LAWRENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY TRANSFER BRIEFING

DAILY STS/ISS CREW TRANSFER TAGUP

WITH MEAL: RENAL STONE (ORB OPS)

CMG R&R EVA SETUP (ROBOTICS, CMG R&R EVA SPT)

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY STS/ISS CREW TRANSFER TAGUP

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER Ref. MPLM TRANSFER LIST

~

MCC

3-51

05MET 004/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/16(260)

00:00

01:00

02:00

03:00

04:00

MET

Day 004E W Z

TDRS

ORB

64

65

66

67

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

BSA BATTERY RECHARGE INIT (ISS EVA SYS, BATTERY OPS)

IVA SUPPORT FOR EVA

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Do not perform: EMU WATER RECHARGE Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EMU METOX/LIOH/BATTERY REPLACE (ISS EVA SYS, EMU MAINT)

LAWRENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY TRANSFER BRIEFING

DAILY STS/ISS CREW TRANSFER TAGUP

WITH MEAL: RENAL STONE (ORB OPS)

CMG R&R EVA SETUP (ROBOTICS, CMG R&R EVA SPT)

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY STS/ISS CREW TRANSFER TAGUP

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER Ref. MPLM TRANSFER LIST

~

MCC

Page 110: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-52

05MET 004/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/17(261)

04:00

05:00

06:00

07:00

08:00

MET

Day 004E W Z

TDRS

~ ~

~

ORB

67

68

69

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-52

05MET 004/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/17(261)

04:00

05:00

06:00

07:00

08:00

MET

Day 004E W Z

TDRS

ORB

67

68

69

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 111: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-53

05MET 004/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/17(261)

04:00

05:00

06:00

07:00

08:00

MET

Day 004E W Z

TDRS

~ ~

~

ORB

67

68

69

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-53

05MET 004/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/17(261)

04:00

05:00

06:00

07:00

08:00

MET

Day 004E W Z

TDRS

ORB

67

68

69

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 112: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-54

05MET 004/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/17(261)

08:00

09:00

10:00

11:00

12:00

MET

Day 004E W Z

TDRS

~ ~

~

ORB

69

70

71

72

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-54

05MET 004/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/17(261)

08:00

09:00

10:00

11:00

12:00

MET

Day 004E W Z

TDRS

ORB

69

70

71

72

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 113: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-55

05MET 004/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/17(261)

08:00

09:00

10:00

11:00

12:00

MET

Day 004E W Z

TDRS

~ ~

~

ORB

69

70

71

72

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-55

05MET 004/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/17(261)

08:00

09:00

10:00

11:00

12:00

MET

Day 004E W Z

TDRS

ORB

69

70

71

72

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 114: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-56

FD06 EZ ACTIVITIES

06

FD06HARD REBOOT PGSCOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)L17 Check MCIU Filter Screen

MET 004/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/17(261)

12:00

13:00

14:00

15:00

16:00

MET

Day 004E W Z

TDRS

~

~

~

~

ORB

72

73

74

75

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

CWC VENTINGPWR OVERBOARD DUMP (ORB OPS, ECLS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

H/O ATT CONTROL CMG TA to ORB (JOINT OPS, MATED OPS)

IMU STAR OF OPTY ALIGN (ORB OPS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CWC VENTINGPWR OVERBOARD DUMP (ORB OPS, ECLS)

~

SALIVA COLLECT (ORB OPS, DSO)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOGUCHI

TAKE 1 ASPIRIN (325mg) EMU WATER RECHARGEEMU POWERDOWN (ISS EVA SYS, EMU MAINT)

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

TPS EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

ROBINSON

TAKE 1 ASPIRIN (325mg) EMU WATER RECHARGEEMU POWERDOWN (ISS EVA SYS, EMU MAINT)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

TPS EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

MCC

3-56

FD06 EZ ACTIVITIES

06

FD06HARD REBOOT PGSCOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)L17 Check MCIU Filter Screen

MET 004/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/17(261)

12:00

13:00

14:00

15:00

16:00

MET

Day 004E W Z

TDRS

ORB

72

73

74

75

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

CWC VENTINGPWR OVERBOARD DUMP (ORB OPS, ECLS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

H/O ATT CONTROL CMG TA to ORB (JOINT OPS, MATED OPS)

IMU STAR OF OPTY ALIGN (ORB OPS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CWC VENTINGPWR OVERBOARD DUMP (ORB OPS, ECLS)

~

SALIVA COLLECT (ORB OPS, DSO)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOGUCHI

TAKE 1 ASPIRIN (325mg) EMU WATER RECHARGEEMU POWERDOWN (ISS EVA SYS, EMU MAINT)

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

TPS EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

ROBINSON

TAKE 1 ASPIRIN (325mg) EMU WATER RECHARGEEMU POWERDOWN (ISS EVA SYS, EMU MAINT)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

TPS EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

MCC

Page 115: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-57

06

FD06

MET 004/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/17(261)

12:00

13:00

14:00

15:00

16:00

MET

Day 004E W Z

TDRS

~

~

~

~

ORB

72

73

74

75

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER Ref. MPLM TRANSFER LIST

~

LAWRENCE

TRANSFER REVIEW Update MASTER Xfer list

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER Ref. MPLM TRANSFER LIST

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER REVIEW Update MASTER Xfer list

TRANSFER Ref. MPLM TRANSFER LIST

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

WLES CRU BATTERY CHANGEOUT (ORB OPS, WLE SENSORS)

MCC

3-57

06

FD06

MET 004/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/17(261)

12:00

13:00

14:00

15:00

16:00

MET

Day 004E W Z

TDRS

ORB

72

73

74

75

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER Ref. MPLM TRANSFER LIST

~

LAWRENCE

TRANSFER REVIEW Update MASTER Xfer list

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER Ref. MPLM TRANSFER LIST

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER REVIEW Update MASTER Xfer list

TRANSFER Ref. MPLM TRANSFER LIST

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

WLES CRU BATTERY CHANGEOUT (ORB OPS, WLE SENSORS)

MCC

Page 116: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-58

06

Minerals and/or Ag Biocide are req'd.Samples are/are not req'd.Fill Duration: 56 minutes.

A

MET 004/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/17(261)

16:00

17:00

18:00

19:00

20:00

MET

Day 004E W Z

TDRS

~

~ ~

~

ORB

75

76

77

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

CABIN TEMP CNTL RECONFIG 2(1)(ORB OPS, ECLS)

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) CHANGEOUT, STEPS 1-6

SHUTTLE/ISS H2O CONT FILL A (ORB OPS, ECLS) INIT #7

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #6 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

HTR RCNFG-CNFG B (ORB OPS, EPS)

RCS REG RCNFG (ORB OPS, RCS)√ WCS hose block filter

PUBLIC AFFAIRS EVENTKU AVAIL TDRS XX:XX-XX:XX REF MSG ###

H/O ATT CONTROL ORB to RS (JOINT OPS, CONTINGENCY)

KELLY

CWC VENTINGPWR OVERBOARD DUMP (ORB OPS, ECLS)

~

TRANSFER Ref. MPLM TRANSFER LIST

PUBLIC AFFAIRS EVENT

TRANSFER Ref. MPLM TRANSFER LIST

NOGUCHI

METOX REGENERATION TERM (ISS EVA SYS, EMU MAINT)

EVA 2 TOOL CONFIG (EVA, EVA 2)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

TPS EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

760 EVA CAMR (PHOTO/TV, DCS 760)

ROBINSON

EVA 2 TOOL CONFIG (EVA, EVA 2)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

TPS EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

760 EVA CAMR (PHOTO/TV, DCS 760)

MCC

3-58

06

Minerals and/or Ag Biocide are req'd.Samples are/are not req'd.Fill Duration: 56 minutes.

A

MET 004/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/17(261)

16:00

17:00

18:00

19:00

20:00

MET

Day 004E W Z

TDRS

ORB

75

76

77

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

CABIN TEMP CNTL RECONFIG 2(1)(ORB OPS, ECLS)

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) CHANGEOUT, STEPS 1-6

SHUTTLE/ISS H2O CONT FILL A (ORB OPS, ECLS) INIT #7

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #6 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

HTR RCNFG-CNFG B (ORB OPS, EPS)

RCS REG RCNFG (ORB OPS, RCS)√ WCS hose block filter

PUBLIC AFFAIRS EVENTKU AVAIL TDRS XX:XX-XX:XX REF MSG ###

H/O ATT CONTROL ORB to RS (JOINT OPS, CONTINGENCY)

KELLY

CWC VENTINGPWR OVERBOARD DUMP (ORB OPS, ECLS)

~

TRANSFER Ref. MPLM TRANSFER LIST

PUBLIC AFFAIRS EVENT

TRANSFER Ref. MPLM TRANSFER LIST

NOGUCHI

METOX REGENERATION TERM (ISS EVA SYS, EMU MAINT)

EVA 2 TOOL CONFIG (EVA, EVA 2)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

TPS EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

760 EVA CAMR (PHOTO/TV, DCS 760)

ROBINSON

EVA 2 TOOL CONFIG (EVA, EVA 2)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

TPS EVA TOOL TRANSFER (EVA, AIRLOCK CONFIG)

~

760 EVA CAMR (PHOTO/TV, DCS 760)

MCC

Page 117: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-59

06MET 004/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/17(261)

16:00

17:00

18:00

19:00

20:00

MET

Day 004E W Z

TDRS

~

~ ~

~

ORB

75

76

77

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

TRANSFER Ref. MPLM TRANSFER LIST

~

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

EVA 2 TOOL CONFIG (EVA, EVA 2)

LAWRENCE

EXERCISE

TRANSFER Ref. MPLM TRANSFER LIST

~

DIGITAL PAO CC (PHOTO/TV, SONY PD100)

TRANSFER Ref. MPLM TRANSFER LIST

CAMARDA

EXERCISE

TRANSFER Ref. MPLM TRANSFER LIST

~

TRANSFER Ref. MPLM TRANSFER LIST

PUBLIC AFFAIRS EVENT

MCC

3-59

06MET 004/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/17(261)

16:00

17:00

18:00

19:00

20:00

MET

Day 004E W Z

TDRS

ORB

75

76

77

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

TRANSFER Ref. MPLM TRANSFER LIST

~

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

EVA 2 TOOL CONFIG (EVA, EVA 2)

LAWRENCE

EXERCISE

TRANSFER Ref. MPLM TRANSFER LIST

~

DIGITAL PAO CC (PHOTO/TV, SONY PD100)

TRANSFER Ref. MPLM TRANSFER LIST

CAMARDA

EXERCISE

TRANSFER Ref. MPLM TRANSFER LIST

~

TRANSFER Ref. MPLM TRANSFER LIST

PUBLIC AFFAIRS EVENT

MCC

Page 118: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-60

06MET 004/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/17(261)

20:00

21:00

22:00

23:00

00:00

MET

Day 004E W Z

TDRS

~

~

~

~

ORB

77

78

79

80

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

EXERCISE

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

PUBLIC AFFAIRS EVENT REF MSG ###

CWC TRANSFER Xfer 2 CWC bags to ISS

MEAL

PWR FILL (ORB OPS, ECLS)

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

KELLY

MEAL

TRANSFER Ref. MPLM TRANSFER LIST

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

NOGUCHI

MEAL

PUBLIC AFFAIRS EVENTKU AVAIL TDRS XX:XX-XX:XX REF MSG ###

TRANSFER Ref. MPLM TRANSFER LIST

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

ROBINSON

MEAL

TRANSFER Ref. MPLM TRANSFER LIST

PUBLIC AFFAIRS EVENTKU AVAIL TDRS XX:XX-XX:XX REF MSG ###

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

MCC

3-60

06MET 004/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/17(261)

20:00

21:00

22:00

23:00

00:00

MET

Day 004E W Z

TDRS

ORB

77

78

79

80

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

EXERCISE

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

PUBLIC AFFAIRS EVENT REF MSG ###

CWC TRANSFER Xfer 2 CWC bags to ISS

MEAL

PWR FILL (ORB OPS, ECLS)

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

KELLY

MEAL

TRANSFER Ref. MPLM TRANSFER LIST

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

NOGUCHI

MEAL

PUBLIC AFFAIRS EVENTKU AVAIL TDRS XX:XX-XX:XX REF MSG ###

TRANSFER Ref. MPLM TRANSFER LIST

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

ROBINSON

MEAL

TRANSFER Ref. MPLM TRANSFER LIST

PUBLIC AFFAIRS EVENTKU AVAIL TDRS XX:XX-XX:XX REF MSG ###

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

MCC

Page 119: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-61

06MET 004/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/17(261)

20:00

21:00

22:00

23:00

00:00

MET

Day 004E W Z

TDRS

~

~

~

~

ORB

77

78

79

80

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

MEAL

TRANSFER Ref. MPLM TRANSFER LIST

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

LAWRENCE

TRANSFER Ref. MPLM TRANSFER LIST

MEAL

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

CAMARDA

MEAL

TRANSFER Ref. MPLM TRANSFER LIST

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

MCC

3-61

06MET 004/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/17(261)

20:00

21:00

22:00

23:00

00:00

MET

Day 004E W Z

TDRS

ORB

77

78

79

80

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

MEAL

TRANSFER Ref. MPLM TRANSFER LIST

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

LAWRENCE

TRANSFER Ref. MPLM TRANSFER LIST

MEAL

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

CAMARDA

MEAL

TRANSFER Ref. MPLM TRANSFER LIST

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

MCC

Page 120: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-62

06MET 005/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/17(261)

00:00

01:00

02:00

03:00

04:00

MET

Day 005E W Z

TDRS

~

~

~

~

ORB

80

81

82

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

KELLY

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

EXERCISE

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

ROBINSON

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

MCC

OCA-PMC

3-62

06MET 005/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/17(261)

00:00

01:00

02:00

03:00

04:00

MET

Day 005E W Z

TDRS

ORB

80

81

82

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

KELLY

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

EXERCISE

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

ROBINSON

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

MCC

OCA-PMC

Page 121: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-63

06MET 005/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/17(261)

00:00

01:00

02:00

03:00

04:00

MET

Day 005E W Z

TDRS

~

~

~

~

ORB

80

81

82

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

LAWRENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY TRANSFER BRIEFING

DAILY STS/ISS CREW TRANSFER TAGUP

WITH MEAL: RENAL STONE (ORB OPS)

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY STS/ISS CREW TRANSFER TAGUP

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

MCC

3-63

06MET 005/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/17(261)

00:00

01:00

02:00

03:00

04:00

MET

Day 005E W Z

TDRS

ORB

80

81

82

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

LAWRENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY TRANSFER BRIEFING

DAILY STS/ISS CREW TRANSFER TAGUP

WITH MEAL: RENAL STONE (ORB OPS)

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY STS/ISS CREW TRANSFER TAGUP

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 2 BRIEFING CARD (EVA, EVA 2)

~

MCC

Page 122: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-64

06MET 005/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/18(262)

04:00

05:00

06:00

07:00

08:00

MET

Day 005E W Z

TDRS

~

~ ~

ORB

83

84

85

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-64

06MET 005/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/18(262)

04:00

05:00

06:00

07:00

08:00

MET

Day 005E W Z

TDRS

ORB

83

84

85

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 123: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-65

06MET 005/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/18(262)

04:00

05:00

06:00

07:00

08:00

MET

Day 005E W Z

TDRS

~

~ ~

ORB

83

84

85

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-65

06MET 005/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/18(262)

04:00

05:00

06:00

07:00

08:00

MET

Day 005E W Z

TDRS

ORB

83

84

85

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 124: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-66

06MET 005/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/18(262)

08:00

09:00

10:00

11:00

12:00

MET

Day 005E W Z

TDRS

~

~ ~

ORB

85

86

87

88

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-66

06MET 005/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/18(262)

08:00

09:00

10:00

11:00

12:00

MET

Day 005E W Z

TDRS

ORB

85

86

87

88

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 125: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-67

06MET 005/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/18(262)

08:00

09:00

10:00

11:00

12:00

MET

Day 005E W Z

TDRS

~

~ ~

ORB

85

86

87

88

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-67

06MET 005/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/18(262)

08:00

09:00

10:00

11:00

12:00

MET

Day 005E W Z

TDRS

ORB

85

86

87

88

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 126: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-68

07

FD07FD07 EZ ACTIVITIESHARD REBOOT PGSCsOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)L17 Check MCIU Filter Screen

BSA BATTERY RECHARGE TERM (ISS EVA SYS, BATTERY OPS)

BSA BATTERY RECHARGE TERM (ISS EVA SYS, BATTERY OPS)

MET 005/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/18(262)

12:00

13:00

14:00

15:00

16:00

MET

Day 005E W Z

TDRS

~

~ ~

ORB

88

89

90

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

06 UHF MODE - OFF A/G PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Waste Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Waste Dump

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

H/O ATT CONTROL CMG TA to ORB (JOINT OPS, MATED OPS)

IMU STAR OF OPTY ALIGN (ORB OPS)

KELLY

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Waste Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Waste Dump

SALIVA COLLECT (ORB OPS, DSO)

EVA COMM CONFIG (ISS EVA SYS, EVA PREP/POST)

NOGUCHI

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

ROBINSON

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

UPDATEH2O WASTEDUMP QTY

UPDATEH2O WASTEDUMP QTY

3-68

07

FD07FD07 EZ ACTIVITIESHARD REBOOT PGSCsOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)L17 Check MCIU Filter Screen

BSA BATTERY RECHARGE TERM (ISS EVA SYS, BATTERY OPS)

BSA BATTERY RECHARGE TERM (ISS EVA SYS, BATTERY OPS)

MET 005/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/18(262)

12:00

13:00

14:00

15:00

16:00

MET

Day 005E W Z

TDRS

ORB

88

89

90

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

06 UHF MODE - OFF A/G PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Waste Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Waste Dump

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

H/O ATT CONTROL CMG TA to ORB (JOINT OPS, MATED OPS)

IMU STAR OF OPTY ALIGN (ORB OPS)

KELLY

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Waste Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Waste Dump

SALIVA COLLECT (ORB OPS, DSO)

EVA COMM CONFIG (ISS EVA SYS, EVA PREP/POST)

NOGUCHI

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

ROBINSON

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

UPDATEH2O WASTEDUMP QTY

UPDATEH2O WASTEDUMP QTY

Page 127: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-69

07

FD07

MET 005/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/18(262)

12:00

13:00

14:00

15:00

16:00

MET

Day 005E W Z

TDRS

~

~ ~

ORB

88

89

90

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

SHUTTLE LEH CONFIG FOR EVA P/B ON ISS (ISS EVA SYS, EVA PREP/POST)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER REVIEW Update MASTER Xfer list

EXERCISE

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER Ref. MPLM TRANSFER LIST

~

TRANSFER REVIEW Update MASTER Xfer list

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

MCC

3-69

07

FD07

MET 005/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/18(262)

12:00

13:00

14:00

15:00

16:00

MET

Day 005E W Z

TDRS

ORB

88

89

90

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

SHUTTLE LEH CONFIG FOR EVA P/B ON ISS (ISS EVA SYS, EVA PREP/POST)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER REVIEW Update MASTER Xfer list

EXERCISE

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER Ref. MPLM TRANSFER LIST

~

TRANSFER REVIEW Update MASTER Xfer list

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

MCC

Page 128: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-70

07

UPLINKβ 0° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX E2-68<AZ<-10-67<EL<4

C1,C2,C3+E2

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

MET 005/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/18(262)

16:00

17:00

18:00

19:00

20:00

MET

Day 005E W Z

TDRS

~

~ ~

ORB

90

91

92

93

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

EVA 2 INHIBIT PAD (EVA, EVA 2)

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #8 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

EXERCISE

H/O ATT CONTROL ORB to RS (JOINT OPS, CONTINGENCY)

KELLY

EVA - CMG R&R (ROBOTICS, CMG R&R EVA SPT)

~

TRANSFER Ref. MPLM TRANSFER LIST

NOGUCHI

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

EVA 2 EGRESS/SETUP (EVA, EVA 2)

~

CMG R&R (EVA, EVA 2)

~

ROBINSON

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

EVA 2 EGRESS/SETUP (EVA, EVA 2)

~

CMG R&R (EVA, EVA 2)

~

MCC

3-70

07

UPLINKβ 0° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX E2-68<AZ<-10-67<EL<4

C1,C2,C3+E2

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

MET 005/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/18(262)

16:00

17:00

18:00

19:00

20:00

MET

Day 005E W Z

TDRS

ORB

90

91

92

93

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

EVA 2 INHIBIT PAD (EVA, EVA 2)

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #8 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

EXERCISE

H/O ATT CONTROL ORB to RS (JOINT OPS, CONTINGENCY)

KELLY

EVA - CMG R&R (ROBOTICS, CMG R&R EVA SPT)

~

TRANSFER Ref. MPLM TRANSFER LIST

NOGUCHI

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

EVA 2 EGRESS/SETUP (EVA, EVA 2)

~

CMG R&R (EVA, EVA 2)

~

ROBINSON

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

EVA 2 EGRESS/SETUP (EVA, EVA 2)

~

CMG R&R (EVA, EVA 2)

~

MCC

Page 129: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-71

07

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST) TRANSFER

Ref. MPLM TRANSFER LIST

MET 005/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/18(262)

16:00

17:00

18:00

19:00

20:00

MET

Day 005E W Z

TDRS

~

~ ~

ORB

90

91

92

93

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

IVA SUPPORT FOR EVA

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

~

LAWRENCE

P/TV07 EVA (SETUP) (PHOTO/TV, SCENES)CONFIG DTV FOR DNLKL10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

TRANSFER Ref. MPLM TRANSFER LIST

EVA - CMG R&R (ROBOTICS, CMG R&R EVA SPT)

~

CAMARDA

EXERCISE

~

MCC

EVA 2 INHIBIT PAD (EVA, EVA 2)

3-71

07

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST) TRANSFER

Ref. MPLM TRANSFER LIST

MET 005/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/18(262)

16:00

17:00

18:00

19:00

20:00

MET

Day 005E W Z

TDRS

ORB

90

91

92

93

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

IVA SUPPORT FOR EVA

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

~

LAWRENCE

P/TV07 EVA (SETUP) (PHOTO/TV, SCENES)CONFIG DTV FOR DNLKL10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

TRANSFER Ref. MPLM TRANSFER LIST

EVA - CMG R&R (ROBOTICS, CMG R&R EVA SPT)

~

CAMARDA

EXERCISE

~

MCC

EVA 2 INHIBIT PAD (EVA, EVA 2)

Page 130: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-72

07MET 005/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/18(262)

20:00

21:00

22:00

23:00

00:00

MET

Day 005E W Z

TDRS

~

~

~

~

ORB

93

94

95

96

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

ON MCC GO:CMG 1 ON-ORBIT CHECKOUT (ASSY OPS, ASSEMBLY)SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #9 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

MEAL

KELLY

ESP2 EVA SETUP (ROBOTICS, ESP2 INSTL EVA SPT)

EVA - CMG R&R (ROBOTICS, CMG R&R EVA SPT)

~

NOGUCHI

CLEANUP/INGRESS (EVA, EVA 2)

~

CMG R&R (EVA, EVA 2)

~

ROBINSON

CLEANUP/INGRESS (EVA, EVA 2)

~

CMG R&R (EVA, EVA 2)

~

MCC

3-72

07MET 005/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/18(262)

20:00

21:00

22:00

23:00

00:00

MET

Day 005E W Z

TDRS

ORB

93

94

95

96

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

ON MCC GO:CMG 1 ON-ORBIT CHECKOUT (ASSY OPS, ASSEMBLY)SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #9 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

MEAL

KELLY

ESP2 EVA SETUP (ROBOTICS, ESP2 INSTL EVA SPT)

EVA - CMG R&R (ROBOTICS, CMG R&R EVA SPT)

~

NOGUCHI

CLEANUP/INGRESS (EVA, EVA 2)

~

CMG R&R (EVA, EVA 2)

~

ROBINSON

CLEANUP/INGRESS (EVA, EVA 2)

~

CMG R&R (EVA, EVA 2)

~

MCC

Page 131: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-73

07MET 005/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/18(262)

20:00

21:00

22:00

23:00

00:00

MET

Day 005E W Z

TDRS

~

~

~

~

ORB

93

94

95

96

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

IVA SUPPORT FOR EVA

~

~

LAWRENCE

ESP2 EVA SETUP (ROBOTICS, ESP2 INSTL EVA SPT)

EVA - CMG R&R (ROBOTICS, CMG R&R EVA SPT)

~

CAMARDA

MEAL

TRANSFER Ref. MPLM TRANSFER LIST

~

MCC

3-73

07MET 005/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/18(262)

20:00

21:00

22:00

23:00

00:00

MET

Day 005E W Z

TDRS

ORB

93

94

95

96

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

IVA SUPPORT FOR EVA

~

~

LAWRENCE

ESP2 EVA SETUP (ROBOTICS, ESP2 INSTL EVA SPT)

EVA - CMG R&R (ROBOTICS, CMG R&R EVA SPT)

~

CAMARDA

MEAL

TRANSFER Ref. MPLM TRANSFER LIST

~

MCC

Page 132: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-74

07

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33

C1,C2,C3

CMG HTR: R1 PL AFT MNC - OFF

√ HUM SEP FOR H20 ACCUMULATION

MET 006/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/18(262)

00:00

01:00

02:00

03:00

04:00

MET

Day 006E W Z

TDRS

~ ~

~

ORB

96

97

98

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CWC TRANSFER Xfer 2 CWC bags to ISS

KELLY

EVA COMM DECONFIG (ISS EVA SYS, CHECKOUTS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

CLEANUP/INGRESS (EVA, EVA 2)

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Do not perform: EMU WATER RECHARGE Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

ROBINSON

CLEANUP/INGRESS (EVA, EVA 2)

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Do not perform: EMU WATER RECHARGE Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

OCA-PMC

3-74

07

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33

C1,C2,C3

CMG HTR: R1 PL AFT MNC - OFF

√ HUM SEP FOR H20 ACCUMULATION

MET 006/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/18(262)

00:00

01:00

02:00

03:00

04:00

MET

Day 006E W Z

TDRS

ORB

96

97

98

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CWC TRANSFER Xfer 2 CWC bags to ISS

KELLY

EVA COMM DECONFIG (ISS EVA SYS, CHECKOUTS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

CLEANUP/INGRESS (EVA, EVA 2)

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Do not perform: EMU WATER RECHARGE Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

ROBINSON

CLEANUP/INGRESS (EVA, EVA 2)

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Do not perform: EMU WATER RECHARGE Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

OCA-PMC

Page 133: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-75

07

DAILY STS/ISS CREW TRANSFER TAGUP

MET 006/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/18(262)

00:00

01:00

02:00

03:00

04:00

MET

Day 006E W Z

TDRS

~ ~

~

ORB

96

97

98

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

IVA SUPPORT FOR EVA

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Do not perform: EMU WATER RECHARGE Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

WITH MEAL: RENAL STONE (ORB OPS)

CAMARDA

TRANSFER Ref. MPLM TRANSFER LIST

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY STS/ISS CREW TRANSFER TAGUP

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

3-75

07

DAILY STS/ISS CREW TRANSFER TAGUP

MET 006/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/18(262)

00:00

01:00

02:00

03:00

04:00

MET

Day 006E W Z

TDRS

ORB

96

97

98

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

IVA SUPPORT FOR EVA

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Do not perform: EMU WATER RECHARGE Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

WITH MEAL: RENAL STONE (ORB OPS)

CAMARDA

TRANSFER Ref. MPLM TRANSFER LIST

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY STS/ISS CREW TRANSFER TAGUP

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

Page 134: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-76

07MET 006/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/19(263)

04:00

05:00

06:00

07:00

08:00

MET

Day 006E W Z

TDRS

~ ~

~

ORB

98

99

100

101

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-76

07MET 006/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/19(263)

04:00

05:00

06:00

07:00

08:00

MET

Day 006E W Z

TDRS

ORB

98

99

100

101

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 135: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-77

07MET 006/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/19(263)

04:00

05:00

06:00

07:00

08:00

MET

Day 006E W Z

TDRS

~ ~

~

ORB

98

99

100

101

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-77

07MET 006/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/19(263)

04:00

05:00

06:00

07:00

08:00

MET

Day 006E W Z

TDRS

ORB

98

99

100

101

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 136: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-78

07MET 006/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/19(263)

08:00

09:00

10:00

11:00

12:00

MET

Day 006E W Z

TDRS

~

~

~

~

ORB

101

102

103

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-78

07MET 006/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/19(263)

08:00

09:00

10:00

11:00

12:00

MET

Day 006E W Z

TDRS

ORB

101

102

103

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 137: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-79

07MET 006/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/19(263)

08:00

09:00

10:00

11:00

12:00

MET

Day 006E W Z

TDRS

~

~

~

~

ORB

101

102

103

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-79

07MET 006/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/19(263)

08:00

09:00

10:00

11:00

12:00

MET

Day 006E W Z

TDRS

ORB

101

102

103

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 138: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-80

FD08 EZ ACTIVITIES

08

FD08HARD REBOOT PGSCOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)

MET 006/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/19(263)

12:00

13:00

14:00

15:00

16:00

MET

Day 006E W Z

TDRS

~

~

~

ORB

104

105

106

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PWR FILL (ORB OPS, ECLS)

PWR FILL (ORB OPS, ECLS)

IMU STAR OF OPTY ALIGN (ORB OPS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SALIVA COLLECT (ORB OPS, DSO)

EXERCISE

TRANSFER Ref. MPLM TRANSFER LIST

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOGUCHI

TAKE 1 ASPIRIN (325mg) EMU WATER RECHARGEEMU POWERDOWN (ISS EVA SYS, EMU MAINT)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

~

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

ROBINSON

TAKE 1 ASPIRIN (325mg) EMU WATER RECHARGEEMU POWERDOWN (ISS EVA SYS, EMU MAINT)

EXERCISE

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

3-80

FD08 EZ ACTIVITIES

08

FD08HARD REBOOT PGSCOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)

MET 006/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/19(263)

12:00

13:00

14:00

15:00

16:00

MET

Day 006E W Z

TDRS

ORB

104

105

106

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PWR FILL (ORB OPS, ECLS)

PWR FILL (ORB OPS, ECLS)

IMU STAR OF OPTY ALIGN (ORB OPS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SALIVA COLLECT (ORB OPS, DSO)

EXERCISE

TRANSFER Ref. MPLM TRANSFER LIST

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOGUCHI

TAKE 1 ASPIRIN (325mg) EMU WATER RECHARGEEMU POWERDOWN (ISS EVA SYS, EMU MAINT)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

~

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

ROBINSON

TAKE 1 ASPIRIN (325mg) EMU WATER RECHARGEEMU POWERDOWN (ISS EVA SYS, EMU MAINT)

EXERCISE

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

Page 139: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-81

FD08

08MET 006/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/19(263)

12:00

13:00

14:00

15:00

16:00

MET

Day 006E W Z

TDRS

~

~

~

ORB

104

105

106

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

~

EMU METOX/LIOH/BATTERY REPLACE (ISS EVA SYS, EMU MAINT)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

TRANSFER REVIEW Update MASTER Xfer list

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER REVIEW Update MASTER Xfer list

TRANSFER Ref. MPLM TRANSFER LIST

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

MCC

3-81

FD08

08MET 006/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/19(263)

12:00

13:00

14:00

15:00

16:00

MET

Day 006E W Z

TDRS

ORB

104

105

106

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

~

EMU METOX/LIOH/BATTERY REPLACE (ISS EVA SYS, EMU MAINT)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

TRANSFER REVIEW Update MASTER Xfer list

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER REVIEW Update MASTER Xfer list

TRANSFER Ref. MPLM TRANSFER LIST

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

MCC

Page 140: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-82

08MET 006/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/19(263)

16:00

17:00

18:00

19:00

20:00

MET

Day 006E W Z

TDRS

~

~

~

ORB

106

107

108

109

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

CREW CONFERENCE Ref. MSG ###

CREW PHOTO

EXERCISE

FILTER CLEANING (IFM, SCHED MAINT) Inspect filters and clean as necessary

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #10 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCCCWC TRANSFER Xfer 1 CWC bag to ISS

PWR FILL (ORB OPS, ECLS)

KELLY

CREW CONFERENCE Ref. MSG ###

CREW PHOTO

TRANSFER Ref. MPLM TRANSFER LIST

~

NOGUCHI

CREW CONFERENCE Ref. MSG ###

CREW PHOTO

METOX REGENERATION TERM (ISS EVA SYS, EMU MAINT)

EVA 3 TOOL CONFIG (EVA, EVA 3)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

~

DIGITAL PAO CC (PHOTO/TV, SONY PD100)

760 EVA CAMR (PHOTO/TV, DCS 760)

TRANSFER Ref. MPLM TRANSFER LIST

ROBINSON

CREW CONFERENCE Ref. MSG ###

CREW PHOTO

EVA 3 TOOL CONFIG (EVA, EVA 3)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

~

760 EVA CAMR (PHOTO/TV, DCS 760)

TRANSFER Ref. MPLM TRANSFER LIST

MCC

3-82

08MET 006/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/19(263)

16:00

17:00

18:00

19:00

20:00

MET

Day 006E W Z

TDRS

ORB

106

107

108

109

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

CREW CONFERENCE Ref. MSG ###

CREW PHOTO

EXERCISE

FILTER CLEANING (IFM, SCHED MAINT) Inspect filters and clean as necessary

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #10 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCCCWC TRANSFER Xfer 1 CWC bag to ISS

PWR FILL (ORB OPS, ECLS)

KELLY

CREW CONFERENCE Ref. MSG ###

CREW PHOTO

TRANSFER Ref. MPLM TRANSFER LIST

~

NOGUCHI

CREW CONFERENCE Ref. MSG ###

CREW PHOTO

METOX REGENERATION TERM (ISS EVA SYS, EMU MAINT)

EVA 3 TOOL CONFIG (EVA, EVA 3)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

~

DIGITAL PAO CC (PHOTO/TV, SONY PD100)

760 EVA CAMR (PHOTO/TV, DCS 760)

TRANSFER Ref. MPLM TRANSFER LIST

ROBINSON

CREW CONFERENCE Ref. MSG ###

CREW PHOTO

EVA 3 TOOL CONFIG (EVA, EVA 3)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

~

760 EVA CAMR (PHOTO/TV, DCS 760)

TRANSFER Ref. MPLM TRANSFER LIST

MCC

Page 141: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-83

08MET 006/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/19(263)

16:00

17:00

18:00

19:00

20:00

MET

Day 006E W Z

TDRS

~

~

~

ORB

106

107

108

109

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EVA 3 TOOL CONFIG (EVA, EVA 3)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

~

CREW CONFERENCE Ref. MSG ###

CREW PHOTO

TRANSFER Ref. MPLM TRANSFER LIST

LAWRENCE

CREW CONFERENCE Ref. MSG ###

CREW PHOTO

TRANSFER Ref. MPLM TRANSFER LIST

CAMARDA

CREW CONFERENCE Ref. MSG ###

CREW PHOTO

EXERCISE

TRANSFER Ref. MPLM TRANSFER LIST

~

MCC

3-83

08MET 006/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/19(263)

16:00

17:00

18:00

19:00

20:00

MET

Day 006E W Z

TDRS

ORB

106

107

108

109

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EVA 3 TOOL CONFIG (EVA, EVA 3)

EQUIPMENT LOCK PREP (ISS EVA SYS, AIRLOCK CONFIG)

~

CREW CONFERENCE Ref. MSG ###

CREW PHOTO

TRANSFER Ref. MPLM TRANSFER LIST

LAWRENCE

CREW CONFERENCE Ref. MSG ###

CREW PHOTO

TRANSFER Ref. MPLM TRANSFER LIST

CAMARDA

CREW CONFERENCE Ref. MSG ###

CREW PHOTO

EXERCISE

TRANSFER Ref. MPLM TRANSFER LIST

~

MCC

Page 142: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-84

08MET 006/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/19(263)

20:00

21:00

22:00

23:00

00:00

MET

Day 006E W Z

TDRS

~

~

~

~

ORB

109

110

111

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

MEAL

OFF DUTY

PUBLIC AFFAIRS EVENT (JAXA)KU AVAIL TDRS XX:XX-XX:XX REF MSG ###

KELLY

MEAL

OFF DUTY

NOGUCHI

MEAL

OFF DUTY

PUBLIC AFFAIRS EVENT (JAXA)KU AVAIL TDRS XX:XX-XX:XX REF MSG ###

ROBINSON

MEAL

OFF DUTY

MCC

3-84

08MET 006/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/19(263)

20:00

21:00

22:00

23:00

00:00

MET

Day 006E W Z

TDRS

ORB

109

110

111

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

MEAL

OFF DUTY

PUBLIC AFFAIRS EVENT (JAXA)KU AVAIL TDRS XX:XX-XX:XX REF MSG ###

KELLY

MEAL

OFF DUTY

NOGUCHI

MEAL

OFF DUTY

PUBLIC AFFAIRS EVENT (JAXA)KU AVAIL TDRS XX:XX-XX:XX REF MSG ###

ROBINSON

MEAL

OFF DUTY

MCC

Page 143: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-85

08MET 006/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/19(263)

20:00

21:00

22:00

23:00

00:00

MET

Day 006E W Z

TDRS

~

~

~

~

ORB

109

110

111

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

OFF DUTY

MEAL

LAWRENCE

OFF DUTY

MEAL

CAMARDA

OFF DUTY

MEAL

MCC

3-85

08MET 006/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/19(263)

20:00

21:00

22:00

23:00

00:00

MET

Day 006E W Z

TDRS

ORB

109

110

111

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

OFF DUTY

MEAL

LAWRENCE

OFF DUTY

MEAL

CAMARDA

OFF DUTY

MEAL

MCC

Page 144: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-86

08

OVERNIGHT ISS SURVEY:R12(VPU) Green Jumper - LDRI/ITVCR12(OBSS) ITVC ENA - ONCONFIG DTV FOR DNLK:L10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

MET 007/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/19(263)

00:00

01:00

02:00

03:00

04:00

MET

Day 007E W Z

TDRS

~

~ ~

ORB

111

112

113

114

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 3 BRIEFING CARD (EVA, EVA 3)

ILLUMINATOR OPS (CUE CARD) (PHOTO/TV, TV) ILLUMINATORS ON - A,B,C,D

KELLY

EVA 3 BRIEFING CARD (EVA, EVA 3)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

EVA 3 BRIEFING CARD (EVA, EVA 3)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

EXERCISE

ROBINSON

EVA 3 BRIEFING CARD (EVA, EVA 3)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

OCA-PMC

3-86

08

OVERNIGHT ISS SURVEY:R12(VPU) Green Jumper - LDRI/ITVCR12(OBSS) ITVC ENA - ONCONFIG DTV FOR DNLK:L10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

MET 007/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/19(263)

00:00

01:00

02:00

03:00

04:00

MET

Day 007E W Z

TDRS

ORB

111

112

113

114

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 3 BRIEFING CARD (EVA, EVA 3)

ILLUMINATOR OPS (CUE CARD) (PHOTO/TV, TV) ILLUMINATORS ON - A,B,C,D

KELLY

EVA 3 BRIEFING CARD (EVA, EVA 3)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

EVA 3 BRIEFING CARD (EVA, EVA 3)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

EXERCISE

ROBINSON

EVA 3 BRIEFING CARD (EVA, EVA 3)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

OCA-PMC

Page 145: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-87

08MET 007/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/19(263)

00:00

01:00

02:00

03:00

04:00

MET

Day 007E W Z

TDRS

~

~ ~

ORB

111

112

113

114

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EVA 3 BRIEFING CARD (EVA, EVA 3)

EXERCISE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

EVA 3 BRIEFING CARD (EVA, EVA 3)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY TRANSFER BRIEFING

DAILY STS/ISS CREW TRANSFER TAGUP

WITH MEAL: RENAL STONE (ORB OPS)

CAMARDA

EVA 3 BRIEFING CARD (EVA, EVA 3)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY STS/ISS CREW TRANSFER TAGUP

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

3-87

08MET 007/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/19(263)

00:00

01:00

02:00

03:00

04:00

MET

Day 007E W Z

TDRS

ORB

111

112

113

114

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EVA 3 BRIEFING CARD (EVA, EVA 3)

EXERCISE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

EVA 3 BRIEFING CARD (EVA, EVA 3)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY TRANSFER BRIEFING

DAILY STS/ISS CREW TRANSFER TAGUP

WITH MEAL: RENAL STONE (ORB OPS)

CAMARDA

EVA 3 BRIEFING CARD (EVA, EVA 3)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY STS/ISS CREW TRANSFER TAGUP

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

Page 146: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-88

08MET 007/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/20(264)

04:00

05:00

06:00

07:00

08:00

MET

Day 007E W Z

TDRS

~

~ ~

ORB

114

115

116

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-88

08MET 007/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/20(264)

04:00

05:00

06:00

07:00

08:00

MET

Day 007E W Z

TDRS

ORB

114

115

116

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 147: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-89

08MET 007/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/20(264)

04:00

05:00

06:00

07:00

08:00

MET

Day 007E W Z

TDRS

~

~ ~

ORB

114

115

116

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-89

08MET 007/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/20(264)

04:00

05:00

06:00

07:00

08:00

MET

Day 007E W Z

TDRS

ORB

114

115

116

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 148: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-90

08MET 007/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/20(264)

08:00

09:00

10:00

11:00

12:00

MET

Day 007E W Z

TDRS

~

~

~

~

ORB

117

118

119

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-90

08MET 007/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/20(264)

08:00

09:00

10:00

11:00

12:00

MET

Day 007E W Z

TDRS

ORB

117

118

119

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 149: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-91

08MET 007/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/20(264)

08:00

09:00

10:00

11:00

12:00

MET

Day 007E W Z

TDRS

~

~

~

~

ORB

117

118

119

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-91

08MET 007/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/20(264)

08:00

09:00

10:00

11:00

12:00

MET

Day 007E W Z

TDRS

ORB

117

118

119

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 150: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-92

09

FD09 FD09 EZ ACTIVITIESHARD REBOOT PGSCOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)L17 Check MCIU Filter Screen

MET 007/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/20(264)

12:00

13:00

14:00

15:00

16:00

MET

Day 007E W Z

TDRS

~ ~

~ ~

ORB

119

120

121

122

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

CWC OVERBOARD DUMP (INIT) (ORB OPS, ECLS) DUMP CWC S/N ####

EVA 3 INHIBIT PAD (EVA, EVA 3) ~

06 UHF MODE - OFF A/G PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ILLUMINATOR OPS (CUE CARD) (PHOTO/TV, TV) ILLUMINATORS OFF - A,B,C,DH/O ATT CONTROL CMG TA to ORB (JOINT OPS, MATED OPS)

IMU STAR OF OPTY ALIGN (ORB OPS)

KELLY

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER Ref. MPLM TRANSFER LIST

~

CWC OVERBOARD DUMP (INIT) (ORB OPS, ECLS) DUMP CWC S/N ####

SALIVA COLLECT (ORB OPS, DSO)

EVA COMM CONFIG (ISS EVA SYS, EVA PREP/POST)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOGUCHI

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

ROBINSON

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

3-92

09

FD09 FD09 EZ ACTIVITIESHARD REBOOT PGSCOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)L17 Check MCIU Filter Screen

MET 007/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/20(264)

12:00

13:00

14:00

15:00

16:00

MET

Day 007E W Z

TDRS

ORB

119

120

121

122

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

CWC OVERBOARD DUMP (INIT) (ORB OPS, ECLS) DUMP CWC S/N ####

EVA 3 INHIBIT PAD (EVA, EVA 3) ~

06 UHF MODE - OFF A/G PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ILLUMINATOR OPS (CUE CARD) (PHOTO/TV, TV) ILLUMINATORS OFF - A,B,C,DH/O ATT CONTROL CMG TA to ORB (JOINT OPS, MATED OPS)

IMU STAR OF OPTY ALIGN (ORB OPS)

KELLY

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER Ref. MPLM TRANSFER LIST

~

CWC OVERBOARD DUMP (INIT) (ORB OPS, ECLS) DUMP CWC S/N ####

SALIVA COLLECT (ORB OPS, DSO)

EVA COMM CONFIG (ISS EVA SYS, EVA PREP/POST)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOGUCHI

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

ROBINSON

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

Page 151: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-93

09

FD09

MET 007/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/20(264)

12:00

13:00

14:00

15:00

16:00

MET

Day 007E W Z

TDRS

~ ~

~ ~

ORB

119

120

121

122

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SHUTTLE LEH CONFIG FOR EVA P/B ON ISS (ISS EVA SYS, EVA PREP/POST)EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

TRANSFER REVIEW Update MASTER Xfer list

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER Ref. MPLM TRANSFER LIST

~

TRANSFER REVIEW Update MASTER Xfer list

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

MCC

EVA 3 INHIBIT PAD (EVA, EVA 3) ~

3-93

09

FD09

MET 007/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/20(264)

12:00

13:00

14:00

15:00

16:00

MET

Day 007E W Z

TDRS

ORB

119

120

121

122

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SHUTTLE LEH CONFIG FOR EVA P/B ON ISS (ISS EVA SYS, EVA PREP/POST)EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

TRANSFER REVIEW Update MASTER Xfer list

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER Ref. MPLM TRANSFER LIST

~

TRANSFER REVIEW Update MASTER Xfer list

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

MCC

EVA 3 INHIBIT PAD (EVA, EVA 3) ~

Page 152: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-94

09

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

UPLINKβ 21° +

BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX E3-49<AZ<9-89<EL<4

C1,C2,C3+E3

MET 007/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/20(264)

16:00

17:00

18:00

19:00

20:00

MET

Day 007E W Z

TDRS

~

~

~

~

ORB

122

123

124

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

CWC OVERBOARD DUMP (TERM) (ORB OPS, ECLS)

EVA 3 INHIBIT PAD (EVA, EVA 3)

~

EXERCISE

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #12 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #11 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

MEAL

~

H/O ATT CONTROL ORB to RS (JOINT OPS, CONTINGENCY)

KELLY

EXERCISE

TRANSFER Ref. MPLM TRANSFER LIST

~

CWC OVERBOARD DUMP (TERM) (ORB OPS, ECLS)

EVA - ESPAD INSTALL (ROBOTICS, ESP2 INSTL EVA SPT)

NOGUCHI

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

EVA 3 EGRESS/SETUP (EVA, EVA 3)

~

PRIMARY CABLE ROUTING (EVA, EVA 3)

MISSE 1 & 2 RETRIEVAL (EVA, EVA 3)

~

ROBINSON

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

EVA 3 EGRESS/SETUP (EVA, EVA 3)

~

ESPAD INSTALL (EVA, EVA 3)

~

MCC

3-94

09

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

UPLINKβ 21° +

BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX E3-49<AZ<9-89<EL<4

C1,C2,C3+E3

MET 007/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/20(264)

16:00

17:00

18:00

19:00

20:00

MET

Day 007E W Z

TDRS

ORB

122

123

124

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

CWC OVERBOARD DUMP (TERM) (ORB OPS, ECLS)

EVA 3 INHIBIT PAD (EVA, EVA 3)

~

EXERCISE

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #12 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #11 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

MEAL

~

H/O ATT CONTROL ORB to RS (JOINT OPS, CONTINGENCY)

KELLY

EXERCISE

TRANSFER Ref. MPLM TRANSFER LIST

~

CWC OVERBOARD DUMP (TERM) (ORB OPS, ECLS)

EVA - ESPAD INSTALL (ROBOTICS, ESP2 INSTL EVA SPT)

NOGUCHI

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

EVA 3 EGRESS/SETUP (EVA, EVA 3)

~

PRIMARY CABLE ROUTING (EVA, EVA 3)

MISSE 1 & 2 RETRIEVAL (EVA, EVA 3)

~

ROBINSON

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

EVA 3 EGRESS/SETUP (EVA, EVA 3)

~

ESPAD INSTALL (EVA, EVA 3)

~

MCC

Page 153: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-95

09

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

MET 007/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/20(264)

16:00

17:00

18:00

19:00

20:00

MET

Day 007E W Z

TDRS

~

~

~

~

ORB

122

123

124

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

IVA SUPPORT FOR EVA

~

~

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

LAWRENCE

EXERCISE

~

P/TV07 EVA (SETUP) (PHOTO/TV, SCENES)CONFIG DTV FOR DNLKL10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

EVA - ESPAD INSTALL (ROBOTICS, ESP2 INSTL EVA SPT)

TRANSFER Ref. MPLM TRANSFER LIST

CAMARDA

EXERCISE

TRANSFER Ref. MPLM TRANSFER LIST

~

TRANSFER Ref. MPLM TRANSFER LIST

MEAL

~

MCC

EVA 3 INHIBIT PAD (EVA, EVA 3)

~

3-95

09

EVA PREP USING SHUTTLE O2 (ISS EVA SYS, EVA PREP/POST)

MET 007/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/20(264)

16:00

17:00

18:00

19:00

20:00

MET

Day 007E W Z

TDRS

ORB

122

123

124

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

IVA SUPPORT FOR EVA

~

~

EMU PURGE (ISS EVA SYS, EVA PREP/POST)

EMU PREBREATHE (ISS EVA SYS, EVA PREP/POST)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

LAWRENCE

EXERCISE

~

P/TV07 EVA (SETUP) (PHOTO/TV, SCENES)CONFIG DTV FOR DNLKL10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

EVA - ESPAD INSTALL (ROBOTICS, ESP2 INSTL EVA SPT)

TRANSFER Ref. MPLM TRANSFER LIST

CAMARDA

EXERCISE

TRANSFER Ref. MPLM TRANSFER LIST

~

TRANSFER Ref. MPLM TRANSFER LIST

MEAL

~

MCC

EVA 3 INHIBIT PAD (EVA, EVA 3)

~

Page 154: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-96

09MET 007/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/20(264)

20:00

21:00

22:00

23:00

00:00

MET

Day 007E W Z

TDRS

~

~

~

~

ORB

125

126

127

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

ESP2 UNBERTH Steps 3-5 (ROBOTICS, ESP2 INSTL EVA SPT)

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

MEAL

~

CWC TRANSFER Xfer 2 CWC bags to ISS

KELLY

MATED MPLM GRAPPLE (ROBOTICS, MPLM OPS)

MNVR TO MATED MPLM PRE-GRAPPLE (ROBOTICS, MPLM OPS)

ESP2 UNBERTH (ROBOTICS, ESP2 INSTL EVA SPT)

ESP2 GRAPPLE (ROBOTICS, ESP2 INSTL EVA SPT)

ESP2 INSTALL (ROBOTICS, ESP2 INSTL EVA SPT)

ESP2 UNGRAPPLE (ROBOTICS, ESP2 INSTL EVA SPT)

NOGUCHI

ESP2 INSTALL (EVA, EVA 3) NOTE: NO EXERCISE

MISSE 1 & 2 RETRIEVAL (EVA, EVA 3)

~

MISSE 5 INSTALL (EVA, EVA 3)

SECONDARY CABLE ROUTING (EVA, EVA 3)

ESP2 FRGF REMOVE AND STOW (EVA, EVA 3)

ROBINSON

ESPAD INSTALL (EVA, EVA 3)

~

MISSE 5 INSTALL (EVA, EVA 3)

SECONDARY CABLE ROUTING (EVA, EVA 3)

ESP2 INSTALL (EVA, EVA 3) NOTE: NO EXERCISE

MCC

3-96

09MET 007/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/20(264)

20:00

21:00

22:00

23:00

00:00

MET

Day 007E W Z

TDRS

ORB

125

126

127

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

ESP2 UNBERTH Steps 3-5 (ROBOTICS, ESP2 INSTL EVA SPT)

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

MEAL

~

CWC TRANSFER Xfer 2 CWC bags to ISS

KELLY

MATED MPLM GRAPPLE (ROBOTICS, MPLM OPS)

MNVR TO MATED MPLM PRE-GRAPPLE (ROBOTICS, MPLM OPS)

ESP2 UNBERTH (ROBOTICS, ESP2 INSTL EVA SPT)

ESP2 GRAPPLE (ROBOTICS, ESP2 INSTL EVA SPT)

ESP2 INSTALL (ROBOTICS, ESP2 INSTL EVA SPT)

ESP2 UNGRAPPLE (ROBOTICS, ESP2 INSTL EVA SPT)

NOGUCHI

ESP2 INSTALL (EVA, EVA 3) NOTE: NO EXERCISE

MISSE 1 & 2 RETRIEVAL (EVA, EVA 3)

~

MISSE 5 INSTALL (EVA, EVA 3)

SECONDARY CABLE ROUTING (EVA, EVA 3)

ESP2 FRGF REMOVE AND STOW (EVA, EVA 3)

ROBINSON

ESPAD INSTALL (EVA, EVA 3)

~

MISSE 5 INSTALL (EVA, EVA 3)

SECONDARY CABLE ROUTING (EVA, EVA 3)

ESP2 INSTALL (EVA, EVA 3) NOTE: NO EXERCISE

MCC

Page 155: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-97

09MET 007/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/20(264)

20:00

21:00

22:00

23:00

00:00

MET

Day 007E W Z

TDRS

~

~

~

~

ORB

125

126

127

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

IVA SUPPORT FOR EVA

~

~

LAWRENCE

MATED MPLM GRAPPLE (ROBOTICS, MPLM OPS)

MNVR TO MATED MPLM PRE-GRAPPLE (ROBOTICS, MPLM OPS)

ESP2 UNBERTH (ROBOTICS, ESP2 INSTL EVA SPT)

ESP2 GRAPPLE (ROBOTICS, ESP2 INSTL EVA SPT)

ESP2 INSTALL (ROBOTICS, ESP2 INSTL EVA SPT)

ESP2 UNGRAPPLE (ROBOTICS, ESP2 INSTL EVA SPT)

CAMARDA

CBM CPA INSTALLATION (S&M, NOMINAL)

MEAL

~

ESP2 UNBERTH Steps 3-5 (ROBOTICS, ESP2 INSTL EVA SPT)CBM CPA INSTALLATION (S&M, NOMINAL)

TRANSFER Ref. MPLM TRANSFER LIST

~

MCC

3-97

09MET 007/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/20(264)

20:00

21:00

22:00

23:00

00:00

MET

Day 007E W Z

TDRS

ORB

125

126

127

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

IVA SUPPORT FOR EVA

~

~

LAWRENCE

MATED MPLM GRAPPLE (ROBOTICS, MPLM OPS)

MNVR TO MATED MPLM PRE-GRAPPLE (ROBOTICS, MPLM OPS)

ESP2 UNBERTH (ROBOTICS, ESP2 INSTL EVA SPT)

ESP2 GRAPPLE (ROBOTICS, ESP2 INSTL EVA SPT)

ESP2 INSTALL (ROBOTICS, ESP2 INSTL EVA SPT)

ESP2 UNGRAPPLE (ROBOTICS, ESP2 INSTL EVA SPT)

CAMARDA

CBM CPA INSTALLATION (S&M, NOMINAL)

MEAL

~

ESP2 UNBERTH Steps 3-5 (ROBOTICS, ESP2 INSTL EVA SPT)CBM CPA INSTALLATION (S&M, NOMINAL)

TRANSFER Ref. MPLM TRANSFER LIST

~

MCC

Page 156: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-98

09

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX O1-35<AZ<-10-45<EL<-18

C1,C2,C3+O1

OVERNIGHT ISS SURVEY:R12(VPU) Green Jumper - LDRI/ITVCR12(OBSS) ITVC ENA - ONCONFIG DTV FOR DNLK:L10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

MET 008/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/20(264)

00:00

01:00

02:00

03:00

04:00

MET

Day 008E W Z

TDRS

~

~ ~

~

ORB

127

128

129

130

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

ILLUMINATOR OPS (CUE CARD) (PHOTO/TV, TV) ILLUMINATORS ON - A,B,C,DGENERIC REPRESS (JOINT OPS, MATED OPS) REPRESS to 14.7 psia Config to PCS 2

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

EVA COMM DECONFIG (ISS EVA SYS, CHECKOUTS)WCS COMPACTOR OPS (DUAL-VANE) (ORB OPS, CUE CARD)

CONFIG MPLM RACKS FOR ENTRY (S&M, NOMINAL)

TRANSFER Ref. MPLM TRANSFER LIST

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

CLEANUP/INGRESS (EVA, EVA 3)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

ROBINSON

CLEANUP/INGRESS (EVA, EVA 3)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

OCA-PMC

3-98

09

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX O1-35<AZ<-10-45<EL<-18

C1,C2,C3+O1

OVERNIGHT ISS SURVEY:R12(VPU) Green Jumper - LDRI/ITVCR12(OBSS) ITVC ENA - ONCONFIG DTV FOR DNLK:L10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

MET 008/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/20(264)

00:00

01:00

02:00

03:00

04:00

MET

Day 008E W Z

TDRS

ORB

127

128

129

130

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

ILLUMINATOR OPS (CUE CARD) (PHOTO/TV, TV) ILLUMINATORS ON - A,B,C,DGENERIC REPRESS (JOINT OPS, MATED OPS) REPRESS to 14.7 psia Config to PCS 2

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

EVA COMM DECONFIG (ISS EVA SYS, CHECKOUTS)WCS COMPACTOR OPS (DUAL-VANE) (ORB OPS, CUE CARD)

CONFIG MPLM RACKS FOR ENTRY (S&M, NOMINAL)

TRANSFER Ref. MPLM TRANSFER LIST

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

CLEANUP/INGRESS (EVA, EVA 3)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

ROBINSON

CLEANUP/INGRESS (EVA, EVA 3)

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

OCA-PMC

Page 157: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-99

09MET 008/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/20(264)

00:00

01:00

02:00

03:00

04:00

MET

Day 008E W Z

TDRS

~

~ ~

~

ORB

127

128

129

130

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

IVA SUPPORT FOR EVA

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY TRANSFER BRIEFING

DAILY STS/ISS CREW TRANSFER TAGUP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG MPLM RACKS FOR ENTRY (S&M, NOMINAL)

WITH MEAL: RENAL STONE (ORB OPS)

POST EVA TOOL TRANSFER MPLM (EVA, AIRLOCK CONFIG)

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY STS/ISS CREW TRANSFER TAGUP

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER Ref. MPLM TRANSFER LIST

~

MCC

3-99

09MET 008/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/20(264)

00:00

01:00

02:00

03:00

04:00

MET

Day 008E W Z

TDRS

ORB

127

128

129

130

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

IVA SUPPORT FOR EVA

~

CREWLOCK DPRS/RPRS CUE CARD (ISS EVA SYS, EVA PREP/POST)

POST EVA (ISS EVA SYS, EVA PREP/POST) Perform: METOX REGENERATION

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

LAWRENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY TRANSFER BRIEFING

DAILY STS/ISS CREW TRANSFER TAGUP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG MPLM RACKS FOR ENTRY (S&M, NOMINAL)

WITH MEAL: RENAL STONE (ORB OPS)

POST EVA TOOL TRANSFER MPLM (EVA, AIRLOCK CONFIG)

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY STS/ISS CREW TRANSFER TAGUP

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER Ref. MPLM TRANSFER LIST

~

MCC

Page 158: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-100

09MET 008/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/21(265)

04:00

05:00

06:00

07:00

08:00

MET

Day 008E W Z

TDRS

~

~

~

~

ORB

130

131

132

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-100

09MET 008/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/21(265)

04:00

05:00

06:00

07:00

08:00

MET

Day 008E W Z

TDRS

ORB

130

131

132

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 159: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-101

09MET 008/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/21(265)

04:00

05:00

06:00

07:00

08:00

MET

Day 008E W Z

TDRS

~

~

~

~

ORB

130

131

132

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

N1 CBM DEMATE (MPLM, NOMINAL)

3-101

09MET 008/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/21(265)

04:00

05:00

06:00

07:00

08:00

MET

Day 008E W Z

TDRS

ORB

130

131

132

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

N1 CBM DEMATE (MPLM, NOMINAL)

Page 160: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-102

09MET 008/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/21(265)

08:00

09:00

10:00

11:00

12:00

MET

Day 008E W Z

TDRS

~

~

~

ORB

132

133

134

135

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-102

09MET 008/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/21(265)

08:00

09:00

10:00

11:00

12:00

MET

Day 008E W Z

TDRS

ORB

132

133

134

135

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 161: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-103

09MET 008/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/21(265)

08:00

09:00

10:00

11:00

12:00

MET

Day 008E W Z

TDRS

~

~

~

ORB

132

133

134

135

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-103

09MET 008/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/21(265)

08:00

09:00

10:00

11:00

12:00

MET

Day 008E W Z

TDRS

ORB

132

133

134

135

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 162: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-104

FD10 EZ ACTIVITIES

10

FD10HARD REBOOT PGSCOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)L17 Check MCIU Filter Screen

MET 008/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/21(265)

12:00

13:00

14:00

15:00

16:00

MET

Day 008E W Z

TDRS

~

~

~

ORB

135

136

137

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

IMU STAR OF OPTY ALIGN (ORB OPS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MPLM TRANSFER CLEANUP Ref. MPLM RETURN XFER LIST

SALIVA COLLECT (ORB OPS, DSO)

NOGUCHI

TAKE 1 ASPIRIN (325mg)

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 3rd & 4th EMUs

~

ROBINSON

TAKE 1 ASPIRIN (325mg)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 3rd & 4th EMUs

~

MCC

3-104

FD10 EZ ACTIVITIES

10

FD10HARD REBOOT PGSCOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)L17 Check MCIU Filter Screen

MET 008/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/21(265)

12:00

13:00

14:00

15:00

16:00

MET

Day 008E W Z

TDRS

ORB

135

136

137

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

IMU STAR OF OPTY ALIGN (ORB OPS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MPLM TRANSFER CLEANUP Ref. MPLM RETURN XFER LIST

SALIVA COLLECT (ORB OPS, DSO)

NOGUCHI

TAKE 1 ASPIRIN (325mg)

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 3rd & 4th EMUs

~

ROBINSON

TAKE 1 ASPIRIN (325mg)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 3rd & 4th EMUs

~

MCC

Page 163: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-105

10

FD10

MET 008/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/21(265)

12:00

13:00

14:00

15:00

16:00

MET

Day 008E W Z

TDRS

~

~

~

ORB

135

136

137

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

POST EVA3 RECONFIG & XFER (EVA, AIRLOCK CONFIG)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

LAWRENCE

MPLM TRANSFER CLEANUP Ref. MPLM RETURN XFER LIST

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY TRANSFER BRIEFING

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

MPLM DEACTIVATION (MPLM, NOMINAL) Steps 1-2, 4-6

MPLM CLOSEOUT DEWPOINT (MPLM, NOMINAL)

MPLM VESTIBULE-CONFIG FOR DEMATE (S&M, NOMINAL)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MPLM EGRESS (MPLM, NOMINAL)

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

MCC

3-105

10

FD10

MET 008/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/21(265)

12:00

13:00

14:00

15:00

16:00

MET

Day 008E W Z

TDRS

ORB

135

136

137

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

POST EVA3 RECONFIG & XFER (EVA, AIRLOCK CONFIG)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

LAWRENCE

MPLM TRANSFER CLEANUP Ref. MPLM RETURN XFER LIST

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DAILY TRANSFER BRIEFING

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

MPLM DEACTIVATION (MPLM, NOMINAL) Steps 1-2, 4-6

MPLM CLOSEOUT DEWPOINT (MPLM, NOMINAL)

MPLM VESTIBULE-CONFIG FOR DEMATE (S&M, NOMINAL)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MPLM EGRESS (MPLM, NOMINAL)

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

MCC

Page 164: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-106

10

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX D1-41<AZ<8-88<EL<-9

C1,C2,C3+D1

MET 008/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/21(265)

16:00

17:00

18:00

19:00

20:00

MET

Day 008E W Z

TDRS

~

~

~

~

ORB

138

139

140

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #13 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

MEAL

~

PWR FILL (ORB OPS, ECLS)

PWR FILL (ORB OPS, ECLS)

PUBLIC AFFAIRS EVENTKU AVAIL TDRS XX:XX-XX:XX REF MSG ###

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #14 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

PWR FILL (ORB OPS, ECLS)

DIGITAL PAO CC (PHOTO/TV, SONY PD100)

KELLY

EXERCISE

ILLUMINATOR OPS (CUE CARD) (PHOTO/TV, TV) ILLUMINATORS OFF - A,B,C,D

MEAL

TRANSFER Ref. MDDK TRANSFER LIST

PUBLIC AFFAIRS EVENTKU AVAIL TDRS XX:XX-XX:XX REF MSG ###

TRANSFER Ref. MDDK TRANSFER LIST

NOGUCHI

METOX REGENERATION TERM (ISS EVA SYS, EMU MAINT)EVA TOOL STOW (EVA, AIRLOCK CONFIG)

NODE 1 CBM DEMATE (S&M, NOMINAL) NOTE : NO Exercise

~

POST EVA3 RECONFIG & XFER (EVA, AIRLOCK CONFIG)

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 3rd & 4th EMUs

~

EMU TRANSFER TO ISS

ROBINSON

POST EVA3 RECONFIG & XFER (EVA, AIRLOCK CONFIG)

NODE 1 CBM DEMATE (S&M, NOMINAL) NOTE : NO Exercise

~

EVA TOOL STOW (EVA, AIRLOCK CONFIG)

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 3rd & 4th EMUs

~

EMU TRANSFER TO ISS

MCC

3-106

10

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX D1-41<AZ<8-88<EL<-9

C1,C2,C3+D1

MET 008/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/21(265)

16:00

17:00

18:00

19:00

20:00

MET

Day 008E W Z

TDRS

ORB

138

139

140

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #13 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

MEAL

~

PWR FILL (ORB OPS, ECLS)

PWR FILL (ORB OPS, ECLS)

PUBLIC AFFAIRS EVENTKU AVAIL TDRS XX:XX-XX:XX REF MSG ###

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) INIT #14 Minerals and/or Ag Biocide are req'd. Samples are/are not req'd. Fill Duration: 56 minutes

PWR FILL (ORB OPS, ECLS)

DIGITAL PAO CC (PHOTO/TV, SONY PD100)

KELLY

EXERCISE

ILLUMINATOR OPS (CUE CARD) (PHOTO/TV, TV) ILLUMINATORS OFF - A,B,C,D

MEAL

TRANSFER Ref. MDDK TRANSFER LIST

PUBLIC AFFAIRS EVENTKU AVAIL TDRS XX:XX-XX:XX REF MSG ###

TRANSFER Ref. MDDK TRANSFER LIST

NOGUCHI

METOX REGENERATION TERM (ISS EVA SYS, EMU MAINT)EVA TOOL STOW (EVA, AIRLOCK CONFIG)

NODE 1 CBM DEMATE (S&M, NOMINAL) NOTE : NO Exercise

~

POST EVA3 RECONFIG & XFER (EVA, AIRLOCK CONFIG)

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 3rd & 4th EMUs

~

EMU TRANSFER TO ISS

ROBINSON

POST EVA3 RECONFIG & XFER (EVA, AIRLOCK CONFIG)

NODE 1 CBM DEMATE (S&M, NOMINAL) NOTE : NO Exercise

~

EVA TOOL STOW (EVA, AIRLOCK CONFIG)

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 3rd & 4th EMUs

~

EMU TRANSFER TO ISS

MCC

Page 165: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-107

10

MPLM VESTIBULE-CONFIG FOR DEMATE (S&M, NOMINAL)

MET 008/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/21(265)

16:00

17:00

18:00

19:00

20:00

MET

Day 008E W Z

TDRS

~

~

~

~

ORB

138

139

140

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EVA TOOL STOW (EVA, AIRLOCK CONFIG)

POST EVA3 RECONFIG & XFER (EVA, AIRLOCK CONFIG)

~

MEAL

~

LAWRENCE

P/TV06 MPLM ASSEMBLY OPS (S/U) (PHOTO/TV, SCENES)

MEAL

~

EXERCISE

PCG-STES TRANSFER ISS TO MDDK (ASSY OPS, POWERED)

TRANSFER Ref. MDDK TRANSFER LIST

CAMARDA

~

NODE 1 MPLM VESTIBULE DEPRESS (MPLM, NOMINAL)

MEAL

~

MCC

3-107

10

MPLM VESTIBULE-CONFIG FOR DEMATE (S&M, NOMINAL)

MET 008/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/21(265)

16:00

17:00

18:00

19:00

20:00

MET

Day 008E W Z

TDRS

ORB

138

139

140

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

EVA TOOL STOW (EVA, AIRLOCK CONFIG)

POST EVA3 RECONFIG & XFER (EVA, AIRLOCK CONFIG)

~

MEAL

~

LAWRENCE

P/TV06 MPLM ASSEMBLY OPS (S/U) (PHOTO/TV, SCENES)

MEAL

~

EXERCISE

PCG-STES TRANSFER ISS TO MDDK (ASSY OPS, POWERED)

TRANSFER Ref. MDDK TRANSFER LIST

CAMARDA

~

NODE 1 MPLM VESTIBULE DEPRESS (MPLM, NOMINAL)

MEAL

~

MCC

Page 166: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-108

10

A √ROEU MATE COMPLETE R1 PRI PL MNC -ON (tb-ON) L12 MPLM CH 1,2 HTR PWR-ON(tb-gray)

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX X1-65<AZ<8-88<EL<-52

C1,C2,C3+X1

TFL 199

MET 008/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/21(265)

20:00

21:00

22:00

23:00

00:00

MET

Day 008E W Z

TDRS

~

~ ~

ORB

140

141

142

143

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

On MCC GO:APCU 1 DEACT (ASSY OPS)

MEAL

~

NOMINAL H20 CONFIG (ORB OPS, ECLS) FES Pri A req'd

CWC TRANSFER Xfer 2 CWC bags to ISS

APCU 1 ACT (ASSY OPS, APCU)

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

KELLY

MPLM UNINSTALL (ROBOTICS, MPLM OPS) NOTE: NO Exercise

MPLM BERTH (ROBOTICS, MPLM OPS)

MPLM HEATER ON ABERTHED MPLM UNGRAPPLE (ROBOTICS, MPLM OPS)

MNVR TO OBSS GRAPPLE AT H/O (ROBOTICS, OBSS OPS)

OBSS GRAPPLE AT HANDOFF (ROBOTICS, OBSS OPS)

OBSS MNVR TO CLEAR UHF (ROBOTICS, OBSS OPS)

~

NOGUCHI

EXERCISE

MEAL

NODE 1 CBM DEMATE (S&M, NOMINAL) NOTE : NO Exercise

~

TRANSFER Ref. MDDK TRANSFER LIST

ROBINSON

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) PART 1 Checkout RNDZ tools with RPOP2

NODE 1 CBM DEMATE (S&M, NOMINAL) NOTE : NO Exercise

~

TRANSFER Ref. MDDK TRANSFER LIST

MEAL

MCC

TFL 184

TFL 192

3-108

10

A √ROEU MATE COMPLETE R1 PRI PL MNC -ON (tb-ON) L12 MPLM CH 1,2 HTR PWR-ON(tb-gray)

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33BOX X1-65<AZ<8-88<EL<-52

C1,C2,C3+X1

TFL 199

MET 008/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/21(265)

20:00

21:00

22:00

23:00

00:00

MET

Day 008E W Z

TDRS

ORB

140

141

142

143

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

On MCC GO:APCU 1 DEACT (ASSY OPS)

MEAL

~

NOMINAL H20 CONFIG (ORB OPS, ECLS) FES Pri A req'd

CWC TRANSFER Xfer 2 CWC bags to ISS

APCU 1 ACT (ASSY OPS, APCU)

SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report Barcode & S/N to MCC

KELLY

MPLM UNINSTALL (ROBOTICS, MPLM OPS) NOTE: NO Exercise

MPLM BERTH (ROBOTICS, MPLM OPS)

MPLM HEATER ON ABERTHED MPLM UNGRAPPLE (ROBOTICS, MPLM OPS)

MNVR TO OBSS GRAPPLE AT H/O (ROBOTICS, OBSS OPS)

OBSS GRAPPLE AT HANDOFF (ROBOTICS, OBSS OPS)

OBSS MNVR TO CLEAR UHF (ROBOTICS, OBSS OPS)

~

NOGUCHI

EXERCISE

MEAL

NODE 1 CBM DEMATE (S&M, NOMINAL) NOTE : NO Exercise

~

TRANSFER Ref. MDDK TRANSFER LIST

ROBINSON

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) PART 1 Checkout RNDZ tools with RPOP2

NODE 1 CBM DEMATE (S&M, NOMINAL) NOTE : NO Exercise

~

TRANSFER Ref. MDDK TRANSFER LIST

MEAL

MCC

TFL 184

TFL 192

Page 167: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-109

10

MEAL

MET 008/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/21(265)

20:00

21:00

22:00

23:00

00:00

MET

Day 008E W Z

TDRS

~

~ ~

ORB

140

141

142

143

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

MEAL

~

NITROGEN TRANSFER TERM (JOINT OPS, MATED OPS)

P/B USING SHUTTLE O2 TEARDN (JOINT OPS, MATED OPS)

OBSS HANDOFF FROM SRMS TO SSRMS (PDRS, OBSS NOMINAL) Steps 1-4

OBSS BERTH CAMERA SUPPORT

~

MPLM BERTH (ROBOTICS, MPLM OPS) Steps 3-9

LAWRENCE

BERTHED MPLM UNGRAPPLE (ROBOTICS, MPLM OPS)

MPLM BERTH (ROBOTICS, MPLM OPS)

MPLM UNINSTALL (ROBOTICS, MPLM OPS) NOTE: NO Exercise

~

MNVR TO OBSS GRAPPLE AT H/O (ROBOTICS, OBSS OPS)

OBSS GRAPPLE AT HANDOFF (ROBOTICS, OBSS OPS)

OBSS MNVR TO CLEAR UHF (ROBOTICS, OBSS OPS)

~

CAMARDA

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) PART 1 Checkout RNDZ tools with RPOP2

MEAL

~

TRANSFER Ref. MDDK TRANSFER LIST

OBSS HANDOFF FROM SRMS TO SSRMS (PDRS, OBSS NOMINAL) Steps 1-4

OBSS BERTH CAMERA SUPPORT

~

MPLM BERTH (ROBOTICS, MPLM OPS) Steps 3-9

MCC

MPLM ENVIRONMENT CHECK (MPLM, NOMINAL)

3-109

10

MEAL

MET 008/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/21(265)

20:00

21:00

22:00

23:00

00:00

MET

Day 008E W Z

TDRS

ORB

140

141

142

143

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

MEAL

~

NITROGEN TRANSFER TERM (JOINT OPS, MATED OPS)

P/B USING SHUTTLE O2 TEARDN (JOINT OPS, MATED OPS)

OBSS HANDOFF FROM SRMS TO SSRMS (PDRS, OBSS NOMINAL) Steps 1-4

OBSS BERTH CAMERA SUPPORT

~

MPLM BERTH (ROBOTICS, MPLM OPS) Steps 3-9

LAWRENCE

BERTHED MPLM UNGRAPPLE (ROBOTICS, MPLM OPS)

MPLM BERTH (ROBOTICS, MPLM OPS)

MPLM UNINSTALL (ROBOTICS, MPLM OPS) NOTE: NO Exercise

~

MNVR TO OBSS GRAPPLE AT H/O (ROBOTICS, OBSS OPS)

OBSS GRAPPLE AT HANDOFF (ROBOTICS, OBSS OPS)

OBSS MNVR TO CLEAR UHF (ROBOTICS, OBSS OPS)

~

CAMARDA

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) PART 1 Checkout RNDZ tools with RPOP2

MEAL

~

TRANSFER Ref. MDDK TRANSFER LIST

OBSS HANDOFF FROM SRMS TO SSRMS (PDRS, OBSS NOMINAL) Steps 1-4

OBSS BERTH CAMERA SUPPORT

~

MPLM BERTH (ROBOTICS, MPLM OPS) Steps 3-9

MCC

MPLM ENVIRONMENT CHECK (MPLM, NOMINAL)

Page 168: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-110

10

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33

C1,C2,C3

√ HUM SEP FOR H20 ACCUMULATION

OVERNIGHT ISS SURVEY:R12(VPU) Green Jumper - LDRI/ITVCR12(OBSS) ITVC ENA - ONCONFIG DTV FOR DNLK:L10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

MET 009/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/21(265)

00:00

01:00

02:00

03:00

04:00

MET

Day 009E W Z

TDRS

~

~ ~

ORB

143

144

145

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

ILLUMINATOR OPS (CUE CARD) (PHOTO/TV, TV) ILLUMINATORS ON - A,B,C,D

L12 MPLM CH 1,2 HTR PWR-OFF(tb-bp)

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

OBSS BERTH (ROBOTICS, OBSS OPS)

BERTHED OBSS UNGRAPPLE (ROBOTICS, OBSS OPS)

OBSS MNVR TO CLEAR UHF (ROBOTICS, OBSS OPS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

P/TV08 EXTERNAL SURVEY (OPS) (PHOTO/TV, SCENES)

P/TV08 EXTERNAL SURVEY (S/U) (PHOTO/TV, SCENES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

P/TV04 INGRESS/EGRESS (S/U) (PHOTO/TV, SCENES)

ROBINSON

EXERCISE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

OCA-PMC

3-110

10

UPLINKβ 21° + BOX C1-15<AZ<52-62<EL<75BOX C2-41<AZ<-10-23<EL<39BOX C3-71<AZ<-36-4<EL<33

C1,C2,C3

√ HUM SEP FOR H20 ACCUMULATION

OVERNIGHT ISS SURVEY:R12(VPU) Green Jumper - LDRI/ITVCR12(OBSS) ITVC ENA - ONCONFIG DTV FOR DNLK:L10(MUX) MUX BYPASS - ACT MUX/VTR/CC PWR - ON

MET 009/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/21(265)

00:00

01:00

02:00

03:00

04:00

MET

Day 009E W Z

TDRS

ORB

143

144

145

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

ILLUMINATOR OPS (CUE CARD) (PHOTO/TV, TV) ILLUMINATORS ON - A,B,C,D

L12 MPLM CH 1,2 HTR PWR-OFF(tb-bp)

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

OBSS BERTH (ROBOTICS, OBSS OPS)

BERTHED OBSS UNGRAPPLE (ROBOTICS, OBSS OPS)

OBSS MNVR TO CLEAR UHF (ROBOTICS, OBSS OPS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CONFIG ODS DRAGTHROUGHS FOR SLEEP

NOGUCHI

P/TV08 EXTERNAL SURVEY (OPS) (PHOTO/TV, SCENES)

P/TV08 EXTERNAL SURVEY (S/U) (PHOTO/TV, SCENES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

P/TV04 INGRESS/EGRESS (S/U) (PHOTO/TV, SCENES)

ROBINSON

EXERCISE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

OCA-PMC

Page 169: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-111

10

√ HUM SEP FOR H20 ACCUMMULATION

MET 009/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/21(265)

00:00

01:00

02:00

03:00

04:00

MET

Day 009E W Z

TDRS

~

~ ~

ORB

143

144

145

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS PWRDN (PDRS, RMS PWRDN) Do not STOW MPMs

OBSS BERTH CAMERA SUPPORT

~

LAWRENCE

DAILY STS/ISS CREW TRANSFER TAGUP

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

BERTHED OBSS UNGRAPPLE (ROBOTICS, OBSS OPS) Steps 1-4

OBSS BERTH (ROBOTICS, OBSS OPS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

WITH MEAL: RENAL STONE (ORB OPS)

OBSS MNVR TO CLEAR UHF (ROBOTICS, OBSS OPS)

~

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MIDDECK STATUS CHECKS (ASSY OPS, CUE CARD)

OBSS BERTH CAMERA SUPPORT

~

MCC

3-111

10

√ HUM SEP FOR H20 ACCUMMULATION

MET 009/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/21(265)

00:00

01:00

02:00

03:00

04:00

MET

Day 009E W Z

TDRS

ORB

143

144

145

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS PWRDN (PDRS, RMS PWRDN) Do not STOW MPMs

OBSS BERTH CAMERA SUPPORT

~

LAWRENCE

DAILY STS/ISS CREW TRANSFER TAGUP

DAILY TRANSFER BRIEFING

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

BERTHED OBSS UNGRAPPLE (ROBOTICS, OBSS OPS) Steps 1-4

OBSS BERTH (ROBOTICS, OBSS OPS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

WITH MEAL: RENAL STONE (ORB OPS)

OBSS MNVR TO CLEAR UHF (ROBOTICS, OBSS OPS)

~

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MIDDECK STATUS CHECKS (ASSY OPS, CUE CARD)

OBSS BERTH CAMERA SUPPORT

~

MCC

Page 170: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-112

10MET 009/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/22(266)

04:00

05:00

06:00

07:00

08:00

MET

Day 009E W Z

TDRS

~

~

~

~

ORB

146

147

148

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-112

10MET 009/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/22(266)

04:00

05:00

06:00

07:00

08:00

MET

Day 009E W Z

TDRS

ORB

146

147

148

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 171: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-113

10MET 009/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/22(266)

04:00

05:00

06:00

07:00

08:00

MET

Day 009E W Z

TDRS

~

~

~

~

ORB

146

147

148

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-113

10MET 009/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/22(266)

04:00

05:00

06:00

07:00

08:00

MET

Day 009E W Z

TDRS

ORB

146

147

148

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 172: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-114

10MET 009/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/22(266)

08:00

09:00

10:00

11:00

12:00

MET

Day 009E W Z

TDRS

~ ~

~

ORB

148

149

150

151

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-114

10MET 009/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/22(266)

08:00

09:00

10:00

11:00

12:00

MET

Day 009E W Z

TDRS

ORB

148

149

150

151

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 173: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-115

10MET 009/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/22(266)

08:00

09:00

10:00

11:00

12:00

MET

Day 009E W Z

TDRS

~ ~

~

ORB

148

149

150

151

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-115

10MET 009/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/22(266)

08:00

09:00

10:00

11:00

12:00

MET

Day 009E W Z

TDRS

ORB

148

149

150

151

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 174: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-116

11

FD11 EZ ACTIVITIESFD11

HARD REBOOT PGSCOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)

Steps 12 & 6 Triple G2 NBAT 1233O6 S TRK PWR -Z -ONCRT GNC I/O RESET

A

TFL 192

MET 009/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/22(266)

12:00

13:00

14:00

15:00

16:00

MET

Day 009E W Z

TDRS

~ ~

~

ORB

151

152

153

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

FAREWELLKU AVAIL XX:XX - XX:XX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DUCT REMOVAL AND HATCH CLS (BYPASS CONFIG) (JOINT OPS, EGRESS STATION)

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN)A

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

IMU STAR OF OPTY ALIGN (ORB OPS)

KELLY

FAREWELL

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DUCT REMOVAL AND HATCH CLS (BYPASS CONFIG) (JOINT OPS, EGRESS STATION)

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN)A

SALIVA COLLECT (ORB OPS, DSO)

NOGUCHI

FAREWELL

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

SSV POWER ON-OUT RATE = 3

P/TV04 INGRESS/EGRESS (OPS) (PHOTO/TV, SCENES)

P/TV03 UNDOCK (S/U) (PHOTO/TV, SCENES)

ROBINSON

EXERCISE

FAREWELL

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) PART 2 Checkout RNDZ tools with RPOP1

MCC

3-116

11

FD11 EZ ACTIVITIESFD11

HARD REBOOT PGSCOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)

Steps 12 & 6 Triple G2 NBAT 1233O6 S TRK PWR -Z -ONCRT GNC I/O RESET

A

TFL 192

MET 009/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/22(266)

12:00

13:00

14:00

15:00

16:00

MET

Day 009E W Z

TDRS

ORB

151

152

153

STS ATT~

~

BIAS -XLV +ZVV

COLLINS

FAREWELLKU AVAIL XX:XX - XX:XX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DUCT REMOVAL AND HATCH CLS (BYPASS CONFIG) (JOINT OPS, EGRESS STATION)

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN)A

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

IMU STAR OF OPTY ALIGN (ORB OPS)

KELLY

FAREWELL

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DUCT REMOVAL AND HATCH CLS (BYPASS CONFIG) (JOINT OPS, EGRESS STATION)

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN)A

SALIVA COLLECT (ORB OPS, DSO)

NOGUCHI

FAREWELL

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

SSV POWER ON-OUT RATE = 3

P/TV04 INGRESS/EGRESS (OPS) (PHOTO/TV, SCENES)

P/TV03 UNDOCK (S/U) (PHOTO/TV, SCENES)

ROBINSON

EXERCISE

FAREWELL

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) PART 2 Checkout RNDZ tools with RPOP1

MCC

Page 175: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-117

11

FD11

MET 009/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/22(266)

12:00

13:00

14:00

15:00

16:00

MET

Day 009E W Z

TDRS

~ ~

~

ORB

151

152

153

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

ODS VEST/PMA DEPRESS &HATCH LEAK CHECK (JOINT OPS, EGRESS STATION)

FAREWELL

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FORMALDEHYDE MONITOR KIT (ORB OPS, CREW SYS) DEPLOY

LAWRENCE

ODS VEST/PMA DEPRESS &HATCH LEAK CHECK (JOINT OPS, EGRESS STATION)

FAREWELL

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

HARDLINE AUDIO CONFIG BACKOUT (JOINT OPS, COMM/DATA) Steps 1,3,4

FAREWELL

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MIDDECK STATUS CHECKS (ASSY OPS, CUE CARD)

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

EXERCISE

~

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) PART 2 Checkout RNDZ tools with RPOP1

MCC

3-117

11

FD11

MET 009/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/22(266)

12:00

13:00

14:00

15:00

16:00

MET

Day 009E W Z

TDRS

ORB

151

152

153

STS ATT~

~

BIAS -XLV +ZVV

THOMAS

ODS VEST/PMA DEPRESS &HATCH LEAK CHECK (JOINT OPS, EGRESS STATION)

FAREWELL

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FORMALDEHYDE MONITOR KIT (ORB OPS, CREW SYS) DEPLOY

LAWRENCE

ODS VEST/PMA DEPRESS &HATCH LEAK CHECK (JOINT OPS, EGRESS STATION)

FAREWELL

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

HARDLINE AUDIO CONFIG BACKOUT (JOINT OPS, COMM/DATA) Steps 1,3,4

FAREWELL

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MIDDECK STATUS CHECKS (ASSY OPS, CUE CARD)

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

EXERCISE

~

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) PART 2 Checkout RNDZ tools with RPOP1

MCC

Page 176: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-118

11

< UNDOCK (17:15)

UPLINKβ 21° + B1

BOX B1-35<AZ<45-35<EL<40

< SEP 2 (18:12)

UPLINKβ 21° + MASK

L12 MPLM CH 1,2 HTR PWR -ON (tb-gray)

< SEP 1 (17:44)

MET 009/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/22(266)

16:00

17:00

18:00

19:00

20:00

MET

Day 009E W Z

TDRS

~ ~

~

ORB

153

154

155

156

STS ATT~

UNDOCK

~

-ZLV +YVV BIASED

COLLINS

APCU 1 ACT (ASSY OPS, APCU)

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6,9 & 12, Single G2

MEAL

MNVR (TRK) -ZLV +YVV (BIASED) TG=2 BV=3 OM=310 A6/AUTO/ALT Init TRK

MNVR (TRK) UNDOCK ATT TG=2 BV=5 P=180 Y=0 OM=0 A12/AUTO/VERN Init TRK (9/16:15)

OFF DUTY

~

UNDOCKING/SEPARATION TIMELINE (RNDZ, UNDOCK/SEP TIMELINE)

H/O ATT CONTROL RS to ORB (JOINT OPS, CONTINGENCY)

KELLY

On MCC GO:APCU 1 DEACT (ASSY OPS)

EXERCISE

~

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6,9 & 12, Single G2

ILLUMINATOR OPS (CUE CARD) (PHOTO/TV, TV) ILLUMINATORS OFF - A,B,C,D

MEAL

UNDOCKING/SEPARATION TIMELINE (RNDZ, UNDOCK/SEP TIMELINE)

NOGUCHI

MEAL

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR) Step 1 ONLY

SSV OUT RATE = 3

P/TV03 UNDOCK (OPS) (PHOTO/TV, SCENES)

L12(SSP) C/L CAM PWR - OFF Remove, Stow C/L CAMR, Harness ASSY

OFF DUTY

~

ROBINSON

MEAL

OFF DUTY

~

UNDOCKING/SEPARATION TIMELINE (RNDZ, UNDOCK/SEP TIMELINE)

MCC

TFL 184

3-118

11

< UNDOCK (17:15)

UPLINKβ 21° + B1

BOX B1-35<AZ<45-35<EL<40

< SEP 2 (18:12)

UPLINKβ 21° + MASK

L12 MPLM CH 1,2 HTR PWR -ON (tb-gray)

< SEP 1 (17:44)

MET 009/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/22(266)

16:00

17:00

18:00

19:00

20:00

MET

Day 009E W Z

TDRS

ORB

153

154

155

156

STS ATT~

UNDOCK

~

-ZLV +YVV BIASED

COLLINS

APCU 1 ACT (ASSY OPS, APCU)

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6,9 & 12, Single G2

MEAL

MNVR (TRK) -ZLV +YVV (BIASED) TG=2 BV=3 OM=310 A6/AUTO/ALT Init TRK

MNVR (TRK) UNDOCK ATT TG=2 BV=5 P=180 Y=0 OM=0 A12/AUTO/VERN Init TRK (9/16:15)

OFF DUTY

~

UNDOCKING/SEPARATION TIMELINE (RNDZ, UNDOCK/SEP TIMELINE)

H/O ATT CONTROL RS to ORB (JOINT OPS, CONTINGENCY)

KELLY

On MCC GO:APCU 1 DEACT (ASSY OPS)

EXERCISE

~

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6,9 & 12, Single G2

ILLUMINATOR OPS (CUE CARD) (PHOTO/TV, TV) ILLUMINATORS OFF - A,B,C,D

MEAL

UNDOCKING/SEPARATION TIMELINE (RNDZ, UNDOCK/SEP TIMELINE)

NOGUCHI

MEAL

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR) Step 1 ONLY

SSV OUT RATE = 3

P/TV03 UNDOCK (OPS) (PHOTO/TV, SCENES)

L12(SSP) C/L CAM PWR - OFF Remove, Stow C/L CAMR, Harness ASSY

OFF DUTY

~

ROBINSON

MEAL

OFF DUTY

~

UNDOCKING/SEPARATION TIMELINE (RNDZ, UNDOCK/SEP TIMELINE)

MCC

TFL 184

Page 177: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-119

11MET 009/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/22(266)

16:00

17:00

18:00

19:00

20:00

MET

Day 009E W Z

TDRS

~ ~

~

ORB

153

154

155

156

STS ATT~

UNDOCK

~

-ZLV +YVV BIASED

THOMAS

COMM STRING 1 C/O (PART A) (ORB OPS, COMM/INST)

MEAL

OFF DUTY

~

RMS PWRDN (MPM STOW) (PDRS, RMS PWRDN) Steps 3,5-7

UNDOCKING/SEPARATION T/L (RNDZ, UNDOCK/SEP TIMELINE)

LAWRENCE

MEAL

OFF DUTY

~

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR) Step 1 ONLY

OPERATIONS (DIGITAL) (CUE CARD, PLAYBACK) KU TDRX (XX:XX - XX:XX)

ACTIVATION (DIGITAL) (CUE CARD, PLAYBACK) Undocking

UNDOCKING/SEPARATION T/L (RNDZ, UNDOCK/SEP TIMELINE)

CAMARDA

MEAL

SSOR DEACTIVATION (JOINT OPS, COMM/DATA)

UNDOCKING/SEPARATION T/L (RNDZ, UNDOCK/SEP TIMELINE)

OFF DUTY

~

AIRLOCK FAN BYPASS (RNDZ, APDS-NOMINAL)

EXERCISE

~

MCC

MPLM ENVIRONMENT CHECK (MPLM, NOMINAL) Steps 1 & 4 Note: Pressure Check (NO fan)

3-119

11MET 009/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/22(266)

16:00

17:00

18:00

19:00

20:00

MET

Day 009E W Z

TDRS

ORB

153

154

155

156

STS ATT~

UNDOCK

~

-ZLV +YVV BIASED

THOMAS

COMM STRING 1 C/O (PART A) (ORB OPS, COMM/INST)

MEAL

OFF DUTY

~

RMS PWRDN (MPM STOW) (PDRS, RMS PWRDN) Steps 3,5-7

UNDOCKING/SEPARATION T/L (RNDZ, UNDOCK/SEP TIMELINE)

LAWRENCE

MEAL

OFF DUTY

~

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR) Step 1 ONLY

OPERATIONS (DIGITAL) (CUE CARD, PLAYBACK) KU TDRX (XX:XX - XX:XX)

ACTIVATION (DIGITAL) (CUE CARD, PLAYBACK) Undocking

UNDOCKING/SEPARATION T/L (RNDZ, UNDOCK/SEP TIMELINE)

CAMARDA

MEAL

SSOR DEACTIVATION (JOINT OPS, COMM/DATA)

UNDOCKING/SEPARATION T/L (RNDZ, UNDOCK/SEP TIMELINE)

OFF DUTY

~

AIRLOCK FAN BYPASS (RNDZ, APDS-NOMINAL)

EXERCISE

~

MCC

MPLM ENVIRONMENT CHECK (MPLM, NOMINAL) Steps 1 & 4 Note: Pressure Check (NO fan)

Page 178: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-120

11

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate SIMO Dump

MET 009/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/22(266)

20:00

21:00

22:00

23:00

00:00

MET

Day 009E W Z

TDRS

~

~

ORB

156

157

158

STS ATT~

-ZLV +YVV BIASED

COLLINS

CWC OVERBOARD DUMP (TERM) (ORB OPS, ECLS)

EXERCISE

OFF DUTY

~

OFF DUTY

IMU STAR OF OPTY ALIGN (ORB OPS)

KELLY

STS/ISS H2O CONT FILL(CWC SAMPLE) (ORB OPS, ECLS) Steps 1-2 Label BAG: Orbiter Condensate

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform TEARDOWN Temp stow full CWC for dump

CWC OVERBOARD DUMP (INIT) (ORB OPS, ECLS) DUMP CWC S/N ####

EXERCISE

~

OFF DUTY

~

OFF DUTY

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate SIMO Dump

OFF DUTY

NOGUCHI

EXERCISE

OFF DUTY

~

OFF DUTY

~

ROBINSON

OFF DUTY

~

~

MCC

UPDATEH20 WASTEDUMP QTY

3-120

11

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate SIMO Dump

MET 009/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/22(266)

20:00

21:00

22:00

23:00

00:00

MET

Day 009E W Z

TDRS

ORB

156

157

158

STS ATT~

-ZLV +YVV BIASED

COLLINS

CWC OVERBOARD DUMP (TERM) (ORB OPS, ECLS)

EXERCISE

OFF DUTY

~

OFF DUTY

IMU STAR OF OPTY ALIGN (ORB OPS)

KELLY

STS/ISS H2O CONT FILL(CWC SAMPLE) (ORB OPS, ECLS) Steps 1-2 Label BAG: Orbiter Condensate

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform TEARDOWN Temp stow full CWC for dump

CWC OVERBOARD DUMP (INIT) (ORB OPS, ECLS) DUMP CWC S/N ####

EXERCISE

~

OFF DUTY

~

OFF DUTY

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate SIMO Dump

OFF DUTY

NOGUCHI

EXERCISE

OFF DUTY

~

OFF DUTY

~

ROBINSON

OFF DUTY

~

~

MCC

UPDATEH20 WASTEDUMP QTY

Page 179: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-121

11MET 009/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/22(266)

20:00

21:00

22:00

23:00

00:00

MET

Day 009E W Z

TDRS

~

~

ORB

156

157

158

STS ATT~

-ZLV +YVV BIASED

THOMAS

OFF DUTY

~

VIDEO CONFERENCING (ORB OPS, PGSC) - PFC

OFF DUTY

~

LAWRENCE

EXERCISE

OFF DUTY

~

VIDEO CONFERENCING (ORB OPS, PGSC) - PFC

OFF DUTY

~

CAMARDA

OFF DUTY

~

OFF DUTY

~

VIDEO CONFERENCING (ORB OPS, PGSC) - PFC

MCC

3-121

11MET 009/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/22(266)

20:00

21:00

22:00

23:00

00:00

MET

Day 009E W Z

TDRS

ORB

156

157

158

STS ATT~

-ZLV +YVV BIASED

THOMAS

OFF DUTY

~

VIDEO CONFERENCING (ORB OPS, PGSC) - PFC

OFF DUTY

~

LAWRENCE

EXERCISE

OFF DUTY

~

VIDEO CONFERENCING (ORB OPS, PGSC) - PFC

OFF DUTY

~

CAMARDA

OFF DUTY

~

OFF DUTY

~

VIDEO CONFERENCING (ORB OPS, PGSC) - PFC

MCC

Page 180: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-122

11MET 010/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/22(266)

00:00

01:00

02:00

03:00

04:00

MET

Day 010E W Z

TDRS

~ ~

~

ORB

159

160

161

STS ATT

~

-ZLV -XVV

COLLINS

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A6/AUTO/ALT Init TRK

OFF DUTY

VIDEO CONFERENCING (ORB OPS, PGSC) - PFC

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OFF DUTY

KELLY

L12 MPLM CH 1,2 HTR PWR-OFF(tb-bp)

OFF DUTY

~

VIDEO CONFERENCING (ORB OPS, PGSC) - PFC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOGUCHI

OFF DUTY

~

VIDEO CONFERENCING (ORB OPS, PGSC) - PFC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

ROBINSON

OFF DUTY

OFF DUTY~

VIDEO CONFERENCING (ORB OPS, PGSC) - PFC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

OCA-PFC

OCA-PMC

OCA-PFC

OCA-PFC

OCA-PFC

3-122

11MET 010/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/22(266)

00:00

01:00

02:00

03:00

04:00

MET

Day 010E W Z

TDRS

ORB

159

160

161

STS ATT

~

-ZLV -XVV

COLLINS

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A6/AUTO/ALT Init TRK

OFF DUTY

VIDEO CONFERENCING (ORB OPS, PGSC) - PFC

VIDEO CONFERENCING (ORB OPS, PGSC) - PMC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OFF DUTY

KELLY

L12 MPLM CH 1,2 HTR PWR-OFF(tb-bp)

OFF DUTY

~

VIDEO CONFERENCING (ORB OPS, PGSC) - PFC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOGUCHI

OFF DUTY

~

VIDEO CONFERENCING (ORB OPS, PGSC) - PFC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)

ROBINSON

OFF DUTY

OFF DUTY~

VIDEO CONFERENCING (ORB OPS, PGSC) - PFC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MCC

OCA-PFC

OCA-PMC

OCA-PFC

OCA-PFC

OCA-PFC

Page 181: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-123

11MET 010/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/22(266)

00:00

01:00

02:00

03:00

04:00

MET

Day 010E W Z

TDRS

~

~

~

ORB

159

160

161

STS ATT

~

-ZLV -XVV

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

OFF DUTY

~

LAWRENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OFF DUTY

~

WITH MEAL: RENAL STONE (ORB OPS)

CAMARDA

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MIDDECK STATUS CHECKS (ASSY OPS, CUE CARD)

MCC

3-123

11MET 010/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/22(266)

00:00

01:00

02:00

03:00

04:00

MET

Day 010E W Z

TDRS

ORB

159

160

161

STS ATT

~

-ZLV -XVV

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

OFF DUTY

~

LAWRENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OFF DUTY

~

WITH MEAL: RENAL STONE (ORB OPS)

CAMARDA

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MIDDECK STATUS CHECKS (ASSY OPS, CUE CARD)

MCC

Page 182: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-124

11MET 010/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/23(267)

04:00

05:00

06:00

07:00

08:00

MET

Day 010E W Z

TDRS

~ ~

~

ORB

161

162

163

164

STS ATT~

~

-ZLV -XVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-124

11MET 010/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/23(267)

04:00

05:00

06:00

07:00

08:00

MET

Day 010E W Z

TDRS

ORB

161

162

163

164

STS ATT~

~

-ZLV -XVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 183: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-125

11MET 010/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/23(267)

04:00

05:00

06:00

07:00

08:00

MET

Day 010E W Z

TDRS

~

~

~

ORB

161

162

163

164

STS ATT~

~

-ZLV -XVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-125

11MET 010/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/23(267)

04:00

05:00

06:00

07:00

08:00

MET

Day 010E W Z

TDRS

ORB

161

162

163

164

STS ATT~

~

-ZLV -XVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 184: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-126

11MET 010/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/23(267)

08:00

09:00

10:00

11:00

12:00

MET

Day 010E W Z

TDRS

~ ~

~

ORB

164

165

166

STS ATT~

~

-ZLV -XVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

3-126

11MET 010/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/23(267)

08:00

09:00

10:00

11:00

12:00

MET

Day 010E W Z

TDRS

ORB

164

165

166

STS ATT~

~

-ZLV -XVV

COLLINS

SLEEP

~

KELLY

SLEEP

~

NOGUCHI

SLEEP

~

ROBINSON

SLEEP

~

MCC

Page 185: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-127

11MET 010/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/23(267)

08:00

09:00

10:00

11:00

12:00

MET

Day 010E W Z

TDRS

~

~

~

ORB

164

165

166

STS ATT~

~

-ZLV -XVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

3-127

11MET 010/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/23(267)

08:00

09:00

10:00

11:00

12:00

MET

Day 010E W Z

TDRS

ORB

164

165

166

STS ATT~

~

-ZLV -XVV

THOMAS

SLEEP

~

LAWRENCE

SLEEP

~

CAMARDA

SLEEP

~

MCC

Page 186: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-128

12

FD12 EZ ACTIVITIESHARD REBOOT PGSCOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)

TFL 161

FD12

APU STEAM VENT HTR ACTR2 √BLR CNTLR/HTR (three)-B PWR (three) -ON

A

Steps 3&4, use default POS STIMRepeat steps 3&4, use NEG STIM

MET 010/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/23(267)

12:00

13:00

14:00

15:00

16:00

MET

Day 010E W Z

TDRS

~ ~

~~

ORB

167

168

169

STS ATT~

~

-ZLV -XVV

COLLINS

FCS CHECKOUT (ORB OPS, GNC)

L12 MPLM CH 1,2 HTR PWR -ON (tb-gray)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RCS HOT FIRE TEST (ORB OPS, RCS) CONFIG DAP: A6/AUTO/ALT ELEVON POSITIONING FOR INSPECT A (ORB OPS, GNC)

~

KELLY

APCU 1 ACT (ASSY OPS, APCU)

On MCC GO:APCU 1 DEACT (ASSY OPS) FCS CHECKOUT (ORB OPS, GNC)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RCS HOT FIRE TEST (ORB OPS, RCS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SALIVA COLLECT (ORB OPS, DSO)

ELEVON POSITIONING FOR INSPECT A (ORB OPS, GNC)

~

NOGUCHI

FILTER CLEANING (IFM, SCHED MAINT) Inspect filters and clean as necessary

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

CABIN CONFIG/STOW

~

ROBINSON

FCS CHECKOUT (ORB OPS, GNC)

PILOT W/ RHC SETUP DIAGRAM (ORB OPS, PGSC)~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RCS HOT FIRE TEST (ORB OPS, RCS)

MCC

3-128

12

FD12 EZ ACTIVITIESHARD REBOOT PGSCOCAC FILTER INSPECTTEPC (STATUS CK) (ORB OPS, CREW SYS)

TFL 161

FD12

APU STEAM VENT HTR ACTR2 √BLR CNTLR/HTR (three)-B PWR (three) -ON

A

Steps 3&4, use default POS STIMRepeat steps 3&4, use NEG STIM

MET 010/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/23(267)

12:00

13:00

14:00

15:00

16:00

MET

Day 010E W Z

TDRS

ORB

167

168

169

STS ATT~

~

-ZLV -XVV

COLLINS

FCS CHECKOUT (ORB OPS, GNC)

L12 MPLM CH 1,2 HTR PWR -ON (tb-gray)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RCS HOT FIRE TEST (ORB OPS, RCS) CONFIG DAP: A6/AUTO/ALT ELEVON POSITIONING FOR INSPECT A (ORB OPS, GNC)

~

KELLY

APCU 1 ACT (ASSY OPS, APCU)

On MCC GO:APCU 1 DEACT (ASSY OPS) FCS CHECKOUT (ORB OPS, GNC)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RCS HOT FIRE TEST (ORB OPS, RCS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SALIVA COLLECT (ORB OPS, DSO)

ELEVON POSITIONING FOR INSPECT A (ORB OPS, GNC)

~

NOGUCHI

FILTER CLEANING (IFM, SCHED MAINT) Inspect filters and clean as necessary

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

CABIN CONFIG/STOW

~

ROBINSON

FCS CHECKOUT (ORB OPS, GNC)

PILOT W/ RHC SETUP DIAGRAM (ORB OPS, PGSC)~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RCS HOT FIRE TEST (ORB OPS, RCS)

MCC

Page 187: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-129

12

FD12

MET 010/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/23(267)

12:00

13:00

14:00

15:00

16:00

MET

Day 010E W Z

TDRS

~

~

~

~

ORB

167

168

169

STS ATT~

~

-ZLV -XVV

THOMAS

CABIN CONFIG/STOW

EXERCISE

~

OIU DEACTIVATION (ORB OPS, OIU)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRLA CLOSE (ORB OPS, PRLA)

LAWRENCE

CABIN CONFIG/STOW

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

CABIN CONFIG/STOW

~

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MIDDECK STATUS CHECKS (ASSY OPS, CUE CARD)

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

PRLA CLOSE (ORB OPS, PRLA)

MCC

MPLM ENVIRONMENT CHECK (MPLM, NOMINAL) Steps 1 & 4 Note: Pressure Check (NO fan)

3-129

12

FD12

MET 010/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/23(267)

12:00

13:00

14:00

15:00

16:00

MET

Day 010E W Z

TDRS

ORB

167

168

169

STS ATT~

~

-ZLV -XVV

THOMAS

CABIN CONFIG/STOW

EXERCISE

~

OIU DEACTIVATION (ORB OPS, OIU)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRLA CLOSE (ORB OPS, PRLA)

LAWRENCE

CABIN CONFIG/STOW

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

CABIN CONFIG/STOW

~

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MIDDECK STATUS CHECKS (ASSY OPS, CUE CARD)

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

PRLA CLOSE (ORB OPS, PRLA)

MCC

MPLM ENVIRONMENT CHECK (MPLM, NOMINAL) Steps 1 & 4 Note: Pressure Check (NO fan)

Page 188: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-130

12

TFL 184

A

Steps 3&4, use default POS STIMRepeat steps 3&4, use NEG STIM

MET 010/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/23(267)

16:00

17:00

18:00

19:00

20:00

MET

Day 010E W Z

TDRS

~

~~

ORB

169

170

171

172

STS ATT~

~

-ZLV -XVV

COLLINS

CABIN CONFIG/STOW

DEORBIT BRIEF

EXERCISE

SPLY H2O DUMP W/FES (ORB OPS, ECLS) Step 1 using FES Pri A

PUBLIC AFFAIRS EVENTKU AVAIL TDRS XX:XX-XX:XX REF MSG ###

~

PILOT WITH RHC (ORB OPS, PGSC)

ELEVON POSITIONING FOR INSPECT A (ORB OPS, GNC)

~

FUTR LOAD +ZLV MNVR (TRK)TG=2 BV=5 P=270 Y=0 OM=180A6/AUTO/ALT (21:00) Init TRK

KELLY

DEORBIT BRIEF

EXERCISE

PILOT WITH RHC (ORB OPS, PGSC)

PUBLIC AFFAIRS EVENT~

CABIN CONFIG/STOW

ELEVON POSITIONING FOR INSPECT A (ORB OPS, GNC)

~

NOGUCHI

DEORBIT BRIEF

EVA HARDWARE STOW (EVA, TOOLS AND STOWAGE)

EXERCISE

POST EVA ENT PREP (EVA, POST EVA ENT PREP)

CABIN CONFIG/STOW~

PUBLIC AFFAIRS EVENT~

DIGITAL PAO CC (PHOTO/TV, SONY PD100)

ROBINSON

DEORBIT BRIEF

EVA HARDWARE STOW (EVA, TOOLS AND STOWAGE)

PILOT WITH RHC (ORB OPS, PGSC)

PILOT W/ RHC SETUP DIAGRAM (ORB OPS, PGSC)

~

POST EVA ENT PREP (EVA, POST EVA ENT PREP)

PUBLIC AFFAIRS EVENT~

MCC

3-130

12

TFL 184

A

Steps 3&4, use default POS STIMRepeat steps 3&4, use NEG STIM

MET 010/16:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

16:00

17:00

18:00

19:00

GMT

Date09/23(267)

16:00

17:00

18:00

19:00

20:00

MET

Day 010E W Z

TDRS

ORB

169

170

171

172

STS ATT~

~

-ZLV -XVV

COLLINS

CABIN CONFIG/STOW

DEORBIT BRIEF

EXERCISE

SPLY H2O DUMP W/FES (ORB OPS, ECLS) Step 1 using FES Pri A

PUBLIC AFFAIRS EVENTKU AVAIL TDRS XX:XX-XX:XX REF MSG ###

~

PILOT WITH RHC (ORB OPS, PGSC)

ELEVON POSITIONING FOR INSPECT A (ORB OPS, GNC)

~

FUTR LOAD +ZLV MNVR (TRK)TG=2 BV=5 P=270 Y=0 OM=180A6/AUTO/ALT (21:00) Init TRK

KELLY

DEORBIT BRIEF

EXERCISE

PILOT WITH RHC (ORB OPS, PGSC)

PUBLIC AFFAIRS EVENT~

CABIN CONFIG/STOW

ELEVON POSITIONING FOR INSPECT A (ORB OPS, GNC)

~

NOGUCHI

DEORBIT BRIEF

EVA HARDWARE STOW (EVA, TOOLS AND STOWAGE)

EXERCISE

POST EVA ENT PREP (EVA, POST EVA ENT PREP)

CABIN CONFIG/STOW~

PUBLIC AFFAIRS EVENT~

DIGITAL PAO CC (PHOTO/TV, SONY PD100)

ROBINSON

DEORBIT BRIEF

EVA HARDWARE STOW (EVA, TOOLS AND STOWAGE)

PILOT WITH RHC (ORB OPS, PGSC)

PILOT W/ RHC SETUP DIAGRAM (ORB OPS, PGSC)

~

POST EVA ENT PREP (EVA, POST EVA ENT PREP)

PUBLIC AFFAIRS EVENT~

MCC

Page 189: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-131

12MET 010/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/23(267)

16:00

17:00

18:00

19:00

20:00

MET

Day 010E W Z

TDRS

~

~ ~

ORB

169

170

171

172

STS ATT~

~

-ZLV -XVV

THOMAS

CABIN CONFIG/STOW

DEORBIT BRIEF

EXERCISE

~

PUBLIC AFFAIRS EVENT~

LAWRENCE

CABIN CONFIG/STOW

~

CABIN CONFIG/STOW

DEORBIT BRIEF

EXERCISE

PUBLIC AFFAIRS EVENT~

CAMARDA

CABIN CONFIG/STOW

~

DEORBIT BRIEF

PUBLIC AFFAIRS EVENT~

MCC

3-131

12MET 010/16:00

STS-114 LF1 (FD )

MS3 MS4 MS5

16:00

17:00

18:00

19:00

GMT

Date09/23(267)

16:00

17:00

18:00

19:00

20:00

MET

Day 010E W Z

TDRS

ORB

169

170

171

172

STS ATT~

~

-ZLV -XVV

THOMAS

CABIN CONFIG/STOW

DEORBIT BRIEF

EXERCISE

~

PUBLIC AFFAIRS EVENT~

LAWRENCE

CABIN CONFIG/STOW

~

CABIN CONFIG/STOW

DEORBIT BRIEF

EXERCISE

PUBLIC AFFAIRS EVENT~

CAMARDA

CABIN CONFIG/STOW

~

DEORBIT BRIEF

PUBLIC AFFAIRS EVENT~

MCC

Page 190: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-132

12

A B IMU STAR PAD HUD CAL LOG -Y: 110 STAR ID: 38 AOS: 22:42 AOS: 22:57 LOS: 23:31 LOS: 23:47 -Z: 58 AOS: 23:08 SS: 23:14 LOS: 23:52 SR: 23:50

MET 010/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/23(267)

20:00

21:00

22:00

23:00

00:00

MET

Day 010E W Z

TDRS

~

~~

ORB

172

173

174

STS ATT~

-ZLV -XVV

+ZLV

-ZLV -XVV

HUD

~

COLLINS

CABIN CONFIG/STOW

SPLY H2O DUMP W/FES(ORB OPS, ECLS) Step 2. FES Pri A req'd

LANDING-1 COMM C/O (ORB OPS, COMM/INST)

MEAL

PUBLIC AFFAIRS EVENTKU AVAIL TDRS XX:XX-XX:XX REF MSG ###

~

CABIN CONFIG/STOW

HUD CALIBRATION (ORB OPS, GNC)

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A6/AUTO/ALT Init TRK

WSSH COMM C/O (ORB OPS, COMM/INST)

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A6/AUTO/ALT Init TRK

KELLY

CABIN CONFIG/STOW

MEAL

PUBLIC AFFAIRS EVENT

~

HUD CALIBRATION (ORB OPS, GNC)

MNVR HUD CAL ATT R=328.68 P=302.05 Y=2.96 A1/AUTO/VERN (23:13) Init MNVR B

MNVR IMU ALIGN ATT R=329 P=298 Y=10 A1/AUTO/VERN (22:56) Init MNVR A

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A6/AUTO/ALT Init TRK

IMU ALIGN - S TRK (ORB OPS, GNC)

NOGUCHI

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) RECONFIG/STOW

MEAL

ENTRY VIDEO SETUP (PHOTO/TV, MINI-CAM)

PUBLIC AFFAIRS EVENT

~

CABIN CONFIG/STOW

ROBINSON

CABIN CONFIG/STOW

EXERCISE

MEAL

PGSC STOW PART I Stow STS PGSCs not needed for MFX ops

PUBLIC AFFAIRS EVENT

~

MCC

3-132

12

A B IMU STAR PAD HUD CAL LOG -Y: 110 STAR ID: 38 AOS: 22:42 AOS: 22:57 LOS: 23:31 LOS: 23:47 -Z: 58 AOS: 23:08 SS: 23:14 LOS: 23:52 SR: 23:50

MET 010/20:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

20:00

21:00

22:00

23:00

GMT

Date09/23(267)

20:00

21:00

22:00

23:00

00:00

MET

Day 010E W Z

TDRS

ORB

172

173

174

STS ATT~

-ZLV -XVV

+ZLV

-ZLV -XVV

HUD

~

COLLINS

CABIN CONFIG/STOW

SPLY H2O DUMP W/FES(ORB OPS, ECLS) Step 2. FES Pri A req'd

LANDING-1 COMM C/O (ORB OPS, COMM/INST)

MEAL

PUBLIC AFFAIRS EVENTKU AVAIL TDRS XX:XX-XX:XX REF MSG ###

~

CABIN CONFIG/STOW

HUD CALIBRATION (ORB OPS, GNC)

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A6/AUTO/ALT Init TRK

WSSH COMM C/O (ORB OPS, COMM/INST)

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A6/AUTO/ALT Init TRK

KELLY

CABIN CONFIG/STOW

MEAL

PUBLIC AFFAIRS EVENT

~

HUD CALIBRATION (ORB OPS, GNC)

MNVR HUD CAL ATT R=328.68 P=302.05 Y=2.96 A1/AUTO/VERN (23:13) Init MNVR B

MNVR IMU ALIGN ATT R=329 P=298 Y=10 A1/AUTO/VERN (22:56) Init MNVR A

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A6/AUTO/ALT Init TRK

IMU ALIGN - S TRK (ORB OPS, GNC)

NOGUCHI

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) RECONFIG/STOW

MEAL

ENTRY VIDEO SETUP (PHOTO/TV, MINI-CAM)

PUBLIC AFFAIRS EVENT

~

CABIN CONFIG/STOW

ROBINSON

CABIN CONFIG/STOW

EXERCISE

MEAL

PGSC STOW PART I Stow STS PGSCs not needed for MFX ops

PUBLIC AFFAIRS EVENT

~

MCC

Page 191: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-133

12MET 010/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/23(267)

20:00

21:00

22:00

23:00

00:00

MET

Day 010E W Z

TDRS

~

~ ~

ORB

172

173

174

STS ATT~

-ZLV -XVV

+ZLV

-ZLV -XVV

HUD

~

THOMAS

CABIN CONFIG/STOW

COMM STRING 2 C/O (PART B) (ORB OPS, COMM/INST)

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) RECONFIG/STOW

MEAL

PUBLIC AFFAIRS EVENT

~

LAWRENCE

CABIN CONFIG/STOW

~

MEAL

PUBLIC AFFAIRS EVENT

~

CAMARDA

CABIN CONFIG/STOW

MEAL

PUBLIC AFFAIRS EVENT

~

MCC

3-133

12MET 010/20:00

STS-114 LF1 (FD )

MS3 MS4 MS5

20:00

21:00

22:00

23:00

GMT

Date09/23(267)

20:00

21:00

22:00

23:00

00:00

MET

Day 010E W Z

TDRS

ORB

172

173

174

STS ATT~

-ZLV -XVV

+ZLV

-ZLV -XVV

HUD

~

THOMAS

CABIN CONFIG/STOW

COMM STRING 2 C/O (PART B) (ORB OPS, COMM/INST)

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) RECONFIG/STOW

MEAL

PUBLIC AFFAIRS EVENT

~

LAWRENCE

CABIN CONFIG/STOW

~

MEAL

PUBLIC AFFAIRS EVENT

~

CAMARDA

CABIN CONFIG/STOW

MEAL

PUBLIC AFFAIRS EVENT

~

MCC

Page 192: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-134

12

TFL 161

R12 VPU PWR - OFF (LED-off) Minimize use of P/TV equipment Dim cabin lighting to 25%

A √

FD12 OVERNIGHT CONFIG OCA ROUTER - ON MFX LAUNCHED

MET 011/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/23(267)

00:00

01:00

02:00

03:00

04:00

MET

Day 011E W Z

TDRS

~

~~

ORB

174

175

176

177

STS ATT~

~

-ZLV -XVV

COLLINS

LANDING-1 COMM C/O (ORB OPS, COMM/INST)

06 UHF MODE - OFF A/G PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

ENTRY COOLING CONFIG A

KU-BD ANT STOW (ORB OPS, COMM/INST)

L12 MPLM CH 1,2 HTR PWR-OFF(tb-bp)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

NOGUCHI

PRE SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

SSV DEACTIVATION (PHOTO/TV, SSV)

ROBINSON

OCA S-BAND MODEM (MFX) ACT (ORB OPS, PGSC)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MCC

3-134

12

TFL 161

R12 VPU PWR - OFF (LED-off) Minimize use of P/TV equipment Dim cabin lighting to 25%

A √

FD12 OVERNIGHT CONFIG OCA ROUTER - ON MFX LAUNCHED

MET 011/00:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

00:00

01:00

02:00

03:00

GMT

Date09/23(267)

00:00

01:00

02:00

03:00

04:00

MET

Day 011E W Z

TDRS

ORB

174

175

176

177

STS ATT~

~

-ZLV -XVV

COLLINS

LANDING-1 COMM C/O (ORB OPS, COMM/INST)

06 UHF MODE - OFF A/G PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KELLY

ENTRY COOLING CONFIG A

KU-BD ANT STOW (ORB OPS, COMM/INST)

L12 MPLM CH 1,2 HTR PWR-OFF(tb-bp)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

NOGUCHI

PRE SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

SSV DEACTIVATION (PHOTO/TV, SSV)

ROBINSON

OCA S-BAND MODEM (MFX) ACT (ORB OPS, PGSC)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MCC

Page 193: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-135

12MET 011/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/23(267)

00:00

01:00

02:00

03:00

04:00

MET

Day 011E W Z

TDRS

~

~ ~

ORB

174

175

176

177

STS ATT~

~

-ZLV -XVV

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

LAWRENCE

CABIN CONFIG/STOW

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

WITH MEAL: RENAL STONE (ORB OPS)

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MIDDECK STATUS CHECKS (ASSY OPS, CUE CARD)

DEACTIVATION AND TEARDOWN (ORB OPS, WLE SENSORS)

MCC

3-135

12MET 011/00:00

STS-114 LF1 (FD )

MS3 MS4 MS5

00:00

01:00

02:00

03:00

GMT

Date09/23(267)

00:00

01:00

02:00

03:00

04:00

MET

Day 011E W Z

TDRS

ORB

174

175

176

177

STS ATT~

~

-ZLV -XVV

THOMAS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

LAWRENCE

CABIN CONFIG/STOW

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

WITH MEAL: RENAL STONE (ORB OPS)

CAMARDA

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MIDDECK STATUS CHECKS (ASSY OPS, CUE CARD)

DEACTIVATION AND TEARDOWN (ORB OPS, WLE SENSORS)

MCC

Page 194: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-136

12MET 011/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/24(268)

04:00

05:00

06:00

07:00

08:00

MET

Day 011E W Z

TDRS

~

~

ORB

177

178

179

STS ATT~

~

-ZLV -XVV

COLLINS

SLEEP

~

~

KELLY

SLEEP

~

~

NOGUCHI

SLEEP

~

~

ROBINSON

SLEEP

~

~

MCC

3-136

12MET 011/04:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

04:00

05:00

06:00

07:00

GMT

Date09/24(268)

04:00

05:00

06:00

07:00

08:00

MET

Day 011E W Z

TDRS

ORB

177

178

179

STS ATT~

~

-ZLV -XVV

COLLINS

SLEEP

~

~

KELLY

SLEEP

~

~

NOGUCHI

SLEEP

~

~

ROBINSON

SLEEP

~

~

MCC

Page 195: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-137

12MET 011/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/24(268)

04:00

05:00

06:00

07:00

08:00

MET

Day 011E W Z

TDRS

~

~

ORB

177

178

179

STS ATT~

~

-ZLV -XVV

THOMAS

SLEEP

~

~

LAWRENCE

SLEEP

~

~

CAMARDA

SLEEP

~

~

MCC

3-137

12MET 011/04:00

STS-114 LF1 (FD )

MS3 MS4 MS5

04:00

05:00

06:00

07:00

GMT

Date09/24(268)

04:00

05:00

06:00

07:00

08:00

MET

Day 011E W Z

TDRS

ORB

177

178

179

STS ATT~

~

-ZLV -XVV

THOMAS

SLEEP

~

~

LAWRENCE

SLEEP

~

~

CAMARDA

SLEEP

~

~

MCC

Page 196: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-138

13

FD13

MET 011/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/24(268)

08:00

09:00

10:00

11:00

12:00

MET

Day 011E W Z

TDRS

~

~

~

ORB

180

181

182

STS ATT~

~

-ZLV -XVV

COLLINS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

KELLY

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

SALIVA COLLECT (ORB OPS, DSO)

NOGUCHI

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

~

SLEEP

~

ROBINSON

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MCC

3-138

13

FD13

MET 011/08:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

08:00

09:00

10:00

11:00

GMT

Date09/24(268)

08:00

09:00

10:00

11:00

12:00

MET

Day 011E W Z

TDRS

ORB

180

181

182

STS ATT~

~

-ZLV -XVV

COLLINS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

KELLY

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

SALIVA COLLECT (ORB OPS, DSO)

NOGUCHI

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

~

SLEEP

~

ROBINSON

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MCC

Page 197: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-139

13

FD13

MET 011/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/24(268)

08:00

09:00

10:00

11:00

12:00

MET

Day 011E W Z

TDRS

~ ~

~

ORB

180

181

182

STS ATT~

~

-ZLV -XVV

THOMAS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

LAWRENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

MCC

3-139

13

FD13

MET 011/08:00

STS-114 LF1 (FD )

MS3 MS4 MS5

08:00

09:00

10:00

11:00

GMT

Date09/24(268)

08:00

09:00

10:00

11:00

12:00

MET

Day 011E W Z

TDRS

ORB

180

181

182

STS ATT~

~

-ZLV -XVV

THOMAS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

LAWRENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

CAMARDA

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

SALIVA COLLECT (ORB OPS, DSO)FLIGHT SLEEP LOG (ORB OPS, DSO)

MCC

Page 198: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-140

13

FD13 EZ ACTIVITIES BEFORE LEAVING FLT PLNFLUID LOADING PREP Fill drink containers per MCCREMOVE Loose items stored in AirlockPerform SEAT INSTALLATIONPerform ENTRY STOWAGE (FLTSW/RETN NET) (REF DATA, ENT STOW)STOW CSA-CP

TFL 164TRANSITION TO D/O PREP @ 11/13:53

MET 011/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/24(268)

12:00

13:00

14:00

15:00

16:00

MET

Day 011E W Z

TDRS

~

~

~

ORB

182

183

184

185

STS ATT~

-ZLV -XVV

VERIF

-XSI

~

COMM

COLLINS

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Dual G2, NBAT 1212

MNVR IMU ALIGN ATT A (pg 3-142) A1/AUTO/VERN Init MNVR (13:05)IMU ALIGN - S TRK (ORB OPS, GNC)MNVR IMU VERIF ATT B (pg 3-142) A1/AUTO/VERN Init MNVRIMU ALIGN - S TRK (ORB OPS, GNC)MNVR (TRK) -XSI ATT TG=4 BV=5 P=184 Y=0 OM=90 A1/AUTO/VERN Init TRK (11/13:46)

L12 MPLM CH 1,2 HTR PWR -ON (tb-gray)06 UHF MODE - OFF A/G PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

KELLY

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Dual G2, NBAT 1212

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOGUCHI

GIRA STOWAGE (ORB OPS, ECLS) After fluid loading water pulled

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

~

ROBINSON

COLOR PRINTER STOW (ORB OPS, PGSC)

PGSC STOW PART II Stow remaining STS PGSCs

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MCC

3-140

13

FD13 EZ ACTIVITIES BEFORE LEAVING FLT PLNFLUID LOADING PREP Fill drink containers per MCCREMOVE Loose items stored in AirlockPerform SEAT INSTALLATIONPerform ENTRY STOWAGE (FLTSW/RETN NET) (REF DATA, ENT STOW)STOW CSA-CP

TFL 164TRANSITION TO D/O PREP @ 11/13:53

MET 011/12:00

STS-114 LF1 (FD )

CDR PLT MS1 MS2

12:00

13:00

14:00

15:00

GMT

Date09/24(268)

12:00

13:00

14:00

15:00

16:00

MET

Day 011E W Z

TDRS

ORB

182

183

184

185

STS ATT~

-ZLV -XVV

VERIF

-XSI

~

COMM

COLLINS

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Dual G2, NBAT 1212

MNVR IMU ALIGN ATT A (pg 3-142) A1/AUTO/VERN Init MNVR (13:05)IMU ALIGN - S TRK (ORB OPS, GNC)MNVR IMU VERIF ATT B (pg 3-142) A1/AUTO/VERN Init MNVRIMU ALIGN - S TRK (ORB OPS, GNC)MNVR (TRK) -XSI ATT TG=4 BV=5 P=184 Y=0 OM=90 A1/AUTO/VERN Init TRK (11/13:46)

L12 MPLM CH 1,2 HTR PWR -ON (tb-gray)06 UHF MODE - OFF A/G PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

KELLY

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Dual G2, NBAT 1212

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOGUCHI

GIRA STOWAGE (ORB OPS, ECLS) After fluid loading water pulled

POST SLEEP ACTIVITY (ORB OPS, CREW SYS)

GALLEY MORNING CONFIG (ORB OPS, ECLS)

~

ROBINSON

COLOR PRINTER STOW (ORB OPS, PGSC)

PGSC STOW PART II Stow remaining STS PGSCs

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MCC

Page 199: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-141

13

TRANSITION TO D/O PREP @ 11/13:53

MET 011/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/24(268)

12:00

13:00

14:00

15:00

16:00

MET

Day 011E W Z

TDRS

~ ~

~

ORB

182

183

184

185

STS ATT~

-ZLV -XVV

VERIF

-XSI

~

COMM

THOMAS

OCAC STOWAGE (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FORMALDEHYDE MONITOR KIT (ORB OPS, CREW SYS) STOW

LAWRENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TISSUE EQUIV PROP COUNTER (ORB OPS, CREW SYS) Powerdown

DOFF ACT WATCH (ORB OPS, DSO)

CAMARDA

AIR SAMPLE Record MET and location on bottle

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MIDDECK STATUS CHECKS (ASSY OPS, CUE CARD)DOFF ACT WATCH (ORB OPS, DSO)

MCC

3-141

13

TRANSITION TO D/O PREP @ 11/13:53

MET 011/12:00

STS-114 LF1 (FD )

MS3 MS4 MS5

12:00

13:00

14:00

15:00

GMT

Date09/24(268)

12:00

13:00

14:00

15:00

16:00

MET

Day 011E W Z

TDRS

ORB

182

183

184

185

STS ATT~

-ZLV -XVV

VERIF

-XSI

~

COMM

THOMAS

OCAC STOWAGE (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FORMALDEHYDE MONITOR KIT (ORB OPS, CREW SYS) STOW

LAWRENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TISSUE EQUIV PROP COUNTER (ORB OPS, CREW SYS) Powerdown

DOFF ACT WATCH (ORB OPS, DSO)

CAMARDA

AIR SAMPLE Record MET and location on bottle

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MIDDECK STATUS CHECKS (ASSY OPS, CUE CARD)DOFF ACT WATCH (ORB OPS, DSO)

MCC

Page 200: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/114/BAS A 3-142

A IMU STAR ALIGN

ID: -Y: 13 RIGELMET (11/13:07 TO 11/13:57)

-Z: 95 BETA GRUISMET (11/12:58 TO 11/13:47)

ANG DIFF: 89.4

DUAL S TRKR 2nd ATTITUDEALIGNMENT (SINGLE S TRKR) -Z: 13 -Y: 95

R 195 R 105 284P 134 P 148 128Y 13 Y 8 359

REQD ID:

-Y:_____, -Z:_____, ANG ERR____,____,____

ANG: 1 2 3∆X ( )___,___,___ ( )___,___ ___ ( )___,___ ___∆Y ( )___,___,___ ( )___,___ ___ ( )___,___ ___∆Z ( )___,___,___ ( )___,___ ___ ( )___,___ ___

EXECUTION TIME: ___/___:___:___ MET

B IMU STAR VERIFICATION

ID: -Y: 93 ICENMET (11/13:29 TO 11/14:18)

-Z: 21 PROCYONMET (11/13:20 TO 11/14:11)

ANG DIFF: 89.4

DUAL S TRKR 2nd ATTITUDEALIGNMENT (SINGLE S TRKR) -Z: 93 -Y: 21

R 71 R 346 162P 68 P 56 59Y 17 Y 8 29

REQD ID:

-Y:_____, -Z:_____, ANG ERR____,____,____

ANG: 1 2 3∆X ( )___,___,___ ( )___,___ ___ ( )___,___ ___∆Y ( )___,___,___ ( )___,___ ___ ( )___,___ ___∆Z ( )___,___,___ ( )___,___ ___ ( )___,___ ___

If any ∆X, ∆Y, OR ∆Z > 0.1 Check MCCEXECUTION TIME: ___/___:___:___ MET

3-142

A IMU STAR ALIGN

ID: -Y: 13 RIGELMET (11/13:07 TO 11/13:57)

-Z: 95 BETA GRUISMET (11/12:58 TO 11/13:47)

ANG DIFF: 89.4

DUAL S TRKR 2nd ATTITUDEALIGNMENT (SINGLE S TRKR) -Z: 13 -Y: 95

R 195 R 105 284P 134 P 148 128Y 13 Y 8 359

REQD ID:

-Y:_____, -Z:_____, ANG ERR____,____,____

ANG: 1 2 3∆X ( )___,___,___ ( )___,___ ___ ( )___,___ ___∆Y ( )___,___,___ ( )___,___ ___ ( )___,___ ___∆Z ( )___,___,___ ( )___,___ ___ ( )___,___ ___

EXECUTION TIME: ___/___:___:___ MET

B IMU STAR VERIFICATION

ID: -Y: 93 ICENMET (11/13:29 TO 11/14:18)

-Z: 21 PROCYONMET (11/13:20 TO 11/14:11)

ANG DIFF: 89.4

DUAL S TRKR 2nd ATTITUDEALIGNMENT (SINGLE S TRKR) -Z: 93 -Y: 21

R 71 R 346 162P 68 P 56 59Y 17 Y 8 29

REQD ID:

-Y:_____, -Z:_____, ANG ERR____,____,____

ANG: 1 2 3∆X ( )___,___,___ ( )___,___ ___ ( )___,___ ___∆Y ( )___,___,___ ( )___,___ ___ ( )___,___ ___∆Z ( )___,___,___ ( )___,___ ___ ( )___,___ ___

If any ∆X, ∆Y, OR ∆Z > 0.1 Check MCCEXECUTION TIME: ___/___:___:___ MET

Page 201: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

4-i FLT PLN/114/BAS A

The sections following this divider page will not be included in flight copies.

Page 202: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

4-ii FLT PLN/114/BAS A

This Page Intentionally Blank

Page 203: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

4-1 FLT PLN/114/BAS A

AT

TIT

UD

E

TIM

EL

INE

ATTITUDE TIMELINE

Page 204: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

4-2 FLT PLN/114/BAS A

AT

TIT

UD

E

TIM

EL

INE

This Page Intentionally Blank

Page 205: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

Attitude Timeline ORBITER MET/GMT MNVR OPTION DAP E/S/ β REF ATT/REMARKS EVENT 1 M50 (CALC) RATE 0.5000 +X PYR OMS-2 000/00:30:00 M INRTL R = 122.00 DB AT 3.50 R = 359.73 Posi Heads Up MNVR P = 111.00 DB RT 0.20 P = 16.03 PYR Y = 40.00 Y = 0.04 TIG 00:38 256/23:52:33 G SUN R 234 LVLH MNVR TRN/AUTO/PRI P 71 000/00:38:15 M HOLD (same) β = 49 257/00:00:48 G DV= 95.7 2 STS-114 000/01:00:00 M Launch Sept 12, 2004 257/00:22:33 G GMTLO: 256/23:22:33 3 LVLH TRACK RATE 0.2000 LVLH R= 0.00 Biased -ZLV +YVV 000/01:12:00 M TGT = 2 P = 90.00 DB AT 1.000 P=180.00 PLBD Opening 17:27 BV = 3 Y = 0.00 DB RT 0.020 Y= 60.00 OM = 300.00 257/00:34:33 G EARTH R 0 40:00 MNVR A1/AUTO/VERN P 90 HOLD (same) β = 49 SOPA @ 3:30 4 M50 (CALC) RATE 0.2000 +X PYR NC-1 000/04:50:00 M INRTL R = 122.00 DB AT 1.000 R = 0.23 Posi Heads Up 05:01:48 MNVR P = 113.00 DB RT 0.020 P = 15.91 OMS PYR Y = 37.00 Y = 0.00 TIG 05:05 257/04:12:33 G SUN R 234 LVLH 24:21 MNVR A1/AUTO/VERN P 69 000/05:05:00 M HOLD (same) β = 49 257/04:27:33 G DV= 89.1 5 LVLH TRACK RATE 0.2000 LVLH R= 0.00 -ZLV -XVV 000/05:10:00 M TGT = 2 P = 90.00 DB AT 1.000 P=180.00 22:00 BV = 3 Y = 0.00 DB RT 0.020 Y= 10.00 (tweaked for Ku) OM = 350.00 257/04:32:33 G EARTH R 0 44:33 MNVR A1/AUTO/VERN P 90 HOLD (same) β = 49 6 INRTL R = 0.00 RATE 0.2000 INRTL HOLD 000/08:30:00 M MNVR P = 0.00 DB AT 1.000 ONE ORBIT 42:57 Y = 0.00 DB RT 0.020 DEU 257/07:52:33 G SUN R 113 08:05:30 MNVR A1/AUTO/VERN P 170 HOLD (same) β = 48 7 LVLH TRACK RATE 0.2000 LVLH R= 0.00 -ZLV -XVV 000/10:15:00 M TGT = 2 P = 90.00 DB AT 1.000 P=180.00 29:32 BV = 3 Y = 0.00 DB RT 0.020 Y= 0.00 OM = 0.00 257/09:37:33 G EARTH R 0 52:05 MNVR A1/AUTO/VERN P 90 HOLD (same) β = 48 8 M50 (CALC) RATE 0.2000 +X PYR NC-2 000/15:10:00 M INRTL R = 122.00 DB AT 1.000 R = 0.41 Posi Head Up 19:46 MNVR P = 116.00 DB RT 0.020 P = 16.35 OMS - Right PYR Y = 40.00 Y = 355.80 TIG 15:29 257/14:32:33 G SUN R 230 LVLH 42:19 MNVR A1/AUTO/VERN P 67 000/15:29:34 M HOLD (same) β = 47 257/14:52:07 G DV= 8 9 LVLH TRACK RATE 0.2000 LVLH R=180.00 Biased -ZLV -YVV 000/15:35:00 M TGT = 2 P = 90.00 DB AT 1.000 P= 0.00 48:51 BV = 3 Y = 0.00 DB RT 0.020 Y=320.00 Biased for Ku OM = 140.00 for Calibration 257/14:57:33 G EARTH R 0 and 1st Scan 15:11:24 MNVR A1/AUTO/VERN P 90 HOLD (same) β = 47 10 LVLH TRACK RATE 0.2000 LVLH R=180.00 Biased -ZLV -YVV 000/20:10:00 M TGT = 2 P = 90.00 DB AT 1.000 P= 0.00 12:30 BV = 3 Y = 0.00 DB RT 0.020 Y=290.00 Biased for Ku OM = 110.00 for 2nd and 3rd 257/19:32:33 G EARTH R 0 Scans 35:03 MNVR A1/AUTO/VERN P 90 HOLD (same) β = 47 ALL ORBITER DATA IN 4-3 FLT PLN/114/BAS AMEAN OF 1950 AND PYR EULER SEQUENCE

Page 206: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

Attitude Timeline ORBITER MET/GMT MNVR OPTION DAP E/S/ β REF ATT/REMARKS EVENT 11 LVLH TRACK RATE 0.2000 LVLH R= 0.00 Biased -ZLV +YVV 001/00:00:00 M TGT = 2 P = 90.00 DB AT 1.000 P=180.00 14:35 BV = 3 Y = 0.00 DB RT 0.020 Y= 65.00 Biased for Ku OM = 295.00 for down-link 257/23:22:33 G EARTH R 0 37:08 MNVR A1/AUTO/VERN P 90 HOLD (same) β = 46 12 NPC 001/01:08:00 M Multi-Axis TIG 01:08 258/00:30:33 G DV= .7 13 M50 (CALC) RATE 0.2000 +X PYR NC-3 001/02:25:00 M INRTL R = 234.00 DB AT 1.000 R = 360.00 +X RCS 36:57 MNVR P = 292.00 DB RT 0.020 P = 15.96 Posi Heads Up PYR Y = 324.00 Y = 359.98 TIG 02:39 258/01:47:33 G SUN R 310 LVLH 59:30 MNVR A1/AUTO/VERN P 110 001/02:39:51 M HOLD (same) β = 46 258/02:02:24 G DV= 3 14 LVLH TRACK RATE 0.2000 LVLH R= 0.00 -ZLV -XVV 001/02:45:00 M TGT = 2 P = 90.00 DB AT 1.000 P=180.00 56:57 BV = 3 Y = 0.00 DB RT 0.020 Y= 0.00 OM = 0.00 258/02:07:33 G EARTH R 0 19:30 MNVR A1/AUTO/VERN P 90 HOLD (same) β = 46 15 INRTL R = 0.00 RATE 0.2000 INRTL HOLD 001/07:00:00 M MNVR P = 0.00 DB AT 1.000 ONE ORBIT 14:26 Y = 0.00 DB RT 0.020 DEU 258/06:22:33 G SUN R 113 36:59 MNVR A1/AUTO/VERN P 171 HOLD (same) β = 45 16 LVLH TRACK RATE 0.2000 LVLH R= 0.00 -ZLV -XVV 001/08:45:00 M TGT = 2 P = 90.00 DB AT 1.000 P=180.00 57:59 BV = 3 Y = 0.00 DB RT 0.020 Y= 0.00 OM = 0.00 258/08:07:33 G EARTH R 0 20:32 MNVR A1/AUTO/VERN P 90 HOLD (same) β = 45 17 LVLH TRACK RATE 0.2000 LVLH R=270.00 Biased +ZLV +YVV 001/12:25:00 M TGT = 2 P = 310.00 DB AT 1.000 P=270.00 Simo Dump 37:40 BV = 5 Y = 0.00 DB RT 0.020 Y=310.00 SOPA @ 14:00 OM = 270.00 Inspection 258/11:47:33 G EARTH R 180 1/13:50-14:50 12:00:13 MNVR A1/AUTO/VERN P 50 (Ku optimized for HOLD (same) β = 44 Inspection) 18 M50 (CALC) RATE 0.2000 +X PYR NH 001/14:45:00 M INRTL R = 226.00 DB AT 1.000 R = 359.41 Posi Heads Up 52:28 MNVR P = 349.00 DB RT 0.020 P = 16.00 OMS PYR Y = 43.00 Y = 359.82 TIG 14:58 258/14:07:33 G SUN R 242 LVLH 15:01 MNVR A1/AUTO/VERN P 127 001/14:58:08 M HOLD (same) β = 44 258/14:20:41 G DV= 110 19 RATE 0.2000 LVLH R=359.42 LVLH HOLD 001/15:03:00 M DB AT 2.00 HOLD P= 35.68 between burns DB RT 0.100 Y=359.80 258/14:25:33 G EARTH R 181 P 126 HOLD A7/AUTO/ALT β = 44 20 M50 (CALC) RATE 0.2000 +X PYR NC-4 001/15:42:00 M INRTL R = 147.00 DB AT 2.00 R = 0.16 Posi Head Up 45:20 MNVR P = 187.00 DB RT 0.100 P = 15.62 OMS PYR Y = 307.00 Y = 0.21 TIG 15:47 258/15:04:33 G SUN R 307 LVLH 07:53 MNVR A7/AUTO/ALT P 61 001/15:47:06 M HOLD (same) β = 44 258/15:09:39 G DV= 88.3 ALL ORBITER DATA IN 4-4 FLT PLN/114/BAS AMEAN OF 1950 AND PYR EULER SEQUENCE

Page 207: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

Attitude Timeline ORBITER MET/GMT MNVR OPTION DAP E/S/ β REF ATT/REMARKS EVENT 21 EPH TARGET RATE 0.5000 LVLH R=359.93 -Z TGT TRK 001/16:00:00 M TGT = 1 P = 90.00 DB AT 2.00 P=271.99 05:11 BV = 3 Y = 0.00 DB RT 0.100 Y= 0.00 OM = 0.00 258/15:22:33 G TGT VIDFILE: 27:44 MNVR B7/AUTO/ALT 114SIM_ISS HOLD A7/AUTO/VERN β = 44 VID #: 1 22 M50 (CALC) RATE 0.2000 +X PYR TI 001/17:10:00 M INRTL R = 153.00 DB AT 2.00 R = 0.70 Posi Head Up 15:01 MNVR P = 194.00 DB RT 0.100 P = 16.29 OMS - Left PYR Y = 312.00 Y = 353.90 TIG 17:19 258/16:32:33 G SUN R 310 LVLH 37:34 MNVR A7/AUTO/ALT P 57 001/17:19:04 M HOLD (same) β = 43 258/16:41:37 G DV= 8.9 23 EPH TARGET RATE 0.5000 LVLH R=359.79 -Z TGT TRK 001/17:35:00 M TGT = 1 P = 90.00 DB AT 2.00 P=276.29 40:29 BV = 3 Y = 0.00 DB RT 0.100 Y= 0.00 OM = 0.00 258/16:57:33 G TGT VIDFILE: 17:03:02 MNVR B7/AUTO/ALT 114SIM_ISS HOLD A7/AUTO/VERN β = 43 VID #: 1 24 LVLH TRACK RATE 0.0500 LVLH R= 0.00 +ZLV +XVV 001/18:40:00 M TGT = 2 P = 270.00 DB AT 1.000 P= 0.00 54:23 BV = 5 Y = 0.00 DB RT 0.020 Y= 0.00 Establish RBAR OM = 0.00 258/18:02:33 G EARTH R 180 16:56 MNVR A8/AUTO/VERN P 90 HOLD A7/AUTO/VERN β = 43 25 LVLH TRACK RATE 0.7500 LVLH R= 0.00 RPM MNVR 001/18:57:00 M TGT = 2 P = 180.00 DB AT 1.00 P= 90.00 59:00 BV = 5 Y = 0.00 DB RT 0.10 Y= 0.00 OM = 0.00 258/18:19:33 G EARTH R 90 21:33 MNVR A9/AUTO/PRI P 180 HOLD (same) β = 43 26 LVLH TRACK RATE 0.7500 LVLH R= 0.00 RPM MNVR 001/18:59:00 M TGT = 2 P = 90.00 DB AT 1.00 P=180.00 19:01:00 BV = 5 Y = 0.00 DB RT 0.10 Y= 0.00 OM = 0.00 258/18:21:33 G EARTH R 0 23:33 MNVR A9/AUTO/PRI P 90 HOLD (same) β = 43 27 LVLH TRACK RATE 0.7500 LVLH R= 0.00 RPM MNVR 001/19:01:00 M TGT = 2 P = 0.00 DB AT 1.00 P=270.00 03:00 BV = 5 Y = 0.00 DB RT 0.10 Y= 0.00 OM = 0.00 258/18:23:33 G EARTH R 307 25:33 MNVR A9/AUTO/PRI P 0 HOLD (same) β = 43 28 LVLH TRACK RATE 0.7500 LVLH R= 0.00 RPM MNVR 001/19:03:00 M TGT = 2 P = 270.00 DB AT 1.00 P= 0.00 05:00 BV = 5 Y = 0.00 DB RT 0.10 Y= 0.00 OM = 0.00 258/18:25:33 G EARTH R 180 27:33 MNVR A9/AUTO/PRI P 90 HOLD (same) β = 43 29 LVLH TRACK RATE 0.1300 LVLH R= 0.00 -XLV +ZVV 001/19:08:00 M TGT = 2 P = 179.00 DB AT 1.00 P= 91.00 TORVA 19:40 BV = 5 Y = 0.00 DB RT 0.10 Y= 0.00 OM = 0.00 Transition from 258/18:30:33 G EARTH R 0 +RBar to +VBar 42:13 MNVR A9/AUTO/PRI P 179 HOLD (same) β = 43 30 FREE DRIFT DOCKING 001/19:58:00 M 01/19:58 Config DAP: A12 for Att. Cntrl 258/19:20:33 G ISS (0,0,0) ALL ORBITER DATA IN 4-5 FLT PLN/114/BAS AMEAN OF 1950 AND PYR EULER SEQUENCE

Page 208: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

Attitude Timeline ORBITER MET/GMT MNVR OPTION DAP E/S/ β REF ATT/REMARKS EVENT 31 COE (CALC) RATE 0.1000 ISS YPR BIAS -XLV +ZVV 001/20:35:00 M TGT = 2 P = 157.00 DB AT 3.000 R = 0.00 Approx ISS TEA 38:40 BV = 5 Y = 0.00 DB RT 0.050 P = 23.00 OM = 0.00 Y = 0.00 ISS (0,23,0) 258/19:57:33 G EARTH R 0 LVLH ORB R = 0.00 20:01:13 MNVR A12/AUTO/VERN P 157 001/20:35:00 M LVLH P = 113.00 HOLD (same) β = 43 258/19:57:33 G Y = 0.00 32 LVLH TRACK RATE 0.1000 LVLH R= 0.00 -XLV +ZVV 009/16:15:00 M TGT = 2 P = 180.00 DB AT 3.000 P= 90.00 Prep for Undock 18:50 BV = 5 Y = 0.00 DB RT 0.050 Y= 0.00 OM = 0.00 ISS (0,0,0) 266/15:37:33 G EARTH R 36 41:23 MNVR A12/AUTO/VERN P 180 Note:BV=5 keeps w HOLD (same) β = 7 RNDZ/Flyaround 33 FREE DRIFT UNDOCK 009/17:15:00 M for Undocking 09/17:15 266/16:37:33 G 34 SEP 1 009/17:44:00 M 9/17:44 266/17:06:33 G DV = 1.5 35 LVLH FREE ROTATION RATE 0.1300 LVLH R= 0.00 1/4 "FLY AROUND" 009/17:50:00 M ROTR ABOUT +Y AXIS DB AT 1.000 P= 90.00 RATE=0.130 DB RT 0.020 Y= 0.00 266/17:12:33 G MNVR A9/LVLH/VERN HOLD (same) β = 7 36 RATE 0.1300 LVLH R= 0.00 LVLH HOLD 009/18:01:33 M DB AT 1.000 HOLD P=180.09 DB RT 0.020 Y= 0.00 FINAL SEP: TIG: 18:12 266/17:24:06 G EARTH R 0 P 90 HOLD A9/LVLH/VERN β = 7 37 LVLH TRACK RATE 0.2000 LVLH R= 0.00 -ZLV +YVV 009/18:15:00 M TGT = 2 P = 90.00 DB AT 5.00 P=180.00 19:10 BV = 3 Y = 0.00 DB RT 0.070 Y= 50.00 post sep for: OM = 310.00 Simo Dump 266/17:37:33 G EARTH R 0 Init: 21:30 41:43 MNVR A6/AUTO/ALT P 90 HOLD (same) β = 6 38 LVLH TRACK RATE 0.2000 LVLH R= 0.00 -ZLV -XVV 010/00:00:00 M TGT = 2 P = 90.00 DB AT 5.00 P=180.00 04:10 BV = 3 Y = 0.00 DB RT 0.070 Y= 0.00 OM = 0.00 266/23:22:33 G EARTH R 0 26:43 MNVR A6/AUTO/ALT P 90 HOLD (same) β = 5 39 RATE 0.0500 INRTL R=202.06 FCS C/O 010/15:00:00 M DB AT 1.000 HOLD P= 48.45 DB RT 0.020 Y= 32.41 267/14:22:33 G SUN R 183 P 124 HOLD A6/INRT/VERN β = 2 40 LVLH TRACK RATE 0.2000 LVLH R= 0.00 -ZLV -XVV 010/15:10:00 M TGT = 2 P = 90.00 DB AT 5.00 P=180.00 13:17 BV = 3 Y = 0.00 DB RT 0.070 Y= 0.00 OM = 0.00 267/14:32:33 G EARTH R 0 35:50 MNVR A6/AUTO/ALT P 90 HOLD (same) β = 2 ALL ORBITER DATA IN 4-6 FLT PLN/114/BAS AMEAN OF 1950 AND PYR EULER SEQUENCE

Page 209: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

Attitude Timeline ORBITER MET/GMT MNVR OPTION DAP E/S/ β REF ATT/REMARKS EVENT 41 RATE 0.0500 INRTL R=147.45 RCS H/F 010/15:40:00 M DB AT 1.000 HOLD P=205.98 DB RT 0.020 Y=338.14 267/15:02:33 G SUN R 355 P 33 HOLD A6/INRT/VERN β = 2 42 LVLH TRACK RATE 0.2000 LVLH R= 0.00 -ZLV -XVV 010/15:55:00 M TGT = 2 P = 90.00 DB AT 5.00 P=180.00 59:55 BV = 3 Y = 0.00 DB RT 0.070 Y= 0.00 OM = 0.00 267/15:17:33 G EARTH R 0 22:28 MNVR A6/AUTO/ALT P 90 HOLD (same) β = 2 43 LVLH TRACK RATE 0.2000 LVLH R=180.00 +ZLV -XVV 010/21:00:00 M TGT = 2 P = 270.00 DB AT 5.00 P=180.00 for WSSH 15:00 BV = 5 Y = 0.00 DB RT 0.070 Y= 0.00 UHF Comm Check OM = 180.00 267/20:22:33 G EARTH R 180 37:33 MNVR A6/AUTO/ALT P 90 HOLD (same) β = 1 44 LVLH TRACK RATE 0.2000 LVLH R= 0.00 -ZLV -XVV 010/21:40:00 M TGT = 2 P = 90.00 DB AT 5.00 P=180.00 55:00 BV = 3 Y = 0.00 DB RT 0.070 Y= 0.00 OM = 0.00 267/21:02:33 G EARTH R 0 17:33 MNVR A6/AUTO/ALT P 90 HOLD (same) β = 1 45 INRTL R = 329.00 RATE 0.2000 -Y: 110 IMU ALIGN 010/22:56:00 M MNVR P = 298.00 DB AT 1.000 ZETA HERCULES 23:07:53 Y = 10.00 DB RT 0.020 22:42 - 23:31 -Y: 110 -Z: 58 267/22:18:33 G SUN R 206 -Z: 58 30:26 MNVR A1/AUTO/VERN P 118 DENEB ALGEIDI PAIR AOS: 23:08 HOLD (same) β = 1 23:08 - 23:52 PAIR LOS: 23:31 46 INRTL R = 328.68 RATE 0.2000 ID: 38 HUD CAL 010/23:13:00 M MNVR P = 302.05 DB AT 1.000 NAVI 41 Y = 2.96 DB RT 0.020 22:57 - 23:47 STAR ID: 38 267/22:35:33 G SUN R 210 36:14 MNVR A1/AUTO/VERN P 122 SUNSET: 23:14 HOLD (same) β = 0 SUNRISE: 23:50 47 LVLH TRACK RATE 0.2000 LVLH R= 0.00 -ZLV -XVV 010/23:25:00 M TGT = 2 P = 90.00 DB AT 5.00 P=180.00 37:48 BV = 3 Y = 0.00 DB RT 0.070 Y= 0.00 OM = 0.00 267/22:47:33 G EARTH R 0 23:00:21 MNVR A6/AUTO/ALT P 90 HOLD (same) β = 0 48 INRTL R = 195.00 RATE 0.2000 -Y: 13 IMU ALIGN 011/13:05:00 M MNVR P = 134.00 DB AT 1.000 RIGEL 13:48 Y = 13.00 DB RT 0.020 13:07 - 13:57 -Y: 13 -Z: 95 268/12:27:33 G SUN R 151 -Z: 95 36:21 MNVR A1/AUTO/VERN P 47 BETA GRUIS PAIR AOS: 13:07 HOLD (same) β = -1 12:58 - 13:47 PAIR LOS: 13:47 49 INRTL R = 71.00 RATE 0.2000 -Y: 93 VERIFICATION 011/13:19:00 M MNVR P = 68.00 DB AT 1.000 ICEN 31:24 Y = 17.00 DB RT 0.020 13:29 - 14:18 -Y: 93 -Z: 21 268/12:41:33 G SUN R 295 -Z: 21 53:57 MNVR A1/AUTO/VERN P 111 PROCYON PAIR AOS: 13:29 HOLD (same) β = -1 13:20 - 14:11 PAIR LOS: 14:11 50 TGT= 4 RATE 0.2000 INRTL R=128.41 -XSI 011/13:46:00 M BV = 5 P = 184.00 DB AT 1.000 P= 2.06 52:46 Y = 0.00 DB RT 0.020 Y=357.84 OM = 90.00 268/13:08:33 G SUN R 180 15:19 MNVR A1/AUTO/VERN P 176 RA= 180.976 HOLD (same) β = -2 DEC= -0.423S ALL ORBITER DATA IN 4-7 FLT PLN/114/BAS AMEAN OF 1950 AND PYR EULER SEQUENCE

Page 210: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

Attitude Timeline ORBITER MET/GMT MNVR OPTION DAP E/S/ β REF ATT/REMARKS EVENT 51 INRTL R = 269.00 RATE 0.2000 COMM 011/15:28:00 M MNVR P = 30.00 DB AT 1.000 39:48 Y = 1.00 DB RT 0.020 268/14:50:33 G SUN R 91 15:02:21 MNVR A1/AUTO/VERN P 150 HOLD (same) β = -2 52 M50 (CALC) RATE 0.5000 +X PYR D/O BURN 011/17:30:00 M INRTL R = 174.00 DB AT 3.50 R = 0.65 Retro Head Down 34:03 MNVR P = 262.00 DB RT 0.20 P = 196.26 Dual OMS PYR Y = 322.00 Y = 0.10 268/16:52:33 G SUN R 2 LVLH KSC TIG 11/17:53 56:36 MNVR TRN/AUTO/PRI P 83 011/17:53:00 M HOLD (same) β = -2 268/17:15:33 G DV = 186

ALL ORBITER DATA IN 4-8 FLT PLN/114/BAS AMEAN OF 1950 AND PYR EULER SEQUENCE

Page 211: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

5-1 FLT PLN/114/BAS A

FL

IGH

T P

LA

N

NO

TE

S

FLIGHT PLAN NOTES

Page 212: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

5-2 FLT PLN/114/BAS A

FL

IGH

T P

LA

N

NO

TE

S

FLIGHT PLAN NOTES

A. FLIGHT DESCRIPTION

Orbiter: OV-103 Discovery Launch Window: 10 minutes Inclination: 51.6° Insertion/Rndz Altitude: 122/190 nautical miles Duration: 12 + 0 + 2 days

B. SHUTTLE CREW

CDR – Eileen Collins MS3 – Andrew Thomas PLT – James Kelly MS4 – Wendy Lawrence MS1 – Soichi Noguchi MS5 – Charles Camarda MS2 – Steve Robinson

C. MAJOR EVENTS

EVENT FD MET DATE CDT GMT Launch 1 0/00:00 9/12/2004 18:22 256/23:22 OMS-2 1 0/00:38 9/12/2004 19:00 257/00:00 NC-1 1 0/03:35 9/12/2004 21:57 257/02:57 NC-2 2 0/15:29 9/13/2004 9:52 257/14:52 OBSS Survey 2 0/17:15 9/13/2004 11:37 257/16:37 NPC 2 1/01:08 9/13/2004 19:30 258/00:30 NC-3 2 1/02:40 9/13/2004 21:02 258/02:02 NH 3 1/14:58 9/14/2004 9:20 258/14:20 NC-4 3 1/15:47 9/14/2004 10:09 258/15:09 Ti 3 1/17:19 9/14/2004 11:41 258/16:41 MC-4 3 1/18:36 9/14/2004 12:58 258/17:58 Docking 3 1/19:58 9/14/2004 14:20 258/19:20 ISS Ingress 3 1/22:10 9/14/2004 16:32 258/21:32 OBSS Handoff 3 1/23:00 9/14/2004 17:22 258/22:22 MPLM Install 4 2/14:00 9/15/2004 8:22 259/13:22 OBSS Survey 4 2/19:45 9/15/2004 14:07 259/19:07 EVA 1 5 3/18:00 9/16/2004 12:22 260/17:22 EVA 2 7 5/18:00 9/18/2004 12:22 262/17:22 EVA 3 9 7/18:00 9/20/2004 12:22 264/17:22 MPLM Uninstall 10 8/20:30 9/21/2004 14:52 265/19:52 OBSS Handoff 10 8/23:00 9/21/2004 17:22 265/22:22 ISS Egress 11 9/14:15 9/22/2004 8:37 266/13:37 Undocking 11 9/17:15 9/22/2004 11:37 266/16:37 Sep-1 11 9/17:44 9/22/2004 12:06 266/17:06 Sep-2 11 9/18:12 9/22/2004 12:34 266/17:34 Deorbit Burn 13 11/17:53 9/24/2004 12:15 268/17:15 Landing 13 11/18:56 9/24/2004 13:18 268/18:18

Page 213: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

5-3 FLT PLN/114/BAS A

D. LANDING OPPORTUNITIES

Landing

Orbit Site CST MET Nominal Primary 186 KSC Sep 24/13:15 11/17:53 1 Rev Late 187 KSC Sep 24/14:51 11/19:29 EOM +1 Primary 202 KSC Sep 25/13:41 12/18:19 1 Rev Late 203 EDW Sep 25/12:11 12/19:49 EOM +2 Primary 217 KSC Sep 26/12:31 13/17:09 1 Rev Late 218 KSC Sep 26/14:07 13/18:45

E. COMMUNICATIONS

The Summary Timeline contains several data bands for ground site and TDRS events. The TDRS band reflects the three prime TDRS satellites that will be used for orbiter coverage (East, West, and Z) and their longitudinal positions. Ku-band coverage is shown as unshaded bars.

TDRS-Z currently does not have the capability for DTV, therefore can not be used for critical damage detection. Nor is TDRS-Z considered acceptable for PAO events. OCA downlink is limited to 2 Mbps on TDRS-Z.

Prime TDRS Support: East (aka ‘Spare’): -47°, West (aka ‘171’): -171°, Z: -275° Backup TDRS Support: East: -41°, West: -174° U.S. Ground Sites: MIL, DFR, WLP

F. MAJOR PAYLOADS

1. LOGISTICS FLIGHT 1 (LF1) LAUNCH PACKAGE (LP)

The ISS LF1 LP consists of the MPLM, the External Stowage Platform (ESP)-2, the Lightweight Multi-Purpose Experiment Structure Carrier (LMC), two Assembly Power Converter Units (APCUs), and ISSP equipment and supplies in the orbiter crew compartment.

The MPLM Cargo Element (CE) is a pressurized module that will carry to orbit one payload rack, seven Resupply Stowage Platforms (RSPs), and four Resupply Stowage Racks (RSRs). The payload rack is the Human Research Facility (HRF)-2 rack. For LF1, the MPLM is configured in its passive configuration.

The ESP-2 consists of the Unpressurized Cargo Pallet (UCP) and the Keel Yoke Assembly (KYA). The UCP will be installed on the ISS, while the KYA will be returned in the orbiter payload bay. The UCP will carry to orbit four Video Stanchion Support Assemblies (VSSAs) and three Orbital Replacement Units (ORUs): the Utility Transfer Assembly (UTA), the Flex Hose Rotary Coupler (FHRC), and the Main Bus Switching Unit (MBSU). An EVA-removable cable harness is used to provide 120 Vdc of electrical power to the ESP-2 heaters while installed in the orbiter payload bay. The starboard Tool Stowage Assembly (TSA) contains ESP-2 primary and secondary power cables.

The LMC is a cross-bay carrier located in Bay 13. Its launch configuration will include a replacement ISS Control Moment Gyro (CMG)-1, and hardware associated with DTO 848 Orbiter Thermal Protection System (TPS) Repair Techniques.

Page 214: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

5-4 FLT PLN/114/BAS A

Cargo/payload items will be carried in the orbiter crew compartment including EVA tools and equipment, and other ISS mission-unique support hardware.

The ISS LF1 Return Complement (RC) in the cargo bay consists of the MPLM with seven RSPs, four RSRs, the ESP-2 KYA, the LMC, and two APCUs.

The LMC return configuration will carry the failed CMG unit and the DTO 848 hardware. The starboard TSA will return the ESP-2 Flight Releasable Grapple Fixture (FRGF).

Cargo/payload items will also be returned in the orbiter crew compartment, including a utilization payload, EVA tools and equipment, and other ISS mission-unique support hardware. The only ISS middeck utilization return experiment for LF1 is Protein Crystal Growth-Single Thermal Enclosure System (PCG-STES)-10. PCG-STES-10 is powered during descent.

2. MAJOR MISSION OBJECTIVES

A combination of EVA, robotics, and IVA activities will be performed to accomplish the following major LF1 mission objectives:

a. Inspect all orbiter Reinforced Carbon-Carbon (RCC) using the Orbiter Boom Sensor System (OBSS) attached to the SRMS, and downlink sensor data to the ground for evaluation.

b. Inspect all orbiter tile using ISS imagery during the rendezvous Rbar Pitch Maneuver (RPM) and the SRMS end effecter camera.

c. Perform three scheduled EVAs to accomplish DTO 848 objectives, remove and replace CMG-1, install ESP-2, and install the Material International Space Station Experiment (MISSE)-5 and retrieve MISSEs 1 and 2.

d. Transfer MPLM logistics and experiment hardware.

e. Transfer middeck logistics and experiment hardware.

G. STATION DEVELOPMENT TEST OBJECTIVE (SDTO)

1. SDTO 12004-U: SHUTTLE BOOSTER FAN BYPASS

The purpose of this SDTO is to increase shuttle on-orbit cryo margin by bypassing and deactivating the shuttle booster fan (airlock fan) whenever possible on orbit. The booster fan will not be activated in post insertion and will remain deactivated for most of the mission. It will however be activated for APDS docking ring extension, docking, and undocking to provide cooling to the powered docking avionics and to prevent condensation on the ODS hatch window. The fan will also be activated when the crew is working in the airlock (such as during EMU checkout) to provide good airflow. While docked, sufficient air circulation will be achieved through use of the Lab forward IMV fan so that CO2 levels on both the ISS and shuttle can be controlled during the day by the ISS. During the overnight period, additional remediation may be required to control CO2 levels in the shuttle. A real-time call may instruct the crew to replace LiOH on the middeck to supplement the CO2 removal provided by the ISS, or to reconfigure the duct and turn on the booster fan overnight. Acceptable flow rate through the IMV fan and proper CO2 levels on the shuttle throughout the docked timeframe must be confirmed on-orbit to prove this cryo reduction method a success.

Page 215: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

5-5 FLT PLN/114/BAS A

H. ON-ORBIT DETAILED TEST OBJECTIVES (DTOs)

1. DTO 848: ORBITER THERMAL PROTECTION SYSTEM (TPS) REPAIR TECHNIQUES

The purpose of this DTO is to perform an on-orbit EVA demonstration of the tools and techniques developed to repair damaged orbiter TPS tiles and RCC; however, effective RCC repair techniques have not been developed to date. Tile samples will be mounted into the TPS Sample Box Assembly (SBA) and onto the upper surface of the LMC. The EVA crew will translate to the DTO worksite on the LMC, open the SBA protective cover, and use EVA tools such as the CIPAA and Emittance Wash Applicator to repair damaged tile samples. The SSRMS will be used to position EV crewmembers at the worksite. Tile repair objectives include: 1) demonstrate adhesion of ablative repair material using various application techniques and repair depths, 2) perform repairs to be evaluated post flight, 3) demonstrate that tile repair can be accomplished without significant voids in the ablator material, 4) demonstrate that recommended techniques are effective given environmental factors, and 5) evaluate ablator material hardness after it has cured. RCC repair hardware and techniques may also be evaluated if viable methods are developed in time. MV/Orbiter Project Office is responsible for the design and development of this DTO.

2. DTO 850: WATER SPRAY BOILER COOLING WITH WATER/PGME ANTIFREEZE

The purpose of this DTO is confirm ground test results for Water Spray Boiler (WSB) capability post APU shutdown and confirm that coolant usage is within predictions. A special antifreeze of water and propylene glycol monomethyl ether (PGME) mixture will be loaded into WSB 3 only. All three APUs will be shut down per the nominal Post Insertion timeline and allowed to cool. Then APU 3 will be restarted in OPS 8 and allowed to heat until the WSB is commanded to spray. The APU 3 will be restarted while it is still warm but has not cooled below its normal restart limits, thus the restart will be a real-time call based on temperatures. APU 3 is projected to cool to the restart limits around MET 0/03:45 based on previous flight data. After cooling capability has been verified, APU 3 will be shut down again.

I. ON-ORBIT DETAILED SUPPLEMENTAL OBJECTIVES (DSOs)

1. DSO 490B: BIOAVAILABILITY AND PERFORMANCE EFFECTS OF PROMETHAZINE DURING SPACE FLIGHT

The purpose of this DSO is to evaluate Promethazine (PMZ) as an aid for space motion sickness. All participants will don an Actilight watch as soon as possible on orbit, and will record sleep times at wakeup. If motion sickness occurs during the first three days, participants will collect a saliva sample, take PMZ, and complete a series of saliva samples and logs.

2. DSO 493: MONITORING LATENT VIRUS REACTIVATION AND SHEDDING IN ASTRONAUTS

The objective of this DSO is to determine the frequency of induced reactivation of latent viruses, latent virus shedding, and clinical disease after exposure to the physical, physiological, and psychological stressors associated with space flight. Participants will collect a saliva sample and complete a log entry at wakeup.

Page 216: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

5-6 FLT PLN/114/BAS A

3. DSO 633B: RENAL STONE RISK DURING SPACE FLIGHT, ASSESSMENT AND COUNTERMEASURE VALIDATION

The purpose of this DSO is to quantify the risk of renal stone formation associated with space flight, evaluate the effects of dietary intake on the urinary biochemistry, and determine the effects of potassium citrate as a countermeasure in reducing the potential for renal stone formation. Participants will ingest a potassium citrate (Kcit) pill with each evening meal.

4. DSO 634: SLEEP/WAKE ACTIGRAPHY AND LIGHT EXPOSURE DURING SPACE FLIGHT

The objective of this DSO is to monitor sleep/wake activity and light exposure patterns obtained in flight, to better understand and develop countermeasures for insomnia common in space flight. Participants will don an Actilight watch as soon as possible on orbit, and will wear it continuously throughout the mission on their non-dominant wrists outside of their clothing/sleeve. A common Actilight watch is used for DSO 490B. Subjects will also complete a sleep log within 15 min of wakeup every morning.

Page 217: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

6-1 FLT PLN/114/BAS A

FL

IGH

T P

LA

N

WA

LK

TH

RO

UG

H

FLIGHT PLAN WALKTHROUGH

Page 218: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

6-2 FLT PLN/114/BAS A

FL

IGH

T P

LA

N

WA

LK

TH

RO

UG

H

FLIGHT PLAN WALKTHROUGH

Station Activities Performed Prior to Shuttle Docking • Prepacking • LF-1 timeline review • RPM photography training • SSRMS checkouts and move from MBS to Lab PDGF • ITCS sampling • VDS routing • Node 1 nadir CBM checkout • Airlock prep for EVA ops, EMU battery recharge, METOX regen, Safer checkout, and EVA

tool config • CBCS install and checkout • PMA prep for docking

Generic Activities/Constraints • Daily log entries for DSOs 490B and 634 and saliva samples for DSO 493 are collected

every morning at wakeup. A renal stone pill for DSO 633B is ingested with every evening meal.

• A total of 14 CWCs and 8 PWRs are filled and transferred to ISS. CWCs and PWRs cannot be filled at the same time since EECOM would not be able to tell how much water is in each. PWR fills cannot occur during supply nozzle dumps.

• An estimated 90 man-hr are required for MPLM generic transfer, and TBD hr for middeck transfer. Powered payload, EVA equipment, and water bag transfers are scheduled separately from generic transfer. MS4 (loadmaster), MS5 (b/u loadmaster), and ISS CDR will perform a transfer review every docked morning to review the latest uplinked transfer list. A transfer tagup between crewmembers and a transfer call to MCC are scheduled for MS4 and/or MS5 and ISS CDR every docked day starting 2 hr prior to sleep. HRF-2 rack transfer and RSP rotation are not scheduled, per crew request.

• All nominal EVAs are performed using the ISS airlock and the CEVIS exercise prebreathe protocol. The shuttle crew is prime for all SSRMS and EVA tasks. MS1 and MS2 are EVs, MS3 is IV, ISS FE-1 is IV2, and PLT and MS4 are SSRMS operators. MS5 will perform any SRMS tweaks for camera views if necessary although none are scheduled.

• The SRMS is used for OBSS operations and EVA camera views. The SSRMS is used for MPLM operations, OBSS survey camera views, and EVA robotics operations. SSRMS operators are PLT and MS4 and SRMS operators are MS3 and MS5. PLT, MS3, and MS5 are prime for OBSS/SRMS survey operations.

• Water dumps can and will be performed in the docked attitude as long as the centerline of the dump nozzle is aft of the LVLH Y-Z plane (retrograde). The shuttle will hold attitude control during all dump events.

• TFLs: o TFL 192 is required for TCS during rndz tool c/o, rendezvous, and undocking. SSV

Outrate = 3. o TFL 184 is required for MPLM environmental checks and is the default while undocked.

SSV Outrate = 3. o TLF 199 is used while docked. SSV Outrate = 2. o TFL 161 is required for FCS C/O.

• Matrix aligns are required during the docked period because there are no stack maneuvers scheduled for stars of opportunity.

• If reboost is added back to the mission, schedule both CDR and PLT for the first 20 min of procedure, then only one for the rest.

• Post undocked maneuvers and attitude hold periods are performed in ALT DAP to save forward prop.

Page 219: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

6-3 FLT PLN/114/BAS A

Flight Day 1 • MS5 will set up the middeck PGSCs (Kfx, router, color printer), and MS2 will set up the

flight deck PGSCs (2 A31Ps) for ET umbilical photos and WLES sensor data. The crew will download the ET photos and WLES data to the A31Ps as soon as possible so OCA can downlink them for quick ground processing. The crew will also load ET handheld camera still photos to the Kfx machine for downlink. The remainder of the network setup is scheduled on FD2.

• MS1 will downlink the ET handheld camera video during Ku coverage. • The PI, NC-1, and post burn -ZLV attitudes are biased to improve Ku for quick downlink of

ET photos and video and WLES sensor data. • Two hours of P/TV01 setup are completed. This activity sets up all photo/tv equipment

needed for the FD2 OBSS survey. • APCU 1 and OIU are activated so MCC can perform an MPLM environmental check. The

FD1 check is a full check with fan activation. • The RMS init includes deployment of both port and starboard MPMs. RMS C/O is

scheduled on FD1 to allow more OBSS survey time on FD2. The RMS C/O on FD2 will be deleted real-time if accomplished on FD1. The RMS will remain in precradle overnight, thus only step 1 is scheduled for the powerdown.

• WSB DTO is performed by starting APU 3 when the APU is at a good temperature per real time call (~3:45 MET). Elevon park is also included in this procedure since both require Ops 8. NC-1 was moved late to accommodate the Ops 8 transition.

• Actilight watches are donned for DSOs 634 and 490B.

Flight Day 2 • All starboard wing, nose cap, and port wing RCC are surveyed with the OBSS. Three crew

are required continuously during the survey with two performing OBSS/SRMS ops and one monitoring the LDRI and situational awareness cameras. When the three primary crew (PLT, MS3, MS5) are taking a break, MS4 will assist with camera ops. Only two crew are required during unberthing and berthing (non laser ops). The survey is scheduled to continue through the night passes due to time constraints, but the crew may elect to pause if the nighttime visuals are not sufficient. The survey attitude requires no sun within 20 degrees normal to the RCC surface to avoid sun glint. An LDRI 3D calibration during OBSS unberth requires real-time Ku to evaluate laser accuracy. Real-time Ku is not required during the flat-field calibration during the maneuver to the first survey. Each 90-minute surface scan requires as much real-time Ku as possible to downlink DTV. Biased -ZLV attitudes are scheduled to maximize Ku. These maneuvers are scheduled to occur during SRMS repositioning and should be delayed if necessary until the survey is complete. Replay of survey data not obtained real-time will occur in presleep after the crew cues up the tapes using LOS times provided by INCO. The presleep burn attitudes are also biased for Ku. Note: TDRS Z does not have the capability for DTV, thus cannot be used to downlink critical damage data.

• RMS C/O will be deleted real time if accomplished on FD1. • The RMS will remain is precradle overnight, thus no powerdown is required (the precradle

step is in the OBSS berth procedure). • Two EMUs, two PGTs, three CIPAAs, and one Emittance Wash Applicator are checked out.

MS4 will perform the EMU comm check with the EV crew. During the EVA prep for transfer procedure, the crew will pack EMUs 1/2 and EVA tools for transfer to ISS, and remove and pack EMUs 3/4 batteries for use during EVA 2. One safer is in the middeck, but is checked out on FD4 at the same time as the safer in the MPLM.

• Manual FC purge is scheduled early to avoid survey because of possible contamination on the LDRI.

• PGSCs are set up if not completed on FD1. • APCU 1 is activated so MCC can perform an MPLM environmental check (pressure check

only). • Rendezvous prep activities are performed including centerline camera install, rendezvous

tool checkout part 1, ODS ring extension, and rendezvous burns. Centerline camera install

Page 220: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

6-4 FLT PLN/114/BAS A

is required prior to survey because the same monitor is used for the camr crosshair check as for LDRI video. The rndz tool checkout is divided into two parts such that on FD2 the tools are checked out with the RPOP2 machine since RSAD will be running continuously on the prime RPOP machine during survey. Rndz tool checkout must be decoupled with APCU on for MPLM checks due to a TFL conflict. Due to clearances, docking ring extension cannot be performed until the starboard survey is complete. NC2 is scheduled early in post sleep and NPC/NC3 are scheduled late to avoid the survey.

• The airlock fan is turned off for the mission to save cryo per SDTO 12004-U. It is activated before ODS ring extension to provide cooling to docking avionics, and will remain activated during EMU checkout to provide airflow to the crew while they’re working in the airlock.

• P/TV01 setup is completed. • Middeck transfer prep is scheduled to prepare items for transfer to ISS. • CWC fill equipment is set up so that fills can begin immediately after docking. • An A/G only PAO event is scheduled because all available Ku is needed for downlink of

LDRI data. • The CMG heater is activated by 1/02:00 MET for thermal protection. • Sleep begins at MET 1/04:00, two hours earlier than on launch day, to shift the crew for an

early docking and set up the sleep cycle to support EOM landing.

Flight Day 3 • A simo water dump is performed to minimize the amount of waste water dumped during the

docked mission. The maneuver for the dump is uplinked via DEU. • An SRMS end effector survey of upper tile surfaces is performed. Real-time Ku is required

to downlink survey video, therefore the retrograde water dump attitude is +YVV, with a pitch bias to maximize Ku. Replay of any survey data not obtained real-time will occur as soon as possible before the Ku is taken to radar mode. The SRMS must be precradled prior to NH (called out in survey procedure), and will remain precradled through docking.

• Rendezvous tool checkout part 2 is performed after the SRMS survey to configure the prime RPOP machine from RSAD to RPOP operations.

• The condensate collection hardware is setup and collection is initiated. This also minimizes waste dumps during the docked mission.

• The two EMUs are removed from the shuttle airlock and temp stowed prior to docking to facilitate PMA access/transfers after docking.

• As part of the rendezvous procedures, the crew will perform a 360º Rbar pitch maneuver while the ISS crew takes digital photos of the lower and upper tile surfaces. The ISS crew will load these photos onto the network so that ISS OCA can downlink them as soon as Ku is regained after docking.

• The shuttle will dock with the ISS. After docking, leak checks are performed on the PMA and ODS, the ODS is prepared for ingress (centerline camera removed and ducting prepared), and hatches are opened. All crew will participate in a 25-minute safety briefing. The airlock fan is bypassed and deactivated as part of the post docking procedures.

• The shuttle will maneuver the stack to the nominal docked TEA attitude (STS biased -XLV +ZVV) after rates are damped. Once in attitude, the crew will perform attitude control handover from shuttle to RS, and MCC will perform handover from RS to CMGs.

• The PGSC network is reconfigured from the rendezvous configuration to the EVA configuration, and the PCS is set up to monitor ISS status.

• APCU 1 is activated so MCC can perform an MPLM environmental check (pressure check only).

• EVA tools (such as the CIPAAs) to be used during the TPS DTO EVA are transferred to ISS. • The OBSS is unberthed by the SSRMS and handoff from the SSRMS to the SRMS is

completed. Two SRMS crew and two SSRMS crew are required for this entire operation. ISS FE-1 will provide SSRMS support since this is the first use of the SSRMS by the shuttle crew. During SSRMS unberth of the OBSS and maneuver to handoff position, the SRMS cameras will provide clearance monitoring. After handoff is complete, the SSRMS is maneuvered to a position for an overnight MCC commanded petal deploy and seal

Page 221: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

6-5 FLT PLN/114/BAS A

inspection on the Node 1 nadir ACBM. The SRMS/OBSS will remain deployed and powered for the entire docked mission.

• One CWC is filled. • P/TV06 is set up for MPLM operations the next day.

Flight Day 4 • APCU 1 is activated so MCC can perform an MPLM environmental check (pressure check

only) prior to MPLM unberth. • The ROEU is disconnected, the PRLAs unlatched, and the MPLM unberthed from the

payload bay using the SSRMS and installed onto ISS Node 1 nadir. During MPLM install and in the low hover position, the CDR will use the PLB cameras to perform a PCBM seal inspection.

• CBMs are closed after MPLM installation is complete. No exercise is allowed from the start of MPLM installation until bolts are acquired. The 1-hr CBM bolt loading must be completed by MCC before the vestibule can be pressurized. The CBCS is removed and the equipment needed for vestibule config is set up.

• MS4 and ISS CDR will continue with vestibule depress, vestibule config for ingress, MPLM activation parts I and II, MPLM ingress, and MPLM setup. One safer stowed in MPLM is transferred and checked out at the same time as the one stowed in the middeck.

• A placeholder is scheduled for docked OBSS survey. This may be used to complete the nominal FD2 RCC survey if it runs long, or to perform a focused inspection on areas where tile or RCC damage is suspected. The SSRMS must be based on the MBS for situational awareness views, so PLT and ISS FE-1 will perform a walkoff of the SSRMS to the MBS and will maneuver the SSRMS to a viewing position prior to the survey. MS3 is one of the three prime survey crewmembers but he is also IV. Therefore, CDR is scheduled as a third person to assist with video routing while MS3 performs EVA prep activities.

• Several activities are scheduled throughout the day for the EVs and IVs to prepare the EMUs and airlock equipment for EVA 1. The shuttle O2 system is configured for use during EVA prep prebreathe. The two EVs will familiarize themselves with CEVIS as used during EVA prep prebreathe. The EMUs are transferred to the ISS airlock and reconfigured as necessary with parts from ISS. An EMU to airlock interface check is performed, the EVA still camera is set up, the equipment lock and EVA tools are configured, the REBA hardware is checked out, and CIPAA preheat is initiated. CIPAA preheat init must occur on FD4 but no later than 11 hr prior to the EVA. An ~1.5 hr EVA procedure review is conducted between all crewmembers involved with the EVA, including the CDR, EVs, IVs, and SSRMS and SRMS operators.

• N2 transfer from the shuttle to the ISS airlock tanks is initiated. • Two CWCs are filled. • MDDK transfer is performed. • An A/G only PAO event is scheduled because all available Ku is needed for downlink of

LDRI data.

Flight Day 5 • PLT’s comm config is required 4 hr prior to the end of crewlock depress. • EVs will terminate CIPPA preheat prior to EVA Prep. • EVA 1 specific tasks include:

o Tile samples are contained in a Sample Box Assembly (SBA) on the upper surface of the LMC. The EV crew will translate to the DTO worksite, open the SBA protective cover, prime the tile samples, and use 2 CIPAAs and various repair methods to repair the damaged tile samples.

• The crew will perform an SSRMS walkoff from the MBS to the Lab PDGF prior to egress. They will utilize the SSRMS based on the Lab PDGF for EV worksite access. The SSRMS is maneuvered to the EVA 2 position after all EVA tasks are complete.

• Post EVA: H2O recharge is delayed until the following day to maximize presleep. The EMU batteries are removed and replaced with batteries taken from EMUs 3/4 on FD2. The

Page 222: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

6-6 FLT PLN/114/BAS A

METOX is replaced with LiOH, and METOX regeneration is initiated. BSA and EMU battery charging is initiated.

• Two CWCs and one PWR are filled. This PWR fill is required prior to EMU H2O recharge on FD6.

• MPLM transfer continues.

Flight Day 6 • EMU water recharge and METOX regen termination are performed. METOX term is

required ≥14 hr after init (after 16:00 MET). TPS EVA tool transfer and stow is required to get the CIPAAs and other TPS equipment cleaned and stowed back in the middeck.

• The crew will prepare for EVA 2 with equipment lock prep, still camera set up, and EVA tool config. At least 1.5 hr for three crewmembers are required for EVA tool config. A 1-hr (or more) EVA procedure review is conducted between all crewmembers involved with the EVA including the CDR, EVs, IVs, and SSRMS and SRMS operators (all except ISS CDR).

• Several partially full CWCs and expired PWRs from ISS are vented from the shuttle. The CWCs bags are dumped out the supply nozzle and the PWRs out the waste nozzle. Two crew are required for the first hour and only one is required for the remainder of the procedure. The crew will perform attitude control handover from CMGs to shuttle before the dump and back to RS after the dump. Then MCC will perform control handover from RS to CMGs. The PWR dumps are required before the third PWR is filled (currently scheduled for FD8) since the same PWR will be filled. There are no constraints on when the CWC dumps occur.

• The shuttle condensate bag is swapped. This is required no later than FD6. • Two CWCs and one PWR are filled. • MPLM transfer continues. • WLES requires a battery changeout mid-mission. • Shuttle mid-mission reconfigurations are completed. • One Russian and two U.S. PAO events are scheduled using shuttle assets.

Flight Day 7 • PLT’s comm config is required 4 hr prior to the end of crewlock depress. • EVs will terminate BSA battery charging prior to EVA Prep. • A wastewater dump is performed. The crew will perform attitude control handover from

CMGs to shuttle before the dump and back to RS after the dump. Then MCC will perform control handover from RS to CMGs.

• EVA 2 specific tasks include: o A complete R&R of CMG-1 is performed. The failed CMG is removed from the Z1 truss

and replaced with a spare CMG, which is launched on a Lightweight MPESS Carrier (LMC) in the PLB. The failed CMG is returned on the LMC.

o MCC will unpower the CMG electronics assembly prior to the R&R (included in inhibits). After three of the connectors are mated, MCC will power up the electronics assembly and the crew will perform a CMG aliveness check.

• The crew will utilize the SSRMS based on the Lab PDGF for EV worksite access. The SSRMS is maneuvered to the EVA 3 position after all EVA tasks are complete.

• Post-EVA: H2O recharge and EMU METOX/LiOH/battery replacement are delayed until the following day to maximize presleep. METOX regeneration is initiated on a stowed canister.

• Two CWCs are filled. • MPLM transfer continues. • The heater is turned off for the old CMG in the PLB.

Flight Day 8 • EMU water recharge and METOX regen termination are performed. METOX term is

required ≥14 hr after init (after 16:00 MET). EMU batteries are replaced with the ones charged after EVA 1, and LiOH is replaced with METOX.

Page 223: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

6-7 FLT PLN/114/BAS A

• The crew will prepare for EVA 3 with equipment lock prep, still camera set up, and EVA tool config. At least 1.5 hr for three crewmembers are required for EVA tool config. A 1-hr EVA procedure review is conducted between all crewmembers involved with the EVA including the CDR, EVs, IVs, and SSRMS and SRMS operators (all except ISS CDR).

• The joint crew news conference, crew photo, and a JAXA event for MS1 are scheduled using shuttle assets. The JAXA event is highly desired during daylight hours in Japan (GMT + 9 hr).

• A joint crew meal is scheduled per crew request. • One CWC and three PWRs are filled. • MPLM transfer continues. • Three hours of off duty are scheduled for the shuttle crew, with the remainder scheduled

post undock. Off duty is not required for the ISS crew but they will not perform any joint activities during this time period.

• Illuminators are activated, OBSS ITVC is enabled, and DTV is configured for downlink prior to crew sleep for ground controlled video overnight.

Flight Day 9 • Illuminators are deactivated. • PLT’s comm config is required 4 hr prior to the end of crewlock depress. • A dump of one of the shuttle condensate bags is performed through the waste nozzle. The

crew will perform attitude control handover from CMGs to shuttle before the dump and back to RS after the dump. Then MCC will perform control handover from RS to CMGs.

• EVA 3 specific tasks include: o The ESP Attachment Device (ESPAD) is installed on the ISS airlock, the ESP-2 is

berthed to the ESPAD, and the power cables are connected. CDR/MS5 will unlatch the PRLAs prior to ESP-2 unberthing from the PLB. After ESP-2 install is complete, MCC will power up and checkout the ESP heaters. ESP-2 contains critical spares.

o The MISSE Payload Experiment Carriers (PECs) 1 and 2 are removed from the ISS airlock and replaced with PEC 5.

o The FRGF is removed from ESP-2 and stowed in the starboard TSA for return. • The crew will utilize the SSRMS based on the Lab PDGF for EV worksite access and to

install the ESP-2. The SSRMS will grapple the MPLM after all EVA tasks are complete. • No exercise is allowed during ESP-2 installation until hard capture. • All post EVA activities are performed including H2O recharge. METOX regeneration is

initiated on a stowed canister. • Two CWCs are filled. • The CBM CPA installation occurs at the end of the day, allowing MCC to do a complete

checkout overnight in preparation for the MPLM uninstall on FD10. After the CPAs are installed the crew will only be able to transfer smaller MPLM items.

• MPLM transfer concludes. Due to cg limitations, a percentage of the MPLM return items cannot be brought back if the ESP-2 is still in the PLB. Therefore, a few hours of transfer are scheduled after ESP-2 install to allow the crew time to stow these items in the MPLM. MS4 specifically is scheduled to stow EVA hardware in the MPLM.

• The MPLM racks are configured for entry. • Generic repress is performed to repress the cabin to 14.7 psi. • Illuminators are activated, OBSS ITVC is enabled, and DTV is configured for downlink prior

to crew sleep for ground controlled video overnight.

Flight Day 10 • Illuminators are deactivated. • EMUs 3 and 4 are checked out and transferred to ISS. EMU resize and reconfig is

performed to leave usable EMUs 3/4 and parts of EMUs 1/2 onboard ISS, and to transfer EMUs 1/2 back to shuttle. The crew will clean up the airlock and stow tools during EVA tool stow.

Page 224: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

6-8 FLT PLN/114/BAS A

• METOX regen termination is performed. METOX term is required ≥14 hr after init (after 16:00 MET).

• MPLM cleanup and transfer call will occur before egress. This is the final time to transfer any last minute items to/from the MPLM. MS5 and ISS CDR will perform MPLM egress, deactivation, vestibule configuration, and vestibule depress. Note that a different shuttle crewmember will perform MPLM vestibule ops on FD10 as on FD4 to avoid SCSC exceptions.

• After vestibule depress, the crew will perform Node 1 nadir CBM demate, and uninstall and reberth the MPLM in the PLB using the SSRMS. No exercise is allowed during CBM demate and MPLM uninstall. The MPLM heaters are turned on for about 4 hr. APCU 1 is activated so MCC can perform a full environmental check.

• The OBSS handoff from the SRMS to the SSRMS is completed and the SSRMS will reberth the OBSS in the PLB. Two SRMS crew and two SSRMS crew are required for this entire operation. During SSRMS maneuvering after OBSS grapple and during reberthing, the SRMS cameras will provide clearance monitoring. After the OBSS is reberthed, the SSRMS is maneuvered to an undock viewing position and the SRMS is powered down.

• The PCG-STES 10 powered payload is transferred from ISS to the shuttle middeck. Two crewmembers are required for one hr each. A status check is performed every morning and evening after the payload is transferred to shuttle.

• Two CWCs and three PWRs are filled. • The shuttle O2 prebreathe equipment is torn down. • N2 transfer from the shuttle to the ISS airlock tanks is terminated. • MDDK transfer concludes. • Rendezvous tool checkout is completed to support undock. The checkout is divided into two

parts such that on FD10 the tools are checked out with the RPOP2 machine since RSAD will be running continuously on the prime RPOP machine during MPLM berthing. Rndz tool c/o must be decoupled with APCU on for MPLM checks due to a TFL conflict.

• One U.S. PAO event is scheduled using shuttle assets. • P/TV08 ISS external survey is performed over a daylight pass. • Illuminators are activated, OBSS ITVC is enabled, and DTV is configured for downlink prior

to crew sleep for ground controlled video overnight.

Flight Day 11 • A PCG-STES 10 status check is performed in the morning and evening. • The crew will close the hatch between vehicles, perform an ODS leak check, and install the

centerline camera. • Rendezvous tool checkout part 2 is performed to configure the prime RPOP machine from

RSAD to RPOP operations. • MPLM heaters are activated for ~9 hr. • The formaldehyde monitoring kit (FMK) deploy is performed. It must be stowed after 48 hr. • MCC will perform handover of attitude control from CMGs to RS. Then the crew will perform

handover from RS to shuttle and maneuver to undock attitude. • Undocking is performed at sunrise minus 5 minutes. Flyaround is low on the priority list and

was not scheduled in order to allow sufficient transfer time by maximizing post undock off duty.

• The starboard and port MPMs are stowed. • Illuminators are deactivated. • APCU 1 is activated so MCC can perform an MPLM environmental check (pressure check

only). • The centerline camera is removed from the ODS. • The airlock fan is deactivated. • The comm system is switched to comm string 1 to check out that string. • A maneuver to -ZLV +YVV attitude is performed soon after undocking and a simo and

condensate bag dump is performed later in the day once ISS is out of range for dump particle recontact.

Page 225: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

6-9 FLT PLN/114/BAS A

• Approximately 4 to 5 hr of off-duty is scheduled for all crewmembers. • PFCs are scheduled for each crewmember during off duty.

Flight Day 12 • A PCG-STES 10 status check is performed in the morning and evening. • APCU 1 is activated so MCC can perform an MPLM environmental check (pressure check

only). Once this last MPLM check is complete, the OIU is deactivated. • Standard day before entry activities are performed: FCS checkout, RCS hotfire, PILOT ops,

deorbit briefing, L-1 comm checks, cabin stow, entry video setup, SSV deact, ergometer stow, Ku stow, PGSC stow, and MFX setup.

• A procedure to position the elevons for inspection is performed anytime after undocking. • MPLM heaters are activated for ~13 hr. • The PRLAs that were unlatched during ESP-2 unberth are closed. • One U.S. PAO event is scheduled for all crewmembers. • EVA hardware stow and post EVA entry prep are performed. • A FES dump is performed for 3 hr. • A dedicated IMU alignment and HUD calibration are performed during a night pass. This is

required since the HUD has been removed and reinstalled in the vehicle. • The WLES A31P and equipment is stowed. • The comm system is switched back to comm string 2 after 24 hr.

Flight Day 13 • Standard entry day activities are performed: IMU align, GIRA stow, TEPC stow, air sample,

OCAC stow, PGSC and printer stow, group B powerup, and mnvr to -XSI. • The MPLM heaters are activated. They are deactivated in D/O prep. • The DSO actilight watches are stowed after final log. • The formaldehyde monitoring kit (FMK) stow is performed after 48 hr of deployment. • A PCG-STES 10 status check is performed. • Deorbit prep and landing at KSC.

Page 226: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

6-10 FLT PLN/114/BAS A

This Page Intentionally Blank

Page 227: Flight Plan - NASAviii FLT PLN/114/BAS A INTRODUCTION The STS-114 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

Flight Cover (trim bottom to expose tabs)

JSC-48000-114 BASIC, REV A

FLIGHT PLAN STS

114